HomeMy WebLinkAbout2018-10-08-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday October 8, 2018 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution Correcting Resolution 2018-151 Adopting Meadow Way
onto the County Road System.
3. Request to Authorize Chair's Signature on the United States Forest Service Grant
Application Letter of Support.
4. Grant County PUD No. 2 FERC Discussion.
5. Draft Resolution of Intent to Formulate Road Improvement District No. 2018-01 Wiehl Road.
6. 2018-2037 Kittitas County Transportation Plan Discussion.
7. Other business
8. Adjourn
Created on 10/5/2018 8:55:23 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM October 8. 2018
Board members present: Chairman Laura Osiadacz; Vice -Chairman Obie
O'Brien; Commissioner Cory Wright
Others: Mark Cook, Candie Leader, Public Works; Dan Carlson,
Lindsey Ozbolt, Calvana Carper, Community Development Services;
Kayla Bonar, Daily Record; Shannon Lowry, Grant County Public
Utility District
At 1:34 pm Chairman Osiadacz opened the Public Works Study Session.
No additional agenda items were added.
REQUEST TO APPROVE A RESOLUTION CORRECTING RESOLUTION 2018-151
ADOPTING MEADOW WAY ONTO THE COUNTY ROAD SYSTEM
Mark Cook presented a Resolution to correct Resolution 2018-151
that adopted Meadow Way onto the County Road System. Mark Cook
stated that Resolution 2018-151 incorrectly identified Meadow Way
as Marian Way within the body of the Resolution. Discussion was
held. Vice -Chairman O'Brien made a motion to approve Resolution
2018-161 Correcting Resolution 2018-151 Adopting Meadow Way onto
the County Road System. Commissioner Wright seconded the motion.
Motion passed 3-0.
REQUEST TO AUTHORIZE CHAIR'S SIGNATURE ON THE UNITED STATES FOREST
SERVICE GRANT APPLICATION LETTER OF SUPPORT
Mark Cook stated that the Forest Service is applying for grant
funds through the Recreation and Conservation Office to support
winter and summer recreational activities in Kittitas County. Mark
Cook added that staff drafted a letter of support for Board
approval to be included in the grant package. Discussion was held.
Vice -Chairman O'Brien made a motion to Authorize Chair's Signature
on the United States Forest Service Grant Application Letter of
Support. Commissioner Wright seconded the motion. Chairman
Osiadacz stated that the County has a good partnership with the
Forest Service and thanked staff for their efforts. Motion passed
3-0.
2018-10-08 MINUTES
GRANT COUNTY PUD NO. 2 FERC DISCUSSION
Mark Cook introduced Shannon Lowry from Grant County PUD and stated
that she requested to meet with the Board to discuss the issues
surrounding the Vantage Boat Launch area. Shannon Lowry presented
an area map showing the ownership at the boat launch and explained
the project boundaries. Shannon Lowry then gave a brief history of
the boat launch and the restrooms that are currently owned by the
County but are on Grant County PUD property. Shannon Lowry stated
that those restrooms were vandalized and in the spring a meeting
between herself, Mark Cook and Vice -Chairman O'Brien was held to
discuss a path forward. Shannon Lowry continued that in July she
reached out to Mark Cook to request a copy of the RCO Grant that is
related to the restroom facility. Shannon Lowry stated that Mark
Cook informed her that staff was applying for Public Facility funds
to repair the restrooms but that the funding wasn't guaranteed.
Shannon Lowry added that she was surprised when she received notice
of the comments sent to FERC and that Grant County PUD wants to
continue a partnership with Kittitas County. Shannon Lowry
mentioned that the overflow parking at the boat launch and stated
that the area in question is outside the project area. Shannon
Lowry stated that there is no obligation by Grant County PUD on the
parking and at the height of events that parking lot is full.
Shannon Lowry added that she would like to leave today's meeting
with a renewed commitment by PUD and they want to be a good
partner. Vice -Chairman O'Brien stated that the Conference of
Government scores various applications for funding award and that
funding for the restrooms was not awarded for the repairs. Vice -
Chairman O'Brien continued that Public Works does not have a stream
of funding for the repairs and stated that the County has supported
Grant County PUD in numerous ways during their projects at Vantage.
Vice -Chairman O'Brien inquired about the gate that was put up on
County property without notice or permission and Shannon Lowry
stated that the gate was in the original design for the project and
can provide keys to the County for it. Shannon Lowry added that
she is committed to working with Mark Cook on a solution and they
need a path forward in writing. Commissioner Wright stated that
there is an expectation of service for the facility and that the
County pays for costs and is burdened with servicing an area that
is an attractive nuisance being that the facility is free to use by
the public. Commissioner Wright added that the Board needs more
from Grant County PUD than "they will do better". Chairman
Osiadacz inquired as to where the PUD Commissioners are to discuss
this issue and is concerned that conversations being had regarding
these issues are not being taken seriously. Shannon Lowry replied
that she is considered the decision maker since she is the Lands
Recreation Manager but can put the Board of County Commissioners on
the agenda of an upcoming meeting of the Grant County PUD
Commissioners for further discussion. Chairman Osiadacz stated
2018-10-08 MINUTES
that they will not be going to a meeting or cater to their agenda.
Chairman Osiadacz added that it is the Commissioners responsibility
to spend tax dollars wisely and she believes it is unwise to invest
in a facility that is on someone else's property. Shannon Lowry
commented that she understands that recreation isn't a high
priority for the County and under previous management at Public
Works; staff was very engaged in the plan and had conversations on
a path to working together. Chairman Osiadacz stated that
recreation is very important to the County and that currently there
is an unequal partnership between the County and Grant County PUD.
Shannon Lowry asked if the lack of grants funds means that the
restrooms won't be getting repaired. Vice -Chairman O'Brien replied
that currently no funding has been found for the repairs and
funding for the facility is a challenge for the County. Vice -
Chairman O'Brien continued that the County and Grant County PUD
need to work together to get them fixed and would be open to
meeting with the PUD Commissioners. Vice -Chairman O'Brien added
that the restroom facility could be repaired to previous levels but
upgrading to vandal proof facilities should be jointly funded.
Chairman Osiadacz agreed with Vice -Chairman O'Brien that Kittitas
County should not fully fund the upgrade and that the costs for
vandal proof facilities should be a partnership. Mark Cook thanked
the Board for having a conversation with Shannon Lowry and will
update the Board if he hears anything further from FERC regarding
the comments that were submitted.
DRAFT RESOLUTION OF INTENT TO FORMULATE ROAD IMPROVEMENT DISTRICT
NO. 2018-01 WIEHL ROAD
Mark Cook stated that the last study session he committed to
bringing forward a draft resolution for Board review and added that
the Board may want legal review on the document. Mark Cook then
went through the steps after the resolution is approved including
notice in the newspaper of record and letters being sent out to
property owners. Mark Cook added that he would like to get this
item placed on the October 16, 2018 agenda session. Vice -Chairman
O'Brien stated that he will send the resolution over to legal for
review.
2018-2037 KITTITAS COUNTY TRANSPORTATION PLAN DISCUSSION
Mark Cook gave background on the project and stated that prior to
the departure of Paul Jewell he gave comments on the draft plan
that was presented to the Board for review. Mark Cook continued
that those comments have been added to the plan. Mark Cook added
that one element that was to be revised, connection of roadways for
emergency purposes, staff declined to update. Mark Cook stated
that the previous Commissioner thought it was an expensive project
and had funding challenges but after hearing further conversations
2018-10-08 MINUTES
from the Board he elected to keep the
Chairman Osiadacz commented that the
is necessary. Discussion was held.
the revised plan for adoption on the
session.
Meeting adjourned at 2:46 pm.
2018-10-08 MINUTES
project in the plan.
need for roadway connections
Staff was directed to place
October 16, 2018 BOCC agenda
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
BOARD OF COUNTY COMMISSIONE]
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 - 161
AMENDING RESOLUTION 2018-151 ADOPTING MEADOW WAY ONTO THE
KITTITAS COUNTY ROAD SYSTEM
WHEREAS: The Easton Flats Short Plat (Auditors number 200501240029) dedicated a 60
foot roadway tract to Kittitas County located in portions of Sections 1 and 12,
Township 20 N Range 13 E, W.M.; and
WHEREAS: A road meeting public standards was accepted as constructed by Public Works;
and
WHEREAS: The current short plat owner desires establishing the roadway now known as
Meadow Way onto the County Public Road system; and
WHEREAS: Public Works has required an additional easement from the landowner accessing
a temporary turn -around at the end of the road; and
WHEREAS: Meadow Way is intended to be the access roadway for Marian Meadows Long
Plat(LPT-17-000001); and
WHEREAS: The Board of County Commission has granted approval to Marian Meadows
Planned Unit Development (PD -17-00001), Conditional Use Permit (CU -17-
00001) and Plat (LPT- 17-0000 1) pursuant to Ordinance 2018-006; and
NOW, THEREFORE BE IT RESOLVED That the Board of County Commissioners, in the
best interest of the public, does hereby adopt all of Meadow Way (Milepost 0.0
to Milepost 0.17) onto the Kittitas County Road System.
