2. Request to Approve a Resolution Awarding the Design and Environmental Permitting
Contract for the Kachess Lake Road Culvert Replacement Project to Jacobs and Authorize the
Director of Public Works to negotiate scope of work and sign the required local agency
agreement.
3. Request to Approve a Resolution Awarding the Design and Environmental Permitting
Contract for the Naneum Road Culvert Replacement Project to Jacobs and Authorize the
Director of Public Works to negotiate scope of work and sign the required local agency
agreement.
4. Out of State Travel and Training Discussion
5. Bowers Field Taxi -Lane Construction Discussion
6. Bakers Road Truck Traffic Discussion
7. East Taneum Road Speed Study Two (2) Results
8. Other business
9. Adjourn
Created on 818/2019 8:02:21 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM AUGUST 12, 2019
Board members present: Chairman Cory Wright; Vice -Chairman Brett
Wachsmith
Others: Mark Cook and Candie Leader, Public Works and One (1) Member
of the Public
At 1:30 pm Chairman Cory Wright opened the Public Works Study Session.
One (1) item was removed from the Agenda - Out of State Travel and
Training Discussion
REQUEST TO APPROVE A RESOLUTION AWARDING THE DESIGN AND ENVIRONMENTAL
PERMITTING CONTRACT FOR THE KACHESS LAKE ROAD CULVERT REPLACEMENT
PROJECT TO JACOBS AND AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO
NEGOTIATE SCOPE OF WORK AND SIGN THE REQUIRED LOCAL AGENCY AGREEMENT
Mark Cook presented the resolution for consideration. Mark Cook
stated that this project is being funded with STBG funds and staff
received seven (7) responses for the project. Mark Cook continued
that four (4) reviewers from Public Works scored the submittals with
Jacobs being the selected consultant for the project. Commissioner
Wright inquired about the timeline on getting the negotiations and
scope of work completed with Mark Cook replying about two (2) weeks.
Vice -Chairman Brett Wachsmith made a motion to approve Resolution
2019-127 Awarding the Design and Environmental Permitting Contract for
the Kachess Lake Road Culvert Replacement Project to Jacobs and
Authorize the Director of Public Works to negotiate Scope of Work and
sign the required Local Agency Agreement. Chairman Cory Wright
seconded the motion. Motion passed.
REQUEST TO APPROVE A RESOLUTION AWARDING THE DESIGN AND ENVIRONMENTAL
PERMITTING CONTRACT FOR THE NANEUM ROAD CULVERT REPLACEMENT PROJECT TO
JACOBS AND AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO NEGOTIATE SCOPE
OF WORK AND SIGN THE REQUIRED LOCAL AGENCY AGREEMENT
Mark Cook stated that the project for Naneum Road Culvert Replacement
Project is a similar funded project as Kachess Lake Road. Mark Cook
commented that there is recurrent flooding in this area and staff
received eight (8) responses for the project and had the same four (4)
staff reviewers. Mark Cook added that Jacobs was also selected for
this project. Vice -Chairman Brett Wachsmith made a motion to approve
Resolution 2019-128 Awarding the Design and Environmental Permitting
Contract for the Naneum Road Culvert Replacement Project to Jacobs and
Authorize the Director of Public Works to negotiate Scope of Work and
2019-08-12 MINUTES
signed the required Local Agency Agreement. Chairman Cory Wright
seconded the motion. Motion passed.
BOWERS FIELD TAXI LANE CONSTRUCTION DISCUSSION
Mark Cook stated that staff recently met with two potential lessees
for property at Bowers Field. Mark Cook continued that these lots
would have private hangars constructed on them, however, the area
where the lots are located do not have utilities or taxi lanes
constructed. Mark Cook added that he is requesting to add the costs
for these improvements into the 2020 budget and potentially lease
these lots at a higher rate to recover some of the improvement costs.
Discussion was held. Staff was directed to pursue the costs
associated with the improvements and program into the budget for 2020.
