HomeMy WebLinkAbout2017-08-28-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday August 28, 2017 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution to Amend Resolution 2017-138 Awarding the Distressed
County Sales and Use Tax Funding for 2018 Correcting the Match Percentage.
3. Request to Approve a Resolution to Award the Contract for the North Fork Teanaway Road
Bridge #16203 Repair and Authorize the Public Works Director to Execute said Contract.
4. University Way Bridge Project Update.
5, Hyak Drive Update.
6. Bowers Field Update.
7. Weihl Road Improvement District Update.
8. Other business
9. Adjourn
Created on 8/25/2017 9:26:08 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM August 28, 2017
Board members present: Chairman Paul Jewell; Vice -Chairman Laura
Osiadacz; Commissioner Obie O'Brien
Others: Mark Cook, Candie Leader, Public Works; Four (4) Members of
the public
At 1:31 pm Chairman Jewell opened the Public works Study Session. One
(1) item was added under Other Business: Exit 78 Closure Times as
Proposed by Washington State Department of Transportation.
REQUEST TO APPROVE A RESOLUTION TO AMEND RESOLUTION 2017-138
AWARDING THE DISTRESSED COUNTY SALES AND USE TAX FUNDING FOR
2018 CORRECTING THE MATCH PERCENTAGE
Mark Cook stated that recently Public Works brought forward a
resolution which followed the Board of County Commissioner's (BOCC)
request to adjust the City of Roslyn's request for a smaller
funding amount and that the City of Roslyn and City of Cle Elum to
provide proof of matching funds prior to the release of Distressed
County funding. In that action the match percentage was stated as
fourteen percent (14s) instead of the correct amount of thirteen
and one half (13.5%). The resolution being presented would correct
that error. Chairman Jewell called for motion to approve
Resolution 2017-141 to Amend Resolution 2017-138 Awarding the
Distressed County Sales and Use Tax Funding for 2018 Correcting the
Match Percentage. Commissioner Osiadacz made a motion to approve
Resolution 2017-141 as presented and Commissioner O'Brien seconded
the motion with said motion passing.
REQUEST TO APPROVE A RESOLUTION TO AWARD THE CONTRACT FOR THE
NORTH FORK TEANAWAY ROAD BRIDGE #16203 REPAIR AND AUTHORIZE THE
PUBLIC WORKS DIRECTOR TO EXECUTE SAID CONTRACT
Mark Cook stated that last fall an individual drove through the
downstream guardrail on the main stem Teanaway Bridge wiping out
the entire section. Over the winter the roadway was restricted to
one lane and jersey barriers in place. The repair was designed;
bids were solicited with two responses, with one response being
deemed non responsive for being submitted after the bid closing
time. Discussion was held regarding the cost of the bid amounts
submitted and the increase in contract pricing. Commissioner
O'Brien inquired about the accident and any potential for insurance
cost recovery. Mark Cook replied that the owner of the vehicle
claimed it was stolen and cost recovery is unlikely. Chairman
2017-08-28 MINUTES
Jewell called for a motion to approve Resolution 2017-142 to Award
the Contract for the North Fork Teanaway Road Bridge #16203 Repair
and Authorize the Public Works Director to Execute Said Contract.
Commissioner Osiadacz made a motion to approve Resolution 2017-142
as presented with Commissioner O'Brien seconding the motion.
Motion passed.
UNIVERSITY WAY BRIDGE PROJECT UPDATE
Mark Cook commented that last year during a routine bridge
inspection staff found significant concrete spalling on one of the
bridge piers at the railroad crossing on University Way. There is
also concern about the number of groundhog burrows that are present
at both abutments. Staff had a structural engineer take a look at
the issues with them and agree that the burrowing is causing the
approach settlement. Mark Cook continued that in an attempt to
secure round about funding with the City of Ellensburg and Kittitas
County putting in $450,000.00 for that project; in exchange for
that Kittitas County asked the City of Ellensburg to annex that
portion of University Way into city limits. Staff felt that giving
the City of Ellensburg damaged infrastructure would not be wise and
went into a structural design for the bridge. Bids were then
solicited and the low bid was twenty five percent (250) over the
engineer's estimate and the bidder was nonresponsive with some of
the required paperwork with that bid being rejected. Staff is also
waiting on permits from Burlington Northern. At this time if the
BOCC follows staff recommendation of rejection of all bids, staff
will continue to pursue the permits from Burlington Northern with a
new bid solicitation in spring. Discussion was held regarding
spalling and current monitoring of the issues. No direction was
given.
HYAK DRIVE UPDATE
Mark Cook stated that the Public Works Department has been working
with the Hyak Homeowners Association for around two (2) years on a
variety of issues including snow removal, winter parking and
speeding in the community. Mark Cook spoke about the speeding
commenting that staff deployed a new striping plan narrowing the
lanes of traffic and after three (3) weeks placed traffic counters
conducting a speed study. This action caused numerous complaints
therefore deploying staff to blackout the paint stripe. This
action caused another issue in which a driveway was damaged from
the product used to black out the striping. The next option would
be structural efforts such as traffic islands and possibly speed
humps though speed humps would add issues for snow removal. Mark
Cook continued that crews are running out of places to put the
plowed snow and with I-90 construction and closures response times
have been hindered. Mark Cook suggested meeting with the
Homeowners Association to problem solve options. Discussion was
held with staff stating a full review of options will be done and
will come back to the BOCC with proposals. Further discussion was
2017-08-28 MINUTES
held regarding research done by the IT Department on GPS, roadway
routes and road designations. Staff was encouraged to get with the
IT Department to gather further information on the topic.
BOWERS FIELD UPDATE(S)
Mark Cook reported on several issues at Bowers Field starting with
the temporary closure of Runway 7-25. Public Works has followed
the directive of the BOCC and a scope of work was sent out to HLA
Engineering and Surveying out of Yakima and a site visit was
conducted. Staff is expecting a scope of work back this week and
then a special Airport Advisory Board meeting will be scheduled to
review the scope and have HLA present their qualifications. If the
Airport Advisory Board is satisfied with the scope of work then a
notice to proceed can be sent out to HLA. Discussion was held as
to the base of the runway and the possibility of having
geotechnical testing done. Further discussion was held with no
Board direction.
Mark Cook stated that pursuant to the t -hangar inspections last
month and the amount of non -aviation related items in the hangars,
follow up letters were sent and two responses have been had so far.
Staff will re -inspect all hangars again in thirty (30) days and
move forward. Discussion was held. No direction was given.
Mark Cook spoke about the Carrera Hangar and staff has been working
with the owner on the cleanup of the fire that had occurred there.
Public Works initially supplied assistance with the cleanup
operations and provided an area of storage of the material so it
could be hauled off. Mark Cook continued that staff had to keep in
contact with the hangar owner to maintain the area was clear of
foreign object debris (FOD) and the area was fenced. Building
permits are finally in process in Community Development Services.
Discussion was held. No direction was given.
Mark Cook commented that there was a malfunction of one of the
airport gates that has resulted in a claim for damages to a
vehicle. Staff contacted the gate contractor and parts have been
ordered for repairs due to apparent vandalism. Discussion was
held. No direction was given.
Mark Cook reported that the Master Plan update is almost complete.
The preferred alternative was sent to the Federal Aviation
Administration (FAA) months ago for review and at this time is has
still not been reviewed. The Master Plan will likely be submitted
in October and is close to being completed. Discussion was held.
