HomeMy WebLinkAbout2016-12-12-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session REGULAR MEETING Monday, December 12, 2016 - 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Teanaway Road Bridge at Dickey Creek Bridge Strike 3. Wilson/Naneum Split Discussion 4. Other business 5. Adjourn Created on 12/8/2016 9:23:03 AM �p5CAD55._. TO 1, D �� ON KMITAS COUNTY THOSE PRESENT: GUESTS PRESENT: KZTTZTAtS COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director TEANAWAY ROAD BRIDGE AT DICKEY CREEK BRIDGE STRIKE: Board Direction: WILSON/NANEUM SPLIT DISCUSSION: 411 N. Ruby, Suite #1 Ellensburg, WA 98926 STUDY SESSION MINUTES December 12, 2016 Paul Jewell, Obie O'Brien. Laura Osiadacz (BOCC); Mark Cook, Luke Huck, Candie Leader, Kathy Jurgens, Tammy Burgess (DPW) Ryan Lyyski, City of Ellensburg Mark reported that on December 3, 2016, our Teanaway Road Bridge at Dickie Creek. The vehicle went through the rail into the river and has been removed. We since pulled all our rail and metal from the river as well. Staff has erected Jersey barrier and restricted the bridge to single lane. Stop signs have been put up on both ends of the bridge with advance warning signs. We are speaking with WSDOT to see if they have the capacity to oversee the bridge repair. We have contacted our on-call structural engineer to schedule an inspection of the bridge. Discussion was held. No Direction Mark gave background on the need to understand the counties obligation as to maintenance of the Naneum/Wilson split and the control structures. Currently, there is a small group of irrigators that are setting the flow control. The stream bed on Wilson has degraded. There is about a 3 foot hydraulic differential now between the bottom of Wilson Creek and Naneum. Our concern is that once the flow control is removed from Naneum most of the flow will divert into the Nanuem channel. Also, last year the bridge at Bar 14 Road flooded for about two months and again that's on the Naneum leg. We are concerned if we shift all the flow we will see some further closure of the bridge. We ordered title reports on both properties. One report was clean the other showed encumbrance and the easement describes the width of the easement and spells out the use of the easement. What we have not been able TEL (509) 962-7523 FAX (509) 962-7663 Dept. of Public Works Page 2 to find is the County's obligation associated with the easement. The City of Ellensburg historically has had its intake for city water at this location. That easement was vacated and the water pipe is essentially gone from this location. It appears it leaves our entity to be burdened with entry and maintenance at these structures. Now, the question is what involvement the Flood Control Zone District has in this or if it is considered road maintenance. The other piece is who acquires the approval to perform the work and goes after the HPA. Commissioner Jewell inquired about the need to dredge the channel and cleaning out the rock and why the topic is coming before them now; and when is the last time the channel has been cleaned out. Mark replied that he spoke with the Maintenance Manager, Jim VanDeVenter, and he stated that he doesn't remember when we were in there last. Luke Huck added that the last time it was cleaned out the water master performed the work. Discussion was held. Board Direction: No Direction OTHER BUSINESS: Mark presented the new fees proposal for Public Works. The new proposal is a full cost recovery model. The process used was not an easy task since the Department has more than one fund to manage. The first fund presented is the Airport Fund. The only cost currently for the fund is the card keys for access. The next sheet presented was for the Flood Control Zone District costs. The floodplain management permit currently is $180 and the true cost is around $4,000 and reflects true costs to process. Discussion on the spreadsheets was held. The last sheet discussed was the Road Fund. This includes access permits, franchises, road standards variance, etc. About a handful are new fees. And some there is a base fee and a 100% hourly value plus any hard costs associated with it. Commissioner Jewell had a few suggestions. He recommended that we get full cost recovery on the Shoreline permits. Discussion was held on full cost recovery for certain permits. Commissioner Jewell suggested looking at the 75% scenario for the LOMA(s). He also mentioned the solar panel permitting and raising the cost by about $5.00. Commissioner O'Brien agreed with that recommendation. Commissioner Jewell referred to the last spreadsheet for the Road Fund. He stated that some fees look fine others like the grading permit should be at full cost; haul routes to cost recovery as well; on system county road establishment should be at the top amount considering the amount of work to be done. He inquired about the right of way use special use permit. 