STUDY SESSION MINUTES
November 28, 2016
Paul Jewell, Laura Osiadacz (BOCC), Mark Cook, Candie
Leader (DPW)
None
Mark stated that he met with the managing member of the
Kittitas County Rifle Club on the state of their current
facility which is located by Mt. Stuart Elementary. It is a 22
caliber gun club and they are looking to relocate, possibly
to the industrial area at Bowers Field. The club has
reached out to law enforcement in the past with no luck in
getting a response. Discussion was held.
Schedule time to get on the Law and Justice Study
Session to further discuss the topic.
AIRPORT UPDATE(S): Mark reported that recently the Board signed a lease
assignment agreement between Midstate Aviation and
Central Washington University (CWU). That agreement
opened the door for certain Midstate assets to transfer to
CWU and the flight training program. Mark checked with
the building department earlier in the day and the permit
for Midstate Aviation's new modular building that will be
placed outside the fence should be completed by
Wednesday. The building itself is ready to be placed and
is sitting in Yakima for delivery. This will be a temporary
office for Midstate until Ron Mitchell gets going on plans to
construct a permanent facility inside the fence.
Mark stated that he has met with CWU twice within the last
two weeks discussing a laundry list of things they are
looking for. One item is changing the main hangar from
propane over to natural gas. Natural gas is available along
Bowers Road. They are also looking for tree trimming and
sign erection. CWU is also requesting more parking. They
suggested putting more parking by the propane tank and
staff is not comfortable with that idea. Staff is looking at
the current lot across the street and making the area
bigger to accommodate the request. Maintenance staff
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
should be able to complete this request in short order. The
piece that remains unresolved is the (ASCO use
agreement. Mark presented the topic to the Airport
Advisory Board and there was not a single voice when
setting a revised use agreement rate. The majority of the
members favored a rate commensurate with IASCO's
impact at around $20,000 a year. Staff contacted IASCO
and they are coming to town Wednesday. A meeting is set
up and Mark will bring this discussion back to the table.
Discussion was held.
Board Direction: No Direction
LEVEE REPAIR(S) UPDATE: Mark reported that he had previously briefed the Board on
the Schaake and Klocke Levee repairs. In November of
last year both levees received damage from flooding
events and in response to that the Corp of Engineers came
out this summer to do investigations on both levees and
come up with proposals for repairs. That proposal was
generated by the Corp of Engineers. They solicited Public
Works for adoption of the proposal and at that same time
conversation with the Bureau of Reclamation were
happening regarding the Schaake Levee because the
Bureau of Reclamation is moving forward with the setback
levee and are at 30% design. The resource agencies are
opposing our desire to repair the levees in the water.
They'd like to see us setback the Schaake Levee and
possibly abandon Klocke. While we are not considering
abandoning Klocke we have looked at setting back
Schaake. In discussion of the setback staff pulled
easement documents from our files and the County
Surveyor reviewed the information. What we saw was a
1947 US Army Corp of Engineers map that ties back to
wooden stake beneath a willow tree. There's no way to
find the wood stake or willow tree to be found at this time.
As we looked at the documentation we believe we have
the right to setback the levee, so we went back to the
Bureau of Reclamation and asked for the chain of title that
they got when they purchased the property. The Bureau of
Reclamation stated that they bought the property without a
chain of title. We then got into contact with the Real Estate
Division of Bureau of Reclamation and asked for a new
easement. The response was ok; however, Kittitas County
has to do all the survey work to obtain the easement.
Unfortunately, staff does not have the time to support this.
Discussion was held.
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 3
Board Direction:
SIX YEAR TRANSPORTATION
PLAN ADOPTION:
Calendar the US Army Corp of Engineers agreement
for approval and bring in the local biologists for
discussion on the projects.
Mark reported that the department is late on the process
this year. We generally have the outreach done mid-
November and have the proposal ready in December
during budget adoption. That did not happen this year.
Previously, Mark briefed the Board on Public Works
financing and in recognition of overstating maintenance
budgeting and that we've been deferring maintenance for a
number of years on projects that are really preservation
projects not capital improvement projects. Mark explained
that we cannot go and replace a corrugated 72" culvert at
Via Kachess we have to replace it with a 20' four sided box
culvert due to the fish biologists in the region. So, these
projects are becoming very expensive. We have a couple
of areas that have been allowed to get to a point that we
know now that we have to move on in 2017, 2018 and
perhaps as late as 2019. The only funding source now for
these is local funds and the only local money available is
cash reserves. Discussion was held. On December 6,
2016 staff will present documents to set the public hearing
to approve the Six Year Transportation Improvement Plan
and Annual Construction Plan to conduct the hearing on
December 20, 2016. Commissioner Jewell stated that this
is fine and budgets can be amended.
