HomeMy WebLinkAbout2016-03-28-minutes-public-works-study-sessionC G E e KITI'1"fAl COUNTY KXWWX9rA1S COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director STUDY SESSION MINUTES March 28, 2016 THOSE PRESENT: Gary Berndt, Paul Jewell, Obie O'Brien (BOCC), Mark Cook, Candie Leader (DPW); Doc Hansen, Steph Mifflin (CDS) Guests Present: REQUEST TO APPROVE AND SIGN THE DIGITAL SUBMITTAL CERTIFICATION TO THE COUNTY ROAD ADMINISTRATION L-Rzinffl None Mark presented the annual County Road Administration Board digital submittal for approval. Mark would like to point out that there is a considerable amount of money that we qualified for day labor expense this year. In the coming years staff will look at the possibility for more day labor projects. Commissioner Jewell asked for clarification of day labor projects. Mark replied the Lambert Road hard surfacing. Projects that can be done with county crews. Commissioner Jewell asked what the threshold was for the program. Mark stated that it's a percentage. Going forward he'd like to focus more on the annual program and work closer with maintenance. Discussion was held. Board Direction: Commissioner Jewell made a motion to approve the digital submittal certification to the County Road Administration Board. Commissioner Berndt seconded the motion. Approved. REQUEST TO AUTHORIZE THE PUBLIC WORKS DIRECTOR TO SIGN TASK ORDER NO. 8 AMENDMENT 2 WITH SARGENT ENGINEERS, INC.: Mark stated that currently we have a contract with Sargent Engineers for structural engineering on our bridges. Task Order No. 8, Amendment 2 is recognition of a misfire made on the Taneum/North 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 2 Thorp Highway bridge abutment. Last year during a routine bridge inspection it was discovered that an abutment timber was completely rotten and one lane was closed. Staff went into an emergency design to replace that structure. The previous County Engineer wanted to avoid any permitting on the project and gave direction to the Consultant to do a design where it would leave us out of a permitting condition. That design was provided in late January, early February. Bridge Inspector Ken Bamford and Mark felt that it couldn't be constructed the way it was designed. Mark brought the design concerns to the Consultant and he felt it would be very difficult to build. It was agreed to push the project back and pursue an alternative design. Some level of permitting may be necessary for the new design. Commissioner O'Brien asked what the total value of the project. Mark responded $75,000. Commissioner Berndt inquired as to how much was lost in funding for the previous design and it is around $30,000. Discussion was held. Board Direction: Commissioner Jewell made a motion to authorize the Director's signature on Task Order No. 8, Amendment 2 with Sargent Engineers, Inc. Commissioner Berndt seconded the motion. Approved. REQUEST TO AUTHORIZE THE PUBLIC WORKS DIRECTOR TO SIGN TASK ORDER NO. 11 WITH SARGENT ENGINEERS, INC.: On the current 6 year Transportation Improvement Plan the No. 6 Road Bridge Replacement is budgeted in the plan for $125,000 for design this year. We have gotten a task order from the bridge design consultant in the amount of $114,000, which is less than we anticipated paying. Mark is asking to get approval to sign the task order with Sargent Engineers, Inc. Discussion was held. Board Direction: Commissioner Jewell made a motion to authorize the Director's signature on Task Order No. 11 with Sargent Engineers, Inc. Commissioner Berndt seconded the motion. Approved. 411 N. Ruby, Ste. #1 Ellensburg, WA 98926 TEL (509) 962-7523 FAX (509) 962-7663 Dept. of Public Works Page 3 REQUEST TO AUTHORIZE THE PUBLIC WORKS DIRECTOR TO SIGN TASK ORDER NO. 92 WITH SARGENT ENGINEERS, INC.: Mark reported that last week he and Bridge Inspector Ken Bamford were under the Hungry Junction Road Bridge and there is some significant corrosion to the exterior girders. Mark would like to get Sargent Engineers, Inc. out to look at the bridge to see if a load limit is wise for the structure. Discussion was held. Board Direction: Commissioner Jewell made a motion to authorize the Director's signature on Task Order No.12 with Sargent Engineers, Inc. Commissioner Berndt seconded the motion. Approved. Other Business: Traffic Diversion — Mark stated that he is not seeking board action on this topic. He has concerns on the level of service from the Sheriff's Office for chipseal support and for traffic studies; and also illegal dumping that is occurring with no response. He's requesting to have a conversation regarding the topic. Commissioner Jewell suggested getting the topic on the Law and Justice Study Session and get with Mandy in the Commissioner's Office to schedule. Mark R. Cook Director of Public Works 411 N. Ruby, Ste. #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 KITTITAS COUNTY COMMISSIONERS REGULAR MEETING PUBLIC WORKS STUDY SESSION MONDAY, MARCH 28, 2016 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Request to Approve and Sign the Digital Submittal Certification to the County Road Administration Board. 3. Request to Authorize the Public Works Director to Sign Task Order No. 8 Amendment 2 with Sargent Engineers, Inc. 4. Request to Authorize the Public Works Director to Sign Task Order No. 11 with Sargent Engineers, Inc. 5. Request to Authorize the Public Works Director to Sign Task Order No. 12 with Sargent Engineers, Inc. 6. Other business 7. Adjourn Created on 3/24/2016 3:48:47 PM KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT DATE: March 28, 2016 ACTION REQUESTED: Approve & Sign the Digital Submittal Certification to the County Road Administration Board. BACKGROUND: Kittitas County Public Works Department is required (WAC 136-04) on an annual basis to send an Annual Certification to the County Road Administration Board (CRAB). This certification is a report required by CRAB that includes departmental information regarding Management and Administration, and Policies and Operations. This digital submittal certification requires a signature from the Board of County Commissioners Chair, County Engineer, Sheriff, and Auditor. INTERACTION: Public Works; Sheriff; Auditor RECOMMENDATION: Move to Approve Board Chair signature on the Digital Submittal Certification to the County Road Administration Board. HANDLING: Return 1 original to Public Works ATTACHMENTS: Annual Certification; Digital Submittal LEAD STAFF: Mark Cook Public Works Director OPERATIONS G. Projects to which construction expenditures were charged were all on the originally adopted 2015 Annual X Yes No Program or as amended per WAC 136-16-042 - Attach Amendments. (If No, please attach a brief explanation.) H. The County's construction by county forces limit for 2015 computed in accordance with RCW 36.77.065: $ 1,267,168.00 I. The actual expenditure for construction by county forces as reported in the 2015 Annual Const. Report: $ 181,493.00 J. A written report of bridge inspection findings was furnished to the legislative authority on: February23, 2015 as required by WAC 136-20-060. (Please attach a copy) EMAIL WITH ATTACHMENTS TO THE COUNTY ROAD ADMINISTRATION BOARD NO LATER THAN APRIL 1, 2016 Must be followed by signed "County Certification" form via regular mail KITTITAS COUNTY ANNUAL CERTIFICATION FOR CALENDAR YEAR 2015 (WAC 136-04) MANAGEMENT AND ADMINISTRATION (If the answer to any question except "B"is No, please attach an explanation.) A. During 2015 the County Engineer performed the duties and had the responsibilities specified X Yes No in RCW 36.80.030- 6. At any time during 2015 was there a vacancy in the position of county Engineer? Yes X No If so, were the procedures in WAC 136-12 followed? Yes No C. The processing of County Road Accident Reports during 2015 complied with WAC 136-28. X Yes No D. Priority Programming techniques were applied to the ranking of all potential projects on the