HomeMy WebLinkAbout2017-02-27-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday February 27, 2017 -1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Fees Update 3. Naneum Road Bridge 4. Other business 5. Adjourn Created on 2/24/2017 8:23:27 AM `t CASCA�F.S.., l0 }}IfCp�G yA KITTITAS COUNTY 1EKX=X1rA !; COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director STUDY SESSION MINUTES February 27, 2017 THOSE PRESENT: Paul Jewell, Laura Osiadacz (BOCC); Mark Cook, Luke Huck, Kathy Jurgens, Candie Leader (DPW); Dan Carlson, Doc Hansen, Stephanie Mifflin (CDS) GUESTS: None FEES UPDATE: Kathy Jurgens presented spreadsheets with the updated information requested by the BOCC at the last Study Session. Staff reached out to other agencies for comparable fees and found that the fee schedules are either outdated or do not have fees implemented. Discussion was held. Board Direction: BOCC requested that staff do more work on the fees update. NANEUM ROAD BRIDGE: Luke reported that in late November staff found damaged timber caps and timber uprights along with a concrete abutment footing being undermined approximately 2.5' which has resulted in a vertical crack in the center of the abutment extending through the footing. Luke stated that a task order has been agreed upon with WSDOT that would provide the repair and the purchase of the materials and all costs associated with the repairs. The repairs must be completed by April 151, 2017; however, the timbers that were ordered in mid-December still haven't arrived and may not be delivered until mid-March. Commissioner Jewell inquired if there are any other options to fix the bridge if the time frame is not met. Luke replied that other avenues have not been explored and Mark added that only temporary fixes can be performed. Luke stated that if the repairs are not completed by the deadline additional consultant inspections will be necessary and may require the bridge to either be reduced to one lane for through traffic or closed entirely until the repairs can be completed in the fall of 2017 following the commencement of the irrigation season. Board Direction: No Direction. �—c4Lk Mark Cook, Director of Public Works 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 §§ !I - � : r , ; , ; w § , • , ; | \ / � !! ;� !� ■� ; ! \ � .( 3- - - \ � (,§ ((/ \,§ /t/ � �•� � � 2� � � � ! ) :88 §§ (8 (\ !g 2 ; d -\ §§ 11 1 nppEppua.i SuSiaS d.�.22Sp FpX 2 i.{ Ye¢&e'�33 � 3 sZ g i E Ias} aa9a'e li$!I � i I j • � G � 1 .• j e I s e e • $ N III � 1 tl w i &.. � �9CS8 $ �^:: @: BImY�B � a j I S 8 i'W' Y E !1 • Y ° Q ALV Y rS w Yld rl C @ $ c u : 1" u : E $ g1 ^z 8#-nn--#----$XMR-- S I 1 s$y$$akNozsz„ a$ i 3 j `»' "«• i $ '�' yy 6 $ pp } 8Yt%'8'�§Sx�."z�Ls°C$�."asii ^ 8 $ a $ a $ $ $ 588885$ea8B8a$88a8$8 rr rr £, rr rri rr Irl rr I $$ 8 T 7m t 8 $ $8 a8 $$ $8 $ ......E4! Ii a$ s N N N s 8 I' $ «««" « —�««« i I z j N I1 89 m i i i i 1 i i i F i j E r; i I i j I N i t 1 1 i 1 1 1 I v I & $ 8 B 8 $ 8 $ 8 8 $ 8 lil 01 £F £i FF F£ ££ £ i£ ii ££i Fi Fi $ f$ a I a E.B. $e. 1.8.B. E.. 1 $$. « i- - - „Y „ « 1- i« s I 1««„ i „« i « „« P is I ««.,. „„ j1 . „ « « «I.n KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: February 27, 2017 ACTION REQUESTED: Informational Only BACKGROUND: Public Works entered into an agreement with the Washington State Department of Transportation (WSDOT) to repair Bridge Number 89091 on Naneum Road. The repairs needed for the bridge include the replacement of the timber caps and timber uprights which are showing signs of significant