HomeMy WebLinkAbout2018-03-12-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday March 12, 2018 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
I. Call to Order
2. Request to Approve a Resolution Authorizing Load Restrictions on Certain County Bridges
and Prescribing a Misdemeanor for Violation Thereof.
3. Request to Approve a Resolution Authorizing Placement of an Informational Klosk at the
end of Cove Road on County Right of Way for the Manastash Ridge Trail.
4. Request to Authorize Chair Signature on the Yakima Basin Integrated Plan Requested Letter
of Commitment for Land Acquisition.
5. Snow Blower Acquisition Discussion.
6. New FEMA Flood Maps for Kittitas County Discussion.
7. Other business
8. Adjourn
Created on 319/201.6 8:27:58 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM March 12, 2018
Board members present: Chairman Laura Osiadacz; Vice -Chairman
Obie O'Brien; Commissioner Paul Jewell
Others: Mark Cook, Lucas Huck, Candie Leader, Public Works; Dan
Carlson, Stephanie Mifflin, Lindsey Ozbolt, Mike Flory,
Community Development Services; Neil Caulkins, Prosecutor's
Office, Kayla Bonar, Daily Record; Three (3) members of the
public
REQUEST TO APPROVE A RESOLUTION AUTHORIZING LOAD RESTRICTIONS ON
CERTAIN COUNTY BRIDGES AND PRESCRIBING A MISDEMEANOR FOR
VIOLATION THEREOF
At 2:46 pm Chairman Laura Osiadacz opened the Public Works Study
Session. Mark Cook requested to add one item to the agenda -
Runway 7/25 - Form 7480. Commissioner Jewell requested to
discuss items four (4) and seven (7) due to his commitment to
another meeting at 3:00pm.
Lucas Huck presented a Resolution for consideration regarding
placing load restrictions on certain county bridges. He stated
that the Federal Highway Administration (FHWA) developed new
calculations for determining the weight a bridge can safely
carry and to allow heavier trucks on roadways. He added that
staff coordinated with KPFF (on call Structural Engineering
Consultants) to identify bridges in county inventory that may
require load ratings. Staff has identified fifteen (15) bridges
that require new vehicle weight restrictions and two (2)
additional bridges that require shoulder restrictions.
Discussion was held. Commissioner Osiadacz called for a motion
to approve Resolution 2018-047 Authorizing Load Restrictions on
Certain County Bridges and Prescribing a Misdemeanor for
Violation Thereof. Commissioner O'Brien moved to approve
Resolution 2018-047. Commissioner Jewell seconded said motion.
Motion carried 3-0 with no discussion -
2018 -03-12 MINUTES
REQUEST TO AUTHORIZE CHAIR SIGNATURE ON THE YAKIMA BASIN
INTEGRATED PLAN REQUESTED LETTER OF COMMITMENT FOR LAND
ACQUISITION
Mark Cook stated that he is presenting a letter of commitment
for property acquisition near Hansen Pits. Staff has spent
approximately six (6) weeks working with the Yakima Basin
Integrated Plan (YBIP) Habitat Subcommittee (HS) lead staff
working on the terms of the letter. There is twenty (20) acres
immediately south of Hansen Pits that is currently leased to
Twin City Foods supporting land application of waste water
effluent. Mark Cook continued that the letter eliminates hard
performance requirements on the part of the County allowing
actions by others in the absence of County funding. Staff and
YBIP HS are in agreement on restricting portions of the acquired
lands for habitat restoration consistent with reserving lands
for future use by Twin City Foods should the need arise.
Discussion was held. Commissioner Jewell moved for a motion
authorizing signature on the Yakima Basin Integrated Plan
Requested Letter of Commitment for Land Acquisition.
Commissioner O'Brien seconded the motion.. Motion carried 3-0
RUNWAY 7/25 FORM 7480
Mark Cook gave background on the closure of Runway 7/25 and
after multiple months of discussion the Federal Aviation
Administration (FAA) Form 7480 is ready to be filed. Mark Cook
continued that staff has met with Central Washington University
(CWU) and the FAA with several concerns from CWU being
addressed. Mark Cook added that the current NOTAM for Runway
7/25 is set to expire March 31, 2018 and the FAA is anticipating
the Form 7480 to be submitted. Mark Cook stated that he would
like to file the Form 7480 on Thursday after the Airport
Advisory Committee meeting to give them prior notice of the
filing. Discussion was held with Commissioner Jewell adding
that he has been working with staff and CWU on all issues
regarding Bowers Field with three (3) meetings being held last
week. Commissioner Jewell moved for a motion authorizing staff
to prepare the Form 7480 and file said form after the Airport
Advisory Committee meeting to be held on Wednesday.
Commissioner O'Brien seconded the motion. Motion carried 3-0-
2018-03-12 MINUTES
REQUEST TO APPROVE A RESOLUTION AUTHORIZING PLACEMENT OF AN
INFORMATIONAL KIOSK AT THE END OF COVE ROAD ON COUNTY RIGHT OF
WAY FOR THE MANASTASH RIDGE TRAIL
Lucas Huck reported that he has been working with the Manastash
Ride Trails Planning Coalition on a request to place an
informational kiosk at the end of Cove Road. Lucas Huck
continued that staff reviewed the requested location and has
concluded that it does not impede snow removal and routine
maintenance operations, hinder existing utilities and meets
clear zone safety requirements. Lucas Huck added that Kittitas
County Code 12.50 prohibits commercial signs within County Right
of way and is seeking Board of County Commissioner approval to
allow for the installation of said kiosk as it is not believed
to be of commercial use and supports recreational opportunities.
Discussion was held. Commissioner Osiadacz called for a motion
to approve Resolution 2018-048 Authorizing the Placement of an
Informational Kiosk at the end of Cove Road on County Right of
Way for the Manastash Ridge Trail. Commissioner O'Brien moved
for a motion with Commissioner Osiadacz seconding the motion.
Motion carries 2-0.
SNOW BLOWER ACQUISTION DISCUSSION
Mark Cook reported that recently the Maintenance Manager for
Public Works had been informed of the possible surplus of a snow
blower currently owned by the City of Yakima. Mark Cook
continued that staff inspected the unit and appears to be in
good shape with minimal use and is similar to current equipment
used by Public Works' crews. Mark Cook added that staff would
like to proceed with negotiating a purchase price and while the
blower is not budgeted in the current budget cycle, there is
enough in the fund to cover the cost. Discussion was held.
Commissioner O'Brien made a motion to authorize the purchase,
Commissioner Osiadacz seconded the motion. Motion carries 2-0.
Staff was also directed to see if a budget amendment is
necessary with the Auditor's office.
NEW FEMA FLOOD MAPS FOR KITTITAS COUNTY DISCUSSION
Mark Cook gave background on the topic stating that the FEMA
flood study for Kittitas County began in 2010 with draft maps
being rejected by County staff in 2012. In 2015, Public Works
reconnected with FEMA and offered to proceed with a limited
remapping effort. At the time the briefing was prepared the new
maps were to be released on March 9, 2018. However, the date
has been pushed back to March 26, 2018. Mark Cook continued
2018-03-12 MINUTES
that staff would like to start coordinating public outreach
efforts and requests that the Board of County Commissioners
attend if available. Mark Cook added that staff will prepare
the outreach campaign and present to the BOCC for review and
approval. Discussion was held with direction given,
Meeting adjourned at 3:24 pm
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
1'
Candie Leader Laura Osiadacz, Chairman
2018-03-12 MINUTES
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
RESOLUTION AUTHORIZING LOAD RESTRICTIONS ON CERTAIN
COUNTY BRIDGES AND PRESCRIBING A MISDEMEANOR FOR
VIOLATION THEREOF
WHEREAS: Load ratings and engineering investigations have been made on 48 Kittitas
County Bridges by KPFF Consulting Engineers; and
WHEREAS: Such investigations has revealed that 17 bridges, designated herein, have
stresses above what is normally considered safe for certain heavy loads or
combination of loads which might be expected to use the bridges if left
open to unrestricted use by the traveling public; and
WHEREAS: In the interest of safety to the traveling public shoulder closures will be
established for two bridges and load restriction shall be enacted on 15
bridges in accordance with RCW 36.75.270; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, restrict the use of the following Kittitas
County Bridges as hereinafter stated:
Bridge No. 07 101 — Liberty Road over Swauk Creek
Single Unit Vehicle Trucks
4 axle
5 axle
6 axle
7 axle
23 tons
25 tons
26 tons
27 tons
Bridge No. 60043 — Ross Road over Turbine Canal North
Single Unit Vehicle Trucks
4 axle
5 axle 6 axle
7 axle
29 ton- 36 ton
28 tons 28 tons
31 tons
Bridge No. 60091 — Ross Road over Turbine Canal South
AASHTO
Motor Truck
Motor Truck and Motor Truck and
Semi -- Trailer Trailer
18 ton
29 ton- 36 ton
Single Unit Vehicle Trucks
4 axle
5 axle 6 axle
7 axle
17 tons
18 tons 19 tons
21 tons
Bridge No. 79132 — Badger Pocket Road over Parke Creek
Single Unit Vehicle Trucks
4 axle
5 axle 6 axle
7 axle
32 tons
34 tons
Emergency Vehicles
EV2 EV3
31 tons
Bridge No. 80181 — Cooke Canyon Road over Hiline Canal
AASHTO
Motor Truck
Motor Truck and Motor Truck and
Semi — Trailer Trailer
8 ton
12 ton 15 ton
Single Unit Vehicle Trucks
4 axle
5 axle b axle
7 axle
7 tons
8 tons 8 tons
r 8 tons
Bridge No. 88082 — Clarke Road over Dry Creek
Single Unit Vehicle Trucks
4 axle
5 axle
6 axle 7 axle
26 tons
26 tons
27 tons 1 29 tons
Bridge No. 88212 — Faust Road over Towne Ditch
Single Unit Vehicle Trucks
4 axle 5 axle 6 axle
7 axle
22 tons 23 tons 24 tons
26 tons
Bridge No. 89022 — Fairview Road over Hiline Canal
Single Unit Vehicle Trucks
4 axle
1 5 axle
1 6 axle
1 7 axle
28 tons 29 tons
28 tons
1 29 tons
1 30 tons
Bridge No. 89113 — Schnebly Road over Hiline Canal
Single Unit Vehicle Trucks 4 axle 5 axle
28 tons
6 axle
7 axle
29 tons
30 tons
Bridge No. 98262 — Robbins Road over Hiline Canal
Single Unit Vehicle Trucks
4 axle
5 axle 6 axle
7 axle
7 axle
28 tons 29 tons
30 tons
Bridge No. 98265 — Smithson Road over Hiline Canal
Single Unit Vehicle Trucks
4 axle
5 axle
6 axle
7 axle
24 ton
28 tons
29 tons
30 tons
Bridge No. 99325 — Thomas Road over Naneum Creek
Single Unit Vehicle Trucks
4 axle 5 axle 6 axle
7 axle
25 ton 27 tons 28 tons
1 30 tons
Bridge No. 16203 — NF Teanaway Road over NF Teanaway River
Single Unit Vehicle Trucks
4 axle
5 axle
6 axle
7 axle
24 ton
28 tons
29 tons
1 29 tons
Bridge No. 88283 — Old HWY 10 over Currier Creek
Emergency Vehicles
EV2 EV3
36 tons
Bridge No. 88322 — Weaver Road over Westside Ditch
Single Unit Vehicle Trucks
4 axle
1 5 axle
6 axle 7 axle
24 ton
25 tons
26 tons 29 tons
Bridge No. 79141 — Tjossem Road over Towne Ditch
Traffic shall be restricted from use of the right shoulder along the eastbound lane of the
bridge.
Bridge No. 87131 — South Thorpe HWY over Westside Ditch
Traffic shall be restricted from use of both shoulders of the bridge.
NOW, THEREFORE BE IT FURTHER RESOLVED that the Board of County
Commissioners, in the best interest of the public, declare the established
restrictions on the herein designated Kittitas County Bridges remain in
force and effect until the designated bridges have been reconstructed or
are deemed capable of sustaining legal loads whichever shall occur first.
The County Engineer is hereby directed and authorized to post and
maintain signs in accordance with this Resolution and the Manual on
Uniform Traffic Control Devices. The restrictions authorized by this
resolution shall take effect upon the placement of signs; any violation of
the provisions of this resolution shall constitute a misdemeanor pursuant to
RCW 36.75.270.
The Clerk of the Board is hereby directed to have published the
aforementioned restrictions in the official Kittitas County newspaper as by
law required.
DATED on this 12th day of March, 2018, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
`\`\\`\`
`�,,, ,10,9pu�ty Clerk of the Board- Mandy Buchholz
`�Y COA444ZSS%
SES
-Uhl
. Z
BOARD OF COUNTY
COMMISSIONERS
KIjITAS COUNTY, WASHINGTON
a,�ura�si cz, an
E Q:�n Vice -Chairman
Paul Jewell, Commissioner
S pDES...
KITTRAS CouN .
February 27, 2018
Kittitas County, Washington
BOARD of COUNTY
COMMISSIONERS
District One District Two District Three
Paul Jewell Laura Osiadacz Obie O'Brien
Yakima Basin Integrated Plan Habitat Subcommittee
c/o Mr. Sean Gross
NOAA Fisheries — Columbia Bassin Branch
304 S. Water St., #201
Ellensburg, WA 98926
RE: Kittitas County Commitment Regarding YBIP Funding for Proposed Land
Acquisition
Bear Mr. Gross:
As requested by the Yakima Basin Integrated Plan (YBIP) Habitat Subcommittee at its
September 21, 2017 meeting, the County is following up with you, as a member of that
subcommittee, regarding the County's request for funding for the acquisition of a 160 -
acre parcel, Kittitas County Parcel 508933 (Stewart).
At that meeting, the Subcommittee proposed allocating $1,200,000 of Ecology YBIP
funding towards the County's acquisition of this parcel, subject to the Subcommittee's
approval of the County's plans for managing and restoring this parcel and the adjacent
County -owned properties to the north.
This letter details the commitment and intentions of the County if awarded this grant.
The proposed acquisition is part of the implementation of the County's 2015 Yakima
River Jeffries Levee to Yakima Can on Habitat Enhancement and Flood Risk
Management Plan (Plan). The County seeks this acquisition funding to facilitate
implementation of specific actions identified in the Plan for Parcel 508933 (the Stewart
parcel, the property proposed for acquisition), and County -owned parcels 17895 (County
Sprayfield) and 728733 (Hansen Pits).
If the YBIP Program awards the County a $1,200,000 grant for use towards the
acquisition of Parcel 508933, and the County succeeds in acquiring this parcel, the
County agrees to the items listed below. (For reference, please see the attachment for an
approximate location of the management areas noted in this letter. However, the specific
boundary between Areas 3 and 4 will be determined as noted in #5a and #5b of this
letter.)
Kittitas County Courthouse - 205 West 5h Avenue, STE 108 • Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-7679
www.co.kittilas.wa.us
Parcel 508933, Stewart Parcel
1. Long-term Management of Property
a. Western portion (Area 1 in the attachment - the area from the western
boundary of the parcel eastward to 100 feet east of "Spring Creek," a
spring/wetland complex that bisects the parcel from north to south): The
County would use this area primarily for fish and wildlife habitat,
including restoration of native forest and natural river processes including
flooding and erosion. The County would allow for recreational uses, such
as fishing and hiking, if consistent with the primary use. However, the
County would not use this area for permanent infrastructure such as roads,
buildings, paved trails, parking areas, or a boating access ramp.
b. Eastern portion (Area 2 in the attachment - approximately 40 -acres): The
County would use this area consistent with flood storage during seasonal
flooding, uses that may include but are not limited to a sprayf eid or other
agricultural purposes, a trail, a parking area for public access, and/or
habitat.
c. Deed Restrictions for parcel 508933: The County accepts that Ecology
will require a deed restriction that memorializes the above in perpetuity as
well as preserves the opportunity for both the near-term and long-term
restoration actions noted below.
