HomeMy WebLinkAbout2016-06-27-minutes-public-works-study-session�sU.oFs ...'ro o»Ec
��t olr
KITi1Tg5 COUNTY
THOSE PRESENT:
GUESTS PRESENT:
KZTTZ13V1A.1S COUNTY
DEPARTMENT OF PUBLIC WORKS
Mark Cook, Director
REQUEST TO APPROVE A
RESOLUTION FOR A CALL
FOR SEALED BIDS FOR THE
SILICA ROAD BRIDGE
REPLACEMENTAND TO
AUTHORIZE THE DIRECTOR
OF PUBLIC WORKS TO SIGN
PROCUREMENT DOCUMENTS:
STUDY SESSION MINUTES
June 27. 2016
Obie O'Brien, Laura Osiadacz (BOCC), Mark Cook, Luke
Huck, Candie Leader (DPW), Doc Hansen, Mike Flory,
Angela San Filippo, Steph Mifflin (CDS), Neil Caulkins (PA)
None
Mark Cook presented a Resolution to Call for Sealed Bids for
the Silica Road Replacement. Mark gave background on the
removal of the bridge and the damage that helped make that
decision. After the removal Kittitas Reclamation District,
Kittitas Valley Fire and Rescue and the Kittitas County PUD
No. 1 reported that the structure was used by them and
requested to replace the bridge. Staff did some research and
have found a solution to put in a 25' bridge. The pricing
should be under the $40,000.00. Anticipating a small number
of response and the Small Works Roster will be used to solicit
bids and also advertised in the newspaper of record.
Discussion was held.
Board Direction: Commissioner Osiadacz made a motion to approve
Resolution 2016-083 for the authorization for a Call for
Bids for the Silica Road Bridge Procurement.
Commissioner O'Brien seconded the motion. No
discussion.
OTHER BUSINESS: Mark stated he has six other items to add under other
business.
Luke Huck reported that the City of Ellensburg submitted a
request to put in a bike path through the John Wayne Trail at
Alder down 8th — they would like a guide sign and arrows
painted along the path. Luck stated that they went ahead and
approved the sign placement. The Board of County
Commissioners does not need to approve this sign only
regulatory signage.
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
Luke gave an update on Lodge Creek — Via Kachess culvert
replacement. Working with Old Castle to get an estimate for
a culvert to replace the bridge, staff should see the estimate
in a few days and then go ahead with a Purchase Order
Agreement to them. Jacobs is moving along on the design.
Still on an August timeline to perform work and are on
schedule for an early September road closure. Leave as a
gravel surface and pave in the spring. An open house has
been scheduled on July 26th from 4pm to 6pm at the
Community Club House. Further discussion was held.
Luke stated that he has finished the review of the Palomino
Fields Plat. Mark and Luke met with Pat Deneen to go over
concerns before official comment was made. It was
discovered that some of the property does fall in a floodplain
and a permit will be required as well as a new storm water
plan.
Discussion was held regarding Blackhorse and the ongoing
issues with storm water and continued flooding. More needs
to be reviewed and submitted from D.R. Horton to resolve the
issues. Sidewalks have been poured along Reecer Creek
Road and they are performing what work they can.
Luke reported that the survey crew is staking the right of way
of Mt. Daniels Drive. He will make a site visit and discuss the
right of way and construction with the residents that live in the
area. It should be a two week project once design is
complete. Chipseal will be completed at a later date.
Discussion was held on alternate routes in Grasslands.
Mark reported that a conversation was had with FHWA
regarding the FLAP grant. The locations can be re -tasked
and staff was unaware of this. Mark added that when he
signed the match agreement for Teanaway culvert
improvements. We are using the left over funds from the 5
million dollar project for the matching funds. Discussion was
held on design and next steps.
Mark stated that an alternate project be done with regards to
Ringer Loop. The Department of Military approved the
estimate for the alternate project and the strategy has paid
off. A letter of approval will follow. And staff would
recommend the purchasing of equipment with the funds from
the alternate project.
Mark R. Cook
Director of Public Works
411 N. Ruby, Ste. #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
KITTITAS COUNTY COMMISSIONERS
REGULAR MEETING
PUBLIC WORKS STUDY SESSION
MONDAY, JUNE 27, 2016
1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution for a Call for Sealed Bids for the Silica Road Bridge
Replacement and to Authorize the Director of Public Works to Sign Procurement
Documents.
3. Other business
4. Adjourn
Created on 6/24/2016 5:07:59 AM
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2016 -vu`s
AUTHORIZATION FOR A CALL FOR BIDS — SILICA ROAD BRIDGE PROCUREMENT
WHEREAS: The Silica Road bridge was recently removed by order of the Kittitas County
Road Engineer for safety considerations; and
WHEREAS: The Silica Road bridge is infrequently used by the Public Utility District No. 1,
Kittitas Valley Fire and Rescue and Kittitas Reclamation District for occasional
access to the Yakima Training Center; and
WHEREAS: The Board of County Commissioners desire re-establishing access to the Yakima
Training Center at Silica Road;
NOW, THEREFORE BE IT RESOLVED, that the Board of County Commissioners, in the best
interest of the public, does hereby authorize the Director of Public Works to issue a call for bids
supporting procurement of a replacement metal bridge at the end of Silica Road.
