HomeMy WebLinkAbout2018-07-09-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday July 9, 2018 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution to Award the 2018 Bowers Field Runway 7/25 Pavement
Break Project and Authorize the Director of Public Works to Sign said Contract.
3. Upper County Traffic Task Force Proposal
4. 2018 Road Standards Review Committee
5. Other business
6. Adjourn
Created on 7/6/2018 9.03:02 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM July 9, 2018
Board members present: Chairman Laura Osiadacz; Vice -Chairman
Obie O'Brien; Commissioner Cory Wright
Others: Sara Folk, Candie Leader, Public Works; Dan Carlson,
Steph Mifflin, Lindsey Ozbolt, Mike Flory, Community Development
Services; Kayla Bonar, Daily Record; Three(3) members of the
public
REQUEST TO APPROVE A RESOLUTION TO AWARD THE 2018 BOWERS FIELD
RUNWAY 7/25 PAVEMENT BREAK PROJECT AND AUTHORIZE THE DIRECTOR OF
PUBLIC WORKS TO SIGN SAID CONTRACT
At 1:30 pm Chairman Laura Osiadacz opened the Public Works Study
Session.
Sara Folk presented the resolution for consideration stating
that Public Works invested $24,000 out of the Airport fund to
produce the plans and specifications for the project and a match
requirement of approximately $17,000. Sara Folk continued that
the Federal Aviation Administration (FAA) is financing the
remainder of the project in an approximate amount of $154,000.
Sara Folk stated that the FAA has approved the submitted bid
amount. Discussion was held. Commissioner O'Brien made a
motion to approve Resolution 2018-113 to Award the 2018 Bowers
Field Runway 7/25 Pavement Break Project and Authorize the
Director of Public Works to Sign said Contract. Commissioner
Wright seconded the motion. Further discussion was held.
Motion passed.
UPPER COUNTY TRAFFIC TASK FORCE PROPOSAL
Sara Folk gave background on the ongoing speeding and congestion
issues in the Upper County due to the ongoing construction on I-
90. Sara Folk stated that after a recent community meeting
staff is suggesting putting together a community task force to
come up with possible solutions. Sara Folk presented the task
force proposal for Board of County Commissioner consideration.
Discussion was held. Commissioner Wright inquired as to adding
the City of Roslyn to the task force since they are impacted by
2018-07-09 MINUTES
the traffic issues as well. Further discussion was held.
Commissioner O'Brien made a motion to approve the proposal and
form the Upper County Traffic Task Force as amended to include
the City of Roslyn. Commissioner Wright seconded the motion.
Sara Folk added that she will reach out to South Cle Elum as
well. Motion passed.
2018 ROAD STANDARDS REVIEW COMMITTEE
Sara Folk stated that a previous study session staff updated the
Board of County Commissioners on the work being done on an
update to the current road standards. Sara Folk continued that
in the last update in 2015 a committee was formed to review the
proposed changes at that time. Sara Folk added that staff
recommends forming another committee to help facilitate with
this update as well. Discussion was held. Commissioner O'Brien
made a motion to approve the proposal as presented and form a
2018 Road Standards Review Committee. Commissioner Wright
seconded the motion. Motion passed.
Meeting adjourned at 1:59 pm.
2018-07-09 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -_V la
TO AWARD THE 2018 BOWERS FIELD RUNWAY 7/25 PAVEMENT BREAK
PROJECT TO BELSAAS AND SMITH AND AUTHORIZE THE PUBLIC WORKS
DIRECTOR TO SIGN SAID CONTRACT DOCUMENTS
WHEREAS: The 2018 Bower's Field Runway 7/25 pavement break contract is included in the
2018 Airport Capital Improvement Plan; and
WHEREAS: Public Works solicited contractors through Municipal Research Service
Corporations contractor website for two weeks consistent with Federal Aviation
Administration requirements; and
WHEREAS: Public Works received a qualified bid from Belsaas and Smith, Inc. in the amount
of $170,640; and
WHEREAS: Public Works has a cost match obligation of $17,064 and said funds are allocated
in the 2018 Airport Fund budget;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award the 2018 Bowers Field Runway 7/25 pavement
break contract to Belsaas and Smith, Inc. in the amount of $170,640 and authorize the Public
Works Director to sign said contract documents.
DATED this 9th day of July, 2018, at Ellensburg, Washington.
o`d,
U Aly C04,^'/,
'= Aklest, �
'0.. `0
L`fi Clerk of the Board- Julie Kjorsvik
'16eputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laur O dacz airman
Obie O'Brien, ice -Chairman
Coral Wright, Commissioner
G=R
\k}
888
:§
§!
