2. Request to Approve an Interlocal Agreement with Grant County PUD No. 2 for Shared
Operation and Maintenance Responsibilities for the Kittitas County Boat Launch Facility
at Vantage, Washington.
3. Request to Approve a Resolution Authorizing the Director's Signature on a Task Order
with Sargent Engineers Increasing the original Agreement by $28,483.00 for the
Westside Road Re -design.
4. Discussion Regarding DNR Monument Memorandum of Understanding with WSACE.
S. Biltmore Road Improvement District.
6. Other business
7. Adjourn
Created on 8/5/2016 9:07;13 AM
ADES ... TO }}}FCS �89
G
xIz- AS CO NTv
KZ'TTZTgIS CO
DEPARTMENT OF PUBLIC WORKS
Mark Cook, Director
STUDY SESSION MINUTES
August 8, 2016
THOSE PRESENT: Paul Jewell, Laura Osiadacz (BOCC), Mark Cook, Luke
Huck, Candie Leader (DPW), Doc Hansen, Steph Mifflin
(CDS), Jerry Pettit (AU)
GUESTS PRESENT: Tony — Daily Record
REQUEST TO APPROVE AN
INTERLOCAL AGREEMENT
WITH GRANT COUNTY PUD
NO. 2 FOR SHARED OPERATION
AND MAINTENANCE
RESPONSIBILITIES FOR THE
KITTITAS COUNTY BOAT
LAUNCH FACILITYAT
Mark presented a Resolution to authorize Director's
VANTAGE, WASHINGTON:
Mark Cook presented a Resolution and an Interlocal
Agreement with Grant County PUD No. 2 for the shared
maintenance and responsibilities for the Vantage Boat
Launch. The original agreement has expired and this will
be a renewal of that agreement. It was reviewed by DPA
Caulkins with no issues found.
Board Direction: Commissioner Jewell made a motion to approve
Resolution No. 2016105 and Commissioner Osiadacz
seconded the motion. No further discussion was held.
REQUEST TO APPROVE A
RESOLUTION AUTHORIZING
DIRECTOR'S SIGNATURE ON
A TASK ORDER WITH SARGENT
ENGINEERS INCREASING THE
ORIGINAL AGREEMENT BY
$28,483.00 FOR THE WESTSIDE
ROAD RE -DESIGN:
Mark presented a Resolution to authorize Director's
signature on a Task Order with Sargent Engineers to
increase the original agreement by $28,483.00 to re -scope
the Westside Road project and install guardrail on
Huntzinger. He stated that WSDOT Local Programs
approved the request to re -task project funding. Staff is
working on securing a Categorical Exemption for both
projects and once that is completed Westside Road can be
411 N. Ruby, Suite #1
TEL (509) 962-7523
Ellensburg, WA 98926
FAX (509) 962-7663
Dept. of Public Works
Page 2
advertised and avoid a twenty (20) percent project match
requirement.
Board Direction: Commissioner Osiadacz made a motion to approve
Resolution No. 2016-106 and Commissioner Jewell
seconded the motion. No further discussion was held.
DNR MONUMENT
MEMORANDUM OF
UNDERSTANDING WITH
WSACE: Mark gave background on survey monumentation and the
importance of tracking said monuments. The department
entered into the program previously and a report for 2016
needs to be completed. However, the monuments were
not established. Luke Huck stated that currently the
County is not compliant in the program and staff is working
to re-establish the monuments. Commissioner Jewell
inquired on what needed to be done to move forward.
Mark replied that staff will contact DNR and have a
discussion regarding the department being pro -active in
getting the monuments established.
Board Direction: No Direction
BILTMORE ROAD
IMPROVEMENT DISTRICT:
Mark reported that residents of a private road can petition
the County for a Road Improvement District to improve the
road. He has received a petition from the Biltmore Road
residents and met with DPA Caulkins to discuss the law
and process. Mark stated he has validated the petition
and verified ownership of the properties. The original
developer did not sign the petition but verbally committed
to the RID. Next steps would be to approve a Resolution
to Formulate, advertise for a Public Hearing and then
conduct the Public Hearing. Commissioner Jewell
requested more information on what the term "frontage"
means in the law.
Board Direction:
Research a better understanding of the law and report
back to the Board.
OTHER BUSINESS:
Public Facilities — Mark presented the Board with the
newest funding amount including reserves for the Public
Facilities Fund. The amount currently is larger than last
years. He'd like to put together a proposal for the Board
with funding amounts and clarify policy. Commissioner
Jewell asked if staff was asking to formulate a new policy
and Mark replied yes.
TEL (509) 962.7523
411 N. Ruby, Ste. #1
Ellensburg, WA 98926
FAX (509) 962-7663
Dept. of Public Works
Page 3
Board Direction: Staff to develop a recommendation to present the new
policy to the Board first then to the Conference of
Government (COG).
OTHER BUSINESS: Ringer Loop — Mark reported that the Department was
Unsuccessful in obtaining the Salmon Recovery Funding
Board Grant for Ringer Loop and staff is working on a plan
to move forward.
2�-�Ie44� -
Mark R. Cook
Director of Public Works
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO: 2016-1u�.
RESOLUTION TO APPROVE AN INTERLOCAL AGREEMENT BETWEEN KITTITAS
COUNTY AND GRANT COUNTY PUBLIC UTILITY DISTRICT NO.2 FOR SHARED
OPERATION AND MAINTENANCE RESPONSIBLITIES FOR THE KITTITAS COUNTY
BOAT LAUNCH FACILITY AT VANTAGE, WASHINGTON
WHEREAS, Grant County Public Utility District No. 2 is the owner of record of certain real
property located in Kittitas County; and
WHEREAS, Grant County Public Utility District No. 2 has recreation facility development and
operations requirements under the operating license for the Priest Rapids
Hydroelectric Project; and
WHEREAS, Kittitas County desires to share operations and maintenance (O&M) responsibilities
for the Kittitas County Boat Launch Facility, Vantage, Washington for public
recreational benefits and sustainable and economic needs and Grant County Public
Utility District No. 2 desires to enter into said agreement; and
WHEREAS, Said agreement for services is authorized by the provisions of Chapter 39.34 RCW,
the Interlocal Cooperation Act; and
NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners
hereby approves the attached Interlocal Agreement between Kittitas County and Grant County Public
Utility District No. 2 for shared operation and maintenance responsibilities for the Kittitas County
Boat Launch Facility at Vantage, Washington.
ADOPTED this 8th day of August, 2016.
t�, `lam\��
Clerk ohrd- Julie Kjorsvik
a
y lei•1Nb1 the Board- Mandy Buchholz
:7,P
''''!!!lffl1114111111�\\`
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
ObiZ'Chairman
aul Jewell, Vice -Chairman
1.
Laura Osla acz, Commissioner
LAND USE COOPERATIVE AGREEMENT
This Land Use Cooperative Agreement (Agreement) is entered into this 22 day of AW st
2016, by and between PUBLIC UTILITY DISTRICT NO.2 OF GRANT COUNTY, WA, a municipal
corporation incorporated under the laws of the State of Washington, hereinafter referred to as the
"Grant PUD" and KITTITAS COUNTY, a political subdivision of the State of Washington, "County."
The parties intend that this Agreement shall remain in effect for a period of five (5) years from this
date described above. This Agreement shall be binding upon all successors in interest to the
parties during said term.
WITNESSETH:
WHEREAS, Grant PUD is the owner of record of certain real property located in Kittitas County,
State of Washington, as more particularly described below:
The Northwest quarter of the Northwest quarter of Section 20, Township 17 North, Range 23,
E.W.M,, Kittitas County at Vantage, Washington.
WHEREAS, Grant PUD has recreation facility development and operations requirements under the
operating license for the Priest Rapids Hydroelectric Project.
WHEREAS, County desires to share operations and maintenance (0&M) responsibilities for the
Kittitas Boat Launch facility in Kittitas County for public recreational benefits and sustainable social
and economic needs.
Grant PUD desires to enter into an agreement with County regarding site management, operations
and maintenance of the premises.
WHEREAS, this Agreement for services is authorized by the provisions of Chapter 39.34 RCW, the
Interlocal Cooperation Act.
NOW THEREFORE, in consideration of the mutual promises and covenants contained herein, the
Parties agree as follows:
NOW THEREFORE, it is mutually agreed that Grant PUD does hereby accept responsibility for
planning, design, and construction of recreation facilities and various site management
responsibilities and County does hereby accept 0&M site management responsibilities to allow the
public to use said facilities until termination of this Agreement.