BE IT FURTHER RESOLVED, that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 27th day of June, 2016, at Ellensburg, Washington.
\ ouuwnin„
�oJN( (COm�SS,
0
Cf
n
�s. :o.
Affe'' •.........•• ' C,'�
❑ Clerk oi4he hoard- Julie Kjorsvik
V Deputy Clerk of the B rd- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
c
Obie O'Brien, Chairman
ABSENT
Paul Jewell, Vice -Chairman
ra Osiada , Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: June 23, 2016
ACTION REQUESTED: Authorize a Call for Bids — Silica Road Bridge
Replacement and for the Director to sign procurement
documents
BACKGROUND: In late 2015, the Silica Road Bridge was removed by order
of the Kittitas County Road Engineer. The bridge had been
closed for more than one year owing to structural damage
to the bridge superstructure.
Following bridge removal, Kittitas County Public Utility
District No. 1, Kittitas County Fire and Rescue and Kittitas
Reclamation District contacted the County requesting the
bridge be replaced. Public Works proposes replacing the
old concrete bridge with a new 14 foot X 25 foot metal
bridge with a safety rail.
Suppliers on the County's small works roster will be
targeted for providing bids and the call for bids will be
advertised in the County's paper of record for two weeks
beginning on June 29, 2016. The Engineer's estimate for
bridge procurement including delivery is $40,000.00.
INTERACTION: Public Works
RECOMMENDATION: Move to authorize a call for bids and the Director's
signature on procurement documents.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Instructions to Bidders, Standard Terms and
Conditions, Special Provisions
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2016 -
AUTHORIZATION FOR A CALL FOR BIDS — SILICA ROAD BRIDGE PROCUREMENT
WHEREAS: The Silica Road bridge was recently removed by order of the Kittitas County
Road Engineer for safety considerations; and
WHEREAS: The Silica Road bridge is infrequently used by the Public Utility District No. 1,
Kittitas Valley Fire and Rescue and Kittitas Reclamation District for occasional
access to the Yakima Training Center; and
WHEREAS: The Board of County Commissioners desire re-establishing access to the Yakima
Training Center at Silica Road;
NOW, THEREFORE BE IT RESOLVED, that the Board of County Commissioners, in the best
interest of the public, does hereby authorize the Director of Public Works to issue a call for bids
supporting procurement of a replacement metal bridge at the end of Silica Road.
BE IT FURTHER RESOLVED, that the Director of Public Works is authorized to sign the
contract documents upon such terms and conditions specified in the Proposal submitted by said
bidder(s).
DATED this 27th day of June, 2016, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Obie O'Brien, Chairman
Paul Jewell, Vice -Chairman
Laura Osiadacz, Commissioner
KITTITAS COUNTY PUBLIC WORKS
PROPOSAL - SILICA ROAD BRIDGE
REPLACEMENT
JUNE 2016
KITTITAS COUNTY
0172'191:2t
TO: Mark R. Cook, Director
Kittitas County Department of Public Works
411 North Ruby, Suite 1
Ellensburg, WA 98926
Mr. Cook:
This certifies that the undersigned has thoroughly examined the procurement
package for Silica Road Bridge Replacement and that the method by which
payment will be made for said work, is understood. The undersigned hereby
proposes to undertake and complete the work embraced in this procurement in
accordance with said: instructions to bidders, standard terms and conditions,
and special provisions.
Total Cost in Written Form:
hereby certify that the above is a true and accurate statement.
SUBMITTED BY:
Signature of Contractor/Bridge Supplier
Address
Date
UNIT
TOTAL
ITEM
APPROX.
UNIT
ITEM
COST
COST
NUMBER
QUANTITY
Furnish and deliver one 14 foot X 25
foot LRFD metal bridge with safety
rail — complete with foundation
system — delivered to Silica Road,
1
1
LS
Kittitas County, WA.
Total Cost in Written Form:
hereby certify that the above is a true and accurate statement.
SUBMITTED BY:
Signature of Contractor/Bridge Supplier
Address
Date
NOW COLLUSION DECLARATION
I, by signing the proposal, hereby declare, under penalty of perjury under
the laws of the United States that the following statements are true and
correct:
1. That the undersigned person(s), firm, association or corporation has (have)
not, either directly or indirectly, entered into any agreement, participated in
any collusion, or otherwise taken any action in restrain of free competitive
bidding in connection with the project for which this proposal is submitted.
2. That by signing the signature page of this proposal, I am deemed to have
signed and have agreed to the provisions of this declaration.
NOTICE TO ALL BIDDERS
To report bid rigging activities call:
1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll-free
"hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone
with knowledge of possible bid rigging, bidder collusion, or other fraudulent
activities should use the "hotline" to report such activities.