X Yes No arterial road system in 2015 per WAC 136-14-020. E. As of December 31, 2015 the management of the county road department was in accordance with policies set by the county legislative authority including, but not limited to, the following specific policies required by WAC 136-50-050: POLICY WAC DATE OF CURRENT VERSION Re: Organization 136-50-051 1 -Feb -11 Re: Personnel Practices 136-50-052 1 Re: Complaint Handling 136-50-053 1 -Nov -99 Re, Work for Others 136-50-054 2 -Jun -98 Re: Utility Accommodation 136-50-055 31 -Mar -04 Re: Priority Programming 136-14-030 1 -Sep -98 F. The following were submitted to CRAB in a timely manner: DATE OF DATE SENT TO ADOPTION/ CRAB DOCUMENT WAC DUE DATE PREPARATION '15 Six -Year Program 136-15-050 31 -Dec -14 3 -Nov -15 3 -Nov -15 '15 Annual Construction Program 136-16-040 31 -Dec -14 3 -Nov -15 3 -Nov -15 '15 CAPP Program 136-300-060 31 -Dec -14 29 -Dec -15 29 -Dec -15 '15 Road Fund Budget 31 -Dec -14 29 -Dec -15 29 -Dec -15 '15 Maint Mgmt Wrk Pln & Budget 136-11-040 31 -Dec -14 29 -Dec -15 29 -Dec -15 '15 Road Levy Certification 136-150-021 01 -Feb -15 29 -Feb -16 29 -Feb -16 '14 _ Certification of Road Fund Exp. 136-150-022 01 -Apr -15 28 -Mar -16 For Traffic Law Enforcement '14 Engineer's Certification of Fish 136-150-023 01 -Apr -15 28 -Mar -16 30 -Mar -16 Barrier Removal Costs '14 Annual Construction Report 136-16-050 01 -Apr -15 28 -Mar -16 30 -Mar -16 '14 CAPP Report 136-300-090 01 -Apr -15 28 -Mar -16 30 -Mar -16 '14 Maint Mgmt Certification 136-11-050 01 -Apr -15 28 -Mar -16 30 -Mar -16 '14 Annual Certification 136-04-030 01 -Apr -15 28 -Mar -16 30 -Mar -16 '14 Road Log Update 136-60-030 01 -May -15 29 -Dec -15 29 -Dec -15 '15 PMS Certification for CAPA 136-70-070 31 -Dec -15 29 -Dec -15 29 -Dec -15 Eligibility. OPERATIONS G. Projects to which construction expenditures were charged were all on the originally adopted 2015 Annual X Yes No Program or as amended per WAC 136-16-042 - Attach Amendments. (If No, please attach a brief explanation.) H. The County's construction by county forces limit for 2015 computed in accordance with RCW 36.77.065: $ 1,267,168.00 I. The actual expenditure for construction by county forces as reported in the 2015 Annual Const. Report: $ 181,493.00 J. A written report of bridge inspection findings was furnished to the legislative authority on: February23, 2015 as required by WAC 136-20-060. (Please attach a copy) EMAIL WITH ATTACHMENTS TO THE COUNTY ROAD ADMINISTRATION BOARD NO LATER THAN APRIL 1, 2016 Must be followed by signed "County Certification" form via regular mail STATE OF WASHINGTON COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM CERTIFICATION OF ROAD FUND EXPENDITURES FOR TRAFFIC LAW ENFORCEMENT WAC 236-150-022 Submitting County. Kittltas Total Road Levy: Budgeted Road Levy revenue (as listed on the Road Levy Certification - WAC 136-150-021) Actual Road Levy revenue produced: Traffic Law Enforcement Paid by Road Levy Diversion: Budgeted Road Levy Diversion (as listed on the Road Levy Certification - WAC 136-150-021) Actual amount of Diverted Road Levy, Was Diverted Road Levy deposited in a specific and identifiable account (RCW 36.82.040)? Traffic Law Enforcement Paid by Budgeted Road Fund Expenditures: Budgeted cost reimbursements and/or operating transfers from the Road Fund Actual total amount of cost reimbursements and/or operating transfers from the Road Fund: Total Road Portion Traffic Law Enforcement Expenditures: Total Traffic Law Enforcement Expense (ALL COUNTY FUNDS): Budget Year 2015 $ 3,695,186.19 $------------------- 3,652:590.28 $ 200,004.89 $ .............197.700:06 (Yes --- No --- N/A) Yes 197.700 06 $ 229,925.00 RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road purposes only for such purposes, including traffic law enforcement, as are allowed by Article ll, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural Arterial Trust Account. This form must be reviewed and certified (on the "Engineer's Certification Form") by: County Sheriff County Auditor OR Charter designated Chief Financial Officer Chair, Board of County Commissioiners OR County Executive Due Date: April 1, 2016 n n m 0 z 0 D a -- ---------------------- ____ ------------------ .----------------------------- __._________.--. lz,, A , poOno m U (n __N___m___N -be-l9 v9- 9 vm 9 9 9 i --------- -f i asdssecF' :a o o'q qoo o o.o a . k k!z '3 $ i .i @¢ T 3 3 3 i z ---1-1-1-1-5- z z z ¢' z' a' .i i ii g $ z. R 8 S R n$ S A$ S$ R a z 9� , r I , ' IISm. — - o �0 I m' 9 `g;$ � o $ $ $ i' & & $ v o v $ o P m m ,.. -r m u $ o'in? n• i t V m y m v iN i i i F_}_____________________________________________________________________________ m;„ a ur vo a w _ - a - � -ii i o Ne esti n u ;mm&�' o' g------ o- 9 8 S m m m$ E 3 E 8 9 m 9$$ S 8$ m m $I m a m a o Im 1 Ir , n it r----------------------------------------------- - --------- ------- --------------------- 4 -------------------- ----- O o .n' ----------------------------------- mr I I obs T, r, I yl � 10: N• u u r -----_- N ---------------------------------------------------'o,--- 7Vy T w 1 D CA --------------------------------------------------------------------------------------------------------------- ;O i :Z Q :O 0 O n iNi 7 � O a w $ r 3 „�O I t .__________ r r 000 ------------ 0' F = iiz z. FEF F• �o .i A� o. r I I p( ------------------------- 0 i T -. , r i i ' r r r r ,m r - -'`- y 0 � e' 13I o � u •mr $>m N;m? � I rm ... E______________________._______________._ rar �Uo� : 0 l ' r o -- -- - y z I $oors0 — — — — -- O , r 0 A p�•i�_. ____________._---_-_________________________._.._.. __________--..___-_--__-__.-._ _-D_ ._a____.Iiii m; -A_->�-_-T-STniT .iriii� p._ ....... r-0 18: r zD I ,rrirrI m ro n e y 10 0 'al 141 9i r-, 4m .____-_______. $ 8N -- A 3 0 m N n m > C � 3 N m S > W No�om 99,$&8,3N n m a a a a a a W � W ANNUALPROG. COMPLETED z ITEM NO (n A o$ N C n W D n __ 1 Ol � C? C tW0 N N _ !A 000 n =v 09 FUNCTIONAL D.0D 1 pti D 0 rcr CLASS 0 0 N Z Z Z ITI m 0 -- C Z O W caz 0� "' 0 c p aao 0 TYPE OF WORK v _ < 71 Z D O A c�i N r A m' 00 R m` A C Z 50 ' � « m O $ 0� 2 D O z 0 n z 3 m 3 A 3 0 0 0 O Z p m z 0 r n ti y N o O 'z El N D PROJECT " ) ;o - IS � 1 ANNOUNCEMENT y O C -t n m D 1.-. 3 'n uPROJECT '4Z A Z R ^ CLOSUREn ;a to M 3.3 3 3Oy Q N v N 0 L Jp W J O V N 0 0 0 0+ o O o O o o W COMPLETED z O 0 (n A LENGTH N r C !rt'Y cJ ❑ __ 1 Ol 300 _ z C? C tW0 N N _ !A m m $ .o FUNCTIONAL m 1 pti D 0 0 y CLASS 0 0 N Z Z Z ITI -- C Z O W 0 0� "' 0 c Q1 a'mo 0 TYPE OF WORK v O c�i N r i m' o z O Z 50 0 L Jp W J O V N 0 0 0 0+ o O o O o o W x m O O m O (n A A N ^ Z 0 A a m !rt'Y cJ ❑ m W 1 Lp W Y C? C tW0 N N D m m m n r 1 pti D 0 0 y x 'V io 0 0 N Z p i? Z ITI A O W 0 0� > C 1 0 A O i o z ;u Im= = T << c x x X x « co 0 ? o c O D O z 0 3 A m I N N v 00 p 0 n 0 n 0 O O O O O v N r n ti y N o O 'z El N �' y ti m O O ^ (n A A N 2 P O O p N !rt'Y m W Lp W Y W W tW0 N N m m v 2 0 y yp D O 0 _ D IT o. > Db A O o n y n O m C i << c x x X x « << X X 0 ? o v D O z 0 y m J y Z 0 n 0 n 0 O O O O m T T T o a O O o m m �a 3 3 W W 'z ' y N o O 'z El �' y y O Z D 0 0 o on on n z > > > 3.3 3 3Oy a s a s S m 5 3 5 m mm m m^ m Z v o a 22 N v+ mW m PROJECT y ANNOUNCEMENT PROJECT Q CLOSURE COMPLETED LENGTH FUNCTIONAL CLASS TYPE OF WORK -Z,' ANNUALPROG '... ITEM NO a o a m 0 0 n O v p D 3 i O a r a o A m nm a. 0? 9 yy _ ro m O� Z 3 z H m PROJECT y ANNOUNCEMENT PROJECT Q CLOSURE COMPLETED LENGTH FUNCTIONAL CLASS TYPE OF WORK -Z,' p n mI m D r Dn X 0? o _ ro m z H z y C o A m DIGITAL SUBMITTAL CERTIFICATION- COUNTY ROAD ADNIINISTRATIOM BOARD REPORTS FOR 2015 County # Required Submittal Date: County Name KITTITAS April 1, 2016 The County Engineer checks each box, confirming the forms have been certified by the listed signatures and submitted to and accepted by the County Road Administration Board, then sends this completed form to CRAB via regular mail. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Traffic Low Enforcement Certification 2015 (Engineer Check) I hereby certify that the above report is true and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136 � County stmmw -� Date County Auditor Date Chair if Executive Date ******************************************** Fish Passage Barrier Removal Certification 2015 (Engineer Check) 0 Annual Certification 2015 (Engineer Check) I hereby certify that the Fish Passage Barrier Removal and Annual Certifications are true and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136. Chair/Executives Date r County Engineer: Date ******************************************** Annual Construction Report for 2015 (Engineer Check) County Arterial Preservation Report for 2015 (Engineer Check) ❑ Maintenance Management Cert, for 2015 (Engineer Check) I hereby certify that the Annual Construction Report, CAPP Report, and Maintenance Management Certification are one and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136. 2016 101116 EngrCertforApr. xis STATE OF WASHINGTON COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM CERTIFICATION OF ROAD FUND EXPENDITURES FOR TRAFFIC LAW ENFORCEMENT WAC 136-150-022 Submitting County: Kittltas Total Road Levy: Budgeted Road Levy revenue (as listed on the Road Levy Certification - WAC 136-150-021) Actual Road Levy revenue produced: Traffic Law Enforcement Paid by Road Levy Diversion: Budgeted Road Levy Diversion (as listed on the Road Levy Certification - WAC 136-150-021) Actual amount of Diverted Road Levy: Was Diverted Road Levy deposited in a specific and identifiable account (RCW 36.82.040)? Traffic Law Enforcement Paid by Budgeted Road Fund Expenditures: Budgeted cost reimbursements and/or operating transfers from the Road Fund: Actual total amount of cost reimbursements and/or operating transfers from the Road Fund: Total Road Portion Traffic Law Enforcement Expenditures: Total Traffic Law Enforcement Expense (ALL COUNTY FUNDS): Budget Year: 2015 $ ------ 3,695,186.19 $ 3,652,590.28.. $ ........................ -200,004.89-. $........ — ----------197,700.06-. (Yes -- No -- N/A) Yes 5 S - $ 197,7M06 $ 229,925.00 RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road purposes only for such purposes, including traffic law enforcement, as are allowed by Article II, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural Arterial Trust Account. This form must be reviewed and certified (on the "Engineer's Certification Form") by: County Sheriff County Auditor OR Charter designated Chief Financial Officer Chair, Board of County Commissioiners OR County Executive Due Date: April 1, 2016 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT WORK SESSION DATE: March 28, 2016 TOPIC: Sargent Engineers, Inc. Task Order No. 8 Amendment 2 ACTION REQUESTED: Request to Authorize the Directors Signature on the Task Order LEAD STAFF: Mark R. Cook RECOMMENDATION: Authorize the Director's signature on the Task Order. BACKGROUND: In fall 2015, during a routine bridge inspection, staff identified a failed wooden abutment on the North Thorpe Highway/Taneum Road intersection. An immediate design proposal was sought from Sargent Engineers. The previous County Engineer directed a design anticipating construction without having to obtain federal permitting. In February 2016, Public Works reviewed the proposed design and identified significant constructability issues with the design. DISCUSSION: We are asking Sargent Engineers to redesign the structure and provide permitting support for late 2016 — early 2017 construction. FISCAL IMPACTS: Redesign costs are estimated at $28,550. ATTACHMENTS: EXHIBIT 1: Task Order No. 8 —Amendment No. 2 Page 1 of 1 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Formal Task Assignment Document Task Number: 8 - Amendment 2 The general provisions and clauses of Agreement BOCC Res. No. 2015-021 shall be in full force and effect for this Task Assignment. Location of Project: Tanuem Road and Thorpe Highway Project Title: Taneum Road Bridge Repair Maximum Amount Payable Per Task Assignment: $46,889 + $28,550 (Amendment 2) = $75,439 Completion Date: December 31, 2017 Description of Work: (Note attachments and give brief description) This amendment provides for the revision of the plans, specifications, and estimate to a spread footing abutment. The detailed scope of work is attached. Agency Project Manager Signature Oral Authorization Date: Date: See Letter Dated: Consultant Signature: �t-� Date: j��y�jly Agency Approving Authority: Consultant: Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, WA 98502 (360) 867-9284 Date: Scope of Work ENVIRONMENTAL PERMITTING Widener will assemble and organize all necessary environmental permit applications to a standard acceptable by the permitting agencies. Anticipated permits include the following: 1. JARPA 2. USACE Section 404 Permit 3. Water Quality Management Plan Permit applications shall include all requested information, such as application forms, all necessary permit drawings, an attachment describing project location, project purpose and need, alternatives considered, and a summary of project impacts. Widener shall also provide a draft transmittal letter for submittal of the application by the County. Draft applications, including supporting information, shall be submitted to the County for review and comment. Revised permit applications shall be provided to the County for signature and submittal to permitting agencies. Widener shall perform the necessary coordination to obtain the permits. The Water Quality Management Plan will be developed to ensure the project meets the 401 water quality standards allowing for the 401 certification process to be waived. BRIDGE DESIGN Sargent Engineers will revise the design for the bridge to include cast in place concrete spread footing abutments and wingwalls. The design will follow the requirements of the AASHTO LRFD Bridge Design Specifications. PLANS Sargent Engineers will update the plans for the replacement of the bridge. The following will be updated: • Quantities Sheet • Bridge Layout • Foundation Plan • Abutment Details BID DOCUMENTS The bid documents will be updated for the spread footing abutments. Page 1 Page 1 of 1 Exhibit D Consultant Fee Determination Project: Taneum Road Bridge Revisions _. - - _— Project! Design Principal_ Engineer Engineer Drafter IIS Task Cost _ _ --. Rate $162.93 $123.43 $8887 $8887 ..._ 60% Documents -- -......... Site Investigation _._ 8 $1,303 Design abutments ! ! 16; $1,422 Prepare foundation plan 1t.� 8. $800 Prepare abutment sheets - ? 16 $1,511 Prepare quantities I 41 $355 Prepare cost estimate 2� $178 90% Documents Attend Invest n s- -_- _ -----_ _ - - 7i - - --�——� i '-- $1,141 Check design _ $98_7_ -- Check drawings 9 i 1 r 12 $1 190 Check,quantties ......_ ............. - _ -. _ 4 ............._8+ --_-_. r ... $494 Check cost estimate 21 $247 Pians, Specifications and Estimate _-11 }I Make changes to plans, specifications and estimate----- 2� 6 8 8, $2,735 Produce bid document originals i 4 8 8' $1,916 Load Rap Bd9e .-^4� $1205 As built plans — I` —� 4 20, $2,133 Total Direct Salary Cost 17: a1. 