DATED on this 8th day of October, 2018, at Ellensburg, Washington.
' iI
0",�ATY CO
�� %.
G0... • .M?9js
\ :m=
Ai
o;�A6the Board- Julie Kjorsvik
giqm i iWn"�
Clerk of tt),e Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
TY, WASHINGTON
aur Os adac Xhairman
Obie O'Brien, Vice -Chairman
o�Commissioner
EPSCPOES._TO THF
E
�♦f OfL'
d
4p 99
All l'IT\V 0111.\1'\
October 8, 2018
Kittitas County, Washington
BOARD OFCOUNTY COMMISSIONERS
District One District Two District Three
Cory Wright Laura Osiadacz Obie O'Brien
Washington State Recreation and Conservation Office
P.O. Box 40917
Olympia, WA 98504-0917
To Whom It May Concern:
Kittitas County Public Works strongly supports the U.S. Forest Service Cle Elum Ranger
District's applications for Recreation and Conservation Office NOVA and RTP (winter and
summer) grants. These grants will improve winter recreation, keep trails open, maintain
campgrounds, protect natural resources, and educate recreationists to improve overall
recreational experience in Forest Service lands within Kittitas County.
Tourism and outdoor recreation are key components to the economy of Kittitas County. Kittitas
County's public lands, managed by the U.S. Forest Service, are considered destination hotspots
state and even country wide. Tourists visit year-round to explore the County's lakes and many
trails, supporting our local businesses. This funding is essential to the conservation of our
County's natural resources and education of our residents. We pride ourselves on our recreational
areas and depend on funding like this to keep our trails, campgrounds, and road access available
for use.
Please let me know if you have any questions or need further information.
Sincere
Ms. La sia carr
Kittitas County Board of County Commissioners
Kittitas County Courthouse 205 West 5" Avenue, STE 108 Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-7679
ff
rl
i
r*
ID
w
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 8, 2018
ACTION REQUESTED: Approve a Resolution Correcting Resolution No. 2018-151
that incorrectly named the roadway being established onto
the County Road System.
BACKGROUND:
In late September 2018, Public Works requested the Board
of County Commissioners establish Meadow Way onto the
public road system. The second and fifth "WHEREAS"
clauses erroneously identify "Marian Way" rather than
Meadow Way. The error also appears in the "NOW,
THEREFORE." section. Public Works is providing a
revised resolution correcting our errors and consistently
referencing "Meadow Way" for establishment.
INTERACTION:
Public Works
RECOMMENDATION:
Adopt the amending resolution establishing Meadow Way
onto the public road system.
HANDLING:
Return one original to Public Works
ATTACHMENTS:
Resolution Amending 2018-151
LEAD STAFF:
Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF HITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
AMENDING RESOLUTION 2018-151 ADOPTING MEADOW WAY ONTO THE
HITTITAS COUNTY ROAD SYSTEM
WHEREAS: The Easton Flats Short Plat (Auditors number 200501240029) dedicated a 60
foot roadway tract to Kittitas County located in portions of Sections 1 and 12,
Township 20 N Range 13 E, W.M.; and
WHEREAS: A road meeting public standards was accepted as constructed by Public Works;
and
WHEREAS: The current short plat owner desires establishing the roadway now known as
Meadow Way onto the County Public Road system; and
WHEREAS: Public Works has required an additional easement from the land owner accessing
a temporary turn -around at the end of the road; and
WHEREAS: Meadow Way is intended to be the access roadway for Marian Meadows Long
Plat (LPT-17-000001); and
WHEREAS: The Board of County Commission has granted approval to Marian Meadows
Planned Unit Development (PD -17-00001), Conditional Use Permit (CU -17-
00001) and Plat (LPT-17-00001) pursuant to Ordinance 2018-006; and
NOW, THEREFORE BE IT RESOLVED That the Board of County Commissioners, in the
best interest of the public, does hereby adopt all of Meadow Way (Milepost 0.0
to Milepost 0.17) onto the Kittitas County Road System.
DATED on this 8th day of October, 2018, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Obie O'Brien, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 8, 2018
ACTION REQUESTED: Authorize the Chair's Signature on the United
States Forest Service Grant Application Letter of
Support
BACKGROUND:
The Cle Elum Ranger District is seeking grant
funding from the Recreation and Conservation
Office (RCO) supporting winter and summer
recreational activities. The USFS is seeking
funding for: trail maintenance, campground
maintenance, protecting natural resources and
educating recreationists. Outdoor recreation is a
key component to the economy of Kittitas County.
Public Works routinely partners with the Cle Elum
District in matters of road maintenance and
recreation access.
INTERACTION:
Public Works
RECOMMENDATION:
Authorize the Chair's signature on a letter of
support for USFS grant applications to WA RCO.
HANDLING:
Return one original to Public Works
ATTACHMENTS:
Letter of Support
LEAD STAFF:
Mark R. Cook. Director
October 8. 2018
Kittitas County, Washington
BOARD oFCOUNTY COMMISSIONERS
District One District Two Disirict Three
Cory Wright Laura Osiadaez Obie O'Brien
Washington State Recreation and Conservation Office
P.O. Box 40917
Olympia, WA 98504-0917
To Whom It May Concern:
Kittitas County Public Works strongly supports the U.S. Forest Service Cie Clum Ranger
Districts applications for Recreation and Conservation Office NOVA and RTP (winter and
summer) grants. These grants will improve winter recreation, keep trails open, maintain
campgrounds, protect natural resources, and educate recreationists to improve overall
recreational experience in Forest Service lands within Kittitas County.
Tourism and outdoor recreation are key components to the economy of Kittitas County. Kittitas
County's public lands, managed by the U.S. Forest Service, are considered destination hotspots
state and even country wide. Tourists visit year-round to explore the County's lakesand many
trails, supporting our local businesses. This funding is essential to the conservation of our
County's natural resources and education of our residents. We pride ourselves on our recreational
areas and depend on funding like this to keep our trails, campgrounds, and road access available
for use.
Please let me know if you have any questions or need further information.
Sincerely,
Ms. Laura Osiadacz, Chair
Kittitas County Board of County Commissioners
Kinnas County Counkuse 205 %ol ? Avenue, S I r 108 - 9llenshurg, WA 98926
( 509) 962-7508 F AN (109) 962-0679
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 02, 2018
TOPIC: Grant County PUD No. 2 FERC Discussion
ACTION REQUESTED: No Action Requested
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
None.
BRIEFING SUMMARY:
• Recently, the Board of County Commissioners requested Public Works send
comments to the Federal Energy Regulatory Commission (FERC) regarding
Grant County PUD No. 2's recreational plan update.
• PUD staff desire having a discussion with the Board regarding the Board's
decision.
BACKGROUND:
Several weeks ago, the Board of County Commissioners directed Public Works to file
comments with FERC regarding Grant PUD's pending recreation plan. PW submitted
the comments to FERC on September 12, 2018.
DISCUSSION:
Grant County PUD staff desires a discussion with the Board of County Commissioners
regarding the restroom at Vantage Boat Ramp and other issues raised with FERC.
FISCAL IMPACTS:
The Public Facilities grant application from Public Works is not being recommended for
funding by the Council of Government.
ATTACHMENTS:
Exhibit 1: FERC comments on PUD No. 2's proposed recreation plan.
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: FERC COMMENTS ON PUD NO. 2'S PROPOSED RECREATION
PLAN
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
September 11, 2018
Kittitas County Comments on Priest Rapids Hydroelectric Project FERC Project No. 2114,
Recreation Resources Management Plan, April 2017.
We note with concern that there is no consideration of current enhancement
requirements for the Vantage Boat Ramp. The ramp is identified in the report as being
the second highest utilized recreational facility managed by Public Utility District No. 2
of Grant County, Ephrata, Washington. Insufficient parking availability and use stress on
the restroom facility plague the Vantage Boat Ramp.
