Loading...
HomeMy WebLinkAbout2017-07-24-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday July 24, 2017 -1:30 PM Commissioners' Auditorium 205 West Sth Room 109 - Ellensburg 9. Call to Order 2. Request to Approve a Resolution to Award the Huntzinger Road Safety Improvements Project. 3. Request to Approve a Resolution and a Notice of Call for Sealed Bias for the University Way Bridge Project. 4. Request to Approve a Resolution to Award Additional Distressed County Sales and Use Tax Funding to the City of Cie Elum for Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project in the amount of $25,000.00. 5. Lund Lane Road Improvement Discussion. 6. Kittitas County Road Standards - Task Order with KPG 7. Other business 8. Adjourn Created on 7/18/2017 2:01:21 PM /\ Gy ASCoup THOSE PRESENT: 3FKITTZT1L43 CO DEPARTMENT OF PUBLIC WORKS Mark Cook, Director STUDY SESSION MINUTES July 24, 2017 Paul Jewell, Laura Osiadacz (BOCC); Mark Cook, Candie Leader, Luke Huck (DPW); Clay Myers (SO) REQUEST TO APPROVE A RESOL UTION TO AWARD THE HUNTZINGER ROAD SAFETY IMPR 0 VEMENTS PROJECT: Luke stated that this is the first project that Public Works has done 100% in house for design, survey and advertisement. Two bids were received with one close to the Engineer's estimate and one that was 5% lower than the Engineer's estimate, which was Petersen Brothers, Inc. That is the construction company that recently did the guardrail work on Westside Road. He presented the resolution for consideration. Discussion was held. Board Direction: Commissioner Jewell called for a motion. Commissioner Osiadacz made a motion to approve the Resolution to Award the Huntzinger Road Safety Improvements Project as presented. Commissioner Jewell seconded the motion and Resolution 2017-116 was approved as presented. REQ UEST TO APPROVE A RESOL UTIONAND A NOTICE OF CALL FOR SEALED BIDS FOR THE UNIVERSITY WAY BRIDGE PROJECT: Luke reported that early in 2017 there was a resolution that enabled Public Works to fund the shortfall of approximately $445,000 for the Dolarway Roundabout — WSDOT project. As a result of that resolution there was a section in there that stipulated that the bridge repairs for the University Way Bridge would be performed prior to the annexation and turning over the roadway to the City of Ellensburg. As a result, Public Works has advanced that project from the 2018 construction season to the 2017 construction season. Staff met with faculty from Central Washington University to discuss closure timelines. A closure date of September 18th -- October 2"d was agreed upon which allows them to get through move in for students. Staff is also working to get letters out to local business owners that have seen impacts from the roundabout project. Luke stated that a press release will go out after Labor Day to inform the public of the closure. Discussion was held. 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 2 Board Direction: Commissioner Jewell called for a motion. Commissioner Osiadacz made a motion to approve the Resolution and a Notice of Call for Sealed Bids for the University Way Bridge Project as presented. Commissioner Jewell seconded the motion and Resolution 2017-117 was approved as presented. REQUEST TO APPROVE A RESOL UTION TO AWARD ADDITIONAL DISTRESSED CO UNTY SALES AND USE TAX FUNDING FOR EMER GENCY REPAIRS FOR THE CLE EL UM D 0 WNTO WN BA THR OOMS RESTORA TION PR OJECT IN THE AMOUNT OF $25,000.00: Mark gave background on the Public Facilities fund and the intent of the funds for projects. He continued that last week he attended the Conference of Government (COG) meeting and discussion was had on the applications and score sheets. It was brought to staff's attention that in an absence of consultation with Public Works by the COG this award occurred last year with no Board of County Commissioner action taken. Staff is now presenting the resolution for consideration and approval. Discussion was held. Board Direction: Commissioner Jewell called for a motion. Commissioner Osiadacz made a motion to approve the Resolution to Award an Additional $25,000 Distressed County Sales and Use Tag Funds to the City of Cle Elum for Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project as Recommended by the Conference of Governments as presented. Commissioner Jewell seconded the motion and Resolution 2017-118 was approved as presented. L UND LANE ROAD IMPROVEMENT DISCUSSION: Mark stated that Lund Lane is a private road that a local developer is utilizing to access planned unit development that was approved by the Board of County Commissioners known as Big Creek. He continued that discussions were held in 2016 and early 2017. The key point is that the private road segment has to be improved to a public standard. The issue in this case is that the road would likely remain private even though it will be improved to a public standard because it's held by at least four (4) easement owners. These easement owners would have to agree to dedicate the road to the county. Staff will reach out to the community this week and have a conversation about the private road status. Mark added that the fear of the residents living on Lund Lane would be an increase in speed by the traveling public once the roadway is widened. He added that the opportunity exists, in conversation with the developer, to do some realignment of the existing road. There is a structure with a pump control feature in the easement that would be at risk if the widening project were to happen. Mark continued that the next piece that is attached to that is the existing wooden bridge structure across the upper part of the canal. The bridge is a Bureau of Reclamation bridge and it is going to have to be removed with a new public bridge created by order of the Board of County Commissioners. Mark stated 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 3 that staff has made application to the Bureau of Reclamation (BOR) and will likely hear from them shortly with a notice to proceed. The construction and demolition of the existing bridge is the burden of the developer. Although staff will be working with the developer to make sure the proper structure is placed. Knowing that the bridge is moving forward it's a good time to start engaging the community on the impacts of keeping the road private. The concern from Public Works has been, and continues to be is essentially a public road serving sixty (60) residents of the approved Planned Unit Development there is some thought they could close the road. In which case we would not have public access that we were seeking with the bridge and other public road construction. Mark added that there is some advantage to see if that section can come into the road network for public dedication. There are two paths we can go down. We can either lobby and reach consensus from the easement owners to petition for the road to be established on network, in which case we would be providing snow removal and ongoing maintenance on the roadway and the other option is condemnation by the Board of County Commissioners. Staff is committed to having conversations this week about this issue with the easement owners. Discussion was held regarding the public road standard and how the roadway is to be built. Commissioner Jewell recapped the conversation with questions on how the easement owners can close the roadway. Mark replied that the County does not have any right of way of the private road. Further discussion was held. Commissioner Jewell added that closing that road is not an acceptable alternative and staff needs to find a way to prevent that from happening. Commissioner Osiadacz added that staff will be contacting landowners that are adjacent to Lund Lane to discuss what the roadway will look like. She has received several emails with concerns about speeds and what will occur as the improvements are made. One of her goals is to work with the developer and meeting with the property owners and find ourselves in a position where everyone is agreeable to the outcome. Commissioner Jewell asked to discuss the improvements because he feels this is another piece to the issue. Discussion was held regarding the roadway improvements and the traveling public. Board Direction: No Direction. KITTITAS COUNTY ROAD STANDARDS —TASK ORDER WITH KPG. Mark stated that staff has been looking at the road standards. The last update that was minimal was in 2015. Staff is anxious to update the current road standards to be more user friendly and have been having several discussions with one of our consultants KPG. Staff has seen other county standards and they far exceed what our road standards are currently. Staff would like to make a draft run at updating these standards in 2017 with a presentation to the Board in 2018 after outreach to the public and stakeholders. Commissioner Jewell commented that the last time the road standards had a broad update was as far back as 2007-2008. Mark replied that it was in 2005. Commissioner Jewell added that he is favor of an update; however, he is concerned about staff doing a full draft without a stakeholder group being involved in the process. Mark commented that staff would like to come back at another study session with a proposal for what the stakeholder group would look like and would prefer to have a document for the stakeholder group to review and get some body of work together for them. Discussion was held. 