FOR AND IN CONSIDERATION of the mutual benefits to be derived, Grant PUD and County
mutually covenant and agree as follows:
1. Grant PUD and County agree to co -manage this site for public water access and day use
recreation opportunities.
2. Grant PUD and County agree this site will be managed by Grant PUD's policies and
procedures required to meet requirements of the Federal Energy Regulatory Commission
(FERC) license. Grant PUD policies and rules will be posted at the site to provide public
outreach and educational information.
3. Grant PUD and County agree the boat launch, day use areas and parking lot are open
year round. Restrooms may be closed Dec. 1— Feb. 28 annually.
4. Grant PUD will be responsible for all repairs and maintenance of picnic tables, boat
launch, boarding dock, parking lot, pilings and trail.
5. Grant PUD shall be responsible for maintaining cleanup for the boat launch, restrooms,
day use areas, and parking area year round.
6. Grant PUD shall provide and maintain all signagelkiosk information.
7. County will be responsible for repairs and maintenance of the restroom building and
associated plumbing and electrical year round.
B. County will provide water, electricity and toilet paper for the restroom building.
9. Detailed tasks and responsibilities regarding operation and maintenance activities and law
enforcement will be coordinated on an annual basis or as needed based upon the
approved Management Plan (Appendix A).
Each party to this Agreement agrees to be responsible for being appropriately self-insured or
providing adequate liability insurance related to the responsibilities and activities of itself, its
agents, contractors and employees at the premises. To the extent allowed by law, each party to
this Agreement, with respect to damages or injuries arising out of the acts or omissions of itself, its
agents, contractors, and employees at the premises, agrees to indemnify and hold harmless the
other party.
The parties to this Agreement agree to assist each other in preserving and presenting a defense of
limited liability under RCW 4.24.219 by allowing public to use said property for outdoor recreation.
No provision of this Agreement transfers any real property rights from Grant PUD to County or
County to Grant PUD.
IN WITNESS WHEREOF, the parties hereto have mutually agreed upon the terms and conditions
of this instrument and have caused it to be executed as below subscribed.
PUBLIC UTILITY DISTRICT No. 2 OF GRANT COUNTY
Name Date
Title
Kittita
Name
Dto
Title
Appendix A
Vantage Boat Launch Management Plan
5112116
1.0 Location
The Vantage Boat Launch facility is located on the Columbia River at Vantage on Grant Public Utility
District No. 2 (Grant PUD) Wanapum Reservoir. The project site is located between the Riverstone Resort
Marina and the Interstate -90 causeway,
Northeast'/ of Section 29, Township 17 North, Range 23 E.
Latitude and Longitude: 46.9556 (46 56'28.44")N; -119.9485 (119 59' 3.78")W
2.0 Operations
The Vantage Boat Launch is designed to provide water access for medium sized watercraft and limited
hiking access along the Wanapum reservoir. Recreation amenities were renovated in 2015. For the
purpose of this plan, the Kittitas County Sheriffs Building is not included. This building is wholly owned and
operated by Kittitas County to include all maintenance and operations. See Figure 1 Site Map
2.1 Amenities
An overview of site amenities is described below:
• Boat Launch — two lane
• 2 paved ADA vehicle parking spaces (1 with trailer)
• 47 paved vehicle w/trailer parking spaces
• 1 paved Sheriff's vehicle wltraller parking space
• 9 paved single vehicle parking spaces
ADA Restroom
• 9 picnic tables
• Kiosks and interpretive signage
2.2 Operating Season/Hours
Vantage Boat Launch operating times and periods may vary according to conditions. Such times and
periods will be posted at the main kiosk, entrance gate and on the Grant PUD web site, Vantage Boat
Launch will generally be open year around, from dawn to dusk (% hour prior to sun -rise to % hour after sun-
set).
Overnight camping is not permitted. See Section 2.3 Facilities Use, Scheduling, and Use Permits.
2.3 Facilities Use, Scheduling, and Use Permits
Vantage Boat Launch facilities are available to individual persons, families, and small groups for activities
consistent with the facility design, Grant PUD park rules and regulations,
Grant PUD will be the contact for all site operations. Activities may include commercial sponsored events,
community activities, etc. Grant PUD may develop an appropriate written agreement with the requesting
party. This agreement will act as the mechanism for scheduling and reserving areas for non -routine use, as
well as providing the approval for appropriate activities,
2.4 Gates
There is a gate installed on the main access road to Vantage Boat Launch to allow the site to be
temporarily closed for unforeseen maintenance. Prior approval for any closure will be coordinated between
Grant PUD and Kittitas County.
2.5 Rules
Park patrons are ultimately responsible to ensure that their conduct follows applicable laws and rules. This
includes:
R2 Grant PUD Park Rules and Policies
• Rules Governing Public Use of Project Lands and Waters
• Washington State Laws
• Kittitas County Code
Park rules are posted at various conspicuous locations where they are applicable. Public use areas and
restricted areas are posted and delineated.
2.6 Emergency Action Plan
In the event that there is an imminent threat to human safety, Grant PUD or contract staff has the authority
to close all or portions of the facility as appropriate. Contact should be made with supervisors, agency
contacts and emergency services if needed. See table below.
Contact List
Agency
Name
Title
Contact Info
Grant PUD
Vanessa Seidai
Site Maintenance
509/793-1557
Manager
Cell 5091429-9604
yseldal(a).gcr)ud.oro
Grant PUD
Ruben Puente
Facilities Contact
5091754-0500 ex 2120
Cell 5091289-0247
Contracted
Brady Phelps
Grant PUD Security
50917540500 ex 2120
Security
Cell 509/237-9025
Kittitas County
Jim Vandeventer or
Kittitas County Public
5091962-7524
Public Works
Ryan Berge
Works
Jim.vandeventerCboo.kittitas.wa.us
R an.be a co.kittitas.wa.us
Kittitas County
Dispatch
Non -emergency 509/982-7525
Sheriff
911
Kittitas Valley Fire
Vantage — Dist. 4
Office 5091856-7140
& Rescue
Dispatch — Dist. 2,
Office 5091933-7231
Kittitas Valley Fire &
911
Rescue
3.0 Maintenance
Grant PUD and Kittitas County will share maintenance responsibilities throughout the year. If a
maintenance activity is not clearly defined in the following sections, coordination between Grant PUD and
Kittitas County should occur. Grant PUD is ultimately responsible for ensuring that all internal protocol and
external permits are in-place for maintenance activities at Vantage Boat Launch; therefore clear
communication is vital to the future success of this property.
Maintenance tasks and frequencies are designed to meet the Grant PUD goal that all recreation facilities
and equipment will:
• Look good
• Be in good repair
Be appropriate
Function
All sites will meet basic standards for health and cleanliness:
Healthy environment for users and employees
- Minimal odor
• Minimal litter
Maintenance extends the usability of all built elements in a recreation site. Maintenance of facilities is
critical to a visitor's experience.
The cleanliness of restroom facilities is the highest priority to most park visitors and sets a first impression
of the entire park. It is important that the visual cleanliness of the restroom conveys to the visitors a facility
that presents no health risks, no safety concerns, and a feeling of security and nothing that detracts from
the site.
Site cleanliness, including litter removal and grounds maintenance, frequently rank second in determining
visitor satisfaction, based on user comments at public recreation sites.
3.1 Maintenance Categories
Maintenance will be categorized in the following designations: routine, seasonal, scheduled/capital and
unscheduled.
Grant PUD will be the lead on maintenance but duties will be shared with Kittitas County.
Maintenance will be shared as shown in the following tables:
3.2 Grant PUD Responsibilities
Maintenance Task
Grant PUD Re , ortsibilkities
Developed recreation
Maintain a# FERC required recreation amenities.
area maintenance
Maintain grounds, park equipment and boat launch
Enforcement
Maines developed parking area and boulder barriers, cleanliness,
Coordinate with Grant PUD
parking stripes, and dkec ionak arrows.
Maintain trees, ornamental plantings and mitigation plantings.
agencies
Manage noxious weeds and spray records.
Maintain Grant PUD Signs.
3.3 Kittitas County Responsibilities
Maintenance Task
Kittitas County Responsibilities
Maintenance
Al building maintenance and repairs
Responsibilities
Supply toilet paper for the restrooms
Enforcement
Snow removal on entrance road and within parking lot
3.4 Shared Responsibilities
Maintenance Task
Grant PUD
Kittitas County
Responsibilities
Responsibilities
Enforcement
Coordinate with Kittitas County
Coordinate with Grant PUD
coordination with outside
agencies
Site inspections
Coordinate with Kittitas County
Coordinate with Grant PUD
Complete Grant PUD inspection
form annuals
Restroom
Report to Kittites Coun
Garbage
Coordinate with iGttitas Count`
Coordinate with Grant PUD
Operations and maintenance schedules will be coordinated between Grant PUD and Kittitas County
annually during the first quarter of each calendar year.
