HomeMy WebLinkAbout2017-02-27-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday February 27, 2017 -1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Fees Update
3. Naneum Road Bridge
4. Other business
5. Adjourn
Created on 2/24/2017 8:23:27 AM
`t CASCA�F.S.., l0 }}IfCp�G
yA
KITTITAS COUNTY
1EKX=X1rA !; COUNTY
DEPARTMENT OF PUBLIC WORKS
Mark Cook, Director
STUDY SESSION MINUTES
February 27, 2017
THOSE PRESENT: Paul Jewell, Laura Osiadacz (BOCC); Mark Cook, Luke
Huck, Kathy Jurgens, Candie Leader (DPW); Dan Carlson,
Doc Hansen, Stephanie Mifflin (CDS)
GUESTS:
None
FEES UPDATE: Kathy Jurgens presented spreadsheets with the updated
information requested by the BOCC at the last Study Session.
Staff reached out to other agencies for comparable fees and
found that the fee schedules are either outdated or do not have
fees implemented. Discussion was held.
Board Direction: BOCC requested that staff do more work on the fees
update.
NANEUM ROAD BRIDGE: Luke reported that in late November staff found damaged
timber caps and timber uprights along with a concrete
abutment footing being undermined approximately 2.5' which
has resulted in a vertical crack in the center of the abutment
extending through the footing. Luke stated that a task order
has been agreed upon with WSDOT that would provide the
repair and the purchase of the materials and all costs
associated with the repairs. The repairs must be completed by
April 151, 2017; however, the timbers that were ordered in
mid-December still haven't arrived and may not be delivered
until mid-March. Commissioner Jewell inquired if there are
any other options to fix the bridge if the time frame is not met.
Luke replied that other avenues have not been explored and
Mark added that only temporary fixes can be performed.
Luke stated that if the repairs are not completed by the
deadline additional consultant inspections will be necessary
and may require the bridge to either be reduced to one lane for
through traffic or closed entirely until the repairs can be
completed in the fall of 2017 following the commencement of
the irrigation season.
Board Direction: No Direction.
�—c4Lk
Mark Cook, Director of Public Works
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
§§
!I
-
�
:
r
,
;
,
;
w
§
,
•
,
;
|
\
/
�
!!
;�
!�
■�
;
!
\
�
.(
3-
- -
\
�
(,§
((/
\,§
/t/
�
�•�
� � 2� � �
�
!
)
:88
§§
(8
(\
!g
2
;
d
-\
§§
11
1
nppEppua.i SuSiaS
d.�.22Sp
FpX 2
i.{ Ye¢&e'�33 �
3
sZ
g
i
E
Ias} aa9a'e
li$!I
�
i
I
j
•
�
G
�
1
.•
j
e
I
s
e
e
•
$
N
III
�
1
tl
w
i
&..
� �9CS8 $ �^:: @: BImY�B
�
a
j
I
S
8
i'W'
Y
E
!1
•
Y
°
Q ALV Y
rS w Yld rl C @ $ c u : 1" u : E $
g1
^z
8#-nn--#----$XMR--
S
I
1
s$y$$akNozsz„ a$
i
3
j
`»'
"«•
i
$
'�'
yy
6
$
pp }
8Yt%'8'�§Sx�."z�Ls°C$�."asii
^
8
$
a
$
a
$
$
$
588885$ea8B8a$88a8$8
rr
rr
£,
rr
rri
rr
Irl
rr
I
$$
8
T 7m
t
8
$
$8
a8
$$
$8
$
......E4!
Ii
a$
s
N
N
N
s
8
I'
$
«««"
«
—�«««
i
I
z
j
N
I1
89
m
i
i
i
i
1
i
i
i
F i
j
E
r;
i
I
i
j
I
N
i
t
1
1
i
1
1
1
I
v
I
&
$
8
B
8
$
8
$
8
8
$
8
lil
01
£F
£i
FF
F£
££
£
i£
ii
££i
Fi
Fi
$
f$
a
I
a
E.B.
$e.
1.8.B.
E..
1
$$.
«
i-
- -
„Y
„
«
1-
i«
s I
1««„
i
„«
i
«
„«
P
is
I
««.,.
„„
j1
.
„
«
«
«I.n
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: February 27, 2017
ACTION REQUESTED: Informational Only
BACKGROUND: Public Works entered into an agreement with the
Washington State Department of Transportation
(WSDOT) to repair Bridge Number 89091 on Naneum
Road.