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 DepL of Public Works Page 4 Board Direction: Begin draft and involve stakeholders in updates. LOCAL TRAFFIC ONLYDISCUSSIONFOR NELSON SIDING ROAD: Mark stated that several weeks back staff briefed the Board on several issues along Nelson Siding Road due to closures and construction on I-90. Mark had a chance to look at statutes where the Public Health Officer can close the roadway due to the public urination and other health concerns. He added that the Board has the ability to temporarily close the road to all class of vehicles due to the increase of traffic on a regular basis. If this path of road closure was to be gone down the logistics of who would close the road and who would manage the closure. When the speed limit was lowered on the road this caused an extra burden on law enforcement to enforce the change. The speed lowering did not help with the amount of traffic volume. Mark contacted the regional engineer from South Central Region of Washington State Department of Transportation as the Board requested to schedule a meeting to discuss the issue and he has not received a response. Commissioner Jewell indicated to wait another week and then follow up with another phone call. Commissioner Osiadacz spoke to Undersheriff Myers being present and he spoke to the issue and presented a handout showing the calls and infractions in the Upper County area from May 1, 2017 to July 23, 2017. Discussion was held. Board Direction: Follow up with Washington State Department of Transportation to get the meeting scheduled. OTHER BUSINESS. CARROLL ROAD UPDATE: Mark stated that staff met with the Board several weeks back regarding the traffic on Carroll Road. After that meeting staff deployed traffic counters to track the speeds and traffic volumes. When the results of that study came back staff wasn't satisfied with the results due to the placement of the counters. They were redeployed in a different area of the roadway and have been out for week and will remain out for at least another week. Once this data is collected and compiled Mark stated he will bring those results back to the Board for discussion. 491 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of I-ublic Works Page 5 HYAK DRIVE UPDATE: Mark presented that in another response to speeding conditions on Hyak Drive, staff did a speed study last year that confirmed speeding on the roadway. Staff looked at various strategies and the area is poor for the placement of speed signs that are interactive because of the snowfall and the technology of those signs. Temporary traffic calming devices cannot be deployed due to snow removal efforts. Staff looked to national guidance that reported some good response to the perception of narrowing the roadway with striping markings. The new markings were signed and created ten foot lanes from thirteen foot lanes. Unfortunately, this did not help with the speed reduction and the new speed data confirms that. Crews will go and remove the markings with fog seal within the next couple of days. The next plan is to deploy some permanent rumble strips. Discussion was held. -&a Oe 1,126 -1 � , Mark Cook, Director 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2017 -116 TO AWARD THE CONTRACT FOR THE HUNTZINGER ROAD SAFETY IMPROVEMENTS PROJECT AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME WHEREAS: The Department of Public Works solicited bids for the Huntzinger Road Safety Improvements Project contract in accordance with RCW 36.77.020 Contract Procedures; and WHEREAS: Sealed bids were opened on July 14, 2017, at 10:00 am in the Kittitas County Permit Center, Department of Public Works, 411 N. Ruby Street, Suite 1, Ellensburg, Washington; and WHEREAS: Two (2) bids were received for the prescribed work. The Director of Public Works recommends the lowest responsive bid be accepted. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the Huntzinger Road Safety Improvements Project to Petersen Brothers, Inc. in the amount of $407,526.59. BE IT FURTHER RESOLVED that the Director for the Department of Public Works is authorized to sign the contract documents for said project. DATED on this 24th day of July, 2017, at Ellensburg, Washington. t: clerk of the Board- Julie Kjorsvik the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ABSENT Obie O'Brien, Commissioner V V S-- mm mm '-4 !i mm ai O Z q C.4,� C1 O � W [~.1 N W CT fD � v O m �y Q C CP W -4m ChA W N T W N yy 0 3 C 0 O r m ym� civ � m m I o G) G) y q CJ ti m C C CCC m Q I 2 r Zm 'n.-(a].Tn1x.Zmw Vi 3 0 S I F, C Cv C) �pZ [1 �C�O�77 �ff1Y9�y OL3Q�JQ C Z q �' �m=mmm n 0 m v'{ Gm� p o w w w n y a n / F+ Z �� �xZe,'mcn p O 3 O 0� p00 A 2m�o o O Z O z Yo5.0 gii Z N m b m nOn C o Q b\ Z M m '- 3 N � C vii rm r�[1 rR1mr� A Cn3T�nT�s Z Z x xx N O V N C8 N ' �nNNO6i CCN Ch Ch M W ifi C Z p 0 0 0o g 0 m 0 ynj 0 a � In c o C:. S a Z v Gy'7 C) 0 C m 0 sa 4A +n to to tq ens CA m CA m u' v 0 m o p0 c7 �. z ZD D� C 0 m m r a .� ti m m 1- y C 0 f) n P C y m W 1 OS Od O00 CD [TC N D m m 7 m rn Cn m is m o 0 co 0000000 000000c In o o ae z y A 0 1 r rn G7 O 0 0 0 15, 00 0000000 0 S p D 0 z 0 m m❑ Z I't1 y 7C Ell sn ut {R ip fn N {w -W 4r yr C 1V a O N W Z O O T V CWn O~+ � Jf, bw ` r � L! ilF i/F i4 iR iR iR iN i�F ilF N �/! ply C7 � TX A H k iC X 1C p ~ `$J g yyQ V N N �V' �+ pr ? N nn � 9r A C. WN V O VI lVWVO 01 N� O O O Of r CSC LD S m N O QW N Q�� O(/��? (/� [Wll "1 N M iR i�F Vf VF VF VF V! i1F iR 1/F V! C � Z � S S S G O S C CC��,,11 N W S O (j G] S S SEE S O S 888 S S p Sp W iR 4F iR 1R 1R b' in M M iM iR X x x X X x� N o m N N S O o g q ppN S 9 N Q 4 o 13 O e3 C 0 Sol 0 0 0 0 0 0 0 0 o o 0 o a o O a 0 a f31 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2017 -113 TO AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO AUTHORIZE A NOTICE OF CALL FOR BIDS FOR THE UNIVERSITY WAY BRIDGE PROJECT WHEREAS: The University Way bridge over the Burlington Northern Santa Fe railroad tracks is in need of repair; and WHEREAS: Public Works has advanced the bridge repairs in conformance with Section two of Resolution 2017-058; and WHEREAS: The plans and specifications for the University Way Bridge are complete; and WHEREAS: This Construction Project is included on the Six Year Transportation Improvement Plan and the Annual Construction Plan; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby direct the Director of Public Works to prepare a Notice of Contractors for a call for bids. BE IT FURTHER RESOLVED that bids will be received until 10:00 am on Wednesday August 9, 2017 at the office of the Department of Public Works, 411 North Ruby Street, Suite 1, Ellensburg, Washington, to be publicly read aloud after 10:00 am on Wednesday, August 9, 2017, in the Department of Public Works, Ellensburg, Washington. DATED on this 24th day of July, 2017, at Ellensburg, Washington. (faWul'Te—well, COUNTY COMMISSIONERS LINTY, WASHINGTON Chairman Attest: Clerk of the Board- Julie Kjorsvik L sia acz, Vice -Chairman Pfty,�Clerk of the Board- Mandy Buchholz �o °_ �SHNG10N " 11111iinWWO ABSENT Obie O'Brien, Commissioner Page 1 of 2 Public Notice Kittitas County, Ellensburg WA KITTITAS COUNTY STATE OF WASHINGTON CONTRACT DOCUMENTS INVITATION TO BID KITTITAS COUNTY — UNIVERSITY WAY BRIDGE IMPROVEMENTS KITTITAS COUNTY ELLENSBURG, WASHINGTON Sealed bids will be received by the Kittitas County Public Works, at the reception desk located at 411 North Ruby Street, Suite 1, Ellensburg, Washington until 10:00 AM on *** August 9, 2017 *** and will then and there be opened and publicly read for the construction of the improvements. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bonds within the time stated in the specifications, the bid proposal deposit shall be forfeited to the Kittitas County Public Works. The right is reserved to reject any and all bids and to waiver informalities in the bidding. Complete digital project bidding documents, including plans and specifications, are available at wry W.(Auestcdn.c0rP. You may download the digital plan documents for $10 by inputting Quest project #5273453 on the website's Project Search page. Please contact QuestCDN.com at 952-233-1632 or info(q',q1!estcdn corn for assistance in free membership registration, downloading, and working with this digital project information. Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411 North Ruby Street, Suite 1, Ellensburg, WA 98926. The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The improvement for which bids will be received is described below: This Contract provides for the improvement of University Way Bridge over the BNSF Railroad tracks, including the construction of approach slabs, concrete substructure repairs, minor drainage modifications, and other work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. Specifications may be seen at the office of the Board of Commissioners and online at http://www.co.kittitas.wa.us/notices/ of the Board Publish: file:///C:/Users/candie.leader/Downloads/newspaper-text%20(6).html 7/18/2017 Page 2 of 2 Daily Record: 0712612017; 08/02/2017 Daily Journal of Commerce: 07/26/2017; 08/02/2017 file:///C:/Users/candie.leader/Downloads/newspaper-text%20(6).html 7/18/2017 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. - 11?? TO AWARD AN ADDITIONAL $25,000.00 DISTRESSED COUNTY SALES AND USE TAX FUNDS TO THE CITY OF CLE ELUM FOR EMERGENCY REPAIRS FOR THE CLE ELUM DOWNTOWN BATHROOMS RESTORATION PROJECT AS RECOMMENDED BY THE CONFERENCE OF GOVERNMENTS WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds are for the purpose of financing Public Facilities which are defined as bridges, roads, domestic and industrial water facilities, sanitary sewer facilities, earth stabilization, storm sewer facilities, railroad, electricity, natural gas, buildings, structures, telecommunications infrastructure, transportation infrastructure or commercial infrastructure and port facilities in the State of Washington. WHEREAS: The COG as directed, met to review the emergency application to consider if it met the economic development needs of the county and communities within the county; and WHEREAS: The COG is recommending awarding an additional $25,000.00 from the Public Facilities Fund balance to the City of Cle Elum for Emergency Repairs for the Cle Elwin Downtown Bathrooms Restoration Project; and WHEREAS: The restroom, in its current state, presents