deterioration. Additionally one of the concrete abutment footings is undermined approximately 2.5' which has resulted in a vertical crack in the center of the abutment extending through the footing. Public Works agreed with a WSDOT provided repair estimate of $23,676 which included the purchase of the materials and all costs associated with the repairs. Both WSDOT and Public Works agree the repairs must be completed by April 1st 2017. Recently it has been brought to our attention that the materials may not be delivered until mid -march 2017 which could hinder the ability for us to meet the April 1st deadline which coincides with the startup of the 2017 irrigation season. Public Works recognizes that if these repairs are not completed the need for additional consultant inspections will be necessary and may require the bridge to either be reduced to one lane for through traffic or closed entirely until the repairs are completed in the fall of 2017 following the commencement of irrigation season. INTERACTION: Public Works RECOMMENDATION: Continue with the acquisition of materials, and proceed appropriately to protect the safety of the public if the repair deadlines are not met ATTACHMENTS: WSDOT Repair Estimate Task Order Agreement LEAD STAFF: Lucas Huck County Engineer AdMk Wo nt shington State Departmeof Transportation COST ESTIMATE Estimate Id: 27943 DATE: 12/19/2016 ORG CODE 455560 LOCATION OF WORK Naneum road Bridge #89091 DESCRIPTION OF WORK: Replace all timber in kind at bent on the Naneum road bridge. ESTIMATE LABOR DESCRIPTION QTY REG. HOURS O/T HOURS AMOUNT Maintenance Lead Tech. 1 60.0 0.0 $2,721.00 Maintenance Mechanic 3 7 60.0 0.0 $17,140.20 TOTAL LABOR ESTIMATE: $19,861.20 EQUIPMENT TYPE QTY HOURS AMOUNT 0430 - Truck; 1 Ton; with Service Body; Gas 1 50.0 $227.50 0827 - Less Than 38K GVWR; Crew Cab (Road Warrior) 1 20.0 $214.20 0852 - Truck; Bridge Repair; without elevating platform 1 50.0 $433.50 0853 - Truck; Bridge Repair Support; with Hydraulic boom Crane; 54,000 GVW; 6x4 1 50.0 $568.00 TOTAL EQUIPMENT ESTIMATE: $1,443.20 MATERIAL TYPE QTY AMOUNT $0.00 TOTAL MATERIAL ESTIMATE: $0.00 MISCELLANEOUS CHARGES - DESCRIPTION QTY AMOUNT steel and misc. parts 1.0 $600.00 timber 10" x 10" x 24' 2.0 $794.52 timber 10" x 12"x 26' 1.0 $516.44 timber 3" x 10" x 26' 2.0 $258.22 timber 6" x 10" x 24' 1.0 $202.00 TOTAL MISCELLANEOUS ESTIMATE: $2,371.18 TOTAL CHARGES: $23,675.58 MAINT. AREA LOCATION: REGION South Central CONT. SECTION WORK ORDER NO: CREATED BY: DATE: Jason Goetz 12/19/2016 OFFICE USE ONLY: Estimate Only: Y Revised Estimate: N Work Completed: N Work Completed Date: Page 1 DATE PRINTED: 12/19/2016 Washington State Department of Transportation Agreement No. (To be filled in by WSDOT Program Manager) Task No. Amendment No. a Work Order No. no 16ttitas County — Naneum Road - Bridge #89091 over the Highline Canal rolect Manaeer n ormatron Task Order STATE Program Manager Phone No. Jim Henderson hende' wsdot.wa. ov 509-577-1960 Mailing Address Fax No. 2809 Rudkin Road Union Gap, WA 98903-1648 509-577-1959 Kittitas County Project Manager Phone No. Luke Huck County Engineer S09-%2-7018 Lukas.Huck co.kittitas.wa.us Mailing Address Fax No. 411 North Ruby Street, Suite 1 509-962-7663 Ellensburg, WA 98926 Scope of Task Order Provide brief description of work to be performed and reference attachments to include proposed work schedules, a detailed cost estimate, and any additional termstconditions. Repairs; Naneum Road Highline Canal Bridge #89091: WSDOT will replace all wood