2. We note with concern that there are no proposed operations and maintenance
improvements at Vantage Boat Ramp specific to increasing maintenance demands at the
restroom facility and parking area.
3. We note with concern that there is no requested amendment to License Article 418
regarding necessary improvements to the Vantage Boat Ramp facility.
4. It is common for weekend Seattle recreational users to inundate the Vantage Boat Ramp
during the summer months. The available parking is soon exceeded and the County road
network is overwhelmed with roadside parking. Ramp users park on undeveloped
County land bordering the ramp on dry grasses. Increasingly, the County is engaged in
fire -fighting activities in and around the unincorporated area of Vantage. Parking on high
fire risk areas greatly concerns or fire/life/safety service providers. Repeatedly, when the
County discusses the topic with PUD No. 2 the response is: "It is not in the project area".
The attractive nuisance created by the ramp is overwhelming the County's law
enforcement resources attempting to manage illegal area parking. The area is posted "no
parking" but pressure is such that users routinely disregard the postings. While the
County originally built the restroom facility — owing to a lack of PUD No. 2 effort,
increasing demands on the restrooms is causing a funding crisis for the County relative to
ongoing maintenance and operations. In spring of this year, vandalism to all of the
restroom plumbing caused the County to close the facility. Repairs are anticipated to
reach $30,000. Funding for repairs is uncertain. Replacement with stainless steel vandal
proof fixtures appears to be our new reality.
We appeal to FERC for assistance managing increasing demands on the Vantage Boat Ramp
from PUD No. 2's successful implementation of its recreational plan. The County is not
resourced in meeting the increasing demands placed on the restroom facility and area
parking.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 8th, 2018
TOPIC: Draft Resolution of Intent to Formulate Road
Improvement District No.
2018-01 Wiehl Road
ACTION REQUESTED: Issue the "Notice of Intent to Formulate Road
Improvement District No. 2018-01 Wiehl Road"
and Schedule the Public Hearing for 2:00 PM
Local Time, November 20, 2018 in the
Commissioners Auditorium
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Issue the "Notice of Intent to Formulate Road Improvement District No. 2018-01 Wiehl
Road" and schedule the public hearing for 2:00 PM local time, November 201h, 2018 in
the Commissioners auditorium.
BRIEFING SUMMARY:
• RID formulation begins with the resolution stating the Board's intent to
formulate (EXHIBIT 1)
• Specific language and exhibits are required to accompany the resolution
• Formulation is pursuant to an Ordinance following a public hearing
• Legal notice is required and the resolution must be published in the County's
paper of record for a minimum of two consecutive issues at least fifteen days
before the fixed date of the hearing
• The Ordinance has required and optional language as prescribed in Revised Code
of Washington 35.43.
BACKGROUND:
For the past several years, Public Works has been working towards formulating the Wiehl
Road Improvement District. Recent outreach to benefited property owners affirms a
minority of opposition (4 of 66).
DISCUSSION:
The resolution has specific requirements in law for inclusion. Public Works has
attempted to ensure compliance with state law requirements. It might be beneficial to
have the Board's attorney review our work prior to Board action.
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FISCAL IMPACTS:
Current engineer's estimate for construction is $874,269.81. The Board has stated
willingness to cover $273,656.16; leaving $600,614 to be borne by benefited property
owners in the district.
ATTACHMENTS:
Exhibit 1: Draft Resolution
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: DRAFT RESOLUTION
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
NOTICE OF INTENT TO FORMULATE KITTITAS ROAD IMPROVEMENT DISTRICT
2018-01— CREATING ROAD IMPROVEMENTS TO A SECTION OF WIEHL ROAD
FROM MP 0.00 TO MP 0.27
WHEREAS: Residents utilizing an unimproved section of Wiehl Road to access residential areas
have previously submitted a petition to Kittitas County Public Works requesting the
formation of a road improvement district (RID); and
WHEREAS: The submitted petition failed to consider the required public roadway construction
requirement in state law; and
WHEREAS: The Kittitas Board of County Commissioners (BOCC) has directed Public Works to
finalize public road improvement design; and
WHEREAS: The roadway design is sufficiently complete to notice benefitted property owners of
RID estimated costs and said costs have been preliminarily presented to said property
owners; and
WHEREAS: The BOCC desires conducting a public hearing considering the merits of formulating
Road Improvement District 2018-01 Wiehl Road;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby declare its intention to order the improvement to Wiehl Road,
setting forth the nature (EXHIBIT 1) and territorial extent of the improvement (EXHIBIT 2); and
does now state that actual assessments may vary from assessment estimates so long as they do not
exceed a figure equal to the increased true and fair value of the improvement adds to the property and
notifies all persons who may desire to object thereto to appear and present their objections at 2:00
PM local time on November 20, 2018 at Room 109, 205 West Fifth Street, Ellensburg, WA.
DATED this 16th day of October, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Cory Wright, Commissioner
EXHIBIT 1 NATURE OF IMPROVEMENT
Weihl Road Improvements, MP 0.0 to MP 0.27
Nature of the improvement: The grade of the roadway is adjusted to meet a maximum of twelve
(12) percent grade. The roadway is widened to a paved hot mix asphalt width of 24 feet.
Drainage improvements are constructed along the inside slope of the roadway along with
retaining walls on the outside of the roadway. Guardrail is placed at areas of high risk on the
outside edge of the roadway. A paved turnaround is constructed at the end of the improvement
at intersection with Loping Lane.
EXHIBIT 2 TERRITORIAL EXTENT OF IMPROVEMENT
Legal Description for Wiehl Road
A 60 foot wide county right of way described as Labusky Road as shown upon that certain
survey recorded in Book 11 of Surveys, Page 59, under Auditor's File No. 467553, records of
Kittitas County, Washington.
60 NAaw�4
L ldtwtww Os� /J 1
Sit+„"w:W�la.1�
6�1-�z'IP•w-s�.w� 1
LM
r 114,
p,%;s
al! -Ir NL" 41 -La. &N
.4 % iff
S'aIaS2"12:• W-1'5.46
a
0 9
IX 0
0
a. or
J 39
1J
S49 -4&S 6I: E -l2. to
i TZ.'SGS`14 3I'4f--11,W
Fm
Road
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: October 8, 2018
TOPIC: Adoption of the 2018-2037 Kittitas County Transportation Plan
ACTION REQUESTED: Direct Staff Prepare Enabling Documents for Plan
Adoption
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct that staff prepare enabling documents supporting adoption of the "2018-2037
Kittitas County Transportation Plan".
BRIEFING SUMMARY:
• Prior to the departure of Commissioner Jewell, Public Works presented the final
draft 2018-2037 Transportation Plan
• Commissioner comments are now incorporated into the final plan
• The plan is now ready for adoption by the Board of County Commissioners
(BOCC)
BACKGROUND:
During 2017 and early months of 2018, Public Works worked towards updating the 2008
Twenty Year Transportation Plan. The plan was presented to the BOCC in late May
2018. Several items were identified for modification and those changes are now
incorporated into the final document with one exception.
DISCUSSION:
The updated plan embraces a streamlined policy section and incorporates a funding plan
supporting full implementation. At the Board's direction, priority is given to road
improvement projects that provide alternate escapes routes to fire prone dead-end
roadways. The funding plan incorporates a new road exiting the Teanaway toward
Salmon Le Sac. The cost is significant. One commissioner requested removal of the
project from the funding list. Staff has not removed the project and it remains in the plan
for adoption.
FISCAL IMPACTS:
Numerous funding actions are required to implement projects and actions identified in the
plan.
ATTACHMENTS:
Exhibit 1: Requested changes made on May 31, 2018.
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: MAY 31, 2018 REQUESTED CHANGES
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Kittitas County Transportation Element 2oi8
Kittitas County is an area rich in history and a
premier destination for outdoor adventure. It is
home to the five cities of Ellensburg, Cie Elum, South
Cie Elum, Roslyn, and Kittitas, each with their own
amenities and charm.
This Transportation Element aims to provide a 20 -
year vision for the County's transportation system,
which respects the character of each of its regions,
supports anticipated growth, and builds on Kittitas
County's development as an attractive place to live,
work, and play by supporting safe and comfortable
travel by all modes through 2037.
1.1 PURPOSE
The overall vision for Kittitas County's
Transportation Element is to provide a safe,
balanced, and efficient multi -modal transportation
system that serves anticipated local and regional
growth. Guidance from County staff and the Policy
Working Group helped identify five goals, which
serve as the foundation for this element:
• Safe — Create a transportation network that
can be shared safely by all users and
provides sufficient access for emergency
response and designated evacuation routes.