2. Near -Term Restoration Actions on Property: This pertains to those portions of
Flood Hazard Management Project PB3 and Habitat Restoration Actions #15,
#16, and #18 of the Plan that occur on this parcel. This includes removal of a
private berm near the Yakima River, restoration of Spring Creek and its riparian
buffer (100 feet on each side of Spring Creek), and other actions as noted in the
Plan.
a. Within one year of acquisition of this parcel, the County intends that it, or
one of its partners, will initiate planning, design, and other preliminary
activities to implement restoration actions on the parcel.
b. Subject to available funding and timeliness of required permit approvals,
the County intends to complete these restoration projects within three
years of acquisition.
c. if a partner is leading a Plan restoration action, such as taking
responsibility for an action's design, construction, and/or funding, the
County intends to support its partner's efforts to the best of the County's
ability, subject to the partner's compliance with all applicable rules and
regulations and the availability of County resources.
3. Long -Term Restoration of Property: Several side channels of the Yakima River
currently occupy parts of Area 1. The County recognizes that significant side
channels and/or the main channel of the Yakima River may occupy Area 1 in
some future time and support fish and wildlife habitat, including restoration of
native forest and natural river processes including flooding and erosion.
Establishment of these channels may occur as components of planned actions,
Kittitas County Courthouse • 205 West 5h Avenue, ,STE 108 • Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-7679
www.co,kitfitm.wa.us
such as the flood hazard management projects and habitat restoration projects
referenced in other parts of this letter, or through natural flooding and erosion
processes. In any case, the County will not take or allow any action that would
preclude the possibility that significant side channels and/or the main channel of
the Yakima River may come to occupy Area 1 at a future date, unless such action
is necessary as part of a restoration action consistent with the primary use of the
property.
Parcel 728733, Hansen Pits
4. This pertains to the project to reconnect Hansen Pits to the Yakima River. The
project's goals are to: 1) allow more natural river flooding and erosion processes
at the Hanson Pits and other locations in the reach, 2) allow native trout and
salmon access to the Hansen Pits, 3) reduce non-native fish populations in Hansen
Pits, and 4) to do so while protecting private property and critical transportation
facilities. Two conceptual alternatives for this project were identified in the Plan
as Flood Hazard Management Projects HP 14 and HP 16. These alternatives ranked
highly and are consistent with purchase and implementation of restoration on the
Stewart Parcel (described in #2 and #3, above.) These alternatives will be
considered in the planning process, though other alternatives or combinations of
alternatives that meet project goals may be implemented.
a. Within three years of acquisition of the Stewart parcel and subject to
available funding, the County intends to initiate technical studies,
stakeholder engagement, and other planning for this project.
b. Within six years of acquisition of the Stewart parcel and subject to
available funding and timeliness of required permit approvals, the County
intends to complete the implementation of this project.
c. The project will be compatible with establishment of a community park, if
desired by the County.
Parcel 17895, County Spra. field
5. Long-term, the County intends to restore portions of this parcel to support
reconnection to Hansen Pits and the establishment of a native riparian forest (see
Area 3 and 4 in the attachment for a concept drawing of these areas — the actual
boundary between these two areas will be determined per the process defined
below)
a. Restoration and Long -Term Management of Area 3: The County intends
to conduct a flood avulsion flow path risk assessment in 2020 (provided
sufficient funding exists at the time). The assessment will identify the
probable significant flow paths of the river once it avulses into Hansen
Pits. The assessment will also consider probable significant flow paths
under a scenario in which the existing levees around and between the pits
are removed from the model to represent the unobstructed natural
Kittitas County Courthouse 205 West 5t°Avenue, STE 108 • Ellensburg, WA 98926
(509) 962-7508 -FAX (509) 962-7679
www oo.kittitas.wa.us
condition in which water can spread freely across the floodplain. The
County agrees to setback 300 feet from the centerline of the easternmost
identified probable significant flood path, allowing sufficient space for
river reconnection and buffering. The Yakima Integrated Plan Habitat
Subcommittee agrees to review the County's flood risk work and will
affirm the probable significant flow paths if they concur. Upon
concurrence, the County agrees to make the area set aside for the channel
and buffer area available for habitat enhancement work immediately
following concurrence on flow path alignment. Area 3 would then be
defined as that portion of the County Sprayfield property extending from
the western boundary of the property eastward to the setback located 300
feet eastward of the centerline of the easternmost identified probable
significant flow path. The County would use Area 3 for the same uses
proposed for Area 1 (see #1a), as well as accommodating flow through the
identified significant flow paths.
b. Management of Area 4 (Defined as the remainder of the County
Sprayfield not included in Area 3): The County intends to manage Area 4
similar to Area 2 (see #1b).
We believe this letter provides the desired commitment from the County allowing the
YBIP Habitat Subcommittee sufficient confidence to move forward with incremental
land acquisition filnding. Please let me know if you desire any other actions in this
matter.
Sincerely,
Laura Osiadacz
Chair, Kittitas County Board of County Commissioners
Attachment - Management Areas Map
cc: Mark R. Cook
Flood Control Zone District Administrator
Kittitas County Courthouse • 205 West 5h Avenue, STE 108 • Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-7679
www.co.kittitas.wa.us
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -. QLf 5
RESOLUTION AUTHORIZING THE PLACEMENT OF AN INFORMATIONAL
KIOSK AT THE END OF COVE ROAD ON COUNTY RIGHT OF WAY FOR
THE MANASTASH RIDGE TRAILS
WHEREAS: The Manastash Ride Trails Planning Coalition seeks to install an
informational kiosk within County Right of Way at the end of Cove Road;
and
WHEREAS: The proposed location and design of the kiosk does not impede County
maintenance operations and is located and constructed in a manner that
preserves the safety of the traveling public; and
WHEREAS: In the interest of proving informational opportunities to recreationalists
utilizing the Manastash Ridge Trails system;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, authorize the placement of an informational
kiosk at the end of Cove Road on County Right of Way as shown in
Attachment A.
DATED on this 12th day of March, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
,,,,,G1,rDeppty Clerk of the Board- Mandy Buchholz
-0 GOMMI �s..
4 i
SEA
l
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Lia-Osiadacz, Chairkan
.-, /��, VI r7 t
Obie O'Brien, Vice -Chairman
ABSENT
Paul Jewell, Commissioner
JED
X
w
Attachment A
LL-)
-- Placement Pending:
Need approval from
Kittitas Co. Laid out
�-----=,and painted 2116118.
Existing User Kiosk proposal: Move existing user kiosk from up near the
irrigation canal down to this location. This location provides protection
for the flush telephone ped at this location.
5'x8' placement proposal
Kiosk is freestanding, will sit on 12"x12" flush patio bricks (does not
require anchoring and is moveable with 4 men), (Actual 4'7"x 7'8" after
modifications to be made smaller to better fit this location)
0
Dimensions
accurate. Drawing
NOT TO SCALE 11
phone Ped Flush Utility Box
New state kisok proposal.
Posts would be 4'x4' or
-eakaway" since in the county
ght of way. Structure would
eve pasts anchored in ground
-2' deep on four corners.
County asked us
not to extend
beyond the
existing fence
kick -out (kiosk
placement not to
exceed the
proximity of the
existing fence
south of the
proposed kiosk)
I I
Cove/Manastas h
Intersection 0.2mi
to the north
I
d
Orrion
Rd
Private
Dr
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 12, 2018
ACTION REQUESTED: Approve Resolution Authorizing Load Restrictions on
Certain County Bridges and Prescribing a Misdemeanor for
Violation Thereof
13ACKGROUND:
The Federal Highway Administration (FHWA) developed
new calculations for determining the weight that a bridge
can safely carry following a bridge collapse and,
importantly, a recent decision by FHWA to allow heavier
trucks on roadways. All state and local governments are
evaluating publicly owned vehicle bridges using these new
criterion and determining whether additional vehicle weight
restrictions must be placed on bridges.
Key components of new method:
• Added requirement to rate bridge's ability to carry
four additional types of "special haul vehicles."
These are newly authorized vehicles on roadways
that can have heavier loads.
• Added requirement to evaluate and rate certain
connections on bridges with structural steel
members.
Public Works coordinated Efforts with KPFF (on call
Structural Engineering Consultants) to identify bridges
within our inventory that require load ratings in order to
comply with the new FHWA mandate. This resulted in 48
bridges that were required to be load rated by December
31, 2017 and 52 bridges to be completed by December 31,
2022.
Of the bridges evaluated so far, engineers have determined
new vehicle weight restrictions are necessary for 15
bridges. Two additional bridges avoided the posting
requirement but will require the shoulders to be restricted
with barrier to ensure no loading occurs on the outside of
the bridge.
As the rest of the bridge inventory is inspected and
evaluated, any additional bridges that need restricting will
be brought to the Board of County Commissioners for
resolution prior to restriction implementation.
The County Engineer and Traffic Supervisor have worked
together to plan the signing deployment for compliance
with FHWA and are utilizing sign specifications in
accordance with the Manual of Uniform Traffic Control
Devices. 60 signs will be required to be deployed in total
for compliance with the bridge posting and advance
warning locations.
To date, the efforts to perform the required load ratings for
2017 has an associated cost of $99,000 approving
resolution 2017-101. The anticipated cost for the sign
purchase and deployment efforts is anticipated to have an
initial cost of $15,000 with an minimum annual
maintenance cost expected at this time but it is yet to be
determined. Following adoption by resolution the
deployment is anticipated to take two employees
approximately two weeks to complete
INTERACTION: Public Works
)tRECOMNlENDATION: Approve Resolution Authorizing Load Restrictions on
Certain County Bridges and Prescribing a Misdemeanor for
Violation Thereof
XANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Resolution, Load Restriction Summary Table, Map of
impacted bridges, Sign Examples
LEAD STAFF: Lucas Huck, County Engineer
BOARD OF COUNTY CO,MNUSSIONERS
COUNTY OF KTTTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
RESOLUTION AUTHORIZING LOAD RESTRICTIONS ON CERTAIN
COUNTY BRIDGES AND PRESCRIBING A MISDEMEANOR FOR
VIOLATION THEREOF
WHEREAS: Load ratings and engineering investigations have been made on 48 Kittitas
County Bridges by KPFF Consulting Engineers; and
WHEREAS: Such investigations has revealed that 17 bridges, designated herein, have
stresses above what is normally considered safe for certain heavy loads or
combination of loads which might be expected to use the bridges if left
open to unrestricted use by the traveling public; and
WHEREAS: In the interest of safety to the traveling public shoulder closures will be
established for two bridges and load restriction shall be enacted on 15
bridges in accordance with RCW 36.75.270; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, restrict the use of the following Kittitas
County Bridges as hereinafter stated:
Bridge No. 07101— Liberty Road over Swauk Creek
Single Unit Vehicle Trucks
4 axle 5 axle
6 axle 7 axle
23 tons 25 tons
26 tons 27 tons
Brid a No. 60043 — Ross Road over Turbine Canal North
Single Unit Vehicle Trucks 4 axle 5 axle1 6 axle 7 axle
2$ tons 1 28 tons 31 tons
Bridge No. 60091— Ross Road
over Turbine Canal South
AASHTO
Motor Truck
Motor Truck and Motor Truck and
Semi — Trailer Trailer
18 ton
29 ton 36 ton
Single Unit Vehicle Trucks
4 axle
5 axle 6 axle 1 7 axle
17 tons
1$ tons.1 19 tons 1 21 tons
Brid a No. 79132 — Badger Pocket Road over Parke Creek
Single Unit Vehicle Trucks
4 axle
P5 axle 6 axle
1 7 axle
32 tons
1 34 tons
Emergency Vehicles
EV2 EV3
31 tons
Bridge No. 80181 — Cooke Can on Road over Hiline Canal
AASHTO
Single Unit Vehicle Trucks
Motor Truck
Motor Truck and
Semi — Trailer
Motor Truck and
Trailer
8 ton
4 axle
12 ton
5 axle
15 ton
6 axle 7 axle
7 tons
8 tons
8 tons 8 tons
Bri a No. 88082 — Clarke Road over D!y Creek
Single Unit Vehicle Trucks
4 axle
5 axle axle 7 axle
24 tons
26 tons h 7 tons 29 tons
Bridge No, 88212 — Faust Road over Towne Ditch
Single Unit Vehicle Trucks 4 axle 5 axle
22 tons 23 tons
b axle
7 axle
24 tons
26 tons
Brill a No. 89022 — Fairview Road over Hiline Canal
Single Unit Vehicle Trucks 4 axle 5 axle 6 axle 7 axle
28 tons 29 tons 30 tons
Bridge No. 89113 — Schnebly Road over Hiline Canal
Single Unit Vehicle Trucks
4 axle 5 axle 6 axle
7 axle
28 tons 29 tons
30 tons
Brill a No. 98262 — Robbins Road over Hiline Canal
Single Unit Vehicle Trucks
4 axle 5 axle
6 axle 7 axle
28 to
29 tons 30 tors
Bridge No. 98265 — Smithson Road over Hiline Canal
Single Unit Vehicle Trucks 4 axle
5 axle 6 axle
7 axle
28 tons 29 tons
1 30 tons
Bridge No. 99325 — Thomas Road over Naneum Creek
Single Unit Vehicle Trucks
4 axle 5 axle 6 axle—I 7 axle
25 ton 27 tons 28 tons 1 30 tons
Bridge No. 16203 — NF Teanaway Road over NF Tean—a ay River
Single Unit Vehicle Trucks
4 axle 5 axle
6 axle
7 axle
24 ton 28 tons
29 tons
1 29 tons
Brill a No. 8 82 83 — Old HWY 10 over Currier Creek
Emergency Vehicles
EV2 EV3
36 tons
L Bridge No. 88322 — Weaver Road over Westside Ditch
Single Unit Vehicle Trucks 4 axle 5 axle 6 axle 7 axle
24 ton 25 tons 1 26 toms 1 29 tons
Bridge No. 79141— T'ossem Road over Towne Ditch
Trak shall be restricted from use of the right shoulder along the eastbound lane of the
bridge.
Bridge No. 87131 — South Tho e HWY over Westside Ditch
Traffic shall be restricted from use of both shoulders of the bridge.
NOW, THEREFORE BE IT FURTHER RESOLVED that the Board of County
Commissioners, in the best interest of the public, declare the established
restrictions on the herein designated Kittitas County Bridges remain in
force and effect until the designated bridges have been reconstructed or
are deemed capable of sustaining legal loads whichever shall occur first.
The County Engineer is hereby directed and authorized to post and
maintain signs in accordance with this Resolution and the Manual on
Uniform Traffic Control Devices. The restrictions authorized by this
resolution shall take effect upon the placement of signs; any violation of
the provisions of this resolution shall constitute a misdemeanor pursuant to
RCW 36.75.270.
The Clerk of the Board is hereby directed to have published the
aforementioned restrictions in the official Kittitas County newspaper as by
law required.
DATED on this 12th day of March, 2018, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Obie O'Brien, Vice -Chairman
Deputy Clerk of the Board- Mandy Buchholz _
Paul Jewell, Commissioner
If A W I M M 10 140 CY 1 -41 IM I ill 14A A 65 1 is I F+ I O I 10 I Gp V I in I VI A 1 W I Fd IP s b fit V OI 41 #1 w IH
W N ►+ Vt N N M VJ tY N N N N t+ F+ N N
R. N # N N Y t-•+ F+ N N i.a p M v
w �rm inO Nwxm 0Oj 514 m �ofaw�m3 CH
n ry
m m 3.
a g g g
i6 m CL
a$ m +b i3�aam
g $ g 0
a 2 = g
v
= x Z, �i
3 mm �n m �i R rC'pf 'm m. co
N N N IA MA YI V! N Vl C N Yl Vi ��yy
YCCpIII, NC� S ^-I y� e{ n NS r i1
CL
Ion m N ti
c C
N s �O 01 n"1 09
N V V W V?