The "hotline" is part of USDOT's continuing effort to identify and investigate
highway construction contract fraud and abuse and is operated under the
direction of the USDOT Inspector General. All information will be treated
confidentially and caller anonymity will be respected.
I hereby maintain that I am a responsible Bidder, as contemplated by the policies
of the State of Washington (RCW 36.34.190)
A. My permanent place of business is
Which I have maintained for years.
B. I have adequate plant equipment to do expeditiously and properly the
work contemplated for Kittitas County, Washington:
DESCRIPTION OF WORK:
Fabricate and deliver one 14 foot X 25 foot LRFD metal bridge with foundation
system with all appurtenances supporting bridge assembly.
C. I have had experience in this class of work, having provided the following
similar bridges:
I hereby certify that the above is a true and accurate statement.
SUBMITTED BY:
Signature of Contractor
Address
Date
The bidder is hereby advised that by signature of this proposal he/she is deemed
to have acknowledged all requirements and signed all certificates contained
herein.
A proposal guaranty in an amount of five percent (5%) of the total bid based
upon the approximate estimates of quantities at the above prices and in the form
as indicated below is attached hereto:
CASH ❑ IN THE AMOUNT OF
CASHIER'S CHECK ❑
CERTIFIED CHECK ❑ ($ ) Made Payable to the Kittitas
County Treasurer
BID BOND ❑ In the Amount of 5% of the Bid
Receipt is hereby acknowledged of Addendum(s) No.(s)
SIGNATURE OF AUTHORIZED OFFICIALS (S)
121:710TAIlIl l�l�
ADDRESS
TELEP
F.
Signed and sworn to (or affirmed) before me on
20
NOTARY PUBLIC
My appointment expires
(Seal or Stamp)
Note: (1) This proposal form is not transferable and any alteration of the firm's
name entered hereon without prior permission from the Secretary of
Transportation will be cause for considering the proposal irregular and
subsequent rejection of the bid.
INSTRUCTIONS TO BIDDERS
Bids must be received in sealed envelopes and plainly marked "Silica Road
Bridge" FAXED BIDS WILL NOT BE ACCEPTED.
Bids will be opened July 20th, 2016 at 10:00 AM., at the Kittitas County Public
Works Office, 411 N. Ruby, Ste. #1, Ellensburg, WA 98926.
3. All Proposal Sheets must be signed.
4. Bids must be accompanied by a bid bond, certified check, cashier's check or
cash in the amount of five percent (5%) of the total bid.
5. Bidder must submit detailed design specifications and illustration sheets showing
specific bridge bid on and approved by the County prior to bridge delivery.
6. Copies of warranty and guarantee applicable to unit bid and described in #22
(below) must be attached. Noncompliance can be cause for bid rejection.
7. Delivery shall be to the site at the end of Silica Road, Ellensburg, Washington.
Warranty shall not begin until time of acceptance by Kittitas County.
8. Bridge shall be delivered no later than September 30th, 2016.
9. All steel fabrication shall be in accordance with current standards and
specifications of the "American Welding Society."
10. The Board of County Commissioners reserves the right to accept or reject any or
all bids, in whole or in part, as the Board determines to be in the best interest of
Kittitas County. Any units not conforming to bidder's exact specifications will be
rejected and it will be the responsibility of the manufacturer and/or bidder to
conform to the requirements. The County will not be liable for any errors in any
bids. Bidders will not be allowed to alter bids after the deadline for the
submissions of bids.
11. The County reserves the right to refrain from contracting with any Bidder. The
release of this Call for Bids does not compel the County to purchase.
12. The County reserves the right to make corrections or amendments due to errors
identified in the bid documents by the County or a potential bidder. This type of
correction or amendment will only be allowed for such errors as typing,
transposition or any other obvious error.
13. When, after the opening and tabulation of the bids, a Bidder claims error, and
requests to be relieved of the award, that Bidder will be required to promptly
present certified work sheets. The County will review the work sheets and if the
County is convinced by clear and convincing evidence, that an honest,
Page 1 of 8
mathematically excusable error or critical omission of costs has been made, the
Bidder may be relieved of his bid.
14. Bidders may withdraw a bid that has been submitted at any time up to the due
date and time. To accomplish this, a written request signed by an authorized
representative of the bidder must be submitted to the Kittitas County Public
Works Department.
15. The County is not liable for any costs incurred by the Bidders in the preparation
and presentation of bids submitted in response to this Call for Bids.
16. All materials submitted in response to this request become the property of the
County. Selection or rejection of a response does not affect this right.
17. Payment will be made by Kittitas County Public Works Department within thirty
(30) days from date of delivery. All interest costs incurred to bidder must be
computed in the original price bid as no further compensation will be made. No
down payment or advance payment of any kind will be made.
18. A certified statement shall be furnished to Kittitas County on off -shore items in
excess of $2,500.00 (RCW 39.25.020).
19. Appurtenances and/or accessories not herein mentioned but necessary to furnish
a complete unit ready for use upon delivery shall be included in the bid and
conform in design, strength, quality of material, and workmanship to what is
usually provided to the trade in general. The units furnished shall include, but not
be limited to, factory standard equipment and those optional items as specified.