The repairs needed for the bridge include the
replacement of the timber caps and timber uprights
which are showing signs of significant deterioration.
Additionally one of the concrete abutment footings is
undermined approximately 2.5' which has resulted in
a vertical crack in the center of the abutment
extending through the footing.
Public Works agreed with a WSDOT provided repair
estimate of $23,676 which included the purchase of
the materials and all costs associated with the repairs.
Both WSDOT and Public Works agree the repairs
must be completed by April 1st 2017. Recently it has
been brought to our attention that the materials may
not be delivered until mid -march 2017 which could
hinder the ability for us to meet the April 1st deadline
which coincides with the startup of the 2017 irrigation
season.
Public Works recognizes that if these repairs are not
completed the need for additional consultant
inspections will be necessary and may require the
bridge to either be reduced to one lane for through
traffic or closed entirely until the repairs are
completed in the fall of 2017 following the
commencement of irrigation season.
INTERACTION: Public Works
RECOMMENDATION: Continue with the acquisition of materials, and
proceed appropriately to protect the safety of the
public if the repair deadlines are not met
ATTACHMENTS: WSDOT Repair Estimate
Task Order Agreement
LEAD STAFF: Lucas Huck
County Engineer
AdMk
Wo
nt shington State
Departmeof Transportation
COST ESTIMATE
Estimate Id: 27943
DATE:
12/19/2016
ORG CODE
455560
LOCATION OF WORK
Naneum road Bridge #89091
DESCRIPTION OF WORK:
Replace all timber in kind at bent on the Naneum road bridge.
ESTIMATE
LABOR DESCRIPTION QTY REG. HOURS O/T HOURS AMOUNT
Maintenance Lead Tech.
1
60.0
0.0
$2,721.00
Maintenance Mechanic 3
7
60.0
0.0
$17,140.20
TOTAL LABOR ESTIMATE: $19,861.20
EQUIPMENT TYPE QTY HOURS AMOUNT
0430 - Truck; 1 Ton; with Service Body; Gas
1
50.0
$227.50
0827 - Less Than 38K GVWR; Crew Cab (Road Warrior)
1
20.0
$214.20
0852 - Truck; Bridge Repair; without elevating platform
1
50.0
$433.50
0853 - Truck; Bridge Repair Support; with Hydraulic boom
Crane; 54,000 GVW; 6x4
1
50.0
$568.00
TOTAL EQUIPMENT ESTIMATE: $1,443.20
MATERIAL TYPE QTY AMOUNT
$0.00
TOTAL MATERIAL ESTIMATE: $0.00
MISCELLANEOUS CHARGES - DESCRIPTION QTY AMOUNT
steel and misc. parts
1.0
$600.00
timber 10" x 10" x 24'
2.0
$794.52
timber 10" x 12"x 26'
1.0
$516.44
timber 3" x 10" x 26'
2.0
$258.22
timber 6" x 10" x 24'
1.0
$202.00
TOTAL MISCELLANEOUS ESTIMATE: $2,371.18
TOTAL CHARGES: $23,675.58
MAINT. AREA LOCATION:
REGION
South Central
CONT. SECTION
WORK ORDER NO:
CREATED BY: DATE:
Jason Goetz 12/19/2016
OFFICE USE ONLY:
Estimate Only: Y
Revised Estimate: N
Work Completed: N
Work Completed Date:
Page 1 DATE PRINTED: 12/19/2016
Washington State
Department of Transportation
Agreement No. (To be filled in by WSDOT Program Manager)
Task No. Amendment No. a Work Order No.
no
16ttitas County — Naneum Road - Bridge #89091 over the Highline Canal
rolect Manaeer n ormatron
Task Order
STATE Program Manager
Phone No.
Jim Henderson hende' wsdot.wa. ov
509-577-1960
Mailing Address
Fax No.
2809 Rudkin Road
Union Gap, WA 98903-1648
509-577-1959
Kittitas County Project Manager
Phone No.
Luke Huck County Engineer
S09-%2-7018
Lukas.Huck co.kittitas.wa.us
Mailing Address
Fax No.
411 North Ruby Street, Suite 1
509-962-7663
Ellensburg, WA 98926
Scope of Task Order
Provide brief description of work to be performed and reference attachments to include proposed work schedules, a detailed cost estimate,
and any additional termstconditions.