L' !v n� Ids arte+
3 V Oa ONo 0 ON6 w W m trt w w
n� �6
low
r
m
11 �3
N
r, 'p11 C
.�•.96n 4 CII
1--` N IV F+ N N M N i,y i� p,, M N M M 1+ N 1d F't N !•+ �t N F+ }+ H 1•+ M !•+ � N F+ N I+ M �p
W Yf C Vl 1p ' V ' W V �i {may �1 fY �y i0 O W �,y y,� �1 En W p tlt Fu p1 UI W �7
G at Sn ut w W w u' t+ w+ 4 V O O + S' O {D } i'} + V t R V M O N O tV
monpq
iga a i cg's a
�j o Oq
m
3
9
3
S N
§§§§§
§
§§a
§k
0
z
c
ml>
§
�22�§
c
CL. 2
®P■SL§
CLfo
��
B
�wr
—
$
S
�
If
2
IA
CL C
cr
ra
_E§
■�
�
■ w
�
■
� ��
_■
m
■
94
■
00
■§ ��
g
.
L
g
§
&W
E
■
to
I
C
e
W
v
m
r"I
X
m
cn
I
X
0
1
O
z
C0
O
w
1
z
MO
e
r
At
r
ter.
LLwJ
46
M
i
�r1�
..iris
r�
�� .,��•
In C
in B
f
COOP)
i
r
rr, ffi
Ii
f
I
wa�
a� 1
f
mm
Rif+
t
In C
in B
The second posting sign is to be used when both routine a mmercial traffic and
SHVs are required to be posted for load. The following variations of the weight
limit sign are designated as Sign Number OR12-5f from the ODOT Sign Policy
and Guidelines, Chapter 3, page 3-111.
s•-o�
g MIT�M
WEIGHT LIMIT
s•
Olin
15
15 T
= a •e
4-5 AILIS
141
`4"B
6 AXLES
16T
T AXLES
i 4 T
4m
24T
321
_ 4�a
4�
JI-ir
--BA
5"B
= 9w8
=j0
=3s
J" 0.5”
_
-- 9
4v
_4,
g MIT�M
WEIGHT LIMIT
s•
Zi T
4 1 35T
4 AXLES IST
`4"B
t
`�
6-5'ULES 27T
_�
U'
7 AXLES 21T
`Ir•'s
40T
—4::8
4� 4#T
� �„B
—4�
--BA
5"B
= 9w8
=j0
=3s
J" 0.5”
_
-- 9
4v
_4,
g MIT�M
Zi T
SIT
I
XT
O f
OT
--BA
5"B
= 9w8
=j0
=3s
J" 0.5”
_
-- 9
4v
_4,
KI'l'TTTAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 12, 2018
ACTION REQUESTED: Approve Resolution Authorizing the Placement of an
Informational Kiosk at the end of Cove Road on County
Right of Way for the Manastash Ridge Trails
BACKGROUND: The Manastash Ride Trails Planning Coalition has held
discussions for improvements and management strategies
for the Manastash Ridge recreation area accessed off of the
end of Cove Road since the summer of 2017.
One main topic of discussion has been the lack of
opportunity to notice information to recreationalists near
the area that is typically used as parking to access the trail
system.
Public Works has worked with the Planning Coalition to
craft a solution that does not impede our ability to maintain
snow removal and routine maintenance operations, hinder
existing utilities, and that meets clear zone safety
requirements to protect the traveling public.
The current proposal that has been brought to the County
Engineer for review appears to satisfy the needs of both
Public Works and the Planning Coalition. The Kiosk as
shown in the attachments is located such that it is outside of
the design clear zone of errant vehicles, utilizes crash
worthy posts, accommodates maintenance operations and
fits the needs of the Planning Coalition and Recreationalists
alike. The Planning Coalition has took on the task of
communicating with the existing utility company located in
this vicinity and worked an agreement to convert the above
ground phone pedestal to a flush mounted vault.
Kittitas County Code 12.50 prohibits commercial signs
within County Right of Way. Public Works seeks BOCC
approval to allow for the installation of the Kiosk as it is
not believed to be of commercial use and supports
recreational opportunities.
INTERACTION: Public Works
RECOMMENDATION: Approve Resolution Authorizing the PIacement of an
Informational Kiosk at the end of Cove Road on County
Right of Way for the Manastash Ridge Trails
HANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Resolution, Kiosk Exhibit
LEAD STAFF: Lucas Huck, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTPTAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
RESOLUTION AUTHORIZING THE PLACEMENT OF AN INFORMATIONAL
KIOSK AT THE END OF COVE ROAD ON COUNTY RIGHT OF WAY FOR
THE MANASTASH RIDGE TRAILS
WHEREAS: The Manastash Ride Trails Planning Coalition seeks to install an
informational kiosk within County Right of Way at the end of Cove Road,
and
WHEREAS: The proposed location and design of the kiosk does not impede County
maintenance operations and is located and constructed in a manner that
preserves the safety of the traveling public; and
WHEREAS: In the interest of proving informational opportunities to recreationalists
utilizing the Manastash Ridge Trails system;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, authorize the placement of aux informational
kiosk at the end of Cove Road on County Right of Way as shown in
Attachment A.
DATED on this 12th day of March, 2018, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUN'T'Y
COMMISSIONERS
KITTITAS COUNTY, WARRINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Paul Jewell, Commissioner
�3
Attachment A
D o d
Placement Pending,
Need approval from
KIWas Co Lard ow
--}and painted 2116118.
I
: r1T
Fidsing User Kiosk proposal: dove existing user kiosk from up nearthe
Irrigation canal clown to this location. This location provides protection
for the flush telephone pad at this location.
5W placement proposal
Kiosk is freestanding, will sit on 17MZ' flush patio bricks (does not
require anchoring and Is moveable with 4 men). (Actual 47"x 7'8" after
modHlcallons to be made srrmler to better flt this location)
i I
Z—m;, F' ,Telephone Ped Flush Utility Box
916"
Dimensions
accurate. Drawing
NOT TO SCALE
�i
,
C
m
c
V
Now stats Wook proposal.
Posts would be 4"x4" or
"breakaway" since In the county
right of way. Structure would
have posts anchored in ground
M2' deep on four comers.
County asked us
not to extend
beyond the
existing fence
kick -out (kiosk
placement not to
exceed the
proximity of the
existing fence
south of the
proposed kiosk)
�r
CovelManastash
Ilrtersection 0.2mi
to the north
Q� I
0
� I
7
V
0
O
rn
W
f
1
Drrion
Rd
Private
Or
KITTITAS COUNTY"
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMNIISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 12, 2018
TOPIC: YBIP Funding towards Protected Acquisitions near Hansen Pits
ACTION REQUESTED: Authorize the Chairs Signature on the Requested Letter
of Commitment
LEAD STAFF:
Mark R. Cook
REC OA&IENDATION:
Authorize the Chair's signature on the Yakima Basin Integrated Plan (YBIP) Habitat
Subcommittee (HS) requested letter of commitment acquiring land near Hansen Pits.
BRIEHNG SUIVIMAR.Y:
• YBIP HS is offering $1,200,000 towards acquiring land south of Hansen Pits
• HS is requesting a letter of commitment from the Board of County
Commissioners (BOCC)
Staff recently concluded discussions with HS lead representative as facilitated by
Trust for Public Land
The terms described in the requested commitment letter are acceptable to staff
BACKGROUND:
Recently, the Yakima Basin Integrated Plan (YBIP) Habitat Subcommittee released its
proposed funding plan based on the adopted 2017-2019 state capital budget. The HS is
requesting a letter of commitment from the BOCC. Staff has working with the lead HS
member on the project finalizing the wording of the requested letter. The acquisition
effort has been going for the past several years and is nearing completion. Trust for
Public Land is leading the acquisition effort with the understanding that the County will
provide the balance of acquisition funding izz the next couple of years.
DISCUSSION:
The central issue delaying final language of the requested letter centers around the
County's ongoing use of twenty (20) acres of land immediately south of Hansen Pits.
The land is currently leased to Twin City Foods supporting land application of waste
water effluent. The original HS request was for 12 acres of the 20 dedicated to restoring
the Yakima River once the inevitable avulsion into the pits takes place. The BOCC may
recall that the inability of the County to maintain the levee at Hansen Pits has allowed the
river to encroach towards the ponds. The likelihood of avulsion into the pits is high.
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION ST"F REPORT
Rather than dedicating an arbitrary amount of land supporting natural river function, staff
is advocating a different approach. Staff proposes conducting an avulsion flood flow
analysis defining probable river flow path(s). Once the path(s) are identified, we suggest
placing a. 300 foot buffer from the centerline of the flow path supporting re-establishment
of vegetative growth complementing the river's path.
The letter also eliminates hard performance requirements on the part of the County
allowing actions by others in the absence of County funding. We are in agreement with
YBIP HS on restricting portions of the acquired lands for habitat restoration consistent
with our desire reserving lands for future use by Twin City Foods should the need arise.
FISCAL RVIPACTS:
$1,200,000 is being invested towards acquisition by YBIP HS_
Trust for Public Land is suggesting that they are in position to complete the acquisition
allowing the County sufficient time to generate remaining funds needed to place
ownership with the County,
ATTACHMENT'S:
Exhibit 1: Draft letter to YBIP HS
Exhibit 2: YBIP 2017-2019 Funded Projects
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: DRAFT LETTER TO YBIP HS
Page 3 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
February 27, 2018
Kittitas County, Washington
BOARD of COUNTY
COMMISSIONERS
District One District Two District Three
Paul Jewell Laura Osiadacz Obie O'Brien
Yakima Basin Integrated Plan Habitat Subcommittee
c/o Mr. Sean Gross
NOAA Fisheries — Columbia Basin Branch
304 S. Waxer St., #201
Ellensburg, WA 98926
RE: Kittitas County Commitment Regarding YBIP Funding for Proposed Land
Acquisition
Dear Mr. Gross:
As requested by the Yakima Basin Integrated Plan (YBIP) Habitat Subcommittee at its
September 21, 2017 meeting, the County is following up with you, as a member of that
subcommittee, regarding the County's request for funding for the acquisition of a 160 -
acre parcel, Kittitas County Parcel 508933 (Stewart).
At that meeting, the Subcommittee proposed allocating $1,200,000 of Ecology YBIP
funding towards the County's acquisition of this parcel, subject to the Subcommittee's
approval of the County's plans for managing and restoring this parcel and the adjacent
County -owned properties to the north.
This letter details the commitment and intentions of the County if awarded this grant.
The proposed acquisition is part of the implementation of the County's 2015 Yakima
River Jeffries Levee to Yakima Canvon Habitat Enhancement and Flood Risk
Managm.ent Plan (Plan). The County seeks this acquisition funding to facilitate
implementation of specific actions identified in the Plan for Parcel 508933 (the Stewart
parcel, the property proposed for acquisition), and County -owned parcels 17895 (County
Sprayfield) and 728733 (Hansen Pits).
If the YBIP Program awards the County a $1,200,ODU grant for use towards the
acquisition of Parcel 508933, and the County succeeds in acquiring this parcel, the
County agrees to the items listed below. (For reference, please see the attachment for an
approximate location of the management areas noted in this letter. However, the specific
boundary between Areas 3 and 4 will be determined as noted in #5a and #5b of this
letter.)
Kittitas County Courthouse • 205 West 5i'Avenve; STE 108 • Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-76-19
www.co.kittitas.wa.us
Parcel 508933, Stewart Parcel
Long-term Management of Property
a. Western portion (Area 1 in the attachment - the area from the western
boundary of the parcel eastward to 100 feet east of "Spring Creels," a
spring/wetland complex that bisects the parcel from north to south): The
County would use this area primarily for fish and wildlife habitat,
including restoration of native forest and natural river processes including
flooding and erosion. The County would allow for recreational uses, such
as fishing and hiking, if consistent with the primary use. However, the
County would not use this area for permanent infrastructure such as roads,
buildings, paved trails, parking areas, or a boating access ramp.
b. Eastern portion (Area 2 in the attachment - approximately 40 -acres): The
County would use this area consistent with flood storage during seasonal
flooding, uses that may include but are not limited to a sprayfield or other
agricultural purposes, a trail, a parking area for public access, and/or
habitat.
c. Deed Restrictions for parcel 508933: The County accepts that Ecology
will require a deed restriction that memorializes the above in perpetuity as
well as preserves the opportunity for both the near-term and long-term
restoration actions noted below.
2. Near -Term Restoration Actions on Property: This pertains to those portions of
Flood Hazard Management Project PB3 and Habitat Restoration Actions #15,
# 16, and #18 of the Plan that occur on this parcel. This includes removal of a
private berm near the Yakima River, restoration of Spring Creek and its riparian
buffer (100 feet on each side of Spring Creek), and other actions as noted in the
Plan.
a. Within one year of acquisition of this parcel, the County intends that it, or
one of its partners, will initiate planning, design, and other preliminary
activities to implement restoration actions on the parcel.
b. Subject to available funding and timeliness of required permit approvals,
the County intends to complete these restoration projects within three
years of acquisition.
c. If a partner is leading a Plan restoration action, such as taking
responsibility for an action's design, construction, and/or funding, the
County intends to support its partner's efforts to the best of the County's
ability, subject to the partner's compliance with all applicable rules and
regulations and the availability of County resources.
3. Long -Term Restoration of Property: Several side channels of the Yakima River
currently occupy parts of Area 1. The County recognizes that significant side
channels and/or the main channel of the Yakima River may occupy Area 1 in
some future time and support fish and wildlife habitat, including restoration of
native forest and natural river processes including flooding and erosion.
Establishment of these channels may occur as components of planned actions,
Kittites County Courthouse ° 205 West PAvenoe, $TE 109 • Ellensburg, WA 99926
(509) 962-7508 -FAX(509)962-7679
www.cc.kft0tns.wLw us
such as the flood hazard management projects and habitat restoration projects
referenced in other parts of this letter, or through natural flooding and erosion
processes. 7n any case, the County will not take or allow any action that would
preclude the possibility that significant side channels and/or the main channel of
the Yakima River may come to occupy Area 1 at a future date, unless such action
is necessary as partof a restoration action consistent with the primary use of the
Property.
Parcel 728733, Hansen Pits
4. This pertains to the project to reconnect Hansen.Pits to the Yakima River. The
project's goals are to: 1) allow more natural river flooding and erosion processes
at the Hanson Pits and other locations in the reach, 2) allow native trout and
salmon access to the Hansen Pits, 3) reduce non-native fish populations in Hansen
Pits, and 4) to do so while protecting private property and critical transportation
facilities- Two conceptual alternatives for this project were identified in the Plan
as FIood Hazard Management Projects HP14 and HP16. These alternatives ranked
highly and are consistent with purchase and implementation of restoration on the
Stewart Parcel (described in #2 and #3, above.) These alternatives will be
considered in the planning process, though other alternatives or combinations of
alternatives that meet project goals may be implemented.
a. Within three years of acquisition of the Stewart parcel and subject to
available funding, the County intends to initiate technical studies,
stakeholder engagement, and other planning for this project.
b. Within six years of acquisition of the Stewart parcel and subject to
available funding and timeliness of required permit approvals, the County
intends to complete the implementation of this project.
c. The project will be compatible with establishment of a community park, if
desired by the County.