a safety concern; and NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after due consideration, does hereby accept the Conference of Government's recommendation to award $25,000.00 to the City of Cle Elum for emergency repairs for the Cle Elum Downtown Bathrooms Restoration Project from the 2017 Sales and Use Tax for Public Facilities in Rural Counties in accordance with RCW 82.14.370. DATED this 24th day of July, 2017, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS TTI WS COUNTY, WASHINGTON au ewell, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik U,+Deimty, Clerk of the Board- Mandy Buchholz Vice -Chairman ASSENT Obie O'Brien, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS SUDY SESSION STAFF REPORT STUDY SESSION DATE: July 24, 2017 ACTION REQUESTED: Approve the Resolution to Award the Huntzinger Road Safety Improvements Project. BACKGROUND: The Department of Public Works solicited bids for the Huntzinger Road Traffic Safety contract in accordance with RCW 36.77.020 Contract Procedures. Sealed Bids were opened on July 14, 2017 at 10am. Two (2) bids were received for the prescribed work. The lowest responsive bid was Petersen Brothers, Inc., in the amount of $407,526.59 approximately 5% under the Engineer's Estimate of $431,316.90. This contract provides for safety improvements of Huntzinger Road, by installing guardrail as needed from I-90 to the State Park. The total HSIP funds allocated for construction improvements on Westside Road and Huntzinger Road was $511,402.00. The Westside Road Safety project was completed with approximately $136,760.00 of HSIP funds still available for reimbursement. The remaining $271,066.59 required to complete the Huntzinger Road improvements will be funded by the road fund. Future investments from Grant County PUD along the Huntzinger corridor has motivated Public Works to be proactive and improve safety by protecting existing roadside hazards with guardrail. The cost increase was associated with the aforementioned increase of use which spurred the decision to deploy safety rail on both the east and west side of the road rather than just the river side as previously estimated. INTERACTION: Public Works RECOMMENDATION: Motion to approve the Resolution to Award the Huntzinger Road Safety Improvements Project contract and authorize the Director of Public Works to sign said contract documents. HANDLING: Return a copy of the Resolution to Public Works. ATTACHMENTS: Resolution, Bid Tabulations LEAD STAFF: Lucas Huck, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2017 - TO AWARD THE CONTRACT FOR THE HUNTZINGER ROAD SAFETY IMPROVEMENTS PROJECT AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME WHEREAS: The Department of Public Works solicited bids for the Huntzinger Road Safety Improvements Project contract in accordance with RCW 36.77.020 Contract Procedures; and WHEREAS: Sealed bids were opened on July 14, 2017, at 10:00 am in the Kittitas County Permit Center, Department of Public Works, 411 N. Ruby Street, Suite 1, Ellensburg, Washington; and WHEREAS: Two (2) bids were received for the prescribed work. The Director of Public Works recommends the lowest responsive bid be accepted. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the Huntzinger Road Safety Improvements Project to Petersen Brothers, Inc. in the amount of $407,826.59. BE IT FURTHER RESOLVED that the Director for the Department of Public Works is authorized to sign the contract documents for said project. DATED on this 24th day of July, 2017, at Ellensburg, Washington. Attest: ❑ Clerk of the Board -Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTiTAS COUNTY, WASHINGTON Paul Jewell, Chairman Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Obie O'Brien, Commissioner x c a_ x� cnco CS W� bQ co 0-0 wa CD c s 3 en � KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT AGENDA DATE: July 24th, 2017 ACTION REQUESTED: Approve a Notice of Call for Seated Bids for the University Way Bridge Project BACKGROUND: The University Way Bridge over the Burlington Northern Santa Fe railroad tracks is need of repair. Damage to the substructure has been identified on the girders and the cross beams. Additionally, settlement at both bridge approaches have been identified resulting in the design and proposed construction of new approach slabs. Resolution 2017-058 funding the shortfall of $445,000 for the construction of the Dolarway Roundabout, required the County to move forward with the required repairs. The Engineers estimate for the proposed project is approximately $215,000. This project will repair the damaged substructure and install approach slabs. The contract will require early cure high strength concrete to expedite construction. A two week closure will be required to accommodate the construction as traffic is not manageable over the bridge due to conflicts with width and concrete cure efforts. A full closure is anticipated to be in effect the evening of September 18`x' through October 2"d 2017. These closure dates have been communicated and agreed upon with Central Washington University. Bids are scheduled to be opened on August 9th; 2017 at 10:00 a.m. in the Public Works Department. INTERACTION: Public Works RECOMMENDATION: Move to approve Notice of Call for Sealed Bids for the University Way Project, HANDLING: Return one (1) copy to Public Works ATTACHMENTS: Notice of Call for Bids LEAD STAFF: Lucas Huck, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2017 - TO AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO AUTHORIZE A NOTICE OF CALL FOR BIDS FOR THE UNIVERSITY WAY BRIDGE PROJECT WHEREAS: The University Way bridge over the Burlington Northern Santa Fe railroad tracks is in need of repair; and WHEREAS: Public Works has advanced the bridge repairs in conformance with Section two of Resolution 2017-058; and WHEREAS: The plans and specifications for the University Way Bridge are complete; and WHEREAS. This Construction Project is included on the Six Year Transportation Improvement Plan and the Annual Construction Plan; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby direct the Director of Public Works to prepare a Notice of Contractors for a call for bids. BE IT FURTHER RESOLVED that bids will be received until 10:00 am on Wednesday August 9, 2017 at the office of the Department of Public Works, 411 North Ruby Street, Suite 1, Ellensburg, Washington, to be publicly read aloud after 10-00 am on Wednesday, August 9, 2017, in the Department of Public Works, Ellensburg, Washington. DATED on this 24th day of July, 2017, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Paul Jewell, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Obie O'Brien, Commissioner rage i or G Public Notice Kittitas County, Ellensburg WA KITTITAS COUNTY STATE OF WASHINGTON CONTRACT DOCUMENTS INVITATION TO BID KITTITAS COUNTY — UNIVERSITY WAY BRIDGE IMPROVEMENTS KITTITAS COUNTY ELLENSBURG, WASHINGTON Sealed bids will be received by the Kittitas County Public Works, at the reception desk located at 411 North Ruby Street, Suite 1, Ellensburg, Washington until 10:00 AM on *** August 9, 2017 *** and will then and there be opened and publicly read for the construction of the improvements. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (51/o) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bonds within the time stated in the specifications, the bid proposal deposit shall be forfeited to the Kittitas County Public Works. The right is reserved to reject any and all bins and to waiver informalities in the bidding. Complete digital project bidding documents, including plans and specifications, are available at i"vw. uestedn.corn. You may download the digital plan documents for $10 by inputting Quest project #5273453 on the website's Project Search page. Please contact QuestCDN.com at 952-233-1632 or info(a�cturstcdn.corn for assistance in free membership registration, downloading, and working with this digital project information. Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411 North Ruby Street, Suite 1, Ellensburg, WA 98926. The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The improvement for which bids will be received is described below: This Contract provides for the improvement of University Way Bridge over the BNSF Railroad tracks, including the construction of approach slabs, concrete substructure repairs, minor drainage modifications, and other work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications, Specifications may be seen at the office of the Board of Commissioners and online at http:l/www.co,kittitas.wa.us/notices/ Clerk of the Board Publish: file)//C:/Users/candie.leader/Downloads/newspaper-text%20(6).htm] M W2017 rage L or 1 Daily Record: 07/26/2017; 08/02/2017 Daily Journal of Commerce: 07/26/2017; 08/02/2017 file:///C :/Users/candie.leader/Downloads/newspaper-text°1020(6). htm] 7/18/2017 rage 1 oI 1 For more information, contact Public Works All bid submittals shall become the property of Kittitas County. Kittitas County reserves the right to reject all bids and re -advertise if necessary. iile://lC:/Users/candie.Ieader/Downloads/www-text%20(fi).html 7/18/2017 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 24, 2017 ACTION REQUESTED: Consider a Resolution to Award Additional Distressed County Sales & Use Tax Funding to the City of Cle Elum for Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project in the amount of $25,000.00. BACKGROUND: In iggg Legislature passed RCW 82.14.370 Sales & Use Tax for Public Facilities in rural Counties. These funds are for the purpose of financing public facilities in rural counties. The Conference of Governments (COG) has been charged with the review and scoring of the applications and submitting their recommendations to the Board of County Commissioners for approval. INTERACTION: On March 15, 2017, the C.O.G met to review the application