3.5 Routine Maintenance
3.5.1 Constructed Recreation Facilities
At recreation sites in general!, this is typically cleaning of built features such as restrooms, campsites, swim
beaches, boat launches, and docks. While routine maintenance of facilities is accomplished by people with
the least amount of technical staff training, it is the most critical to a visitor's experience.
Routine facility maintenance can impact the usability of facilities; for example loose gravel and debris can
hinder the ability of a boat launch, route of travel, or roadway to function as intended, if fasteners and
railings are not routinely inspected and tightened or loose gravel is not removed from paved trail surfaces
where wheeled activities such as in-line skating or roller skating takes place, this is a safety issue.
3.5.2 Grounds
This ranges from litter removal, to turf mowing and routine maintenance of water systems. The cleanliness
of grounds and the quality of turf care frequently rank #2 in determiners of visitor satisfaction based on user
comments at public recreation sites. With Vantage Boat launch meeting the Grant PUD classification
criteria of an urban site, the user expectations are consistent with the higher level of development, Flush
restrooms, paved parking, concrete sidewalks and multiple garbage cans, all give visitors the impression
that this site is maintained frequently.
Seasonal
Facilities — examples include:
Snow removal/plowing of roadways
Trail surface maintenance for compacted gravel trails
Grounds
Pruning
Fertilizelseed
Noxious Weeds/Pest Control
3.6 Non -Routine Maintenance of Constructed Recreation Facilities
Facilities — unscheduled but vital tasks include, but are not limited to; graffiti removal, utility distribution
system repairs, pavement maintenance, etc.
Grounds — can include replacement of vegetative plantings necessary to meet environmental permit
requirements or operational objectives such as shade at universally accessible facilities.
4.0 Work Assignment
Work Assignment Feedback/Monitoring Activities — will assist Grant PUD in preparing accurate staffing and
budget plans. A Recreation Specialist will coordinate with Grant PUD Facilities Department and contract
staff as needed to verify work durations for specific projects. This information will be reviewed on an
annual basis to adjust estimated work durations for specific tasks.
A combination of the Maximo system (Facilities Department work order system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
4.1 Standard Operating Procedures
Vantage Boat Launch has no complex, interlinked multi -function systems that would warrant the
development of Standard Operating Procedures (SOP). SOPS are developed for systems associated with
the operation of complex, multiple interlinked functions that must all occur for an outcome that fulfills the
expectation for that specific aspect of an operation. SOPS are also written instructions to achieve
uniformity of the performance of functions associated with quality requirements of a system.
5.0 Maintenance Monitoring
5.1 Unplanned Maintenance
All personnel involved in the operation or maintenance of Vantage Boat Launch will have a means to
provide feedback to Grant PUD Recreation Specialists on observed or reported maintenance needs outside
their direct responsibility. This will assure a means of timely awareness of maintenance needs and
appropriate responses being directed at the issue.
5.2 Inspections
In addition to reporting and tracking of Unplanned Maintenance, Recreation Specialists will conduct site
inspections at Vantage Boat Launch twice a year to evaluate the success of current task schedule
frequencies and to identify any non -routine maintenance that needs to be addressed.
5.3 Maintenance Tracking
Activity tracking will assist Grant PUD in preparing accurate staffing and budget plans. A Recreation
Specialist will coordinate with Grant PUD Facilities department and contract staff as needed to verify work
durations for specific projects. This information will be reviewed on an annual basis to adjust estimated
work durations for specific tasks.
A combination of the Maximo system (maintenance management system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
6.0 Vegetation Management
6.1 Trees
An annual inspection of all trees by staff with training in tree disease and structural failure indicators, will
occur in the fall. If indicators are found that warrant more than increased observation, a trained arborlst
should be called to determine if a corrective prescription is needed. Any corrective action can be
implemented prior to the next use season.
All staff performing routine maintenance at the site should be aware and observant of indicators of tree
hazards.
6.2 Weed Control
Noxious weeds will be managed for the site under the Districts Vegetation Management Program,
consistent with the integrated pest management plan for Vantage Boat Launch. The Grant PUD Facilities
staff or a contractor will control the weeds as needed, based upon site vegetation assessments.
Weed Control Methods and Schedule
Weeds will be controlled by herbicide spraying, hand -pulling, or by mechanical methods (weed -whacking or
mowing). These methods and their frequency are described in the table below.
6
Vegetation Management
Method
Timing and Location(s)
Staff Required
Herbicide Spraying
Initial application of pre -emergent herbicide should
Facilities staff must
occur along the trail, trail shoulders, gravel walkways,
apply herbicides
picnic areas, etc. in late winter or early spring when
that require
temperatures are forecast to be consistently above
application by a
freezing and rain is likely within 24-48 hours after
licensed herbicide
application.
applicator.
Follow-up spot applications of herbicide should be
applied to breakthrough weeds along the trail, trail
LRC or Lands
shoulders, gravel walkways, picnic areas, etc. in June
Specialists can use
through early September. Staff should use a dyed
un -regulated
herbicide when spraying near public areas.
herbicides (OTC
Selective herbicides may be used in landscaped areas
Round -up)
(parking lot islands, bioswales, etc.) If necessary.
Application should occur between May and September
as needed.
Hand Pulling
Hand pulling is the preferred method for landscaped
LRC, Contractor,
areas, but if the weed population is large, selective
Lands Specialist
herbicides may be used. Hand pulling should occur as
soon as weeds are spotted. Hand pulling can occur all
year, but mostly during growing season (June through
September).
Mechanical
Mechanical methods should be used where weed
Facilities or
populations cover a large area. Timing and frequency
Contractor
depends on the weed species.
PF*scent Bar
.�'',��? al;�li 'ate 9
Gorge
G rge
amnat Cooumna3l
Figure I Site Map
a qPwa
o Aire
L
Project Boundary
Grant County
PUSUO �AILLrkly al'SIR1107
8
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2016 -
AUTHORIZE THE CHAIR'S SIGNATURE ON A TASK ORDER SUPPLEMENT FOR
SARGENT ENGINEERS SUPPORTING THE REDESIGN OF THE WESTSIDE ROAD
HIGHWAY SAFETY IMPROVEMENT PROJECT
WHEREAS: Kittitas County Public Works entered into a Task Order assignment with Sargent
Engineers for designing safety improvements to Westside Road under
Resolution No. 2015-021; and
WHEREAS: Public Works required a re -design supporting critical permitting timelines; and
WHEREAS: The cost of re -designing safety improvements has exceeded authorized
spending amounts by $28,483.00; and
WHEREAS: Public Works desires obligating project funds by the end of the federal fiscal year
and project completion is critical to meeting deliverable schedules;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby authorize the Chair's signature on a Task Order Consultant
Supplement Agreement increasing the cost of Westside Road Highway Safety Improvement
design by $28,483.00.
DATED this 8th day of August, 2016, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
IND Wwk of the Board- Mandy Buchholz
.... •�;���'
SM
' rWAN��
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Ob' Chairman
aul ewell, Vice -Chairman
e--Zt 0
ha6ra Osia , Commissioner
Formal Task Assignment Document
Task -Number: 2 - Amendment 1
The general provisions and clauses of Agreement BOCC Res. No. 2015-021 shall be in fall force and
effect for this Task Assignment.
Location of Project: Huntzin er Road and West Side Road
Project Title: Huntzinger Road and West Side Road Improvements
Maximum Amount Payable Per Task Assignment: $73,671.00 + $28,483 (Amendment 1) = $102,154
Completion Date: December 31, 2016
Description of Work:
(Note attachments and give brief description)
This amendment provides for changing the design to include all of Westside Road between Tree Haven
Road to Golf Course Road. The design includes safety improvements (guardrail, signing, and striping).
It does not include road widening or realignment. It also provides for obtaining the permits for this
scope of work.
Agency Project Manager Signature
Oral Authorization Date:
Consultant Signature:
Agency Approving Authority: _
�.
Consultant: Sargent Engineers, Inc.
320 Ronlee Lane NW
Olympia, WA 98502
(360) 867-9284
Date:
See Letter Dated:
Date: '901 Cv
Date: g' //'-/4"
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STAFF REPORT
HEARING DATE: August S, 2016
ACTION REQUESTED: Request to Approve an Interlocal Agreement with
Grant County PUD No. 2 for Shared Operation and
Maintenance Responsibilities for the Kittitas County
Boat Launch Facility at Vantage, Washington.