52 72I 577 616 Page 1 of 1 Exhibit E Subconsultant Fee Determination - Summary Sheet Widener and Associates Project: Taneum Rd. Kittitas County- Sargent Engineers Project Project Manager Biologist Hours Hours Task 1 JARPA 404 Permit Draft 8 24 Final 4 12 USACE Approval 12 4 Task 3 Water Quality Management Plan Draft Report 8 16 Final Report 4 8 Total hours 36 64 Summary Hours Rate' Project Manager 36 $140.00 Project Biologist 64 $86.80 Cost $5,040.00 $5,555.20 2126/2016 $10,595.20 TOTAL ESTIMATED COST $10,595.20 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT WORK SESSION DATE: March 28, 2016 TOPIC: Sargent Engineers, Inc. Task Order No. 11 ACTION REQUESTED: Request to Authorize the Directors Signature on the Task Order LEAD STAFF: Mark R. Cook RECOMMENDATION: Authorize the Director's signature on the Task Order. BACKGROUND: The No.6 Road Bridge replacement is on the County's six year transportation improvement plan. The project is partially funded by Rural Arterial Program funds. The project replaces a narrow bridge that partially constricts Ellensburg Water Company irrigation flow. DISCUSSION: Design (2016) of the bridge is funded in the current six-year plan at $125,000. FISCAL IMPACTS: Design of the bridge is estimated by Task Order No. 11 as being $113,621.00. ATTACHMENTS: EXHIBIT 1: Task Order No. 11 Page 1 of 1 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Formal Task Assignment Document Task Number: 1 1 The general provisions and clauses of Agreement BOCC Res. No. 2015-021 shall be in full force and effect for this Task Assignment. Location of Project: No. 6 Road Project Title: No. 6 Road Bridge over Towne Ditch Maximum Amount Payable Per Task Assignment: 5113,621 Completion Date: December 31, 2017 Description of Work: (Note attachments and give brief description) See attached scope of work and estimate. Agency Project Manager Signature Oral Authorization Date: Consultant Signature: Agency Approving Authority: Consultant: Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, WA 98502 (360)867-9284 Date: See Letter Dated: Date: Date: Exhibit A Scope of Work This project involves the improvement of No. 6 Road by replacing the bridge over Towne Ditch. The Consultant will survey the site, perform a geotechnical investigation, obtain the environmental permits, evaluate the scour at the bridge, and prepare the contract documents for replacing the bridge. This project is being funded by CRAB. LAND SURVEYING Gray and Osborne will perform the land survey. Task 1: Topographic Survey Objective: To obtain vertical and horizontal control necessary for design of replacement of No. 6 Road Bridge. The work shall include identifying existing bridge, utilities, topography, road alignment, and other related site topography. 1. Establish vertical and horizontal control for survey and mapping at a scale of 1 "=20' horizontal. Control shall be referenced to the Washington State Plane coordinate system NAD 83/11, NAVD88. 2. Acquire topographical and planimetric survey of site (right-of-way to right -of way, + 25 feet each side) to include establishing surface grades and grade breaks, ditch profiles, pavement edges, utility poles, hydrants, valves, fences, trees, significant landscaping, existing driveways, mailboxes, road signs, road channelization, and existing utilities as located in sufficient detail to support adequate design. 3. Acquire "off-site" survey of No. 6 Rd (to approximately 250 feet beyond existing bridge) to facilitate bridge approach and pavement transitions. 4. Notify 1 -call and obtain topographic survey of located utilities. 5. Provide electronic survey data in Civil3D 2014 format containing survey points with descriptions, lines, layers, grade lines, and symbols provided by Gray & Osborne, Inc. Task 2: Right of Way and Property Boundary Determination 1. Acquire public "records of survey plat maps, assessor maps, "as-builts", etc. as may be available. 2. Physically locate available local monumentation and fix to project control to accurately tie record boundary surveys and information to project datum. 3. Obtain title reports in the form of Subdivision Guarantees for the 4 properties directly adjacent to the site identifying last known deed, ownership, and existing easements and encumbrances that may affect the project area. 4. Provide electronic boundary data in Civil3D 2014 format containing right of way margins, adjacent parcel boundaries, County parcel numbers, house numbers and pertinent notes on survey methodology. Services not included under this task 1. Any services associated with acquisition of property or staking of right of way. Page 1 2. Any services associated with completing or filing record of surveyor boundary line adjustment maps. 3. Preparing legal descriptions or exhibits for easements and/or right of way acquisition. Task 3: QA/QC Review 1. Complete QA/QC review of work products. Deliverables Gray & Osborne will submit the following: 1. Electronic survey data in Civil3D 2014 format for Topography and Boundary survey work 2. Electronic copies in pdf format of survey field notes and title reports 3. Excel spreadsheet of Survey Control for incorporation into engineering documents identifying horizontal and vertical coordinates and physical descriptions of site Benchmarks ENVIRONMENTAL PERMITTING Widener and Associates will prepare the environmental permits. Early input into the formation of project alternatives will be provided to ensure each alternative includes provisions to minimize impacts to the surrounding environment. This coordination within the various design elements of the project will identify and incorporate minimization measures early in the alternative development phase of the project and will ensure that an appropriate range of alternatives are developed prior to the agency coordination. Section Seven Consultation A Specific Project Information Form (SPIF) will be prepared for the preferred alternative in accordance with Corp of Engineers guidelines. The following subtasks will be undertaken in preparation of the project SPIF. 1. Information will be reviewed and a consultation strategy will be developed. 2. Initiate informal consultation with United States Fish and Wildlife Service (USFWS) and National Oceanographic and Atmospheric Administration (NOAA) Fisheries by preparing written requests for lists of endangered, threatened, proposed, and candidate species. 3. Conduct a field reconnaissance to investigate on-site habitat conditions. 4. Make telephone contact with the appropriate resource agency staff for input on species occurrence, habitat use, and potential project impacts. 5. Prepare a draft SPIF addressing listed species, proposed species, candidate species, species of concern, and critical habitat. The SPIF will include a project description, a list of species, a description of the species and their habitat, an analysis of project effects, and mitigation recommendations. 6. Provide the draft SPIF to the County for review and approval. 7. Revise the SPIF, as appropriate, and submit the final SPIF to USFWS and NOAA Fisheries for their review, possible negotiation of mitigation measures, and concurrence. 8. It is anticipated the Corp will determine the project has no effect on Endangered Species as the project will be built in the non -irrigation season. Page 2 Deliverables 1. Three copies of a draft SPIF for review by County with accompanying draft special provisions if required. 2. Three copies of a draft SPIF, incorporating the County's comments, for submittal to Corp of Engineers. 3. Three copies of a revised draft SPIF, incorporating comments by Corp of Engineers. Permits (optional) Widener will assemble and organizing all necessary environmental permit applications to a standard acceptable by the permitting agencies if the WDFW and the Corp assume jurisdiction over the canal. Anticipated permits include the following. 1. JARPA 2. USACE Section 404 Permit 3. WDFW Hydraulic Project Approval Permit applications shall include all requested information, such as application forms, all necessary permit drawings, an attachment describing project location, project purpose and need, alternatives considered, and a summary of project impacts. Widener shall also provide a draft transmittal letter for submittal of the application by the County. Draft applications, including supporting information, shall be submitted to the County for review and comment. Revised permit applications shall be provided to the County for signature and submittal to permitting agencies. The Consultant shall perform the necessary coordination to obtain the permits. Section 106 Report (Cultural and Historic Resources) This work would include the preparation of the Section 106 Report in accordance with the State Historic Preservation Office standards and guidelines. The work will include the following subtasks. 