Board Direction: Present documents to set a public hearing to consider
adopting the Six Year Transportation Improvement
Plan and Annual Construction Plan on the next agenda
session.
Mark Cook
Public Works Director
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
KITTITAS COUNTY COMMISSIONERS
Public Works Study Session
REGULAR MEETING
Monday, November 28, 2016 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Kittitas County Rifle Club
3. Airport Update(s)
4. Levee Repair(s) Update
5. Other business
6. Adjourn
Created on 11/23/2016 11:28:20 AM
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 23, 2016
TOPIC: Kittitas Riffle Club
ACTION REQUESTED: Direct Staff Conduct Outreach to Local Law
Enforcement Agencies
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Direct staff conducts outreach to local law enforcement agencies for constructing
a regional firing range.
BACKGROUND:
Last month, staff met with a representative from the Kittitas Riffle Club discussing
the club's desire relocating their existing facility to airport industrial lands. The
current facility was constructed in 1947 near what is now an elementary school
(Mt Stuart). The club is considering selling assets and desires reinvesting in a
replacement facility. Staff discussed various development options including the
possibility of pursuing a regional firing range.
DISCUSSION:
The club has attempted discussions previously with law enforcement agencies
but has no met with any success. Staff is prepared to take on the outreach effort
attempting to define options leading to a combined multiuse facility. Staff desires
Board support prior to initiating any contact to local law enforcement agencies.
FISCAL IMPACTS:
Fiscal impacts are not defined at the time of this briefing.
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 23, 2016
TOPIC: Airport Update
ACTION REQUESTED: Informational
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Informational briefing — no recommendations are being sought.
BACKGROUND:
Recently, the Board of County Commissioners signed a lease assignment
agreement between Midstate Aviation and Central Washington University
(CWU). The final action of that agreement requires County acceptance of a
privately owned hangar for aircraft maintenance. Staff anticipates taking final
action during the week of November 28`h, 2016.
Staff met recently with CWU hearing numerous requests for capital
improvements. Parking, relocation of the County's fuel warning system, tree
trimming, installation of new aircraft tie -downs, building signage and installation
of natural gas heat are all items of discussion.
DISCUSSION:
It appears that Midstate will be setting a mobile office structure in the vicinity of
the old flight school just east of the existing gas tanks. This allows complete
assumption of our main hangar by CWU.
Resolution of lassco's use agreement remains undetermined. The Airport
Advisory Board does not have a single voice when setting a revised use
agreement rate. The majority of the members favor a rate commensurate with
lassco's impact ($20,000/year). Staff will contact lassco during the week of
November 28, 2016 requesting a meeting to discuss use rate finalization.
FISCAL IMPACTS:
Fiscal impacts resulting from capital improvements to Bowers Field are not
identified at this time.
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: November 23, 2016
TOPIC: Levee Repair Update
ACTION REQUESTED: Informational
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Direct staff submits requested United States Army Corps of Engineers
documents for signature: Cooperative Agreement, Certification of Lands and
Authorization for Entry/Attorney's Certificate/Third Party Risk Analysis.
BACKGROUND:
The United States Army Corps of Engineers is offering to repair flood damage to
two County levees: Schaake and Klocke. Over the past month, staff has been
working to determine if the Schaake Levee repair can entail setting the levee
back approximately 100 feet from the current location. Bureau of Reclamation
(BOR) cannot provide a chain of title on the Schaake property. A new easement
from BOR is required supporting the setback.
Repair of the Klocke Levee may involve Burlington Northern Sante Fe Railroad
(BNSF). Staff is working to finalize any actions required by BNSF impacting
levee repair.
DISCUSSION:
Attempts to define exact easement extend for the Schaake Levee have failed.
New easement documents are required to meet USACE certification
requirements. Timeline for survey and BOR action do not support USACE's
project timeline. The current location is easily certified by staff. There is a
consideration of added costs associated with levee setback. After much back
and forth, staff now believes the path forward is certifying the existing levee and
abandoning the setback idea at this time. The USACE is moving rapidly to
finalize public comment and schedule the necessary repair. Staff believes the
way forward is to certify documents submitted by the USACE.
FISCAL IMPACTS:
Staff is budgeting $100,000 for 2017 levee repair cost share.
ATTACHMENTS:
None.