Parcel 17995. CpigM S a eld
5. Long-term, the County intends to restore portions of this parcel to support
reconnection to Hansen Pits and the establishment of a native riparian forest (see
Area 3 and 4 in the attachment for a concept drawing of these areas — the actual
boundary between these two areas will be determined per the process defined
below)
a. Restoration and Long -Tenon Management of Area 3; The County intends
to conduct a flood avulsion flow path risk assessment in 2020 (provided
sufficient funding exists at the time). The assessment will identify the
probable significant flow paths of the river once it avulses into Hansen
Pits. The assessment will also consider probable significant flow paths
under a scenario in which the existing levees around and between the pits
are removed from the model to represent the unobstructed natural
Kittitu County Courthouse • 2D5 west P Avenue. ST£ 108 • Ellensburg, WA 989-6
(509) 962-7508 -FAX(509)%2-7679
www.ao.kittitas.ws.us
condition in which water can spread freely across the floodplain. The
County agrees to setback 300 feet from the centerline of the easternmost
identified probable significant flood path, allowing sufficient space for
river reconnection and buffering. The Yakima Integrated Plan Habitat
Subcommittee agrees to review the County's flood risk work and will
affirm the probable significant flow paths if they concur. Upon
concurrence, the County agrees to make the area set aside for the channel
and buffer area available for habitat enhancement work immediately
following concurrence on flow path alignment. Area 3 would then be
defined as that portion of the County Sprayfield property extending from
the western boundary of the property eastward to the setback located 300
feet eastward of the centerline of the easternmost identified probable
significant flow path. The County would use Area 3 for the same uses
proposed for Area 1 (see #la), as well as accommodating flow through the
identified significant flow paths.
b. Management of Area 4 (Defined as the remainder of the County
Sprayfield not included in. Area 3): The County intends to manage Area 4
similar to Area 2 (see #lb).
We believe this letter provides the desired commitment from the County allowing the
YBIP Habitat Subcommittee sufficient confidence to move forward with incremental
land acquisition funding. Please let me know if you desire any other actions in this
matter.
Sincerely,
Laura Osiadacz
Chair, Kittitas County Board of County Commissioners
Attachment - Management Areas Map
cc: Mark R. Cook
Flood Control Zone District Administrator
Kittitas County Courthouse 205 West 56iAvenue, STE 108 • Ellensburg, WA 98926
(509) 961-7508 TAX (509) 962-7679
WwW.00.kittit"ma.us
E)UHBIT 2: YBIP FUNDED PROJECTS 2017-2019
Page 4 of 4
PUBLIC WORKS HOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Updated Allocations for Habitat Projects - YBIP
(Based on Adopted 2017-2019 State Capital Budget)
Habitat Subcommittee Meeting 2/27/2018
Note: Due to delay of capital budget approval to Jan. 2018, and limited field season, some projects
will extend beyond end of biennium.
Updated Request
updated
Projects
Allocations
912112417
2!2712018
L.oww Yakima Rhrer Projects
Bateman Island
$145,800
$145,600
Smolt Receivers
$22,300
Thermal Refuge 8 Aquifer Recherge
$208,000
$208,000
Wapato Ranch (WR) & Tributaries
WR - Riparian project
$275,000
$275,000
WR -Acquisition & Restaration (Leff Bank)
$225,000
$225,000
WR Tributaries (Sterval on Flats, Toppenish, A htenum)
$800,000
$800,000
Union GapfNaches • Floodplains & Tributaries
Naches River & Cowldhe Creak Floodplalns Restonatlon
$300,000
$500,000
Ramblers Park Phase A
$0
$0
USFS - Lithe Neches & Crow Watershed Aquatic Restoration
—
--
Liths Neches Design & Pen Mng
$150,000
$0
Lidle Na *m Construction (now planned for 2020)
$350,000
$0
Design & permit: Salmon Falls to FR 1902 Bridge levee, LWD, re-veg.
$160,400
Fawn Creek Culvert
$125,400
Multi-vratershed Vood Fiesta"
$215,500
Itittlas County Floodplains & Tributaries
Protection Acquisitions (Thorp Reach)
$1,200,000
$1.2013,000
Teeneway Inabeam Restoration
$500,000
$500,000
Tillman Creek
$201,760
$0
TeanmW Valley Farre
NI
$45,000
Land Subcommittee- TCF Habitat PrsaW*n Infrastructure
$400,000
96 Administrative casts of $SARI habitat appropriation (Ecology)
$182,000
LOWWOW AcqulaltlonWContingeney
$422,144
$438,9DD
Funds Appropriated for 2017.2019
$.11040,000
$5,400,000
Note: Due to delay of capital budget approval to Jan. 2018, and limited field season, some projects
will extend beyond end of biennium.
m
tU
G
Uj
A
OF
fry
Go- -4y
ry
t. t
4L
-CIr
V
='ti AL. i
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 12, 2018
ACTION REQUESTED: Direct staff to begin negotiations of cost for purchase of
loader mounted snow blower from the City of Yakima
BACKGROUND: The City of Yakima purchased a Larue D55 Snow Blower
in 2014 for $138,586.00. This snow blower is very similar
to the blower's utilized by Public Works for snow removal
operations in Upper County and on occasion in Lower
County. It was recently brought to the attention of our
Road Maintenance Manager that the City of Yakima had
interest in selling the Blower due to lack of use.
The Road Maintenance Manager has recently inspected the
blower and is in belief that the blower has not been used
due to no scratching of paint on the impellers or other
associated equipment parts once the shrink-wrap covering
had been removed from the equipment.
Currently Public Works owns two snow blowers that are
actively used during the winter months. One 2012 unit and
one 2006 unit, the 2006 unit is currently in need of repair
with a damaged clutch in need of replacement. Both are
past warranty and are starting to exhibit increased
maintenance demand. Both blowers handle approximately
1,300 tons of snow removal per hour under normal use, the
Yakima blower would handle about 1,250 tons per hour
which is in the same class of our current equipment. It is
anticipated that the 2006 unit will need to be replaced in the
next equipment purchase cycle and is estimated to sell for
approximately $30,000 to $60,000. New blowers are
estimated to cost $160,000 to $200,000 and typically come
with a two year warranty.
The warranty has expired on the blower from the City of
Yakima but with no use to date it is expected to be in good
working condition. Public Works would like to proceed
with attempting to negotiate a purchase price for the blower
from the City. The initial estimated purchase price is
expected to be between $70,000 and $90,000.
If authorized to proceed and a purchase price is negotiated
that is deemed reasonable by Public Works a proposal for
purchase would then be brought forth to the BOCC for
approval to purchase out of cycle.
Current reserves within the ER&R fund account support
this purchase, impacts associated to the fund once a
purchase price is Down will also be presented to the
BOCC.
INTERACTION: Public Works
RECOMMENDATION: Direct staff to begin negotiations of cost for purchase of
loader mounted snow blower from the City of Yakima
ATTACHMENTS: Euipment purchase sheet
LEAD STAFF: Lucas Huck, County Engineer
:;._iES PARTS SERVICE
0-17
Z-0
Larue D55 Snow Blower
Quote from NJ PA Contract # 080114 -JAL
Per your request we are pleased to quote the following Equipment manufactured to
current standards to Include the folloowing:
One (1) Larue D55 Engine Snow Blower Consisting of:
2 stage blower
Cummins 275 HP QS136.7
Instrument panel gauges
90 amp Alternator
90 gallon fuel tank
Mechanical We drive line system
Engine drive hydraulics
I heavy duty 36" augers
40" Impeller
270 degree chute rotation
Steel scraper blades
Carbide shoes
2750 Tons per hour rated
Fits 2.5 yard loader
Clearance width 114"
Clearance height 5S"
Overall clearance height 157"
Total Weight 9200 bs
No hitch included in quote snow blower side
187 Telescopic Truck loading chute
Single steering vane 112' Width
Impeller oasting 140 degree rotation (worm gear)
Cowl muffler (residential type)
Full width skid kit
Wireless In Cab Controls
PDI, Installation and Onsite Training $133,086.-00
Freight from Factory to City of Yakima $5,500-00
Total Purchase Price 3438,586.00
KITTTTAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMNIISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 12, 2018
TOPIC: New FEMA Flood Hazard Maps for Kittitas County
ACTION REQUESTED: No action required — informational briefing only
LEAD STAFF:
Mark R. Cook
REC0h9dBhM TION:
Coordinate Board member calendars supporting the Flood Control Zone District's public
outreach campaign.
BRIEFING SUMMARY:
• FEMA flood study for Kittitas County began in 2010
• Draft maps were rejected by county staff in 2012
• In 2015, PW reconnected with FEMA and offered to proceed with limited
remapping deployment
• Staff selected key streams and Yakima river reaches for consideration: 62 miles
of new Zone A, 26 miles of new Zone AE, re -delineation of 55 miles, floodplain
refinement of 56 miles and 335 miles of digitized mapping
Over the past couple of years, FEMA and staff have worked finalizing the
remapping effort and are now ready to proceed with the outreach and adoption
process
BACKGROUND:
In 2010, FEMA began a remapping effort of flood hazards in Kittitas County. Draft
maps were produced in 2012 and were not accepted by the County. Numerous concerns
from the new maps stalled any substantive discussion towards adoption.
In 2015, staff began discussions with FEMA regarding a limited map adoption process
and solicited FEMA for support with the agency's Cooperative Technical partner (CTP)
program. FEMA has supporting partial funding of the County's Whiskey Creek and
Mercer Creek flow models and we have moved forward towards implementing a subset
of the 2012 revised flood hazard maps. This cooperative effort has delivered FEMA's
acceptance of the County's Currier Creek two-dimensional flow model for regulatory
remapping.
Page 1 of 6
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
DISCUSSION:
Working with Watershed Science and Engineering (WSE), PW identified numerous
creeks and the Yakima River (Easton downstream to Cle Mum) for remapping
consideration. PW wrote a task order with WSE (EXHIBIT 1) defining the technical
review specifics associated with our reconsideration of map adoption. Our review effort
(E)GHBIT 2) was provided to FEMA and the mapping team made appropriate
adjustments on their end. As part of the required remapping effort, the County is
required to have FEMA issue digitized flood hazard maps for all areas of hazard in the
County not being addressed in our current effort (EXHIBIT 3). The result of this map
adopting process is: New better maps for portions of the County with the existing maps
in digital form. Errors in the 1984 digitized maps will remain. Our ability developing
relatively inexpensive highly accurate flow models for pennies on the dollar (compared to
FEMA costs) positions us for future efforts in problem areas in the County. Our success
with modeling Currier Creek, Whiskey Creek and Mercer Creek affrms the value of our
remapping in the absence of FEMA contractors.
Reviewing the revised maps, there is one area of concern: Thorp. PW recently discussed
the revised mapping impact on properties located behind the railroad grade. The current
hazard map (1984) does not show any hazard behind the grade. A policy implementation
in the past two years now requires FEMA to model the grade as no benefit to flood
attenuation. The result is mapped hazard behind the railroad grade. In nearly every other
new map, floodway extend reduces. Staff is anxious to get the new maps out for public
review. As part of the adoption process, FEMA is required to notice congress of the
remapping effort (EXHIBIT 4). That notice is attached for BOCC background and
overall program understanding.
PW will prepare an outreach campaign and present it to the BOCC on our March 260'
study session. The maps are scheduled for delivery on March 9, 2018.
FISCAL IMPACTS:
The outreach effort is expected to cost less than $10,000 and is budgeted within the 2018
Flood Control Zone District operating budget.
ATTACHMENTS:
Exhibit 1: WSE Task Order
Exhibit 2: WSE Review Memo
Exhibit 3: FEMA Request Letter
Exhibit 4: FEMA Notice to Congress
Page 2 of 6
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHHBIT 1: WSE TASK ORDER REVIEWING A SUBSET OF 2012 FEMA HAZARD
MAPS
Page 3 of b
PUBLIC WORKS 130ARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Formal Task Assignment Document
Task Number 8
The general provisions and clauses of Agreement KITT-2015-2017 shall be in full force and
effect for this Task Assignment
Location of project: Klttitas County
Project Trtle: Review Pro os d PbMA DFIRM Flood Mapping
Maximum Amount Payable per Task Assignment: $14,755 (Detailed budget breakdown attached)
Contractor: WATERSHED Science & Engineering
110 Prefontaine Place South, Suite 508
Seattle, WA 98104
(2061) 521-3000
Completion Date: 12/31/2016
Description of Work:
S._ cope
See attached Scope of Work
Schedule
See attached Scope of Work
Agency Project Manager Signature:
Oral Authorization Date:
Consultant Signature:
Agency Approving Authority:%
Date:
See Letter Dated•
Date: 2 1
- . ` Date:
- 'h:1 -R! -- February 5, 2016
Scope of Work
Review Proposed FEMA DFIRM Flood Mapping
IKittitas County
Watershed Science and Engineering (WSE) Is assisting K'rttitas County Department of Public Works with the
review of new flood hazard boundary maps prepared by FEMKs study contractor STARR. The maps are to
be included in a new County -Wide Digital Flood insurance Rate Map (DFIRM) STARR is currently preparing.
WSE will review the proposed draft floodplain boundary maps to confirm that they present a reasonable
representation of the flood hazard area. Specific tasks to be completed by WSE will include:
Task 1. Data Collection
WSE will obtain the data and information required to complete the review including but not limited to:
u Draft DFIRM flood hazard area map files prepared by STARR
A Topographic data used to develop the flood hazard data, including LIDAR and ground based
channel surveys
HEC -RAS made) Input and output files
Hydrologic data and analyses used to determine magnitude of annual instantaneous peak flow
flood frequency discharges for each stream
Road and canal structure data used to code crossings in the HEC -RAS models
o High water mark and corresponding discharge data used to calibrate HEC -RAS models created for
the Yakima River
c Historical flood data such as photographs and documented anecdotal information
Task 2. tone A -- Approximate Study Areas Mapped By STARR
WSE will review draft flood hazard maps for streams where HEC -RAS models have been created to estimate
flood hazard Inundation limits (Zone A flood hazard areas}, The review will consist of comparing proposed
flood hazard delineations to topographic data, historical flood photographs, and anecdotal information. If
areas are identified where the de)lneatkms do not appear reasonably accurate and if there are homes or
structures in those areas, WSE will create a map and short written summary which Identifies and describes
the apparent problem. The streams to be examined include:
Crystal Creek (partial reach)
Dry Creek (partial reach)
Little Creek (partial reach)
r Manastash Creek (partial reach)
e Cluliomeme Creek
t Robinson Creek (partial reach)
e Roza Creek
Skookumchck Creek
o Squaw Creek
Taneum Creek (partial reach)
Tekison Creek
a Limtanum Creek
February 5, 2016
Unnamed Tributary 5 (partial reach)
o Unnamed Tributary $ (partial reach)
Whiskey Dick Creek
o Yakima River (partial reach)
Task 3. ZONE AE -- Detailed Study Yakima River Cie Elim to Easton
WSF will review the detailed study completed by STARR forthe Yakima River between Cie Elum and Easton,
including review of the hydraulic model Inputs, to determine if proposed Base Flood Vevations (SFEs) and
flood hazard boundary limits appear reasonable, If the BFEs and/or flood hazard delineations do not
appear accurate, WSE will create a map and short written summary which identifies and describes
apparent problems.
Task 4. Flood Hazard Map Lower Manastash Creek
WSE will review proposed flood hazard delineations for the lower six miles of Manastash Creek. if the flood
hazard delineations do not appear accurate, WSE will create a map and short written summary which
Identifies and describes the apparent problem.
Task S. Technical Memorandum
WSE will prepare a brieftechnical memorandum that compiles the figures and descriptions prepared in
Tasks 2 to 4.
Task 6. On -Lino Meeting with FEMA & STARR
WSE will host an on-line meeting with the County, FEMA, DOE and STARR team representatives to discuss
the results of the review. Together the team will decide the best approach to refining the delineations (if
needed),
Task 7, project Administration
WSE will conduct general project administration activities including keeping the County's project manager
Informed of all significant project related news, preparation of monthly invoices, and contract
management.
cost
See attached spreadsheet.
Schedule
WSE will complete the Review by April 15, 2016, assuming all necessary files can be obtained From FEMA by
February19. The Task Order completion date will extend to December 31, 2017 to allow ample time to
coordinate with and respond to FEMA.
