AGENDA DATE: June 16, 2020
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
signature on the Local Agency Federal Aid Project
Prospectus for the Bullfrog Road Project, CRP 300-20.
BACKGROUND: On January 15, 2020 Kittitas County Board of County
Commissioners put in place a temporary speed reduction on
Bullfrog Road responding to unforeseen significant
roadway deterioration (Resolution 2020-001). This speed
reduction was to minimize damage to the roadway and to
vehicles using Bullfrog Road. Kittitas County Public
Works has been preparing a design and assembling a
construction contract advertisement to repair the damaged
and deteriorating roadway.
This Project Prospectus covers the Federal Funding portion
for the Surface Transportation Block Grant and Highway
Infrastructure Funding construction phase and needs to be
approved by WSDOT Local Programs. The approval needs
to happen so W SDOT can obligate the federal funds for the
construction phase.
Public Works is preparing to advertise for construction in
July 2020. This requires the Local Agency Federal Aid
Project Prospectus to be signed and approved by the Chair
of the BOCC.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Bullfrog Road Project, CRP 300-20.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS FOR THE VANTAGE HIGHWAY
PROJECT, CRP 298-19
WHEREAS: Deteriorating pavement during the 2019/20 winter along Bullfrog Road
resulted in a temporary speed reduction mitigating against increasing
safety concerns for travels (Resolution 2020-001); and
WHEREAS: The Bullfrog Road Project proposed using Federal Funds (Surface
Transportation Block Grant and Highway Infrastructure Funding) to repair
the damaged and deteriorating portions of Bullfrog Road; and
WHEREAS: This project will remove asphalt in the damaged locations and replace it
with new hot mix asphalt and install new roadway striping on the entire
length of Bullfrog Road; and
WHEREAS: In preparation to advertise the project for construction in July of 2020
Public Works is requesting the Washington State Department of
Transportation to release the Federal Funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the Bullfrog Road
Project, CRP 300-20.
DATED on this 16th day of June, 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY,
WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
Washington State
Aft
�AP Department of Utrsnsportation Local Project Federal Aid
Prospectus
Prefix Route ( ) Dete
Federal Aid
Project Number DUNS Number 01-020-2547
Local Agency RC 2002 -ST, CRP300-20 WSDOT Federal Employer 91-601349
Project Number ( Use Only Tax ID Number
Agency TAgency Federal Program Title
Kittitas County Public WorksYes ❑ No ❑✓ 20.205 ❑ Other
Project Title Start Latitude N 47 I I'4.95" Start Longitude W 121 0'54.67"
Bullfrog Road End Latitude N 47 12'26.82" End Lon itude W 120 58'55.30"
Project Termini From -To Nearest City Name Project Zip Code (+4)
0.00 2.70 Cle Elum 98922-8700
Begin Mile Post
0.00
End Mile Post
2.70
Length of Project
2.70
Award Type
❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
R/W
0.00
2.70
509-962-7019
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
519100
Phase
Cost
Nearest Hundred Dollar
I-V----'
Funding
Nearest Hundred Dollar
Federal Funds
Nearest Hundred Dollar
V"p'V 011.01111.Estimated
Date
Month Year
P. E.
50000
50000
Local Agency Contact Person
03/2020
R/W
Darren Case
Construction Manager
509-962-7019
Mailing Address
411 North Ruby, Suite 1
Const.
666100
147000
519100
07/2020
Total
716100
197000
519100
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
34'-66'
2-3
The asphalt overlay on the roadway is failing in two sections, there are many potholes and delamination is very
visible.
Description of Proposed Work
Description of Proposed Worko(Attach additional sheet(s) if necessary
Bullfrog Road is part of Exits off of I-90 servicing Suncadia and Ras yn. Bullfrog Road is experiencing pavement failure creating a hazard for the
traveling public. Work will include milling the existing roadway and overlaying with hot mix asphalt to provide anew roadway surface. The two
sections that will be repaired - approx. MP 0.55 -MP 0.90 and MP 1.75 -MP 2.25. Final pavement striping will be included for the entire length of
the project MP 0.00 -MP 2.70. The roadway will remain open to traffic during construction and temporary traffic control utilizing a pilot vehicle
will utilize the entire section from MP 0.00 -MP 2.70.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
411 North Ruby, Suite 1
City
Ellensburg
State
WA
Zip Code
98926
By
Project Prospectus
Approving Authority
DOT Fnrm 1AF_1n1
Title Public Works Director/ County Engineer
Revised 042015 Previous Editions Obsolete - rage 1
Agency
Project Title
Date
Kittitas County Public works
Bullfrog Road
Type of Proposed Work
Project Type (Check all thatApply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
10'-28'
1-2
❑ Reconstruction ❑ Pedestrian / Facilities
0✓ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
Principal Arterial
Federal
❑ Urban
❑ MinorArterial
❑ Urban
❑ Minor Arterial
FunctionalElcollector
�✓ Rural
El Rural
El Collector
Classification
NHS
Z Major Collector
NHS
El Major Collector
El Minor Collector
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
❑✓ Flat ❑ Roll ❑ Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
35-50
Design Speed
35-50
Existing ADT
3507-4166
Design Year ADT
3507-4166
Design Year
2020
Design Hourly Volume (DHV)
222-255
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County Forces
%
100
Construction Will Be Performed By
Contract
Agency
Contractor
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
[:]Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPASection 404
Interagency Agreements
Environmental Considerations
n07 Fnrm �an_im
Revised 0412015 Previous Editions Obsolete Page 2
Agency Project Title Date
Kittitas County Public Works Bullfrog Road
Right of Way
No Right of Way Needed ❑ Right of Way Needed
"AII construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
✓❑ No utility work required ❑✓ No railroad work required
❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑AII utility work will be completed in coordination ❑AII the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
There should not be any utility work required. If conflicts are discovered during design, the utilities will be
relocated by the owner prior to construction.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? [:]Yes Z No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 04/2015 Previous Editions Obsolete