HomeMy WebLinkAbout2017-04-10-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday April 10, 2017 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Municipal Research and Services Center Professional Services Roster Discussion.
3. Request to Approve a Resolution to Award the Bid for the Manufacture and Supply of
Aggregate for Bituminous Surface Treatment for One (1) Calendar Year Following Contract
Execution.
4. Request to Approve a Resolution to Delegate the County Engineer Authority to Legally
Bind the Kittitas County Public Works Department for the Purpose of Requesting Federal
Transportation Project Reimbursement.
5. Flood Control Zone District Advisory Board.
6. Palomino Fields Development Agreement Revision.
7. Six Year Transportation Improvement Plan Amendment Discussion.
8. Other business
9. Adjourn
Created on 4/7/2017 8:21:48 AM
i �scno6s _.. to rkc�N
G'9
9
KITTITAS COS NTA'
KITTITAIS COUNTY
DEPARTMENT OF PUBLIC WORKS
Mark Cook, Director
STUDY SESSION MINUTES
April 10, 2017
THOSE PRESENT: Paul Jewell, Laura Osiadacz, Obie O'Brien (BOCC); Mark
Cook, Luke Huck, Candie Leader (DPW); Dan Carlson
(CDS); Judy Pless (AU); Chris Horner (PA); Lisa
Lawrence (SW)
GUESTS:
Chad Bala, Pat Deneen
MUNICIPAL RESEARCHAND SERVICES CENTER PROFESSIONAL SERVICES
ROSTER DISCUSSION.•
Mark introduced Judy Pless from the Kittitas County Auditor's office to discuss the MRSC item.
Judy stated that in August 2016 the Board of County Commissioners authorized staff to pursue
going to MRSC for Small Works, Small Purchasing and Contracting Rosters. Judy added that
there are only two times during the year you can join which is December and May. The deadline
for December was missed and now there are a few questions that need answered before joining
in May. The first being the BOCC has given different levels of department's authorization to
sign contracts and also the process of awarding bids once they are opened. Commissioner Jewell
responded that only two departments that have authority to sign contracts, one is Public Works
and the other is the Fair/Event Center. Discussion was held.
Board Direction:
No direction.
REQUEST TO APPROVE A RESOLUTION TO AWARD THE BID FOR THE
MANUFACTURE AND SUPPL Y OFA GGREGA TE FOR BITUMINOUS SURFACE
TREATMENT FOR ONE (1) CALENDAR YEAR FOLLOWING
Mark presented the Resolution to Award the bid for the Manufacture and Supply of Aggregate
for Bituminous Surface Treatment for One (1) Calendar Year following Contract Execution. He
then introduced Luke Huck, County Engineer to discuss the item further. Luke reported that the
department solicited bids for the manufacture and supply of aggregate for bituminous surface
treatment and only one bid was received from Ellensburg Cement Products. This year the bid
structure was done differently than in previous years. We are actually testing the material prior to
purchasing and in lieu of specifying specific pit sites for stockpiling locations that were primarily
owned and operated by Ellensburg Cement Products we are requesting delivery to our own
designated pit sites spread out across the county. We did have to hire a third party to test the
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
material and we contracted with Baer Testing and requested that Ellensburg Cement Products
truck the material to our sites once the rock passes the testing. We are hoping to see some better
quality rock and will see some longer ROI on our chip seal. It will also allow us to maintain
some stockpile of rock to use for other projects. Discussion was held.
Board Direction:
Commissioner Osiadacz made a motion to approve the Resolution to Award the Bid for the
Manufacture and Supply of Aggregate for Bituminous Surface Treatment for One (1)
Calendar Year following Contract Execution. Commissioner O'Brien seconded the
motion. Resolution No. 2017-070 was approved as presented.
REQUEST TO APPROVE A RESOL UTION TO DELEGATE THE COUNTY ENGINEER
AUTHORITY TO LEGALLYBIND THE KITTITAS COUNTYPUBLIC WORKS
DEPARTMENT FOR THE PURPOSE OFREOUESTING FEDERAL TRANSPORTATION
Mark stated that the department received notice from the Federal Highway Administration that
last year the Federal Code registry was changed to require a particular certification for local
government relative to cost recovery on federal aid projects. Our current practice is that every
pay request is signed by either the Director of Public Works or the County Engineer.
Washington State Department of Transportation is requiring a Resolution be approved by the
Board of County Commissioners specifically noticing that the County Engineer is authorized to
be signing the vouchers and reimbursement requests.
Board Direction:
Commissioner Osiadacz made a motion to approve the Resolution to Delegate the County
Engineer Authority to Legally Bind the Kittitas County Public Works Department for the
Purpose of requesting Federal Transportation Project Reimbursement. Commissioner
O'Brien seconded the motion. Resolution No. 2017-071 was approved as presented.
FLOOD CONTROL ZONE DISTRICTADVISOR Y BOARD:
Mark stated that two weeks ago at study session staff discussed with the Board of County
Commissioners about the desire to bring some structure into the administration of the Flood
Control Zone District. Since the formation in 2012, there have been two completed and one near
completion watershed assessments that have identified numerous projects for eventual
implementation. Currently, the only strategy for choosing amongst the projects is the Flood
Control Zone District Administrator who could build a priority list and present it to the Board of
County Commissioners for consideration. Mark added that it is his opinion and a shared opinion
from the majority of the Board from the last discussion two weeks ago that a utility rate payer
based advisory board might be a favorable alternative to the other model. Given that the utility is
county wide and the type of projects are significantly different that a blended approach to
formation would be considered. This being made of up three rate payers from Upper County,
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 3
three from Lower County and an at large member. Mark continued that an odd number would be
favorable so that the committee can have a decision making tool available if consensus was to
fail. The advisory board would essentially help screen the projects that have come from the
watershed assessments and annually create a process where rate payers could solicit other rate
payers for their projects. This allowing projects county wide to be recognized. Mark believes
that staff could pull something together in a couple month period with possibly presenting at
service groups, City Councils, run radio ads and press releases. Commissioner Jewell inquired
on how to define Upper County vs. Lower County members. Mark replied that the Board could
define this with the districting, however, Commissioner Jewell didn't agree due to the way the
districts are set up. Commissioner Jewell suggested using the Commissioners' Districts since
they are pretty evenly split. This would allow two members from District 1, two from District 3
and three from District 2. Discussion was held.
Board Direction:
Build outreach plan for review at a future study session.
PALOMINO FIELDS DEVELOPMENT AGREEMENT REVISION:
Mark stated that Public Works has been working with the developer of Palomino Fields for the
last eight to nine months. What has been recognized is that the siting of the plat and the
association of the Currier Creek floodplain requires some special analysis. The Flood Control
Zone District recently completed a two dimensional flow model for the entirety of Currier Creek,
including the limits of the property that is slated for development at Palomino Fields. Staff made
the developed model available to the developer for their review. Mark continued that what has
come to light is that there are five phases of the development they are insensitive to the specific
land characteristics of the entire plat, so where there are uplands and floodplains we might find a
regional stormwater facility is more suited in phase five but we aren't able to task it from phase
one because the current developer agreement requires the completion of one phase before the
other. Staff believes this handicaps the developer as it relates to our added knowledge of the
sensitive nature of floodplain development and so staff has suggested to the developer to
approach the BOCC with a request to amend the developer agreement. Pat Deneen commented
on the issue. Discussion was held.
Board Direction:
Move the topic forward for the public hearing process.
SIX YEAR TRANSPORTATION IMPROVEMENT PLANAMENDMENT DISCUSSION:
Mark commented that with the Board's recent decision to invest road fund dollars supporting the
Hwy 97 roundabout project requires that staff bring forward a revised annual construction
program. While staff was looking at the current program they saw an opportunity to make other
changes as it relates to impacts on the six year transportation improvement program. Mark
continued that staff has also received confirmation from the Federal Highway Administration
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 4
that they are going to follow our lead and return the Teanaway Hydraulic project back to the
county, as staff feels we are better equipped to deliver the project. Mark added that this winter
we came out with significant snow pack levels in Manastash. As staff was doing the
environmental scoping for the permitting for the Manastash washout it was discovered that, even
in late March, trying to collect additional data that our consultant was looking for and found
three inches of ice below two feet of snow and being unable to even probe the area with our data
collectors. This project is most likely going to be pushed back a year. So, recognizing that
project being pushed back, the addition of the roundabout project, the FLAP and staff believes
we can accelerate the No. 81 Road pedestrian lane project. Data collection is currently underway
on that project. Discussion was held.