BACKGROUND: Grant County PUD No. 2 is the owner of record of
certain real property at Vantage, Washington.
Kittitas County and Grant County PUD No. 2 desire
to enter into said agreement to share operations and
maintenance responsibilities for the Kittitas County
Boat Launch Facility. Said agreement shall be for a
period of five (5) years from the date said agreement
is approved.
INTERACTION: Public Works, Prosecutors Office, Grant County PUD
#2; Kittitas County Sheriff's Office
RECOMMENDATION: Approve chair signature on the Interlocal Agreement
between Kittitas County and Grant County PUD #2
for shared operations and maintenance of the Kittitas
County Boat Launch Facility at Vantage,
Washington.
HANDLING: Return three (3) signed originals to Public Works to
obtain Grant County PUD No. 2 Agent Signature.
ATTACHMENTS: Interlocal Agreement
LEAD STAFF: Mark Cook, Director of Public Works
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO: 2016 -
RESOLUTION TO APPROVE AN INT TRLOCAL AGREEMENT BETWEEN KITTITAS
COUNTY AND GRANT COUNTY PUBLIC UTILITY DISTRICT NO.2 FOR SHARED
OPERATION AND MAINTENANCE RESPONSIBLITIES FOR THE KITTITAS COUNTY
BOAT LAUNCH FACILITY AT VANTAGE, WASHINGTON
WHEREAS, Grant County Public Utility District No. 2 is the owner of record of certain real
property located in Kittitas County; and
WHEREAS, Grant County Public Utility District No. 2 has recreation facility development and
operations requirements under the operating license for the Priest Rapids
Hydroelectric Project; and
WHEREAS, Kittitas County desires to share operations and maintenance (O&M) responsibilities
for the Kittitas County Boat Launch Facility, Vantage, Washington for public
recreational benefits and sustainable and economic needs and Grant County Public
Utility District No. 2 desires to enter into said agreement; and
WHEREAS, Said agreement for services is authorized by the provisions of Chapter 39.34 RCW,
the Interlocal Cooperation Act; and
NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners
hereby approves the attached Interlocal Agreement between Kittitas County and Grant County Public
Utility District No. 2 for shared operation and maintenance responsibilities for the Kittitas County
Boat Launch Facility at Vantage, Washington.
ADOPTED this 8th day of August, 2016.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Obie O'Brien, Chairman
Paul Jewell, Vice -Chairman
Laura Osiadacz, Commissioner
LAND USE COOPERATIVE AGREEMENT
This Land Use Cooperative Agreement (Agreement) is entered into this day of
2016, by and between PUBLIC UTILITY DISTRICT N0.2 OF GRANT COUNTY, WA, a municipal
corporation incorporated under the laws of the State of Washington, hereinafter referred to as the
"Grant PUD" and KITTITAS COUNTY, a political subdivision of the State of Washington, "County."
The parties intend that this Agreement shall remain in effect for a period of five (5) years from this
date described above. This Agreement shall be binding upon all successors in interest to the
parties during said term.
WITNESSETH:
WHEREAS, Grant PUD is the owner of record of certain real property located in Kittitas County,
State of Washington, as more particularly described below:
The Northwest quarter of the Northwest quarter of Section 20, Township 17 North, Range 23,
E.W.M., Kittitas County at Vantage, Washington.
WHEREAS, Grant PUD has recreation facility development and operations requirements under the
operating license for the Priest Rapids Hydroelectric Project.
WHEREAS, County desires to share operations and maintenance (0&M) responsibilities for the
Kittitas Boat Launch facility in Kittitas County for public recreational benefits and sustainable social
and economic needs.
Grant PUD desires to enter into an agreement with County regarding site management, operations
and maintenance of the premises.
WHEREAS, this Agreement for services is authorized by the provisions of Chapter 39.34 RCW, the
Interlocal Cooperation Act.
NOW THEREFORE, in consideration of the mutual promises and covenants contained herein, the
Parties agree as follows:
NOW THEREFORE, it is mutually agreed that Grant PUD does hereby accept responsibility for
planning, design, and construction of recreation facilities and various site management
responsibilities and County does hereby accept 0&M site management responsibilities to allow the
public to use said facilities until termination of this Agreement.
FOR AND IN CONSIDERATION of the mutual benefits to be derived, Grant PUD and County
mutually covenant and agree as follows:
1. Grant PUD and County agree to co -manage this site for public water access and day use
recreation opportunities,
2. Grant PUD and County agree this site will be managed by Grant PUD's policies and
procedures required to meet requirements of the Federal Energy Regulatory Commission
(FERC) license. Grant PUD policies and rules will be posted at the site to provide public
outreach and educational Information.
3. Grant PUD and County agree the boat launch, day use areas and parking lot are open
year round. Restroams may be closed Dec. 1— Feb. 28 annually,
4. Grant PUD will be responsible for all repairs and maintenance of picnic tables, boat
launch, boarding dock, parking lot, pilings and trail.
5. Grant PUD shall be responsible for maintaining cleanup for the boat launch, restrooms,
day use areas, and parking area year round.
6. Grant PUD shall provide and maintain all signage/kiosk information.
7. County will be responsible for repairs and maintenance of the restroom building and
associated plumbing and electrical year round.
S. County will provide water, electricity and toilet paper for the restroom building.
9. Detailed tasks and responsibilities regarding operation and maintenance activities and law
enforcement will be coordinated on an annual basis or as needed based upon the
approved Management Plan (Appendix A).
Each party to this Agreement agrees to be responsible for being appropriately self-insured or
providing adequate liability insurance related to the responsibilities and activities of itself, its
agents, contractors and employees at the premises. To the extent allowed by law, each party to
this Agreement, with respect to damages or injuries arising out of the acts or omissions of itself, its
agents, contractors, and employees at the premises, agrees to indemnify and hold harmless the
other party.
The parties to this Agreement agree to assist each other in preserving and presenting a defense of
limited liability under RCW 4.24.210 by allowing public to use said property for outdoor recreation.
No provision of this Agreement transfers any real property rights from Grant PUD to County or
County to Grant PUD.
IN WITNESS WHEREOF, the parties hereto have mutually agreed upon the terms and conditions
of this instrument and have caused it to be executed as below subscribed.
PUBLIC UTILITY DISTRICT No. 2 OF GRANT COUNTY
Name
Title
Kittitas County
Name
Title
Date
Date
Appendix A
Vantage Boat launch Management Plan
5112116
1.0 location
The Vantage Boat Launch facility is located on the Columbia River at Vantage on Grant Public Utility
District No. 2 (Grant PUD) Wanapum Reservoir. The project site is located between the Riverstone Resort
Marina and the Interstate -90 causeway.
Northeast'/. of Section 29, Township 17 North, Range 23 E.
Latitude and Longitude; 46.9556 (46 56'28.44')N; -119.9485 (1 i9 59' 3.78")W
2.0 Operations
The Vantage Boat Launch is designed to provide water access for medium sized watercraft and limited
hiking access along the Wanapum reservoir. Recreation amenities were renovated in 2015. For the
purpose of this plan, the Kittitas County Sheriffs Building is not included. This building is wholly owned and
operated by Kltdtas County to include all maintenance and operations. See Figure I Site Map
2.1 Amenities
An overview of site amenities is described below:
0 Boat Launch — two lane
2 paved ADA vehicle parking spaces (1 with trailer)
k. 47 paved vehicle wltrailer parking spaces
1 paved Sheriff's vehicle wltrailer parking space
9 paved single vehicle parking spaces
C ADA Restroom
9 picnic tables
Kiosks and interpretive signage
2.2 Operating Season/Hours
Vantage Boat Launch operating times and periods may vary according to conditions. Such times and
periods will be posted at the main kiosk, entrance gate and on the Grant PUD web site. Vantage Boat
Launch will generally be open year around, from dawn to dusk (% hour prior to sun -rise to % hour after sun-
set).
Overnight camping is not permitted. See Section 2.3 Facilities Use, Scheduling, and Use Permits
2.3 Facilities Use, Scheduling, and Use hermits
Vantage Boat Launch facilities are available to individual persons, families, and small groups for activities
consistent with the facility design, Grant PUD park rules and regulations,
Grant PUD will be the contact for all site operations. Activities may include commercial sponsored events,
community activities, etc. Grant PUD may develop an appropriate written agreement with the requesting
party. This agreement will act as the mechanism for scheduling and reserving areas for non -routine use, as
well as providing the approval for appropriate activities.
2.4 Gates
There is a gate installed on the main access road to Vantage Boat Launch to allow the site to be
temporarily closed for unforeseen maintenance. Prior approval for any closure will be coordinated between
Grant PUD and Kittitas County.