4;§!§!§;§§;§|
>*\
:
!!:§/
r§)
)))
\)§)§§
:
j-
]§
7 77
|/(}
��,...�.�....,.(
\
®(
/ /\
0_!
y
m
-\f
)
\
)
0.0
-57
\\;)\
)))//
a,e,e
k2k))
°
)))))
:§
§!
4;§!§!§;§§;§|
>*\
:
!!:§/
r§)
)))
\)§)§§
:
j-
]§
��,...�.�....,.(
)
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 9, 2018
ACTION REQUESTED: Request to Approve a Resolution to Award the 2018
Bower's Field Runway 7/25 Pavement Break
Construction Contract and Authorize the Director of Public
Works to sign said contract.
BACKGROUND: For the past several months, Public Works (PW) has been
working to finalize Bowers Field Runway 7/25 pavement
break construction. The Federal Aviation Administration
(FAA) is offering to cover 90 percent of all construction costs.
PW solicited the plans and specifications to over 40 qualified
firms via the Municipal Research Service Corporations online
construction bid service. We received a single bid proposal
from a local construction company, Belsaas and Smith, Inc.
The engineer's estimate for the project is $129,880.80.
Belsaas' bid is for $170,640.00.
The FAA is offering to finance $153,576 leaving a match
requirement of $17,064 for the County. PW elected to spend
$23,796.13 from the Airport Fund in plans and specifications
design. Grant award timing did not allow for competitive
solicitation. All in, PW will fund $40,860.13 removing the
intersecting pavement on runways 7/25 and 11/29. Total
project costs are: $23,796.13 + $170,640 = $194,436.13. Our
total percentage of contribution towards project costs is:
21%.
This project is identified and prioritized in the 2018 Airport
Capital Improvement Plan.
INTERACTION: Public Works
RECOMMENDATION: Award the 2018 Runway 7/25 construction project to Belsaas
and Smith, Inc. for $170,640 and authorize the Public Works
Director to sign said contract.
HANDLING: Return one original to Public Works
ATTACHMENTS: None
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
TO AWARD THE 2018 BOWERS FIELD RUNWAY 7/25 PAVEMENT BREAK
PROJECT TO BELSAAS AND SMITH AND AUTHORIZE THE PUBLIC WORKS
DIRECTOR TO SIGN SAID CONTRACT DOCUMENTS
WHEREAS: The 2018 Bower's Field Runway 7/25 pavement break contract is included in the
2018 Airport Capital Improvement Plan; and
WHEREAS: Public Works solicited contractors through Municipal Research Service
Corporations contractor website for two weeks consistent with Federal Aviation
Administration requirements; and
WHEREAS: Public Works received a qualified bid from Belsaas and Smith, Inc. in the amount
of $170,640; and
WHEREAS: Public Works has a cost match obligation of $17,064 and said funds are allocated
in the 2018 Airport Fund budget;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award the 2018 Bowers Field Runway 7/25 pavement
break contract to Belsaas and Smith, Inc. in the amount of $170,640 and authorize the Public
Works Director to sign said contract documents.
DATED this 9th day of July, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Corey Wright, Commissioner
82'6
,�-ffi
99
838
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 9, 2018
TOPIC: Upper County Traffic Task Force
ACTION REQUESTED: Direct Solicitation of Interested Participants
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct that staff solicit interested individuals serving on an Upper County Traffic task
force.
BRIEFING SUMMARY:
• A recent public meeting regarding Upper County traffic issues was well attended
• The meeting providing no community consensus on the path forward
• Public Works suggests pulling together a community task force working with the
Sheriffs Office and PW identifying solution approaches
• PW has a suggested process for Board consideration (EXHIBIT 1)
BACKGROUND:
Ongoing Sunday traffic avoiding 1-90 congestion continues plaguing area residents. Our
attempt this summer limiting heavy truck traffic has not been successful. Speeding and
traffic volume are primary concerns. A recent public meeting underscores the need for
community involvement in any solution approach pursued by Public Works.
DISCUSSION:
PW is proposing the formulation of an Upper County traffic task force (EXHIBIT 1). We
desire attracting residents from Upper Peoh, Westside and Nelson Siding. Additionally,
we are suggesting that representatives from the City of Cle Elum, WSDOT and the
Sheriffs Office be included in the effort.
FISCAL IMPACTS:
Fiscal impacts are not determined at this time. Rental fees for meeting venue are the
likely first financial impact.
ATTACHMENTS:
Exhibit 1: Suggested Upper County Traffic Task Force solution approach
Page] of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: SUGGESTED UPPER COUNTY TRAFFIC TASK FORCE SOLUTION
APPROACH
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Upper County Traffic Task Group Proposal
June 27, 2018
Issue: Weekend traffic diverting from Interstate 90 creates two main issues for area residents: speeding
and congestion.