Board Direction:
Schedule a public hearing to amend the plan.
FEMA Alternate Project Update:
Mark stated that staff received notice Friday afternoon of final acceptance of our proposal to
acquire essentially one million dollars of heavy equipment as a settlement to not repair Ringer
Loop Road. Staff is currently soliciting and updating the prequalified bid list and various
purchasing venues with state and federal government. Mark continued that staff is anticipating
seeing the equipment by fall. One of the items staff is looking to secure is a temporary bridge
that could be used for rental to other agencies. Discussion was held.
Blackhorse Update:
Mark stated that the project team met Friday at some length to discuss DR Horton taking flows
from their development and conveying them across Reecer Creek Road onto property that is held
by Pat Deneen. Some significant regional soil with the characteristics needed to dispose of
improved runoff. Staff encouraged Mr. Deneen to have a conversation with DR Horton about
the possibility of making some of his land available. The project team, consisting of the
hydrogeologist, civil engineer, and a DR Horton representative all met and the opportunity for
some solutions to issues that have arose. Discussion was held.
Executive Session (s):
To consider the selection of a site or the acquisition of real estate by lease or purchase when
public knowledge regarding such consideration would cause a likelihood of increased price.
In Executive Session at 2:24 pm
Executive Session adjourned at 2:34 pm
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 5
To evaluate the qualifications of an applicant for public employment or to review the
performance of a public employee. However, subject to RCW 42.30.140(4), discussion by a
governing body of salaries, wages, and other conditions of employment to be generally
applied within the agency shall occur in a meeting open to the public, and when a
governing body elects to take final action hiring, setting the salary of an individual
employee or class of employees, or discharging or disciplining an employee, that action
shall be taken in a meeting open to the public.
In Executive Session at 2:35 pm
Executive Session adjourned at 2:41 pm
//1'l �X aA,
Mark Cook, Director of Public Works
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. -1SLI_ Lt O
RESOLUTION TO AWARD THE BID FOR THE MANUFACTURE AND SUPPLY OF
AGGREGATE FOR BITUMINOUS SURFACE TREATMENT FOR ONE (1)
CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE THE
PUBLIC WORKS DIRECTOR TO SIGN CONTRACT DOCUMENTS
WHEREAS: A Notice of Call for Bids was approved and signed on March 13, 2017, for the
Manufacture and Supply of Aggregate for Bituminous Surface Treatment; and
WHEREAS: Sealed bids were opened on March 30, 2017,at 2:00 p.m. in the Kittitas County
Public Works and one (1) bid was received; and
WHEREAS: The Public Works Department recommends that the responsible bid of
Ellensburg Cement Products be accepted for the Manufacture and Supply of
Aggregate for Bituminous Surface Treatment for one (1) calendar year following
contract execution; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby award the bid for 2017 Manufacture and Supply of Aggregate
for Bituminous Surface Treatment to Ellensburg Cement Products, upon such terms and
conditions as specified in the Proposal submitted by said bidder(s).
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 10th day of April, 2017, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Attest:
FI'Clerk of the Board- Julie Kjorsvik <21�
Laura Osia acz, Vice -Chairman
El Deputy Clerk of the Board- Mandy Buchholz f
I J/ / L'
y
Obie O'Brien, Commissioner
OGS W4...... a
/ //////11111111 IIPO
2017 Manufacture and Supply of Aggregate for Bituminous Surface Treatment
Bid Opening March 30, 2017, at 2:00 p.m.
Price Per Ton Delivered
ITEM
ESTIMATED
QUANTITY
EllensburgCement Products
NO.
(In TONS)
ITEM DESCRIPTION
Price Per Ton
TOTAL PRICE
1/2" - 1/4" Aggregate for
Bituminous Surface
Treatment (WSDOT
-- 1
20,000
Standard Specifications)
$15.50_ $310,000.00
--- -
-
3/8" - #10 Aggregate for
Bituminous Surface
Treatment (WSDOT
j
2
7,000
Standard Specifications)
Sub -total before Tax -
SALES TAX - 8%
$19.75 $138,250.00
i
$448,250.00
$35,860.00
Total Bid -
$484,110.00
ChipRock2017
BOARD OF COUNTY COMMISSh
COUNTY OF HITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2017 - 0-71
DELGATING TO THE HITTITAS COUNTY ENGINEER AUTHORITY TO LEGALLY
BIND THE COUNTY THE SOLE PURPOSE OF REQUESTING FEDERAL
REIMBURSEMENT
WHEREAS: The Kittitas County Engineer has been duly appointed by the Board of County
Commissioners in accordance with Resolution 2016-071, which includes
establishing, laying out, constructing, altering, improving, repairing, and maintaining
all county roads of the county; and
WHEREAS: The Federal Highway Administration, through the State authorizes federal
transportation funding to the County for transportation projects; and
WHEREAS: The Code of Federal Regulations, 2 CFR 200.415(a) has been revised to ensure that
final fiscal reports or vouchers requesting payment under Federal agreements must
include a certification, signed by an official who is authorized to legally bind the
non -Federal Agency; and
WHEREAS: The Kittitas County Engineer executes all Federal grant funding agreements and
supplement agreements; and
WHEREAS: In order to see timely reimbursement for proper expenditures related to the Federally
funded grant projects, the Board of County Commissioners delegates to the person
appointed as the Kittitas County Engineer authority per 2 CFR 200.415(s) to legally
bind the County in furtherance of the intent of this resolution; and
NOW, THEREFORE BE IT RESOLVED By the Board of County Commissioners that the person
duly appointed as the Kittitas County Engineer shall be authorized to sign all grant
reimbursement vouchers for grant funded transportation projects on behalf of Kittitas
County.
DATED on this 10th day of April, 2017, at Ellensburg, Washington.
of the Board- Julie Kjorsvik
". oUNTVc "I,,,
2iy
,,,�E] DeN C erk of the Board- Mandy Buchholz
=n;
-fly �;
w . O
BOARD OF COUNTY
Obie O'Brien, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: APRIL 10, 2017
TOPIC: MUNICIPAL RESEARCH AND SERVICES CENTER PROFESSIONAL
SERVICES ROSTER
ACTION REQUESTED: DIRECT PUBLIC WORKS JOIN THE MRSC ROSTER
FOR PROFESSIONAL SERVICES
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
.loin the MRSC professional services roster-
BREIFING SUMMARY:
• Current small works roster is cumbersome and time consuming to administer
• MRSC roster is highly efficient and avoids issues of fairness
• Significant roster size affords multiple resources to staff
BACKGROUND:
Historically, Public Works has supported a small works roster for purchasing goods valued
between 55,000 and $25,000. RCW 36.32.245 provides for dispensing with advertisement
and sealed bidding for all purchases of goods valued less than $5,000; and
RCW 36.32.250 authorizes a county, by resolution or ordinance, to dispense with competitive
bids for public works projects valued less than $40,000 and allow use of a small works roster.
consonant with RCW 39.04.155, for public works valued at 5300,000 or less. County
Resolution 2007-123 amended Resolutions 2006-28, 2003-128, and 90-44 to set out County
policies for small works and small purchase roster.
DISCUSSION:
While Public Works solicits participation in the small works roster annually, firms are added
throughout the year. Administration of the small works roster requires administrative
resources keeping the roster current.
During the past several years, MRSC has developed a roster that is very robust. Firms pay an
annual fee for participating in the program. Agencies provide a request to MRSC and the
roster is automatically solicited and notices sent to participants consistent with their roster
expertise. The process is highly efficient and provides multiple options for each solicitation.