• Efficient and Accommodates Growth, but
Respects Rural Character — Provide a
transportation system that works hand-in-
hand with existing and planned land uses,
supports farm -to -market and recreational
tourism needs, but respects the rural
character and wildlife that residents
cherish.
• Complete, Multimodal, and
Accommodates Outdoor Recreation — Fill
gaps in the system to accommodate safe
and enjoyable travel by those choosing to
walk, bike, or use transit, including
recreational users.
• Leveraged by Active Partnerships—
Coordinate with a broad range of groups
(including local, state, and regional
agencies, airports, businesses, and the
public) to develop and operate the
transportation system.
Sustainably Funded and Maintains What
We Have — Plan for a financially -viable
system that considers the full lifecycle costs
of infrastructure and leverages outside
funds, while maintaining existing
transportation facilities in a state -of -good -
repair to ensure their continued function.
The Transportation Element sets a framework for
creating a transportation network that will help
Kittitas County achieve its vision.
1.2 PLANNING CONTEXT
Kittitas County's geography plays a role in the
demands put on its transportation system. The
County is located in central Washington, with major
highway connections, railroad lines, and river
crossings.
Kittitas County is bisected by 1-90, which also.
connects to 1-82 and US 97. These are important
connections for freight and passenger travel across
the state as well as into Oregon, Idaho, and Canada.
Travelers from all regions come to Kittitas County
looking for a variety of activities, including
patronizing the highway -oriented services for a quick
stop or visiting the lakes and mountains for
recreation. These routes also serve the Yakima
Training Center operated by the US Army.
1-90 is a major freight corridor for trucks and the
parallel privately owned Burlington Northern Santa
Fe Railway (BNSF) rail corridor moves more than five
million tons of goods each year. This is an important
aspect of Kittitas County's economic vitality, but also
poses transportation challenges.
The County must coordinate its transportation
planning with a variety of jurisdictions and agencies,
including the city governments, QUADCO Regional
Planning Organization, US Forest Service, FHWA, US
Army, and the State of Washington.
Figure 1 shows the location of Kittitas County in this
regional setting.
3 1 P a g e
Kittitas County Transportation Element 2oi8
OTHERPLANS
As part of this planning process, several local,
regional, and state plans and documents that
influence transportation planning in Kittitas County
were reviewed. This section summarizes some of
those key plans.
KITTITAS COUNTY 2008 COMPREHENSIVE PLAN
The County's last major Comprehensive Plan update
occurred in 2008 and has guided decisions on land
use, transportation, economic development, and
public infrastructure. It was written to address both
short and long-term needs and laid out a future
vision for the region. The overarching goal of the
Transportation Element was to provide a safe and
integrated transportation system that maintains and
preserves the existing facilities, while supporting
land use development and economic vitality.
The previous iteration of this Plan identifies 52 goals
for transportation in the region focusing on:
1. Multi -Modal Transportation System,
Arterial System, and System Maintenance
2. Land Use, Environment and Economic
Development
3. Level of Service (LOS) and Concurrency
4. Financing Transportation Improvements
5. Intergovernmental Coordination and Public
Participation
This plan was reviewed and key projects that were
not yet completed, but still considered viable, are
included in the 20 -year project list for this
Transportation Element.
KITTITAS COUNTY LONG RANGE
TRANSPORTATION PLAN
Kittitas County also developed a Long Range
Transportation Plan in 2008 to guide the County's
planning for roads, public transportation, air, rail,
bicycle/pedestrian facilities, and recreation. The
overarching goal of this plan was to "Provide a
balanced and well-maintained transportation system
for the safe and efficient movement of people,
goods and services."'
' Kittitas County Long Range Transportation Plan - 2008
The Plan identified 11 key goals for transportation in
the County:
1. Preserve and maintain Kittitas County's 565
miles of arterial roads and bridges.
2. Improve roads that do not meet design
standards according to the County's priority
system and as funds become available.
3. Improve roads with high accident rates and
target road deficiencies that affect safety
according to the County's priority system
and as funds become available.
4. Preserve right of way for additional routes
to establish a better grid system of roads,
especially in areas that have only one way
in and one way out and in areas
experiencing a large amount of new
development.
5. Maintain roadway capacity at an acceptable
level of service by monitoring and
forecasting development growth and
identifying infrastructure improvements
needed to address expected growth in the
next 20 years.
6. Continue supporting programs that provide
essential public transportation services for
the county's senior, disabled and low-
income population.
7. Implement strategies as funding becomes
available to encourage people to travel in
carpools, vanpools, or buses such as
establishing park and ride lots or expanding
existing shuttle services to nearby county
residents.
8. Program improvements needed to connect
travelers and freight to airports and rail
services.
9. Include construction of pedestrian paths
and bike routes with major reconstruction
projects when they are within the non -
motorized system plan and develop inter-
agency partnerships to seek grants for
paths and bike routes.
10. Coordinate with US Forest Service and
Washington State Parks and Recreation to
establish off-road parking facilities to
5 1 P a 9 e
Kittitas County Transportation Element 2oi8
provide access to the over 500 miles of
snowmobile and dirt bike trails in the
county.
11. Identify roads that are needed to access the
county's recreational lands and develop
partnerships with other jurisdictional
agencies to seek funding to improve or
construct these roads.
KITTITAS COUNTY ROAD SAFETY PLAN
The 2017 Kittitas County Road Safety Plan aims to
reduce serious injury and fatal accidents throughout
the County road network. The plan catalogues areas
with roadside hazards, clear zone inventory, bridge
rail deficiencies, and corridor/intersection
improvements. It ranks projects to identify the
highest priority improvements with the greatest
benefits. Relevant components of the Safety Plan
were included in this Transportation Element.
ELLENSBURG COMPREHENSIVE PLAN
As a part of its recent Comprehensive Plan update,
the City of Ellensburg completed a transportation
assessment. This plan identified key transportation
goals and improvement projects for a 20 -year
planning horizon. Some of these projects will affect
travel outside of the city, including bike and
pedestrian connections to regional trails, expanded
transit service, and roadway projects along
University Way.
QUADCO REGIONAL TRANSPORTATION PLAN
QUADCO is the regional planning organization
consisting of Adams, Grant, Lincoln, and Kittitas
Counties. The QUADCO Regional Transportation Plan
establishes a regional method of decision making
that is also consistent with statewide goals.
It identifies six major goals for the region:
1. Safety - Protect the safety of our
community.
2. Preservation - Preserve and extend the life
and utility of prior transportation system
investments.
3. Economic Vitality- Enhance our region's
economic vitality by promoting and
developing transportation systems that
stimulate, support, and enhance the
movement of people and goods.
4. Mobility - Enhance the mobility of people
and goods throughout the region by
providing an interconnected transportation
system and opportunities for choosing
different transportation modes.
5. Environment - Protect our region's
environment and high quality of life
through transportation investments that
promote energy conservation, enhance
healthy communities, and protect the
environment.
6. Stewardship - Improve the quality,
effectiveness, and efficiency of our region's
transportation system and growing
communities with cost effective
investments that have public support.
KITTITAS COUNTY PARK, RECREATION & OPEN
SPACE(PROS)PLAN
The 2016 Park, Recreation & Open Space (PROS)
Plan inventories Kittitas County's current open
space, park, and trail facilities. It also outlines future
demand and the preferred actions for the expansion
and management of these spaces. It identifies 12
goals; the three that are most relevant to this effort
are included here:
• Strategic Role - Undertake a strategic
approach to open space, trail, park, and
recreation facilities and recreation services
where Kittitas County assumes
responsibility for functions of countywide
interest where there are no other viable
sponsors, and helps coordinate or support
functions and activities that have other
viable sponsors.
Trail Systems - Facilitate the planning,
development, and operation of a variety of
countywide trails including winter, water,
horse, off-road hike and bike, off-road
vehicle and all -terrain vehicle trails, on -road
bicycle touring routes and scenic drives that
are directly related to environmental
resources that are of most interest to
Kittitas County residents and tourists.
Design Standards - Develop and maintain
design guidelines to ensure facilities are
6 1 P a g e
Kittitas County Transportation Element 2oi8
accessible, safe, and easy to maintain, with
life cycle features that account for long-
term costs and benefits.