timbers, bents, piers, caps at mid span; pier 2 and repair the undermined area at the south abutment. Repairs will include prep work, water diversion as warranted, cribbing forjacking, removing existing wooden timbers, placing and securing new timbers, forming/grout work at the abutment and general site cleanup at the end of the project. See attached photo of the area to be repaired. WSDOT will provide labor, equipment, and repair materials for the work outlined above. WSDOT will follow Regionally accepted Best Management Practices when working in environmentally sensitive areas unless other direction is provided by the agency. The Agency is responsible for waste materials resulting from the repairs and will clean-up the removed waste material. The Agency will provide a mini excavator with operator for work in the canal and supplement labor for the project. The Agency is responsible for any environmental/other required permitting and will permit the work accordingly. The Agency will provide all necessary public notification & traffic control for the repairs. The WSDOT will provide repair details, materials, equipment, and personnel to replace/repair noted items. 1/2 Task Schedule and Cost Work is anticipated to begin January 1, 2017 and completed by April 1, 2017. The estimated cost of $27,817; includes labor, equipment, and material, see attached. Does not include traffic control. Task Start Date January 1. 2017 (No payment for work done PRIOR to this date) Task End Dale April 1.2017 (No payment for work done AFTER (Itis date) Task Amount actual cost Approval Signatures """'Note: Two original signed Documents are required."*" Washington Stale Department ofTmnsportation Ile' A A ministmtor for Maintenance Date Distribution: Originals: Kinitas County, Public Works Department Title: Public Works Director Date ❑ City Pgm. Manager Copies: ❑ STATE Pgm. Manager ❑ STATE OR Financial Services ❑ STATE OR Local Programs 12 ❑ Other ,l1 •I• $Iat- QQ �a • . . of Trana � tnfii,. D ['6i r. � 011 T k_ Page 1 DATE PRINTED: 12/20/2016 Estimate Id: 27943 —16—RG DATE: 12/192016 CODE 455560 LOCATION OF WORK Naneum road Bridge #89091 DESCRIPTION OF WORK: -Replace all timber In kind at bent on the Naneum road bridge. -fill void under abutment no trafidc control Is Included with this estimate. ESTIMATE LABOR DESCRIPTION QTY REG. HOURS OIT HOURS AMOUNT Maintenance Lead Tech. 1 60.0 1--LO= .0 $3,007.25 Maintenance Mechanic 3 7 60.0 0.0 $18,943.35 TOTAL LABOR ESTIMATE: $21,950.60 TYPE QTY HOURS AMOUNT 1 Ton; with Service Body; Gas ff 1 50.0 $251.43 han 38K GVWR; Crew Cab (Road Warrior) 1 20.0 $236.73 Bridge Repair; without elevating pOatform 1 50.0 $479.10 0653 - Truck; Bridge Repair Support; with Hydraulic boom Crane; 54,000 GVW; 6x4 1 50.0 $627.75 TOTAL EQUIPMENT ESTIMATE: $1,595.02 MATERIAL TYPE QTY AMOUNT $0.00 TOTAL NAATERIAL ESTIMATE: $0.00 Page 1 DATE PRINTED: 12/20/2016 nxk� •torn .Imes Dc p!.:e. trrrt nl .�f Tr,vm sF, t.� ts,�r COST EST9M&TF MISCELLANEOUS CHARGES - DESCRIPTION QTV _ _ - AMOUNT Plywood 3.0 $165.78 sleet and misc. parts 1.0 $663.12 TAMMS Form and Pour 64.0 $1,485.39 timber 10" x 10"x 24' 2.0 $878.10 timber 10" x 12" x 26' 1.0 $570.77 timber 3" x 10" x 26' 2.0 $285.38 timber 6" x 10" x 24' 1.0 $223.25 TOTAL MISCELLANEOUS ESTIMATE: $4,271.80 TOTAL CHARGES: $27,817.42 MAINT. AREA LOCATION: REGION South Central CONT. SECTION IWORKORDERNO: CREATED BY: DATE Jason Goetz 12/1 912 0 1 6 OFFICE USE ONLY: Estimate Only: Y Revised Estimate: N Work Completed: N Work Completed Date: Page 2 DATE PRINTED. 12/20/2016