110 Preftnulne Place Smut, suits 110
Seeft, WA 99104
Tel. JUS) 62141900
Estimate of Professional Services
Prepared for YJWfts County
Prajeeir FEMA DFIRM Mapping RwIew
Date, FDbmafy 5, 20i6
Prepared By: jeff Johnson
9Wdy.Aii8$ loop! ftgTA
YAWW River Cie FIUM6 tmirton —Z
5. Technical Mwn;lmldum 2
dors end Dired tabor Cad M
LABOR CMT
Direct EXIM"se Derail
I Zia I NO IOA Mo I _on I
$1007 1 2158.54 1 9121.38 1 04.551 MOO 1 $102-751
55.238 113= 30 S5,301) so 0 Si76f
UrIft Raga C4611
Trawl Io Pr*cl 9b 0 $0.60 $0.00
Rspm&Om and Cma, unimthn $100.00
TOW $100.00
L
Costsummetry
Total Labor 14AM
Tata) Dkedl. Bipermmm ADD
Tool 74,786
EXHIMIT 2: WSE REVIEW MEMORANDUM
Page 4 of C
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
WATERSHED
SCIENCE & ENGINEERING
110 Pref+onlaine Place South, Sulle 5013
Seattle, WA 98104
206-521-3000
Memorandum
Tkx Ted Perkins, FEMA Region X
Kevin Donnelly, STARR
Marts Cook, P.E., Kitlft County Department of Public Works
Fran: Shaina Sabatine P.E., Bob Elliot P.E., Jeff Johnson P.E.
Date: 7/21/2018
Ra Review of Proposed FEMA DFIRM Flood Mapping in KdUlas County
Introduction
Watershed Science & Engineering (WSE) was retained by Kittitas County Department of Public
Works to review new floodplain delineations proposed by FEMA and their study contractor
STARR. The delineations are to be Included in a new County -Wide Digital Flood Insurance
Rate Map (DFIRM) that FEMA and STARR are preparing.
WSE reviewed modeled Zone A 100 -year floodplain delineations for 13 of 14 streams and six
reaches of the Yakima River (see list below). STARR was unable to provide the floodplain
delineation for Big Creek, therefore, WSE could not review it.
Big Creek
= Crystal Creek
• Little Creek
• Manastash Creek
= Quliomene Creek
• Roza Creek
• Skookumchuck Creek
• Squaw Creek
Taneum Creek
Tekison Creek
fl Umtanum Creek
Unnamed Tributary 5
Unnamed Tributary 8
Whiskey Dick Creek
Six reaches of Yakima River
WSE also reviewed a detailed Zone AE 100 -year floodplain delineation for the Yakima River
between the Cities of Easton and Cie Elum.
I
Review Findings — Modeled Zone A Streams
WSE reviewed each HEC -RAS model and proposed delineation focusing on areas where there
is either existing development or future development likely. WSE did not examine areas where
the floodplains are confined by natural topographic relief and therefore remain narrow and have
little potential for future development. General findings common to many of the modeled Zone
A delineations are described below. Eight sites have specific issues worthy of a more detailed
description. These are presented in Figures 1 to B.
General Comments
Hydrology — StreamStats appears to have been used to determine the magnitude of the
100 -year flood for each stream. While Streem5tats may be a useful and simple tool to
estimate flows for ungauged sates, it is often inaccurate within Kittitas County. WSE has
found that annual instantaneous peak discharges obtained from StreamStats for streams
In this area are frequently under -predicted. This is based on our personal history of
conducting hydraulic investigations within the County. In one recent case it under-
predicted the 100 -year event by approximately 300 percent. The problem occurs
because the regression equations used in StreemStats are based upon a relatively small
annual instantaneous peak flow dataset obtained from a wide range of gage sites -- from
large rivers Including the Yakima and Teanaway to very small streams.
An example of the problem described above occurs within subreach 4 of the Yakima
River. The proposed modeled Zone A delineation for this reach is based upon a
StreamStats 100 -year discharge estimate of 20,700 cls. WSE recently completed a
detailed hydrologic investigation for a reach of the Yakima River immediately upstream
from subreach 4 and the resulting 100 -year discharge was 35,300 cfs, a value
approximately 70% larger than the StreamStats estimate (WSE, 2015). Based upon our
study, 20,700 ds is approximately a 10 -year event, not a 100 -year flood (WSE, 2015).
In a separate issue, there is a specific problem with the 100 -year discharge estimate for
Quilomene Creek obtained from StreamStats. The drainage basin area used to estimate
the flow from the program includes the watershed of Brushy Creek, an area which does
not contribute flow to Quiiomene Creek.
2. Cross Section Orientation — Cross sections must be oriented perpendicular to the
direction of flow in a 1 D model. In many models, the ends of some cross sections are
bent so sharply up -valley that these portions of the cross sections are not perpendicular
to flow. In these cases the cross sections erroneously tie into high ground creating a
fictitious narrow flow corridor and floodplain. Examples of this problem are specifically
ldentlfled in Figures 1, 2, 3, 4, 5, and 7.
3. Main Channel Location — The main channel is incorrectly located along a number of
reaches and therefore, the floodplain delineations are incorrect. Obvious mistakes
Include reaches of Big Creek, Crystal Creek, and Taneum Creek (Figures 1, 2, and 6). It
can be difficult to locate the main channel of a small stream using topography or aerial
photography. When uncertainty exists, the location of the main channel should be field
verified.
2
4. Crossings — Bridge and culvert crossings were not included in the models, apparently to
minimize cost. Bridges and culverts, particularly those undersized, can have a
significant impact on flood inundation extents especially along the upstream side of a
road. In many instances, it appears that the floodplain delineations do not reflect the
potential backwater impacts caused by the crossings. WSB recommends that STARR
review and refine the floodplain delineations at all crossing locations to better represent
potential inundation limb.
5. Definition of Bank Points and Manning's n Values — Manning's n values are
incorrectly applied to many cross sections. Bank points are used to define breaks in
Manning's n values. Unfortunately, bank points are repeatedly defined incorrectly in the
approximate study area models (e.g. too low on the banks, on the bed of the channel, or
In some cases completely missing the low flow channel). When bank stations are
defined incorrectly, large unreasonable Manning's n values are inadvertently applied to
the main channel. This can lead to overly conservative water surface elevations and
inundation limits. An example of incorrectly defined Manning's n values is shown in
Figure S. If STARR is delineating bank points in GIS, an underlying surface terrain layer
should be used to visually determine where the tops of bank are located. If relying
instead on aerial photography, the banks should be determined based upon inspection
of the cut moss sections. Cross sections In all models should be reviewed to check
bank station placement and therefore, Manning's n value assignments. In some cases,
field verifications may be necessary.
B. Definition of Ineffective Areas -- Ineffective flow limits are often incorrectly defined
which allows conveyance through areas that do not convey flow (e.g. backwater areas,
areas disconnected from the main channel by natural high ground, etc.) All cross
sections, particularly those near road crossings, should be reviewed to determine if
ineffective flow limits are needed.
T. Downstream Boundary Conditions — Water surface elevations at the downstream and
of each model are often incorrect. In each model, either a specified fixed water surface
elevation has been applied or the computer is allowed to estimate the water surface
elevation using normal depth calculations at the most downstream cross section_ For
those models with a foxed water surface elevatlon, the ;same value is frequently applied
to all profiles simulated (2 -year through 500 -year events). An example of this is in the
Little Creek model and is shown on Figure 3. For models that use normal depth, the
slope of the energy grade (often estimated as the slope of the channel profile or valley)
must be entered. In many cases, the slope applied is incorrect, which likely has led to
either over or underestimation of water surface elevations and inundation limits near the
downstream and of the model. An example of this is in the Crystal Creek Cedar Gultch
model and is shown on Figure 2.
8. Cross Section Spacing — Gross sections should be spaced close enough so that river
and floodplain features are adequately defined. It is conventional for cross sections to
be fairly evenly spaced with fighter cross sections In areas that need additional definition
(for example crossing locations). An example of inadequate cross section spacing
3
occurs in the Unnamed Tributary 8 model (Figure 8). There is a large gap in the cross
sections and therefore a large gap in the floodplain delineation.
9. Disconnected Floodplain Areas — Pools of water disconnected from the main channel
show up in many of the modeled Zone A floodplain delineations. Automated mapping
procedures for HEC -RAS often produce such disconnected areas, but these are typically
either removed in final mapping or physically connected to the main channel delineation.
WSE assumes these problems will be corrected in the final mapping.
Zone AE Detailed Study of the Yakima River from Easton to Cie Elum
In general, the Zone AE model for the Yakima River from Easton to Cie Elum appears
reasonably wall developed; however, Issues have been identified which are described below
and presented in Figure 9.
Hydrology — STARR has reduced the magnitude of the 100 -year flow significantly which
is the primary reason BFEs in the new study are lower and floodplain inundation limits
are reduced when compared to the effective study. For example, the new model uses a
flow of 24,095 cfs at a location just downstream of the confluence with the Teanaway
River (cross section 85147), while the effective model uses 29,100 cfs at the same
location (FEMA, 1981). Similarly, just upstream from the confluence the new model
uses 19,828 cls while the effective model uses 25,200 cfs. Documentation as to how
the new discharge was computed was not provided. WSE would like to review the
hydrology calculations developed for this study.
2. Cross Section Orientation and Data — Several cross sections appear to be skewed
significantly to the direction of flow or contain data errors. Several examples are
highlighted in Figure 9.
3. Definition of Ineffective Areas -- Ineffective flow areas are defined liberally throughout
the Yakima River made[, and most appear logical. However, WSE noticed a number of
instances where continuity of flow along a floodplain is interrupted by questionable
Ineffective flow designations. WSE recommends that STARR conduct a simple review
of all ineffective areas to double check for continuity of down valley flow.
In several reaches the 500 -year flood is conveyed through the floodplain at one cross
section, but not the next. It appears Ineffective elevations were set to accommodate the
100 -year event, but not the 500 -year. Ineffective elevations need to be adjusted or
ineffective areas added or deleted such that flow remains either consistently effective or
Ineffective along a reach during the 500 -year flood; unless features are present that
physically do block flow.
4. Downstream Boundary Condition - Normal depth procedures are used to estimate the
downstream boundary condition for each profile; however, the slope applied appears to
be too flat when compared to the slope of the river, valley, and energy grade line.
4
Summary
The modeled Zone A approach has promise if applied carefully and if adequate time is provided
to complete each task. Unfortunately, numerous mistakes have been identified and need to be
addressed. The most significant are:
1. StreamStats must be applied with caution within Kktitas County because it frequently
underestimates discharges. Where it does, the proposed floodplain inundation
boundaries are likely too narrow.
2. Cross sections are frequently aligned incorrectly with the most common problem being
that the ends of the cross sections are turned up -valley creating a fictitious confined
floodplain. Where this occurs, the proposed flood inundation boundaries are likely much
too narrow.
3. Omitting bridge and culvert crossings simplifies the modeling effort but care must be
taken to estimate inundation limits in the vicinity of these crossings, something that has
yet to be done in the delineations provided.
4. Bank stations are frequently incorrectly positioned which leads to significant errors in
definition of the Manning's n values and therefore water surface elevation computations.
The Yakima River Zone AE model appears well constructed. The following significant issues
were identified:
1. A significant reduction in the 100 -year discharge is proposed over the value used in the
effective study. This reduction may be valid, but WSE would like to review the hydrology
calculations for the proposed flows.
2. A number of cross sections are misaligned or contain date errors.
3. Ineffective flow areas need to be reviewed for continuity of down valley flow.
Referent
FEMA, 1981. "Flood Insurance Study: City of Cie Elum, City of South Cie Elum, City of
Ellensburg, Town of Kittitas, and Kittitas County, Washington".
WSE, 2015. "draft Corridor Plan: Yakima River Jeffries Levee to Yakima Canyon Habitat
Enhancement and Flood Risk Management Plan"
5
Big Creek HEC -RAS Model Review
The mein channel nllgmnwd was 1psplyd Incermdy
thnrfON the 100-ywr flosdplaln was hmorrerdiy
mapped. Sha black Ike Is the gipproxlmats oarscl
mein channel taxrlrOn and the blue line in the
main ehannef tanlerllne used In do 1-1111CAPS model.
Also, nose sadicna are beak m sharpy upebum
that qNy may creafe artlRaial high around boundarNm
on the banks end pntroat wabrfrorn sPFWAng oaf.
Crouings (marked whth orange stsrt
giro rmodeled Because of this,
the floodplain delinratlons upstream
m
and downstrum ore=@ oawngs
are n1laMruanlad (true for sit
foeations where crossings are not
mods".
Rsriswaf Zee A
RM
Approximeft Study
Areas Mapped By
STARR
Blp Croak
rerwcw*,wa
19E .
e I= 200
r�inuw
,� MM7�i5a W
Crystal Creak and Crystal Creak Cedar Gultch NEC -RAS Models Review
The main channel dignmerd was kadw b=rrenfly
therefore the 10D jmw 1lao* do was Incorrectly
mapped. Trim blank Irhe Is the approdmab carnet
main dunnal conbrgns and the light blur
shading In the aflaative FEMA FIRM 100 -rear
toodplain delineapan.
The floodpldn at the tlawaabeem end of Crystal Creak at
Cedar Gulch (outlined In bkok) la ewareatlmeted due to the
adremaly @hollowslopa used for the nonsol depth
downehmm boundary condition In the HEC4LW metlaL
Aho, croaehhga (marlmd with orenga stare) are not msdaled.
Because of this, the floodpkdn dsllnedbris upstream and
downstream of ft" aresalnps are misrepresented (hum for
all locations whore crossings are not modeled).
The floodpteht Is undenesthnated.
Cross sewtlenS are hart so aherply
upabeam that they creche arocill
high ground boundaries on the right
hank end prevmd water item
apnadlrg out Into IAN arca.
Tfhaflaodpla n Is underoWmabd.
Boat erose sections here amob
arliftldy largo o finehm flow areas
In the model, dnwing down the
simulated water murfav slonnion.
Bent Crams swoons ilea svelte
mtiflalel hqh ground hounds an
the right honk that prawrnt wow
from spreading ami Into the Brea.
Review of Zane A
Approulan s Study
Areae Mapped By
BTARR
Crystei Creek
S�3
�M
�y •M1M
w�,�aahmp
"41st 41M:
Little Crook NEC -RAS Model Review
Thera Is a berm on the MR bank of the downstream end of
LEtia Creek that Is rat adaquMnly madded with the cry
sections In the NEC -RAS model. This area would be better
repreaanbed with shoFlar and more frequsrd cruse ascdons
alltRted as shown by the red lines to dstsrmine INwhme qts
berm Is ovalopped. If the berm Is ovsrteppsd, the ores
north and wast of the berth (outlined by the preen one)
should be modeled with a atorape area or ZD ansa to
determine the exlent of inundation. Ahw, the downebeam
boundary condition In the HEC-RAB model is defined as
a constant warm aurfaes ekr+mgon for all Sows modeled
(2 -year through Myearl. This la unfiksly to be the ease.
If this watts In be high, water surface elevations will be oYer-
asllmeted, and Rads value Is loo low, water surfaoa
elevations will be undersetlrruled.
Crossings (msrkad with orange stare
are not modeled. Because of this,
the MmdpWM delineations upstream
and downstream of these crnuings
are misrepmsenbd (true for an
locatlanswhara crossings ars not
modOI64
The fkwdplain k undersstimsted.
Crass sections are bent so sharply
upstream that they cim arOcial
high ground boundaries on the rlgM
bank and prevent water $pre
spreading out Into this arae. 9 is
recommended that arose a cftne
be allpned as shown by the red lines.