WASHINGTON STATE FREIGHT MOBILITY PLAN
Washington State Department of Transportation
(WSDOT) created the Freight Mobility Plan in 2014
to ensure the enhancement of trade flows and
associated economic growth throughout the state.
It conforms to federal freight goals and the Moving
Ahead for Progress in the 21st Century Act (MAP -21)
objectives for each state to create a Freight Mobility
Framework. The plan was developed with three
objectives:
• Developing an urban goods movement
system that supports jobs, the economy,
and clean air for all; and provides goods
delivery to residents and businesses.
• Maintaining Washington's competitive
position as a global gateway to the nation
with intermodal freight corridors serving
trade and international and interstate
commerce, and the state and national
Export Initiatives.
Supporting rural economies' farm -to -
market, manufacturing, and resource
industry sectors.
1 -go SNOQUALMIE PASS EAST PROJECT
The Federal Highway Administration (FHWA) and
WSDOT are making improvements to a 15 -mile
section of 1-90 east of Snoqualmie Pass. The corridor
project will widen the freeway, build and replace
bridges, minimize closures due to avalanches and
rockslides, and address wildlife connectivity. Phase 1
addresses the first five miles of the corridor and will
be completed in 2018. Phase 2 improves the next
two miles and will be completed in 2019, and
funding has been secured for the remaining eight -
mile section.
Completion of the project will result in a six -lane
freeway with less avalanche closures, increased
safety, and new pavement. The improved corridor
will increase traffic capacity coming to and from
Kittitas County along 1-90.
GMA
The State's Growth Management Act of 1990
requires communities to prepare a transportation
plan that ties directly to the County's land use
decisions and financial planning. This Transportation
Element Update fulfills the mandate.
7 1 P a g e
Kittitas County Transportation Element 2oi8
2.1 EXISTING CONDITIONS
This chapter describes how people use Kittitas
County's transportation network today, as well as
how that may change over the next 20 years as the
region grows. The way people travel is greatly
influenced by the built environment, which includes
land use and travel corridors, as well as the key
destinations where people live, work, shop, and
recreate. This chapter also describes trends in how
people are traveling based on anticipated
development patterns and travel mode data.
LAND USES AND KEY DESTINATIONS
The places where people live, work, and play are
impacted by how a county and its communities
guide development. The Land Use Element of this
Comprehensive Plan provides this guidance. The
Kittitas County zoning map regulates the types of
uses that are allowed in specific areas of the region.
This zoning map leads to clustering of like uses, for
example shopping and other commercial
destinations in downtown and along major roadway
corridors, with other areas limited to primarily
residential development or agriculture. Changes to
zoning can affect not only the land use, but also use
of the surrounding transportation network. The
current zoning map for Kittitas County is shown in
Figure 2. Key destinations in the county are mapped
in Figure 3 and described below.
The incorporated cities in Kittitas County are
Ellensburg, Cie Elum, South Cie Elum, Roslyn, and
Kittitas. Ellensburg is the county seat and the largest
of these cities, a hub of commercial and recreational
activity. The cities of Roslyn and Cie Elum are both
centers of recreational tourism. Even within these
incorporated communities, the majority of housing is
detached single family with an owner occupied
housing rate of 58 percent'.
More than half of the county is forested, with 30
percent pasture and only two percent urban land.
Agricultural developments are located throughout
Kittitas County, with lower, more level expanses
located in the central and southeast regions. The
County is known for its high quality Timothy Hay that
is shipped all over the world. Timber is another
2 ACS 2011-2015
major economic commodity for County residents.
The export of forest and agricultural products lead to
a lot of farm and heavy vehicles traveling on low
volume County roads. This can lead to
disproportionately high levels of pavement damage
and safety concerns.
Large swaths of the northwest portions of the
county are highly mountainous, with the Okanogan -
Wenatchee National Forest, four lakes that the US
Bureau of Reclamation (USBR) operates as part of
the Yakima Project, and Lake Easton State Park
comprising large areas of public land. Recreation
opportunities draw crowds to the sno-parks, lakes,
and trails. Sixty four percent of Kittitas County land is
managed by state or federal agencies so interagency
cooperation is crucial.
It is important to consider that areas of commercial,
industrial, and dense residential land use tend to
have more concentrated trips and can be supportive
of alternative modes of travel such as transit,
whereas areas of low density residential and
agricultural use tend to have dispersed trip patterns
more conducive to trips made by personal vehicle.
Recreational destinations are also subject to
seasonal trip fluctuations, which can stress local
roadway networks.
9 1 P a g e
Kittitas County Transportation Element 2018
Ellensburg
Ellensburg, the county seat of Kittitas County, is a
city rich in history, and home to Central Washington
University. Ellensburg has continued to grow since it
was incorporated in 1883, and is projected to grow
at a fast pace over the next twenty years. Currently
over half of county residents live in Ellensburg.
The main commercial areas in Ellensburg are the
Central Commercial zones, the Commercial Highway
zones, and the Commercial Tourist zones. The
Central Commercial zone is generally comprised of
older historic buildings in the historic downtown
core that was rebuilt after the fire of 1889 and that
was revitalized beginning in the late 1970s. Outside
of the Central Commercial zone, areas of commercial
development are largely auto -oriented with larger
buildings and ample off-street parking lots. The
Central Commercial II zone includes newer
developments, like the Fred Meyer shopping center.
Newer developments are also located in pockets of
Commercial Highway zones, mostly centered on
Canyon Road near 1-90, West University Way, and
Vantage Highway. Tourist services such as
restaurants, coffee shops, and gas stations are
clustered in the Commercial Tourist zones around
the two interstate interchanges in Ellensburg.
As the largest urban center in the county, Ellensburg
provides many essential services. The Ellensburg
School District serves almost 3,300 students as of
May 20163 and operates five K-12 schools that serve
the community. Kittitas Valley Healthcare Hospital
serves Ellensburg and the surrounding areas. The
hospital is a 25 -bed inpatient facility, although
outpatients make up 85 percent of the total usage.
The hospital employs approximately 600 people in
addition to other medical clinics on the same
campus. Ellensburg also has a number of retirement
communities and medical facilities. ADA accessible
pedestrian infrastructure surrounding retirement
communities and medical communities should be in
place for those that wish to walk.
' Office of Superintendent of Public Instruction. 2016.
"Washington State Report Card, Ellensburg School District"
http://reportcard.ospi.kl2.wa.us/summary.aspx?groupLevel=Dist
rict&sch ool Id=127&reportLeve I=D ist rict&orgLi nkl d=127&yrs=201
5-16&year=2015-16
4 Central Washington University. 2016. "Quick Facts"
https://www.cwu.edu/about/quick-facts
Central Washington University
Central Washington University (CWU) is a major
destination and economic driver in the County. The
380 -acre campus is located northeast of historic
downtown Ellensburg. The University had almost
11,000 students enrolled in the 2015-2016 academic
year, of which over 3,000 live on campus4. In
addition to students, there are about 1,500 faculty
and staff memberss. The large concentration of
students, faculty, and staff leads to university -
specific transportation issues, such as clustering of
arrivals and departures around class schedules,
parking availability and pricing concerns, and how to
accommodate students without access to personal
vehicles. The University has plans for continued
growth in enrollment and campus facilities,
particularly on the relatively undeveloped areas on
the north end of campus. Growth at CWU was
considered in future conditions analysis.
Bowers Field Airport
Bowers Field is the largest airport in Kittitas County
and is located just north of Ellensburg. Home to the
Central Washington University Flight School it
provides regional connections for tourism,
emergency medical services, and firefighting
operations. In 2012, it supported 129 jobs and $11.8
million in regional economic activity6.
Kittitas Valley Event Center
The Kittitas Valley Event Center, also known as the
fair and rodeo grounds, are located in Central
Ellensburg. They are a major draw on Labor Day
weekend coinciding with the Kittitas County Fair and
Rodeo, but are used intermittently throughout the
year for equestrian and 4-H related activities. In
2016, the County adopted a Master Plan for the
grounds —this element considers consistency with
potential improvements at the event center. The
Composite Long Range Plan for the Event Center is
shown in Figure 4.
Central Washington University. 2014. "Economic Impact"
http://www.cwu,edu/president/sites/cts.cwu.edu.president/files/
documents/economic%20impact%20brochu re%20fi nal2. pdf
°WSDOT. 2012. "Airport Economic Profile".
https://www.wsdot.wa.gov/N R/rdonlyres/A3 DF6FC9-CB27-4C BD-
BAA4-31F26BC08896/0/2012BowersField.pdf
121Page
Kittitas County Transportation Element 2018
TRANSPORTATION NETWORK OVERVIEW
Kittitas County possesses a rich and diverse mix of
land uses and destinations that require a specialized
transportation plan to ensure efficient mobility and
accessibility throughout the County.