submitted and agreed to fund the Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project application submitted by the City of Cle Elum in the amount Of $25,000.00 from the Public Facilities Fund balance. Public Works; Conference of Governments RECOMMENDATION: Move to Approve & Sign Resolution to Award the Distressed Counties Sales & Use Tax Funding in the amount of $25,000.00 for Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project to the City of Cle Elum as recommended by the Conference of Governments. HANDLING: Return 1 original to Public Works; Copy to Kittitas County Auditor Finance Department ATTACHMENTS: Resolution; Application; March 15, 2017 COG Meeting Minutes LEAD STAFF: Mark Cook, Director of Public Works BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. TO AWARD AN ADDITIONAL $25,000.00 DISTRESSED COUNTY SALES AND USE TAX FUNDS TO THE CITY OF CLE ELUM FOR EMERGENCY REPAIRS FOR THE CLE ELUM DOWNTOWN BATHROOMS RESTORATION PROJECT AS RECOMMENDED BY THE CONFERENCE OF GOVERNMENTS WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds are for the purpose of financing Public Facilities which are defined as bridges, roads, domestic and industrial water facilities, sanitary sewer facilities, earth stabilization. storm sewer facilities, railroad, electricity, natural gas, buildings, structures, telecommunications infrastructure, transportation infrastructure or commercial infrastructure and port facilities in the State of Washington. WHEREAS: The COG as directed, met to review the emergency application to consider if it met the economic development needs of the county and communities within the county; and WHEREAS: The COG is recommending awarding an additional $25,000.00 from the Public Facilities Fund balance to the City of CIe Elum for Emergency Repairs for the Cle Elum Downtown Bathrooms Restoration Project; and WHEREAS: The restroom, in its current state, presents a safety concern; and NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after due consideration, does hereby accept the Conference of Government's recommendation to award $25,000.00 to the City of Cle Elum for emergency repairs for the Cle Elum Downtown Bathrooms Restoration Project from the 2017 Sales and Use Tax for Public Facilities in Rural Counties in accordance with RCW 82.14.370. DATED this 24th day of July, 2017, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KIT'I'ITAS COUNTY, WASHINGTON Paul Jewell, Chairman Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Obie O'Brien, Commissioner Kittitas County Distressed County Sales and Use Tax Grant Application, Guidelines & Instructions EMERGENCY FUND REpiTEST CLE ELUM DOWNTOWN BATHROOMS RESTORATION PROXECT Return To: Kittitas County Department of Public Works 411 North Ruby Street, Suite #1 Ellensburg, Washington 98926 Kittitas County Department of Public Works DIS'T'RESSED COUNTY SALES AND USE TAx INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION The Distressed County Sales and Use Tax Infrastructure improvement Program supports improvements to infrastructure systems that foster economic development in Kittitas County. The goal is to create economic opportunity through Infrastructure investment. APPLICANT INFORMATION Applicant: City of Cle Eiurn Contact Name: Robert Omans Address Address: City: Telephone: 119 W First Street Cle Elurn (509) 674-2262 WA Zip: 98922 FAX: (509) 674-4097 E-mail Address: robert cit ofcleelum.coin Project Location: 221 E First Street Jurisdiction Population: 1891 Project Title: Downtown Bathroom Restoration APPLICATION THRESHOLDS Applicant Requirement: Check -off: Q 1. The project is improvement to an infrastructure system(s) linked to economic development. [J( 2. A detailed 8 % X 11" vicinity map that clearly shows the project is included in the application package. El 3. Distressed County funds are not being substituted for other funds that are already secured. 21 4. The project involves traditional improvements, instead of "non-traditional" improvements eligible for "Enhancement" funding Rl 5. Applicant is submitting this application as an emergency fund request only. Q 6. The localtregional economic development organization has been informed of the project. 2 I C f b 'G .a P. 2 C d) Z LIL a O i1 a. N a Q! i! !0 Wo O 4 O L CV C d U4" A C G LO V 6f} A d Q ea co cc � a 'm a aw 4►4 ra V 'a a a m CD m O L' LL to O M as N LU w 0). 4/3 413 6R 40- 413 613 449. 6% 611} 40> 40 �d V LL !� e V >mw 0? R O O Lp 21 ul co M 63 6$ 6Ry 0). 6F60). + 613 E9 6g f13 69 0). 4/3 413 6R 40- 413 613 449. 6% 611} 40> 40 �d V LL !� e V >mw 0? R Lp 21 co M 63 6$ 6Ry 0). 6F60). 0). 4/3 413 6R 40- 413 613 449. 6% 611} 40> 40 �d V LL !� e V >mw 0? R fn PROJECT NARRATIVE 1. Project Description: Describe the scope of work. Indicate the major work involved, including a brief comparison of existing and proposed conditions. This project consists of a revitalization of an existing public bathroom facility used and enjoyed by hundreds of travelers for over Zit years_ The structure was built in the early 90's made of block and brick walls with a low sloped wood framed roof system. In 2015 the City was awarded $ 35,000 from the 09 funds to make the following improvements (listed below) in 2016 to help restore the bathrooms. Original Improvements: • Install all new plumbing fixtures,4-waterclosets, 2-uranlas, 4 -lays, 1 -hot water Tank -less • Install all new stall partitions • Install all new light (LED), fans and outlets • Install new electric hand driers (one each side) • Install new waste paper cans NO towel dispenser • Repair walls and ceilings as needed • Paint walls, doors, floor and ceilings with two-part epoxy paint n Install new soap dispensers (one each side) Since then and right before construction was about to commence we noticed that the skylights and roof were both leaking. We tried to get a roofing contractor in before the snow but were unsuccessful. Now we need to fix the leaking before moving on to the original improvements. Added Improvements Needed: • Remove and Install 2 new skylights • Re -roof bathroom with new membrane style roofing Currently the bathrooms are still closed and our City Public Works crews have removed everything listed below making it ready for the contractor. • Removed all plumbing fixtures: 4-waterclosets, 2-uranlas, 4 -lays and counter, 1 -hot water tank, • Removed all stall partitions Removed everything else on the walls to prepare for contractor Removed waste paper can / paper towel dispenser 2. Explain the specific Infrastructure issues the project addresses and how they are linked to economic development improvements, The existing City of Cie Elum public restrooms were constructed years ago in recognition that the travelling public will stop and/or spend more time in areas where they have access to basic essential tourism infrastructure, such as restrooms, benches, water fountains and the like. Over time, the restrooms have seen extensive year round use by both the traveling public and Cie Elum area tourists and are showing their age. The restrooms, as with any public space, make a definitive statement about the quality of the area, its resource base and the care and accommodation they provide to their guests. Public Restrooms have often been a "lure" to entice the traveling public to include a destination/area on their route planning, and to encourage them to stop/stay longer in an area. The central thesis of this proposition is that the restroom quality, cleanliness and appearance must be exceptional; otherwise the risk is run of becoming a "throw -away -stop", akin to a truck -stop. Cie Elum is a tourism and service destination for the travelling public. We are both the first full service stop entering the county and the last full service stop before heading back over the pass. As such Cie Elum hosts many of the visitors and tourists that then venture to other points throughout the county. Additionally our public restrooms are strategically situated on First Street (SR -903 extension) which provides easy visibility and access to the travelling public. This project directly increases tourism related economic activity by accomplishing the following: • Keeping Cie Elum as a tourism nexus and tourism support service area for the traveling public. • Encourage the traveling public to continue to route -plan a stop in Cie Elum for services, which creates ancillary services and stops in Cie Elum • Continues to provide that 'best county -wide experience' as the first and last full service stop for those traveling over the past to patronize Kittitas County. 3. Preliminary Planning 1 Engineering Phase: DONE see attached floor plans Estimated Start Date: Estimated End Date: Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that may slow phase progress). 4. Right of Way Phase: NIA Estimated Start Date: Is It Required? Yes No X Estimated End Date: Please explain prase status (work already completed, in progress, awaiting funding, etc., and factors that may slow phase progress). 5. Construction Phase: Estimated Start Date: April 1. 2017 Estimated End Date: June 1. 2017 Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that may slaw phase progress). Currently the public works crew has removed all plumbing fixtures and stall partitions. We have obtained one estimate for installing a new roof and skylights and one estimate to install the new fixtures and the rest of the work outlined above. Because the bathroom roof is leaking the City does not want to do anything inside until the roof gets replaced. The roof cannot get replaced until the snow leaves. Once the snow leaves, the roofer will replace the roof and skylight (which currently is scheduled for the first of April but could change with the weather) and another contractor will finished the work immediately afterwards. 