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 3 Mark replied that it's for a right of way use impact. Luke added it's for like a bicycle event. Commissioner Jewell continued with going through certain fees. He suggested full cost recovery on lot consolidation. Mark stated that he wasn't expecting the BOCC to go through the permits one by one today and we can schedule something for another time to complete the process. Commissioner Jewell questioned the plat amendment and short plat amendment; he suggested going to full cost recovery on those as well. He stated that the development agreement should be at full cost recovery also. Mark stated that we have been seeing a number of civil plans for review that may or may not be reflective of our standards. Commissioner Jewell suggested a 50% cost recovery on this fee. Commissioner O'Brien suggested looking at the grading permit again for under 500. He'd like to see a penalty phase for this practice. Luke added that in some instances a hourly fee could be put into place for this also. Commissioner Jewell would like to avoid hourly rates except in some instances like an EIS or a full development agreement. He suggested a resubmittal fee or something similar. Further discussion was held. Jaw )6A nt //7 n M Mark Cook Public Works Director 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 12, 2016 TOPIC: Teanaway Road Bridge at Dickey Creek Bridge Strike ACTION REQUESTED: Information Only LEAD STAFF: Mark R. Cook RECOMMENDATION: This is an informational briefing requiring no recommendation from the Board of County Commissioners. BACKGROUND: On December 3, 2016, our Teanaway Road Bridge at Dickey Creek was struck by a car removing the entire downstream bridge rail. Upper County Road Foreman Chuck Reed responded deploying temporary warning devices — cones and barricades. On Monday morning, bridge inspector Bamford and Construction Manager Folk performed a detail inspection of the bridge. Following their inspection, concrete Jersey barrier rail is now deployed restricting the bridge to single lane traffic. The majority of debris from the crash has been removed from the river. DISCUSSION: We have contacted our on-call structural engineer (Monte Smith — Sargent Engineers) scheduling an inspection. County Road Engineer Huck has also contacted the WSDOT bridge crew for a review determining their ability assisting rail reconstruction. Winter repair is unlikely. We have deployed advanced warning signs and carsonite posts along the barrier rail — assisting night drivers locate the rail. Once we understand the cost impact, we may need to amend the annual construction program. FISCAL IMPACTS: At this time, it is our understanding that the individual responsible for the damage has not been located. Cost recovery seems unlikely. ATTACHMENTS: Exhibit 1: Damage Photo Public Works Study Session Briefing December 12. 2016 EXHIBIT 1: DAMAGE PHOTO Page 2 of 2 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 12, 2016 TOPIC: Wilson/Naneum Split ACTION REQUESTED: Provide Staff Direction LEAD STAFF: Mark R. Cook RECOMMENDATION: Support efforts removing accumulated streambed from Wilson Creek BACKGROUND: Recently, staff has been approached by City of Ellensburg staff regarding accumulated streambed gravel in the Wilson leg of the Wilson/Nanuem split flow control structure. Significant debris has accumulated adjusting streambed profile by approximately three feet in elevation. It is unclear as to how irrigation operation has proceeded in the past, but current operations appear to be insufficient allowing natural scour of the Wilson channel. It is assumed that current irrigation practices do not adequately consider impacts to both stream systems. Staff has received title insurance information for both properties associated with the flow control structure splitting Wilson and