The transportation network accommodates many
modes of travel, including walking, bicycling, public
transit, and driving. Vehicular travel is still the
primary mode for most travelers in and around the
County.
Rural roads and highways form the foundation of the
transportation framework with roadways connecting
the many communities in Kittitas County.
Additionally, transit is available within the city of
Ellensburg. The incorporated cities have relatively
well-connected street grids, while rural roadways
with more limited pedestrian amenities characterize
the remaining areas of the County.
The majority of land in the County is owned by
Federal and State entities, including the Department
of Natural Resources and State Park Service (see
Figure 5). The United States Forest Service (USFS)
maintains certain roadways within Kittitas County,
which are known as "Schedule A" roads. As County
residents use roadways on Federal and State land,
coordination between all parties is important to
properly maintain these roadways.
This plan classifies Kittitas County's roadways into
interstates, principal and minor arterials, major and
minor collectors, and local streets, as shown in Table
1, and Figures 6 to 8.
151Page
Kittitas County Transportation Element 2oi8
Auto Network
With many Kittitas County residents and employees
relying on vehicles as their primary mode of
transportation, the County's roadway network is
critical to the transportation system. Growth within
the region has increased the strain on the roadway
network, both in terms of traffic congestion and
wear and tear.
Most of the congestion in Kittitas County occurs in
the urban areas or at certain times of the year— near
ski resorts in winter or routes accessing the lakes in
the summer.
Analysis was conducted on 45 segments of
interstate, arterial, and collector roadways
throughout the County. Roadway segment
operations were evaluated and assigned a level of
service (LOS) grade based on their operations in
terms of a ratio of PM peak hour traffic volumes to
the roadway segment's capacity. This analysis was
performed for multiple times of the year to capture
seasonal shifts in traffic volumes.
Appendix A describes the Level of Service definitions
from the Florida Department of Transportation,
which is a standard methodology for measuring the
performance of roadway corridors. In Kittitas
County, the standard for a roadway to be considered
"acceptable" is LOS C for rural roads and LOS D for
roads within urban growth boundaries.
Based on this analysis only one segment is expected
to exceed LOS standards during the 20 -year planning
horizon —Bowers Road located just to the north of
Ellensburg is projected to be at LOS E by 2037. This
section is within the UGA boundary in an area of
rapid development. A future planned project to
connect Bowers Road to Look Road would bring this
section back into compliance with the County's LOS
standards. Reecer Creek Road from Bowers Road to
Old Highway 10 also sees increased volumes, which
will increase LOS to D by 2037. However, because
this plan reclassifies this section of Reecer Creek to
an urban arterial, this is considered within the
County's LOS standard. Figure 13, Figure 14, and
Table 3 show the LOS segment maps and LOS
analysis summary. A secondary analysis was
performed to capture possible traffic increases from
high growth at the Suncadia Resort. The LOS results
were found to be very similar to the scenario
without additional growth in Suncadia. Detailed LOS
results can be found in Appendix B.
Based on the regional demand and the forecasted
traffic volume, all other County roadways should be
able to accommodate anticipated local and regional
growth over the next 20 years. Nevertheless, the
County should monitor key segments especially near
freeway interchanges, proposed new commercial
and residential developments, and potential
bottleneck locations to maintain an efficient
roadway network.
SAFETY
The County undertook a detailed safety analysis
along the roadway network that was compiled in the
2017 Road Safety Plan. The Plan aims to reduce
fatalities and severe injury accidents across the
County's road network by analyzing crash data and
ranking roadway improvement projects based on
effectiveness.
Between 2011 and 2015, about one third of
collisions in the County resulted in injury. Nineteen
percent of those injuries were fatal and 81 percent
were serious injuries. Of these, the most common
collision types were hitting a fixed object and
overturning. Higher speeds and lack of lighting were
also major contributing factors.
Knowing the contributing factors to these collisions,
the County scored the safety projects on the
presence of potential hazards, inclusion in previous
plans, road curvature, adequate clear zone, and
instances of severe collisions. The final project list
contains 39 items with eight priority levels. This
allows the County to focus its resources on the most
crucial projects that will make the greatest safety
improvement for the cost.
281Page
Table 4. Historical Programmatic Expenditures, 2007-2017
>ource: nimvas wunry rum¢ woms, tuai
371P a 9
Network:
2g. Provide a transportation system with a
hierarchy of roads, with distinct purposes,
forming a complete network.
21h. Encourage a grid system in the Urban
Growth Areas (UGAs) where practical.
2i. Evaluate and plan for regional facility
improvements that may impact the County
road system.
Land use:
2j. Evaluate the merits of a proposed land use
action against the potential impacts on the
transportation system by reviewing
development proposals for potential
impacts to the transportation system and
requiring developments to identify and
mitigate their transportation impacts
through SEPA or other local regulatory
reviews and county permits or actions.
2k. Provide a transportation system that
corresponds to and is consistent with
patterns of land development and which
provides access to and from population
centers identified in the comprehensive
plans in accordance with adopted land use
plans.
21. Encourage land use development patterns
and investments which reduce the demands
on the roadway network.
Farm to Market:
2m. Encourage opportunities for the county to
explore rail transportation.
2n. Identify, designate, and protect agriculture
transportation corridors that facilitate farm
use.
Wildlife:
20. Consider refinements to roadway plans and
design standards to minimize impacts to
wildlife.
2p. Where appropriate, new roadways should
consider incorporating wildlife friendly
design features.
GOAL 3— COMPLETE, MULTIMODAL,
AND ACCOMMODAI ES OUTDOOR
RECREATION
Fill gaps in the system to accommodate safe and
enjoyable travel by those choosing to walk, bike, or
use transit, including recreational users.
3a. Consider alternative modes when reviewing
development applications, incorporate
multiple modes into transportation
improvement projects, and establish
development standards to support the use
of alternative transportation modes.
31b. Develop a variety of performance
measurements to evaluate the multi -modal
transportation system and prioritize
improvements.
3c. Work with WSDOT, transit, and local
agencies to develop park-and-ride, park -
and -pool, and express transit service where
the need for such facilities has been
identified.
Non -motorized:
3d. Identify high priority non -motorized
corridors and evaluate the highest priority
improvements.
3e. Encourage the expansion and use of non -
motorized transportation by constructing
and maintaining safe, efficient, and pleasant
streets for pedestrian and bicycle use.
Recreation:
3f. Promote and support recreational activities
throughout the County by providing
adequate access.
3g. Coordinate with other entities to identify
viable options and projects for connection
to the John Wayne Pioneer Trail within
Kittitas County and to adjacent counties.
421Page
3h. Support the construction of parking
facilities at identified locations known for
recreational and multi -modal use.
Transit:
3i. Support efforts to provide public
transportation services to the general
population.
3j. Work with local transit operators to
maintain existing transit services. Where
appropriate, support service expansion. For
the purposes of measuring Level of Service
for transit routes in Kittitas County, the
following table summarizes this Plan's
standard:
Work with transit to
accommodate access to transit
service expansion.
Work with transit to maintain
*..- existing transit service.
Removal of access to transit.
GOAL 4— LEVERAGED BY ACTIVE
PARTNERSHIPS
Coordinate with a broad range of groups (including
local, state, and regional agencies, airports,
businesses, and the public) to develop and operate
the transportation system.
County/Agency planning:
4a. Identify, review, and resolve
interjurisdictional transportation concerns
within or affecting Kittitas County.
4b. Work with WSDOT, QuadCo RTPO, cities
and neighboring counties to develop and
maintain a system of arterials, collectors
and local access roads.
4c. Coordinate transportation planning,
construction and maintenance efforts with
all affected agencies by developing joint
transportation standards for UGAs between
the County and the adjoining city or town.
4d. Seek partnerships with other public or
private agents when mutual benefits and
significant cost savings are anticipated as a
result of a coordinated transportation
improvement project to maximize benefits
while minimizing costs.
4e. Actively participate on selected state,
regional and local transportation
committees.
4f. Ensure County plans and policies are
consistent with other plans and policies
within the region.
4g. Identify stakeholders and include them in
the decision-making process, and jointly
develop a process for resolving conflicts
between jurisdictions.
41h. Promote public information and
communication with businesses,
organizations, and individual citizens as part
of the transportation planning and decision-
making process.
