2. Request to Approve a Resolution to Award the Bid for the Design, Fabricating, Finishing
and Transporting a Steel Modular Bridge (Big Boulder Creek Bridge Replacement) and
Authorize the Public Works Director to Execute Contract Documents
3. Weihl Road Update
4. Upper County Shop Construction Project Position
5. Permitting Update
6. Oakes Avenue Vacation Request
7. Other business
8. Adjourn
Created on 3/8/2019 8:43:19 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM MARCH 11, 2019
Board members present: Chairman Cory Wright; Vice Chairman Brett
Wachsmith; Commissioner Laura Osiadacz
Others: Mark Cook, Candie Leader, Public Works; Dan Carlson, Calvana
Carper, Pat Nicholson, Community Development Services
At 1:48 pm Chairman Cory Wright opened the Public Works Study Session.
REQUEST TO APPROVE A RESOLUTION TO AWARD THE BID FOR THE DESIGN,
FABRICATING, FINISHING AND TRANSPORTING A STEEL MODULAR BRIDGE (BIG
BOULDER CREEK BRIDGE REPLACEMENT) AND AUTHORIZE THE PUBLIC WORKS
DIRECTOR TO EXECUTE CONTRACT DOCUMENTS
Mark Cook presented the resolution for approval and gave background on
the project. Mark Cook stated that the bridge procurement was done
ahead of bidding out the construction project due to permitting
timelines. Mark Cook continued that one bid was received and the bid
amount was under the Engineer's estimate. Discussion was held. Vice
Chairman Brett Wachsmith made a motion to approve Resolution 2019-051
to Award the Bid for the Design, Fabricating, Finishing and
Transporting a Steel Modular Bridge (Big Boulder Creek Bridge
Replacement) and Authorize the Public Works Director to execute
Contract Documents. Commissioner Laura Osiadacz seconded the motion.
Motion passed 3-0.
WEIHL ROAD UPDATE
Mark Cook gave background on the project and stated that recently a
private landowner has been exploring the option of building the road
with private funds. Mark Cook stated that in these discussions the
landowner has contacted property owners in the area soliciting
interest in getting property donated to build the road without the MSE
wall in place as shown in the original plans. Mark Cook continued
that the project, as previously approved, is ready to go to bid but
with this development it could lower the cost of the project
significantly. Mark Cook added that if this option was to be followed
it would cost around twenty five thousand dollars ($25,000) to redraw
the plans. Discussion was held. Staff was directed to look into the
alternate project and move forward with the redesign if the land can
be acquired to support the new project.
2019-03-11 MINUTES
UPPER COUNTY SHOP CONSTRUCTION PROJECT POSITION
Mark Cook reported that building permits have been submitted for the
Upper County Shop project. Mark Cook continued that this project is
going to require an additional staff member for management of the
project. Mark Cook added that he solicited for consultant costs that
are currently at one hundred ($100) dollars per hour. Mark Cook
stated that the Road Maintenance Supervisor spoke with a previous
county employee that has the experience necessary to help facilitate
the project needs. Mark Cook continued that he is requesting the
Board give him permission to create this position and go out to ad
after working through the benefit issues with Human Resources.
Discussion was held. Staff was directed to move forward with creating
the position.
PERMITTING UPDATE
Mark Cook stated that recently a developer submitted a permit for the
construction of a private bridge to Community Development Services for
review. Mark Cook continued that during this process staff recognized
the need to place this permit and action with Public Works staff
moving forward. Mark Cook added that a permit is being drafted to
facilitate this change in process. Mark Cook stated that staff would
like to look at a couple other permit changes including a change in
access permitting for customers that are simply removing a
manufactured home and replacing with stick built as one example. Mark
Cook added that the last change would be to address plates and that
due to the high fee for a replacement plate the public is making their
own using supplies from local hardware stores. Discussion was held.
Staff was directed to do a rate model and present at a future study
session for further discussion.
OAKES AVENUE VACATION REQUEST
Mark Cook reported that the City of Cle Elum is interested in
acquiring a tax parcel for future development. Mark Cook stated that
the City of Cle Elum owns the surrounding land to the north and south
of the parcel and staff would like to move forward with setting a
public hearing to consider the vacation of the parcel to the City of
Cle Elum. Mark Cook added that the parcel is tax title property and
has no benefit to the county. Discussion was held. Staff was
directed to find the value of the tax parcel and then have a
discussion regarding fees.
