My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Award_LickCreekProject
>
Meetings
>
2020
>
05. May
>
2020-05-19 10:00 AM - Commissioners' Agenda
>
Resolution_Award_LickCreekProject
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:20:28 PM
Creation date
5/14/2020 1:20:23 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution to Award a Contract for the Teanaway Hydraulic Improvements Phase 2: Lick Creek Culvert Replacement Project and Authorize the Public Works Director to Execute said Contract
Order
8
Placement
Consent Agenda
Row ID
62455
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />Board of County Commissioners <br />AGENDA STAFF REPORT <br />AGENDA DATE: May 19, 2020 <br />ACTION REQUESTED: Request to Approve a Resolution to Award the Contract for the <br />Teanaway Hydraulic Improvements Phase 2: Lick Creek Culvert <br />Replacement and authorize the Public Works Director to execute the <br />same. <br />BACKGROUND: On April 7, 2020 the Kittitas County Board of County Commissioners <br />authorized a Notice of Call for Bids for the Teanaway Hydraulic <br />Improvements Phase 2: Lick Creek Culvert Replacement Project. The <br />project is funded through the Federal Lands Access Program (Federal <br />Highway Administration) and Kittitas County. This project is the <br />second phase of the Teanaway Hydraulic Improvements, with phase <br />one, Story Creek, being successfully completed in 2019. <br />The project will include the improvement of North Fork Teanaway <br />Road at Lick Creek by roadway excavation, structure excavation, <br />precast concrete structure installation, streambed excavation and <br />embankment, isolation structure installation, detour construction and <br />removal, roadway surfacing and paving, guardrail, pavement <br />markings, traffic control, channel excavation and other work all in <br />accordance with the Contract Plans, Contract Provisions, and the <br />Standard Specifications. <br />Kittitas County Public Works received 10 sealed bids for the project. <br />The lowest qualified bidder was J & K Earthworks, Inc. with a bid <br />total of $1,252,380.00. The engineers estimate for the project was <br />$1,397,698.00. If the structure cannot be procured in time for <br />construction this season, construction will begin June 28, 2021. <br />INTERACTION: Public Works <br />RECOMMENDATION: Approve the resolution to award the contract for the Teanaway <br />Hydraulic Improvements Phase 2: Lick Creek Culvert Replacement <br />and authorize the Public Works Director to execute the same. <br />HANDLING: Original — Public Works <br />ATTACHMENTS: Resolution; Bid Tab <br />LEAD STAFF: Mark Cook <br />Public Works Director/County Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.