Airports/Airfields:
4i. Protect Kittitas County Airport (Bowers
Field), Cle Elum Municipal, DeVere Field and
Easton State airports from adjacent
incompatible land uses and/or activities
that could impact the present or future use
of these or other public use airports as
essential public facilities.
4j. Recognize air transport and airports as an
important mode of the transportation
system and coordinate with FAA and
WSDOT Aviation Division.
4k. Maintain up-to-date maps of airport
overlays and make available to the general
public.
431Page
GOAL 5 — SUSTAINABLY FUNDED AND
MAINTAINS WHAT WE HAVE
Plan for a financially -viable system that considers the
full lifecycle costs of infrastructure and leverages
outside funds, while maintaining existing
transportation facilities in a state -of -good -repair to
ensure their continued function.
Funding/Costs:
5a. Improve the sustainability of the county's
funding for maintenance, operations, and
capital improvements. Periodically review
funding status and consider either
increasing revenues generated by existing
sources or establishing new funding sources
for transportation.
5b. Maximize local funds by pursuing outside
funding sources for all transportation
improvement projects.
5c. Consider all funding options for financing
transportation improvements by evaluating
the potential funds, including taxes, grants,
fees, etc., and securing funds from all
available sources.
5d. Encourage efforts to reduce the costs
associated with administration of
transportation improvement projects by
identifying opportunities to consolidate or
coordinate administration responsibilities.
Se. Ensure the transportation system can
support new development and that new
development funds all new construction
and improvements that might be necessary
to maintain adopted level of service
standards.
Project Choice/Prioritization
5f. Prioritize projects and expenditures of
transportation funds that have multiple
benefits.
5g. Prioritize arterial improvements and
maintenance activities based on traffic
volumes and identified safety concerns.
5h. Establish appropriate performance
measures by maintaining the Pavement
Management System (PMS) to measure
pavement conditions and to prioritize
maintenance or improvement projects, and
the Hazard Elimination Safety Program to
identify potentially hazardous locations and
to prioritize mitigation measures.
5i. Maintain an arterial system that can
accommodate legal weights year-round by
developing a program for identifying and
prioritizing maintenance and reconstruction
projects for roads that are used primarily
for freight and goods movement.
Maintenance:
5j. Provide scheduled preservation and
maintenance of valuable roadway assets.
5k. Consider the traffic volumes, type of use,
adjacent land uses, and maintenance costs
before approving any new county -
maintained gravel roads.
51. Maintain and operate transportation
infrastructure according to industry
standards.
Sm. Encourage and initiate Road Improvement
Districts to bring all roads up to County
standards.
5n. Protect at -risk roads by imposing seasonal
weight restrictions as appropriate.
441Page
Table 11. Twenty Year Project List
Roadway
Investments
Cost
Score
1
Bender Road - Widening and Pedestrian Improvements
$3,300,000
22
2
Manastash Road Creek Bank Stabilization and Snow Park Improvements
$2,400,000
18
5 Ellensburg Greenway John Wayne Trail Reconnection
Milepost 10.65 to 11.01
14
6 River to Rodeo Trail
3
Fairview Road Widening & Coleman Creek Structures, Brick Mill Road to Rader Road
$2,250,000
17
8 Reecer Creek Trail
Milepost 5.03-6.05
9 City Parks Trail
14
4
Manastash Road Bridge
$2,500,000
16
Milepost 10.567 - 10.633 (State Funding Secured)
5
Reecer Creek Road - advanced warning signs
$20,000
16
Milepost 0.26 - 0.312
6
Reecer Creek Road - curves that need advanced warning signs, chevrons
$20,000
16
Milepost 4.80-6.68
7
Denmark Road Safety Improvements - railing Milepost 0.50-3.08, countermeasures
$385,684
16
Milepost 3.08-4.35
8
Brick Mill Road Bridge over Naneum Creek
$1,500,000
15
Milepost 0.10 East Naneum Road
9
Fairview Road Bridge over Coleman Creek
$2,500,000
1s
Milepost 0.23 North of Brickmill Road
10
Bowers Road Extension
$1,675,000
13
11
Bender Road to Dry Creek Road Connector
$1,500,000
10
12
Brick Mill Road & Wilson Creek Road - four way stop controlled intersection
$20,500
2
13
Kittitas Highway & Number 6 Road - four way stop controlled intersection
$750,000
2
14
Vantage Highway & Number 6 Road - four way stop controlled intersection
$750,000
2
Total: $19,571,184
Nonmotorized Projects
1 Canyon Road on road bike trail -City Limits to SR 821 (No Widening)
Cost
$500,000
Score
17
2 Reecer Creek Road on road bike trail - University Way to Bowers Road (No Widening)
$125,000
17
3 Hansen Pits Park Master Plan - West of Tjossem Road / Canyon Road intersection
$25,000
14
4 Cie Elum Pedestrian Bridge - S. Cie Elum Bridge Vicinity
$1;250;000
14
5 Ellensburg Greenway John Wayne Trail Reconnection
$1,000,000
14
6 River to Rodeo Trail
$2,000,000
14
7 McCabe Ringer Loop
14
8 Reecer Creek Trail
14
9 City Parks Trail
14
10 Bureau of Reclamation (BOR) Trail
14
11 Spray Fields Trail
14
So1Page
6.1 REGIONAL COLLABORATION
As stated earlier, the County's priority in this plan is
to coordinate with a broad range of groups to
develop and operate the transportation system. A
key element of this will be partnering with the city
governments, WSDOT, and USFS to ensure regional
travel patterns do not impact quality of life in Kittitas
County.
CITIES
There are city projects outside of Kittitas County's
purview that will affect travel in and around the
County. Ellensburg recently updated their
comprehensive plan and identified transportation
projects within the city limits that are needed to
accommodate future growth. Coordination with
Ellensburg as well as the other cities within the
County will be necessary to determine the best
allocation of resources for transportation
improvements.
TRANSIT FACILITIES
On the transit side, Ellensburg is working to improve
Central Transit service and facilities within the City
that will connect with regional transit options.
Envisioned improvements include:
• Adding a northeast route stretching east to
Pfenning Road and north to Bender Road
• Adding a west route traveling out to
Dolarway Road and University Way
• Development of a transit center
Greater Kittitas County currently only has on
demand transit service within the region but a more
integrated Central Transit network would support
the County transit and any future expansions.
Increased Central Transit service will also connect
residents to the intercity Yakima Commuter route
that travels between Ellensburg and Yakima during
the week.
IWSDOT
WSDOT supports multimodal integration into
projects and planning multi -agency and community
network interconnectivity. The state system provides
access to key destinations within the County, so
WSDOT will partner with Kittitas County to ensure
that both agencies' needs and concerns are
addressed.
One of the biggest projects that will impact travel in
the region is the WSDOT 1-90 Snoqualmie Pass East
widening. The first two phases of the project will
complete widening, paving, and safety
improvements along seven miles of 1-90 and are
projected to be finished in 2019. Completion of this
roadway is expected to improve safety and mobility
within Kittitas County.
U.S. FOREST SERVICE
The USFS owns and maintains roads throughout
Okanogan -Wenatchee National Forest, which covers
a large portion of Kittitas County. Maintenance and
repairs are necessary to provide access to popular
recreation destinations. Collaboration with the USFS
is necessary to ensure these facilities are maintained
and accessible to Kittitas County residents and
visitors.
FEDERAL HIGHWAY ADMINISTRATION
The Federal Highway Administration (FHWA)
partners with local agencies to oversee
maintenance, capital projects, and preservation of
the country's roads and bridges. It regulates road
operations, provides research and guidance on
transportation best practices, and is a potential
source of funds for improvement projects
throughout the County.
531Page
This chapter considers Kittitas County's funding
picture over the next 20 years and provides
strategies to support implementation of the
recommendations made as part of this
Transportation Element.
Any funding strategy must balance stated goals
against developing sustainable revenue sources that
are feasible for the County to implement. This is
even more pressing given the limited means
counties have at their disposal for raising revenue.
Washington's counties are different from cities and
special service districts in fundamental ways. These
differences are brought into stark relief by
considering the interplay of four factors:
• Counties face strict limits ontheirtaxing
authority.
• Counties are heavily reliant on property
taxes.
Counties face a long list of regional service
obligations that are mandated by the state.
Counties have a complex set of
relationships with multiple constituencies:
o They collect regional taxes and
provide regional services for all
constituents in the county.
o They collect local taxes and
provide local services to
unincorporated areas.
