CONTINUED SOLID WASTE STUDY SESSION MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Special Meeting
THURSDAY 1 2:30 PM I May 16, 2019
Board members present: Chairman Cory Wright; Vice -Chairman Brett Wachsmith; and
Commissioner Laura Osiadacz.
Others: Patti Johnson, Lisa Lawrence
Meeting called to order at 2:29 p.m.
Direction on Co -Locating of SW & DPW: Patti presented the Board with a letter from the
Public Works Director and asked the Board for direction on moving forward on the project with
or without Public Works. Patti informed the Board that it would be an additional $50,000.00 in
design fees to add Public Works in the design process at this time and it would also alter the
existing permitting schedule. The Board directed staff to work with Public Works staff to see if it
was feasible to co -locate.
Other Business: None
Meeting adjourned at 3:00 p.m.
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
f
Lisa awrence Cory Wright, Chairman
2019-05-16 MINUTES
DAR °IGEN`? OFA BLyf� ,VVOR��S
KI ITITns couxry
TO:
Patti Johnson, Director Solid Waste
COPY:
Candie Leader, Administrative Assistant
Taylor Gustafson, Planner III
DATE.
May 14, 2019 -
FROilffi:
!!dark R. Cook, Director'.'
RE:
Transfer Station Collocation
Public Works generates trips at our existing lov,'=r county shop as detailed below for your
consideration.
Approximately 20 employees- including temporary, not including administrative
employees.
Potential for 9 employees from Upper County shop to work at Lower County in the
summer.
Winter hours: 7 am -3:30 pm_
Summer hours: 6 am -4:30 pm.
60 pieces of equipment + snow plows.
Equipment potentially out for 12 hour days, 4 am -4 pm or 6 am -6 pm.
Freight comes in on a daily basis from UPS.
Asphalt loads are delivered every day for the month of July (31 days) typically mid-
morning.
O Anti -icer is delivered once a week for 3 months (12 days), typically mid-morning.
Public Works understands that Solid Waste paid $3,300,000 for 54.95 acres supporting the new
lower county transfer station. A quick lease analysis appears below supporting five (5) acres of
lease from Solid Waste supporting a new lower county shop facility.
Cost per acre = $3,300,000/54.95 acres = $60,055/acre
Five acres = (5)X(43,560 SF) = 217,800 SF
Assume:
Present value = ($60,055/acre)X(5 acres) _ $300,275
Interest rate = two percent per year = 2%
Cost recovery period of initial lease = 40 year:
Payment at the beginning of the lease
Annual payment = $10,762
Cost per square foot (SF) _ $10,7621217,800 SF = $0.05/SF
CONCLUDE: Public Works desires leasing five (5) acres of solid waste transfer station land in a
colocation proposal.