No direction was given.
Mark Cook stated that initial conversations have been had with the
Department of Natural Resources (DNR) regarding lease renewal
rates. Currently, they are paying one (1) cent per square foot and
Central Washington University currently pays three (3) cents per
2017-08-28 MINUTES
square foot. Rates for a new lease are at a rate of twelve (12)
cents per square foot. Mark Cook commented that he proposed to
the DNR that a structured rate increase be set over each biennium.
Discussion was held. No direction was given.
WIEHL ROAD IMPROVEMENT DISTRICT UPDATE
Mark Cook gave background on the project and stated that staff has
been working with residents for the past two (2) years on a solution
to the roadway improvements. Mark Cook continued that a path to a
solution was to form a Road Improvement District with the property
owners and have the roadway built to current standards. Mark Cook
added that after legal review there are a few items that need to be
researched before moving forward. Mark Cook stated that the re -design
and cost estimating are complete and the project costs are around
$750,000, which is an increase from previous cost estimating.
Discussion was held. Two (2) members of the public commented on the
topic. The Board committed to contributing $150,000 and overage costs
for the project.
OTHER BUSINESS:
EXIT 78 CLOSURE TIMES SET BY WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION (WSDOT)
Mark Cook stated that staff and Board members attended a meeting with
WSDOT regarding the ongoing traffic issues affecting Nelson Siding
Road. Mark Cook continued that at the conclusion of the meeting
direction was given to him to notice WSDOT of preferred closing time
for September 4 at Exit 78 westbound was to be from loam to midnight.
Mark Cook added that after speaking with WSDOT they suggest closure
from Sam - Spm. Discussion was held. Staff was directed to contact
WSDOT to confirm the closure times as 8am - 8pm for September 4
Westbound closure at Exit 78.
2017-08-28 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
•I 0
RESOLUTION TO AMEND RESOLUTION 2017-138 TO AWARD THE 2018
DISTRESSED COUNTY SALES AND USE TAX FUNDS AS RECOMMENDED
BY THE CONFERENCE OF GOVERNMENTS CORRECTING MATCH
PERCENTAGE
WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax
for Public Facilities in rural counties; and
WHEREAS: These funds are for the purpose of financing Public Facilities
which are defined as bridges, roads, domestic and industrial water
facilities, sanitary sewer facilities, earth stabilization, storm sewer
facilities, railroad, electricity, natural gas, buildings, structures,
telecommunications infrastructure, transportation infrastructure or
commercial infrastructure and port facilities in the State of
Washington; and
WHEREAS: The Kittitas County Board of County Commissioners makes sales
and use tax funding available to cities pursuant to an annual grant
program; and
WHEREAS: The COG as directed, met to review the 2018 applications to
consider if they met the economic development needs of the
county and communities within the county; and
WHEREAS: The COG is presenting the results and their recommendations for
the funding as shown in Exhibit `A', as amended, and;
WHEREAS: Award recipients are required to provide thirteen and one-half
percent (13.5%) matching funds against sales and use tax grant
awards; and
WHEREAS: The City of Roslyn application fails to meet the required match
and is therefore reduced to $798,222; and
WHEREAS: The City of Cle Elum application requires verification of match
from a state agency funding source; and
WHEREAS: An agreement for receiving funds is required for all grant
applicants and said funds will be available on January 1, 2018; and
NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after
due consideration, does hereby accept the Conference of Government's recommendations
to distribute the 2018 Sales and Use Tax for Public Facilities in Rural Counties in
accordance with RCW 82.14.370 as shown in Exhibit `A' as amended above; and
NOW, BE IT FURTHER RESOLVED: The Public Works Department will manage the
Public Facilities Account; and
NOW, BE IT FURTHER RESOLVED: The City of Cle Elum and the City of Roslyn
are required to produce evidence to the Kittitas County Auditor's Office of matching
funds for said projects prior to receiving 2018 sales and use tax funds.
DATED this 28th day of August, 2017, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
66
Paul Jewell, Chairman
r
Laura Osia acz, ice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
-�' Obie O'Brien, Commissioner
%ZS 9
Ty vq
EXHIBIT A
Kiffilos County - City of Cie Eluou - City of Ellensburg . City of KBtilos � (fly of Roslyn - town of South Cle Elm
KITTiTAS COUNTY CONFERENCE OF GOVERNMENTS
August 1, 2017
Board of County Commissioners
205 W. 5`h Avenue
Ellensburg, WA 98926
Dear Commissioners,
The Conference of Governments (COG) convened on July 19, 2017, to consider the merits of
funding of four (4) applications competing for approximately $1,349,970.00 in the
Unencumbered Fund Balance of Distressed County Sales & Use Tax for the purpose of
improving a community's infrastructure in hopes of creating a more positive economic
development climate. The table reflects the project name, the amount requested and the COG
recommended funding.
The COG reviewed all the applications and applauds each applicant for the thoroughness
of each of the submittals. The above list represents what the COG felt would have
immediate economic impact on the individual communities.
The COG took the position that once these funds were expended there should be a tangible
project that either immediately improves economic development or provides a design that
%.L(0.G 411 North Ruby Street, Suite 2 ^ Ellensburg, WA 98926= PH (509) 962-7685 = EX(509)962-2682
Requesting Agency
Sales & Use Tax
Sales &Use Tax
Fundin Re uestedCity
FFire
r
ofCle Elum
$234,480
nsylvania Place
Stormwater
Bottleneck
City oPRoslyn
X803;222
$801,.222
Replacement Project%G
>
Finance of
Kittitas County
Personnel
Per RCW
Chamber of
$72,000
$72,000
82.14.370(3)(a)
Commerce
Rotary Park Youth
Baseball/Softball
Complex Lighting
City of Ellensburg
$230,000
$230,000
Project
The COG reviewed all the applications and applauds each applicant for the thoroughness
of each of the submittals. The above list represents what the COG felt would have
immediate economic impact on the individual communities.
The COG took the position that once these funds were expended there should be a tangible
project that either immediately improves economic development or provides a design that
%.L(0.G 411 North Ruby Street, Suite 2 ^ Ellensburg, WA 98926= PH (509) 962-7685 = EX(509)962-2682
leads to construction. These projects are worthy candidates for economic development
dollars but the application and project scope need to lead to a completed project.
Thank you for the opportunity to play a critical role in the evaluation and application of
funds that will assist in improving the economic development picture for the entire Kittitas
Valley community and we recommend you approve the funded projects as submitted.
Sincerely.
),
Jay McGowan
Conference of Government Chair
Cc: All Applicants
All COG Members
Kathy Boots. Clerk
8.000.6 - 411 Nerrh Ruby Streel, SuOe 2 P Ellensburg, WA 98926 ^ PH (509) 962-7685 - fX (509) 962.7682
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
• IN N
RESOLUTION TO AWARD THE BID FOR THE NORTH FORK TEANAWAY RD
BRIDGE #16203 REPAIR AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO
EXECUTE SAID CONTRACT
WHEREAS: Bids were solicited in accordance with RCW 39.04.155 Small Works Roster
Contract Procedures; and
WHEREAS: Bids were received via e-mail and standard mail on August 18, 2017 at 10:00am
in the Kittitas County Public Works Department and two (2) bids were received;
and
WHEREAS: The second bidder, although low bidder, has been deemed non-responsive as the
bid was received and time stamped by Public Works after the 10:00am deadline;
and
WHEREAS: The Public Works Department recommends that the responsible bid of Petersen
Brothers Inc. be accepted; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award the bid for the North Fork Teanaway Rd Bridge
#16203 Repair, upon such terms and conditions as specified in the Proposal submitted by said
bidder(s).