Naneum Creeks. The easterly property records an easement for access to repair and maintain the dike and structure and for "emergency purposes". DISCUSSION: While we have verified our right of entry and the ability to conduct maintenance and actions supporting "emergency purposes" — our obligation to perform these actions remains unclear. Electronic searches of Public Works records do not inform us of any recorded memorandums of understanding or other agreements stipulating our obligations. Management of the flow control structure remains private — supporting downstream property owner water rights. Dredging of the Wilson Creek streambed is required to avoid significant increases to Naneum Creek flow. Once flow control (boards) is removed from the Naneum Creek structure, the aggraded Wilson channel will likely see minimal flow. Allowing the bulk of combined flows into Naneum Creek is expected to adversely impact downstream residents. Our bridge at Bar 14 Road was adversely impacted last year owing to aggraded streambed conditions in Public Works Study Session Briefing December 12, 2016 Nanuem Creek. Increased flow into Naneum will likely result in road closure at our Bar 14 bridge. Cooperating with the City of Ellensburg is consistent with regional management of area natural resources. Our preference is to avoid being the Hydraulic Permit applicant as the impacts are not a direct result of any action in our control. Risks associated with channel mining at Wilson Creek are unknown at this time. FISCAL IMPACTS: Fiscal impacts at time are undefined. Cost sharing associated with channel mining at Wilson minimizes adverse unbudgeted impacts to the Flood Control Zone District. ATTACHMENTS: Exhibit 1: Easement Granting Access Page 2 of 3 Public Works Study Session Briefing December 12, 2016 EXHIBIT 1: EASEMENT GRANTING ACCESS Page 3 of 3 E A S E f! E\ l THIS IN'1EN71JR1.:, made this day of 196 by and between EDITtf T'HCMAS AS IFR S4Pt r: Tt,GRANTOR aril 1;';"}'ITAS COUNTY, SPATE OF WASHINGTON, GRANTEE, B:TNESSETdi The grantor for and in consideration of One Goll.ar (g1. -,O), the re- ceipt of which is hereby acknowledged, does by these presents gra:,t to the grantee an easement upon the following d=scribed real estate sit'_,,, in the County of Kittitas, State of Washington, to -wit: That portion of the N.Et 1;4 of the N -S_ 1/4 of Sccti.cn 12. 7`c.:as',iu 19 N. Rangc 19 F.., W.M., described as follows: A strip of land thirty (30) feet in width, lying westerly of, ��ijacent. to and parallel with the ,,surly bank of Nanemn Creek, iy1n, .r.tthe.y,y of Farrell Road and northerly of a I-rie located twenty Of the existing concrete diversion structure where Rilson Creek and Naneum Creek separate. Said easement is for access for dike structure repair and maintenance and emergency purposes. IN WITNESS WHEREOF the parties: her, to have set their hands, the and year first above written. ff////�''jj _141 1_! 7.1..' !1 U 1) SPATE OF WASHINGTON ) ) as. County of Y,ittitas ) On this day personally appeared before me Cz>" �'l to me known to be the individual described in and who executed trill within and foregoing instruments, and acknowledge that --; signed t;^:._ same as AIne free and voluntary act and deed, for the uses and }ur}wses therein mentioned. GIVEN under my hand and offici. '2.1:.,�1 this n7h day of - 1964. If Notary ruhli, in and for the [hc Vashington, residing at . r n OFFICIAL RECORDS PAEOM, WILSON- CHERRY Goals WATERSHED ASSESSMENT and Objectives Nanetini, Wilson, Chei'i't, Ci -eek Watet-shed This Watershed Assessment is intended to develop community support and partnerships between stakeholders to identify watershed issues related to: Flooding, Irrigation, Infrastructure, Water Quality, Fish and Aquatic Habitat. Study Area Issues/Problems: o Flooding: o Wilson and Naneum creeks have regularly flooded Ellensburg and the surrounding area since 1894. o Flooding is an ongoing public hazard requiring expensive post flood restoration. o Flood management has changed in recent decades, irrigation canals may no longer deliberately convey flood flows, stream channel dredging and wood removal are less desirable flood management actions due to habitat impacts. • Irrigation: o The Yakima basin has the most intensive development and use of water in the state. o The watershed includes many unscreened water diversions and impassable barriers resulting