1. Pertinent literature on the archaeology, ethnography, and history of the project area will be reviewed to determine the existence of archaeological sites and to refine the probability of archaeological resources and traditional cultural places in the project areas. 2. The Consultant will maintain contact with the local tribes for any information on historic Indian use of the project area. 3. A systematic field reconnaissance will be conducted to identify previously recorded and/or unrecorded archaeological sites for the proposed project where ground -disturbing activities are expected to take place. Field reconnaissance will consist of the traverse of pedestrian transects at varying intervals, depending on terrain throughout the proposed project area. Shovel probes (digging a hole with a shovel) will be excavated, as deep as feasible, and in areas expected to have a high probability for cultural resources. Shovel probes will be augmented through auger probes to explore the deepest possible deposits. Shovel probes will be screened in highly probable areas and in soil matrixes too dense to identify small chipping debris. 4. All new sites will be mapped, photographed, and recorded on Washington State Archeological Inventory forms and submitted to the state Office of Archeological and Historic Preservation (OAHP) for Smithsonian numbers. Every effort will be made to include Tribal cultural resources personnel in assisting the field effort. Rights -of -entry will be provided by the County. Page 3 Deliverables 1. Three copies of a draft Section 106 Report will be prepared to describe cultural resources identified in the project area to meet state and federal standards for reporting as outlined in the guidelines provided by the OAHP. The report will include summary background information appropriate to a cultural resources assessment of the project area, including environment, previous cultural resources studies, ethnography/ethno history, and history. A discussion of agency and Tribal consultation, methodology, the results of the investigation, and a map of located archaeological sites will be provided. Recommendations will also be extended to any cultural resources that may be significant. Monitoring of construction excavation recommendations may also be included. The historic structures inventory form and/or archaeological site inventory form will be attached to the report as an appendix. 2. Three copies of a revised draft Section 106 report incorporating County comments. 3. Three copies of a final Section 106 report incorporating Corp comments. Task SEPA Checklist: This project is assumed to be SEPA exempt under the repair and maintenance provisions of the WAC. Assumptions: • The project will not require ROW acquisition or impact wetlands. Deliverables: • SEPA exemption letter GEOTECHNICAL STUDY PanGEO will perform the geotechnical study. Existing Information Review — Review existing, readily available geologic and geotechnical information in general vicinity of the project area. Field Exploration & Lab Testing — Perform a visual site reconnaissance and mark locations for two test borings and arrange one -call utility locating. Subcontract drill rig and crew and perform two test borings not to exceed 60 feet deep each. Perform index lab testing on select samples collected from the test borings for sample description and material property identification. Engineering & Reporting — Based on the information obtained from the field explorations and lab testing, prepare geotechnical engineering recommendations for new structure support including driven piles and spread footing options. Provide estimates of nominal strength and service bearing resistance for new or replacement foundations in general accordance with AASHTO LRFD methodology. Provide wall backfill design parameters for lateral earth pressures. Provide construction considerations. Prepare draft and final reports containing results and conclusions of the reconnaissance and engineering analyses. Assumptions: Traffic control and flagging for drilling of test borings to be provided by Kittitas County. Page 4 ROAD AND BRIDGE DESIGN Sargent will prepare the design to improve the road by removing the existing bridge and installing a new bridge. Sargent Engineers will prepare the design for the bridge. The design will follow the requirements of the AASHTO LRFD Bridge Design Specifications. PLANS Sargent Engineers will prepare the plans for the replacement of the bridge. The plans will follow the format that the County desires. They shall include at a minimum: • Cover Sheet • Quantities Sheet • Roadway Layout Sheet • Roadway Details • Bridge Layout • Foundation Plan • Abutment Details • Framing Plan • Girder Details • Guard Rail Details SPECIFICATIONS Sargent Engineers will prepare the specifications in WSDOT format using WSDOT bid items. ESTIMATE Sargent Engineers will prepare an estimate for the project. LOAD RATING Sargent Engineers will prepare a load rating that conforms to Chapter 13 of the WSDOT Bridge Design Manual. AS BUILT PLANS Once the project is complete, as -built plans will be prepared for the bridge. Sargent will submit plans for review to the County at the 60%, and 90% stages for review and comment. BIDDING AND CONSTRUCTION ADMINISTRATION The County will conduct the bidding and administer construction. Page 5 Prepare special provisions Exhibit D --� --- j _-24j -- __-- 733- $2,,5 Prepare quantities Consultant Fee Determination --------- 4i —i - $35 Project: No 6 Road Bridge_ Project - Designl f _ Principa J Pengineer Enginee�j Drafter II Task Cost Rate: $162.93 $123.43 $88.87 $8887 Project Management B Attend i meetings - .... - $1,303 36/6 DocumentsSite Investigation --- - 8 iCheckdesign.. 'Check $1,303 Road and Bridge Layout _ ---g( .-.--_. _.. $7,406 Review with County --- --- -- _ - -... - $1,303 60%Documents -� --- 741 $8,058 y design _ _ __40�. 12 $3,555 Design Design deck - _. -i - _ 41 4, _ I $355 Design girders Design abutments .....{ -_.. .-._-.-12 ....._ .-_ $1 O6 6 _ Plans Specifications and Estimate 161 _ $1,422_ Prepare cover sheet Prepare quantities Sheet -I} _ 1L 4 _$444 21 _ 161 1 � 2 $267 Prepare roadway layout 1, 8 20 $2,488 Prepare roadway details -- I i 8 10 $1,600 Prepare bridge layout sheet 41 __ 1_ 20 $1,866_ Prepare foundation plan r T t7JF- 16 $1,511 Prepare abutment sheets -- $2,133 Total Direct Salary Cost 1 24I $2,222 Prepare framing plan :501 _ _ 1 - 121 $1,155 Prepare girder_ sheets Prepare barrier j— --tL-- --i --- T - _. 11 -- 24 ---- 8 $2,222 -- -- $800 -sheet Preparebarhst - ----. � _� - _ - � ..-.. 8, $711 Prepare special provisions --� --- j _-24j -- __-- 733- $2,,5 Prepare quantities i. -`- --------- 4i _ -�- $35 Prepare cosatet estim - -- D 90hoc------ - - Attend i meetings - .... - W --- - $1,303- iCheckdesign.. 'Check 361.__ .-.--_. _.. $4,443 drawings _ -- -... - 12.---- .-- _-' 741 $8,058 Check special provisions - 12 $1,481 Check quanhties _ - _ 41 $494 Check cost estimate - -- $247 Plans Specifications and Estimate - - Make changes to plans specifications and estimate _ 21 161 1 6f 16 $5,145 Produce bid document originals -- 1, 4r - 81 _ 8 $1,916 Load Rate Bridge -- 41 As built plans T 4i 20i $2,133 Total Direct Salary Cost 34 :501 162 266 $62,090 Direct Non Salary Costs Mileage i $541.65 r- - - _--_- _-_ -------- Land Survey (Gray and Osborre) $8,300.00 _.___-r ; Permitting (Widener and Associates) $25 5,59U0 _Environmental Scour Evaluation (Watershed Science and Eng) - - - Geotechnical Study (PanGEO) "$2.500.00 $14.599.00 - -- Total Direct Non•Salry Costs $51,531 Page 1 of 2 Exhibit D Consultant Fee Determination � J ...-.... _i ......... 