Should the manufacturer's current published data or specifications exceed these,
they shall be considered minimum and be furnished.
20. All unit components shall be designed for LRFD bridge design loading. Materials
shall have physical and chemical properties compatible with the intended service
and with sufficient excess capacity for durability and safety.
21. Adequate section modulus shall be provided in all structural members to support
maximum loads under capacity operations at maximum speeds, without damage
or permanent distortion.
22. Guarantee period shall be one year on the bridge and appurtenances furnished.
The successful bidder shall, at his own expense and without any cost to Kittitas
County, replace all part failures and make all repairs that may be required or
made necessary by reason of defective design, materials, or workmanship, or by
reason of nonconformance with the specifications. Guarantee claims rectified by
the vendor are in turn hereby guaranteed as stated above for the period of the
guarantee. Defects in design or workmanship, as guaranteed herein, shall be
rectified in all units furnished, at a location established by Kittitas County,
Page 2 of 8
23. Kittitas County is exempt from all Federal Excise Tax.
24. Bid quote must include sales tax.
Page 3 of 8
STANDARD TERMS AND CONDITIONS
For Call to Bid & Purchase Order Contract
The Purchase Order includes the following Terms and Conditions and includes, but is
not limited to, the Call to Bid, Specifications, Instructions to Bidders, Policies of the
Kittitas County Department of Public Works, and the Laws of the State of Washington,
which are hereby incorporated by reference.
1. CHANGES. No alteration in any of the terms, conditions, delivery price, quality,
quantities, or specification of this order will be effective without written consent of
the Kittitas County Department of Public Works.
2. HANDLING. No charges will be allowed for handling unless otherwise stated
herein.
3. DELIVERY. For any exception to the delivery date as specified in this order,
vendor shall give prior notification and obtain written approval thereto from the
Kittitas County Engineer with respect to delivery under this order. Time is of the
essence and the order is subject to termination for failure to deliver as specified
and/or appropriate liquid damages. The acceptance by Kittitas County
Department of Public Works of late performance with or without objection or
reservation shall not waive the right to claim damage for such breach nor
constitute a waiver of the requirements of the timely performance of any
obligation remaining to be performed by Vendor.
4. PAYMENTS. Invoices will not be processed for payment until receipt of a
properly completed invoice or invoiced items are received.
5. REJECTION. All goods or materials purchased herein are subject to approval by
Kittitas County Department of Public Works. Any rejection of goods or materials
resulting because of nonconformity to the terms and specifications of this order,
whether held by the Kittitas County Department of Public Works or returned will
be at the Vendor's risk and expense.
6. IDENTIFICATION. All invoices, packing lists, packages, shipping notices,
instruction manuals, and other written documents affecting this order shall
contain the applicable purchase order number.
7. INFRINGEMENTS. Vendor agrees to protect and save harmless Kittitas County
against all claims, suits, or proceedings for patent, trademark, copyright or
franchise infringement arising from the purchase, installation, or use of goods
and materials ordered, and to assume all expenses and damages arising from
such claims, suits or proceedings.
8. WARRANTIES. Vendor warrants that articles supplied under this order conform
to specifications herein and are fit for the purpose for which such goods are
ordinarily employed, except that if a particular purpose is stated, the material
must then be fit for that particular purpose.
Page 4 of 8
9. ASSIGNMENTS. The provisions or moneys due under this contract shall only be
assignable with prior written consent of the Kittitas County Engineer.
10. LIENS, CLAIMS and ENCUMBRANCES. Vendor warrants and represents that all
the goods and materials ordered herein are free and clear of all liens, claims or
encumbrances of any kind.
11. RISK OF LOSS. Vendor agrees to bear all risks of loss, injury, or destruction of
goods and materials ordered herein which occur prior to delivery. Such loss,
injury or destruction shall not release Vendor from any obligation hereunder.
12. INDEMNIFICATION. The successful bidder agrees to and shall defend, indemnify
and hold harmless the County, its appointed and elective officers, agents and
employees, from and against all loss or expense, including but not limited to
judgments, settlements, attorney's fees and costs by reason of any and all claims
and demands upon the County, its elected or appointed officials, agents, or
employees for damages because of personal or bodily injury, including death at any
time resulting therefrom, sustained by any person or persons and on account of
damage to property including loss of use thereof, whether such injury to persons or
damage to property is due to the negligence of the Vendor, its sub -contractors, its
elected officers, employees or their agents, except only such injury or damage as
shall have been occasioned by the sole negligence of the County, its appointed or
elected officials, agents, or employees. It is further provided that no liability shall
attach to the County by reason of entering into this contract, except as expressly
provided herein.
13. TERMINATION. In the event of a breach by Vendor of any of the provisions of this
contract, Kittitas County reserves the right to cancel and terminate this contract
forthwith upon giving oral or written notice to Vendor. Vendor shall be liable for
damages suffered by Kittitas County resulting from Vendor's breach of contract.