Review al Zona A
App u dmateSI&W
Areas Mapped By
BTARR
IJltle Creak
afro cam, VA
L��-
a Imp ZRO
Lia ru
r+.vuar
MUMMER
Manastash Croak HECAU Model Rwvltwv
Legend
Cd txoarw Ndmp*w r
RTARRHEC4VA
ilodel thou seemn
1100-purFbadplain 00
Noy 2At1 Wand Fxla!>m ' r4r
delNluGd lFum raXol j ,: a, t ' -'�, . + • ` l�vr
i ,.,, - Mmnata@h Crook fb►rw through an
s f �• alluvial fee. Aerial photpprepM of tin r ,
my 2014 Rood went Cuppsox nuftly
+ • . • ;.`r'_r. thasame mapnllade @lreulsted In fu _ v
HECAM model) and 2D modeling of
�rl i' '!` this rivaraupp m water @pro@dw waren
ter,•, the fen rathwrthan atwylnq CfsaelnwMed. ;
i } r ! F• k .: = Groan sectionsfirsts era bent Upstream
+ comdhuq 4rge4f to the srd@- Croselrspe (mulurd wAh onrrpw wfari}
ropwaaI in of the RmWpiwin in this are net modeled. Bweause dfrls, the
# �■ p w . medal, fawdplain delineWosn up*mrn and
dorrn.Uwm oflhaaa arosofts we
rnk spr.eenhd (trrm for all lomiion@
where aroesimp are net modeled).
R~ of Zem A
Apprvudmab ft*
Ana@ Mapped By
STARR
Manawimeh Creek
Parer ONW&VA
r ire! �,we
ia�r! � rrtrr
r0lM
wnrrwelreo
Squaw Crook HEC4tAS Uo&l Review
4 e,
rL:16nd
yCMm 6loetlrd
STARR HEOPM
Modal Clow Mon
® ��� r
Crow section alignment at the downatsam
and of the model causes a mleraprosentalion
In the floedplein delineation sepecially In the
eree oulltned In block, Becouse of lMo way
the areas eaatlons were drawn, the doisestr son
boundary of the model Is being Imposed upstream
near the road. Cross an M- -n should be sllgnad
psrpedeuklrtoflow as estimated bytha red Ines.
Also, the crowing {merhad with an aranye dor) Is
not modeled. Because or this, Ow HwWpleln
delineation upstream and downetnen of the
arosedng le mierepraeented "for oil locations
where crossings are not modeled).
Rarfew of Pons A
APPnmdrnsb titr*
Areas Mopped By
Squaw Creek
Wns G -ft WA
e tao oma
KE—
t
�wr.o w�,ow
WATeRelia
Unnamed Tributary 3 HEC -RAS Modal Ruvkw
Legend
r C -N ft Not Modeled '
STYIRRHEGdLgs
Madel Gane section r3 �"Vrp
Moppedby STARR
' s
Unnarrrel'Trit�s,l�r
The tloadpleln Is undereelbnot.d.
Claes aaatloaa aro baht no sharply
upstmoon thin they arealo artlftclal
high around boundutoa on the right
bank and pnment woW from
spreading out Irto aft ams
WY7
Review of Zone A
Appmxlmote Study
AresMapped By
STARUnnamed Tributary 3
,RtlY.anuy, wA
a i
lCm=NVs Qnarked MAth arange stars) Thom is a pop In On aoodptaln
sm not modeled. lil a s of this, the daWreetim here.
fioadplaln dodneadans tupetrsant and 0 7" 1"
dm+rtntrsam of these emsWings are This Is oleo another wmmph of whore
mismpmearded (ores forall looatla►e cross sections are bent so sharply
whore Sammi
lqa ere not modaledJ. upatnrm that Ihry oaole artlRelel
high ground boundimbe on the reght
bank and peowawelar them
spreadnrrg out inlo the ane.
yas�asHEo
Llmemed THbutary 8 HEC -RAS Model Review
Legend .Y
Croeele8 Nor Moderd
aTAM HEC4M ,
Model Cram asellon
to7-pear Ploodpleln
Mapped by8TARR a
ZOO&}p
l
�x
_ �-
ice'-lk���. . Irncorrert
Crossings ¢narked with orange alera)
aro not modeled. Session Otiilsr the
nmdpkdn dallrteations upalraam and
dowrmtraarn of timae amosings aro
misneprssontod (true for all kmMlone
where 6russinips one not modeled).
There IN s Sap in the goodplsln dellnondm In this area due to
■ large qap In cram seationa, definition of InaRecdw
flow areas In the HFC -RAS nmdpi, end lank of cmasfngs
In the mode6 8 IN unclear whether wnbr would overtop
the road of Ola location or simply fill the low area and
pond behind "rand.
I
iz18'1
drflniuon ai ank palyds In the model causes Monning's n values to
'k .x" , be mapped incorrectly onto eros asaftne. affecting the oamputoom of the
-tip_ vrater surface elevation. This occurs froti-rdty throughout the nnodel. An
example ofthe pndgern Is shown In the plot of RS 162 above. Bank points
we marked with red deft and defined Manning`t n „Huss appear along to
— a ----_ K ., ; 1 top of the plot.
Review of Zone A
Apprtltdnlate Study
AreastiMapp d By
TARR
Unnamed Tributary a
ice.. x:a.gr, vw�
0 ed i�
�FMI
f�lY� aa.
A& wwrctaxeo
Yakima River'from Easton to Cir Elum HEC -IM Modal Review
Cruse. asddars should be urboated perpendicular
io flow. Above aro hro kocatipnm wham poen
section or pardons of cross smAloas arm not
perpa - Icuisr toflow. This Increases dee cross-
wdfanal arm In firs modal whloh afficls the
computation of the water surface ahvatfoa.
Example. of Incorrectly defiered
Ineffective awe.
The slope defined me the dowrrd m
boundary Is too shidim therefore. the
water surhm shmadon calmda sed at
the downalmaar end of the model mey
be orerweetTmated.
'bee ecemnpanylna retort forcomplab deseripkbns of Issues ! concerns found during mvWw.
kwkw of ions AE
Arra Napped BY
STARK
Yakima Fdw
rtel.e CDM*. et
oFE
t
;r�� arra
w.+*sas3lso
EXHIBIT 3: REQUEST LETTER FOR HAZARD MAP DIGITIZATION
Page 5 of 6
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
�xylpYb�sA4.`.n+.Jt�u b
rcrrrrrr►acor
July 14, 2017
Ted Perkins, P.E.
Regional Engineer
Federal Regional Center
130 - 228th Street, Southwest
Bothell, WA 98021-8627
DE)FART NT OF PUBLIC WOKS
Mark K Cook, PE Director
RE: Kittitas County Washington
Digitizing Current Effective Maps
Dear Mr. Perkins:
I am writins this letter to confirm Kittitas County's understanding and agreernent on how we
would like to move forward with FEMA's proposed 2017 limited flood study. This current flood
study effort was started back in February 2010 and there was interest in seeing the flood hazard
information updated. Wien the draft maps came out in late 2012, we had numerous concerns
with the accuracy of these maps as they related to the observed flooding that has been seen in the
County. As part of this, we provided several pages of comments detailing our concerns. In your
explanation of these results, we understand better how there are some limitations in your ability
to produce detailed results for many miles of what are defined as approximate level of effort
strearns based on the limited population associated with some of these streams.
There are areas of the 2010 study that we feel sufficient analysis was done and it will improve on
the current effective information so there are some areas we would like to move forward with.
We understand to do that, because our county is just in a paper format now, the rest of the county
will need to have digital data as well. This will mean digitizing the current effective study in. the
areas where we can't currently agree on the flood mapping approach. The agreement on where
we would life to move forward is attached as FXMBIT 1 to this letter. All remaining County
areas would be digitized based on the content of the current paper format.
We are committed to work with you on gradually updating these areas of disagreement through
the CTP program and through some of our oven funds but this will be outside of this initial effort
to get the countywide study into a digital format and it will be limited to funding availability.
There will also likely be some adjustments to some of the agreed on areas through information
that we will submit as appeals and comments when the preliminary maps are released.
411 N. Rutty 8t. Suite #1 TEL (509) 9M-75"
EUwsburg, WA 98925 FAX (609) 962-7663
Dept. of Public Woks
Page 2
We have name to this agreement together with your Risk Analysis Branch stair (Ted Perkins and
Kelly Stone) and with the Washington State Risk -MAP coordinator, Jerry Franklin. Thank you
for your ongoing efforts to assist in alleviation of flood damage in K.ittitas County.
Sincerely,
Mark R. Cools
Director
411 N. Ruby St. Suite #1 TEL (508) 962-7523
Ellensburg, WA 98926 FAX (609) 9627663
EXHIBIT 4: FEMA NOTICE TO CONGRESS
Page 6 of 6
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
NOTICE TO CONGRESS: MONTHLY UPDATE
ON FLOOD MAPPING
Biggert-Waters Flood Insurance Reform Act of 2012 and Homeowner
Flood Insurance Affordability Act of 2014
December 2017
4111iw
FEMA
J
TABLE OF CONTENTS
LIntroduction.rrr__mrMYwMwma.s..._.ru.w._rm,.._nu..NF...MM..NY.,rqN..YMuwM.wur..u.r.uMMw..rr._.r.rr._xlxN._ JL
2. —._rm___.....R,....rm._r.rr..r..._....._.__.r.x._r..r2
3. Risk MAP Program wr.._r......_M_._.r..rr.m_r..... 3
tNotification _....r__m.r..r..._....._...._m__.rmrr_..,r....m....._xm_u__mur..r.r.r.�..�. ,_.....m,..r.r......dx 3
4.1. Estimated Issuance of Preliminary Maps............................................................................ 4
4.2. Estimated Issuance of Revised Preliminary Maps................................................................ 6
4.3. Actions Taken by the administrator...................I.............................................................. 7
S. Additional Informationrrr,wwrw.w.xwr.r_xrmrmar.r...rrrx.rrr+...r.w...n�._mmmx.x..Mx.r._rr..rrxr2L
Appendix A: Flood Maps.._._.......M.xrN......rM12
AppendixB: Acronyms ,rr..—w__mx_.xm,._mxxx_m..rr.__.r....rr.r.._..._.rMrm..mr.,r_.....__.rr..rx........__ 17
Appendix C,. Resources .aR1.MmrrYvu..... q...p.ar.rr...mrr.rr_rxmMRIrM1Y.w..�_.mru._.u_r___.w..m_I.Mri9
Notice to Congress: Monthly update on Flood Mapping
De ce m be r 2017
MoLd-M.-
1. INTRODUCTION
The Biggert-Waters Flood Insurance Reform Act of 2012 (Biggert-Waters), asamended bythe
Homeowner Flood Insurance Affordability Act of 2014, directs the Department of Homeland Security
(DHS), Federal Emergency ManagementAgency(FEMA), to notify Members of Congress when
constituents In their Dlstrictswill be affected by a flood mapping update. Public Law 112-141, div. F,
title 11, §100216, July 6, 2012,126 Stat. 927; Pub. L. 113-B9, §§27,30, Ma r. 21,2014, 128 Stat. 1033,
1034,42 U.S.C. §4101b (d) (1)(G)(i) and (H) (2014). Under Biggert-Waters:
The Administrator shall not less than 30 days before issuance of any preliminary map, notify the
Senators for each State affected and each Member of the House of Representativesfor each
congressional district affected by the preliminary map in writing of the estimated schedule for:
o Community meetings regarding the preliminary map
o Publication of notices regardingthe preliminary map in local newspapers
o The commencement of the appeals process regarding the map
See Biggert-Waters, asamended, at42 U.S.0 §4101b (d)(1)(G)(1).1
Biggert-Waters also states:
The Administrator shall upon the issuance of any proposed map and any notice of an
opportunity to make an appeal relatingtothe proposed map, notifythe Senators for eachState
affected and each Member of the House of Representativesfor each congressional district
affected by the proposed map of anyactiontaken by the Administrator with respect tothe
proposed map or an appeal relatingtothe proposed map.
See Biggert-Waters, asamended, at42 U.S.C, §4101b (d)(1)(H).
In accordance with these requirements, this document serves as notification to Congress and provides
details on studies withan estimated Issuance of preliminary or reed preliminary flood maps in the
current month and the next two months, and studies for which preliminary or revised preliminary flood
maps and/or Lettersof Final Determination (LFD) were issued last morrth.2 LFDs are the actions taken by
FEMA to finalize the flood hazard data shown on a preliminary Flood Insurance Rate Map (FIRM). This
document also provides details on statutoryadministrative appeal periods3 (appeal periods) thatwere
initiated and ma ps that went effective last month.
L FEMA i s working to develop the additional administrative process required to implement 42 U.S.C. §4101b
(d)(1)(G)(11) and will updatethis Notice as appropriate.
2 For definitions of fl ood map, VD, and other terms, please refer to Appendix B.
For more data i Is, see "Information on `Appeal Start Action," i n Section 4.3.
f 7EI" Notice to Congress: Monthly Update an Flood Mapping
ue ee m be r 2097
2. BACKGROUND
Hooding has been, and continues to be, a serious risk in the United States—so serious that most
insurance companies have specifically excluded flood damage from homeowners insurance. To address
the need, the U.S. Congress established the National Hood Insurance Program (NFIP) as a Federal
program in 1968. The NFIP enabled propertyowners in participating communities to purchase flood
insurance if the community adopted floodplain me nagement ordinances and minimum standards for
new construction. However, the owners of existing homes and businesses did not have to rebuild to the
higher standards, and many received subsidized ratesthat did not reflect theirtrue risk.
Biggert-Wat ers we s paswd by Congress and signed into law by the President in 2012. The law required
changes to all of the major components of the progra m, including flood insurance, grants, and the
management offloodplains, aswell astheestablishment of nationafflood mapping program. Manyof
the changes are designed to ma ke the NFIP more financlally stable and to ensure that flood insurance
rates more accurately reflect the real risk of flooding. Biggert-Waters was amended by Congress under
the Homeowner Flood Insurance Affordability Act of 2014, which was signed by the President in 2014.
FEMA identifies flood hazards, assesses flood risks, and partners with States and communities to provide
accurate flood hazard and risk data to encourage communities to take mitigation actions. Flood hazard
mapping Is an Important part of the NFIP, as it is the basis of the NR P regulations and flood insurance
requirements, FEMA maintains and updates data through FIRMsand risk assessments. FIRMsare based
on statistical information, such as data for river flow, storm tides, hydrologic/hydraulic analyses, and
rainfall and topographic surveys. FEMA uses the best available technical data toldentify a community's
flood hazards.
Maps identifying flood hazardsprovide citizens with flood risk information and enable communities to
make informed development decisions. With this information, communities areable to adopt and
enforce minimum floodplain management regulationsthat reduce the loss of I'de and property. These
proactive efforts minimize the financial impact of flooding on individuals and businesses and mitigate
the effects of flooding on new and improved structures. FEMA, through its Risk Mapping, Assessment,
and Planning (Risk MAP) program, releases new flood maps and data as appropriate, giving communities
across America accessto helpful, authoritative data thatthey can use to make decisions about flood risk.
FEMA is required to review community flood ma ps every five years and assess whether to revise or
update them based on current conditions. To learn more about flood maps and how the Risk MAP
program creates and maintains them, please refer to Appendix A.
Notkm to Congress. Monthly Update on Road Mapping 2
U4crrnb(tr 2017
3. RISK MAP PROGRAM
Flood risks change over time, based on new building and development, weather pattern changes, and
other factors. The Risk MAP progra m assists communities nationwide to assess flood risks and
encourages mitigation planning and actions to avoid or minimize damage in the face of future d'usasters.
Through more precise flood maps, risk assessment tools, and outreach support, Risk MAP strengthens
local communities' abdityto make informed decisions about reducing risk.
The Risk MAP program includes collaboration with Federal, State, and local stakeholders in communities
across the nation to identify, assess, communicate, and mitigate risks. The programalmstoaddress
gaps in flood hazard data, provide an enhanced digital platform for the Information that is produced,
and align risk analysis programsto enhance decision-making. Risk MAP works in conjunction with other
FEMA Initiatives and supports the NFIP In its efforts to encourage communities to become risk aware
and resilient. To learn more about the Risk MAP program, go to http,//www.fema.gov/risk-mapping-
assessment-planning.
