HomeMy WebLinkAbout2017-11-27-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday November 27, 2017 - 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Wiehl Road Improvement District Update 3. Flood Control Zone District Advisory Board Update 4. Other business 5. Adjourn Created on 11/22/2017 7:05:36 AM KITTITASCOONI'Y KZTT313r1AJ8 COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director STUDY SESSION MINUTES November 27, 2017 THOSE PRESENT: Paul Jewell, Laura Osiadacz, Obie O'Brien (BOCC); Luke Huck (DPW); Dan Carlson, Stephanie Mifflin, Lindsey Ozbolt (CDS) WIEHL ROAD IMPROVEMENT DISTRICT UPDATE: Luke stated that staff has been working for the last couple years on a road improvement district for Wiehl Road residents. Originally, staff was working under the direction of formulating the road as a private road at the onslaught of the improvements. Earlier this year after researching the RCW's it was discovered that the road would have to be taken on system as a county road. This resulted in a higher cost than anticipated. Staff went back and redesigned the road, came up with additional costs, had further conversations with the Board about potential contributions from the county to help alleviate some of the costs. Luke continued that Director Cook has been looking into the formulation methods for establishing the district and informal conversations have been had with the Prosecuting Attorney's office and is suggesting to the Board that more formal conversations be held. Luke added that while he has not been completely involved in this project he did spend some time this morning looking into the different methods of establishment including reaching out MRSC and other counties. He found that are three avenues that can be used to formulate the district. These include the petition process, by resolution and by ballot. Discussion was held. Board Direction: Submit a request to the Prosecuting Attorney's office for support and schedule a special meeting for discussion. FLOOD CONTROL ZONE DISTRICT ADVISORY COMMITTEE UPDATE: Luke stated that outreach has been done over the last six months with a total of eleven applications being received with five from District 1, four from District 2 and two from District 3. It was pointed out that one application was placed in the incorrect district and will be considered for the appropriate district. Commissioner Jewell inquired as if we are making appointments today. Luke commented that Director Cook was looking for direction as to next steps including continued outreach or accept what applications have been submitted for consideration. Commissioner Jewell suggested that appointments be made at today's meeting. Discussion was held. 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 2 Board Direction: Commissioner Jewell nominated Scott Nicolai and Karen Poulsen for District 1. Commissioner O'Brien made a motion to appoint Scott Nicolai and Karen Poulsen to the Flood Control Zone District Advisory Committee representing District 1 with Commissioner Osiadacz seconding the motion. Motion passed with no discussion. Commissioner Osiadacz made a motion to appoint Jerry Martens, Patrick G. Deneen and Holly English representing District 2 to the Flood Control Zone District Advisory Committee. Commissioner O'Brien seconded the motion. Motion passed with no discussion. And Commissioner O'Brien made a motion to appoint Jeff Dunning and Ryan Lyyski representing District 3 to the Flood Control Zone District Advisory Committee. Commissioner Osiadacz seconded the motion. Motion passed with no discussion. Staff was directed to present a Resolution for consideration at the next agenda session. OTHER BUSINESS: PROJECT UPDATES: Bar 14 Road Bridee: Luke updated on the Bar 14 Road project stating that staff has received all permits and work is going on today, installing the bypass for the stream. Some of this work will be done in collaboration with Kittitas Reclamation District (KRD). Public Works permitted work is for 200 feet up and down the stream from the bridge. KRD's permitting is from their structure downstream all the way up to where our 200 feet begins. Discussion was held. Mercer Creek: Luke reported that staff is about a week or two away from