14. NONDISCRIMINATION. The Vendor agrees not to discriminate against any client,
employee, or applicant for employment or services because of race, creed, color,
national origin, sex, sexual orientation, marital status, age or the presence of any
sensory, mental or physical handicap with regard to, but not limited to, the following
employment upgrading, demotion, or transfer, recruitment or recruitment
advertising, lay-offs or termination, rates of pay or other forms of compensation,
selection for training or rendition of services.
15. DEFAULT, The Vendor covenants and agrees that in the event suit is instituted
by Kittitas County for any default on the part of the Vendor, and the Vendor is
adjudged by a court of competent jurisdiction to be in default, the Vendor shall
pay to Kittitas County all cost, expenses expended or incurred by Kittitas County
in connection therewith, and reasonable attorney's fees. The Vendor agrees that
the Superior Court of the State of Washington shall have jurisdiction over any
such suit and that venue shall be laid in Kittitas County.
Page 5 of 8
16. INSURANCE. The Vendor shall secure and maintain in effect at all times while
providing the goods and materials, such insurance as will protect the Vendor, its
employees, officials and agents from all claims, losses, harm, costs, liabilities,
damages and expenses arising out of personal injury (including death) or
property damage that may result from performance of this Agreement, whether
such performance is by the Vendor, its employees, officials and agents.
All insurance shall be issued by companies admitted to do business in the State
of Washington and have a rating of A-, Class VII or better in the most recently
published edition of Best's Reports unless otherwise approved by the County. If
an insurer is not admitted, all insurance policies and procedures for issuing the
insurance policies must comply with Chapter 48.15 RCW and 284-15 WAC.
The Vendor shall provide proof of insurance for:
A) Commercial General Liability Insurance.
• Coverage limits not less than:
• $1,000,000 per occurrence per project
• $2,000,000 general aggregate
• Certificate Holder — Kittitas County
• The Certificate must name the County as additional insured
• Ten (10) days written notice to the County of cancellation of the
insurance policy.
B) Commercial General Liability Insurance —Per Proiect/Job Aggregate_
• Coverage limits not less than:
• $2,000,000 per project aggregate
• Certificate Holder — Kittitas County
• The Certificate must name the County as additional insured
• Ten (10) days written notice to the County of cancellation of the
insurance policy.
C) Workers' Compensation.
■ Workers' Compensation in amounts required bylaw.
The Vendor shall furnish the County a certificate of insurance with Endorsement
as evidence that policies providing insurance required by this Agreement are in
full force and effect. The Vendor hereby waives all rights of recourse, including
any right to which another may be subrogated, against Kittitas County for
personal injury, including death, and property damage. The Vendor's insurance
policies required above shall be primary insurance and shall be non-contributing
with any other insurance maintained by Kittitas County.
Page 6 of 8
The Vendor shall assume full responsibility for all loss or damage from any cause
whatsoever to any tools, Vendor's employee -owned tools, machinery, equipment,
or motor vehicles owned or rented by the Vendor, or the Vendor's agents,
suppliers or contractors as well as to any temporary structures, scaffolding and
protective fences.
The Vendor shall have sole responsibility for ensuring the insurance coverage
and limits required are obtained by subcontractors.
NOTE: No contract shall form until and unless a copy of the Certificate of
Insurance with Endorsement, properly completed and in the amount required, is
attached hereto.
17.ACCEPTANCE. By accepting this Purchase Order in writing or by delivering the
material ordered, you accept all of the Terms and Conditions set forth. Formal
objection is hereby made to any additional or different terms proposed by Vendor
as a condition of acceptance or delivery.
Page 7 of 8
TO: Kittitas County Board of Commissioners
The undersigned hereby certifies that he has read and thoroughly understands the
specifications covering the bid of a pre-engineered bridge as specified herein.
Attached hereto is a bid bond, certified check, cashier's check or cash in the amount
Dollars
($ ), payable to the Kittitas County Treasurer, this amount being five
percent (5%) of the total bid, based upon the price shown below:
F.O.B. Ellensburg, Washington
Manufacturer:
Model:
**Guaranteed Delivery Date: _
Sub -Total:
% Washington State Sales Tax $
TOTAL NET BID:
Dated this day of 12016.
Signature of Authorized Official
Firm
Address
City State Zip
Tel.#
Fax#
Federal I.D. Number
1.0
SPECIAL PROVISIONS FOR
4.25 -INCH STEEL BRIDGE DECKED MODULAR BEAM BRIDGE
GENERAL
1 1 Scope
These specifications are for fully engineered multi -piece modular bridge of steel
construction with a 4.25 -Inch Steel Bridge Deck and shall be regarded as minimum
standards for design and construction. The work included under this item shall consist of
design, fabricating, finishing and transporting the steel modular beam bridge
superstructure including bearings, the precast concrete sills and the galvanized sheet pile
back wall system.
1.2 Definitions
Owner:
Entity who ultimately will own the bridge.
Engineer:
Entity who will be representing the Owner.