BAKERS ROAD TRUCK TRAFFIC DISCUSSION
Mark Cook stated that there has been a long standing issue with
construction traffic accessing Bakers Road to bypass the internal road
network of Suncadia. Mark Cook commented that he has attempted to
work out a solution with Suncadia but has not been successful. Mark
Cook continued that the traffic is using the Evergreen Valley
neighborhood as a shortcut upsetting residents. Mark Cook added that
as an emergency solution he had staff place barricades on Bakers Road
so large vehicles could not travel on the roadway. Mark Cook stated
that the Board could pass an Ordinance restricting truck traffic and
then it becomes an enforcement issue. Discussion was held. Staff was
directed to remove the barricades and schedule a meeting with Suncadia
and Fire District No. 6 to discuss the issue.
TANEUM ROAD EAST SPEED STUDY TWO (2) RESULTS
Mark Cook stated that at a previous study session he presented speed
study results for Taneum Road East and after discussion the Board
directed staff to conduct an additional study to see if any
recreational traffic would be captured. Mark Cook presented the
results from the second study and commented that the results didn't
change much from the first study. Mark Cook suggested moving forward
with setting a public hearing for the Board to hear from residents in
the area and that his recommendation will be to not lower the speed
limit. Staff was directed to set a public hearing at an upcoming
agenda session.
Meeting adjourned at 1:54 pm
IPI -41 &X61:6IVAIV, I I LI l41
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY,
Cory Wright, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE, OF WASHINGTON
RESOLUTION NO. 2019 -_Laq
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
KACHESS LAKE ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND
AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK
AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations; and
WHEREAS: Seven (7) qualified engineering firms responded to the request for qualifications
with process closing on June 27, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected Jacobs as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with Jacobs for the design and environmental permitting for the Kachess Lake
Road Culvert Replacement Project and authorizes the signature of the Public Works Director on
the required local agency agreement providing an acceptable scope of work and fee is
successfully negotiated.
DATED this 12th day of August, 2019, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
❑ Deputy Clerk of the Board- Mandy Buchholz ABSENT
�pMMlgs/O (J Laura Osiadacz, Commissioner
'SEAL
"S,cQUNTY `NPS
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019 - 11/
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND
AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK
AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations; and
WHEREAS: Eight (8) qualified engineering firms responded to the request for qualifications
with process closing on June 27, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected Jacobs as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with Jacobs for the design and environmental permitting for the Naneum Road
Culvert Replacement Project and authorizes the signature of the Public Works Director on the
required local agency agreement providing an acceptable scope of work and fee is successfully
negotiated.
DATED this 12th day of August, 2019, at Ellensburg, Washington.
Attest:
?'Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Laura Osiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 12, 2019
ACTION REQUESTED: Request to Approve a Resolution Awarding the
Design and Environmental Permitting Contract for
the Kachess Lake Road Culvert Replacement
Project to Jacobs and Authorize the Director of
Public Works to negotiate scope of work and sign
the required local agency agreement.
BACKGROUND: Public Works produced a Statement of
Qualifications that seeks to hire a consultant for
Design and Environmental Permitting services for
the Kachess Lake Road Replacement Project. The
Board of County Commissioners directed Public
Works advertise for said services by issuing a
Request for Qualifications in the local paper of
record. Seven (7) qualified firms responded to the
request for qualifications process closing on June
27, 2019. A review committee of Public Works
evaluated the proposal and reviewers have selected
Jacobs to perform design and environmental
permitting services for said project.
INTERACTION:
Public Works
RECOMMENDATION: Approve a Resolution to Award the Design and
Environmental Permitting Contract to Jacobs for
the Kachess Lake Road Culvert Replacement
Project and Authorize the Director of Public Works
to negotiate scope of work and fee and sign the
required local agency agreement upon successful
negotiation.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019 -
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
KACHESS LAKE ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND
AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK
AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations; and
WHEREAS: Seven (7) qualified engineering firms responded to the request for qualifications
with process closing on June 27, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected Jacobs as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with Jacobs for the design and environmental permitting for the Kachess Lake
Road Culvert Replacement Project and authorizes the signature of the Public Works Director on
the required local agency agreement providing an acceptable scope of work and fee is
successfully negotiated.
DATED this 12th day of August, 2019, at Ellensburg, Washington
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Brett Wachsmith, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Laura Osiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 12, 2019
ACTION REQUESTED: Request to Approve a Resolution Awarding the
Design and Environmental Permitting Contract for
the Nanuem Road Culvert Replacement Project to
Jacobs and Authorize the Director of Public Works
to negotiate scope of work and sign said the
required local agency agreement.