receiving the necessary permits to start this project. We are working with the City of Ellensburg on this and are identifying who is going to secure the equipment needed to do the project. The City of Ellensburg has volunteered to complete some of the brushing that is needed since they have boom trucks and the necessary staff that is familiar with this type of work. Discussion was held. Teanawav Bridge Rail: Luke stated that the Teanaway Bridge Rail project is completed and is now open to traffic. The cost was around $115,000 and it looks like we will not get any cost recovery from the driver's insurance company to reimburse for this project. Luke Huck, County Engineer 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: :November 27, 2017 TOPIC: Wiehl Road Improvement District Update AC'T'ION REQUESTED: Request the Prosecuting Attorney's Office to Brief the Board on District Formulation LEAD STAFF: Mark R. Cook RECOMMENDATION: Request the Prosecuting Attorney's Office brief the Board of County Commissioners (BOCC) on ,Road Improvement District Formulation pursuant to RCW 35.85.020 BREIFING SUMMARY: • County road improvement district legislation is found at RCW 36.88 • RCW 36.88.065 allows the use of RCW 35.43 • Using RCW 35.82.020 avoids requiring an election • Staff has received few comments from our October 27. 2017 letter BACKGROUND: For the past two years, the Public Works Department (PW) has been working with residents in the Wiehl Road area towards forming a road improvement district (RID). Residents responded to a petition effort in early 2017 favorably (90%-1- ). The Prosecuting Attorney's Office (PA) subsequently determined that any RID improvement requires dedication onto the public road network following improvement construction. PW redesigned the proposed Wiehl Road improvements and briefed the Board on cost issues. The BOCC has previously committed to cost share (5150,000 and any cost over- runs) and staff noticed all potential district residents by mail on October 27, 2017 (EXHIBIT 1). 1 o date, I have received one email and had one conversation regarding our letter. The email is attached as EXHIBIT 2. The phone conversation (11-20-2017) informed me of opposition from one proposed district resident. Proponents for RID forniulation are anxious to move forward with the process. DISCISSION: PW believes it is time for the BOCC to receive legal advice from the PA's Office. Specifically, PW desires the BOCC understand RID formulation process (resolution) and render an opinion on the proposed district cost recovery model based on the number of Page I of 4 PUBLIC WORKS BOARD OF COUN I Y COMMISSIOM RS WORK SESSION S'FAFF REPOR I lots served. Additionally, PW desires that the PA inform the [OCC on the use ofRCW 35.43 as a potential formulating vehicle avoiding an election. PIS_CAI, IMP_AC:rS: The BOCC has offered to cover S 150,000 of RID construction via the Road Fund. ATTACHMENTS: Exhibit L October 27, 2017 Letter Exhibit 2: Electronic mail supporting the RID Pagc 2 of 4 Pt.BLIC WORKS BOARD OF COU VTY (OMMISS I ONE.RS WORK SLSS10A S1 A FF REPORT EXIIlB1-1 1: OCTOBER 27, 2017 LEVI FR Page 3 of d PLBIA' WORKS BOARD OF CMIN IY COVNIISSIO',vI RSWORK SESSION S"EAI F REPOR E MEMWWXIYALs 4c4au DEPARTMENT OF PUBLIC WORKS erne^�r=rr"T� Mark R. Cook, PE Director October 27, 2017 Weihl Road Resident RE: Proposed Road Improvement District Dear Resident: Kinitas County Department of Public Works notices you that the Board of County Commissioners has determined that it is in the interest of the County to initiate a Road Improvement .District (RID) for Weihl Road in the near future. The Board is required by Washington State law to notice its intention to formulate the district by resolution. Following this notice, we will send a separate notice to all residents advising of the meeting time and date for passage of the resolution of intent to formulate. We will further explain the process in our next notice to residents. Public Works has completed an improvement design for Weihl Road and delivered a cost estimate to the Board of County Commissioners. We have also prepared a preliminary financial plan supporting improvement construction. Cost estimates are provided below for your