4. NOTIFICATION
Through the implementation of Biggert-Waters a ndthe
Homeowner Flood Insurance Affordability Act of 2014, FEMA is
required to notify Congress of proposed changesto the NFIP
flood maps. This document provides that notification, including
information on the issuance of proposed map changes
(represented as preliminary and revised preliminary flood
maps), the initiation of appeal periods, and the issuance of LFDs
and effective maps. The Information below has been
segmented into tables listing studies with an estimated
issuance of preliminary and revised preliminary maps for the
current month and the next two months. An additional table
lists the studies for which the Administrator took an action last
month. This table includes the actions by categories (e.g.,
preliminary maps, appeal starts, revised preliminary maps, or
the issuance of an LFD and effective maps). All of thetables
Identify the FEMA Regions, State, andcounty impactedby the
actions. The tables also provide details on the study reference
number, status, and estimated or actual dates.
FEMA N0110e to Congress; Monthly Update on Rood Mapping
Risk MAP Vision
'"The vlslon for Nsk MAF Is to deliver
qualltydatathat lncreasa public
awareness ondleadstoaction thotreduces
risk to IIJE and property."
3
rmq
4.1, ESTIMATED ISSUANCE OF PRELIMINARY MAPS
Preliminary FIRMS and Flood Insurance Study (FIS) reports include proposed flood hazard information
for areas inthe counties listed. This information may include the addition or modification of Special
Flood Hazard Areas -the areas subject to inundation bythe base (1 -percent -annual -chance) flood, Base
Flood Elevations or depths, flood zone designations, or regulatoryfloodways (hood hazards), The table
below identifies the studies for which FEMA plans to issue a preliminary FIRM and FIS report in
December 2017, January 2018, or February 2018. The actual release dates are being determined in
coordination with the State and/or local governments.
The quarter shown in the "Estimated Schedule of Community Meeting" column indicates the estimated
quarter of the year In which a community meeting for that study might take place after the preliminary
FIRM and FIS report are issued, Some studies may require multiple meetings to coaxer all communities,
and the dates could vary. The quartersare based on the calendar year (Qua rter 1= January—March,
Quarter 2 = April --June, Quarter = July—September and Quarter = October—December).
In addition, the "Estimated Schedule of Publishing Notices in local Newspapers and Starting Appeal
Period" column indicates the first quarter In which an appeal period may begin for a community within
the study area (marked by the second publication of a notice in the local newspaper). Some studies will
require notices to be published in multiple local newspapers so that all communities are notified; each
community could, therefore, have different publication dates.
Est Fe>ti r,totl
E*rura*sod 8cteaeurr 1pr
El4imatlard Sairredgisai PLP131410111?Nal lei
ilppian Stale Couniy Wine GRsa Number Preldettirfary in Lor,**
tusuaneb cammundy Howapalptraan.
1tAara#�r►p s
BEaMrtino Avpoai
AL
2
NJ
Burlington County
17-02-0795.5
D warrber 2017
Quarter 1, 2019
Quarter 1, 2018
WY
Niagara County
17-02-02945
December 2017
Quarter 1, 2018
Quarter 1, 2018
PA
Adorns County
14-03-19398
February 2018
Quartar 2, 2018
Quarter 3, 2018
I
PA
Oaiumbia county
15-03-02275
February 2o18
Quarter 2, 2018
Quarter 3, 2018
H4
Luzerne County
15-03-0227$
February 2018
Quarter 2, 20'18
Quarter 3, 2018
�7
FL
Gadsden County
12-04-04668
February 2018
Quarter 2, 2018
Quarter 3, 2018
4
FL
Leon County
12-0404888
February 2018
Quarter 2, 2018
Quarbr 3; 2018
r
PL
Liberty County
12-04-04685
February 2018
Quarter 2, 2018
Quarter 3, 2018
R
Wakule County
12-04-04865
February 2018
Quarter 2, 2018
Quarter 3, 2018
4
KY
Jefferson County
10.0478408
Decei rber 2017
Quarter 1, 2018
Quarter 2, 2018
MS
Claiborne County
13-04-44868
January 2018
Quarter 2, 2018
Quarter 3. 2018
M5
Hinds County
13-04-84895
January 2018
Quarter 2, 2018
Quarter 3, 2018
JhiS
Medoon runty
13-04-64865
January 2096
Quarter 2, 2019
Quarter 3, 2018
4
M5
Raman County
14-04-010BS
1=ebruary 2018
Quarter 2, 2018
Quarter 3, 2018
&
M5
scot County
1404-01088
February 2018
Quarter 2, 2018
Quarter 3. 2018
r FETAA 1lbtice to Congress: Monthly Update on Road Mapping
LoGarnasr69'ir
4
a
MS
Swith County
14-04-DI0SS
February 2018
Quarter 2, 2018
Quartsr.3, 2018
f
NN
Norman County
16-05-53248
February 2018
Quarter 1, 2018
Quarter 2, 2018
s
OK
Canadian County
12-M-10305
February 2018
Quarter 2, 2018
Quarter 4, 2018
B
TX
Aransas County
1:-06-081 is
February 2018
Quarter 2, 2016
Quarter 4, 2018
e
TX
Burnet County
i s-08.10SSS
February 2018
Quarter 2, 2018
Quarter 4, 2018
TX
Harris County
17-08-ii238
January 2018
Quarter 1, 2018
Quarter 3, 2018
4
TX
HE County
14-06-15435
February 2018
Quarter 2, 2018
Quarter 4, 2018
1M
TX
ktLennon County
14-08-15485
February 2DI8
Quarter 2, 2018
Quarter 4, 2018
8
TX
San Patrido County
15 -06 -OBI IS
February 2018
Quarter 2, 2018
Quarter 4, 2018
a
TX
Williamson County
15-O iDes5
February 7018
Quarter 2, 2018
Quarter 4 2018
KS
Rice County
12-07-03335
February 2018
Quarter 1, 2018
Quarter 2, 2018
T
mo
Gundy County
17-07-01465
February 2018
Quarter 1, 2018
Quarter 2, 2018
MD
Knox County
17-07-01795
February 2018
Quarter 1, 2018
Quarter 2, 2018
�. 7
MD
Livingston County
17-07-01498
January 2018
Quarter 1, 2018
Quarter 2, 2018
7
MD
Mercer County
17-07-01535
February 2018
Quarter 1, 2018
Quarter 2, 2018
7
MD
Nodew ay County
17-07-01585
February 2.018
Quarter 1, 2018
Quarter 2, 2018
1
MD
Putnam County
17-07-01835
February 2018
Quarter 1, 2018
Quarter 2, 2018
1
MD
Randolph County
17-07-01835
January 2018
Quarter 1, 2018
Quarter 2. 2018
7
MD
IBplsy County
17-07-0103S
January 2018
Quarter 1, 2018
Quarter 2, 2018
7
MD
Scotland County
17-07 01935
February 2018
Quarter 1. 2018
Quarter 2, 2018
7
MD
Shelby County
1747-01268
February 2018
Quarter 1, 2018
Quarter 2, 2D1S
i
MD
Vernon County
17-07-01708
January 2018
Quarter 1, 2016
Quartet' 2., 2016
7
MO
Wttht County
17-07-01985
February 2018
Quarter 1, 2018
Quarter 2, 2018
S
MT
Gallatin County
15-08-01085
February 2018
Quarter 1. 2018
Quarter Z. 2018
8
MT
GoldenCoup Vallay
17-08.08035
February 2015
Quarter 1, 2018
Quarter 2, 2018
' S
Mr
Petroleum County
17-08-08035
February 2018
Quarter 1, 2018
Quarter 2, 2018
I �+
Mr
R3osetxid County
17-08-08=
February 2018
Quarter 1, 2018
Quarter 2, 2018
It
AZ
Mancopa County
1709-04118
January 2018
Quarter 1, 2018
Quarter 2, 2018
tb
ID
Bannock County
16-10-05835
January 2018
Quarter 1, 2018
Quarter 2, 2018
1R
OR
Douglas county
14-10-05745
February 2018
Quarter 1, 2018
Quarter 2, 2018
.10
OR
Lane Comfy
12-10-04008
February 2018
Quarter 1, 2018
Quarter 2, 2018
7 [I
WA
iGltrims County
16-10-08265
January 2018
Quarter 1. 2018
Mortar 2. 2018
*Phase
we EhOiaS mtmber wa Rfelenw f caff&xMg FEMA iftaioaar FJr EnW AffVrT fCW 0ddffim 1 Lgfa maaoa abwrt a SWdy.
Notice to Cangress:MonthlyUpdat , an Flood Mapping
5
4.2. ESTIMATED ISSUANCE OF REVISED PRELIMINARY MAPS
The table below identifies the studies under which FEMA plans to issue revised preliminary maps in
December3017, January- 2018, or February 2018. The actual releasedates are being determined in
coordination with the State and/or local governments.
The information in the table below does not show the estimated datesfor community meetings,
publications in the local newspapers, or a ppeal periods, as these processes are often not necessary for
re vised preliminary mapping products.
t NE Currberiand County 12-01-10595 Oecerri er 2017
1 NE York County 12 01 1051 S Decanter 2017
QA DeKalo County 17-04-46388 December 2017
4 — sG Charketon County 07-04-47718 December 2017
6 N Jasper County 17-05-36005 January 2018
6 V M Lenawee County 12-06-02618 December 2017
NN Garver County 07-05-25145 January 2018
8 NN Fbuston County 11-05-15615 Decenter 2017
: 6 M11 NiarshaA County 15-WOB83S February 2018
6 MN Fbk County 17-05-13895 February 2418
8 OH 1Marran County 14-05-60845 January 2018
LA Calcaslau Parish 12-08.08998 December 2017
IA Fbk County 12-07-09565 Dacenter 2017
NE Hardison County 16-07-0767S Decanter 2017
7 NE York County 1&07-0787S Daoarrber 2017
8 Ur Lkah County 15408-07303 January 2018
AZ Whoop County 15-06-03665 January 2018
a AZ Yavapai County 15408-16925 January 2018
L 9 CA Nlendoono Ccurdy 16-09-2629& February 2018
OWg CIA Ventura County 17-09-01805 February 2018
40 AK SAID Borough 14-104)BM January 2018
10 6] Ada County 11-10-03998 February 2018
10 OR Ctaakamiar, County 12-10-09035 Febnun 2018
10 OR Curry County 12-10-04078 December 2017
10 1MA Jeffers on County 1410-05868 January 2018
16 U1dF1 Nkson County 11-10-04275 February 2018
* Pk= nse VZ Case Wfi"berW c rr*WMe r Cootacft FEMA A9910 of Eamal AUbbs farodd anal infnrrrr mn about 05h*
MOM FENJA Nodes to Congress: Monthly Update on Flood Mapping
6
4.3. ACTIONS TAKEN BY THE ADMINISTRATOR
The table below identifies the studies under which FEMA issued a preliminary RRM and FIS report,
Initiated a 990 -day appeal period, issued a revised preliminary FIRM and FIS report, or issued LFDs in
November 2017. It also Identifies studies that had FIRM panels and R5 reports become effective during
the month of November 2017.
2 _
NJ
#
NY
3
MD
PA
to
FSA
PA
AL
_
CoA
#
4
NC
NC
4
4
NC
NC
4
NC
4
NC
4
A
NC
NO
a
NO
4
NC:
�
6
VVI
AR
T
Iq
7
NE
7
t
a
NE
Co
a
M
9
CA
10
AK
ID
ID
#¢
VA
+0
VA
Bergen County
Niagara County
Allegany County
Nair County
Delaw are County
iiuntingdon County
Mobile County
Long County
Alamance County
Casw all runty.
Durham County
Guilford County
Lee County
Moore County
Orange County
Pbrson County
Randolph County
Welas County
She6y County
Marathon County
Lords County
Fkvnboldt County
Colfax County
Dodge County
13 Faso County
Racer County
San Diego County
Valdez -Cordova Census
Area
Valley County
Thurston Comity
Whatcom County
16-02-04435
16-02-00075
09-03-00155
10.03-07125
14.03-20245
16-03-07135
15-04-87525
12-04-09195
11-04-66105
14-04-9008S
14-04-90885
14.04-90985
1404-901W
14-04-9098s
11-0485105
14-04-90965
14-0490985
1404-90985
16-05-67275
18-05-14645
1408-11165
15-07--09035
17-07-13685
17-07-13IMS
07-08-0392$
17-09-02175
12-09-13278
11-10-04145
11-10-010SS
12-10-03945
13-10-03435
c Notice to Congres sWenthly Update on Rood Mapping
Appeal Start
Maps Effective
Revised ftlirnnery
LFD Issued
Maps Effective
LFD Issued
Preliminary
Maps Efecbve
Maps Effective
Maps Effective
Apps EffGVN9
Maps Effective
Maps Effective
Maps Effeotive
Maps Effective
A4aps Effective
Maps Effective
Maps Effective
Appeal $tart
ft1hinary
Appeal Siert
Maps Effective
Relmnary
Phe h*mry
Revised Prehrrmnary
Revbed ftliminery
Appeal Start
Appeal Start
Pr9elm-Ary,
LFD Issued
Appeal Start
k&
11110=17
111312017
1111512017
11=017
111312017
111212017
1111WD17
11/17/2017
11/1712017
11117/2017
11117/2017
11/17/2017
11/1712017
11/17/2017
11/17/2017
11/17/2017
11/1712017
11117J2017
1 112812 01 7
11/28/2017
11/0/2017
11f,112017
11/27/2017
11/17/2017
1 1r=" 7
IIII 2017
11/3120/7
112912017
11/171,2017
11/1512017
11128/2017
7
"Tease use the rote number w a Mfemm x r nsnbrabW FEMA Real b "mai A (fain fi vaddMbnai bifmmagm about a sa*
l n otenl itrwi cr, `PrAlimiti..rV:: Actbc =.
For the studies identified as "preliminary' in the "Action Taken" column, FEMA provided all affected
communities with preliminary copies of the revised FiRM panels and FIS report.
FEMA has posted digitaicoples of the preliminary FIRMand FIS report materialson the FEMA Map
Service Center (MSC) website (http://www.fema.gov/prelrminaryfloodhazarddato)for public access. In
the coming weeks, FEMA will publish a notice of the proposed updates in the Federal Register. FEMA
also recommends that community officials call further attentiontothe proposed flood hazard
determinations and the appeal process by issuing a press release or other public notice.
The preliminary copies of the FIRM and FIS report will be the basis for a coordination meeting with
community officials and residents. The meeting will give community members a chance to review the
mapping products and comment or ask questions about the map changes. FEMA will contact each
affected community to schedule the coordination meeting. In addition to making the digital copies of
the FIRM and FIS report available on the MSC website, FEMA has encouraged community officials to
circulatetheir copies as widely as possible among elected officials, staff, residents, and other local
stakeholders, so that they will have the opportunity to corrector add to the nontechnical information
presented on the preliminary products, including the configuration and labeling of physical features
such as roads, bridges, and streams. Requests to revise nontechnical information maybe provided to
FEMA during this community review period, at the community coordination meeting, or during the
statutory 9C -day appeal period that will follow. Approved changes will be shown on the final FIRM and
in the final PIS report.
After the review and appeal periods have ended and all comments and appeals have been addressed,
FEMA will initiate the final preparation of the F1 RM and FIS report. The new FIRM and FIS report will
become effective approximately sic months later. Before that date, each community will be reminded
of the requirements to adopt new floodplain ordinances or modify existing ordinances, as necessary, to
reflect any changes in the FIRM or FIS report. FEMA will provide communities with final copies of the
FIRM panels and FCS report before they become effective, a nd final FIRM and FIS reports will officially be
archived on the MSC website at https://msc., fema gov
Informatinr± kin "Ai+peal Scarf' _ x71
The preliminary FIRM panels and AS report include proposed flood hazard information for certain
locations in the counties listed above. This proposed information may include the addition or
modification of Specie I Flood Hazard Areas—the areas subject to Inundation by the base flood, Base
Flood Elevations or depths, flood zone designations, or regulatoryfloodways.