FISC:AE.. IMPACTS:
Unknown at the time of briefing submittal.
ATTACHMENTS:
Exhibit 1: Resolution 2010-12
Page 1 of 2
PUBLIC WORKS BOARD OF COUN'ry COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: Resolution 2010-12
Page 2 of 2
PUBLIC WORKS BOARD OFCOUNTY COMMISSIONERS WORK SESSION STAFF REPORT
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASIHNGTON
RESOLUTION
NO.-. 2010-zrl \
Resolution Amending Mttitas County Procedures For A Small Works And A Small
Purchase Roster and for Leases of Personal Property.
WHEREAS, It is desirable that the County small works and small purchase roster
policies comport to the newest RCW changes; and
WHEREAS, RCW 36.32.245 provides that a cuunty may, by resolution or ordinance,
purchase goods valued between $5,000 and $25,000 using a small
purchase roster and the procedure described in RCW 39.04.190: and
WHEREAS, RCW 3652.245 provides for dispensing with advertisement and sealed
bidding for all purchases of goods valued less than $5,000; and
WHEREAS, RCW 36.32.250 authorizes a county, by resolution or ordinance, to
dispense with competitive bids for public works projects valued less than
$40,000 and allow use of a small works roster, consonant with RCW
39.04.155, for public works valued at 5300,000 or less; and
WHEREAS, Resolution 2007-123 amended Resolutions 2006-28, 2003-128, and 90-
44 to set out County policies for small works and small purchase roster;
and
WHEREAS, Resolution 2009-105 amended Resolution 2007-123 for small works and
small purchase roster to comport with the latest changes to RCWs
36.32.250 and 39.04.155, dealing with bidding and small works roster;
and
WHEREAS, Resolution 2009-105`s Section VI Personal Property [,eases needs to be
amended to provide the County all the options as allowed by State law;
and
WHEREAS, The Kittitas County Board of Commissioners desires to describe
specifically the procedures to be used for both small purchases and small
works, as defined by the above-cited sections of the Revised Code of
Washington.
NOW,'THEREFORE BE IT RESOLVED: That Kittitas County shall follow the
amended procedures and policies for establishment, maintenance, bidding. and purchase
for small works and small purchase rosters as follows:
Section I
Purpose and Intent
The purpose of this resolution is to provide a uniform method of purchasing materials,
supplies, or equipment and awarding contracts for public works projects in accordance
with the statutes cited hereafter. The Kittitas County Board of Commissioners intends for
this procedure to be used by all departments and funds of Kittitas County for the purchase
of any materials, supplies, equipment and awarding contracts for public works projects to
the lowest responsible bidder.
Responsible Bidder - As per RCW3204.350, before awarding a public works contract, a
bidder must meet the required criteria to be considered and qualified. The bidder must:
1. Have a certificate of registration in compliance with RCAV 18.27 at tune of bid
submittal.
2. Have a can ent state unified business identifier number.
3. If applicable, have industrial insurance coverage for employees working in
Washington as required in Title 51 RCW, employment security department
number as required in Title 50 RCW, and a state excise tax registration
number as required in Title 82 RCW.
4. Not be disqualified front bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
The Comity must provide in writing the reasons why a bidder is determined to not be
responsible. The bidder may appeal the determination within the time period specified in
the bidding documents by presenting additional information to the County. The County
must consider the additional information hefore issuing its final determination. If the final
determination affirms that the bidder is not responsible, the County may not execute a
contract with any other bidder until two business days after the bidder determined to be
not responsible has received the final determination.
Supplemental Criteria for Detemtining Bidder Responsibility— In addition, the County
may adopt relevant supplemental criteria for determining bidder responsibility applicable
to a particular project which the bidder must meet. Supplemental criteria for determining
bidder responsibility, including the basis for evaluation and the deadline for appealing a
determination that a bidder is not responsible, must be provided in the invitation to bid or
bidding documents_ A potential bidder may request that the County modify the
supplemental criteria if the request is done in a timely maturer before the bid submittal
deadline. The County must evaluate the information submitted by the potential bidder
and respond before the bid submittal deadline. If the evaluation results in a change of the
criteria, the County must issue an addendum to the bidding documents identifying the
new criteria. If the bidder fails to supply information requested concerning responsibility
within the time and manner specified in the bid documents, the County may base its
determination of responsibility upon any available information related to the
supplemental criteria or may find the bidder not responsible.
Solicitation of Donations - The County will not accept donations of materials or services
in return for a commitment to continue or initiate a purchasing relationship.
Gifts and Gratuities — No employee will accept gifts or gratuities from existing or
potential vendors in return for a commitment to continue or initiate a purchasing
relationship.
Intergovernmental Agreements — Nothing herein shall limit the ability of the County to
purchase goods or contract for public urorks pursuant to valid intergovennnental
contracts with the United States government, State of Washington, or any subdivision
thereof, as allowed by law, including but not limited to Chapters 35 77, 39.32, 39.33,
39.34, and 47.24 RCW.
Electronic Data Processing. Telecommunication Equipment Software - Nothing herein
shall limit the ability of the County to acquire electronic data processing or
telecommunication equipment or software through the request .for proposals and
competitive negotiation process as described in RCW 39.04.270.
Section II
ALL PURCHASES BELOW $5,000.00
Advertisement and formal sealed bidding for purchases of materials, supplies,
equipment, or services below $5,000.00 are hereby dispensed with by order of the
Kittitas County Board of Commissioners as authorized by RCW 36.32.245(3), yet the
County will attempt to obtain the lowest practical price.
Section III
PURCHASES OF MATFRIALS, SUPPLIES, EQUIPMENT, AND SERVICES
BETWEEN $5,000.00 AND $25,000.00 - VENDOR LIST
Advertisement and formal sealed bidding may be dispensed with for purchases of
materials, supplies, equipment, or services costing between 55,000.00 and $25,000.00 by
order of the Kittitas County Board of County Commissioners as authorized by RCW
39.04.190. This statute provides that a vendor list may be used to secure telephone or
written quotations under certain conditions as follows:
A. At least twice a year, the County Auditor shall publish in the official
county newspaper a notice of the existence of a vendor list for categories
of goods and services needed by the County and solicit the names of
vendors for such list. The vendor list shall be maintained in the Auditor's
office. Vendors shall be removed from the list upon their request or
discovery by the County that the vendor is no longer in business.
B. Kittitas County may also use the state wide electronic database developed
and maintained jointly by the Daily Journal of Cormnerce and the
Municipal Research and Services Center of Washington.
C. Kittitas County shall use the following process to obtain telephone
quotations from vendors for the purchase of materials, supplies, or
equipment:
1. Any contract awarded under this subsection need not be advertised. A
written description shall be drafted of the specific materials, supplies,
or equipment to be purchased, including the number, quantity, quality.
and type desired, the proposed delivery date, and any other significant
terms of purchase;
2. The cowtty shall secure telephone or written quotations from at least 3
vendors, if possible, and preferably all vendors listed in the appropriate
category of the small purchase roster to ensure a competitive process
and that the County receives the maximum benefit;
3. The Kit6ta& County representative shall not share telephone quotation
from one vendor with other vendors solicited for the bid on the
materials, supplies, or equipment;
4. The County shall use the County -approved "telephone bid form." This
bid form must be completed and submitted with the voucher for
payment for the purchased materials, supplies, equipment, and
services.
5. Immediately after the award, all bid quotations that tate County secured
must be recorded and made open to public inspection. This
information must also be available to those who inquire by telephone.
6. At least every two months, the County Auditor shall post on the public
notices bulletin board a list of contracts awarded pursuant to this
section valued at more than $5,000.00 but not more than $25,000.00.
The list must contain the name of the vendor, the amount of the
contract, a brief description of the items purchased, and the date of the
award.
D. Exception - The foregoing shall not apply if it has been determined that
the County seeks a single source product or contractor or a declaration of
emergency has been declared by the Board of County Commissioners.