Contractor:
Entity who will be installing, and/or purchasing, the bridge.
Bridge Manufacturer:
Firm who will be supplying the bridge in accordance with these
Special Provisions.
1.3 Qualified of Bridge Manufacturer
Each Contractor is required to identify their intended supplier as part of the bid submittal.
Qualified Bridge Manufacturers must have at least 5 years experience fabricating these
types of structures and shall have an up to date certification by AISC as a Certified
Bridge Fabrication - Intermediate (Major) with Fracture Critical Endorsement. All suppliers
shall fabricate their product, no brokers are allowed.
Pre -Approved Bridge Manufacturers:
Big R Bridge
P.O. Box 1290
Greeley, CO 80632
1-800-234-0734
E-mail: dmvers(d,)bigrbridge.com
Bridge Manufacturers, other than those listed above, may be used provided the Engineer
receives a written request at least 10 days prior to the bid. The written request shall
accompany the following information:
• Bridge Manufacturer's Product Literature,
• Name and resume of Bridge Manufacturer's design professional who will be
signing and sealing the engineering submittals,
• Copy of current AISC certification,
• Representative copies of detailed drawings, field procedures, calculations, quality
control manual, welder's certifications,
• Listing of projects including owner, location, size, year of fabrication, contact
person.
The above will be evaluated by the Engineer for accuracy and ability to provide a bridge
in accordance with these specifications. Bridge Manufactures other than those listed
above may only be used if the Engineer provides written approval 5 days prior to the bid.
The Engineer's ruling shall be final.
1.4 Bridge Manufacturer's Design Professional and Submittals
The Bridge Manufacturer shall have as a direct employee, an engineer who is
experienced in bridge design to perform all engineering related task and design. The
engineer shall have a minimum of 10 years experience in bridge design and be a
currently licensed civil or structural engineer in the State of Washington.
Engineering drawings, 11x17 format, shall be prepared and submitted to the Contractor
or Owner for their review after receipt of the order. Submittal drawings shall be unique
drawings, prepared to illustrate the specific portion of the bridge being fabricated. All
relative design information such as member size, ASTM/AASHTO material specification,
dimension necessary to fabricate and required welding shall be clearly shown on the
drawings. Drawings shall have cross referenced details and sheet numbers. All drawings
shall be stamped, signed and dated by the Bridge Manufacturer's Design Professional.
Structural calculations for the design of the bridge superstructure shall be prepared and
submitted to the Customer for their review after receipt of the order. Calculations shall
include complete design, analysis and code checks for the controlling member,
connectivity and support conditions, deck design, deflection checks, bearings and all
splices.
2.0 APPLICABLE CODES AND STANDARDS
2.1 Governing Specifications
Bridge shall be designed in compliance with the LRFD Bridge Design Specifications,
latest edition, by AASHTO. Calculations shall be in accordance with this document, and
formulas shall reference the appropriate sections.
2.2 Other Reference Codes, Specifications and Standards
AISC, Steel Construction Manual, Latest Edition
American Welding Society, Structural Welding Code, D1.5, Latest Edition
ASCE/SEI 7 Minimum Design Loads for Buildings and Other Structures, Latest Edition
National Design Specification for Wood Construction, ANSI NDS -Latest Edition
3.0 BRIDGE GEOMETRY
3.1 Span Length
The bridge span lenqth shall be 25'-0" (straiqht line dimension) and measured from end
to end of the bridqe structure.
3.2 Width
The bridge width shall be 14'-0" and shall be as measured from the inside face to inside
face of rail.
3.3 Lower Steel Clearance
The bridge manufacturer shall determine the distance from the top of the deck (measured
from the highest point of the deck) to the bottom of any steel member.
Page 2 of 7
3.4 Rail Height
Top of rail shall be a minimum 2'-3" above the top of the wearing surface for vehicular
traffic only.
3.5 Camber
A single simple -span bridge shall have a vertical camber dimension at the mid -span
equal to 100% of the anticipated full dead load deflection. If beam mill camber is
adequate to accommodate full dead load deflection, then indicate so on drawings.
3.6 Elevation Difference
The top of the decks shall be at the same elevation at each end of the bridqe.
4.0 STRUCTURAL DESIGN LOADS
4.1 Dead Load
The bridge structure shall be designed for the total bridge weight plus an additional
allowance of 80 pounds per square foot total wearing surface.
4.2 Vehicle Load (VL)
Bridge shall be designed for one lane of traffic, supporting HL -93 vehicle plus Dynamic
Load Allowance.
4.3 Wind Load (WS)
Bridge shall be designed for a 50 pounds per square foot wind load applied horizontally
against the height of the stringer plus the side dam.
4.4 Fatigue Load (FL)
The fatigue loading shall be as specified in AASHTO LRFD Bridge Design Specifications,
current edition.
4.5 Railing Loads (RL)
Traffic rail shall be designed in accordance with AASHTO LRFD Bridge Design
Specifications, current edition, Appendix At 3.2. Traffic rail has not been physically
crash -tested.