BACKGROUND: Public Works produced a Statement of
Qualifications seeking to hire a consultant for
Design and Environmental Permitting services for
the Naneum Road Replacement Project. The Board
of County Commissioners directed Public Works
advertise for said services by issuing a Request for
Qualifications in the local paper of record. Eight (8)
qualified firms responded to the request for
qualifications process closing on June 27, 2019. A
review committee of Public Works evaluated the
proposal and reviewers have selected Jacobs to
perform design and environmental permitting
services for said project.
INTERACTION:
Public Works
RECOMMENDATION: Approve a Resolution to Award the Design and
Environmental Permitting Contract to Jacobs for
the Naneum Road Culvert Replacement Project
and Authorize the Director of Public Works to
negotiate scope of work and fee and sign the
required local agency agreement once negotiated.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019 -
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND
AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK
AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations; and
WHEREAS: Eight (8) qualified engineering firms responded to the request for qualifications
with process closing on June 27, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected Jacobs as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with Jacobs for the design and environmental permitting for the Naneum Road
Culvert Replacement Project and authorizes the signature of the Public Works Director on the
required local agency agreement providing an acceptable scope of work and fee is successfully
negotiated.
DATED this 12th day of August, 2019, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Brett Wachsmith, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Laura Osiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 12, 2019
TOPIC: Out of State Travel and Training
ACTION REQUESTED: Authorize Out of State Training for Water Resource
Manager Thomas
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Authorize out of state travel and training for Water Resource Manager Thomas.
BRIEFING SUMMARY:
• Floodplain Manager Hodges is retiring 12-31-2019
• Floodplain Manager training is being offered 10-21 through 10-24, 2019 in
Lewiston, ID
• Water Resource Manager Thomas will serve as Floodplain Manager upon
successful completion of the FEMA course and associated certification exam
BACKGROUND:
For the past several years, Planner III Hodges has served as the County's Floodplain
Manager. Karen's pending retirement creates a critical gap in the County's floodplain
management program. Water Resources Manager Thomas is offering to serve as the
County's Floodplain manager following Hodges' retirement.
DISCUSSION:
FEMA is providing the required floodplain manager training course in Lewiston, ID in
October. The course is generally three days and a certification exam is offered following
the course. Public Works (PW) desires having Thomas go through the training and
subsequent exam allowing some additional time if a second exam is needed. In the
absence of a certified floodplain manager, PW will likely have to contract floodplain
permit review to an outside consultant.
FISCAL IMPACTS:
The course is free. Travel is estimated at approximately $800 - $1,000 (meals, lodging
and fuel). The adopted 2019 budget provides $6,000 for training.
ATTACHMENTS:
Exhibit 1: FEMA course flyer
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT l: FEMA COURSE FLYER
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
I
Managing Floodplain Development through the
National Flood Insurance Program (NFIP)
Date:
October 21-24, 2019
Location:
Lewiston, ID
Course Description:
Hosted by FEMA Region X and the Idaho State
Department of Resources. This course is designed
for local officials responsible for administering
their local floodplain management ordinance. The
course will focus on the National Flood Insurance
Program (NFIP) and concepts of floodplain
management, maps and studies, ordinances
administration, and the relationship between
floodplain management and flood insurance.
Target Audience:
Local officials responsible for administering local
floodplain management ordinances, including
floodplain management administration, building
inspectors, code enforcement/ zoning officers, planners,
city/county managers, attorneys, engineers, and
public work officials. Federal/state/regional
floodplain managers are also encouraged to attend.
The course is designed for those officials with less than
three years of floodplain management experience.
Funding:
Tuition is free for those accepted; there are no
travel/salary stipends available for this offering
and all incurred costs are the responsibility of the
attendee or sending organization.