E. Kittitas County shall purchase the materials, supplies or equipment from
the lowest responsible bidder, provided that whenever there is reason to
believe that the lowest acceptable bid is not the best price obtainable, all
bids may be rejected and the County may call for new bids. The County,
in determining the lowest responsible bidder, may take in consideration
the factors listed in RCW 43.19.1911(9).
Section IV
PUBLIC WORKS PROTECTS-VALUFi BELOW $40.000
Advertisement and competitive bidding For public works projects below $40,000.00 are
hereby dispensed with by order of the Kittitas County Board of Commissioners as
authorized by RCW 36.32.250, yet the County will attempt ro obtain the lowest practical
price. The paying of prevailing wages is required for public works projects valued below
$40.000.
Section V
PUBLIC WORKS PROJECTS - ESTIMATED VALUE -S40,000 TO 5300,000.00
This section provides a uniform process to award contract; for public works projects
using a small works roster as provided in RCW 39.04.155 and RCW 36.77.075 and
adopted by the Kittitas County Board of Commissioners per Resolution 2003-128 in lieu
of the requirements for formal sealed bidding. A public work shall mean all work,
construction. alteration, repair, or improvement other than ordinary maintenance,
executed at the cost of the County as defined in RCW 39.04.0 l0_ ;Performance bonds and
the paying of prevailing wages are required on small works roster projects. The small
works roster procedure is as follows:
A. At least once per year, the Public Works Department shall solicit from all
other County departments, in a manner reasonably calculated to insure
notice and response such as intra -office memo or email, information as to
what types of public work each department may need done in the
foreseeable future.
B. At least once a year the Public Works Department shall publish in the
official county newspaper, a notice of the existence of a small works roster
and solicit the names of contractors who can perform the types of work
sought for such a roster. Additionally, other vendors shall be added to the
list upon their request or agreement to be placed thereon.
C. A roster shall be compiled in and by the Public Works Department listing
the name of each contractor who has requested to be on that roster and the
category of work performed by the contractor. Contractors shall be
removed from the list upon their request or upon discovery by the County
that the contractor is no longer in business.
D. 'l he County may also use the state wide electronic database developed and
maintained jointly by the Daily Journal of Commerce and the Municipal
Research and Services Center of Washington.
E. The County shall obtain telephone, written or electronic quotations for
public works contracts front contractors on the appropriate small works
roster to assure that a competitive price is established and to award
contracts to the lowest responsible bidder, as defined in RCW
43.19.7911(9), as follows:
1. A contract awarded from a small works roster need not be advertised.
invitations for quotations shall include an estimate of the scope and
nature of the work to be performed as well as materials and equipment
to be furnished, However, detailed plans and specifications need not be
included in the invitation. This paragraph does not eliminate other
requirements for architectural or engineering approvals as to quality
and compliance with building codes.
?. The County shall use the approved County "telephone bid form." This
bid form must be completed and submitted with the voucher for
payment for the contracted public work.
3. Quotations maybe invited from all appropriate contractors on the
appropriate small works roster. As an alterative, quotations may be
invited from at least five contractors on the appropriate small works
roster who have indicated the capability of performing the kind of
work being contracted, in a manner that will equitably distribute the
opportunity among the contractors on the appropriate roster.
4. If the estimated cost of the work is from one hundred fifty thousand
dollars to three hundred thousand dollars, the County may choose to
solicit bids from less than all the appropriate contractors on the
appropriate small works roster but must also notify the remaining
contractors on the appropriate small works roster that quotations on the
work are being Sought. "f he Comity has the sole option of determining
whether this notice to the remaining contractors is made by:
(i) publishing notice in a legal newspaper in general circulation in the
area where the work is to be done;
(it) mailing a notice to these contractors, or
(iii) sending a notice to these contractors by facsimile or other
electronic means.
For purposes of this resolution, "equitably distribute" means that the
County may not favor certain contractors on the appropriate small
works roster over other contractors on the appropriate small works
roster who perform similar services. At the time bids are solicited, the
County representative shall not inform a contractor of the terms or
amount of any other contractor's bid for the same project;
6. ,A written record shall be made by the County representative of each
contractor's bid on the project and of any conditions imposed on the
bid. hnmediately atter an award is made, the bid quotations obtained
shall be recorded, open to public inspection, and available by
telephone inquiry.
7. .A list shall be prepared annually by the County Auditor of contracts
awarded under this section and shall be available to the public. The
list shall contain the name of the contractor awarded the contract, the
amount of the contract, a brief description of the type of work
performed, and the date the contract was awarded.
Section VI
LEASES OF PERSONAL PROPERTY
A lease of personal property may require competitive bids, depending on the total lease
value. For leases valued betwccn 55,000.00 and 525.000.00 the process outlined in
Section III of this Resolution may be followed. For leases valued at less than $5,000.00.
the Kinitas County Board of Commissioners may waive any bidding, requirements.
ADOPTED this u7pf i'f day of 't'l���z, . y 2010.
`�..•""' eOtSS(OAI
BOARD
:..,lie A. Kjorsvi
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHING'T'ON
Mark McClain, Chairman
(fir
Pau Je«k—F(H Vice -Chairman
Alan Ctankovich, Commissioner
APPROVED AS To FORMi
Stephanie Happold, Deputy Prosdcuting Attorney
WSBAr381 i2
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE. April 10, 2017
ACTION REQUESTED Resolution to Award the Bid for the
Manufacture and Supply of Aggregate for
Bituminous Surface Treatment for One (1)
Calendar Year following Contract Execution.
BACKGROUND: Kittitas County Public Works goes out to bid for
the furnishing of Maintenance Rock Materials
in accordance with specifications. This year our
Aggregate contract was re -worked resulting in
a 30% increase in costs from last year. This
year's contract adds material testing and
delivery costs. The net impact is expected to
result in a minimal cost increase. Bid packets
are sent out to all local businesses in order to
give equal opportunity.
Bids were opened March 30, 2017, at 2:00
p.m. in the Public Works Department.
One (1) bid was received and deemed
responsive.
INTERACTION:
Public Works
RECOMMENDATION: Move to approve Resolution to Award the Bid
for the Manufacture and Supply of Aggregate
for Bituminous Surface Treatment for One (1)
Calendar Year following Contract Execution to
Ellensburg Cement Products.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution, Bid Tab
LEAD STAFF: Mark Cook
Director of Public Works
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
RESOLUTION TO AWARD THE BID FOR THE MANUFACTURE AND SUPPLY OF
AGGREGATE FOR BITUMINOUS SURFACE TREATMENT FOR ONE (1)
CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE THE
PUBLIC WORKS DIRECTOR TO SIGN CONTRACT DOCUMENTS
WHEREAS: A Notice of Call for Bids was approved and signed on March 13, 2017, for the
Manufacture and Supply of Aggregate for Bituminous Surface Treatment; and
WHEREAS: Sealed bids were opened on March 30, 2017,at 2:00 p.m. in the Kittitas County
Public Works and one (1) bid was received; and
WHEREAS: The Public Works Department recommends that the responsible bid of
Ellensburg Cement Products be accepted for the Manufacture and Supply of
Aggregate for Bituminous Surface Treatment for one (1) calendar year following
contract execution; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby award the bid for 2017 Manufacture and Supply of Aggregate
for Bituminous Surface Treatment to Ellensburg Cement Products, upon such terms and
conditions as specified in the Proposal submitted by said bidder(s).
BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 10th day of April, 2017, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY. WASHINGTON
Paul Jewell, Chairman
Laura Osiadacz, Vice -Chairman
Obie O'Brien, Commissioner
2017 Manufacture and Supply of Aggregate for Bituminous Surface Treatment
Bid Opening March 30, 2017, at 2:00 p.m.
Price Per Ton Delivered
ITEM
ESTIMATED
QUANTITY
EllensburgCement Products
NO.