6. Indicate if the project is consistent with the following applicable state, regional and local plans and prioritization processes: ❑ overall Economic Development Plan — Officially Adopted Comprehensive Land Use Plan — Officially Adopted 2009 o Capitai Facility Plan — Officially Adopted 2008 O Community Action Plan (or other community-based plan) — Officially Adopted 1998 2007 Ci Six -Year Transportation Improvement Pian — Officially Adopted 2015 Site-specific development plans; e.g., Community Waster Plan — Officially Adopted 1997 2012 7. Explain how this infrastructure project has been coordinated, or will be coordinated with other jurisdictions, such as counties, cities, state/federal agencies, and with /economic development organizations during planning, design, financing, construction and/or operation phases. The planning and design phase of the project involved coordination with the Chamber of Commerce, local service clubs local trades groups and the public. Coordination also included several City economic development partners including, Suncedia, Central Business District Business Owners and the Washington State Norse Park. The operation phase will continue to include close coordination with the above referenced agencies to ensure smooth operations and 'advertisement' to raise awareness of the visiting/traveling public in regards to facility availability, location, etc. Letters of Project Support are attached. S. Explain how the infrastructure project will helpmeet the economic development goals of your community and/or region. if this project Is not done, will the anticipated private development still take place? Cie Elum is a tourism and service destination for the travelling public, Our Economic Development Strategy is predicated upon Recreation and Tourism; the capitalization of our largest singular asset. Our Average ADT on a busy weekend is over 25,000 vehicles on First Street. This project (both Location "N'& "B" will help us capture and convert more of the existing ADT into vehicle stops. We are both the first full service stop entering the county and the last full service stop before heading back over the pass. As such Cie Elum hosts many of the visitors and tourists that then venture to other points throughout the county. Additionally our public restrooms are strategically situated on First Street (SR -903 extension) which provides easy visibility and access to the travelling public. This project directly increases tourism related economic activity by accomplishing the following: a. Keeping Cie Elum as a tourism nexus and tourism support service area for the traveling public. b. Encourage the traveling public to continue to route -pian a stop in Cie Elum for services, which creates ancillary services and stops in Cie Elum. c. Continues to provide that 'best countywide experience' as the first and last full service stop for those traveling over the past to patronize Kittitas County. In regards to'private development'this project becomes one of many pieces that is the catalyst for continued investment by private industry and businesses to Increase their investment in a functional and amenity driven Central Business District. 9. Describe any feasibility or predeveiopment studies that demonstrate the linkage between the proposes/ Distressed County Infrastructure improvements and the anticipated economic outcomes. There is a demonstrable link between public service amenity (specifically restrooms) and economic development for recreation/tourism dependent communities. Studies and articles are attached (Attachment "B") that demonstrate that "tourism and toilets go hand in hand 10. Indicate If other needed infrastructure (e.g., sewer, water, power) is in place or if there is a pian for getting it in place. All infrastructure is existing and in place. 11. Indicate the Estimated Number of Businesses Created/Retained by the Project. j0 Methodology for question 11 is in a narrative attached. 12. Indicated the Estimated Number of Jobs Created/Retained by the Project. 10 Methodology for question 11 is in a narrative attached. Submit the original application to: Kittitas County Department of Public Works 411 N. Ruby, Suite #1 Ellensburg, Wim. 98920' Applicant Certification Certification is hereby given that the information provided is accurate and the applicable attachments are complete and Included as part of the application package, I certify that application thresholds are met at the time of application. March 8, 2017 Signature of Official Representative Date Kittitas County Department of Public Works Conceptual Approval Approval of the project feasibility, scope and estimated costs. Signature of Kittitas County DPW Representative Date Typed or Printed Name c / rl_ir:l4I..�:l�•�;�# 1�.;' �! :.!� r: I ;, _ ,JF• �Y� ! _ f w 7 � � 1 �� ��—i j — �� J.. � F I [r` ��.•k �C � �{- r �1 �- �F J -. y �, �� -1 _ier�f 1,- !i 1; l I'` i1 �� �' tl j•, !J'j.1 7. �. F-1 77 a 'R 1 � ��� � i•. 1 �J � J' _J ...� 1;'. �j .,i f i ��7� � }� I. �, I 1 ��! I i~! , ; ��. _JI __ ._........,1 ` t f`. J.j1 . A ' i � � �., • Mul .Y 1.. I .. --w-11 - TM P �•y T f •rte • . 1 �J !.'• � • �ft1 1 1; J.? 't -r i ` 'r a- �� •i L' L- j— J. !, � � ��, �'R• � � 1 � � 1' r�'•Y ..:1. s. ''F. ��'T� �` i a IS - ; � I � � ti' � i.'' •..'.�i/i� � i � as k' �3 k°` � ':}�—. - .. •1 • , E r � � �' `�� � fir. �� # !, .� � ��',.�F t� - ' f • l r �'—mac..,,• �t"� I � 1 � i ] i�yix � 1 � � � � � 1� �4�a�. t � is 11 .. i � �. ! 1 t �.wj«� � ��• ; : � , i �. �' a i.� � , ,�' ��`•'+ 1 ? I . s • I i" - . j , fes... � -rr"-- f"�' `. y `� �� +� I s. I• { ` ,• _ .. ... ,, �n��'+!.i,'��rl'� ; I.n 111" - i � � _i �y,.}}41 4 _ •-�i - - �. ��_, . kw \�.» '- � 11 Ln v City of Cic slum Fu6lir- E)atkroom DOWNTOWN TAX I.D.#: 20-15-26051-0820 71-101, 1— T-1 0' FLOOR PLAN SCALE: 1/4"= V SUNG DIA. January 21, 2015 Klttltas County Lodging Tax Advisory Committee C/O Board of County Commissioners 2015 W. 5u' Avenue, Suite 108 Ellensburg, IATA 9SS26 Dear Committee Members: I am writing In support of the Cle Elum application for Lodging Tax Tourism Related Capital funds. We at 5uncadta believe that public restrooms are an integral component of tourism and tourism support related Infrastructures. Moreover clean, modern and functional restroorns present a good overall County impression and reflect well that our County values tourism and the traveling public. The more time visitors spend In Cie glum the greater the chance they All shop, dine and otherwise add to the Kittitas County economy, We would urge you to support this project and fully fund the request. Slacerefy, Rogex edc Managing Director 770 Suncadis "Grail I Cie Elum. WA 98922 1 t 509.649,(AOD I f 509,649,62511 wwmsuncadia.com r4l&rx. 1 1 g West t First Strut Cle Elum, INA 98922 January 21, 2615 Kittitas County Lodging Tax Advisory Cpmmittee C/O Board of County Comminl!or;ers 265 W. 5s` Avenue, Suite 108, Ellensburg, WA 98926 Telephone: (569) 674-2262 Fax; (509) 674-4097 www. ciiyoicleel um.ram RE. Lestet of Support far 2015 Lodging Tax Tourism Related, Municipality -owned, Capital Project: City of Cle Elum Public Ream x m. Remodel Dear LTAC Metabem, Ile City of Cie Slum Lodging Tax Committee supports and endorses this application for a tou;rlsm related, municipality owned ca*W pqject. Our public restroom, wb b are located m the heart of our Central Busimess District and along Pirat Street (SR 903 Extension), are a key piece of tourism related h&astructu re that is used almost exclusively by the tsavoft public. NumMUS studies (attacLed) attest to the critical nexus of clean, modern acid serviceable restrooms and the impact it has on a tourists wilUngness to ffi* stop, return stop (trip planning related to tourism 111hubuchm and sarviow) andlor spend additioual time in the downtown whoa tourism support inficasirUMN is available. Thank you m advance for your consideration. Please do not besit de to ask questions or seek additional infommdon if needed. Find Regards, R a Spears City Council Lodging Tax Committee Clair Partial Studies //References Geisler, Tom. On Public Toilets in Beijing. Journal of Architectural Education_ (2000) C George, Rose. The Big Necessity: Adventures in the World of tfumun Wusm Portobello Books, London. ( 2008) S Greed, Clara. Inclusive Urhan Design: Public Toilets Architectural Press (2003). G Greed, Clara. "Discussion: Public Toilets- the Need for Compulsory Provision" Proceedings of the Institution of Civil Engineers (2005). a Kitchin, Rob and Robin Law 'The Socio -spatial Construction of (In) accessible Public Toilets". Urban Studies, Vol. 38, No. 2,287-298,(2001). Lim, Paul ] "Where Even the Toilet is High -Tech" US News and World Report (2007). o Neves, Randy "Portland Loo' proposed to solve downtown's toilet problem" kgw.com April 11, 2008 r "Public Toilets for Old Town China Town: A report to the community by PHLUSH (2006). Relief Works MURP Workshop 2006: "Going Public. Strategies for meeting public restroom need in Portland's central city" L Voices of Homelessness: A Qualitative Database from Sisters of the Road. Aaw.sistersofthcroadcafe.ore ( 2008) 'L First lobs Created/Retained Assumptions were broken down into four major categories. 1 L. Intangible ! 2_ Taugible Benefits3. Benefits i P:zpericntiAl; Academic Data 4. Costs Raises o $225,00 1Public toilets help 5250,000 total Community Profile Construction i revitalize downtown project Contract Awarded I neighborhoods' investment • Downtown Development 2 -months construction related . Public toilets get • Supports Touristn jobs (local) created people out of cars anti Models for 3 FTE onto the street' • Community wid (estimated) and 2 Public Toilets Economic Partner PTE (Plumbing I improve public Project Support Contractor and Health • Supports Electrical George, Rose. The Community Contractor) Big Nece .