2.5 Rules
Park patrons are ultimately responsible to ensure that their conduct follows applicable laws and rules. This
includes:
v Grant PUD Park Rules and Policies
* Rules Governing Public Use of Project Lands and Waters
Q Washington State Laws
r. Kittitas County Code
Park rules are posted at various conspicuous locations where they are applicable. Public use areas and
restricted areas are posted and delineated.
2.6 Emergency Action Plan
In the event that there is an imminent threat to human safety, Grant PUD or contract staff has the authority
to close all or portions of the facility as appropriate. Contact should be made with supervisors, agency
contacts and emergency services if needed. See table below.
Contact List
Agency
Name
Title
Contact No
Grant PUD
Vanessa Seldal
Site Maintenance
5091793-1557
Manager
Cell 5091429-1604
vselda;0QQcpud.orc
Grant PUD
Ruben Puente
Facilities Contact
5091754-0500 ex 2120
Cell 5091289-0247
Contracted
Brady Phelps
Grant PUD Security
5091754-0500 ex 2120
Security
Cell 5091237-9025
Kittitas County
Jim Vandeventer or
Kittitas County Public
5091962-7524
Public Works
Ryan Berge
Works
J;in.vandeventer co.kittitas.�rra.us
R an.bar eQco.kittitas.w9.us
Kittitas County
Dispatch
Non -emergency 5091962-7525
Sheriff
911
Kittitas Valley Fire
Vantage — Dist. 4
Office 5091856-7140
& Rescue
Dispatch — Dist, 2,
Office 5091933-7231
Kittitas Valley Fire &
911
Rescue
3.0 Maintenance
Grant PUD and Kittitas County will share maintenance responsibilities throughout the year. If a
maintenance activity is not dearly defined in the following sections, coordination between Grant PUD and
Kittitas County should occur. Grant PUD is ultimately responsible for ensuring that all internal protocol and
external permits are in-place for maintenance activities at Vantage Boat Launch; therefore clear
communication is vital to the future success of this property.
Maintenance tasks and frequencies are designed to meet the Grant PUD goal that all recreation facilities
and equipment will:
Look good
rt Be in good repair
�!) Be appropriate
a Function
All sites will meet basic standards for health and cleanliness:
Healthy environment for users and employees
Minimal odor
Minimal litter
Maintenance extends the usability of all built elements in a recreation site. Maintenance of facilities is
critical to a visitor's experience.
The cleanliness of restroom facilities is the highest priority to most park visitors and sets a first impression
of the entire park. It is important that the visual cleanliness of the restroom conveys to the visitors a facility
that presents no health risks, no safety concerns, and a feeling of security and nothing that detracts from
the site.
Site cleanliness, including litter removal and grounds maintenance, frequently rank second in determining
visitor satisfaction, based on user comments at public recreation sites.
3.1 Maintenance Categories
Maintenance will be categorized in the following designations: routine, seasonal, scheduled/capital and
unscheduled.
Grant PUD will be the lead on maintenance but duties will be shared with Kittitas County.
Maintenance will be shared as shown in the following tables:
3.2 Grant PUD Responsibilities
Maintenance Task
Grant PUD Responsibilities
Developed recreation
Maintain all FERC required recreation amenities,
area maintenance
Maintain grounds, park equipment and boat launch.
Enforcement
Maintain developed parking area and boulder barriers, cleanliness,
Coordinate with Grant PUD
parking stripes, and directional arrows.
Maintain trees, ornamental plantings and mitigation plantings.
agencies
Manage noxious weeds and spray records.
Maintain Grant PUD Signs.
3.3 Kittkas County Responsibilities
Maintenance Task
Kittitas County Responsibilities
Maintenance
Ali building maintenance and repairs
Responsibilities
Su I toilet paper for the restrooms
Enforcement
Snow removal on entrance road and within parking -lot
3.4 Shared Responsibilities
Maintenance Task
Grant PUD
Kittitas County
Responsibilities
Responsibilities
Enforcement
Coordinate with Kittitas County
Coordinate with Grant PUD
coordination with outside
agencies
Site inspections
Coordinate with Kittitas County
Coordinate with Grant PUD
Complete Grant PUD inspection
form annually
Restroom
Report to Kittitas Coun
Garbage
Coordinate with Kittitas County
Coordinate with Grant PUD
Operations and maintenance schedules will be coordinated between Grant PUD and Kittitas County
annually during the first quarter of each calendar year.
3.5 Routine Maintenance
3.5.1 Constructed Recreation Facilities
At recreation sites in general, this is typically cleaning of built features such as restrooms, campsites, swim
beaches, boat launches, and docks. While routine maintenance of facilities is accomplished by people with
the least amount of technical staff training, it is the most critical to a visitor's experience.
Routine facility maintenance can impact the usability of facilities; for example loose gravel and debris can
hinder the ability of a boat launch, route of travel, or roadway to function as intended. If fasteners and
railings are not routinely inspected and tightened or loose gravel is not removed from paved trail surfaces
where wheeled activities such as in-line skating or roller skating takes place, this is a safety issue,
3.5.2 Grounds
This ranges from litter removal, to turf mowing and routine maintenance of water systems. The cleanliness
of grounds and the quality of turf care frequently rank #2 in determiners of visitor satisfaction based on user
comments at public recreation sites. With Vantage Boat Launch meeting the Grant PUD classification
criteria of an urban site, the user expectations are consistent with the higher level of development. Flush
restrooms, paved parking, concrete sidewalks and multiple garbage cans, all give visitors the impression
that this site is maintained frequently.
Seasonal
Facilities -- examples include;
Snow removaliplowing of roadways
Trail surface maintenance for compacted gravel trails
Grounds
Pruning
Fertilizelseed
Noxious Weeds/Pest Control
3.6 Non -Routine Maintenance of Constructed Recreation Facilities
Facilities -- unscheduled but vital tasks include, but are not limited to; graffiti removal, utility distribution
system repairs, pavement maintenance, etc.
Grounds — can include replacement of vegetative plantings necessary to meet environmental permit
requirements or operational objectives such as shade at universally accessible facilities.
4.0 Work Assignment
Work Assignment Feed back/Monitoring Activities — will assist Grant PUD in preparing accurate staffing and
budget plans. A Recreation Specialist will coordinate with Grant PUD Facilities Department and contract
staff as needed to verify work durations for specific projects. This information will be reviewed on an
annual basis to adjust estimated work durations for specific tasks.
A combination of the Maximo system (Facilities Department work order system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
4.1 Standard Operating Procedures
Vantage Boat Launch has no complex, interlinked multi -function systems that would warrant the
development of Standard Operating Procedures (SOP). SOPs are developed for systems associated with
the operation of complex, multiple interlinked functions that must all occur for an outcome that fulfills the
expectation for that speck aspect of an operation, SOPS are also written instructions to achieve
uniformity of the performance of functions associated with quality requirements of a system.
5.0 Maintenance Monitoring
5.1 Unplanned Maintenance
All personnel involved in the operation or maintenance of Vantage Boat Launch will have a means to
provide feedback to Grant PUD Recreation Specialists on observed or reported maintenance needs outside
their direct responsibility. This will assure a means of timely awareness of maintenance needs and
appropriate responses being directed at the issue,
5.2 Inspections
In addition to reporting and tracking of Unplanned Maintenance, Recreation Specialists will conduct site
inspections at Vantage Boat Launch twice a year to evaluate the success of current task schedule
frequencies and to identify any non -routine maintenance that needs to be addressed.
5.3 Maintenance Tracking
Activity tracking will assist Grant PUD in preparing accurate staffing and budget plans. A Recreation
Specialist will coordinate with Grant PUD Facilities department and contract staff as needed to verify work
durations for specific projects. This information will be reviewed on an annual basis to adjust estimated
work durations for specific tasks.
A combination of the Maximo system (maintenance management system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
6.0 Vegetation management
6.1 Trees
An annual inspection of all trees by staff with training in tree disease and structural failure indicators, will
occur in the fall. If indicators are found that warrant more than increased observation, a trained arborist
should be called to determine if a corrective prescription is needed. Any corrective action can be
implemented prior to the next use season.
All staff performing routine maintenance at the site should be aware and observant of indicators of tree
hazards.
6.2 Weed Control
Noxious weeds will be managed for the site under the Districts Vegetation Management Program,
consistent with the integrated pest management plan for Vantage Boat Launch. The Grant PUD Facilities
staff or a contractor will control the weeds as needed, based upon site vegetation assessments.