(In TONS)
ITEM DESCRIPTION
Price Per Ton
TOTAL PRICE
1/2" - 1/4" Aggregate for
Bituminous Surface
Treatment (WSDOT
1
20,000
Standard Specifications)
$15.50 $310,000.00
3/8" - #10 Aggregate for
Bituminous Surface
Treatment (WSDOT
2
7.000
Standard Specifications)
$19.75 S138,250.00
Sub -total before Tax -
$448,250.00
SALES TAX - 8%
$35,860.00
Total Bid -
$484,110.00
ChipRock2017
KFFI'FIAS CO( IN l Y
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: April 10, 2017 (Study Session)
ACTION REQUESTED: Sign a Resolution Lo Delegate'fhe County Engineer
Authority To Legally Bind The Kittitas County Public
Works Department For The Purpose Of Requesting Federal
Transportation Project Reimbursement
BACKGROUND: Effective December 1, 2016 the Federal Highway
Administration changed the Code of Federal Regulations; 2
CFR 200.415 (a) to ensure that final fiscal reports or
vouchers requesting payment under Federal agreements
include a certification, signed by an official who is
authorized to legally bind the non -Federal Agency. To
meet this new requirement we are requesting that the
County Engineer be designated as the official having
authority to legally bind the Kittitas County Public Works
Department for the purpose of requesting Federal Grant
reimbursement.
IN'T'ERACTION:
Public Works Department
RECOMMENDATION: Sign a Resolution To Delegate The County Engineer
Authority To Legatly Bind The Kittitas County Public
Works Department For The Purpose OF Requesting Federal
Transportation Project Reimbursement
HANDLING:
Return one (1) original to Public Works
AT"FACIIMENTS: Resolution To Delegate The County Engineer Authority
To Legally Bind The Kittitas County Public Works
Department Por The Purpose Of Requesting Federal
Transportation project Reimbursement
LEAD STAFF: Mark Cook. Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2017 -
DELGATING TO THE KITTITAS COUNTY ENGINEER AUTHORITY TO LEGALLY
BIN[I) THE COUNTY THE SOLE PURPOSE OF REQUESTING FEDERAL
REIMBURSEMENT
WHEREAS: The Kittitas County Engineer has been duly appointed by the Board of County
Commissioners in accordance with Resolution 2016-071, which includes
establishing, laying out, constructing, altering, improving, repairing, and maintaining
all county roads of the county; and
WHEREAS: The Federal Ilighway Administration. through the State authorizes federal
transportation funding to the County for transportation projects; and
WHEREAS: The Code of Federal Regulations, 2 CFR 200.415(a) has been revised to ensure that
final fiscal reports or vouchers requesting payment under Federal agreements most
include a certification, signed by an official who is authorized to legally bind the
non -Federal A¢encv; and
WHEREAS: 'I he Kittitas County Engineer executes all Federal grant funding agreements and
supplement agreements: and
WHEREAS: In order to see timely reimbursement for proper expenditures related to the Federally
funded grant projects, the Board of County Commissioners delegates to the person
appointed as the Kittitas County Engineer authority per 2 CFR 200.415(s) to legally
bind the County in furtherance of the intent of this resolution; and
:NOW, THEREFORE BE YF RESOLVED By the Board of County Commissioners that the person
duly appointed as the Kittitas County Engineer shall be authorized to sign all grant
reimbursement vouchers for grant funded transportation projects on behalf of Kittitas
County.
DATED on this 10th day of April. 2017, at Ellensburg. Washington.
Attest:
71 Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Paul Jewell. Chairman
LauraOsiadacr. Vicc-Chairman
Dcputy Clerk of the Board- Mandy Buchholz
Obie O'Brien. Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: APRIL 10, 2017
TOPIC: FLOOD CONTROL ZONE DISTRICT ADVISORY BOARD
ACTION REQUESTED: DIRECT STAFF BEGIN OUTREACH EFFORTS
LEAD STAFF: Mark R. Cook
RFCOMMENDATION:
Direct outreach efforts begin soliciting rate payers for participation in a rate payer
advisory board.
BREIFING SUMMARY:
• The Board recently requested staff prepare an outreach strategy for attracting rate
payers to serve on a Flood Control Zone District Advisory Board
• Outreach efforts will include press release, possible radio spot, presentations to
local service organizations and possibly City Councils
• Conduct several open houses show casing Flood Control Zone District
accomplishments that serve as recruitment venues
• Select three tipper county and three lower county rate payers with one member at
large
• Begin efforts the week of May 1, 2017
• First applicant screening the week of July 17, 2017
BACKGROUND:
Recently, the Board of County Commissioners directed staff prepare a proposal for
creating a rate payer advisory board for the Flood Control Zone District. The Board will
work with staff developing project ranking criteria — applying the criteria to all adopted
basin plans. The results of the ranking process are expected to result in the District's first
Capital Facility Plan.
The Advisory Board (FCZDAB) will also interact with District staff creating the annual
work program. It is anticipated that the FCZDAB will select activities benefitting rate
payers such as: education/technical assistance/planning and an annual construction
program. The FC/..D Administrator will interact between the FCZDAB and the Board of
County Commissioners. The FCZD Planner III will interact with FCZDAB members
supporting all board meetings.
Page 1 oft
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF RFPOR"1
DISCUSSION:
Kick off efforts will include a press release with a schedule of outreach meetings
targeting local civic organizations. Two open houses are expected to attract rate payer
interest-- one in Ellensburg and another in Cle Elum. Public Work`s website and our
FOLD webpage will both run solicitations. Presentations to City Councils may also be
considered as beneficial outreach opportunities. Prior to the start of the outreach effort, a
final schedule will be prepared and shared with the Board of County Commissioners.
FCZDAB makeup should encompass and odd number of members. A working group o'
seven (7) is ideal given the amount of variables required for consideration when
finalizing ranking criteria. A larger group will increase the work toward consensus.
Public Works believes a balance between Upper County and Lower County
representation is essential for success. A seventh "at large" member allows decision
making. While the objective will always be decision by consensus, the seventh member
allows for a hard vote when consensus cannot be reached.
Staff anticipates taking several weeks identifying appropriate civic organization meeting
dates and verifying their capacity to entertain a FCZD presentation. Prior to project kick
off, staff will return a present the final outreach plan and schedule to the Board of County
Commissioners.
FISCAL IMPACTS:
The solicitation budget is $10,000. Funding is from unspent Schaake Levee repair costs.
The budget supports: venue rental, refreshments and advertising costs.
ATTACHMENTS:
None.
Page 2 of 2
PUBLIC WORKS BOARD OF COfN"I'V COMM ISSIONF.RS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS—BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 10, 2017
'TOPIC: PALOMINO FIELDS DEVELOPMENT AGREEMENT REVISION
ACTION REQUESTED: ADOPT THE REVISED AGREEMENT
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Adopt proposed changes to the Development Agreement.
BREIFING SUMMARY:
• Current Development Agreement is for five (5) Phases
• Since the original agreement, we have been working the floodplain issues
• Adding the ability to allow divisions within the Phases will facilitate dealing with
stormwater and floodplain issues
BACKGROUND:
Palomino Fields Plat construction is underway. Last year, the public bridge over the
Ellensburg Water Company Canal was constructed. Continued construction of the first 8
lots (Division l of Phase 1) located on the east side of the Ellensburg Water Company
Canal has continued through the winter with utilities being installed. The roadway
construction on the west side of the Canal was halted to allow sufficient time to
understand the interaction of roadway runoff with the use of the best available mapping
information for Currier Creek floodplain.
The Flood Control Zone District recently completed two-dimensional modeling of
Currier Creek encompassing Palomino. The developer and Public Works are evaluating
regional stormwater issues associated with plat development and its interaction with
Currier Creek Floodplain.
DISCUSSION:
It is likely that stormwater facilities are best located in portions of several mapped Phases
of the proposed plat. It might be more reasonable to manage runoff from Phase 1 within
the land mass identified as being Phase 2. 3, 4 or 5. The need to task appropriate land
with separation to ground water has been underscored by the Black Horse development
across Reecer Creek Road. Adding flexibility into the Development Agreement will
assist Public Works staff and the developer to minimize adverse impacts resulting from
placement of stormwater facilities serving the internal road network.
