HomeMy WebLinkAbout2019-05-16-minutes-continued-solid-waste-study-session-KITTITAS COUNTY CONTINUED SOLID WASTE STUDY SESSION MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Special Meeting THURSDAY 1 2:30 PM I May 16, 2019 Board members present: Chairman Cory Wright; Vice -Chairman Brett Wachsmith; and Commissioner Laura Osiadacz. Others: Patti Johnson, Lisa Lawrence Meeting called to order at 2:29 p.m. Direction on Co -Locating of SW & DPW: Patti presented the Board with a letter from the Public Works Director and asked the Board for direction on moving forward on the project with or without Public Works. Patti informed the Board that it would be an additional $50,000.00 in design fees to add Public Works in the design process at this time and it would also alter the existing permitting schedule. The Board directed staff to work with Public Works staff to see if it was feasible to co -locate. Other Business: None Meeting adjourned at 3:00 p.m. KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON f Lisa awrence Cory Wright, Chairman 2019-05-16 MINUTES DAR °IGEN`? OFA BLyf� ,VVOR��S KI ITITns couxry TO: Patti Johnson, Director Solid Waste COPY: Candie Leader, Administrative Assistant Taylor Gustafson, Planner III DATE. May 14, 2019 - FROilffi: !!dark R. Cook, Director'.' RE: Transfer Station Collocation Public Works generates trips at our existing lov,'=r county shop as detailed below for your consideration. Approximately 20 employees- including temporary, not including administrative employees. Potential for 9 employees from Upper County shop to work at Lower County in the summer. Winter hours: 7 am -3:30 pm_ Summer hours: 6 am -4:30 pm. 60 pieces of equipment + snow plows. Equipment potentially out for 12 hour days, 4 am -4 pm or 6 am -6 pm. Freight comes in on a daily basis from UPS. Asphalt loads are delivered every day for the month of July (31 days) typically mid- morning. O Anti -icer is delivered once a week for 3 months (12 days), typically mid-morning. Public Works understands that Solid Waste paid $3,300,000 for 54.95 acres supporting the new lower county transfer station. A quick lease analysis appears below supporting five (5) acres of lease from Solid Waste supporting a new lower county shop facility. Cost per acre = $3,300,000/54.95 acres = $60,055/acre Five acres = (5)X(43,560 SF) = 217,800 SF Assume: Present value = ($60,055/acre)X(5 acres) _ $300,275 Interest rate = two percent per year = 2% Cost recovery period of initial lease = 40 year: Payment at the beginning of the lease Annual payment = $10,762 Cost per square foot (SF) _ $10,7621217,800 SF = $0.05/SF CONCLUDE: Public Works desires leasing five (5) acres of solid waste transfer station land in a colocation proposal. 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663