%IV Vision Local sourcing of Adventures in the • Supports aggregate matarials World of Human Recreation Contributes overall to the Waste. Portobello Tourism "Kittitas County Experience" Hooks, London. • Support Capture 2008) of Traveling • Greed, Clara. Public Inclusive Urban • Counly-Wide Design, Public Community Toilers. Gateway Profile Architectural Press (2003). • Greed, Clara. "Discussion: Public Toilets- the Need for Compulsory Provision" Proceedings of the Institution of Civil Engineers (2005), - Urban Studies, i Vol. 38, No. 2, 287-299,(2001), 2_ Information Table Distilled Into Narrative Farm: In speaking with local contractors who are potential bidders on the Project (Location A&13 is a single project) the initial economic benefit in jobs created is directly related to construction. Approximately 3 Fall Time Employee and 2 Part Time Employee positions will be created during the project Ilk providing a direct benefit to Kittitas County. Aggregate materials including sand, gravel and concretes will be sourced from Ellensburg Cement Products and will provide an estimated economic benefit of between $15,000 and $18,000 dollars. In further analyzing the economic impact of the project totality {5250,000 est.}, An economic development analysis prepared in 2013 for the Transportation Regional Board. The study, prepared by Timothy J. Gates Ph.D., P.£., P.T.O,E., et all, both quantitatively and gualititativcly analyzed the economic benefit of public rest areas (restroom facilities) along limited access highways and state routes_ The study found that " Public rest rooms along limited access freeways and h ighways (of which first Street SR 903 is one) allow access to an essential public facility. Furthermore the study created an economic methodology to examine a "broad range of benefits associated with public restrooms" including; travel diversion benefits, comfort and convenience benefits, and increased tourism spending. The Study determined a cost benefit ration of between 1.24 to 5.89 with an average of 3.36 for each dollar invested. Similar facilities with a immediate tourist /activity locus ranged from 1.10 to 7.02 with An average of 4.0. As an interesting note the study also analyzed the cost savings to communities by vehicle crash/accident avoidance by having drivers who have access to urban rest/restroom facilities versus those who don't, but that economic date is excluded from consideration in our monetary analysis. Using the studies traveler center average calculation of 4.0, the investment can result in a 1 -million dollar mtum on the life of the project by new tourism/economic development activity created. According to local business surveyed between 30 and 50 percent of their costs are labor_ 30% to 404Y, or $300k to S400K, would result in IC jobs over the project life. 1, Transportation Regional Board Annual Meeting (2013). Economic Assessment of Public Rest and Traveler information Centers on Limfted Access Freeways. Timothy J. Gates, Ph.D., P.E., P.T.O.E., Peter T. 5avolanien, Ph.D., P.E., japan K. Datta, Ph, D., P.E., Ryan G. Todd. County • City of Cie Elum • City of Ellensburg • City of Kittitas • City of Roslyn - Town of South Cie Elum KITTITAS COUNTY CONFERENCE OF GOVERNMENTS Regular Meeting Minutes — March 15, 2017 at 6 p.m. Call to Order The meeting was called to order at 6:00 p.m. Il. Roll Call Those present: Mary Morgan, Jay McGowan, Laura Osiadacz, John Camarata, Jim DeVere, Steve Sowers, Mitch Long Also present: Doc Hansen-Kittitas County Community Development Services -Planning Official, Kathy Boots -Clerk, Dan Carlson-Kittitas County Community Development Director, Chelsea Benner-Kittitas County Community Development Planner, and Angela San Filippo -City of Ellensburg Planner Those absent: Geoff Scherer, Ken Ratliff, Lou Whitford, Andy Januszkiewicz, Jerry Pettit, Bruce Tabb Ill. Correspondence- None IV. Minutes I. Laura Osiadacz motioned to approve minutes from 2-15-2017 as presented. Mary Morgan seconded the motion. The motion passed with a 7-0 vote. V. New Business 1. Angela San Filippo (City of Ellensburg Planner) informed the group of the City of Ellensburg Housing Needs Assessment that is completed. The assessment is on their website. BERK Consultants assisted with the assessment. The City did their own surveys in addition to using State and National data. The City of Ellensburg determined there is a lack of affordable housing. A. The Homeless and Affordable Housing Committee were informed about the assessment. The Homeless committee would like to know data for each city so that it can be determined where affordable housing and funding are most needed. B, The City of Ellensburg can look at land use and incentives but it is up to the community to seek the resources. C. Roslyn is considering options for people that work in Roslyn so that they don't have to commute to work. Roslyn is working on a moratorium on vacation rentals by home owners. They are hoping to hold off on issuing new business licenses for new applicants while issues are being addressed. Roslyn is not receiving motel/hotel tax on most rentals by home owners, life and safety issues around the number of individuals renting houses, and parking are issues that need to be addressed. D. Laura Osiadacz stated she did a search of house rentals within individual cities and found approximately 140 for the County. Other counties were mentioned. E. Roslyn may consider smaller lots and density to increase housing options. 2. Jim Armstrong with the Kittitas County Chamber of Commerce spoke representing the City of Ellensburg. A Chamber of Commerce letter and email were disbursed. Jim stated that COG approved funding last year for Roof Replacement at the City of Ellensburg Business Incubator. The bid came in below the funding granted. The City would like to use the surplus of funding approved to buy new swamp coolers. The current swamp coolers are leaky. The swamp coolers are part of the roof and to replace them at this time is more cost effective. Opening up the new roof in the future to replace the swamp coolers of a different size will cost more. A. Jim DeVere motioned to allow the City of Ellensburg to use the surplus of .09 funds granted previously to go towards new swamp coolers. Mary Morgan seconded the motion. The motion passed with a 7-0 vote. VI. Old Business 1. Review of A9 fund emergency application for the City of Cie Elum (new bathroom) A. Cie Elum Downtown Bathrooms Restoration Project Emergency Fund Application was disbursed and reviewed. The need of a new roof and sky lights was discussed. The balance of allocated funding for the .09 funds was discussed. Current numbers were brought last month but not this month. B. Mary Morgan motioned to approve the extra funding for the Cie Eium Downtown Bathrooms. Jim DeVere seconded the motion. The motion passed with a 7-0 vote. 1. Employment projection A. Doc Hansen recapped the results of the last meeting. Kittitas County Population and Employment Allocations for 2037 hand out was distributed. The previously agreed upon population numbers were sent back to BERK. BERK used the current estimate and prorated it back to 2015 to get the current numbers. The Board of County Commissioners was presented the employment numbers and the 80/20 split and were satisfied. B. Jim DeVere motioned to recommend approval to the Board of County Commissioners adopt the population employment allocation numbers for 2037. Mary Morgan seconded the motion. The City of Roslyn expressed concern over the motion. Roslyn is in favor of the employment allocation projection but wants the motion to be clear that they are not in favor of the population allocation as previously voted on. Jim DeVere amended the motion to reflect Roslyn's concern about the columns that address the population allocation and recommend adoption of the employment allocation numbers. The 80/20 employment split is also included in the recommend for approval by the Board of County Commissioners. The motion passed with a 7-0 vote. V. Chairman Report A. Chairman Jay McGowan opened up the meeting up for additional comments. B. Mary Morgan informed the group that the Noxious Weed Board will be sending out letters to individual cities asking about when the Board can come do a presentation to individual city councils. They would like to get everyone on board within the next year. Cities provided when their regular meetings are scheduled. C. Doc Hansen informed the group he has accepted another job out of the area. He encouraged the group to continue to meet regularly to keep everyone up to date and keep communication open. Dan Carlson and Chelsea Benner will be involved in the COG meetings for planning department purposes. D. One of the items the group would like to start to address is the scoring sheets and evaluations for the .09 funds. The Clerk will distribute electronic scoring sheets and evaluations to the sub -committee to work on. Mitch Long motioned to adjourn the meeting. Jim DeVere seconded the motion. Meeting adjourned at 6:50 pm KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 24, 2017 TOPIC: Lund Lane Road Improvement ACTION REQUESTED: Informational — No Board Action Required LEAD STAFF: Marr R. Cook RECOMMENDATION: Informational — no Board of County Commissioner action required. BREIFING SUMMARY: • Big Creek PUD is required to bring Lund Lane to a public road standard • The required new bridge crossing at Bureau of Reclamation irrigation canal will be owned by the County • Without geometric alterations, Lund Lane will likely go to 25 MPH following improvement. BACKGROUND: Approval of the Big Creek PUD brings with it several offsite improvement requirements. The existing Bureau of Reclamation (BoR) bridge must be replaced and Lund Lane be improved to a public standard. The Board of County Commissioners (BoCC) is requiring that the bridge be built to public standard and BoR is requiring the County to own and operate the bridge over its irrigation canal. Public Works has submitted a canal crossing permit and BoR is currently processing the permit application. Planning: for bridge construction and road improvement are underway. DISCUSSION: Cooperation amongst easement owners has the potential to afford Lund Lane realignment that is expected to benefit all easement owners, Preservation of irrigation controls and traffic calming geometry are the likely outcome of cooperation. The developer (Deneen) is expressing willingness to work with area residents. To that end, Public Works proposes conducting public outreach seeking to engage easement owners on improvement options for Lund Lane. Outreach is scheduled for the week of August 1, 2417. FISCAL IMPACTS: Minimal costs associated with administrative expense supporting community outreach. Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT ATTACHMENTS: Exhibit 1: Aerial photo and site map Wage 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIO\ERS WORK SESSION STAFF REPORT EXHIBIT 1: AERIAL PHOTO AND SITE MAP Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT a LL] z Lu U) KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 24, 2017 TOPIC: Kittitas County Road Standards Task Order with KPG ACTION REQUESTED: Informational — no Board action required. LEAD STAFF: Mark R. Cook RECOMMENDATION: Informational briefing — no Board of County Commission (BoCC) action is required. BREIFING SUMMARY: • Latest road standard revision was minimal in nature (2015) Significant reorganization and restructure is desired by Public Works • The County Engineer and Public Works Director have been working for several months compiling issues of concern regarding the current standards • Recently, the County Engineer signed a task order with KPG moving the desired revision to a draft proposal • Once staff is satisfied with the effort, public outreach will be conducted in 2018 prior to the County's annual comprehensive plan amendment cycle (June 2018) BACKGROUND: The Road Standards were last revised in 2015. Minor changes were made to the 2005 standards. Significantly, the number of lots served on a private dead end road was reduced from 40 to 30 to be consistent with state fire code. The standards continue to be problematic for folks attempting to use them without guidance from staff. The current standards lack cross-section detail for road construction and do not provide process flow charts for common land use applications involving road construction. In early 2017, Public Works (PW) selected KPG as a second tier civil engineer consultant. A recently opened Wenatchee office now provides local support at significant savings. Taking advantage of the opportunity, we are now scoped to significantly revise the road standards during the remaining months of 2017 (see attached preliminary scope of work). DISCUSSION: PW is seeking to produce a set of road standards that is user friendly. Process flow charts and electronic linkage to various county land use code is anticipated to be well received by users. This will be the first comprehensive revision of the standards in over a decade. Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Once a working draft is available for public review, PW will develop a public outreach campaign with assistance from the BoCC. FISCAL IMPACTS: A fifty thousand dollar ($50,000) task order has been signed by the County Engineer with KPG for revising the current road standards. Funding for the project is via the Road .Fund. ATTACHMENTS: Exhibit 1: KPG Scope of Work Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: KPG SCOPE OF WORK Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT DEPARTMENT OF PUBLIC WORKS Formal Task Order Document KPG, P.S. Task Order Number 02 Maximum Amount Payable $50,000 Completion Date 08/01/2018 The general provisions and, clauses of Local Agency Agreement Number KCPW 2017 19ENG3 shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: Road Standards Update Description of Work: KPG (CONSULTANT) shall provide services as detailed in "Exhibit A Scope of Work" attached. Cost Breakdown: See "Exhibit B Hour and Fee Estimate" (attached) for a detailed breakdown of estimated hours for various tasks and subtasks. Hourly rates will be as agreed upon in Agreement KCPW 2017-19ENG3. Completion Date. 0$10112018. See "Exhibit C Project Schedule" (attached) for additional details on the project schedule. Agency Sigoature: AJ Date: -- zo Consultant Signature; �>` Date;- / 7 2016�7 ,Doak l"O' , <P6 Exhibit A Scope of Work Kittitas County Public Works Road Standards Update Task Order No. 02 Agreement No. KCPW-2017-19ENG3 July 17, 2017 Introduction and Background: Kittitas County desires to make revisions and updates to the code and standards for Title 13 of the County Code, "Roads and Bridges". The County communicated its preliminary goals for this effort in a one page document titled: "Road Standards Update 2017." These goals were discussed in additional detail during a meeting between KPG and the County on May 31, 2017. The County and KPG subsequently executed a Formal Task Order Document, Task Order No. 01 for KPG to provide general engineering support services to the County through 2020. At the same time the County authorized an agreed upon budget portion of Task Order No. 01 to develop this scope and fee estimate for the "Road Standards Update" as the first subtask. The resulting scope and fee is shown below and will provide the basis of Task Order No. 02 for Agreement No. KCPW 2017-19ENG3. TASK 1— PROJECT MANAGEMENT Objective: Provide management of staff and resources, monitor and manage the project budget and project schedule, and provide client contact. 1. Internal resource management and prioritization of resources. 2. Manage and maintain the project schedule and budget. TASK 2 — RESEARCH & CODE REVIEW Objective: Building upon the initial code review performed during the development of this scope under Task Order No. 1. Provide research and additional code review as needed during the development of other task items, check references to other Titles in the Kittitas County Code, and search for useful example code sections to aid in the development of the code revisions. 1. Perform research, code review and evaluation, and integrate ideas from other codes. 2. Check references to the rest of the code as Title 12 is being revised, and update if needed. 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.cym TASK 3 — CODE UPDATE - OUTLINE Objective: Develop an outline for the code update that addresses organizational and content related deficiencies in the current code. 1. Prepare a draft outline of the code update. 2. Provide an internal QA/QC review and check all assumptions. I Meet with County and submit the outline for review. 4. Incorporate County comments and finalize outline. Assumptions: 1. The County will provide a detailed review and comments on the outline. TASK 4 — CODE UPDATE - DRAFT Objective: Prepare a draft update to the Title 12 code including text and tables. 1. Prepare a draft of the body of the code. 2. Provide an internal QA/QC review and check all assumptions. 3. Meet with County and submit code update for review. 4. Incorporate County comments and finalize code update. Assumptions: 1. The total page count for the updated code will be approximately 100 pages maximum. 2. Existing code material and language will be utilized as much as possible. The existing code will not be completely re -written. 3. The County will provide a detailed and comprehensive review of the draft code update. TASK 5 — STANDARD PLANS Objective: Develop a set of standard drawings that accurately summarize select requirements of the updated code where standard plans are deemed necessary. 1. Create standard plans. 2. Submit standard plans for review. 3. Incorporate County comments and finalize drawings. Assumptions: 1. The total number of standard plans will be approximately 15 maximum. Page 12 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www;kpg.com lclpc�w TASK 6 - FINAL DOCUMENTS FOR PUBLIC COMMENT Objective: Provide a comprehensive review of all deliverables, make final revisions, and submit the final project deliverables. 1. Provide a complete internal QA/QC review of the code update, standard drawings, and provide a final check of all assumptions and decisions. 2. Meet with County and submit final documents for review. 3. Incorporate County comments and finalize documents. a. Code Update 2017. Assume 3 bound hardcopies as well as electronic files (in PDF and/or Microsoft Word format) b. Standard Plans Assume 3 hardcopies as well as electronic files (in PDF format) c. Final memorandum documenting the code update process. Assume 3 hardcopies as well as electronic files (in PDF format) 4. Meet with the County to submit all final documents for use in the adoption process. TASK 7 — CODE ADOPTION PROCESS SUPPORT Objective: Provide the County with materials and support during their process for adopting the new roadway standards. Provide materials for public meetings and outreach, assist with answering questions, compile comments, and make revisions to the Code and Standard Plans. 1. Provide materials and support, answer questions, and compile public comments as needed. 2. Attend periodic meetings with the County as needed (assume two meetings total). 3. Make revisions to code and plans as needed. MANAGEMENT RESERVE Kittitas County may require additional services of the Consultant. The scope of these services will be determined based on the unanticipated project needs or other considerations at the sole discretion of Kittitas County. This work may include additional research, code revisions, standard plan revisions, as well other items which were not anticipated with the development of this scope of work. These services will be authorized by Kittitas County under management reserve. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the County has authorized the work and issued a notice to proceed. 