OTHER BUSINESS
FLOOD PREPARATION
Mark Cook reported that warmer temperatures are in the forecast that
could cause some flooding concerns. Mark Cook stated that staff has
done sign inventory and ordered additional signs in preparation of any
event. Mark Cook continued that sandbags were delivered to Upper
2019-03-11 MINUTES
County as well and staff is prepping the temporary bridges in
inventory in case they are needed. Mark Cook added that the crew
discussed auto loaders for sandbagging and felt that these machines
don't cut down on preparation time.
CONFERENCE OF GOVERNMENT SCORING REVISIONS
Mark Cook stated that last year that the Conference of Government
(COG) updated their policies and procedures. Mark Cook continued that
he met with two members of COG to work on a new scoring tool due to
some of the categories being misused or not completely understood.
Mark Cook added that he will be presenting the draft changes to COG at
the upcoming meeting and will report back after a final recommendation
is made.
Meeting adjourned at 2:38 pm.
2019-03-11 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO. v
RESOLUTION TO AWARD THE BID FOR DESIGN, FABRICATING, FINISHING AND
TRANSPORTING A STEEL MODULAR BRIDGE AND AUTHORIZE THE PUBLIC WORKS
DIRECTOR TO EXECUTE SAID CONTRACT
WHEREAS: The Big Boulder Bridge Replacement project is identified in the County's adopted
transportation improvement plan for 2019; and
WHEREAS: Said project is listed on the adopted Six -Year Transportation Improvement Plan for the
Years 2019-2024 by Resolution 2018-207 and the adopted 2019 Annual Construction
Program by Resolution 2018-208; and
WHEREAS: Project permitting timelines do not support having the project contractor procure the steel
bridge superstructure; and
WHEREAS: The Department of Public Works solicited bids for the procurement of a 40 foot steel
modular bridge in accordance with RCW 36.77.020 Contract Procedures; and
WHEREAS: Sealed bids were opened on March 7, 2019 at 10:00 am in the Kittitas County Permit
Center, Department of Public Works, 411 N. Ruby Street, Suite 1, Ellensburg,
Washington; and
WHEREAS: One (1) bid was received from Big R Bridge for the prescribed work. The Public Works
Department recommends the low responsive bid from Big R Bridge be accepted.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby award the contract for the Design, Fabricating, Finishing and Transporting a
Steel Modular Bridge to Big R Bridge in the amount of $48,190.68.
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the contract
documents for said project.
DATED this 11th day of March, 2019, at Ellensburg, Washington.
.....
Cc r, IMl,�";
:�•. --- 'mss
Clerk of the'104d- Julie Kjorsvik
9S
L`Y Idap,,G I�Yk of the Board- Mandy Buchholz
T
BOARD OF COUNTY COMMISSIONERS
KITTITAS COJJyfI'Y, WASHINGTON
Cory Wright, Chairman
Brett Wachs mith, Vice -Chairman
Liurg`bsiaCommissioner
cs
C=5
;
0
ImI
\
V)
\
§ ( j j
Z
( } !
g
2 ! _
k
-
-
2
S j \ ( ±
-
°
k
\
k c § j \ \ }
° g m - -
2
z
@ � ° % j j
§
•
_
§ ± e g §
\
/
§
§
E § )
,
$
&
� 3 2
§
Lu
2
§
(
\
>
�
\
/
\
<
\
\
}
c:
-}
\
j
7-a
\
C:
�
/
e:/
j
¢,
tz
\
ro
\
\
e
? (
}
/
L
k
}
E
_
\
»§
C-)
°\
E
z
;.0
}�/
g
\§
\ <;
\
-
)
§
§
/LL
\
\ (
k
f
k
=
•
\
co`
k
-=
u
k
E
u
}
[
$
LU
_\/
§
F—
2§
`
}
0
§
/
2
a3
/?
-
-
\
±
c
3
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 11, 2019
ACTION REQUESTED: Approve the Resolution to Award the Bid for Design,
Fabricating, Finishing and Transporting a Steel Modular
Bridge (Big Boulder Creek Bridge Replacement) and
Authorize the Public Works Director to Execute Contract
Documents
BACKGROUND: The Department of Public Works solicited bids for the
procurement of a 40 foot steel bridge for the replacement of
the bridge at Big Boulder Creek in summer of 2019.
Sealed bids were received by Public Works on March 7,
2019 at 10:00 a.m. The engineers estimate for the project
was $75,900.00.