1 ._ _ SH2All � Page 2 of 2 No. 6 Road Overcrossing Towne Ditch Bridge Replacement Kittitas County, Washington Prepared for: Monte Smith, Sargent Engineers ESTIMATED LABOR: Proj. No.: P-4102 Dale: 319/2016 Prepared By: REK Revised: Pnrj. Brsl 1-1 WORK TASK DESCRIPT[ON RanGEO Labor Hours & 2016 Ditect Hourly Rates Est_ NV PdntlralGeot. Proj-%1gr. Sr -Gear. rn,- Sc Geologist Pnrj. Brsl 1-1 Admin. Cast Shear Stwt%,h(rockco,t,,,o l) 0 STils 5(3.0.5 550.75 53500 ill )5 Y�855 ('QS]• F Ad Fxpinrauo &Lab Testing Existing Information Rere S to Recon Mark Bonne 1 n.at ons 0 r 6 L Anedx,ol Limlts $372.30 Log Test Barings $95 2 —�— 12— $16 $456.00_ $276.10 Dmft Lugs & Leb S np;a Select o: E gmmnng Analysis -' --- ._ Wall Backfill Dksgn Recortumraaaors 2 r 2 $190.00 n3_]0 d os daourcoun --- }-- 1 0 $387J_0 -u CUorrn C.nddarsons - SIN 10 Geotmhntd Re an:ost Groe Final Otomchnicnl Kepon q 12 2 $380.00_ v ..o 11 LABORATORYTEST SUMMARY $9.390 Est_ NV Unit Total Test 'li sts Cost Cast Shear Stwt%,h(rockco,t,,,o l) 0 $225 $0 Simi Analis 3 $120 $360 Pcrcznt rhre 0 $20 S0 Anedx,ol Limlts 1 S95 $95 Moisture Content 4 $16 $64 n.rna, r,novn,u srrcr rnau�s,: mined Conditions See scope of work. $519 0V -- 2 $3,660.00 OVERHEAT/ & PROFIT: $9.390 OcerheA C 12655,, & DSC $4,632 Profit @ 30% or DSC $1,098 'rt1T'AL IMOR COSTS: $9390 ESTIMATED DIRECT' rXPr,NSFS: $9.390 Per diem 0 @ $I 94/day $0 Milcagc 500 @ 50.54/nri. $270 Field Consumable .$20 "rOTAL DIRECT EXPENSES: $290 SUBCONTRACTOR COSTS: $9.390 Doll Rig Mobllimtlon r $800 Dill Had.,,, (2 ea- 120 Lfos lm al) $3600 TOTAL SUBCONTRACT COSTS: $4,400 10'al lAs' cost $9.390 larb "1 "s to $519 DlrmrExpcn.ws $290 stbc ntnac'e' l6 $4.400 TOTAL: $'14,599 ParOGEO, Inc. EXHIBIT "B" ENGINEERING SERVICES SCOPE AND ESTIMATED COST **NO.6 ROAD BRIDGE REPLACEMENT** Tasks Principal Hours AutoCAD/ GIS Tech./ Eng. Intern Hours Professional Land Surveyor Hours Field Survey (2 person) Hours I Topographic Surveying 4 16 1 CADD Work 4 2 Right of Way & Boundary Survey 12 8 3 QA/QC 2 2 Hour Estimate: 2 4 18 24 Fully Burdened Billing Rate Range:* $112 to $176 $45 to $90 $109 to $128 11441o$210 Estimated Fully Burdened Billing Rate:* $150 $75 $120 $170 Fully Burdened labor Cost: $300 $300 $2,160 $4,080 Total Fully Burdened Labor Cost: Direct Non -Salary Cost: 6,840 Mileage & Expenses (Mileage @ current IRS rate) $ 160 Title Reports $ 1,300 Subconsultant: Subconsultant Overhead (10%) TOTAL ESTIMATED COST: 8,300 Actual labor cost will be based on each employee's actual rate. Estimated rates are for determining total estimated cost only. Fully burdened billing rates include direct salary cost, overhead, and profit. Cost Estimate for Environmental Permitting Services Project Manager Project Biologist Design Coordination 16 8 Biological Assessment Draft 121 24 Final 4 6 Revised 4 2 Permits/JARPA Draft 8 32 Final 4 8 Revisions and Coordiantion 16 8 DAHP Section 106 Report Drag 4M128 Final 2 Revised 6 SEPA Draft 4 Final 2 Total Hours 82 Summar Hours Rate Cost Project Manager 82 $140.00 $11,480.00 Project Biologist 128 $86.80 $11,110.40 Section 106 Field Work $3,000.00 Assumptions Client will provide all graphics and surveying need for the project. TOTAL ESTIMATED COST $25,540.40 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT WORK SESSION DATE: March 28, 2016 TOPIC: Sargent Engineers, Inc. Task Order No. 12 ACTION REQUESTED: Request to Authorize the Directors Signature on the Task Order LEAD STAFF: Mark R. Cook RECOMMENDATION: Authorize the Director's signature on the Task Order. BACKGROUND: Ongoing bridge inspections are revealing structural issues of concern requiring structural engineering evaluation. On 3-23-2016, a site visit to Hungry Junction Road (Cascade Canal crossing) identified significant corrosion of exterior girder reinforcing steel. Portions of the reinforcing steel can now be removed by hand. DISCUSSION: While the reinforcing steel corrosion appears bad, a structural evaluation from Sargent Engineers, Inc. will likely define any necessary remediation efforts. Public Works anticipates additional needs during our 2016 bridge inspection cycle. Having access to on-call inspection services will minimize delays responding to inspections of concern going forward in 2016. FISCAL IMPACTS: $10,000 is requested for initial task order authorization. ATTACHMENTS: EXHIBIT 1: Task Order No. 12 Page 1 of 1 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Formai Task Assignment Document Task Number: 12 The general provisions and clauses of Agreement BOCC Res. No. 2015-021 shall be in fill force and effect for this Task Assignment. Location of Project: Various Locations Project Title: Bridge Load Rating Evaluations Maximum Amount Payable Per Task Assignment: $10,000 Completion Date: December 31, 2017 Description of Work: (Note attachments and give brief description) Provide bridge inspection and load rating assistance as requested by the County on an as -needed basis. Agency Project Manager Signature Oral Authorization Date: Date: See Letter Dated: Consultant Signature: j1 �., Date: �3 Agency Approving Authority: Date: Consultant: Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, WA 98502 (360)867-9284 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT WORK SESSION DATE: TOPIC: ACTION REQUESTED LEAD STAFF: Mark R. Cook March 28`h, 2016 Traffic Law Enforcement Diversion Support Staff Developing an Annual Contract Service Package with the Sheriff's Office RECOMMENDATION: Support staff developing a package of support services for 2016. BACKGROUND: Annually, the Sheriffs Office requests a diversion of Road Fund dollars supporting traffic law enforcement duties. We recently received the 2015 certification of road fund expenditures for traffic law enforcement from the Auditor's Office. DISCUSSION: Reviewing the certification supplied by Sheriff Gene Dana, we note a number of traffic related response totaling 2705 hours of service. The list of responses on County Roads in 2015 includes 2602 traffic stops, 333 vehicle contacts, and 889 total accidents. In mid -2015, I contacted the Sheriffs Office for an initial discussion regarding Public Works service requests. I requested uniform presence during our annual chip seal operation and I was offered the Citizen's Patrol. We also request investigative services regarding illegal dump sites where we have secured mail and other data we believe useful in tracking down the folks responsible for the illegal dumping. Public Works believes our interests are better served by negotiating an annual service package of support services from the Sheriff's Office. Rather than responding to every request for speed study (residents tied of speeding), it would be helpful to Public Works to station a uniformed deputy in those areas engaging in enforcement ahead of deploying all of the resources associated with a speed study. We also have numerous occasions where people speed through our construction zones. We believe maintenance crew safety concerns warrant increased traffic enforcement support from the Sheriff's Office. Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT Public Works recognizes the listed response to County Road related service calls reported by the Sheriff's Office in 2015 and we question if these calls would go unanswered without the $200,000 in Road Fund diversion in 2015. FISCAL IMPACTS: The negotiated service package could result in added law enforcement expense. ATTACHMENTS: EXHIBIT 1: 2015 Certification of Road Fund Expenditures for Traffic Law Enforcement Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT STATE OF WASHINGTON � E ^ r �- COUNTY ROAD ADMINISTRATION BOARD; RURAL ARTERIAL PROGRAM CERTIFICATION OF ROAD FUND EXPENDITURES FOR TRAFFIC LAW ENFORCEMENT WAC 136-150-022 Submitting County Kittltas Budget Year. 2015 Total Road Levy: Budgeted Road Levy revenue (as listed on the Road Levy Certification - WAC 136-150-021) Actual Road Levy revenue produced: Traffic Law Enforcement Paid by Road Levy Diversion: Budgeted Road Levy Diversion (as listed on the Road Levy Certification - WAC 136-150-021) Actual amount of Diverted Road Levy: Was Diverted Road Levy deposited in a specific and identifiable account (RCW 36.82.040)? Traffic Law Enforcement Paid by Budgeted Road Fund Expenditures: Budgeted cost reimbursements and/or operating transfers from the Road Fund: Actual total amount of cost reimbursements and/or operating transfers from the Road Fund: Total Road Portion Traffic Law Enforcement Expenditures: Total Traffic Law Enforcement Expense (ALL COUNTY FUNDS): $ .. 