consideration. Weihl Road Improvement District Financial Plan Total project cost $ 750,614.00 Board of County Commission contribution $ 150,000.00 Remaining improvement cost to residents $ 600,614.00 Proposed cost recovery period 15 years Assumed interest rate 3 percent Assessment basis Number of lots benefited Total number of lots benefited 66 Annual assessment per lot $ 740.09 Previously, residents responded with a petition requesting formulation of the RID using an estimated annual per lot assessment of $776 for a period of ten (10) years. Subsequently; the Prosecuting Attorney Office determined that the roadway requires dedication onto the public 411 N. Ruby St, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FA.X (509) 962-7663 Dept. of Public Works Page 2 road system once improvements are completed. This decision has driven the project cost to the current estimated $750,614. Attempting to maintain previous costs to benefited residents, the Board of County Commission elects to contribute towards total project cost. The contribution lowers the resident share to $600,614. Maintaining a ten (10) year cost recovery period results in an annual lot cost of $1,035.75. Discussing the costs with several area residents suggests that the annual cost is too high. Extending the cost recovery period to fifteen (15) years affords a reduced annual payment of $740.09. We are anxious to hear the community's response to our financial proposal — prior to moving forward with Board of County Commission action. You may call me at: 509-962-7523 or send a response to 411 North Ruby, Suite I ; Ellensburg, WA 98926. You may also email a response to: Sincereh, f" Mark R, Cook Director 411 N. Ruby St, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 FXIfIBJT2: ELEC IRONIC MAIL DATH) 11/07,12017 lla-c 4 of 4 PUBLIC WORKS BOARD OF COUNlY COMMISSIONERS WORK SESSIO\ STAFF R1,POR[ Mark Cook From: Jack Talley <talley.jack@gmail.com> Sent: Tuesday, November 07, 2017 11:03 AM To: Mark Cook Subject: Feedback - Proposed Road Improvement District - Weihl Road I received your letter of Oct 27,2017. 1 read it thoroughly. I attended the last meeting as well at the Grange. I'm in favor of the project. I manage 3 lots in the proposed area -a 13 acre with 2 houses on it, 11.75, and a 6.0 acre (the latter two owned by my mother). I want to tell you how very much I appreciate your experienced skill and effort in working on a difficult complicated project with the Wiehl road residents through the handful of dedicated representatives. Thank you for all the direction you've taken on this issue of safety for residents. Thanks, Jack Talley Personal Cell phone: 425-233.2110 Business Manager, Apple Street LLC also, We rent out our vacation cabin through a property 771L1%RgBY:...{j/p,��/allvurn�one�acotlmirums mrdpniND mii,i ,,92 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: November 27, 2017 TOPIC: Flood Control Zone District Advisory Board update ACTIO\ REQUESTED: None required LEAD STAFF: Mark R. Cook RECOMMENDATION: None required. BREIFING SUMMARY: • Six month of outreach has generated I I applications • Five from District 1, four from District 2 and two from District 3 BACKGROUND: • Several public meetings and one targeted mailing (Ellensburg. Kittitas, Cie Hum and South Cie Elum) have generated a list of eleven potential board members. The district list is generated by the address on the application as follows: five from District 1, Ebur from District 2 and two from District 3. • The Advisory Board is necessary to develop the 2018 FCZ.D capital improvement plan DISCUSSION: The Board of County Commissioners (BOCC) has previously directed staff to build a list of applicants from the following commission districts: three from 2, two from I and two from'). The listing of applicants is provided in "fable One below. Page 1 of2 I'CBIAC WORKS BOARD 01 COt:N"VY COM%,1I SS 10A;;RS WORK SESSION STAFF' REPORr Table One: FCZD Applicants and Commission District James Pryal 2 Patrick C . Dene- 2 _.. _ Ryan I. yski 3 Jeff Dunning FISCAL IMPACTS: PW has spent approximately seven thousand dollars to date recruiting applicants. ATTACHMENTS: Nonc. Page 2 of 2 PUBLIC WORKS BOARD OF COUNTY C'OMMISSIOMIRS WORK SESSION S FAIT RI -PORI