One (1) bid was received for the prescribed work. Public
Works recommends awarding the contract to Big R Bridge
for the amount of $48,190.68 approximately 57% under the
engineers estimate.
Bids will be solicited for the installation of said bridge at a
later date.
INTERACTION: Public Works
RECOMMENDATION: Move to approve a resolution awarding the Contract for
Design, Fabricating, Finishing and Transporting a Steel
Modular Bridge (Big Boulder Creek Bridge Replacement)
and Authorize the Public Works Director to Execute the
Same.
HANDTLING: Return one (1) copy to Public Works
AT'T'ACHMENTS: Resolution, Bid Tabs
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.
RESOLUTION TO AWARD THE BID FOR DESIGN, FABRICATING, FINISHING AND
TRANSPORTING A STEEL MODULAR BRIDGE AND AUTHORIZE THE PUBLIC WORKS
DIRECTOR TO EXECUTE SAID CONTRACT
WHEREAS: The Big Boulder Bridge Replacement project is identified in the County's adopted
transportation improvement plan for 2019; and
WHEREAS: Said project is listed on the adopted Six -Year Transportation Improvement Plan for the
Years 2019-2024 by Resolution 2018-207 and the adopted 2019 Annual Construction
Program by Resolution 2018-208; and
WHEREAS: Project permitting timelines do not support having the project contractor procure the steel
bridge superstructure; and
WHEREAS: The Department of Public Works solicited bids for the procurement of a 40 foot steel
modular bridge in accordance with RCW 36.77.020 Contract Procedures; and
WHEREAS: Sealed bids were opened on March 7, 2019 at 10:00 am in the Kittitas County Permit
Center, Department of Public Works, 411 N. Ruby Street, Suite 1, Ellensburg,
Washington; and
WHEREAS: One (1) bid was received from Big R Bridge for the prescribed work. The Public Works
Department recommends the low responsive bid from Big R Bridge be accepted.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby award the contract for the Design, Fabricating, Finishing and Transporting a
Steel Modular Bridge to Big R Bridge in the amount of $48,190.68.
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the contract
documents for said project.
DATED this I Ith day of March, 2019, at Ellensburg, Washington.
Attest:
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
❑ Clerk of the Board- Julie Kjorsvik
Brett Wachsmith, Vice-Chainnan
❑ Deputy Clerk of the Board- Mandy Buchholz
Laura Osiadacz, Commissioner
06
CK5
`
�
Am
�
co
co
/
/
_\
}
C
*
£ ® § ) e e <
W° <
g
§ * §
'
E \ $ < § & )
%
co n
°
/
k j § } < § *
)
\
e
*
o z E ; §
;
\
( ) )
}
/
} CO
)
z
u
I o $ )
,
ƒ
<
w
( k
§
w
.
_
8
3
/
&
0
§
I
_
=
\
�
)
\
//
-
\
jCL
LLI
c
kkƒ
0\
\
5LLJ
M
(D
ƒ
®°
\ /
°
w
f
}\\
g
±
\
°
-
§ ƒ k
§
\
[
S
$
§
+
S
�)`
r
§
Q
2
z
®
\««
§
s
G
=a
£»
g°
�_
-
^
\§
cE
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 11, 2019
TOPIC: Weihl Road Update
ACTION REQUESTED: None required.
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Advertise for construction.
BRIEFING SUMMARY:
• Plans and specifications supporting Weihl Road improvement construction are
ready to advertise
• Recent attempts to pursue private construction have failed
• Public Works (PW) has re-evaluated the project eliminating the Mechanically
Stabilized Earth (MSE) wall and cutting into the hillside as an alternative
• Significant cost savings appear possible associated with the alternative
• 2019 construction is unlikely if PW pursues right of way acquisition
BACKGROUND:
Recently, the Board of County Commissioners formed RID No. 2018-01 (Weihl Road).
The current improvement plan includes construction of a MSE wall avoiding right of way
acquisition. A member of the RID is attempting to build the improvements privately but
is running into multiple issues. As a result of his efforts, I asked our design consultant
(KPG) to re-evaluate the feasibility of eliminating the MSE wall and cutting into the
existing bank.
DISCUSSION:
Eliminating the MSE wall significantly reduces project cost from $797,000 to $624,000.
If the Board elects to apply the Board pledged contribution ($273,000) towards a revised
project eliminating the MSE wall, RID contributions will reduce from $740 per year (15
years) to approximately $425/lot per year for a 15 year cost recovery period (assumes 65
lots and interest rate of 2.5%).