Traffic rail shall meet the force requirements for a TL -1 rating.
4.6 Combination of Loads
The load combinations and load factors to be used shall be as per specified in AASHTO
LRFD Table 3.4.1-1.
5.0 STRUCUTRAL DESIGN CRITERIA
5.1 Deflections
Per AASHTO LRFD Bridge Design Specifications, vehicle load deflection limits are not
required. However the Bridge Manufacturer will typically try to provide an anticipated
vehicle load deflection of approximately U500, expressed as the ratio of span length to
deflection.
5.2 Fracture
The main beams shall meet CVN values of 20 ft -lbs @ 40 -degrees Fahrenheit.
5.3 Wheel Load Distribution
4.25 -inch Bridge deck shall be designed to support the maximum wheel load from the
design vehicle.
6.0 MATERIALS OF CONSTRUCTION
6.1 Structural Steel
Structural steel shall meet ASTM A709 standards.
6.2 Deck Material
Decking to be 4.25 -inch Steel Bridge Deck, 9 -gage, placed transverse across the width of
the bridge. The height of the deck shall be 4.25' from top of the lower through to top of
the profile. Width of the plank shall be 12-13/16" with one 13/16" overlapping leg.
Decking shall be manufactured from pre -galvanized steel, ASTM A653 Grade 50 Class
with a minimum 2 oz. galvanized coating, Fy=50 ksi. Decking is to be welded to top
flange of stringers and to adjoining sheets. Welds to be treated with organic zinc -rich
coating meeting the material and performance requirements of ASTM A 780 (Standard
Practice for Repair of Damaged and Uncoated Areas of Hot -Dip Galvanized Coatings).
6.3 Wearing Surface
Timber (Treated) - Running (Ribbon)
Top of side dam shall be 3.5" above top of 4.25 -inch Big R Steel Bridge Deck for timber
wearing surface. Timber wearing surface shall be two ribbons of four planks each of
3x12 No. 2 or better, rough sawn, West Coast Region Douglas Fir, pressure treated ACQ
or equal to 0.4 pcf or refusal. Timber shall be attached to the 4.25 -inch Big R Steel
Bridge Deck utilizing %" diameter galvanized carriage bolts, two at each end of the planks
and one alternating every 4'-0" along the length of the planks. Some planks will be
shipped loose to allow access to the lifting lugs and the bolted stitch connection.
6.4 Fasteners
Structural bolts used to field splice, or connect; all main members shall be ASTM A325, in
accordance with the Specification for Structural Joints using ASTM A325 orA490 Bolts.
The nuts for these structural bolts shall be ASTM A563. One flat hardened washer
meeting ASTM F436 shall be supplied with all bolts. All bolts, nuts and washers shall be
galvanized and shall be furnished in an amount of 5% in excess of the number required
for each size and length.
Non-structural bolts shall be ASTM A307, '/." diameter carriage bolts, zinc plated or
galvanized.
Page 4 of 7
Self -drilling fasteners shall be #14 x 1" Zinc Plated Hex Washer Head Tek Screws.
Power Actuated fasteners shall be Hilti sheet metal nail X -ENP -19 fastener.
6.5 Traffic Rail
Rail to be galvanized steel Thrie-Beam Rail, 10 -gage thickness, with flared ends at each
end of bridge. A 2 -sided crystal reflector tab shall be provided to be placed 6'-3" on
center.
7.0 FINISH
7.1 Blast Cleaning
Exposed surfaces of structural steel to be wipe cleaned in accordance with the Steel
Structures Painting Council (SSPC), Surface Preparation Specification No. 1, latest
edition, (SSPC-SP1), Wipe -Off Clean. Exposed surfaces of steel shall be defined as
those surfaces seen from the deck or from the outside and bottom of the structure.
8.0 BEARINGS AND FOUNDATIONS
Elastomeric pads shall be 60-Durometer Neoprene and are to be used only as leveling
pads and do not meet AASHTO, LRFD design criteria. Bridge Manufacturer shall design
and supply the anchor plates for attachment to the top of the precast concrete sills. The
anchor plates shall be fabricated from A588 material and shall be 1/2" thick and 8" x 22"
in plan. To the anchor plate, two 1.25" diameter by 5" long fully -threaded zinc plated rods
shall be welded, spaced to match the hole spacing in the bridge bearing plates and
elastomeric pads. Two nuts and one washer (all galvanized) shall be supplied with each
rod.
Two precast concrete sills shall be designed and supplied by the Bridge Manufacturer.
The precast concrete sills shall be cast by a plant which carries the National Precast
Concrete Association (NPCA) certification. The precast concrete sills shall be 1'-6" deep
by 2'-6" wide by 16'-0" long. The precast concrete sills shall be reinforced with stirrups
and longitudinal reinforcing bars (minimum Grade 40), have a minimum concrete strength
of 4000psi, and shall be sized by the Bridge Manufacturer to support all applied loads. A
2" minimum concrete cover shall be maintained for all reinforcing. Lifting lugs shall be
installed to aid in the unloading and placement of the precast concrete sills. On top of the
precast concrete sill, an A588 plate (1/2" thick by 6" wide by 15'-0" long) shall be
embedded into the concrete with shear studs. This top plate will be used to attach the
anchor plates via field welding by the Contractor.