Weed Control Methods and Schedule
Weeds will be controlled by herbicide spraying, hand -pulling, or by mechanical methods (weed -whacking or
mowing). These methods and their frequency are described in the table below.
Vegetation Management
Method
Timing and Location(s)
Staff Required
Herbicide Spraying
Initial application of pre -emergent herbicide should
Facilities staff must
occur along the trail, trail shoulders, gravel walkways,
apply herbicides
picnic areas, etc, in late winter or early spring when
that require
temperatures are forecast to be consistently above
application by a
freezing and rain is likely within 24-48 hours after
licensed herbicide
application.
applicator.
Follow-up spot applications of herbicide should be
applied to breakthrough weeds along the trail, trail
LRC or Lands
shoulders, gravel walkways, picnic areas, etc. in June
Specialists can use
through early September. Staff should use a dyed
unregulated
herbicide when spraying near public areas.
herbicides (OTC
Selective herbicides may be used in landscaped areas
Round -up)
(parking lot islands, bioswales, etc.) if necessary.
Application should occur between May and September
as needed.
Hand Pulling
Hand pulling is the preferred method for landscaped
LRC, Contractor,
areas, but if the weed population is large, selective
Lands Specialist
herbicides may be used, Hand pulling should occur as
soon as weeds are spotted. Hand pulling can occur all
year, but mostly during growing season (June through
September).
Mechanical
Mechanical methods should be used where weed
Facilities or
populations cover a large area. Timing and frequency
Contractor
depends on the weed species.
Figure 1 Site Map
r
f JIF
I'
ti
r
�r cent Bar
- JV
G �rge
-,Y ant comfll!r
.. 1
�'•. '
bJf
Mattawa
De ert Aire
Project Boundary
r Grant County
PUBLIC U. TILrrY DISTRICT
8
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS -- BOARD OF COUNTY COMMISSIONERS
STUDY SESSION! STAFF REPORT
STUDY SESSION DATE : August 8, 2016
TOPIC
Westside Road and Huntzinger Road
HSIP Projects Update
ACTION REQUESTED Direct Staff Prepare a Consultant
Supplement for Sargent Engineers
Supporting the Revised Project
Prospectus
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Direct staff to prepare a supplement to Sargent Engineer's design task order
supporting Westside Road re -design.
BACKGROUND:
Previously Public Works has advised the Board of County Commissioners on our
desire re -scoping the federally funded safety projects: Westside Road and
Huntzinger Road. The Board may recall that in early spring of this year
management discovered that the design consultant had not been made aware of
federal project funding despite working on a design re -aligning portions of
Westside Road while providing minimal funding for Huntzinger Road. No
National Environmental Policy Act (NEPA) review or permitting was done
supporting the realignment design effort.
The federal funds provide that no County funding match is required if the projects
are obligated prior to the end of this federal fiscal year. Recognizing the errors,
management immediately re -scoped the project with Sargent Engineers targeting
design delivery the end of July 2016. We are currently finalizing the bid package.
DISCUSSION:
The design and cost estimate for Westside Road is approximately one half of the
funding ($300,000 +1-). Knowing substantial funding remains for safety
improvements to Huntzinger Road, staff immediately evaluated the feasibility of
deploying guardrail improvements to Huntzinger Road. Numerous road
segments meet guardrail deployment warrants. We are also aware the PUD
No.2 is investing upwards of $30 million in the next several years to recreational
improvements to Wanapum Reservoir. Investing in Huntzinger guardrail now
seems responsible to Public Works management.
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
WSDOT Local Programs recently approved our request to re -task project
funding. We are working now securing a Categorical Exemption for both
projects. Once in hand, we can advertise Westside Road and avoid a twenty
percent project match requirement.
FISCAL IMPACTS:
Sargent Engineers has exceeded the original authorized amount re -designing
safety improvements to Westside Road. The amount of the requested
supplement is: $28,483.00. Staff proposes designing guardrail improvements to
Huntzinger Road in-house for 2017 construction. The required relocation of a
fiber optic line by Fairpoint Communications will move the second half of the
funding to 2017 — hence a match will likely be required.
ATTACHMENTS:
Exhibit 1: Resolution Supplementing Sargent Engineers Westside Road Task
Order
Exhibit 2: Supplement to Sargent Engineers Design Contract
Page 2of4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: Resolution Supplementing Sargent Engineer's Westside Road Task
Order
Page 3 of
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2016 -
AUTHORIZE THE CHAIR'S SIGNATURE ON A TASK ORDER SUPPLEMENT FOR
SARGENT ENGINEERS SUPPORTING THE REDESIGN OF THE WESTSIDE ROAD
HIGHWAY SAFETY IMPROVEMENT PROJECT
WHEREAS: Kittitas County Public Works entered into a Task Order assignment with Sargent
Engineers for designing safety improvements to Westside Road under
Resolution No. 2015-021; and
WHEREAS: Public Works required a re -design supporting critical permitting timelines; and
WHEREAS: The cost of re -designing safety improvements has exceeded authorized
spending amounts by $28,483.00; and
WHEREAS: Public Works desires obligating project funds by the end of the federal fiscal year
and project completion is critical to meeting deliverable schedules;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby authorize the Chair's signature on a Task Order Consultant
Supplement Agreement increasing the cost of Westside Road Highway Safety Improvement
design by $28,483.00.
DATED this 8th day of August, 2016, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Obie O'Brien, Chairman
Paul Jewell, Vice -Chairman
Laura Osiadacz, Commissioner
EXHIBIT 2: Supplement to Sargent Engineers Design Contract
Page 4 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Formal Task flssignmeni Document
Task Number: 2 - Amendment 1
The general provisions and clauses of Agreement BOCC Res. No. 2015-021 shall be in fall force and
effect for this Task Assignment.
Location of Project: Huntzin er Road and West Side Road
Project Title: Huntzin er Road and West Side Road Improvements
Maximum Amount Payable Per Task Assignment: $73,671.00 + $28,483 (Amendment I) $102,154
Completion Date: December 31, 2016
Description of Work:
(Note attachments and give brief description)
This amendment provides for changing the design to include all of Westside Road between Tree Haven
Road to Golf Course Road. The design includes safety improvements (guardrail, signing, and striping).
It does not include road widening or realignment. It also provides for obtaining the permits for this
scope of work.
Agency Project Manager Signature
Oral Authorization Date:
Date:
See Letter Dated.
Consultant Signature: Date:
.Agency Approving Authority:
Consultant: Sargent Engineers, Inc.
320 Ronlee Lane NW
Olympia, WA 98502
(360) 867-9284
Date:
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUWTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION! DATE August S, 2016
TOPIC
DNR iftnument MOU with WSACE
ACTION REQUESTED Informational
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Recover 2017 chip seal road monuments ahead of 2017 chip seal construction.
BACKGROUND:
Earlier this year, Kittitas County established the Office of County Surveyor. Public
Works (PW) discussed the need for roadway monument re-establishment as a key work
program element for the County Surveyor. PW business practice for multiple years prior
to 2016 was to chip seal roadways without regard of underlying roadway monuments.
Washington Department of Natural Resources has recently negotiated a memorandum
of understanding (MOU) between the Washington State Association of County
Engineers allowing for a process supporting monument preservation following chip seal
operations. County Engineer Huck recently attempted to attach the County to the MOU
and was informed that the process would have to include 2016 chip seal roads. We
recently completed our 2016 chip seal program and will not meet MOU conditions.
DISCUSSION:
The work program implications are not insignificant. We will now have to recover and
raise all road monuments ahead of the 2017 chip seal program. It is possible that DNR
might attempt to regulate the County for failure to file notices of monument destruction —
as we did not attach to the 2016 MOU_ Our voluntary efforts creating the Office of
County Surveyor and our efforts establishing a monument preservation program - in the
absence of regulatory enforcement — should buy us some consideration in 2016. We do
not anticipate any consideration in 2017.
FISCAL IMPACTS:
Compliance is estimated at being approximately $50,000 per year for the next ten years.
ATTACHMENTS:
EXHIBIT I. 2016 WSACE MOU
Page 1 of 'I
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
MEMORANDUM OF UNDERSTANDING BETWEEN THE STATE OF WASHINGTON
DEPARTMENT OF'tiATURAL RESOURCES PUBLIC LAND SURVEY OFFICE.
AND KITTITAS COUNTY
GENERAL. INFORMATION:
This Memorandum of Understanding (MOU) is between the State of Washington, department of Natural
Resources, Public land Survey Office. hereinafter referred to as the PLSO. and INSERT COUNTY,
whose address is INSERT ADDRESS, hereinafter referred to as the County.