The impacts to two property owners (hillside) are not insignificant (EXHIBIT 1). It
appears that as much as sixteen (16) feet of bank loss from the current condition is likely.
Providing area residents do not elect to sale the required bank real estate, the Board could
consider condemnation — though this avenue appears unlikely. Redesign of the project
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
will add approximately $25,000 in design fees and likely force the project to fall
construction or into 2020 depending on right of way negotiations. These considerations
drove PW's decision to build the MSE wall. If area residents are able to secure the
necessary right of way supporting MSE wall elimination, then a donation of land is
required to keep the project on course for 2019 delivery.
FISCAL IMPACTS:
See above discussion.
ATTACHMENTS:
Exhibit 1: Profile view of bank impact.
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT I: PROFILE VIEW OF BANK IMPACT
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
i
,96'LC=MO8 �-
,90"zz-=Mo1
Lb'N=MOH
,99'9z—=Mod--------
0 0 0 0 0 0 0 0
m rn ami m o rn rn m
Ln
+ °u
to F
r
w
N
W
0
Lb'N=MOH
,99'9z—=Mod--------
0 0 0 0 0 0 0 0
m rn ami m o rn rn m
Ln
+ °u
to F
0 o
o p
y o 0 0
o 0
j 0
N
O
D
Z
W
J
--
O O W O O
Z N
� LL
_ O
,09'X=Moa
as
0
O
N
,zs sz-=Moa--------------,---
0 0 0 0 0
0 o a o s
N N N N N
LU
Z
o W
F
J
Q
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE:
TOPIC:
ACTION REQUESTED:
LEAD STAFF:
Mark R. Cook
March 11, 2019
Upper County Shop Construction Project
Position
Authorize Public Works to Finalize a Project
Position with Human Resources
RECOMMENDATION:
Authorize Public Works (PW) to finalize a project position supporting construction
management during Upper County Shop construction.
BRIEFING SUMMARY:
a Attempts to secure construction management services from KPG have failed
a Public Works (PW) has secured interest in a project position from a previous
County employee with significant building construction experience
a $60 per hour is anticipated for compensation (KPG is suggesting $100/hour if
they provide service)
BACKGROUND:
Upper County Shop (UCS) construction is nearing. We anticipate requesting advertising
on March 19, 2019 with a bid opening on April I Oa'. Bid award is anticipated on April
16a'. Construction could begin mid-May 2019.
DISCUSSION:
PW does not have qualified vertical construction inspection experience that can support
the UCS build schedule. For the past several months, PW has been investigating the
possibility of contracting service through KPG or Jacobs. Resources do not appear to be
readily available.
It appears that a retired County building official is interested in supporting our UCS
project. The project employee would provide inspector daily reports and coordinate
contractor and material testing needs with PW. The employee would set their own work
schedule working part time as appropriate.
Pagel of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FISCAL IMPACTS:
KPG is suggesting a compensation rate of $100 per hour is likely if they are required to
be the service provider — likely through subcontracting. PW is suggesting an hourly rate
of $60 is appropriate for the project position. Section 2.2 of the Personnel Policies
Manual is provided below for use.
Project employees are those whose length of employment is either contingent on state,
federal, or other funding and of specific time limited duration, or tied to a project of more
than 2 months in duration. The designation of competitive project employment will be
initiated and approved by the Human Resources Director and/or the authorized proposing
agency designee. They may be eligible for a full or partial benefits package dependent
upon the length of the project, the funding, and the desire of the Department Head or
Elected Official. Benefits for a project employee must be approved in advance by the
Board of County Commissioners. Project employment is generally limited to a period of
one (1) year or the term of the project, whichever is greater. Project employees will be
notified by the date of hire of the "at will" nature of their employment and the expected
date of termination
ATTACHMENTS:
None.
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 11, 2019
TOPIC: Permitting Update
ACTION REQUESTED: Acknowledge Staff Efforts
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Acknowledge staff efforts updating Public Works (PW) permitting structure.
BRIEFING SUMMARY:
• Recent private bridge proposal is driving a review of County process
• PW has taken private bridge design review back from the Building Department
• PW is leading a new private bridge permit workflow
• New construction with an existing access permit is being re -considered for Board
review
• Current pricing structure for address permits has resulted in residents making their
own plates and not using County plates
BACKGROUND:
Recently, PW noticed the building department that we would be taking over private
bridge design and construction oversight for the County. Currently, PW has a private
bridge inspection fee ($3,370) with direct cost recovery.