3,695,186.19 $ 3:652,59028 $ — 200,004.89 $197, 00,004 89 $197, 700.06 -------------------------------------- (Yes No N/A) ,-Yes_._ $ 197, 700.06 $ 229,925.00 RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road purposes only for such purposes, including traffic law enforcement, as are allowed by Article Il, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural Arterial Trust Account. This form must be reviewed and certified (on the "Engineer's Certification Form") by County Sheriff County Auditor OR Charter designated Chief Financial Officer Chair, Board of County Commissioiners OR County Executive Due Date: April 1, 2016 DIGITAL SUBMITTAL CERTIFICATION- COUNTY ROAD ADMINISTRATION BOARD REPORTS FOR 2015 County # Required Submittal Date County Name KITTITAS ; April 1, 2016 The County Engineer checks each box, confirming the forms have been certified by the listed signatures and submitted to and accepted by the County Road Administration Board, then sends this completed form to CRAB via regular mail. i#rk fit 8 t &Yr S�tk tYr >k 8 rYbtk +Y*tY ar�>& s+u�# tku&>k�u ie ti 8>k Yr a'[># Traffic Law Enforcement Certification 2015 (Engineer Check) I hereby certify that the above report is true and accurate and that I have reviewed and approved the report for submission to the County Road AdminiViatign\ and in accordance with WAC 136 C unty� Date —�-- County Au ttor Date Chair/ Executive DFish Passage Barrier Removal Certification 2015 (Engineer Check) Annual Certification 2015 (Engineer Check) Date I hereby certify that the fish Passage Barrier Removal and Annual Certifications are true and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136, Chair / Executive: County Engineer: Date Date fs * W * * rR * * * b * * i i t i t * * * * * t * rk * b * i i b * tk x * t * * * b * * * kr El Annual Construction Report for 2015 (Engineer Check) DCounty Arterial Preservation Report for 2015 (Engineer Check) 0 Maintenance Management Cert. for 2015 (Engineer Check) 1 hereby certify that the Annual Construction Report, CAPP Report, and Maintenance Management Certification are true and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136, 2016 101116EngrCertforApr_x1s GENE DANA, SHERIFF KITTITAS COUNTY SHERIFF'S OFFICE 307 W. Umptanum Rd. • Ellensburg, WA 98926 (509) 962-7525 • (509) 674-2584 FAX (509) 962-7599 February 8, 2016 Judy Pless Kittitas County Auditor's Office 205 West 5" Ave. Room 105 Ellensburg, WA 98926 RE: County Road Diversion Funds Dear Judy, The following is a breakdown of all accidents, motorist assists, driving complaints, vehicle fires, traffic hazards, illegal parking and traffic stops that we responded to on County Roads in 2015. 2015 Est Hours 2015 Injury Accidents 8 24 Non -injury accidents 279 558 Hit and Run accidents 38 152 Other accidents 155 155 Traffic stops 2602 867 Disabled vehicles 121 121 Driving complaints 257 257 Vehicle contacts 333 111 Vehicle fires 17 17 Abandoned Vehicles 71 71 Parking Complaints 66 66 Traffic Hazards 296 296 Flooding over roadway 10 10 Total road incidents 4274 2705 Based upon the average response times to handle and complete the above calls (not including court time or dispatch costs charged to KCSO related to these calls) for 2015 we responded to 4274 incidents on County Roads and spent approximately 2705 hours to handle these traffic related activities. These hours do not include regular pro -active high visibility patrol time on County Roads Sincerely, � u • U U G l 2,705.00 x Gene Dana, Sheri85,00= Sheriff 22),25.00* Enclosure: 2015 KITTCOM CAD Report COPY 7/ 9 �( /Z_ 02/08/16 Kittitas County Sheriffs Office 121 09:51 Total CAD Calls Received, by Nature of Cali Page: 1 Nature of Call -------------------------- Total Calls Received % of Total ABDOMINAL PAIN -------------------- 2 ---------- CHEST PAIN (NON TRAUMATIC) 4 0.02 CONVULSIONS/SEIZURES 9 0.04 DIABETIC PROBLEMS 1 0.08 DROWNING (NEAR)/DIVING/SCUBA 1 0.01 EYE PROBLEMS/INJURIES 1 0.01 FALLS 0.01 ALLERGIES (REACTIONS)/ENVENOM 8 2 0.07 HEMORRHAGE/LACERATIONS 3 0.02 OVERDOSE/POISONING (INGESTION 14 0.03 PSYCHIATRIC/ABNORMAL BEH/SUIC 1 0.13 SICK PERSON (SPECIFIC OIAGNOS 5 0.01 STAB/GUNSHOT/PENETRATING TRAU 1 0.05 STROKE (CVA) 3 0.01 kTRAFFIC/TRANSPORTATION ACCIDE 44 0.03 ANIMAL BITES/ATTACKS 2 0.40 TRAUMATIC INJURIES (SPECIFIC) 8 0.02 UNCONSCIOUS/FAINTING (NEAR) 16 0.07 UNKNOWN PROBLEM (MAN DOWN) 18 0.15 ASSAULT/SEXUAL ASSAULT 4 0.17 BACK PAIN (NON TRAUMATIC OR N 1 0.04 52 -ALARMS 4 0.01 53 -CITIZEN ASSIST/SERVICE CAL 1 0.04 55 -ELECTRICAL HAZARD 11 0.01 57 -EXPLOSION 1 0.10 59 -FUEL SPILL 2 0.01 BREATHING PROBLEMS 5 0.02 65 -MUTUAL AID/ASSIST OUTSIDE. 1 0.05 66 -ODOR (STRANGE/UNKNOWN) 1 0.01. 67 -OUTSIDE FIRE 34 0.01 68 -SMOKE INVESTIGATION 3 0.31 69 -STRUCTURE FIRE 18 0.03 BURNS (SCALDS)/EXPLOSION 2 0.17 71 -VEHICLE FIRE 17 0.02 72 -WATER RESCUE 1 0.16 CARDIAC OR RESPIRATORY ARREST 26 0.01 911 HANG UP 173 0.24 ABANDONED VEHICLE 71 1.59 ACCESS ENTRY 1 0.65 X ACCIDENT -INJURY 8 0.01 (ACCIDENT -NON INJURY 279 0.07 )4ACCIDENT-UNKNOWN INJURY 111 2.56 AGENCY ASSIST 195 1.02 AIRCRAFT PROBLEM/CRASH 11 1.79 ALARM -LAW 293 0.10 ANIMAL PROBLEM 376 2.69 ARSON 7 3.45 ASSAULT 88 0.06 ASSAULT OR NEGLECT OF CHILD 50 0.81 ATTEMPT TO LOCATE 57 0.46 BICYCLE CONTACT 3 0.52 BLUE LIGHT PHONE ACTIVATION 1 0.03 BURGLARY 144 0.01 Burn Complaint 13 1.32 CALLOUT-CORONER 157 0.12 1.44 COPY 02/08/16 Kittitas County Sheriffs Office 121 09:51 Total CAD Calls Received, by Nature of Call Page: 2 Nature of Call- ----------- Total Calls Received a of Total CALLOUT-JUVENILE -------------------- 1 ---------- CHECK WELFARE 197 0.01 CITIZEN ASSIST 351 1.81 CIVIL MATTER 182 3.22 CITY CODE VIOLATION 5 1.67 CUSTODIAL INTERFERENCE 29 0.05 ATTENTION DAY DESK 1 0.27 DEATH 1 0.01 DISABLED VEHICLE 121 0.01 DISORDERLY CONDUCT 7 1.11 DOMESTIC DISPUTE 177 0.06 DRIVING COMPLAINT 257 1.62 Drowning 1 2.36 EVACUATION LEVEL 1 1 0.01 EVACUATION LEVEL 2 3 0.01 EXPLOSION 4 0.03 EXPLOSIVES 1 0.04 REQUEST FOR EXTRA PATROLS 15 0.01 FIREWORKS COMPLAINT 9 0.14 FISH & GAME VIOLATION 12 0.08 FLOODING AT RESIDENTIAL PROPE 6 0.11 FLOODING OVER ROADWAY 10 0.06 FORGERY COMPLAINT 1 0.09 FRAUD COMPLAINT 132 0.01 HARASSMENT 88 1.21 HIT AND RUN ACCIDENT 38 0.81 INDECENCY 3 0.35 CAD INFORMATIONAL REPORT 66 0.03 LINE DOWN 1 0.61 LIQUOR VIOLATION 11 0.01 LITTERING COMPLAINT 26 0.10 MALICIOUS MISCHIEF 115 0.26 MARINE RESCUE/CONTACT/INCIDEN 43 1.05 MESSAGE DELIVERY 9 0.39 MISSING PERSON REPORT 16 0.08 NOISE COMPLAINT 98 0.15 OTHER 0.90 CIVIL PAPER SERVICE 5 540 0.05 PARKING COMPLAINT 66 4.95 PROPERTY -FOUND 85 0.61 PROPERTY -LOST 27 0.78 PROWLER 9 0.25 PURSUIT 3 0.08 RECKLESS ENDANGERMENT 8 0.03 RECOVER -MISSING PERSON/PROP 2 0.07 RECOVER -STOLEN VEH OR PROPERT 11 0.02 CPS REFFERAL 9 0.10 REFERRAL -MHP 7 0.08 REPOSSESSED VEHICLE 12 0.06 ROBBERY 3 0.11 RUNAWAY JUVENILE REPORT 32 0.03 SAFETY HAZARD 22 0.29 SEARCH WARRANT 1 0.20 SEARCH AND RESCUE 73 0.01 SECURITY CHECK 404 0.67 3.70 COPY 02/08/16 Kittitas County Sheriffs Office 121 09:51 Total CAD Calls Received, by Nature of Call Page: 3 Nature of Call Smoke SOCIAL CONTACT SUBJECT STOP SUICIDAL SUBJECT SUSPICIOUS PERSON/CIRCUMSTANC TEST CAD CALL THEFT THREATS TOBACCO POSESSION BY MINOR TRAFFIC HAZARD TRAFFIC STOP PRISONER/SUBJECT TRANSPORT TRESPASS UNLAWFUL ISSUE OF BANK CHECK UNLAWFUL PHONE USAGE UNSECURE PREMISES UNWANTED PERSON VEHICLE CONTACT VEHICLE PROWL DISPUTE/FIGHT VIOLATE COURT ORDER INCORRECTLY CREATED INCIDENT VIOL UNIFORM CONTROL SUBST AC WARRANT SERVICE WEAPONS COMPLAINT