PURPOSE:
The purpose of this MOU is to cooperatively promote a reasonable method of survey monument
preservation throughout the Bituminous Surface Treatment process, hereinafter referred to as chip seal,
without having to submit an Application for Permit to Remove or Destroy a Surrey Monument, per 332-
124-030 WAC.
Ill. RESPONSIBILITIES OF PARTIES -
It shall be the responsibility of the County to provide notificatinn to the ALSO, of the proposed annual
chip seal projects within the County and to ensure that all land boundary survey monuments within the
project area are located and protected. All land boundary survey monuments shall be uncovered and
made useable as soon as possible upon completion ofchip seal activities or within 14 days. The County
shall notify PLSO, in an annual report, when the affected monuments are uncovered and usable. April 1
shall be the reporting of uncovered monuments for the previous year, December 31 shall be reporting of
proposed annual chip seal projects for the upcoming year. Reporting shall be a map showing locations, or
a spread sheet listing by mile post the project limits, or a cover letter on letterhead including chip seal
reporting to the County Road Administration Board. Enacting and complying with the requirements of
this MOU will eliminate the County's responsibility to file a Permit to Remove or Destroy a Survey
Monument. in regards to chip seal projects only.
PLSO will keep a copy of the County's proposed chip seal projects and completion notification on file.
This file will be made available upon request to verify that the County has fulfilled the requirements of
the MOU.
IV. SUBSIDIARY AGREEMENTS:
Additional %orking agreenwrits, regarding specific cooperative of%rts, if needed. shall be effected in
writing by both parties as the need arises.
AMENDMENTS AND REVIEW:
This MOU may be amended at any time by the mutual written consent of the parties concerned or
terminated with thirty (34) days written notice by either party. It may be subject to reconsideration at
such other times as may be required and as agreed to by the parties entering into the MOU.
Vt. NATURE OF AGREEMENT
This MOU is intended to facilitate the statutory obligations imposed upon the various counties and the
State of Washington with respect to the preservation of survey monuments. This MOU is intended only
as a cooperative mechanism. It is not intended to be a binding contract which is subject to enforcement in
a court of law. There would be no remcdv for breach of this MOU.
It is understood that professionally licensed engineers and land surveyors hold themselves to the
professional standards of conduct as outlined in Chapter 196-27A WAC "Rules of Professional Conduct
and Practice".
This X100 must be ,signed by all partners. Mgttalories rntra9 be ofTciallu authorized to sign an behajf o f'
lire agency, include title and agency name.
APPROVED:
KITTITAS COUNTY
9. ].utas Huck P.E.
Siggature _
Date
4! 1 N. Ruby St STE I. Ellensburg WA
Address
509-962-7523
Phone
DEPARTMENT OF NATURAL RESOURCES
Kristina I Iorton. PLS, Manager of the PL50
Signature
Date
Address
Phone
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSIO N! DATE: August 8, 2016
TOPIC: 3iitmore road Improvement District
ACTION REQUESTED: Authorize Stag Prepare the Resolution of intent to
Formulate
LEAD STAFF: Mark R. Cook
RECOMMENDATION:
Direct staff to prepare the resolution of intent to formulate the Biltmore road
improvement district.
BACKGROUND:
33-88.3 04
F ormatior. of disrrim--By pelition—P ocedure.
In case any such road improvement shall be initiated by petition, such petition
shall set forth the nature and territorial extent of such proposed improvement,
and the fact that the signers thereof are the owners, according to the records of
the county auditor of property to an aggregate amount of a majority of the lineal
frontage upon the improvement to be made and of the area within the limits of
the assessment district to be created therefor.
Upon the filing of such petition the board shall determine whether the same shall
be sufficient and whether the property within the proposed district shall be
sufficiently developed and if the board shall find the district to be sufficiently
developed and the petition to be sufficient, it shall proceed to adopt a resolution
setting forth the nature and territorial extent of the improvement petitioned for,
designating the number of the proposed improvement district and describing the
boundaries thereof, stating the estimated cost and expense of the improvement
and the proportionate amount thereof which will be borne by the property within
the proposed district, notifying the owners of property therein to appear at a
meeting of the board at the time specified in such resolution, and directing the
county road engineer to submit to the board at or prior to the date fixed for such
hearing a diagram or print showing thereon the lots, tracts and parcels of land
and other property which will be specially benefited thereby and the estimated
amount of the cost and expense of such improvement to be borne by each lot,
Rage 1 of 8
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
tract or parcel of land or other property, and also designating thereon all
property which is being purchased under contract from the county. The
resolution of intention shall be published in at least two consecutive issues of a
newspaper of general circulation in such county, the date of the first publication
to be at least fifteen days prior to the date fixed by such resolution
for hearing before the board of county commissioners.
Notice of the adoption of the resolution of intention shall be given each
owner or reputed owner of any lot, tract or parcel of land or other property
within the proposed improvement district by mailing said notice to the owner or
reputed owner of the property as shown on the tax rolls of the county treasurer
at the address shown thereon at least fifteen days before the date fixed for the
public hearing. The notice shall refer to the resolution of intention and designate
the proposed improvement district by number. Said notice shall also set forth
the nature of the proposed improvement, the total estimated cost, the
proportion of total cost to be borne by assessments, the estimated amount of
the cost and expense of such improvement to be borne by the particular lot,
tract or parcel, the date and place of the hearing before the board of county
commissioners, and the fact that property owners may withdraw their names
from the petition or add their names thereto at any time prior to five o'clock p.m_
of the day before the hearing.
[ 1963 c 4 § 33.88.460. Prior. 1551 c 1S2 § 6.1
DISCUSSION:
The process described above allows construction of requested improvements in
late September 2016. Anticipating late construction, maintenance utilized "high
float" oil during the gravel road upgrade this year to Schnebly Road. This
construction verifies our ability delivering the project in late September 2016.
RID participates have previously been presented preliminary costs associated
with the improvement and all have indicated acceptance. One property owner,
the original land owner and subsequent developer of the community, has not
attached to the petition but has verbally committed to participating and owns
several lots within the proposed RID boundary.
FISCAL IMPACTS:
Public Works is estimating the total cost of RID improvements at $130,000 (15
years). Preliminary costs have been reviewed and given initial approval by all
petitioners. The initial cost of the RID is proposed to come from Public Works
cash reserves (this negates the need for a bond sale and associated costs).
Annual payments from petitioners will retire the debt in 15 years. Public Works is
funding the project at a three percent interest rate. The selected process
minimizes costs to other County elected offices (auditor and treasurer). Final
costs are currently being developed and will be presented during the notice of
intent to formulate study session with the Board of County Commissioners.
Page 2 of 8
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
ATTACHMENTS:
Exhibit 1: Petition to formulate the Biltmore RID
Exhibit 2: RID boundary map
Exhibit 3: Proposed tum -around improvements
Exhibit 4: Preliminary cost estimates
Page 3 of 8
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: PETITION TO FORMULATE THE BILTMORE RID
Page 4 of
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
� •®}� ��` � �� �� '
.' �f
RTS
� �
�
-
�
�� .. � � ���
:.
w�/�
/�
:• /s�
�.�
z�l� � � y K
�
/(�E
2'§
�01 !�
�
6
41
'\00, � .
�
_ _
�/;�
a•.
//��7
T
;
z
PETITION TO CREATE A KITTITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANTTO THE PROCEEDURES OF RCW 35.88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.$$.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. in return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. It is understood that property owners
may add or withdraw their names from the petition at any time prior to five o'clock p.m. of the
day before the official County Commission hearing and that any effected property owner will
receive a written notice of the hearing from the County at least 15 days before the hearing.
Print Name
Print Name
—
Print Name
F/A91100-1 , I �Plfflotl, I
,o
Signature
Signature
Signature
a t A
Sig ure
SiAoTe
C3pn2ijprp
Signature
Signature
Signature
as reg
Print Name
OAV-.Oj- y, v 'L, P*,�
Print Name
L(t / s
Print Name
INA
Print Name
0,
Print Name
Print Name
Print Name
Print Name
Print Name
Print Name
Print Name
Print Name
Print Name
Print Name
PETITION TO CREATE A KITNTAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANT TO THE PROCEEDURES OF RCW 36.88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment,
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seat pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. in return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
5100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. It is understood that property owners
may add or withdraw their names from the petition at anytime prior to five o'clock p.m. of the
day before the official County Commission hearing and that any effected property owner will
recW asw itten notice of the hearing from the County at least 15 days before the hearing.