The National Flood Insurance Act provides limited rights to appea I proposed flood elevation and flood
hazard zone determinations at42 IJ.S.G §4104, and authorizesonly any owner or lessee of real property
within the community who believes his property rights to be adversely affected by the proposed
determination to appeal, or the community an such Individual's behalf. The only basis for appeal is the
possession of information showing that:
EWANotice toCangreas:Monthly Updain an Road Mapping
:{
8
I=•�
(1) the elevations being proposed by the Administrator with respect to an Identified area having special
flood haz a rds a re scientifica Illy or technically incorrect, or
(2) thedesignation of an identified special flood hazard area is scientifically ortechnically incorrect.
The data must be .submitted during the 90 -day appeal period for proposed maps in order to satisfy the
statutory requirements for an appeal designation or appellant status of the appropriate entity.
For the studies identified as "Appeal Start" in the "Action Taken" column, FEMA published a notice of
the proposed updates in the Federal Register, a long with public notifications of the appeal process in
local newspapers. FEMA recommends that community officials call further attentionto the proposed
food hazard determinations and the appeal process by issuing a press release or other public notice.
These proposed flood hazard updates, once flnelized, will become the basis for the floodplain
management measures that communities must adopt for participation in the NFIP. However, before
any new or modified flood hazard information is finalized and becomes effective, FEMA provides
community officiais and residents an opportunity to appea I the proposed flood hazard information
presented on the preliminary FIRM pa nels and FIS report. The appeaI procedure Is outlined below.
The 90 -day appeal period bega n on the date of the second notification published In the loca I
newspapers. It is important to note that only appeals supported by scientific or technical data will be
considered. The appeal data must be submitted to FEMA during the 90-dayappeal period, which cannot
be extended. FEMAwill also consider comments and inquiries regarding Information other than the
proposed flood haze rd determinations (e.g., incorrect street names, typographical errors, or omissions)
and will incorporate a ny appropriate changes before the revised FIRM and FIS report become effective.
FEMA asks that communities review and consolidate any appeal data they receive and issue a written
opinion stating whether the evidence provided Is sufficient to justify an official appeal. Whether or not
a community decides to appeal, it must send copies of individual appeaisand anysupporting data to
FEMA for consideration.
FEMA will resolve all appeals in consultation with local officlels, through an administrative hearing or by
submitting the conflicting data to an independent scientific body or appropriate Federal agencyfor
guidance. After other alternatives have been explored, communities may also request a review by a
Scientific Resolution Panel (SRP). SRPs are independent panels of experts In hydrology, hydraulics, and
other pertinent sciences, which are established to review conflicting scientific and technicai data and
provide recommendations for resolution. An SRP is an option after FEMA and community officials have
been engaged in a collaborative consultation process for at least 60 days without a mutually acceptable
resolution of anappeal. FEMA will provide the reports and other information used in making the final
determination, for public inspection.
If substantive changes to the preliminary FIRM and FIS report are required aftertheappeal period,
FEMA will send each affected community a revised preliminary copy of the FIRM and FIS report to
FWA Notice to Cana ran*: Monthly Updato on Flood Mapping 9
or, t4" -t-1 UE! f-.
review. After any appeals and comments regardingthose products are resolved, FEMA will send each
community an LFD, which finalizes the flood hazard information presented on the FIRM and FIS report
and establishes an effective date for the mapping products.
lnforrnat;, un'Revised PYelrrnJ0ar}"' Mr.t«•�+7
For the studies identified as "Revised PrellminarVN in the "Action Taken" column, FEMA has provided all
affected communities with revised preliminary copies of the FIRM panels and FIS report and is preparing
to initiate a statutory 90 -day appea I period, if required.
The revised preliminary FIRM and FIS report Include proposed flood hazardinformation for areasin the
counties listed. This information may include the addition or modification of Special Flood Hazard
Areas -the a reqs subject to inundation by the base flood, Base Flood Elevations or depths, flood zone
designations, or regulatory floodways.
FEMA has posted digitalcopies of the revised preliminary FIRM and FIS report materialson the FEMA
MSC website (http:J/www.femo.gov/preliminaryfioodhazorddata)for public access.
After all comments have been addressed, FEMA will Initiate thefinal preparation of the FIRM and FIS
report, which will become effective approximately six months later. Before that date, each community
will be reminded of the requirements to adopt new floodplain ordinances or modify existing ordinances,
as necessary, to reflecta ny changes in the FIRM or FIS report. FEMA will provide communities withfinal
copies of the FIRM panels and FIS report before they become effective, and final FIRM and FIS reports
will officially be archived on the MSC website at https://msc fema.go,
information on "LFQ Issued," Action -
For the studies identified as "LFD Issued" in the "Action Taken" column, FEMAhas alreadyprovided the
communities affected by the updated flood mapping with preliminary copies afthe revised FIS report
and FIRM. Proposed flood hazardchanges were published in local newspapers and in the Federal
Register. Astatutory 90 -day appeal period was held, and FEMA resolved any appeals or comments
received during that period. Accordingly, the flood hazard designations are now considered final. In
compliance with the Code of Federal Regulations (44 GFR 67.11), FEMA has sent a notice of the final
flood hazard information to the Chief Executive Officer of all affected comm unit les, all individua I
appellants, a nd the State Coordinating Agency, and published this information in the Federal Register.
FEMA will provide each affected community with final copies of the updated FIS report and FIRM panels
before they become effective in approximately six months. Final RRMand FIS reports will officially be
archived on the MSC website at.Wps://msc fema. j
Infnrmst1r1n an � Mai s.r; ":r�'.'� ii r7:°1"!`•'s'S.
For the studies identified as "Maps Effective" in the "Action Taken" column, the updated FIRM and FIS
report issued by FEMA have become effective. Effective FIRMsare used by communities to administer
floodplain management reguiationsandm igateflood damage. Loca I citizensuse them to determine
the flood zone for their property or structure. Lending institutions use them todetermine whether
flood insure nce is required. Once the FIRM becomes effective, insurance rates may be affected for
FEMA Notice to Congress --Monthly Update on Flood Mapping 10
property owners within the communities.
S. ADDITIONAL INFORMATION
Flood mapping information and resources that your staff and constituents may find helpful are available
on the FEMA website at www.fema-gov/national flood4nsuranceprogram-flood-hazard mapping. In
addition, the FEMA Map Information Exchange (FM DQ is available to answer questions by telephone, toll
free, at 1.677-336-2527 or by email at FEMAMapSpecialist@riskmapcds.cam Alist ofaddkional
resources Is provided in Appendix C.
If you have any questions or concerns regarding the information in this document, please have a
member of your staff contactthe appropriate FEMA Regional External Affairs Specialist listed below.
FEMA tt�s-wvwwv%memalAffairs Specialist Contact List
Jenna Pnkhpm
617-858-7547
Dennis-Plnkhomffema dhs.gov,
Davit Sullivan
202-480-1053
Kevin.Suilivan@fema.dhs.gov
Corey DdW aro
202-384-8588
CoreyDeMuro@femadhs.gov
Dann Lucas
770-220-5282
Danoun.Lucas@fema.dim gav
Dan Bhulrran
342-408-4427
Dan.Shulman@fema.dhs gov
Juan Ayala
940-898-5105
Juan.Ayala@femixdhs.gov
Mchael Cappannan
816-283-7080
Michael. CoppunnarWfema.dhs gov
Stacie Gaff
303-235-4908
Stacle.Greff@fema.dhs gov
Frank Mansell
510-677-7088
frank Mansell@fema As gov
Ryan Ike
425-4874787
Ryan.lke@fiema.dhs.gov
FEMA Notice to Congress: Monthly Update on Flood Mapping 11
W Cc-rfi be r 2411
APPENDIX A: FLOOD MAPS
Hood hazard mapping is an important part of the NFIP, as It Is the basis for NFIP regulations and flood
insurance requirements. The information graphics in thisappendix detalithe process fbrflood map
creation and updates.
rl tW 15 A lIIIAIP?
A Flood Map informs your community of varying des of iGcal flood risk.
It helps set Minimum floodplain srandant and determines the cost or flood
insurance The lower your degree of (sk, the lower vouf flood Insurance
Premium. though in areas of high flood risk, it might mandate flood
insurance coverage
HOW IS A FLOOD MAP MADE? .
a= Identify Anea to Map or Re -Map
HIIl WOULDA Cllr
N=110 4FAUP7
PppuisUal� fwrnh Br¢ter Chnn�Ns
& Ike naru5 S&kylp �anrh'
SAW doftjW Am
A W8kN od * *40 Wd lorifaaaaaaafr i tea
"W
aaM m6ftOftegad.*W1*l 4161setee
FV
aswwdovdin!at
d2b,me ad 1" 01114do of racy. aa4 jW #"
mrsom*Ie"M
+ s
Ir*slri%=W uWar+dWWWhahaida1L
OJDII)L- Ai R.Foeft am naursotwo
+aMh "►12J USUM
fflWi FE&U Notice to Congress; Monthly Update on Rood Mapping
L—ws..— cv.a ��
0 Conduct DbomM ......... :11 ...... ...........
V. 671
F
Owl T'r
Ififra,43lictutz 41--dramic", Lane oisL#, fxi—in' IT"AiN
. ........... .... . ............
A ROW V.W
0 "*am w 1 plaw mmam rms U" (owl
Camm=mftw MIDI wmmW*mwUmwmm
•
4)WA"UW kwW= ft VIM C"dSPDCW fbod HawAA"m CM)
DdM MgmbW eta and IN mW I*pLwm kWxftC**#O* j*
50,01OWUM Good PORd-da* and bW1tkgAWW#A ft the ammaly
ff-jdhft-Hf% w ft
wi. .-. 0
MqIM and 4W^Ar ng
4milimmilih w 41'.
a ROW Mcip is nmed, a *W
or meolft man on oftkw
Ow d did 0* 6walficabon
and smamwmcsw —1
I ft data and research
am fm Room dw Rood
fors TftdMap 0*4
to Anal alp
ftW
080 to t4mated W Few 9w.
."K =to and IOCBa laadars dater r a 46MM And MAN and
W P Plan as won as remm stir WW moms nm
as VIM or Nwmkgw and Dbcmwy w0~14mambon
Won to ho km swmomrs aview to 490M feduce
@0
and Wbma 711am""RePortPowd" risk.
ftWMWMS *11h a VOWWW"Am and
Vbtkl under rd of OZWMI flood
OlOng 40NOW data, And allffn Rood
mawbon acts les
H;
FEMA Notice to Congres s: M onthly Updats on Flood Mapping
December2017
13
Hold the Flood Risk ReWw and RwAlenm WOW
#A v 9 qP
NN
I x,lf, Po v t-� V I, J,,
io ON 0,
ARI
jjw,Aawlv tai um h0c,
r ti
154
mill: 110. -
FEMA Nat" to Congress: Monthly Update on Rood Mapping 14
Fadk to Public Appeal
and Comment #mad
Rood Maps am efsled ftm sand
soeaoe no MOM hormMMM
brass wCMEO OWTMKMN
d two ft of ftw-pw*Ma
Mft4msWdts apao
pomatlpnopefcrte+
I I L
IZEfVU //N�otice to Congress:MonthlyUpdate on Rood Mapping 15
.01[+C Ya [[[mug iV /f
k�«mar
(Tllhiy1 A13V loddw i=ikw
ikik
delaslupa s Lir, dr .' .� �+ - nppais ills ow Z
tr v Remsim umft)
ieQLmvd W1ft 6 MWOs of 1a[w
PMW QZWI*MOF
[dsenenwgsr
prwta hettiff*
0 Iffq " mmilieellcy O# WaterAW • .
I• •� ....� iiil e:. �r : � [E' FIs .,. �.
ra if
i'
1
_Mill".FEJAA Notice. to Congress - Monthly Update on Flood Mapping
16
=—r
m
APPENDIX B: ACRONYMS
Table 1: Acronyms and Definitions List
B*gen- I Biggert-Waters In July 2012, the US Congress passed the Biggert-Waters Flood
b tun, Flood Insurance Insurance ReformAct of 2012, which calls on the Federal
Reform Act of Emergency Management Agency (FEMA) and other agenciesto
2012 make a number of the nges to the way the National Flood I nsurance
Program (NF[P) is run. For more Information, please visit
httpds//www jema gov/meft4ibrary/resources-
documents/collectrons/341
Flood Insurance
A Flood Insurance Rate Map (FIRM) is an official product on which
Rate Map
FEMA has delineated both the special flood hazard areasand the
risk zones applicable tothe community. For more information,
please visit http//www_fema.govjflood insurance -rate -map -firm
Flood Insurance
A Flood insurance Survey (FIS) is a compilation and presentation of
Study
flood risk data for specific watercourses, lakes, and coastalflood
hazard areas within a community For more information, please
visit hitp,hwww.fema.gov,'Yloodpla►n-managemeno?ood-
insurance study
frwniir FEMA Map
The FEMA Map Information eXchange(FMI)Q was created in March
information
2010 to provide a one-stop shop for a variety of information,
Exchange
products, services, and tools that support the NFlP. For more
Information, please visit
http j/www fToadmaps fema.govjfhnnjYmx main.html
NFir National Flood
The NIFIP identifies areasof flood nskthroughanalym and
Insurance
mapping, encourages floodplain management practices through
Program
community participation, and offers flood insurance to
homeowners, renters, and business owners in participating
communities. For more information, please visit
https//www.fema gov/notionallkmd insurance -program
LFU Letter ofFine I FEMA sends a Letter of Final Determination (LFD) to the Chief
Determination Executive Officer of a community as notification thata new or
updated FIRM will become effective in six months. For more
information, please visit http:/Jwww.fiema.gov/national flood -
insurance -program floodhazard-mappingjletter-frnal-
determination
r -
FEMA Wdoe to Congress: MonthlyUpdete on Rood Mapping 17
December 2017
ffdW
: F,h4A Notice to Congress: Monthly Update on Flood Mapping
uacemoer zu1r
1$
3
MSC Map Service
FEMXs MapService Center (MSC) is the official government
Center
distribution centerfbr digital and paper flood hazard mapping
products created by FEMA in support of the IFI P. For more
wdormation, please visit https //msc fema.gov
RLIk MAP Risk Mapping,
The vision for the Risk Mapping` Assessment, and Planning (Risk
Assessment, and
MAP) program is to deliver quality data that increases public
Planning
awarenessand leads to action thatreduces risk to life and property.
Risk MAP builds an flood hazard data and maps produced during
the Flood Map Modernization program. For more information,
please visit http://www.fema.gov/risk mapping-asseament-
planning
'SRP Scientific
The Scientific Resolution Panel (SRP) process reinforces FEMA's
Resolution Panel
commitment to work with communities to ensure that the flood
IiL
hazard data depicted on FIRMsis built collaborativek usingthe
best science available. For more information, please visit
http.//rvww. femdr. gov/medfa-library-data/1470778879722-
e5a7384967fe3O1cef8bfob130b764a3lSRi Overva?w_fne4_ hnlcpcf
ffdW
: F,h4A Notice to Congress: Monthly Update on Flood Mapping
uacemoer zu1r
1$
3
APPENDIX C: RESOURCES
The fallowing additional resources provide a better understanding of key elements of this report.
...,W41PIRW nttpsy/www fema.gov/media-11braryfresources-
documents/collectronsf341
- — — — .-A
Phame
E-mail
$Gdok iwtedig
Mime
E-mail
https•1fwww f ma gov/natkmaPflaadansuranceprogram
1-898-379-9531 (toll free)
flaodsmart@fema_dhs gov
Twitte rat @NAPtralning
http //www fiema.gov/ruk-mapping-assessment planning
FEMA Map Information Exchange (FMIQ
1-877-336-2627 (toll free)
FEA4AMapSpecia1ist@riskmapcds com
FENU Notice to Congress: Monthly Update on Food Mapping 19
December 2017