1. Call to Order
2. Solid Waste Updates
3. Discussion on Kittitas County Transfer Station Basis of Design Report
4. Maintenance and Project Updates
5. KVEC - Updates *
6. Discussion of Bowling Alley Contents and Proposal Review
7. Enviro Issues Presentation
8. KCSW Facebook Page Discussion
9. Shady Brook Bids
10. Jail Update
11. Bowling Alley Update
12. KVEC Update - Maintenance and Repairs
13. Other business
14. Adjourn
Created on 4/6/2017 2:28:31 PM
COMMISSIONERS' MINUTES
KITTITAS COUNTY, WASHINGTON
BOCC CONFERENCE ROOM
REGULAR MEETING
Tuesday 2:00 PM April 11, 2017
Board members present: Paul Jewell, Laura Osiadacz, Obie O'Brien
Others: Patti Johnson, Lisa Lawrence, Jim Goeben, Jill Scheffer
and Penny Mabie
REGULAR MEETING
COMMISSIONERS
Meeting called to order at 2:04. The Study Session that was held
on February 14th, 2017 per code but inconsistent with publishing
dates scheduled to be re -held on March 14th, 2017 but was
cancelled due to scheduling conflicts was re -held. The items
from that agenda were noted on this agenda with asterisks. There
was no public to comment and no further discussion on was held
on the agenda items from that date.
Enviro Issues Presentation: Patti Johnson introduced Penny Mabie
with Enviro Issues. Penny gave a presentation on the
capabilities of an online platform for public education and
participation that would tell the story throughout the Transfer
Station Relocation Project. Discussion was held on how the
platform would work for the public including the capability to
comment, participate in surveys, the ability to gain access to
email notifications on upcoming meetings and give them access to
updates on the project. Further discussion included branding and
how the public comments were maintained.
KCSW Facebook page discussion: Patti brought it to the Boards
and IT's attention that the Transfer Stations were located on
Facebook and included comments. Discussion was held on the
concern of ownership and/or maintenance of the sites. It was
determined that these were check in sites only within the
program and not County owned documents or sites.
Shady Brook Bids: Patti informed the Board that she received 3
bids on the Shady Brook Project. She further informed the Board
that the apparent low bidder's Business License was expired. The
Board directed Patti to consider the apparent low bidder as non-
responsive and award to the next apparent low bidder. A brief
discussion was held the awarded Contractor demoing on site and
would be recycling as much as possible.
Jail Update: Patti informed the Board that the project was on
schedule and there were no additional costs on the project and
that substantial completion should be the end of June.
Bowling Alley Update: Discussion.was held on the status of the
future use of the Bowling Alley. The Board told staff they would
set up a meeting with the potential interest group and declined
a request to donate it to a Dance Company. Further discussion
included a County storage unit and at the very least the roof
needed replaced. The Board directed staff to get formal bids on
replacing the roof.
KVEC Update - Maintenance and Repairs: Lisa Lawrence informed
the Board that an RV Pedestal was of concern and maybe wired
illegally with an estimate of $2500.00. Jill Scheffer informed
the Board it was looking more like $3300.00. Lisa informed the
Board that the forklift needed repairs with an estimate of
$800.00 and that the roll -up door to Bloom would be replaced on
April 13th. Further discussion was held on the Bloom Project that
heating it may not be an option since it doesn't meet the energy
code and that a variance on the ordinance would be needed.
Patti informed the Board that
next phase of funding and bid
asked the Board for direction
directed staff to finish to a
re -apply for funding next yea
no funding was available for
the Project was ready to start the
stage by the end of July. Patti
on moving forward. The Board
logical point and that they would
. Further discussion was held that
he Arena Project.
Other Business: Patti updated the Board on the Auditor's Project
stating that Tri -Valley Construction would be providing a cost
to remove the asbestos. Discussion was held on estimates and
durability of stretch carpet.
A brief discussion was held on Airport Runway Project.
Meeting adjourned @ 3:00pm