from a complicated system of intersecting streams and ditches primarily managed for irrigation. o Irrigation infrastructure could be used to supplement flows in designated stream channels along with implementation of water conservation projects (similar to projects in the Taneum/Manastash). o The Yakima River Basin Integrated Plan is intended to address many water supply issues on a landscape level. This project was considered a high priority habitat project for the Integrated Plan, and is intended to identify strategic opportunities to align with the plan and associated funding. • Infrastructure: o Instream barriers that prevent fish passage and affect habitat may include; undersized culverts and bridges, roads, developed lands, and utilities. o Much of this infrastructure is aging or has been continually damaged by floods, long-term plans for replacement and upgrades need to be identified, coordinated, funded, and implemented. o Partnership opportunities for infrastructure improvements need to be identified and maximized. • Water Quality: o Water quality issues impact water uses, potentially making it unsafe for drinking or recreation and threatening the health of aquatic animals and fish. o Total maximum daily toads (TMDts) have been developed. Current activities include water quality monitoring and implementation of recommended actions. o This study will consider existing water quality issues, but will not be identifying stand-alone water quality projects. • Fish and Aquatic Habitat: H:\sharepoint_nan_wil_cherry_assess\Final_Goais and Objettive2 (Autosaved).doa o As habitat and access has been restored o Landowner Advisory Group - LAG in the Yakima Basin between 1980 and o Technical Advisory Group -TAG 2015, salmon and steelhead o Advisory Committee - AC populations have increased. • Data collection o The Naneum-Wilson watershed has a o Review and gather existing information large amount of aquatic habitat, and is for the Naneum, Wilson and Cherry one of the key blocked areas within the Creek watersheds. basin needed to meet steelhead o Use the results of the review to identify recovery goals. data gaps and information needs. o Due to the complexity of the Naneum- o Develop a plan to collect data critical to Wilson watershed and alteration of the the successful implementation of future stream into multiple stream channels, it projects. is unclear if there is a feasible route for • Develop a prioritized list of actions for the migratory fish to access headwaters. watershed by screening preliminary o There is a lack of information and alternatives. consensus regarding prioritization of fish habitat projects further east in the Community Benefits: Cherry Creek sub -basin: Coleman, Cooke, Caribou, and Parke creeks. Implementation of the plan in subsequent phases helps to: Goals: Develop an integrated and long-term management plan that builds community support by addressing multiple needs. • Fish Recovery • Flood Hazard Reduction • Irrigation • Infrastructure • Water Quality Objectives: Gather information to understand issues/problems and develop an approach for future projects. • Develop a process to prioritize habitat investments and steelhead recovery and management actions. • Identify flood hazards and mitigation actions. • Coordinate irrigation and infrastructure investments with other watershed improvements. • Facilitate communication processes that build community support among diverse stakeholders groups. • Facilitate effective long range planning for flood, agriculture, and habitat needs in land use/management decisions. • Protect private homes, businesses, and agricultural lands from flooding. • Minimize public expenditure on repair of facilities and infrastructure such as utilities, streets and bridges. • Improve fish habitat. • Identify irrigation improvement opportunities. • Improve safety- minimize the need for rescue and relief efforts associated with flooding. • Improve economic security. H:\sharepoint_nan_wil_cherry_assess\Final_Goals and objective2(Autosaved).docx n 141M ,:. }� k ✓ shy b > a. •{' \ .x t -. : s' A A / u 1 s i 1 I � �4 L. S. - h� V� '.� 0yy4�`ifiC1Re 1 ' �� f t ;, i .• S 1 JrC'6•f�N. Cl `»�.Y fS^'l b faq •1 ��� ii _ai TeJ b, 4� rt 1 :� `l. -ter` _ YO,' al�%xi � ,fl .ice • _ Gj"Y�F� •ta {tjj')/1 J• ^l� �° �i � y,��h �`�,��rt [ fir. µ 4 � ,��. �'�atl . -.:fit � N ^•. °�Y�<' 'wv D. xƒ ,| ! |; » / ( / §}