/,//���� A tAIi.�u-
goature Print Name
Signature Print Name
Signature Print Name
PETITION TO CREATE A KiTTITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANTTO THE PROCEEDU RES OF RCW 36.88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. In return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. it is understood that property owners
may add or withdraw their names from the petition at any time prior to five o'clock p.m. of the
day before the official County Commission hearing and that any effected property owner will
receive a: ritten notice of the hearing from the County at least 15 days before the hearing.
L 1,e,-jrm_n I/ ,
. YA 16
S' cur Print Name
Signature Print Name 1 [[[
Signature
Print Name
PETITION TO CREATE A KITfITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANT TO THE PROCEEDURES OF RCW 36.88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88,050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composer! of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
primate road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around_ in return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. It is understood that property owners
may add or withdraw their names from the petition at any time prior to five o'clock p.m. of the
day before the official County Commission hearing and that any effected property owner will
receive+ritteryliotice of the hearing from the County at least 15 days before the hearing.
Signature Print Name
n_ ;
si nature Print Name
Signature
Print Name
PETITION TO CREATE A KITTITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANT TO THE PROCEEDURES OF RCW 36.88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 !North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. In return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created, It is understood that property owners
may add or withdraw their names from the petition at any time prior to five o'clock p -m. of the
day before the official County Commission hearing and that any effected property owner will
receive ritterr. otice of the hearing from the County at least 15 days before the hearing.
Signattt Print Na
Sl4 4" nz IES E
f % Print !Name
Sienature
signature Print Name
PETITION TO CREATE A KITTITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANT TO THE PROCEEDU RES OF RCW 35,88.050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. in return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. It is understood that property owners
may add or withdraw their names from the petition at any time prior to five o'clock p.m. of the
day before the official County Commission hearing and that any effected property owner will
receive a written notice of the hearing from the County at least 15 days before the hearing.
ry�t --tom. k�l zi/� . LL1a::1 i4a&-: I !tel c4
Signature Print Mame
Signature Print name
Signature Print name
PfTMON TO CREATE A KIFTITA3 COUNTY ROAD IMPROVLMENT
DISI Ricr PURSUEANT'Fo THE PROCEEDURES OF RCW 36.88.050
Te.uariveN, Desigrtaftd a:, Thi
VANDFRBIET COUNTRY (STATES ROAD DISTPICT
P;x5i1att,to%ht: 46_99ASOki.WitvJ0l:'p,x:rl9§iFnat"xir$
r.mgrrw it ai the K•rtirast nuntyCon+m:ssirre a iabiish a County krad IhipttlVe nem Witrlct
knnw.t lontatively knnwrt ,it-hc Van:fwrhlt Fr:tiP.s Pa -4d Cistric,_, rn.id distric- numb( -r ro hr±
as--q-,ed upon finrdl esiablishinent:
rht: 9;rllp0s0 ru3c1d6tfk1 I-�;u;aiid in Totvnu 4p ib Vorth, Pangs _9 East al ki;ttivaCounty
specifically for improvements assoesi;ed wilt, sillmure 0rty: jvtow-d In n• adjacent to the
der uidt_i plat cif Vanetrbilt Ceturf* F -'Aa , off of public roao Keymer_ The road diaries
bou�-darts would be composed Df 30 inchndual ;cturdcd rut%, vr panel! :r. Stiuvrr+ un tlic
a,tdelmJ district bpundaries map.
i=.r intant of the l3islAtt t§ to prepare'rra1d. chip I.L'd, Qdve dliprlrrGrrldleiy mart Mile of e1jviq
prr ate road with the application of three Chip teal lifts, and to provide ix an irnprowd paved
tum-dlUUnd lir Kdyrlor ft.Cud. d Comity pub!][ rnao c',ri'rrRlly latkaslr in i%ppropriazca rum-
wound- Ir N turn far the commurritypro'J.'s1u:9 ui a turri•.l+ouial fair Kdyn;rr R(idd, the [$lint{+
vK .rid Or nvide twrwp)awihp ro rhe Paid ce paeerw nt, A prelimir arF teat e.Wmate prvrKezf by
thrl:ilbLa%rDUntyPubicIA'urk. thimslrnty'dfor il-cprr-pdrawnand imtratrtow7it5
$;0;1,(x]0.45 propu.4ed the cost mould be proportioned on an l-Qtial yf rrr bags he-twecn eacrl
of the 30 parcels with a d•strict payback period of 34 years. (;tin --rev annual pr-Dperty tax
re tessment including lrtcre%T for the mr)year prnml wr.iftd by $371 prr lot.
Petition signator-; rmprx-sent r ccc T -lint. to the rprords of the ceuntV a.iditor girl aggre-gate
;rr+:cunt of a majoriri at the lineal frontage :ipcn thr irnproverahr+r .0 by Pia &. and of thr mfg,
wits in the Wits of ;h t mS0TSNPnt CHArTiCt to be created_ It is unit-Mluod thdl PtaPcrsy ow11txs
mmly add or withdraw their naru:s f:hrrt the prMir..-n at any tame p+ior to fire o'clock parm of the
eoy befirlrr the official Cam nryCorr•mission hearing ,ind th;:t in•VLf'C'ltCd pmpc"Vow'iw will
rete ive a widen noble of the hearing trom the County at Ices: 15 d,;Vs before- the h(wing.
Skri,rcuit
Print 'Jam,
Signat,re F!hi Nanw
PETITION TO CREATE A KITTITAS COUNTY ROAD IMPROVEMENT
DISTRICT PURSUEANT TO THE PROCEEDURES OF RCW 36.88,050
Tentatively Designated as the
VANDERBILT COUNTRY ESTATES ROAD DISTRICT
Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW the following signatories
request that the Kittitas County Commission establish a County Road Improvement District
known tentatively known as the Vanderbilt Estates Road District, road district number to be
assigned upon final establishment.
The proposed road district is located in Township 16 North, Range 19 East of Kittitas County
specifically for improvements associated with Biltmore Drive located in or adjacent to the
recorded plat of Vanderbilt Country Estates off of public road Kaynor. The road district
boundaries would be composed of 30 individual recorded lots or parcels as shown on the
attached district boundaries map.
The intent of the District is to prepare and chip seal pave approximately one mile of gravel
private road with the application of three chip seal lifts, and to provide for an improved paved
turn -around for Kaynor Road, a County public road currently lacking an appropriate turn-
around. In return for the community provision of a turn -around for Kaynor Road, the County
would provide snowplowing to the end of pavement. A preliminary cost estimate provided by
the Kittitas County Public Works Department for the preparation and improvements is
$100,000. As proposed the cost would be proportioned on an equal share basis between each
of the 30 parcels with a district payback period of 10 years. Estimated annual property tax
assessment including interest for the ten year period would be $371 per lot.
Petition signatures represent according to the records of the county auditor an aggregate
amount of a majority of the lineal frontage upon the improvement to be made and of the area
within the limits of the assessment district to be created. It is understood that property owners
may add or withdraw their names from the petition at anytime prior to Ove o'clock p -m. of the
day before the official County Commission hearing and that any effected property owner will
receive a written notice of the hearing from the County at least 15 days before the hearing.
Signature Print Name
Signature
Signature
Print Name
Print Name
EXHIBIT 2: RID BOUNDARY MAP
Page 5 of
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 3: PROPOSED TURN -AROUND IMPROVEMENTS
Page 6 of
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
-I .L (A ! l
C ➢ C7 a]
M0Ln
D �m�p
o�
m of
m10
00
o- —
Q
EXHIBIT 4: PRELIMINARY COST ESTIMATES
Page 7 of
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY PUBLIC WORKS DEPARTMENT
3/23/2016
Road Improvement District Proposal
Biltmore Drive - Kaynor Road
Project Assumptions
30 lots
Equal benefit by lot
50 foot turnaround is available at the end of the improvement length
Improvement length is one mile (5,280 feet)
Improvements include: crushed surfacing (2 inches compacted depth)
Three - applications of BST
Financial Scenarios Evaluated
Period (yrs) Interest rate Present Value PMT/lot/yr JEquivaient
n i PV Beginning End PMT/lot I PMT/Lot/Month
0 0
7 3
10 3
15 3
$100,000.00
$100,000.00 x
x
$100,000.00 x
x
$130,000.00 x
$3,333.33 $
$ 519.44 $
$ 535.02 $
$ 379.39 $
$ 390.77 $
$ 352.42 $
$ 362.99 $
NOTE:
Beginning is payment at the start of the first year, End is payment at the
end of the first year.
The additional $30K at 15 years recognizes a reapplication of chip seal
at the end of the RID period.
DISCLAIMER: the financial estimates above are preliminary in nature
subject to verification from the Kittitas County Treasurers Office.
277.78
43.29
44.59
31.62
32.56
29.37
30.25