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 28th day of August, 2017, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
..,\111111111 p,..
the Board- Mandy Buchholz
////i11111111111P\ \
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
au well, Chairman
Laura Osi'ddfte:t, Vice -Chairman
Obie O'Brien, Commissioner
2h
■
�(
)
2
® )
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 28, 2017
ACTION REQUESTED: Request to Consider a Resolution to Amend
Resolution No. 2017-138 Awarding the
Distressed County Sales & Use Tax Funding for
2018 Correcting the Match Percentage.
BACKGROUND: In 1999 Legislature passed RCW 82.14.370
Sales & Use Tax for Public Facilities in rural
Counties. These funds are for the purpose of
financing public facilities in rural counties.
The Conference of Governments (COG) has
been charged with the review and scoring of
the applications and submitting their
recommendations to the Board of County
Commissioners for approval.
On August 15, 2017 the Board of County
Commissioners approved Resolution 2017-138
awarding the Distressed County Sales and Use
Tax Funding for 2018. After approval an error
in match percentage was found and said
Resolution is now to be corrected.
INTERACTION: Public Works; Conference of Governments
RECOMMENDATION: Move to Approve & Sign Resolution to Amend
Resolution 2017-138 awarding the Distressed
Counties Sales & Use Tax Funding for 2018 as
recommended by the Conference of
Governments, as amended by the Board of
County Commissioners and correcting Match
Percentage.
HANDLING: Return 1 original to Public Works
ATTACHMENTS: Resolution; Exhibit "A"
LEAD STAFF: Mark Cook
Director of Public Works
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.
RESOLUTION TO AMEND RESOLUTION 2017-138 TO AWARD THE 2018
DISTRESSED COUNTY SALES AND USE TAX FUNDS AS RECOMMENDED
BY THE CONFERENCE OF GOVERNMENTS CORRECTING MATCH
PERCENTAGE
WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax
for Public Facilities in rural counties; and
WHEREAS: These funds are for the purpose of financing Public Facilities
which are defined as bridges, roads, domestic and industrial water
facilities, sanitary sewer facilities, earth stabilization, storm sewer
facilities, railroad, electricity, natural gas, buildings, structures,
telecommunications infrastructure, transportation infrastructure or
commercial infrastructure and port facilities in the State of
Washington; and
WHEREAS: The Kittitas County Board of County Commissioners makes sales
and use tax funding available to cities pursuant to an annual grant
program; and
WHEREAS: The COG as directed, met to review the 2018 applications to
consider if they met the economic development needs of the
county and communities within the county; and
WHEREAS: The COG is presenting the results and their recommendations for
the funding as shown in Exhibit `A', as amended, and;
WHEREAS: Award recipients are required to provide thirteen and one-half
percent (13.5%) matching funds against sales and use tax grant
awards; and
WHEREAS: The City of Roslyn application fails to meet the required match
and is therefore reduced to $798,222; and
WHEREAS: The City of Cle Elum application requires verification of match
from a state agency funding source; and
WHEREAS: An agreement for receiving funds is required for all grant
applicants and said funds will be available on January 1, 2018; and
NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after
due consideration, does hereby accept the Conference of Government's recommendations
to distribute the 2018 Sales and Use Tax for Public Facilities in Rural Counties in
accordance with RCW 82.14.370 as shown in Exhibit `A' as amended above; and
NOW, BE IT FURTHER RESOLVED: The Public Works Department will manage the
Public Facilities Account; and
NOW, BE IT FURTHER RESOLVED: The City of Cle Elum and the City of Roslyn
are required to produce evidence to the Kittitas County Auditor's Office of matching
funds for said projects prior to receiving 2018 sales and use tax funds.
DATED this 28th day of August, 2017, at Ellensburg, Washington
Attest:
❑ Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Paul Jewell, Chairman
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Obie O'Brien, Commissioner
EXHIBIT A
Killitos County - City of Cie Elum (ity of Ellensburg , city of Ketilos • City of Roslyn - town of South Cie Slum
August 1, 2017
Board of County Commissioners
205 W.5i6Avenue
Ellensburg, WA 98926
Dear Commissioners,
The Conference of Governments (COG) convened on July 19, 2017, to consider the merits of
funding of four (4) applications competing for approximately $1,349,970.00 in the
Unencumbered Fund Balance of Distressed County Sales & Use Tax for the purpose of
improving a community's infrastructure in hopes of creating a more positive economic
development climate. The table reflects the project name, the amount requested and the COG
recommended funding.
Project Name
Requesting Agency
Sales & Use Tax
Sales & Use Tax
Fundin Re nested
Fundin Received
First Street
-
Stormwater
City ofCle Elum
$234,480
$234,480
lm rovements
Pennsylvania Place
I
Stomreck
Bottleneck
City of Roslyn
380 3?2 ,`.
$803,322
Replacement Project
Finance of
Personnel
Kittitas County
Per RCW
Chamber of
$72,000
$72,000
82.14.370(3)(a)
Commerce
Rotary Park Youth
Baseball/Softbal)
Complex Lighting
City of Ellensburg
$230.00D
$230 000
— Project
The COG reviewed all the applications and applauds each applicant for the thoroughness
of each of the submittals. The above list represents what the COG felt would have
immediate economic impact on the individual communities.
The COG took the position that once these funds were expended there should be a tangible
project that either immediately improves economic development or provides a design that
%.000.G , 411 Nonh Ruby sweet, Suite 2- Ellensburg, Wit 98976^ Pa (509) 961-1685 a FX(509)962 7682
leads to construction. These projects are worthy candidates for economic development
dollars but the application and project scope need to lead to a completed project.
Thank you for the opportunity to play a critical role in the evaluation and application of
funds that will assist in improving the economic development picture for the entire Kittitas
Valley community and we recommend you approve the funded projects as submitted.
Sincerely.
jmf +-J
Jay McGowan
Conference of Government Chair
Cc: All Applicants
All COG Members
Kathy Boots. Clerk
K.000.6 1 411 North Ruby SIT eel, Suh 2 = Ellensburg, WF 98926 o PH (509)962.76B5- FM (589)9677687
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 28th, 2017
ACTION REQUESTED: To Award the Contract for the North Fork Teanaway Rd
Bridge #16203 Repair and Authorize the Public Works
Director to Execute the Same
BACKGROUND: The Department of Public Works solicited bids for the
repair of the bridge rail on the Dickey Creek Bridge in the
Teanaway.
Bids were solicited in accordance with RCW 39.04.155
Small Works Roster Contract Procedures.
Bids were received by e mail and standard mail on August
18, 2017 at 10:00 a.m.
The engineers estimate reflected a total project cost of
$93,330. It is understood that construction costs are
increasing regionally due to the increase in demand by
approximately 20% against recent bid history.
Two (2) bids were received for the prescribed work. Public
Works recommends awarding the contract to Petersen
Brothers for the amount of $114,937.89 approximately
23% over the engineers estimate.
The second bidder, although low bidder, has been deemed
non-responsive as the bid was received and time stamped
by Public Works after the 10:00 am deadline.
Work will commence in September and is anticipated to be
completed late fall.
INTERACTION: Public Works
RECOMMENDATION: Move to approve a resolution awarding the Contract for the
North Fork Teanaway Rd Bridge #16203 Repair and
Authorize the Public Works Director to Execute the Same.
HANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Resolution, Bid Tabulations
LEAD STAFF: Lucas Huck, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO.
RESOLUTION TO AWARD THE BID FOR THE NORTH FORK TEANAWAY RD
BRIDGE #16203 REPAIR AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO
EXECUTE SAID CONTRACT
WHEREAS: Bids were solicited in accordance with RCW 39.04.155 Small Works Roster
Contract Procedures; and
WHEREAS: Bids were received via e-mail and standard mail on August 18, 2017 at 10:00am
in the Kittitas County Public Works Department and two (2) bids were received;
and
WHEREAS: The second bidder, although low bidder, has been deemed non-responsive as the
bid was received and time stamped by Public Works after the 10:00am deadline;
and
WHEREAS: The Public Works Department recommends that the responsible bid of Petersen
Brothers Inc. be accepted; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award the bid for the North Fork Teanaway Rd Bridge
#16203 Repair, upon such terms and conditions as specified in the Proposal submitted by said
bidder(s).
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 28th day of August, 2017, at Ellensburg, Washington
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Paul Jewell, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Obie O'Brien, Commissioner
s2
� S
pY4
S
��
. $�
a�
e5
3
s
�� 3
m
2
T
E
V
G
C sj
G A
x
E �
P
C
4
x
S
v
H
O
i
4
O
7 D
>. ti
�
t�
so
i y
�
�
w
.�+
V
2
T
E
V
G
C sj
G A
x
E �
P
C
4
x
S
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
AGENDA DATE:
ACTION REQUESTED:
August 28, 2017
Informational Only
BACKGROUND: The University Way Bridge over the BNSF railroad tracks
is need of repair. Damage to the superstructure and
substructure has been identified on the girders and the cross
beams, and settlement at both bridge approaches has been
identified resulting in the design and proposed construction
of new approach slabs.
Resolution 2017-058 funding the shortfall of $445,000 for
the construction of the Dolarway Roundabout, required the
County to move forward with the required repairs.
Bids were opened on August 23, 2017 at 10:00 a.m. in the
Public Works Department.
One (1) bid was received from Combined Construction.
Inc. the bid proposal was deemed incomplete as the
Certificate of Compliance — Wages was not included by the
bidder in the proposal as required. Additionally the low bid
was approximately 25% over the engineers estimate.
Public Works has been unsuccessfully working to obtain
the permits required from BNSF for the repairs below the
bridge. Public Works has rejected all bids for the project
and will re -advertise the project in the spring of 2018 in
hopes of receiving more competitive bids.
INTERACTION: Public Works
ATTACHMENTS: Notice of Rejection of Bids, Bid Tabs
LEAD STAFF: Lucas Huck, County Engineer
August 23, 2017
Combined Construction
P.O. Box 418
Mukilteo, WA 98275
Attn: Kyle Smith
DEPARTMENT OF PUBLIC WORKS
Mark Cook, PE, Director
Re: University Way Bridge #88341 Repair
Notice of Rejection of Bids
Dear Mr. Smith,
We wish to notify you that Kittitas County is rejecting all bids for the above referenced project,
as they exceeded Engineer's Estimate and available funds. We plan to rebid this project in the
spring of 2018. We hope you will bid with us at that time.
If you have any questions concerning these procedures, please call Lucas Huck or myself at
(509) 962 - 7523.
Respectfully,
Sara M Folk, PE
Construction Manager
Encl: Bid Tabs
cc: Contract Administration
411 N. Ruby, Suite 01 TEL (509) 962-7523
Ellensburg. WA 98926 FAX (509) 962-7663
BIDS OPENED PUBLICLY AT 10.00 AM ON AUGUST 23, 2017
MTTI IM ( ()1111
BID TABS
L"DD1DER
___
TEM ap
rM rtal "EM11,MHi.i N
UNIT.
)TY
..._......._....._�.. �......nws,.w-crop Ina.
T uJsr uxn 00,v
mi Cy.
— -- --
PREPARATION
1 MNAILIU Im
_
;, 5.
ITA S
— 16.6 s ts.00000 6
T
ISMUC4
L'NI.Y L%LSViTRY!N H4UC
Li _
a] 5
d:l,„: 5
3mm 5 IM.M £
]!"IM
SSRU<iUgE
'
_
1 .IIA I PFMJVAf flip lrpf
_ d G>"YJER v2K'NE1 RCNWAl0.Vp RERAIP
5 ')RCE A.� !NTAWItICNA1 GHOF.4LR
E%PAKHUti JCIMi NDUIIIGTI!MI _
a "I FAV IH5V.2
'i5.{
SF
_'151.
LS
Y: 5
1M F
t 5
t f
1n
)S0. 5
ISDM
r5 L1NMS
A,CC-0M S
3`S 00 S
A
I6AMCA p DSO,M S
15090M s tIOM
IS.'a]W S ISYIOM
F. N s �n ISOM 5
1110. } AISM 6
Iut T
21, -
15 M
'F�:UM
't ESU M
SURFALYx5 _ --
—
_ c9U cTClhGiisSi: C 45E
CY
24 £
IMM S
2.i00_ s ns.[a £
2.LQ .
�Iy
qp—ASP�HALT—_ —_
? VµA LI W . PCu6.2P_
K.
11310 5
i1.Yv. } ]f300 S
6,1:/IIA
_
1RAFFIC
'�T
_
'1 IIA LWJVT UP_SEA.
li EL. LINO CURB_
I. "IN, LINE
_ 13 PH 'EZT'EMPUW.Rt'T�I.Tf:C W1'iRC.
If /rAA CF•IIEI
:.F
LF
LF
'._5
.A 1
9C £
di 5
1M i
! :1
„4
}tM £
%OJ
I:�p
_.L✓f 0
_ � I
idMM S fS OD S
2UMM s uo.M $
i]MQ1 f IDuo
MX
1A:fiM
__ ]iiosm
a,IM.M
TAM
SUS piAL COM i i1TlH COSI
SALES iA% OS
Isl ”) S
Iri.910AJ
-
_-
H.'Mi S
1S551S.M
qG3 ane Mn+m,ew!OIN SSurxY. unM`inpnl DI W Ilnr.t
TDd%af+N'6l�sw ceeD cres<M am mm:-.rci
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 28, 2017
TOPIC: Hyak Drive Update
ACTION REQUESTED: None
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Informational briefing only — no action required.
BREIFING SUMMARY:
• Recent actions designed to reduce speeds along Hyak Drive were not successful
• The striping plan was "blacked out" by a seal coat
o One driveway required cleaning
• Staff is proceeding with speed limit stenciling on the roadway
BACKGROUND:
For the past year and a half, Public Works has been working with the Hyak Homeowner's
Association on numerous issues of concern: speeding, snow removal and winter parking.
Public Works continues investing an inordinate amount of time and effort addressing
Hyak resident concerns.
DISCUSSION:
Long term speed control now appears to require a structural option such as physical
traffic islands and/or speed humps. Both options are anticipated to create winter snow
removal impacts.
Winter parking issues continue being an issue. Public Works has not invested any real
effort towards problem solving — given the resource infusion around the speeding issue.
FISCAL IMPACTS:
The failed stripping plan and subsequent seal coat appears to have cost the County
approximately S 10,000. Deploying two traffic islands and/or speed humps is estimated at
being approximately $15,000 each (engineering, materials and installation).