Repairs;
Naneum Road Highline Canal Bridge #89091: WSDOT will replace all wood timbers, bents, piers, caps at mid span; pier 2 and repair
the undermined area at the south abutment. Repairs will include prep work, water diversion as warranted, cribbing forjacking, removing
existing wooden timbers, placing and securing new timbers, forming/grout work at the abutment and general site cleanup at the end of the
project. See attached photo of the area to be repaired.
WSDOT will provide labor, equipment, and repair materials for the work outlined above.
WSDOT will follow Regionally accepted Best Management Practices when working in environmentally sensitive areas unless other
direction is provided by the agency.
The Agency is responsible for waste materials resulting from the repairs and will clean-up the removed waste material.
The Agency will provide a mini excavator with operator for work in the canal and supplement labor for the project.
The Agency is responsible for any environmental/other required permitting and will permit the work accordingly.
The Agency will provide all necessary public notification & traffic control for the repairs.
The WSDOT will provide repair details, materials, equipment, and personnel to replace/repair noted items.
1/2
Task Schedule and Cost
Work is anticipated to begin January 1, 2017 and completed by April 1, 2017. The estimated cost of $27,817;
includes labor, equipment, and material, see attached. Does not include traffic control.
Task Start Date January 1. 2017
(No payment for work done PRIOR to this date)
Task End Dale April 1.2017
(No payment for work done AFTER (Itis date)
Task Amount actual cost
Approval Signatures """'Note: Two original signed Documents are required."*"
Washington Stale Department ofTmnsportation
Ile' A A ministmtor for Maintenance
Date
Distribution: Originals:
Kinitas County, Public Works Department
Title: Public Works Director
Date
❑ City Pgm. Manager Copies: ❑ STATE Pgm. Manager
❑ STATE OR Financial Services ❑ STATE OR Local Programs
12
❑ Other
,l1 •I• $Iat-
QQ �a • . . of Trana � tnfii,.
D ['6i r. � 011 T k_
Page 1 DATE PRINTED: 12/20/2016
Estimate Id: 27943
—16—RG
DATE:
12/192016
CODE
455560
LOCATION OF WORK
Naneum road Bridge #89091
DESCRIPTION OF WORK:
-Replace all timber In kind at bent on the Naneum road bridge.
-fill void under abutment
no trafidc control Is Included with this estimate.
ESTIMATE
LABOR DESCRIPTION QTY REG. HOURS
OIT HOURS
AMOUNT
Maintenance Lead Tech.
1
60.0 1--LO=
.0
$3,007.25
Maintenance Mechanic 3
7
60.0
0.0
$18,943.35
TOTAL LABOR ESTIMATE:
$21,950.60
TYPE QTY
HOURS
AMOUNT
1 Ton; with Service Body; Gas
ff
1
50.0
$251.43
han 38K GVWR; Crew Cab (Road Warrior)
1
20.0
$236.73
Bridge Repair; without elevating pOatform
1
50.0
$479.10
0653 - Truck; Bridge Repair Support; with Hydraulic boom
Crane; 54,000 GVW; 6x4
1
50.0
$627.75
TOTAL EQUIPMENT ESTIMATE:
$1,595.02
MATERIAL TYPE
QTY
AMOUNT
$0.00
TOTAL NAATERIAL ESTIMATE:
$0.00
Page 1 DATE PRINTED: 12/20/2016
nxk� •torn .Imes
Dc p!.:e. trrrt nl .�f Tr,vm sF, t.� ts,�r
COST EST9M&TF
MISCELLANEOUS CHARGES - DESCRIPTION
QTV _
_ - AMOUNT
Plywood
3.0
$165.78
sleet and misc. parts
1.0
$663.12
TAMMS Form and Pour
64.0
$1,485.39
timber 10" x 10"x 24'
2.0
$878.10
timber 10" x 12" x 26'
1.0
$570.77
timber 3" x 10" x 26'
2.0
$285.38
timber 6" x 10" x 24'
1.0
$223.25
TOTAL MISCELLANEOUS ESTIMATE:
$4,271.80
TOTAL CHARGES:
$27,817.42
MAINT. AREA LOCATION:
REGION
South Central
CONT. SECTION
IWORKORDERNO:
CREATED BY: DATE
Jason Goetz 12/1 912 0 1 6
OFFICE USE ONLY:
Estimate Only: Y
Revised Estimate: N
Work Completed: N
Work Completed Date:
Page 2 DATE PRINTED. 12/20/2016