1. Call to Order
2. Solid Waste Updates
3. Request for Chair Signature on Pre -Application Meeting Application Form
4. Request for Chair Signature on Change Order #1 with Rhine Demolition, LLC
5. Update on Bloom Pavilion Project
6. KVEC Updates
7. Maintenance Updates
8. Other business
9. Adjourn
Created on 12/7/2018 8:39:20 AM
KITTITAS COUNTY
SOLID WASTE, MAINTENANCE, AND FAIR OFFICE STUDY SESSION MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Regular Meeting
TUESDAY 2:00 PM I December 11, 2018
Board members present: Laura Osiadacz, Obie O'Brien
Excused: Cory Wright
Others: Patti Johnson, Lisa Lawrence, Tim Egan
Meeting called to order at 2:03 p.m.
Solid Waste Updates: Patti informed the Board that there will be a SWAC Meeting tomorrow.
Patti informed the Board that she is working with the consultant on the pre -conceptual design of
the new transfer station in preparation for a Pre -Application meeting scheduled with the City on
January 3. Discussion was held on what to do with the remaining 12 acres and the possibility to
surplus. Further discussion was held on the possibility of Public Works purchasing or leasing a
portion of the property for the Lower County Shop.
Discussion was held on selling the sock stuffer. Patti informed the Board that there hasn't been
any interest.
Discussion was held on purchasing a bottle crusher. Patti informed the Board that she was
researching prices.
Request for Chair Signature on Pre -Application Meeting Application Form: Patti requested
the Board authorize Chair's signature on the form. Commissioner O'Brien motioned to approve
chair's signature on the form once completed. Commissioner Osiadacz seconded the motion,
Motion passed. 2-0
Request for Chair Signature on Change Order #1 with Rhine Demolition, LLC: Patti
requested Chair's signature on the change order in the amount of $1,268.30 for additional
concrete crushing at Ryegrass. Commissioner O'Brien motioned to approve Chair's signature.
Commissioner Osiadacz seconded the motion. Motion passed. 2-0
Update on Bloom Pavilion Project: Patti informed the Board that the Pre -Construction walk
through is scheduled for Thursday, the permit is ready to pick up and that the contract should be
signed by the end of the week.
KVEC Updates: Tim informed the Board that there was carpet damage in Heritage and asked
the Board for direction on billing the customer. Discussion was held on the extent of the damage
and the cost to have the carpet replaced. The Board directed staff to bill the customer for the cost
of replacement.
2018-12-11 MINUTES
Maintenance Updates: Tim informed the Board that he had two FT's working in the barns on
safety items, including the slider doors and pulling staples in preparation to paint.
Tim informed the Board he was getting lots of project and paint requests from the Jail.
Discussion was held on expanding or reducing the three color paint pallet approved by an earlier
Board due to maintenance receiving more requests for accent walls. The Board directed staff to
keep the pallet the same.
OTHER BUSINESS: Discussion was held on De -Icing and the pros and cons of salt vs. sand.
Meeting adjourned at 2:21 p.m.
r
Lisa ]Lawrence
2018-12-11 MINUTES 2
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Chairman
November 30, 2018
Rhine Demolition, LLC
1124112 th Street East
Tacoma, Wa 98445-3798
RE: Change Order #1
Kittitas County Solid Waste Programs
And
Maintenance Project Management Office
925 Industrial Way, Ellensburg, WA 98926
Telephone: (509) 962-7542
Fax: (509) 962-7087
This Change Order No. 1 is for the additional time and materials to allow for addition crushing
Original Contract $200,000.00
Additional Crushing $ 1,268.30
New Contract amount $201,268.30
Total cost does not include sales tax.
Approval
K%W-73-
iy eard-off ommissioners
B
Name:
TITLE: Chair
DATE:
Rhine Demolition, LLC.
Name: _..1 o e- w%0 v�_ 5
TITLE: \Ce 5 i e", f
DATE: 1-2Z �'
Gry of Pre -Application Meeting
Eu�ens to Application Form.
BF -04
FORM
Community Development Department
501 N. Anderson, Ellensburg, WA 98926 (509) 962-7239 (Building) (509) 962-7231 (Planning) permits@ dellensburgma.us
The purpose of a Pre -Application meeting is to provide the City with preliminary information regarding
the development proposal and to provide the applicant with preliminary information about Land Use
development requirements, Building Code requirements, Public Works & Energy Services
requirements (i.e. roads, stormwater, sewer, water, gas, electric), environmental issues, procedural
requirements, known community concerns, and other relevant matters prior to the filing of a formal
application.
Pre -Application meetings provide preliminary information only and are not intended to result in final
actions or commitments by either the City or the applicant.
I OFFICIAL USE ONLY:
Staff Person: I
Date Applied:
Pre -App #:
PROPERTY OWNER:
*APPLICANT: ■Owner .Contractor .Tenant .Other
Mailing Address:
Ken- 111INI 1 -
CONTACT PERSON: ■Owner .Contractor .Tenant .Other
Mailing Address:
Ron- - -
DESIGN PROFESSIONAL: .Architect . Engineer .Other
CONTRACTOR:
- 11111 0 1 -
(OVER)
Pre -Application Meeting Submittal Checklist
Please Provide 6 Copies the Following Applicable Information
Please Note: The more information you provide in your pre -application submittal package, the more
feedback you will receive from project reviewers to help you towards finalizing your application.
1. Conceptual Site Plan and Lot Configuration
• North arrow
• Scale (standard Engineering scale)
• Date drawn
• Existing parcels assembled
• Vicinity map
• Existing and/or proposed sewer and water lines
• Existing and/or proposed underground and overhead utilities
• Existing and/or proposed lot layout
• Existing and/or proposed lot sizes
• Proposed connection to existing road system
• General dimensions of lots, rights-of-way, easements, existing structures
• Existing elevation contours at intervals not greater than five feet (Not required where site relief is
less than five feet)
• Indicate Critical Areas (i.e. streams, floodplains, wetlands, steep slopes, etc.)
• Flood Hazard Areas
• Any existing building locations and buildings proposed for demolition
• Proposed new internal roads with proposed road widths
• Conceptual drainage proposal showing collection, detention and discharge
• Proposed and/or existing parking
• Proposed and/or existing Landscaping
2. Building Plans
• Floor plans for any proposed buildings and/or structures
• Elevations for any proposed buildings and/or structures
• Identify occupancy classifications, occupancy loads and types of building construction
• If available, provide determination of "allowable" building areas based on occupancy classification
and type(s) of construction and any calculated area and/or height increases.
• Identify if structure(s) will include sprinkler systems and/or fire alarm systems.
3. Site Description
A brief, written description of the site describing parcel conditions (soils, drainage, topography, wetlands,
streams, vegetation, surrounding land use, traffic patterns, if in the Historic District, nearest schools, bus
stops, walkways and any other unique characteristics of the site).
4. Project Description
Provide a brief, written description of the proposed development, change of use and/or changes to the
existing structure. Please include what you see as key issues or specify questions that you have about
the proposed proiect that you would like reviewers to respond to at the Pre -Application Meeting.
5. Pay a $500.00 Filing Fee
The $500 will be deducted from your permit cost when you apply (You must apply for a permit within 1
year to have the $500.00 put toward your permit).
Your Pre Application Meeting Will Be Scheduled Within Three Weeks of Submitting Your Application
MiilecityI\city\community development\1-building department\forms\2-forms\bf--04 pre -application meeting 10-26-15.doex