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 28, 2017
TOPIC: Bowers Field Update
ACTION REQUESTED: None required
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Informational meeting only — no recommendation required.
BREIFING SUMMARY:
• HLA draft scope of work for runway 7/25
• Central Washington University 7/25 funding discussions
• T Hangar clean up letters
• Carrera Hangar Issues
• Gate No. 16 claim
• Master plan
• Flood alleviation plan
• DNR lease negotiations
BACKGROUND:
Numerous issues at Bowers Field airport have been addressed lately or are in process of
being addressed. The recent temporary closure of runway 7/25 has met significant
opposition from Central Washington University, Midstate Aviation and the local aviation
community in general. Recently, staff inspected our "T" hangars noting significant
storage materials inconsistent with our standard lease agreement requirements. The
Carrera hangar fire of 2016 continues creating cleanup issues. A recent claim for damage
resulting from the unexpected closure of gate no. 16 on a private passenger vehicle is
being evaluated. Our Master Plan effort is reaching conclusion. The data collection
phase of the airport flood alleviation plan is nearing completion. Staff has opening
negotiations with WA DNR regarding the terms of their land lease with the County.
DISCUSSION:
A draft scope of work, pursuant to Board of County Commission (BOCC) directive has
been transmitted to HLA Engineering and Surveying of Yakima, WA (attached as
EXHIBIT 1). Staff anticipates final fee and scope negotiations to complete by September
8th. 2017. 7/25 financing discussions have been set for September 15' , 2017. Our
structural evaluation of County owned "T" hangars affirms that the hangar doors can be
Page 1 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
retrofitted with new doors allowing year round use. Our current track hung doors are
problematic during winter conditions. Proving the Airport Advisory Board (AAB)
recommends proceeding with the door retrofit, staff will return to the BOCC with a scope
ol' work and financing plan supporting door retrofit. As a consequence of the "I" hangar
inspection, staff sent notices of correction to lessee whose hangars contained items other
than aircraft. Lessees have been given 30 days to correct noted issues or face lease
termination. Re -inspection is scheduled for September 18, 2017. None compliant lessees
Will then be served notices of lease termination.
The destructive fire caused by IASCO to the Carrera hangar facility continues being
problematic for management staff. Last week (August 14`h) I spoke with Carrera's
property management defining the timeline for repair response (permits being pulled
from CDS). Earlier this week, a local aviator filed a complaint with the FAA regarding
Foreign Object Debris (FOD). That complaint has driven numerous electronic messages
between my office and the Seattle office of the FAA (attached as EXHIBIT 2).
A recent claim involving gate no. 16 is currently being investigated by staff. Airport gate
contractor M2 began repairs to the fence within 48 hours of notice to Public Works (PW).
Once staff fully understands the circumstances surrounding the claim, we will advise the
Prosecuting Attorney's office.
The airport Master Plan Update is nearing completion. The preferred alternative
supporting extension of runway 11 /29 was submitted to the FAA for review nearly eight
weeks ago — no response from the FAA. Staff is scheduling a meeting with Seattle FAA
in September discussing the master plan and the preferred alternative lengthening runway
11/29. We will also be discussing the status of runway 7/25 going forward.
Data collection supporting the flood alleviation plan for Bowers Field is nearing
completion. Staff anticipates final delivery of all topographic and stream cross-section
data to Watershed Science and Engineering (WSE) by mid-September 2017. We
anticipate preliminary results from WSE by mid-October 2017.
Initial negotiations with WA Department of Natural Resources (DNR) have begun.
Currently, DNR pays one cent per square foot for approximately eight acres and twelve
cents per square foot for approximately five acres. Owing to the financial impact of
moving DNR to the standard current land lease rate of twelve cents per square foot
($0.12/SF); staff is proposing the following schedule of lease increase to DNR for
consideration:
2017 biennium:
$0.03/SF (eight acres)
2019 biennium:
$0.06/SF (eight acres)
2021 biennium:
$0.09/SF (eight acres)
2023 biennium:
$0.12/SF (eight acres)
The impact of moving the eight acres from $0.01 to $0.12 is: $4,802/YR to
$42,444.86/YR.
FISCAL IMPACTS:
The cost of the third party review of runway 7/25 is not known at this time.
Page 2 of'5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
ATTACHMENTS:
Exhibit 1: Scope of Work supporting evaluation of runway 7/25
Exhibit 2: Electronic messages regarding Carrera FOD
Page 3 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSIONS] AFF REPORT
EXHIBIT 1: SCOPE OF WORK SUPPORTING EVALUATION OF RUNWAY 7/25
Page 4 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
nSAVIl 1p /II/�.
KpTITp[ COI!NTV
August 21, 2017
XKX 8 rrA13r1&1S 401110V w i Y
DEPARTMENT OF PUBLIC WORKS
Mark R. Cook, PE Director
KITTITAS COUNTY BOWERS FIELD RUNWAY 7/25 CONSULTANT
SCOPE OF WORK
Background
Bowers Field is a World War II airfield used to train fighter pilots. Runway 7/25 was
constructed in 1942. During the period since construction, very little pavement
remediation has taken place. Significant cracks now exist throughout the length of the
5,590 foot long runway. Runway width is 150 feet. Weed growth is significant and has
become resistant to herbicides.
The 2010 Airport Layout Plan (ALP) lists the 2005 middle 50 feet of runway condition as
being poor to good. Since 2005, the asphalt pavement has continued its decline. The
2010 ALP forecasts the 2015 condition as likely being very poor to fair.
The runway is now limited to aircraft of 12,500 pounds or less. During the past several
years, landing aircraft has dislodged pavement requiring asphaltic patching. Depending
on location, sufficient pavement continuity is difficult to support anchoring of the asphalt
patches. A recent runway "pothole" could not be adequately repaired for nearly 72
hours (County road crew members were engaged in annual bituminous surface
treatment operations). Given existing pavement condition, the inability to provide
constant maintenance support services to the runway, the airport manager issued a
temporary closing of runway 7/25. The County's on-call airport consultant supports the
temporary closure and has developed several options for remediating existing
pavement through pavement reconstruction.
Numerous stakeholders object to the temporary closure of runway 7/25. The Kittitas
County Board of County Commissioners is soliciting a "third party" evaluation of existing
7/25 pavement. Supporting this request, staff has prepared a suggested scope of work
for the third party consultant that targets Board desired deliverables from the selected
consultant.
Staff Suggest Scope of Work
Nondestructive testing of 7/25 asphalt
Using a falling weight deflectometer, or other like means, the consultant shall evaluate
various locations of 7/25 defining the current structural integrity of the pavement, the
subgrade condition and strength, and the load capacity of the pavement structure for
aircraft operations. The consultant will target an area in the center of the existing runway
and focus on a minimum width of 60 feet (30 feet each way from centerline) and a
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
minimum length of 3,700 feet. Note the pavement surface is in poor condition and
testing means shall not further damage the surface.
Deliverable: Multiple testing results, engineering evaluations, and recommendations for
inclusion in a final letter report.
2. Other Subgrade strength and condition testing
Consultant will determine and implement any other additional means to evaluate
subgrade strength and condition. Consultant will coordinate any mechanical means or
testing laboratory equipment providing sufficient subgrade data for use in future possible
runway pavement design.
Deliverable: Subgrade test results supporting possible future runway pavement design.