Currently, an existing access permit is revisited when the parcel land use changes. For
example a mobile home is moved off of the parcel and a home is built in its place. PW
charges a full access permit fee as we conduct a site visit and note any necessary repairs
or alterations in the access.
During 2018, the cost for address plates was raised pursuant to PW's rate study. The cost
of the plates was raised to $50 from $5. As a result, residents are making their own plates
and we are losing the benefit of consistency in plate appearance.
DISCUSSION:
PW proposes retitling the bridge inspection permit to "private bridge design/inspection".
A recent private bridge proposal is driving our need to review and consolidate the private
bridge design/construction process. PW is currently coordinating with CDS further
defining the review process.
Page I of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Occasionally, no alteration to an existing access culvert is required and the applicant is
left feeling like PW "stuck" them with a fee for no service. It might be prudent to allow
the Director to make partial refunds (50%) for instances of re-inspection with no access
alteration required.
Relative to the cost of issuing address plates; we propose lowering the cost of address
plates to $25 and monitoring plate activity.
FISCAL IMPACTS:
PW believes the private bridge design/inspection permit is good for now — lack of any
real activity. Partial access permit refunds will create a need to supplement with Road
Fund. Reducing the cost of address plate production will likely also require
supplementing with Road Fund.
ATTACHMENTS:
None.
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 11, 2019
TOPIC: Oakes Avenue Vacation Request
ACTION REQUESTED: Direct Staff Schedule a Public Hearing
Considering the Vacation of Tax Parcel Number
693835
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff schedules a public hearing receiving testimony considering the vacation of
tax parcel number 693835.
BRIEFING SUMMARY:
• The City of Cle Elum is requesting the Board considering vacating tax parcel
693835
• The County Surveyor and Public Works Director have visited the site and agree a
vacation assists the City of Cle Elum without harming County interests
BACKGROUND:
Last year, the County Surveyor and Public Works Director visited tax parcel 693835 at
the request of Ms. Lucy Temple representing the City of Cle Elum.
DISCUSSION:
It appears that the City of Cle Elum is interested in acquiring tax parcel 693835
supporting future adjacent uses, including a potential dog park at the location. The City
owns land surrounding on the north and south of the parcel and the parcel does not appear
to provide benefit to the County. Public Works is not opposed to the vacation request. If
the Board is interested in moving forward, it might be appropriate for the Board to
consider waiving the required vacation fees in support of the future dog park.
FISCAL IMPACTS:
Current vacation fees are $4,205.
ATTACHMENTS:
Exhibit 1: Electronic mail request with supporting documentation
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT l: ELECTRONIC MAIL REQUEST WITH SUPPORTING
DOCUMENTATION
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Candie Leader
From:
Mark Cook
Sent:
Thursday, February 28, 2019 1:28 PM
To:
Candie Leader
Subject:
FW: Parcel 693835
Attachments:
RE: County PW property in Cie Elum; RE: County PW property in Cie Elum
Remind me to deal.
From: Lucy Temple
Sent: Thursday, February 28, 2019 1:10 PM
To: Mark Cook
Subject: Parcel 693835
Mark,
Remember last year or so when I asked about parcel 693835 that is just off Oakes Ave in Cie Elum and wondered if the
County had a need for that property? Well... I don't remember where we left that discussion. Can you remind me of your
thoughts on the matter? That property would assist in our future park development to the west and maintaining
contiguous pond shoreline access/ownership. I have attached two emails in the conversation we had about this property
for reference. In one of them, Justin Turnbull said the County didn't have any infrastructure there and the local
maintenance supervisor didn't know it belonged to the County. Thoughts on this?
Thanks!
Lucy
Lucy Temple, Planner
119 West First Street
Cle Elum, WA 98922
(509) 674-2262 x102
www.cityofcleelum.com
Idol ice'. hmait sent to Krtilas County may be subject to public disclosure as required bylaw
n,ossagc 10.38cb45913CCdcbdac24bb87l9d004a14
F
'BLai
Z;ZS
of
Y
-
• .,�,y �
L��`, c
''1�. ,; _
.�,�
Lucy Temple, Planner
119 West First Street
Cle Elum, WA 98922
(509) 674-2262 x102
www.cityofcleelum.com
Idol ice'. hmait sent to Krtilas County may be subject to public disclosure as required bylaw
n,ossagc 10.38cb45913CCdcbdac24bb87l9d004a14
F