Kittitas County has a long list of service obligations
with few options for securing new revenue streams.
As they look to the future, Kittitas County faces a
fundamental, structural challenge—and this larger
systemic issue must be considered as part of their
long-term transportation funding strategy.
7.1 BALANCING FINANCIAL
CAPACITY WITH FUTURE FUNDING
NEEDS
When comparing total available revenues for
transportation with expected costs over the 20 -year
planning horizon, revenues are sufficient to cover
the capital project list but fall short of paying for the
current estimated operating costs.
Is See Appendix E for a detailed description for how each project was
evaluated and scored relative to the transportation goals using a scoring
matrix.
Operating and state of repair expenditures total an
estimated $178.2 million for the 20 -year planning
horizon while revenues total $148 million, a gap of
$30.2 million. Revenues for capital projects are an
estimated $117.1 million, which would be sufficient
to complete the $102.6 million in projects on the
capital projects list. Detailed revenue and
expenditure calculations can be found in Appendix
E.
Two main strategies can be used to balance this
implementation plan:
1. Decrease expenses by decreasing level -of -
service or further prioritizing capital projects.
2. Increase revenue, through increases in existing
funding tools or implementation of new funding
or financing tools.
Funding and financing strategies should fund capital
investments that are currently needed, as well as
help the County sustainably fund future capital
needs.
DECREASEEXPENSES
Prioritization
Project prioritization is needed to help identify when
best to fund and implement the projects since
funding is limited. Criteria were established to help
prioritize the projects and implementation 13
Using these criteria, the recommended projects
were evaluated and ranked based on how well each
could meet the criteria. High priority projects for
Kittitas County are those that meet multiple criteria
in terms of effectiveness, benefit to the community,
and ability to be implemented. While the current 20 -
year project list is not expected to exceed the
County's revenue, these prioritization criteria can be
used to evaluate future projects.
Level of Service maintenance
Current operating expenditures incorporate
additional costs needed to bring locations failing LOS
standards back into compliance. Going forward,
541Page
expenditures will maintain existing levels of service,
which may not be as capital intensive.
FUTURE FUNDING STRATEGIES
The following is a list of options for balancing future
funding needs:
• Increase Revenues through Existing Funding
Tools:
o County Admissions Tax
o
County Roads Levy (Property Taxes)
o
General Fund Appropriations
o
Sale of Existing Capital Assets
o
Real Estate Excise Tax 1
• Increase Revenues through New Funding Tools:
o.
$20 Vehicle Licensing Fee levied via a
Transportation Benefit District
0
0.2% Sales and Use Tax levied via a
Transportation Benefit District
o
Levy Lid Lift
o
Transportation Impact Fees
o
Road Improvement District (RID)
o
Local Option Fuel Tax
o
Real Estate Excise Tax 2
• Increase Revenues through New Financing
Tools:
o Limited Tax General Obligation (LTGO)
Bonds
o Unlimited Tax General Obligation
(UTGO) Bond
Table 12 summarizes the potential revenue that can
be generated by these tools, explained in detail
below.
FUNDING TOOLS
To following are potential options to address the
$30.2 million funding gap in operating revenues over
the 20 -year planning period. Each of these options
has its own challenges, and there is no easy solution
to balancing revenues and needs.
Transportation Benefit District— Vehicle Licensing
Fee (Non -Voted)
Independent taxing districts created through
ordinance can impose a vehicle fee on vehicles
under 6,000 pounds, without voter approval, of up
to $20. If a $20 fee has been in effect for at least 24
months, then a vehicle fee up to $40 can be
imposed; if a $40 fee has been effect for at least 24
months, then a $50 vehicle fee can be imposed.
Vehicle license fees can be as much as $100 with
voter approval.
Two ordinances are required to establish a Vehicle
Licensing Fee, first a Transportation Benefit District
(TBD) and then a Vehicle Licensing Lee itself.
Currently, over 100 cities have established TBDs; the
City of Kittitas is a Transportation Benefit District
with a $20 Vehicle Licensing Fee. Kittitas County
could potentially set a fee aligned with the City of
Kittitas. Five counties have established a TBD: King,
Pierce, Points Roberts (formed by Whatcom County),
Snohomish, and Thurston County.
According to Washington State Department of
Licensing (DOL) data, there are 27,549 vehicles
registered in unincorporated Kittitas County. The
DOL collects 1% of revenue generated from a Vehicle
Licensing Fee. The fee can be collected six months
after it is approved, and the County must notify DOL
once the fee has been approved so that the fee can
be included in vehicle renewal notices.
Assuming a constant rate of registered vehicles to
population, and projecting forward using population
estimates, a $20 Vehicle Licensing Fee would bring in
estimated annual additional revenues of $545,470
(after deducting 1% for DOL). This could be a phased
approach, where the County implements a $20 fee
for two years, then a $40 for two years, then a $50
fee for the remaining period. This could bring an
estimated additional $557,054 during the first year
and $31.6 million over the 20 -year period. This is
sufficient to cover the $30.2 million operating
deficit.
Transportation Benefit District — Sales and Use Tax
(Voted)
Independent taxing districts created through
ordinance can impose an additional sales and use tax
of up to 0.2%. This would apply to unincorporated
areas and could be aligned to sales and use taxes in
cities. Currently, the City of Ellensburg is a TBD with
a 0.2% sales tax. The tax must be reauthorized by
voters after ten years.
A Sales and Use Tax levied through a TBD could bring
in approximately $718,636 annually, based on
Unincorporated Kittitas County's 2016 taxable retail
sales data from Washington State's Department of
551Page
Revenue. Based on population projections, this is
approximately $18.2 million over the 20 -year period.
Property Tax Levy Lid Lift—County Road Fund Levy
(Voted)
Levy lid lifts can be permanent or temporary. If
permanent, the revenue collected during the lid
lift is used as the base to calculate the revenue
limit for future levies. If temporary, the revenue
limit for future collections is calculated as if the
lid lift had not occurred. Counties can levy either a
single -year or multi-year levy lid lift to increase
county road property taxes in taxing districts without
banked capacity beyond the 1% limit.
With a permanent single -year lid lift, the County can
increase the county road fund property taxes
beyond the 1% limit in the first year, and then that
amount is used to calculate all future 1% levy
limitations. The measure never expires, and the levy
lid never reverts. Single -year lid lifts may be
submitted to voters at any special, primary, or
general election.
With a permanent multi-year lid lift, the County can
increase the county road fund property taxes
beyond the 1% limit (up to a limit factor specified in
the ballot measure), for six consecutive years up to a
rate equal to or less than the statutory maximum,
which is $2.25 per $1000 of assessed value. After the
six years, the total levy can increase by up to 1%
annually. Multi-year lid lifts must be submitted at
the primary or general election.
Kittitas County is currently levying a County Road
Fund Levy of only $0.97, but could bring this up to
$1.75 per $1000 AV. With a permanent single -year
lid lift by setting the 2019 levy rate at $1.75 per
$1000 AV, the County Road Fund Levy could bring in
an additional $3.6 million during the first year, or
$62.3 million over 20 years, beyond what is
currently being collected. This is based on projected
valuations of property and new construction in
unincorporated Kittitas County.
Local Option Fuel Tax (Voted)
Counties may levy a gas tax for local transportation
purposes. The maximum rate is 10% of the state gas
tax rate (the state rate is currently 49.4 cents per
gallon, so the maximum Local Option Fuel Tax rate is
4.94 cents per gallon). Counties in a Regional
Transportation Improvement District (RTID) may not
levy the tax if the RTID is already levying a local
option fuel tax. Revenues are distributed to the
county and cities within the county on a per capita
basis: 1.5 for the population in the unincorporated
area and 1.0 for city populations. No counties in
Washington have enacted this tax.
The Washington State Joint Transportation
Committee produced revenue estimates for a Local
Option Motor Vehicle in their January 2017
Transportation Resource Manual. Fuel tax collections
are estimated from the County's share as a
percentage of total state fuel gallons taxed at 4.94
cents per gallon. The state total is based on actual
fuel gallons consumed in FY 2016 and uses the
November 2016 forecast for FY 2017 and 2018. The
county's share is based on the Office of Financial
Management's April 1 population estimates. This
report estimates that a Local Option Fuel Tax could
bring in $797,632 annually for Kittitas County. Over
20 years, using population projections, this could
generate approximately $19.8 million over 20 years.
Table 12 details the potential revenue from these
funding strategies over the 20 -year planning horizon.
s6IPage