Task Force Assignment: Provide and/or vet various options proposed by the Department of Public Works
and the Sheriff's Office.
Suggested Task Force Structure:
• Two residents from Westside/Nelson Siding
• Two residents from Upper Peoh/Thorp Prairie
• Two upper county business owners
• One representative from the Sheriffs Office
• One representative from the City of Cle Elum
• One representative from Public Works (Director)
• One representative from Washington State Department of Transportation
Task Force Milestones:
• Form the group by August 13, 2018
• Develop and vet proposals; August 2018 through December 2018
• Present preferred alternatives with implementation timelines January 2019
• Coordinate identified actions with Washington State Department of Transportation February — April
2019
• Deploy infra -structure April -May 2019
• Monitor success of selected actions: Summer 2019
• Reconvene group September 2019 and report back monitoring results
• Identify plan adjustments October -November 2019
• Implement adjusted actions April -May 2020
County Expectations from group participants
• Attendance at six meeting in 2018 (meeting are expected to last 60-90 minutes each). Meeting will
be conducted in the evenings from 6:00 PM to 7:30 PM. Meeting will be conducted in an upper
county venue to be determined.
• Attendance at six meeting in 2019
Outreach effort:
• Press release followed by two consecutive solicitation ads in the Northern Kittitas County Tribune
(Press Release on July 17, 2018 with ads on July 19 and 26).
Formulating Process:
Public Works will prepare a list of responders and present the list to the BOCC during our Study Session
on August 13, 2018.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: July 9, 2018
TOPIC: 2018 Road Standards Review Committee
ACTION REQUESTED: Formulate the Proposed Road Standards Review
Committee
LEAD STAFF:
Mark R. Cook
RECOMMENDATION•
Direct that staff solicit for committee members reviewing proposed changes to Title 12.
BRIEFING SUMMARY:
• Public Works (PW) has recently completed a complete revision to county road
standards.
• PW desires obtaining stakeholder feedback ahead of planning commission review.
• PW has prepared a suggested a process for formulating a stakeholder review
committee (EXHIBIT 1).
BACKGROUND:
Recently, PW completed a complete revision to County Road Standards. The changes
are significant and PW desires having a stakeholder group review the standards ahead of
planning commission review.
DISCUSSION:
It is PW understanding that the County has previously formed a review committee for all
previous revisions to the Road Standards. The current proposed revision is extensive and
area stakeholders are expected to be interested in evaluating staff's proposal ahead of
planning commission submittal. Obtaining consensus from area stakeholders ahead of
planning commission review is expected to facilitate the planning review process.
FISCAL IMPACTS:
Staff time in stakeholder meetings is budgeted in the 2018 PW budget.
ATTACHMENTS:
Exhibit 1: Suggested Road Standards Review Process
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: SUGGESTED 2018 ROAD STANDARDS REVIEW PROCESS
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
2018 ROAD STANDARDS REVIEW COMMITTEE
Introduction
The existing Kittitas County Road Standards are a result of a minimal revision effort conducted
in 2015. The primary result of the revision was to cap the number of private lots on a dead end
road to 30 — consistent with adopted fire code. For the past two years, Public Works staff has
compiled desired revisions reaching well beyond the minor effort of 2015. Recently, KPG (an
on-call civil engineering consultant with PW) delivered a draft 2018 Road Standards package.
This effort represents a wholesale revision to existing county road standards.
PW desires having a group of County stakeholders review the KPG effort, offer revisions and
assist PW through the code adoption process. To that end, PW is requesting the Board of
County Commissioners consider forming a review committee supporting implementation of the
new proposed standards.
Suggested Committee Makeup
• Two local land use developers
• Two representatives from area engineering and/or survey firms specializing in land
development services
• A representative of the real estate community
• Two representatives from local excavation specialty firms
• One representative from local land use consulting firms
• One member from the agricultural community
• One member of from the fire/life/safety community
• One member from the home builders association/community
Proposed Proiect Timeline
• Press Release (7/11/18)
• Ads in Daily Record and Northern Kittitas County Tribune (July 18, 2018)
• Present list of responders for Board consideration (8/13/2018)
• Formulate the committee (8/13/2018)
• Committee review (9/10/2018 — 12/07/2018)
• Present draft for Planning Commission review (12/10/2018)
• Planning Commission review (01 — 02/2019)
• Public Hearing for Title 12 amendment (03/2019)
Committee Level of Effort
Review meetings are expected to last two hours for each session. Two sessions a month are
forecast during 2018 (5 meetings — 10 hours). Planning Commission support is estimated at an
additional four hours.