The soil onto which the precast concrete sills set shall have a minimum allowable bearing
pressure of 3700psf. Contractor and Owner are responsible for verifying the soil capacity
and following all recommendations by a Geotechnical Engineer to assure that the soil
capacity is met.
The back wall system shall be comprised of two pieces of galvanized sheet piling. The
sheet piling shall be of 10 -gage material, 3.25" high and 19.625" wide. Back walls shall
be designed to support the backfill and applied traffic loads. The top piece of sheet piling
shall be 21'-0" long and the lower piece of sheet piling shall be 26' long.
9.0 FABRICATION
9.1 Welding
Welding procedures and weld qualification test procedures shall conform to the
provisions of AWS D1.5, Bridge Welding Code, latest edition. Filler metal shall be in
accordance with the applicable AWS Filler Metal Specification, and shall match the
corrosion properties of the base metal.
9.2 Welders
Welders shall be qualified for each process and position used while fabricating the
bridge. Qualification tests shall be in accordance with AWS D1 A. All weld qualifications
and records shall be kept in accordance with the Fabricators Quality Assurance Manual
which has been approved by AISC.
9.3 Bolted Splices
For shipping purposes, the bridge may be fabricated in sections. Sections shall be field
assembled using bolted connections and or field welding as indicated on the drawings.
Tightening of all structural bolts shall be by Turn -of -the -Nut Method.
10.0 QUALITY CONTROL
10.1 Al SC Certification
The bridge shall be fabricated in a shop owned by the Bridge Manufacturer. This facility
shall have up to date certification by AISC as a Certified Bridge Fabrication - Intermediate
(Major) with Fracture Critical Endorsement.
10.2 Certified Weld Inspector
The bridge manufacturer shall employ a Certified Weld Inspector (CWI), with
endorsement by AWS QC1. This CWI shall be present during the complete fabrication of
the bridge. The CWI shall provide written documentation that the bridge has been
fabricated in accordance with these specifications and the approved design drawings.
10.3 Documentation
Material Certifications shall be available for review for all materials within the bridge.
Traceability of heat numbers is required for all steel.
Documentation showing the performance of all critical quality checks shall also be made
available for review by the Engineer or Owner.
10.4 Non -Destructive Testing
All welds within the structure, shall be visually inspected for conformance to size, under
cut, profile and finish.
11.0 DELIVERY AND ERECTION
11.1 Delivery
Delivery shall be made via truck to a location nearest the site which is accessible to
normal over -the -road equipment. All trucks delivering bridge materials will need to be
unloaded at the time of arrival. If the erection Contractor needs special delivery or
delivery is restricted he shall notify the Bridge Manufacturer prior to bid date. This
Page 6 of 7
includes site issues which may prevent over -the -road equipment from accessing the site.
Steerable dollies are not used in the cost provided by the Bridge Manufacturer.
Determining the length of bridge section which can be delivered is the responsibility of
the Contractor, and shall be communicated to the Bridge Manufacturer prior to the bid
date.
11.2 Installation & Lifting Procedures
The Bridge Manufacturer will provide a standard typical written procedures for lifting and
splicing the bridge. All actual methods, equipment and sequence of erection used are the
responsibility of the Contractor. Each section shall be lifted from the four lifting lugs
provided. Attach rigging to lifting lugs with adequately sized rigging hardware. Rigging
materials and methods are the responsibility of the Installer. Capacity of the lifting lug is
24,000 pounds at a 45 -degree lift angle.
11.3 Loose Items
Post and Rails will be shipped loose for field installation.
Bearing Plate will be shipped loose for field welding to the bottom flange of the stringers.
Precast Concrete Sills, Sheet Pile Back Wall, and Anchor Plates will be shipped loose for
field installation
Field welding shall be performed by others, using an AWS Certified Welder
12.0 WARRANTY
The Bridge Manufacturer shall warrant their steel structure to be free of design, material, and
workmanship defects for a period of ten years from the earlier of the date of delivery or from 60
days after final fabrication. Wood is excluded under this warranty. This warranty shall not cover
defects in the bridge caused by abuse, misuse, overloading, accident, improper maintenance,
alteration, or any other cause not the result of defective materials or workmanship. This warranty
shall be void unless Owner's records can be supplied which shall indicated compliance with the
minimum guidelines specified in the inspection and maintenance procedures. Paint, galvanizing
and other special coatings shall be warranted by the coating manufacturer and is not covered by
the Bridge Manufacturer. Repair or replacement shall be the exclusive remedy for defects under
this warranty. The Bridge Manufacturer shall not be liable for any consequential or incidental
damages for breach of any express or implied warranty on their structures. Use of de-icing or
dust prohibitive chemicals or salts to any part of the bridge structure will void this warranty.