3. Runway options
Using data collected in tasks 1 and 2 above, along with visual inspection of the runway
and relying on the Consultant's experience, Consultant will develop a minimum of three
remediation/replace alternatives including but not limited to:
• immediate repairs getting the runway back is service for a minimum of one
season (spring through fall 2018),
• a plan to rubbelize and reuse the existing asphalt as base materials, and repave
using class A asphalt (WSDOT pavement specifications), and;
• a third plan to perform complete reconstruction using class A asphalt (WSDOT
pavement specifications)
The consultant will provide a description of each approach that details associated
engineering recommendations given the pavement test data collected in tasks 1 and 2.
The consultant will also prepare cost estimates for the three alternatives. The runway
project area is 60 feet wide and 3,700 feet of length.
Deliverable: Rehabilitation recommendations based on pavement test data; and cost
estimates for a minimum of three options identified in task 3.
4. Letter Report
Consultant will provide an electronic copy of the letter report sealed and signed by a
licensed professional engineer in the State of Washington. Four printed copies will also
be provided.
5. Report Presentation Support
Consultant will support presentation of results of 7/25 runway evaluation to the Kittitas
Board of County Commission at a time and date set by the Board.
Page 2 of 3
EXHIBIT 2: ELECTRONIC MESSAGES REGARDING CARRERA FOD
Page 5 ol'5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Candie Leader
From: Mary.Vargas@faa.gov
Sent: Monday, August 21, 2017 10:31 PM
To: Candie Leader; Mark Cook
Cc: Robert.Ticknor@faa.gov; Kittitas County Public Works; Jennifer.Kandel@faa.gov;
Albert.Atkins@faa.gov
Subject: RE:
Attachments: 20170812_102552 1502811656002jpg; 20170811_151309_1502811734372.jpg
Ili Candi and Mark
AX -'e received information conceming foreign object debris (POD) at Bowers Field Airport. If the attached pictured reflect
existing conditions at Bower> Field; 1 hope rhe following information provides support and background on Will, the Counh
needs to immediately remove FOD from the airfield environment.
;Airport sponsors who accept a grant offer are also accepting conditions and obligations associated with the grant assurances
Airport Sponsors 3/2013) (PD ;). l'hese include obligations to operate and maintain the airlxtrt in a safe and serviceable
condition, not grant exclusive rights, mitigate hazards to airspace, and use airport revenue properly. We are concerned the
attached pictures illustrate violations of Gr:mt Assurance 19, Of,eraGo;r (me lainlrnasce. This grant assurance requires safe.
operation in boric movement and non-movcmcnr areas. As the sole recipient of;\itport Improvement Program (AIM grant
aid, the County of Kittiras (airporr opener/sponsor of Bowers Fielcl) has a contractual obligation with the L nited States
government to protect the aiq)ort, abide I)v its grant as;urance< and FAA rclnulations; and ensure the iatct.v. securin, utility,
and clticiencg of Bowers Field. A fist of.Advisory circulars as reference in Grant. :Assurance #34, Yo/i res; .SlmeurreLr, and
1pa,zjicer/torn; is located at httY.ZZwwwv.fia.gov/airports/aip/ineclia/`iip-pfc-checkhst.l)d `1'he following two \d.ison Circulars
C ('I may he of sotoc assistance to von: ,\C 150/ 5220-2a 1 "orml (heed Debris, and AC 150/5370 21', Operrho wheal/) at
lnpnNr i)m-ne Cw,•.dmNnin.
'I hc following link, https://www•.faa.gov/airports/i"ort safet3[, includes a Foreign Object Debris Program. 'I he presence
of 1 01) is a continuing concern at our nat'ion's aignort,. FOD oxates safety hazard, and can uhimawly impact safe operations
by damaging aneraft. Airports; Airlines, and the (:;creta] Aviation communis) have taken the neccasary steps to mirtimize
I OD by engaging va successful NX) management program;, as pea AC 150/5210-24.
Uwe e can be of and assistance, please do not hesnatc, to call me..
Sincereh
Mary Vargas
FAV Scattle-ADO
1601 I.ind Avc. S\X', Ste 250
Renton,AV,A 98057-3356
Ph: (425) 227-2660
Fax: (425) 227-2650
From: Ticknor, Robert (FAA)
Sent: Tuesday, August 15, 2017 1:28 PM
To: Vargas, Mary (FAA)
Subject: FW:
Robeit Ticknor
FAQ. Safety Tepm program Manager
Spokane Right .Standcrds District Office
509-532-2344
Please provide stakeholder feedback here
From: larue [mailtodarue(agemsi.com]
Sent: Tuesday, August 15, 2017 8:41 AM
To: Ticknor, Robert (FAA)
Subject:
Scnl vji) the Samsung GALAXY Su<' 5, an AI & I «G LTE snmrtphone
3 j
Candie Leader
From:
Mark Cook
Sent:
Wednesday, August 23, 2017 8:09 AM
To:
'Mary.Vargas@faa.gov'
Cc:
Paul Jewell; Laura Osiadacz; Obie O'Brien; Candie Leader
Subject:
FOD
Since the fire caused by Central Washington University's flight operations contractor (ASSCO) damaging the
private hangar, we have been constantly encouraging Carrera Hangars Bowers Field LP (airport lessee) to
finalize repairs to their hangar. Last week I spoke with Carrara's property manager (west side WA) and it is my
understanding that contractors would be onsite this week beginning hangar repairs. As it appears that is not
the case, I will notice Carrera this morning of our decision to proceed with notice of lease termination in the
absence of immediate response cleaning FOD from the site. Regards, Cook.
From: Marv.Vargas@)faa.gov [mailto:Mary,VargasCo)faa.gov]
Sent: Monday, August 21, 2017 10:31 PM
To: Candie Leader; Mark Cook
Cc: Robert.TicknorCa)faa.gov; Kittitas County Public Works; Jennifer. Kandel(o)faa.gov; Albert.Atkins@faa.gov
Subject: RE:
Hi Candi and Mark
N\%e received information concerning foreign object debris (POD) at Bowers field Airport. If the attached pictured reflect
existing conditions at Bowers Field, 1 hope the following information provides support and background on why the County
needs to invnediarcly remove POD from the airfield environment.
Airport sporlsors who accept a grant offer are also accepting conditions and obligations associated \Nith the grant assurances
(t\irnort Sponsors (3/2014) (PDF)). "These include obligations to operate and maintain the airport in a safe and scniceablc
condition, not grant exclusive rights, rnitigatc hazards w airspace, and use airport revcamc propedy. Wt are concerned the
attached pictures illustrate violations of Grant Assurance 19, Oper-rNnn anti rtloxnlenonce. 11tis grant assurance requires site,
operation in both nntventent and non -movement areas. As the sole recipient of Airport Improvement Program (.-\IP) grant
aid, the County of Kituras (an -port owner/sponsor of Bowers Field'. has a contractual obligation with the United Stites
government to protect the airport, abide by its grant assurances and 1;-\.\ regulations; and ensure the safety, sucuuty, utilmn
and efiicic:ncy of 13owcrs Field. _\ list of Advrsory circulars as reference. i❑ Grant Assurance #34, Pau r. , .S>en.;mdr. ,tier,`
.,Sptci/ienlirrn;; is located at lit4p://w\�><v Ft1 goe/airportr/tip/media/nip-life-checklist pd 7'he following two \dvisorp Circulars
(AC) may be of some assistance to you: AC150/5220-24, P(,rei�tn objet! Oebiv, and AC. 140/5370-2f Opowifmal.S.0,Y) nn
Li;�rrlr 1>lv�rjg Ciir,•.rOrrlirnr. ..