Total Calls: Report Includes: All dates between '00:00:00 All nature of incidents All cities All types All priorities Ail agencies matching 'KCSO ------------------ COPY Total Calls Received % of Total 1 0.01 92 0.84 10 0.09 78 0.72 354 3.25 11 0.10 202 1.85 56 0.51 1 0.01 296 2.71 2602 23.85 259 2.37 124 1.14 1 0.01 32 0.29 15 0.14 37 0.34 333 3.05 62 0.57 79 0.72 57 0.52 11 0.10 33 0.30 381 3.49 109 ----------------------------------------- 1.00 10908 01/01/15 and '00:00:00 12/31/15 ------------------- *** End of Report /tmp/rptFfFaea-rpcdtccr.rl 2 *** ESTIMATING HOURS FOR CRAB Report Using personal experience and historical tracking of the incidents listed, the following times are being used to account for county road related activities. (These are conservative estimates, some calls take a lot longer (hit and run, fatalities, major road closures) ; ,< < .; wt kv, rt „Ey Injury Accidents 3 hours each -Non-injury accidents 2 hours each • Hit and Run accidents 4 hours each • Other accidents 1 hour each r, Traffic stops 20 minutes each stop Disabled vehicles 1 hour each Driving complaints I hour each Vehicle contacts 20 minutes each Vehicle fires I hour each s Abandoned Vehicles 1 hour each Parking Complaints 1 hour each c Traffic Hazards 1 hour each Flooding over roadway 1 hour each COPY KITTITAS COUNTY LEVIES FOR 2014-2015 TAXING DISTRICT VALUATIONS LEVY LOCALTAX TIMBERTAX TOTAL TAX $PERf SLATE Q'UBLIC SCI TOOLS S 5,750,271,147 2.355088 $ 13542394.SR TOTAL County Funds 2.355088 S 13,542,394.58 $ [3,542,394.55 Current lPxpcnse (2015 - 2016) S 5,782,294,144 1.390351 $ 8,039,418.45 "50%TAY Communiy Services $ $ 5,782,M4,144 0.025949 S 150,042.67 TOTAL, Veterans Mustance $ 5,782,294,144 0.007785 5 45,015.16 N. 28 Easmn Bond CO Rcf d 1s,17 Ad,,m Pees $ S 5,782,294,144 0.001037 $ 5,996.24 '100%T3b' T.cUdca plus $1 OOMCK) Levy Shift TOTAL 0.729768. 1.425122 $ 8,248,472.52 $ 8,240,472.52 464,495,117 County Flood Control Zone Diemict (2013 - 2019) $ 5,782,294,144 0"070054 S 405,07283 8,249,464 201'077 RCV%86.13 TOTAL 5 8,631.82 0.070054 $ 405,072.83 S 405,072.81 825,335.82 Cnunry Road Resolution Page 3 Road Dn.,t No.] 5 4,123,047,160 0.896227 $ 3,695,186.19 cam Dom 0rsu0pt_nrs•,zou Ce. Road Diverted (RC% 36.33.220) tamrs 7 S 4,123,047,160 0.048509 $ 200,004.89 lndudea Mir. $1,000,000 Levy Shifr TOTAL 0.944736 $ 3,895,19108 $ 3.895.191.08 Cities and Towns Cl,. El. Regular lcvy 5 223,672,916 2.285265 $ 511,156.3G TOTAL 2285285 $ 511,15636 $ 511,156.36 Ellensburg Regular 1- ry 5 1,244,884,915 2.183030 5 2,717,621.12 BOND (2004 - 2023) S 1,234,656,425 0.121650 S 150,195.96 'I00%TAV $ 70 0.12165D 8 0.01 TOTAL 2304680 $ 2,867,817.08 $ 0.01 $ 2,867,817.09 Piahs, RegularI y 5 W249,793 2.407001 $ 159,46332 TOTAL 2.407001 $ 159,463.32 3 159,463.32 Roslyn Regehr levy $ 87,715,R60 2205728 S 193,477.33 TOTAL 2,205728 $ 193,47733 $ 193,477.33 5nuth Ck Rlum Regular Le.y S 36,723,500 2.874812 S 105,573.16 TOTAL 2.874812 $ 105,573.16 $ 105,573.16 School Districts No, 7 Dammars h1&O (2015 - 2016) 8 103,76-1,771 2,264132 S 234,943.93 "50%TAY $ 24,726 2,264132 S 55m TOTAL, 2.264132 S 234,943.93 $ 55.98 $ 234.999.91 N. 28 Easmn Bond (2000 - 2019) $ 464,495,117 0.729768 S 338,973.67 '100%T3b' S 1,405,858 0.729768. 0 1,02595 M&O L,,; (2015 - 2018) S 464,495,117 1047077 S 486,361.15 "bT/, T.4V of 1983 Tuebcr 14,0 S 8,249,464 201'077 5 8,631.82 TOTAL 1.776845 $ 825,335.82 $ 9,663.77 $ 834,99959 Resolution Page 3 cam Dom 0rsu0pt_nrs•,zou tamrs 7 T "FJ lY 0 0 d O z 2 5 Z 0 0 0 -,• O N N N N g q q q y y y ir.m m m m 0 0 0 0 n O n p tLou n nnnG <<G n m m m m G L C C G C C y 4 y y C C C C y$ 3 3 C d w w 3 q q b w ro �p ro rob w a w w m m m m a w a w y� RRRrt � vrorow��p �o r .-�rtl oatl �t •G '<n �rnnnnnHvver trtl m mq n 'A rmWr:.aatlQaaaw0ro0 aab orn aag wno 0 a wn on tltj en na�abwnn mno nno�s �nn Y- - �tl nwn Q0 ron aq wn on ag wn on 0 ab wnooan ronnma 0`0agwnd ornaagwnn onrn�Qaabwno onr abwn 0n 0d -?Y. n mr P ad OWfOrrt rwR Ow Y In OrtY.WWOO t' RrOn- OrtY imO1 YR 7W010 ONRn p w rtm O RY.rrd rwr rwmr 0m mO dmd W wW w O w m R wr Y.wn O d W R biOn O w W O 0q0 Ymnn -Fny < -� m - Wn drtl OHn OYL Y - nw nw O Wn n m d n OYn Wn wr OY❑ Wn d •� nO n 5 n n N O r ar W 1-• Y Y W Y Y N W �.• N �` W U N U N U N Ot. U Y O O O 01 VP 0.01 (!� O• U ^ ^ �p A YS Fu' N Y N m � J .-. •P V �-. m � 4!•- A •P `. Ja ^ •P ... .O A .O O U t0 b O •O U ii 0 0 0 0 0 0 O• {+ O O Of l!• O O Ol -. b 6 O O UI 1p O O O'•O U W O O N r m 1^ Y O p _ W O N y: `i b U O l0 A N O O 1+ O O O Y 1 D O O O O J O O N U 000 UI OOm q S O O O O U A O O F' O p 1-' WW o Op � N q 0 0 OW O O •O �O N O O m b`O O'N M O o Y O O b N • O O O Of O. (-1 UI J Q el. t • Y N W- N 0) O o U W o o lD A O O N O O O W m W O O F+ W J Y O. O U `- W U {p O O •D jp N N j • '�R JIA-• OWN. O.ON O W JOl-'O• NOOLI U OOm V OOm O W N W00.Y W OO W O- OO N♦ 1b-' OOO V OOA- gyp. U OOm MOW AU.. pOOvN0011pO00y jOO W00001m�00 NOW y�OpNW Jp1+U NOUIgm b` N ^ N U •.r q N lO •O A V •" m N N •p ^ W J F' O In W O N'A p� O U W _ m W V1 J .� rP W N N O Y J ^ N N m J O J,�p J F+ F' A VI J U A U 1.+ q f' J •U V O O O.W•. NO1JYy OOb•p OF+rNOOb N b1• m 10 m N N O Vi 0 0 O• NOOO W V m N P •. O J'N b O O c •- •p,0 m 0 _ - 01 T.:G - ... � � {)f p 1-• 400 mUY O O di U J F' Ob O •D NJ OON w141dA.0 pOO iP •Np OOAd� 1y W .r U `U U � O• (T Ce W W W •P F+ m O• m Y V J -+ A� V W O W o Y l0 A �• O N W I'• F• W W m A (y ^ A W r' N -Y J Ul F+ N T l0 J b 01 � IJ --• m 01 V O1 N UV P m O In • -� A `� J •O N p m A .. O .... N b O O J N p1 N. tp F' A O Ol W O U' N fa W 001 W m.. J J O N N O O1 N OW W -. Q W b O b J O g O Q 2 N O W A N O •D U p• p O W W •O O Ol O o 0 0 N lJI N W O J • y N f+ 0- V W m _ � � � •A O d+ O m l0 O W N. O• T. A � F+ O J �' Ot p W A ' N` H W J W wIW Y l+ O �:• p• O p• N •p fa f+ b- W J- J U m J• W T A A A U Ja N O• lO �,.• •O .. •O J 1P N N A W A J W (J N N O O F+ F' IJ UI. N m m W W NOl 10 b F+ O• J O •O V O -� N vp N A W r •O '•p. 10 W y U 1-• U. W �D IJ U Y N Ot y. h' N •O b NUO Vyp IpUW L"J JUJ 0.000 p. lO AV1m N001 m N�Pmmb m y .. m eP t0 W q N 41. N ONO\ m0 WmU N Oj O m J O t0 Y A W g W 01 W m r �0 O rP N N Ol Y tO U m N l0 F+ O1 d\ y A. 1p m m A W O O A m Y J J m 1p W V O O.O •.• ••% T .� O1 t0 b O �+ ^ N ' O b Y lJi U .P � . 1p O F' .-"N m O• !+ _iP Cl 10 Vi A .� W • � � �-' m A. ' 01 Y m F' VA m O\ 1p N O\ \O �i 1p A O\ N M •D Y 1p N W U p1 U Ol O N OaO. W p1 W W 1J O W'r6 01 ip W r Y1 J W 10 N• m O A J J O IU W N N OJ m J .W O1 J J W N O m W '•. • r tD O b W iC N J N O m Y O m O mm A A UI N A W O N A b.N J O W m m O O w H ✓1 J p1 m. � OI J m p\ t0 A N O. O p1 fp Y J m O-lA y y ,® KITTITAS �. 307 W. February 8, 2016 Judy Pless Kittitas County Auditor's Office 205 West 5`h Ave. Room 105 Ellensburg, WA 98926 GENE DANA, SHERIFF COUNTY SHERIFF'S OFFICE Umptanum Rd.* Ellensburg, WA 98926 (509) 962-7525 0 (509) 674-2584 FAX (509) 962-7599 RE: County Road Diversion Funds Dear Judy, The following is a breakdown of all accidents, motorist assists, driving complaints, vehicle fires, traffic hazards, illegal parking and traffic stops that we responded to on County Roads in 2015. 2015 Est Hours 2015 Injury Accidents 8 24 Non -injury accidents 279 558 Hit and Run accidents 38 152 Other accidents 155 155 Traffic stops 2602 867 Disabled vehicles 121 121 Driving complaints 257 257 Vehicle contacts 333 111 Vehicle fires 17 17 Abandoned Vehicles 71 71 Parking Complaints 66 66 Traffic Hazards 296 296 Flooding over roadway 10 10 Total road incidents 4274 77n5 Based upon the average response times to handle and complete the above calls (not including court time or dispatch costs charged to KCSO related to these calls) for 2015 we responded to 4274 incidents on County Roads and spent approximately 2705 hours to handle these traffic related activities. These hours do not include regular pro -active high visibility patrol time on County Roads. Sincerely, � V . UJ U � 1 2' J.5 00 Gene Dana, 6 5 0 0_ x Sheriff Enclosure: 2015 KIITCOM CAD Report Z2),Z)'S•OJT