Pagel of3
PUBLIC WORKS BOARD 0F COUNTY COMMISSION FRS WORK SESSION S"IAFF REPORT
FISCAL IMPACTS:
None anticipated.
Al"CACIIMENTS:
Exhibit L "Redline" markup of the existing Development Agreement
Page 2 o1'3
PUBLIC WORKS BOARD OF COLMY COMMISSIONERS WORK SESSION SFAFF REPORT
EXHIBIT l; "Redline" Markup of the ll;xisting Development Agreement
Page 3 of3
PUBLIC WORKS BOARD Of COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
DEVELOPMENT AGREEMENT
This Development Agreement ("Agreement') is made and entered into this _.._._ day of
,___ __, 2016, by the Cie Elum Pines East LLC & Cie Elum Pines West
LLC Washington Limited Liability Companies, hereafter referred to as "Applicant": and KITTIT:AS
COUNTY, hereafter referred to as the "County." This Agreement is made pursuant to the Revised Code of
Washington ("RCW") 36.70B.170 and chapter I5A.1 I Kittitas County Code.
RECITALS
A. Chapter 36.70B RCW (the "Development Agreement Statute"), and Chapter 15A. I I Kittitas
County Code ("Code") authorize the County to enter into an agreement between the County and all parties
having an ownership interest in or control of property described in Exhibit A.
B. The Applicant owns property located in a Portion of the W 1/2 of Section 27. T18N. R18E, WM.
accessed off of Reecer Creek Road (the "Property"). The Property is comprised of Tax Parcel Nos. 18-18-
27020-0001; 0002, 0003, 0015, 0016, 0017, and is legally described on Exhibit A. attached hereto.
C. 'The Applicant submitted Kittitas County a complete application for the Palomino Plat
1). Kittitas County Community Development Services issued a SEPA Mitigated Determination of
Non -significance (MDNS) on September $ 2008.
F. An open public hearing was held before the Kittitas County Hearing Examiner on October 9, 2008
and on October 21. 2008 recommended approval for the Palomino Fields preliminary plat.
F. Kittitas County Board of County Commissioners (BOCC) passed Resolution 2008-160 on
November 18. 2008 adopting the Hearing Examiner's recommendations for approval of the Palomino Fields
preliminary plat (P-07-31). Said Resolution is attached hereto as Exhibit B.
G. This Agreement recognizes the conditions to be met in Resolution 2008-160 and requires the
completion of those conditions to finalize every - phase of the approved plat.
H. The Hearings Examiner recommendations as adopted by the BOCCI, states that the Group A Water
System may be developed to serve this plat in phases.
1. The Applicant desires and intends to develop and sell the Property in five (5) consecutive phases
each final plat -
requirements of Kittitas County Code Title 16 and providing for the full development of the one
hundred and twenty (120) residential parcels as approved under Resolution 2008-160,
J. This Agreement establishes that the Phasing Plan, attached hereto as Exhibit E. is consistent with
the County's comprehensive plan, zoning and development regulations. and is consistent with existing land
use approval of the subject site.
NOW, THEREFORE, in consideration of the recitals (which are incorporated into the Agreement
by this reference) and for other good and valuable consideration. the receipt and sufficiency of which are
hereby acknowledged, the County and the Applicant agree as follows:
AGREEMENT
Effective Date and Termination.
1.1 Effective Date. The Effective Date of this Agreement is the last date upon which it was
signed by the Patties hereto.
12 Term. This Agreement shall be effective for five (5) years consistent with Exhibit E
"Phasing Plan"; provided. however, that the tern of this Agreement may be extended should the Applicant
seek andjustil'y requests for extension to the satisfaction of the Director prior to the expiration of the term.
Upon expiration of such period, or as may be extended above, this Development .Agreement shall
automatically terminate. Upon the County granting the Final Plat for the last phase of the Project this
agreement shall automatically terminate.
1-3 Termination. This Agreement may be terminated at any time, in writing, by mutual
agreement of the Parties to this Agreement.
2. Definitions.
For purposes of this Agreement, the following terms, phrases, words, and their derivations shall have the
meaning given herein where capitalized; words not defined
herein shall have meaning as provided in Webster's cictionaq-. When not inconsistent with the context,
words used in the present tense include the future, words in the plural number include the singular
number, words in the singular number include the plural number, and the use of any Lender shall be
applicable to all genders whenever the sense requires. The words "shall" and "will" are mandatory and
the word "may' is permissive. References to governmental entities (whether persons or entities) refer to
those entities or their successors in authority. If specific provisions of law referred to herein are
renumbered, then the reference shall be read to refer to the renumber provision. References to laws..
ordinances m regulations shall be interpreted broadly to cover government actions, however nominated.
and include laws, ordinances and regulations now in force or hereinafter enacted or amended.
2.1. Agreement. "Agreement" means this Development Agreement between Kittrtas Cozinty
Washington and Cle Ehrna Pines East LLC & Ch, Elum Pines West LLC, as it relates to the Palomino
Fields plat in Resolution 2008-160 approved by the Board of County Commissioners.
2.2. Applicant. "Applicant" means Cie Glum Pines East LLC & Cie Elum Pines West LLC,
a Washington Corporation, or any of its transferees. successors or assigns.
2.3. County. "County" means Kittitas County. Washington.
2.4 Director. "Director" means the Director of the Community Development Services
(CDS) of Kittitas Comity or the person providing the function of the director of CDS
2.5 Effective Date. "Effective Date" means set forth in Section I.1 of this Agreement.
2.6 Open Space. "Open Space" means any land that is retained in a natural condition, or
that is improved for outdoor recreational uses outside of residential node areas (including but not limited
to associated infrastructure such as transmission lines, pumping facilities, and community septic
facilities).
2.7 Parties. "Parties means Kittitas County, Washington and Applicant, Cie Elum Pines
East and Cie Flom Pine West. LLCs, a limited liability company (ies).
2.8 Project. "Project' means the Palomino Fields preliminary Plat as approved by the
County through Resolution 2008-160 being a one hundred and twenty (120) unit residential community
on the Propem,, including but not limited to: (i) single family units and (ii) open space areas.
2.9 Property. "Property" means the site legally described in Exhibit A, attached hereto.
2.10 Utilities. "Utilities" includes, but is not limited to: all (i) storm water and drainage
systems, infrastructure and facilities; (ii) community septic systems; infrastructure and facilities as
approved by Kittitas County; (iii) dry utilities including power infrastructure and facilities,
telecommunication systems, infrastructure and facilities; (iv) Group A domestic water systems; and (v)
irrigation infrastructure and facilities.
3. Project Elements.
3.1. Permitted Uses. Any permitted use as allowed by the Kittitas County Zoning Code at
the date vested by the applications and as permitted by Resolution 2008- 160 attached hereto as Exhibit
B.
3.2. Residential Densities, Tire Residential Densities for the Palomino Fields plat have
been established by Kittitas County, through the adoption of Resolution 2008- 160. The approved
preliminary plat map, attached hereto as Exhibit C, shows the approximate location and boundaries of
lots established for the Palomino Fields plat by said resolution. Banns, outbuildings, garages, shops and
the like are allowed within the Palomino Fields Plat.
3.3. Nonresidential Densities and Intensities. The Non -Residential Densities and
Intensities for the Palomino Fields plat have been established by Kittitas County through the adoption
of Resolution 2008-160. The preliminary plat map. Exhibit. C. shows the Non -Residential Densities and
Intensities established for the Palomino Fields plat by said resolution.
3.4. Building Sizes. Individual residential buildings shall not exceed 6.500 square feet.
Barns, outbuildings, garages, shops and the like are allowed within the Palomino Fields Plat.
4. Mitigation Measures. Development Conditions. and Other Requirements . The Palomino Fields plat
shall meet the mitigation requirements as provided for in the SEPA Mitigated Determination of Non-
significance (.MDNS) issued on September 4, 2008 by Kittitas County and attached hereto as Exhibit D and
those requirements for the Palomino Fields plat as provided for in Kittitas County Resolution 2008-160.