7 he following link, littlis://xiwvv.fia.gov/aiqortc/airport siferL includes a Foreign Object Debris Pr< peon. The presence
of FOD is a continuing concern at our nation's airports. 1.01) orates safety hazards and car, ultimately impact safe operations
by damaging aircraft. airports, Airlines, and the General aviation community have taken the necessary ceps to nmtinlize
FOL) by engaging in successful F01) management progtanv, as per AC 150/5210 -24 -
If we can he of am. assistnnce, please do not hesitate to call Inc.
Sincerely
Miry Vargas
i'AA' Seattle -.ADO
1601 Lind Ave. S\C, Stc 250
Rcnton.A1'A 98057-3356
Ph: (425) 221-3660
Fax: (425) 227-2650
From: Ticknor, Robert (FAA)
Sent: Tuesday, August 15, 2017 1:28 PM
To: Vargas, Mary (FAA)
Subject: FW:
Robert Ticknor
PAA Sarrty Team Program Ar:onaaer
Spokol;e Flight Stondords Disirici Office
504532-2344
Please provide stakeholder feedback here
From: larue [mailto:larue(u)oemsi.com]
Sent: Tuesday, August 15, 2017 8:41 AM
To: Ticknor, Robert (FAA)
Subject:
Sent via the ,aimung GALA XY So;. 5. an A 1'&,'I',IG L: ('L �.[nartphpne
Candie Leader
From:
Mark Cook
Sent:
Wednesday, August 23, 2017 8:17 AM
To:
'kim@carrerahangars.com'
Cc:
'Mary.Vargas@faa.gov'; Paul Jewell; Obie O'Brien; Laura Osiadacz; Candie Leader
Subject:
FOD
Pursuant to sections: 16, 18, 19 and 27 of Camera's lease agreement with Kittitas County, you are noticed to
respond immediately removing Foreign Object Debris (FOD) from Carrara's damaged hangar. We received
notice from FAA Seattle yesterday of their intention to possibly regulate against Kittitas County for failure to
remove FOD from Camera's damaged hangar. I understood that you were responding this week with a repair
contractor. Yesterday's complaint from a local airman requires immediate response. If you cannot coordinate
an immediate response, please contact me requesting County cleanup. We will remove the FOD and bill back
to Carrera the cost of the response effort. I will also prepare a registered letter noticing of our intent to
terminate Carrera's lease later today, in the event you fail to respond to this electronic message. I regret
having to take this action. Regards, Cook.
Mark R. Cook, PE
Public Works Director
Direct line: 509-962-7692
Cellular: 509-859-6879
Electronic mail address: mark.cook(o)co.kittitas.wa.us
Candie leader
From:
Mark Cook
Sent:
Wednesday, August 23, 2017 10:25 AM
To:
'Ma ry.Vargas@faa.gov'
Cc:
Paul Jewell; Obie O'Brien; Laura Osiadacz; Candie Leader
Subject:
RE: FOD
Our consultant (Century West) has been clear with me regarding our ongoing obligations as airport sponsor.
Increasingly, I am educating myself on FAA regulations and airport operations in general. Ever increasingly, I
am addressing long standing issues of concern representing my employer's risk and obligations at the
airport. Some area users are dissatisfied with increasing management from the County. I have attempted to
be responsive to all issues associated with our sponsorship. Recent misinformation from various individuals
has not contributed to a trusting environment between the FAA and ourselves as airport sponsor. Please
understand that I take our obligations very seriously and will continue doing so until all issues of concern are
adequately addressed at the airport. At some point, I welcome a discussion with the FAA regarding our ability
lobbying for sponsorship change. Regards, Cook.
From: Mary.Vargas@faa.gov [mailto:Mary.Vargas@faa.gov]
Sent: Wednesday, August 23, 2017 10:16 AM
To: Mark Cook
Cc: Paul Jewell; Laura Osiadacz; Obie O'Brien; Candie Leader; Albert.Atkins@faa.gov; Jennifer.Kandel@faa.gov;
Robert.Ticknor@faa.gov
Subject: RE: FOD
il'Ltrk
1'hank you for your response.
\\'e hope the background information on the airport sponsor's grant assurance was helpful. If we can be of any assistance
please do nut hesitate to contact us
Sincerely
Man' Vargas
l"AA, Seattle -GADO
1601 Lind t\ve. S\V. Sic 250
Renton, Vial 95057-3356
1'h: (425) 227-2660
I7ax: (425) 227-2650
From: Mark Cook[mailto:mark.cookPco.kittitas.wa.us)
Sent: Wednesday, August 23, 2017 5:09 AM
To: Vargas, Mary (FAA) <Mary.Vargas@faa.eov>
Cc: Paul Jewell<paul.iewell@co.kittitas.wa.us>; Laura Osiadacz<laura.osiadacz@co.kittitas.wa.us>; Obie O'Brien
<Obie.OBrien@co.kittitas.wa.us>; Candie Leader <candle.leader(alco.kittitas.wa.us>
Subject: FOD
Since the fire caused by Central Washington University's flight operations contractor (IASSCO) damaging the
private hangar, we have been constantly encouraging Carrera Hangars Bowers Field LP (airport lessee) to
finalize repairs to their hangar. Last week 1 spoke with Carrera's property manager (west side WA) and it is my
understanding that contractors would be onsite this week beginning hangar repairs. As it appears that is not
the case, I will notice Carrera this morning of our decision to proceed with notice of lease termination in the
absence of immediate response cleaning FOD from the site. Regards, Cook.
From: Mary.Vargas(a)faa.gov [mailto:Mary.Vargas(olfaa.gov]
Sent: Monday, August 21, 2017 10:31 PM
To: Candie Leader; Mark Cook
Cc: Robert.TicknorWaa.gov; Kittitas County Public Works; Jennifer. Kandel4faa.gov; Albert.Atkinsffaagov
Subject: RE:
I fi Candi and Mark
We received information concerning forei},m object debris (FOD) at Bowers Field Airport. If the attached pictured reflect
existing conditions at Bowers Field, I hope the following information provides support and background on why the C:ouriTV
needs to inuncdiateh- remove FOD from the airfield environment.
Airport sponsors who accept a grant offer are also accepting conditions and obligations associated o-ith this l;rant assurances
(Airport Sponsors (3/21114) (PDIT. These include oblignuons to operate and maintain the airport in a safe and sen iceable
condition, not gram esclusn e rights, mitigate hazards to au -space, and use airport revevuc properh=. We are concerned the
attached pictures illustrate. violations of Grant Assurance 19, This grant assurance requires safe
operation in both movement and nim -mm ement arras. As the sole recipient of Airport Improvement Program (All') grant
aid, the Count), of hittitas (airport owner/sponsor of Bowers Field) has a contractual obligation with the United States
government to protect the airport abide by it, ,;ranr. assurances and FAA regulations; and ensure the ,.dory, security, utility,
and efficiency of Bower; Field. A list of Advisory circulars as reference in Grant Assurance #34, Pnhcicr, S/nndrnrlt, and
is located at http://Nk<vv.fia.gov/airForts/iip/media/ail3-pCc-checkhst.pd The following two advisory Circulars
(AC) may be of sonic astista•rce to mu: AC 150/ 5220-21. Fnm(gn 01jia Drbiir, and AC 1511/5370-2F, (>pertlrnnul.S'uj3;, an
iirf nKr Lhnrng Cor; rhn lion.