11 -1 g t7 13 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 Exhibit B HOUR AND FEE ESTIMATE Task Order No. 02 Apreement No. KCPW 2017-19EN03 CBenl: Kittitas County Public Woks Proieal: Road Stendarda Update Oats: July 17, 2017 rL L 1(a3rT Interdisciplinary Design ,rm*mo Task Deempum -- Labor Hm Eatunses Total PAum and Labor Foe Eftma�byTisk SamorCAME eq Project Tsohngian Mmni�waMn S 10680 3 - 13009 $ 1i0.B2 $ 9095 6 63,84 Ibaro Fee Took 1 -Prolm mwmwmnm L7 n RResoyrce Management 1 2 3 5 416.78 ,I=u 12 Mian a Schedule. and Budast 7 2 1 2 1 1 2 7 1 3 766.10 Tack T01111 R 4 L 2 0 2 10 s 1,182.118 Teak 2 - Corte Review 2.7 IFIG80firch and Addtllonal Code Review 2 B 4 2 t5 1,924.08 2.2 Check and Updals Other Chapters and Idles 1 28 4 14 1.797.20 Task T.W] 4 16 8 0 2 30 IS 3,722.06 Teak 3 - Code Updme - Cutkns 3.i Pre ere Drell Outlue- 2 24 4 30 a 8,870.64 32 intemai QAQ 2 4 4 10 5 1278.84 333 Meet with Gounty and Subrnk OrrtUm 4 4 B 963.94 3A IncomorateCommentsandFinalizeOutline 4 4 4 12 $ 1219.00 Task TWd 4 36 i8 0 4 60 $ 7,338.12 Task 4 - Cods Update - Cull 4.1 P aro Draft Code to 4 32 32 16 64 g B Sm.06 42 tntemsl CIA= 0. 8 8 20 g 2,559.68 4.3 148e1 whh County and Submit Draft Cade Update 4 4 6 8 963.64 4.4 lnoc rale Comments and Finalize Code 1,10deffip 4 6 6 6 211 B 3,064.40 Task 7oMl 12 6R 62 0 24 140 g 18,836.08 Yank 5-.81ra1dard Plane 3.1 loreale Standard Plans 6 B 40 1 56 S 5,541.28 5.2 ISubmIt Plans 4 4 8 S 963.64 5.3 ilnuorpomle CorFmWme.and Finalize Plans 1 4 14 B 16 7,686.44 TaskTotall 0 16 18 48 0 80 $ 8,197.36 Task 6 - Fkml Ocuumenta 6.1 ltraernalOVOC 4 .8 8 4 24 I S 2,915.06 6.2 IMeal with County and.Submit Final Ravtsw 4 1 4 0 Is 963.64 6.9 lincoomate Comments arltl Final" Documents 4 4 4 4 4 1 20 Is 2,206.00 BA k4eel with Ckmnly and Submit Final Documents. 4 4 8 is 063.64 Teak Total 8 20 m B 4 60 Is 7,04e.16 Teak 7 • code AdopOan Process Support 7.1Provlde.Metedals anti suppGri 2 2 2 2 8 79020 7.2 Attend Meetings with Chun 4 4 8 ME 7.3 Make Revisions to Code and Plana 4 4 4 2 14 g 1,452,72 Ts" TOW 0 - 10 10 6 4 30 $ 3, LBS PW'JA Y TOTAL WURB AKD LABOR FEE EBTIMATE 3c 1b4 124 e2 Off i 414 # 46A" b4 Relmburable direct HwUlery Cods Meme DSO,535MM Sit Round Trio Wenatchee to Ellensburg at 70 Was EachW 3 44BAC Prkai 100.00 Total Rermbundble Expsmaa 8' 549A9 TOTAL FEE # 47,178.84 Abnmgsnm tRom arve # 2,821.76 TOTAL COMACi AMOUNT , $ 50,MAD FEF ESTIMATE 1 01 1 711772017 0 an on long logo III ones Box to me 11 move memo oil logo III 11 IN in mmom mill son long III III 11 11 Is go in IN NINE Bill logo sell Kim III soon logo III III 13 go 11 Bill logo III NINE III 11 mom 0 1 an NINE moll III NINE III on me so D soon loll III Bill III 0 loss Bill man long oil III as in I 11 on loss NINE son sell sell go 11 of in NINE soon men loss III 13 IV on NINE loll mom I go .1 1 long in 1j No in long soon III logo go 11 on in loll logo oil NINE in 11 so me on so line NINE men mill on 111 . U on loss long mom IN e iimoll iliiloll ilii iiioil iiiiloll ii ii U I an is NINE I sell III NINE I No 11 11 is of am an SEEN Boom Boom moll son III I I me I no 0 is on 11 no so NINE loll oil I U 8 .12 loss soon oil so III to 11 M 1111 1111 go 111 11 0 INS oil 0 11 of IN loss loss III oil on I IN III 1 11 'o a So loss oil I lion III 11 IN go soon I lime III U of Al loin is logo Sol 0 of ME of logo logo IN 11 I long son 1 0 fig SI I in NINE III 11! i/ IN IN logo 111 11 (in do IN loll 11 NINE mom �11 0 41 go on No IN in Noll loll III logo oil 11 a loll III mill I'm oil 111 41111 sell oil soon oil 0 Al Is loss III 1Ej U so NINE NINE oil loss Big on 0 so Boom Bill son loss III in 1111 OR 1111 oil 111111 v cu m 'm a c ca m a FF V N A N O F+ V 0 � N n r T_ n z Q o -n 1 z m n�I ❑_ m n D n -n 0 -nmz `z m� -0 � z n z 1 p " -nn n z* K 0, m-0 C C Mm m D > ZZ �m C z � o O Z z n o n r v+ ❑ p p cZi� c�i� 0> I4A p plz n v "' v '—' n Ln c Z Q O Z Z'Z O ❑ O O H iEZA �+" D zn N Z N IN Z O A Vo p. F l w m A 00 rj 00 v W �o O 1 c n70 m n Nn n V) O � Z O c 0 4 = z> m rn T m N N Ti m L6 o C O n " rn n n m r vri o N DRIVING COMPLAINTS z o r.r rn EXTRA PATROL REQUESTS m m o a a DISORDERLY COMPLAINTS O z 92 0 w �"', TRAFFIC STOPS m Z H o w o MVAS - y ,l INFORMATIONAL v w o N TRAFFIC ENFORCEMENT v u+ WARNINGS ISSUED p z u+ n, INFRACTIONS ISSUED S A J V Y Y V V V V V V V tii J V V V V V V �V V V V V J V V V J V V �aaa�b�b� V { M T S z o O mV s s p p o p O 4 Oy I o e V m C Z s v 00 O s S V s s 8 J V V S s v m� �s to m :O O W y m m N N A r O ti W N AN a s [u to u~i N N OIWp 0 N N N VN V GG ONO d d N N 6~S 0�0 N Obi A A N Y V O A tNO N �i H A OI N m T m m $ G1 m F �➢ C O Y b E> A> C �4Zi IP a IA fps NR z z m3R yRRRR Rliil�Dp AA CI RRG Z .: y - 3A Fn T se T T T ! n y Z Z Z Z 8y n f1 ny� n n n n n n p ff n n n n n n n f] A F n n n yy� I O G7 G7 G1 4l 7� O `^ O O O O Q O O O I Z fi) G � G FIT v E zz Z Z zzggzNZzZ=Zm.G22=22 yYglz�pyl�+7F�+1y+gyLQ+�pyF�+ 00 ooggoag0 ��, i5�2525i5 Z525t5tS I o m m �" _T W W W W m W W X Z z Z Z z z Z ZZ Z Z 2 2 Z Z z Zo Z 2 Z Jac ]rc ]c R N IC N 1e N N N N N N VI �i N N N N I(' isi N N N o v v v v o o v. v` v o o m m 4 rn m m m m m m __ _ Z 2 z x z 2 2 2 Z Z z M 2 Z z z Z Z Z Z g r z G G G G z G1 4l GY G1 G] L1 L1 Cf N G7 sn G1 G1 G1 Ll G7 O G1 GI �i a 0 O a O OEM. 0 g g G1 z z +� z Z z Z Z z z m m v v b v v O O v b Z v v v v v v v O b 0 L- W O N N N N H o N v v v 22 R v o v 2 o_ o b z G1 GZf GAZA1 GZl CZ1 CZi GZ7 O O O g 0 0 0 0 0 'v a- S v vZ O p ^� Yi'1 N 6 A C, rn In mm E i 0998 Z88K C K{,CG,m8 tG. .� m n O O OOvov m z�12Q3ooaa�xo���o��3r�,,.pa'�zb£�0�. z z z z z z z z z z 9 z z z z z z o0zozz33 - zzzz zz222 z`z 2zzzz 2 GIG15Cc�C ��� o�Gf G]cf c7 G�mmc�G�o OOG�m-O cl 0m Glmm z i ,y i'i za3 z azzz m mZ�`aD om v O 2 z i b -1 0 0 GZl 9 2p o v v v z+ .. c li. o G G G a i g= z 13 �A1 ((finn ��nnimp A P P 0 �Zn ,L x x x x x x DRIVING COMPLAINTS x x x EXTRA PATROL REQUESTS z x x DISORDERLY COMPLAINTS z I2 x xxxxxxxxx xxxxxxxxxxxx TRAFFIC STOPS 0 MVAS x x 1-1- x x x x x x INFORMATIONAL pp x x TRAFFIC ENFORCEMENT 9 x x xxxxx x xx T xxxxxx WAIINING5LS5UEDx INFRACTIONSISSUED :� C x N p ?s 1 n o c z n ° m N N n 2 m N m T O � !n C O m mn rn r G M z 0 cl 4 i I I DRIVIIVG COMPLAINTS EXTRA PATROL REQUESTS MSORDERLV COMPLAINTS TRAFFIC STOPS WAS INFORMATIONAL TRAFFIC ENFORCEMENT WARNINGS ISSUED INFRACTIONS ISSUED F+ N r r r V �j V V ,Ls} V,, N H V i"I1 IppQn �IVpp �Q IC In Ol m m l p W WN pp op p-pO pp N N 1T N llI N I+I q o � o� o p�� o� 4 V Ill N N p o of � V of 9 q q Jo 9 0 V 0 V W M W V V l. WI�� �ElyyG W uNi W N F+ N N F+ F+ 1+ G W r ; w g J Ol Nil N N G 3 iY W INiI G G r r N N r ti G A A N N A W f)l O0 [~II Imp W V W py b A b A b N A O if A A P = 0 0 c O % s % ? = 3 n 3 Ct 41 41 G1 G1 L1 G7 G7 41 C1 ��mm m�'3 W LA^I-ii Gv��x Fmmmmm zzzlz"zzzzzzz I `n Ian n n n n n J o a o � n n� ❑ n� n n x o z o `l _ o oo F, n n n o n n 'n n n o o n n o i i b i i •p m m m m m ry�ry�l O Q O:E :E :E •qy ``88'' 00 {.�J In j.�1 m 25 25 25 ii ZS t5 $ F F F F 9 F O O b O O S W 55 VE m Lii Vi m m m ttl W W z W m is Z O y yyO gpOO O_Oq ~t F F II�3 F a F F rC p pm ❑❑p p 6 m � Z�II Z �in Gv 2 z z z r Z I � Z m I�G l� U�] �OpO� Z Y z b" W a -i 1 ? y F m m O O z z z z z z zo Z zo z OI O O O O v v o y A O A v o N N Yl p v v z z i N Vl N N 0 0 a 0 z -2222'2?? N N 0 0 z 0 y C7 C7 X 0 0 0 0 0 m 0 ❑ p P A F agvvvvg F F F F V F p❑ 0 0 Y Y T x x F m S 2 Z O O Q x x apc D $ m x m mCi C nT ❑ (C_�'�l (2('l �2�'lI ((�� F F C C x 2 m 'b y 4 m ❑❑ o v v ❑ m m c- 00 OO F O m F O F b F F F 2 z Z z z A p o ➢W Qn A Fn F D 9 `d A 7rt b A y p g2_z Z Z z C z z F Z Z --------- z$= Z= z Z p I GZ)GZl LZ1 GZ'f C1 m O C S =� O 47 D 2 GS c old C CI GI G] G1 GI L] 47 Z Gi m C C S 0=> O z z 2 t I v p C C I �>+1 I O m O Z C, m- O� � Y. C m V 1000 ' = cm p pF c o � p q a b yli O 3 v z ❑ �rnc m F � 2 0 x m oo � O m Am FA m m tq N C x x u a• A x X x x x x X -H-1- X% x x X iV x x x x X x x x x X t t 4 x x x Ix x x x x xx,rl, a x x x x x x u x x x x x x x x x x x x x x ;N x x :� C x N p ?s 1 n o c z n ° m N N n 2 m N m T O � !n C O m mn rn r G M z 0 cl 4 i I I DRIVIIVG COMPLAINTS EXTRA PATROL REQUESTS MSORDERLV COMPLAINTS TRAFFIC STOPS WAS INFORMATIONAL TRAFFIC ENFORCEMENT WARNINGS ISSUED INFRACTIONS ISSUED WHMIMM �µ''' YOsGoNN, N Y.V[�IB1 pNN� ✓N}�GvN�'uoo�V�"n'i ooINJno:JV�o1D4l ,Vt�o1.1, �1!�C+n1 lIIINV YO {wit Owl W W Ili 111 N N N UI F+ w l.+ N N dd y �+ pp Ill G y N N V GO } N+, A A O W O A W W N F+ t+ w H F+ •+ dl N FT Lip O N N O W O ill V W W [5 A A R N ii A M k l.a �l •• p�p Lj p�p �, lY � W W 41 W V F' N J a vc�mmci c� c�c�c�m $xxc cr -+3 g33 33 3j 3 r2Scccc.SWA p > Ril m p R A R A A A ��nl1 C C -1 m m !rnn �+ m m u� 6'1 5 W w O '� Z z 2 R A n t z O G7 V7 CI C1 G] .n Gf z i z z z z Y z z c 22@19!2003 _ a �z g 5 5 5 c a r 3 3 3 3 3 ri n s r' n n 5 n S S S n n n n n n l odd o�ooCda���do�uzi z ` cziczic=i�A� �� ��9z b b S v v b b b y L v b E b y b b b v V V b b 4 v b b SS Ypppaa SS SS pp��IY$ pqpp pppp SS 9 CO ppYt y b b L i y e V b 9 i p L L V O � W W W m W m A W W m R�� F m R lry f1I �lI acscacvc4-a�acisscac5amvmv�bsemb vv�vvbvvvmvbvvvvvv , C C C C C C C C C C C 0 0 0 m0 m m rn m m m m m m m m S S 2 2 02 S o 0 o a 9 9 2 5 2 2 2 b y 2 S S 2 b x S 2 2 2 z 2 x 2 �mmmwg =�9 �m o$og_oaA$oaaa o$ooaaa$oo�aoa$ b m p Q S 9 V O b y Z 2 OOOOO[ dO$O� 1 yti� Y� y1-1 -Zi Z 2 5 2 2 2 2 x S 2 2 R A 7• R R A ,b A R A R A p R 9 R R A ,b A .b A R R v v b y b y o v o v z v 2 v v v v v x v v o v v v v v v v v v a v Ap $v v z z d v o v o 0 $ a O yyO y C1 3D 3 D 4c Sc m 70 C pp1 d O QQ O n A O v A A m C z z 5 L z lx m Z v v = z O v v rn o o o R o 0 t v ? A R v v v o c D cc z=zzzozzz��5zz�5sa==zz r- N -M Zcluiclmc� � a z�Z mom cl °�czi0Z G)MZ C 2 pA m Y �i C C c a z z Ent Gti F o v czi S & v S c N 3 3 w Wi 7 7+ B+ @+ in Z z � m n ABY �A� 11 N � �IIIIIRII 1�0 111 i 6 7� Cm � � 7C v { ,i; � N 46 N n N t+ �i C V 0- > > � N W � A N � � y m — n m r DRIVING COMPLAINTS EXTRA PATROL REQUESTS DISORDERLY COMPLAINTS TRAFFIC STOPS WAS WFORMATEONAL TRAFFIC ENFORCEMINT WAW,KNGS ISSUED INFRACTIONS ISSUED