5. Development Standards,
S.I. Drainage and Water Quality Requirements. The owner of each parcel shall be responsible
to meet Eastern Washington Storm Water guidelines requirements as established for the Palomino Fields
plat as it pertains to that individual parcel. Road drainage shall meet the Eastern Washington Storm Water
guidelines.
5,2. Landscaping. The areas not containing residential structures and driveways shall become
owned by residents and may be landscaped with grasses, trees and other plants that do not require irrigation
water that would exceed the irrigation allotment for the individual parcel. Maintenance or non -maintenance
of such landscaping shall be the responsibility of residents of the development and will not be the
responsibility of the County.
5.3. Other Development Features; There may be an entry monument placed at the entry to the
Palomino Fields plat. Other development features may be developed within the plat that is homogenous with
residential development.
6. Road and Sidewalk Standards. Sowers Road shall be a public road that is extended into the plat.
The Dowers Road extension shall meet Kittitas County Public Road Standards with said extension design
being approved by Kittitas County. Internal roads may be developed as public or private roads as allowed by
the Kittitas County Road Standards. All internal roads shall be designed and constructed to Kittitas County
Road Standards. Sidewalks are not required within the Palomino Fields plat and are not being constructed as
a condition of this A&geement.
?. Affordable Housing. Affordable housing is not required nor will it be provided within the Palomino
Fields plat.
S. Infrastructure requirements.
8.1. Domestic Water. Group A water systems, as defined by the WAC 246- 294-010.
include systems having 15 or more connections. Phases of the Palomino Fields Plat, shall be served by
a Group A water system per the statutory requirements and as approved by the Washington State
Department of Health. The water system will be constructed in phases commensurate with the phased
development as shown on Exhibit E. attached hereto.
8.2. Irrigation Water. The first 8 lots of Phase I, shall be provided irrigation water by
Cascade Inigation District. All other phases shall be provided irrigation by the Ellensburg Water
Company. The irrigation distribution system shall be owned privately and the design, maintenance and
operation of said irrigation distribution system shall be approved by the district or company providing
the irrigation water or, if the district does not have an approval process, designed by an engineer
licensed in the State of Washington. The irrigation system will be constructed in phases commensurate
with the phased development as shown on Exhibit G attached hereto.
8.3. Sewage Disposal. Any Community Septic Systems, which may serve two to seven
parcels, will be designed by a licensed designer and approved by Kittitas County. The Community
Septic Systems will be constructed in phases commensurate with the phased development as shown on
Exhibit E. The Community Septic Systems will not be required to be developed prior to final platting
of each o any phase but will be constructed simultaneously with buildings as permitted by the Kittitas
County CDS Department and the Kittitas County Health Department. Prior to receiving Occupancy
Permit for any building constructed the community septic system shall be completed and approved by
the County Health ;.),p,.,j,;-,,4 1I ;;,j=r:,,,I..�
8.4. Storm drainage. The owner of each parcel shall be responsible to maintain the storm
water field established for the Palomino Fields plat as it pertains to that individual parcel. Road
drainage shall meet the Eastern Washington Storm Water guidelines. The Applicant shall develop the
Palomino Fields plat in accordance to a stoma water permit issued by the Washington State
Department of Ecology. Stornwater systems shall be designed in each phase to manage total
stornwater of completed phases that is generated by a 24-hour, 25 -year storm event.
8.5. Fire Protection. Sprinklers shall be located in each residence to provide fire Protection
for the residence and will be constructed to current standards. Neither system wide storage tanks nor fire
hydrants are required for the Project.
8.6. Other Infrastructure Requirements. Utilities including but not limited to dry utilities
such as power. phone and internet shall be provided to the property line of each parcel.
9. Parks and open space preservation. The Parks and open space preservation for the Palomino
Fields plat have been established by Kittitas County through the adoption of Resolution 2008-160. The
identified open space tracts shall be proportionately owned by tenants in the common. and retained by
each home owner, and will be assessed. taxed, and foreclosed upon each building lot not fulfilling their
obligation.
10. Phasing. "The project will be constructed and receive final plat ppiw, i n ,n,.;a k>wMaogh ti;c
;;ugh o1 n1<_ifi. Phases. The description
of the Phasing plan is provided in Exhibit F- . i'1=:1 L will occur consecutively in the order as shown in
Exhibit E. The Applicant can complete more than one phase with each final plat submittal.
11 Development Review Processes, Procedures and Standards for implementing Decisions.
11.1. Standards for Implementing Decisions. Kittitas County shall base its decisions on the
Kittitas County Code and per decisions in Resolution 2008-160 as further modified for phased
development by this document.
11.2 Plat Application. The County will process us,, final plan for each phase of the approved
Preliminary plat as defined in KCC Title 16. Each final plat will be assessed processing fees as exist at
the time of submittal.
11.3. SEPA Determination. The County has reviewed, processed and issued a Mitigated
Determination of Non -significance (MDNS) for the preliminary Palomino Fields subdivision and such
determination shall be used for impact evaluation. Each final plat will be evaluated in tenns of its
contribution to the 24-hour. 25 -year stonn event for the accumulation of all finaled plats within the
Palomino Fields project.
1 1.4. Roads. The County will review and approve engineering designs of road(s) and other
infrastructure elements within the County tight of way. Any private and public roads within the project
will be constructed to the Kittitas County Private Road Standards.
1 L5. Grading. The County will review any grading permit necessary to meet the Kittitas
County Code.
11.6. Reimbursement To The County For Review Processes. The Applicant will pay,
pursuant to the fee structure adopted by Kittitas County, any fees required to achieve final plat approval
for each phase of the plat.
11.7.
11.7. Access. Access will be established from Reecer Creek Road along the North boundary
line of the property by means of a new County right-of-way established from Reecer Creek Road in
alignment with the existing Bowers Road and as indicated within the approved preliminary Palomino
Fields plat.
11.8. Home Owner Association. At the conclusion of the development of the Palomino
Fields community a Homeowner Association will be created to govern residential areas, community
facilities. storm water facilities, and road improvements within residential nodes, and open space. The
Group A water system shall be owned, operated and maintained by a entity established, owned and
operated by a designate of the Applicant. Said designate shall establish operation procedures and rates as
may approved by the Washington State authorities havingjurisdiction if and when required by state law.
119. Design Review. Design Review shall be provided for under a Declaration of
Covenants. Conditions and Restrictions (`CC&.Rs'). Design Review shall be determined by Applicant
and shall be consistent with applicable Kittitas County Code. The Design Review provisions shall
include standards for home design, materials- methods and construction, including but not limited to
siting for wind and solar considerations, siting for view considerations, setbacks and height restriction.
After the expiration of this Agreement, the Homeowner Association, if established. may have the right
to adopt further Design Review restrictions as may be permitted consistent with the CC&.Rs, Bylaws and
Articles of Incorporation. Kittitas County Code will apply if CC&Rs we less restrictive than
requirements of the Kittitas County Code.
12, A Build -out m Vesting Period for Applicable Development Standards. The Applicant may
construct one or more : Phase(s) of the project per building season. The Project is
anticipated to be completed within 5 years.
13. Process for Amending the Development Agreement. This agreement may be amended by
mutual consent of all of the parties to this agreement and will follow Kittitas County Code.
14. Any Other Appropriate Development J� - r(s) or Procedure. Any
developer may further improve the property within Palomino Fields characteristic to residential
development and which meets Kittitas County Code and condition, For Palomino Fields noted in
Resolution 2008-160.
is. Model Home. The Applicant, or a designate of the Applicant, may construct a model home,
real estate sales facility, or a temporary construction office to be operating for construction or real
estate office purposes prior to, or in coin mencement with, the initial stages of the development. Said
;1 ; ies) shall be required to be operated and licensed as a real estate office under the laws
of the State of Washington or by Kittitas County Code as applicable. Upon completion of the final plat
of the final phase, or upon selling of' the last lot, the model home, real estate sale facility, or
construction offices will be decommissioned or transferred over as a one of the 120 single-family
residences.