'I lie following link, htips://yvwtirafia.gov/-,ugiorts/aiaiort safen,1, includes a Foreign Object Debris Program. The presence
of 1:01) is a continuing concern at our nation's airports. POD creates safero hazards and call ultimately impact safe operation.,
Ix clamagi,ng aiacrtft Airports, Airlines, and the General Aviation ctnnnunip have taken the necessar+steps at minimize
POD by engaging va successful FOD management programs, as per AC 150/5210-24.
If we can be of any assistance, please do nor hesiuue to call me.
Sincerely
Mary Vargas
FAA, Scattle-ADO
1601 Lind Ave. SW, Ste 250
Renton, WA 98057-3356
Ph: (425) 227-2660
Fax: (425) 227-2650
From: Ticknor, Robert (FAA)
Sent: Tuesday, August 15, 2017 1:28 PM
To: Vargas, Mary (FAA)
Subject: FW:
Robert I icknor
FAA Safely 7'earn Program Manager
Spokane Fhor Sumdards DStrkt OJfine
109-532-2364
Please provide stakeholder feedback here
From: larue [mailto:larue(olgemsi.com]
Sent: Tuesday, August 15, 2017 8:41 AM
To: Ticknor, Robert (FAA)
Subject:
Sent vial dte Samsung G,rMLAXY S.P,' 5, an A I& i =1(� I '11, smartphnne
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 28, 2017
TOPIC: Weihl Road Improvement District Update
ACTION REQUESTED: Direct Staff Prepare the final Financing Plan and Notice
Petitioners
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff prepares the final RID financing plan and notice petitioners.
BREIFING SUMMARY:
• Staff has redesigned Weihl Road at twelve percent (12%) grade
• The revised project cost is now approximately $750,000
• RID Petitioners have agreed to paying $450,000
• The Board of County Commissioners must now direct staff on funding specifics
• Following the final financial plan, the RID can move through process
BACKGROUND:
During the past year and one half, staff has worked with Weihl Road residents towards
resolving access issues associated with Weihl Road. Recently, the Prosecuting
Attorney's Office identified the need for the improved roadway to be brought onto the
public road system upon improvement completion. The decision has forced Public
Works (PW) to redesign the proposal — flattening the proposed grade from 15% to 12%.
The project cost has grown from $450,000 to $750,000. Road Improvement District
(RID) petitioners have previously agreed to pay the initial cost estimate of $450,000.
DISCUSSION:
The cost of Weihl is up significantly from original estimates improving the roadway to a
private road standard. Ongoing maintenance costs were originally envisioned to be
placed on RID petitioners. The public roadway eliminates the need for ongoing costs for
maintenance that were expected to be borne by petitioners. The original financial plan
was designed to minimize annual cost impacts. Several options exist closing the funding
gap between the private road cost and the public road cost. The Board of County
Commissioners can elect to cover the funding gap ($300,000), the cost recovery period
can be extended lowering Commission contribution, or the petitioners can be forced to
cover all increased costs.
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Many of the current residents are living on fixed incomes. These residents have elected
to retire here in Kittitas County. The current assessment based on $450,000 appears to be
near the maximum tolerable limit for many residents. The forecast annual cost over a ten
year period using three (3) percent interest as presented to petitioners is about $776 per
lot per year for the ten year period. PW suggest the Board consider the following
approach to funding:
Interest = 4% (likely current conventional rate)
Load period = 15 years (while five years longer, there is no maintenance cost beyond)
Present value = $600,000 (Board authorizes a $150,000 County contribution)
Payment is due at the beginning of the first year
Annual payment = $786.20 for 66 lots.
While the signed petition is nearly all 66 lots, not all lot owners are electing to
participate. Providing the Board contributes $150,000; PW encourages the Board to
formulate by resolution and force mandatory participation by all 66 lot owners. This is
the only way to keep costs down for all participants.
FISCAL IMPACTS:
$150,000 will come from PW Road Fund reserves
ATTACHMENTS:
Exhibit 1: PW plan and profile design
Exhibit 2: PW cost estimate for public road construction
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: PW PLAN AND PROFILE DESIGN
Page 3 of 4
PUBLIC WORKS HOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
3'
A 2;�
Lam':
O
0�
z
p
0
c
z
--RIGHTOFWAV
0
r OF WAY
71UHT
IA=o
S.
I! tri
\
>
.RIGHT OF WAY
RIGHT OF WAY
3'
Lam':
O
0�
z
p
O
--RIGHTOFWAV
IA=o
\
>
.RIGHT OF WAY
r
vr4
I"
Y
r
p
gg
O
FI
RIGHT OF WAV
O
_
X
.I (n
�
m I I I
p f
d6
o
N \�
O
W
O �
-_-- RIGHT OF WAY
Ly 5
0 0 o c
0
A C
O Z
i 0
y.
w
O
--�,----RIGHTOFWAY
ei
N
o 7r !
0 00
FIA=
1i +
Uq
d•
O 0
S"
C)
9g
0 C)
fg�
a
�
p
n
p
O ZE
---ARIGHT OF WAY
n
ti
o
K �
�
�
O
n D
O
x
z
n
0
z
a
zc
I
N
N N
O
O O
A
O
---�---�-RIGHT OF WAY
{
N
i
y
r..�... '
O
61
Ul
IIS
O
\ j
\J
o
�
F----""'
RIG HT OF WAY
0
B`-
y
X
i�r q
y
2
O
A
2
�
O
{- -!RIGHT OF WAY
a
N
�
O
yl
I
p
N
W
O
n f
--
!RIGHT OF WAY
s
O
to
r
" A
o
n
ti o
i
c�
o
r
I
j;•' a>
e
E
t—
..
\aa-
! Jy
§a
i{
-
,!/�
•§Q�\
/
\
\
(\
!�
k § !
§!�
,,
:!
,§(
!
;
;•|!
.
¥
EXHIBIT 2: PW COST ESTIMATE FOR CONSTRUCTING THE PUBLIC ROAD
Page 4 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
MP TO 'Ob Number: RC2S74-B: PROJECT LENGTH 1320 R
SCOPING ESTIMATE WO,614 ON57R°`T'°"
DURA
4,5,2017 By: Bryan To
attita5 County Is proposing to improve safety along Wield Road by Charging road pro01e/alignment, paying, Installing guaNrail to Protect hazardous slopes.
afety Improvements are necessary in oroer to reduce accidents in this segment, and also to make R easier M plow with county equipment.
Daw
PROJECT CHANGE TRACKING
By ComrnaMs
4/5/2017
BT STARTED ON. COST EST
4/72017
BT UPDATED EST TO REFLECT PLAN OTY CHANGES
020/2017
BT
4/28/2077
BT '
7/26/2017
ST UPDATED EST TO 26' ROADWAY
BM2017
BT Updated ea6maN to mi e t ma mum read profile of 12%
Pnnted 8'142017 10:10 AM I of 1
BID ITEM SUBTOTAL WIO MOBILIZATION $515,53500
SALES TAXA 800% $27,78700
PROJECT SUBTOTAL $606,69041
BELOW THE LINE COSTS
PRELIMINARY ENGINEERING 4% $24,26782
CONSTRUCTION ENGINEERING % $24.26762
ANNUAL MAINTENANCE 1p YEAR6 $50,00000
PROJE :" `'- 'TOTAL