16. Miscellaneous and General Provisions.
16.1. Governing Law. This Agreement shall be governed by the laws of the State of
Washington and the Kinitas County Codes as vested by the Palomino Fields application. Each party
represented is duly authorized to sign and perforin its obligations under this Agreement. The parties
intend this Agreement to be interpreted to the full extent authorized by law as an exercise of the
County's authority to enter into development agreements. Neither this Agreement nor any provision
hereofmay be waived, modified, amended or terminated except by a written agreement of the parties
hereto.
16.1 Successors. This Agreement and the rights set forth herein run with the land and shall
be binding upon the successive owners and assignees of the development.
16.3. Enforcement. Any party to this Agreement may enforce the terms of this Agreement.
No party shall be in default under this Agreement unless it has failed to
perform for a period of twenty-one (21) days after written notice of default from the other party. The
performance period may be extended to allow a reasonable time period to cure the default. Any notice
of default shall specify the nature of the alleged default and the manner in which the default may be
cured satisfactorily. All parties to this agreement shall have all rights and remedies provided by law.
16.4. Notices. All notices or other communications under this Agreement shall be delivered
to the addresses after each signature. Notices shall be in writing and either: (i) delivered personally, (ii)
sent by facsimile transmission with an additional copy mailed first class, (iii) deposited in the U.S. Mail
with certified mail postage prepaid and return receipt requested, or (iv) delivered by nationally
recognized overnight delivery service with signature required. Notice by hand delivery or facsimile
shall be effective upon receipt. If deposited in the mail, notice shall be deemed delivered seventy-two
(72) hours after deposit. If sent by overnight delivery, notice shall be deemed delivered forty-eight (48)
hours after deposit.
( 16.5. Counterparts and Recording. This Agreement may be executed in two or more
counterparts, each of which shall be deemed an original, but all of which together shall constitute one
and the same instrument. Pursuant to RCW 36.70B.190, this Agreement or memorandum thereof shall
be recorded with the Kittitas County Auditor and during the term of this Agreement shall be binding on
the parties, their successors and assigns.
IN WITNESS THEREOF, this Agreement is effective on the date of the last signature below.
KITTI'rARCOUNTY
Approved as to Iorm:
By............ __. .._...__......._.—_
Name: ii µ -itii Name
s -i
- _ County Prosecuting Attorney
County Commissioner Dated:
Dated: _. ..;.'i
CLE SLUM PINES EAST LLC R CLE SLUM PINES WEST LLC
By
Its:
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: APRIL 10, 2017
TOPIC: SIX YEAR PLAN AMENDMENT
ACTION REQUESTED: DIRECT STAFF SCHEDULE A PUBLIC HEARING
AMENDING THE CURRENT SIX YEAR
TRANSPORTATIONPLAN
Lf"AD STAFF: dark R. Cook
RECOMMENDATION:
Direct staff schedules a public hearing amending the current six year transportation
improvement plan.
BREIFING SUMMARY:
• Recent decision funding the I lwy 97 roundabout at Dolarway requires amending
the current six year transportation improvement plan
• Staff has recently negotiated delivery of the Teanaway FLAP grant drainage
improvements away from FIIWA
• Environmental permitting timelines make delivery of Manastash washout repair
doubtful for 2017
• Staff desires to accelerate delivery of Road 81 pedestrian improvements
BACKGROUND:
Public Works annually produces a six year transportation plan for Road Fund investing.
The current plan does not consider the 5445,000 recently dedicated to support
construction of Dolarway roundabout improvements. Changes to the annual construction
program and six year plan require public hearing. The Board of County Commission
may adopt staffs proposal or amend it as a result of public comment. Recent actions in
Design/Construction suggest other changes may be appropriate to consider at this time.
DISCUSSION:
Staff has recently completed discussions with FH WA to return project delivery to the
County. We now anticipate constructing Teanaway drainage improvements in 2019.
Extended winter conditions in Manastash did not support additional survey information
needed by our Hydraulic consultant supporting environmental permitting timelines.
Construction of Manastash improvements cannot be completed in 2017. The gap created
by delaying Manastash presents an opportunity to accelerate delivery of 81 Road
pedestrian improvements.
Page I of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FISCAL IMPACTS:
The 2017 construction program is reduced by $280,000. The 2018 construction program
is reduced by $457,000. The 2020 program increases by S263,000. A comparison of all
six year impacts can be evaluated by comparing EXHIBIT 1 (current adopted six year)
with EXHIBIT 2 (proposed revisions to the adopted six year).
ATTACHMENTS:
EXIIIIBT 1: ADOPTED 2017 SIX YEAR TRANSPORTATION IMPROWMENT
PLAN
EXHIBIT 2: PROPOSED REVISIONS TO "FILE ADOPTED 2017 SIX YEAR PLAN
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FXIIII3IT I: ADOPTED 2017 SIX YEAR TRANSPORTATION IMPROVEMEW
PLAN
Page 3 of A
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
NI)
NIB
Nfa
]OW
M11
NE
Curten'Pllnpr[e ar
3
mc�eon�r�,er
_
It
C. MY Road Gonahuctloa lm m mems
aa—,o
-a'-- uen o,out,amlae
o
J
J
Ml tab 1e 11.W
g
Tmeum ROMern Theep Wpew,Y anCaa
an
k no ewh
I.— ad .allmnuu alope Snuo., e
ito
m vpwremme.aweel
GYM eaOmMp.n Eanka
11G
5
np 9gnXmvrovemrum
uua-lanemwl Reawesuntlm
up l�Ie
am Nv adl
SX[hlmpwnmman
w
RXa,eenenaa.
nws a...mm oRmX k1 aw
u1
akpww¢Iwpr.
wea,-err
wew
yMnwxn
p�relryvu
BNSF IK UMP'�N
]
]JV
I]
RO [uNe. Replaeemau
lIa
aa
m
WIL
m My 1poli
4e R0-<Wwn Rep�xem,v
44
M Ka[1
M
Umpr,wmlMMrmn pnn,y
'
wrowwm Ra lnP43ad.alwlpxwn Pe luP e.a
pall
/4
Mpn0.lAk Plum, nvl¢ raaY na.rvnm
ce,4prme
nia iOUl l.ap
wRe er;ea.'noI
MYCrxY Qg NI a]f
I
tat
w.
eue lw.anmeeu
nanlr.pro-nmmlp,4nn
'
i Vuy By tlenn gµxt
-
Total6
e
c
.
Iro
SY[�
x
'n'
5R;4
a1
tl
1,m
I.Pp.
Annusl Fund Total
-
^a]
Gthal FundalGyan]set
unaxa
-
—
End.InQ u juag
a11�
EXIIIBI 1 2: PROPOSED REVISIONS TO TME ADOPTED 2017 SIX YEAR PI.,AN
Page 4 of 4
PUBLIC WORKS BOARD OFCOUNTY COMMISSIONERS WORK SESSION- STAFF REPORT
�
A
�
c
R^
2i02 ve�l°p le>oA
8
aoz vai°p �oei
8
8
R
8•
$
8
Blaze wwvrewi
`I
=
E
8 i
5
8
8 T
wa°a°lanap wewa
i
romXalantl
s
/tl16X
�
Y
+.ow W,..ww o>
�
'•
q
�
�
r
e
z•
a
i
-
��r
ugplul
i
p
Av+w 14BV
i
�
kri...wni6i
!
�jffi
up
$
8
A
$
F
ev„/°warr
e
I
g
A p�
LL
ol
pi°u
E
a
}`xNy
LLN"IY'..
mEm'I
.0
�°
o
€
6S.
a
.n°M�
n�
rEP6i
s e
.
s
i'z
aC
PKr
'n
_ n p cpIQ�9� Ciel
g
em-C
2
4i'a
"a
iNp?
cg£U<
ii JLL m¢w
UE
CQ
rr:68
;aS
V
f
f
fnf
iFEE
ui'