Prerequisites:
Flood Insurance Rate Map (FIRM) tutorial at
htQ2://wwvv.floodmgps.fema.gov/tutorials/
of firm.swf (30 minutes)
Federal Insurance Studies (FIS) tutorial at:
littl2://wvv-w.floodmags.feina.gov/tutorials/
of fis.svvf (40 minutes)
Course Coordinator:
Michelle Schmeling
FEMA Region X
Floodplain Management Specialist
Phone: (425) 487-4640
Michelle. Sc hmeling@Tema. dhs. gov
Accommodation Requests:
Idaho State Department of Resources and the
Federal Emergency Management Agency (FEMA) ,
Region X are committed to providing access,
equal opportunity and reasonable accommodation
in its services, programs, activities, education
and employment for individuals with disabilities.
To request disability accommodation, contact
Michelle Schmeling at least ten working days in
advance at the above contact info.
To apply: Please see the next page for the "Application Procedures and Points of Contact"
I
Application Procedures and Points off Contact
To Apply:
State and Local Attendees:
FEMA Form 119-25-1 Application:
All FEMA Form 1 19-25-1 applications must be
hctp://tra ning.fema.gov/Apply/ 1 19-25-1.12df
submitted through the appropriate state training
officer (listed below), who will then forward the
Applicants will need to put their Student
form to the FEMA Region X Training Team.
Identification (SID) in place of their social
security number. If you do not yet have a SID,
just follow these three simple steps to obtain one:
Alaska
Jeffrey McKenzies://cdp.dhs.
Step ]:To register, go to: htto
_`' r
State Training Officer
gov/femasid/.
Phone: (907) 428-7021
s
Step 2: Click on the "Register for a FEMA SID"
' Fax: (907) 428-7009
button in the middle of the screen.
leffrey.McKenziga,alaska.gov
Step 3: Follow the instructions and provide
Idaho
the necessary information to create your
Gary Leeder
account.
1 State Training and Exercise Section
Chief
Enrollment confirmations will be sent
Phone: (208) 258-6509
approximately 30 -days prior to the course via
Fax: (208) 422-3044
email.
GLeeder a,imd.idaho.gov
Federal Employees and Tribal Oregon
Partners: Karen Layng
Your supervisor must sign a completed FEMA State Training Officer
Form 119-25-1 application and then forward to It Phone: (503) 378-3231
FEMA -R10 -Training@ erna.dhs.gov Fax: (503) 373-7833
Karen.LayngL@state. onus
Washington
Justin Fordice
State Training Program Supervisor
Phone: (253) 512-7056
Fax: (2S3) 512-7206
EMD.Trainin a mil.wa.gov
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 12, 2019
TOPIC: ELN Taxi -lane Construction
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff prepare cost estimates for extending utilities and constructing two taxi -lanes
at ELN supporting pending private hangar leases.
BRIEFING SUMMARY:
• Five (5) pending lessees require new taxi -lanes to access ELN parcels
• Utilities (sewer, water, electric and gas) should be extended prior to taxi -lane
construction
• The Airport Fund (10 1) does not have sufficient cash reserves likely needed for
taxi -lane construction
• Economic development plan for ELN is likely one year away from delivery
BACKGROUND:
Five (5) private pilots have put deposits down for leasing lots inside the fence at ELN for
building private hangars. The location of the lots requires the construction of two
separate taxi -lanes extending from the existing apron area to back lots located along
Bowers Road.
DISCUSSION:
Taxi -lane construction is envisioned in the current ELN Master plan. The cost of utility
extension is likely the most expensive part of the taxi -lanes. The Board must consider the
impact of seeking total cost recovery for project costs against the lots benefited or
recognize the cost of development is incidental to leasing up available rental area airside
at the airport.
Supplemental funding is required for the taxi -lane to go forward in design and
construction is 2020. Once an engineering and planning consultant is selected for ELN,
the design and construction oversight tasks can be undertaken.
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY CONINUSSIONERS WORK SESSION STAFF REPORT
FISCAL IMPACTS:
Public Works is estimating the combined cost of utility extension at $155/per lineal foot
(using recent Suncadia bonding estimates). The cost of taxi -lane construction is
estimated at being $40,000 (using recent Suncadia bonding estimates). Design is
estimated at $50,000. The likely combined project cost is: $130,000 to $150,000.
ATTACHMENTS:
Exhibit 1: Binding site plan lots 1-15-H13
Page 2 of
PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: TAXI -LANE SUPPORTING LOTS H5 -H13
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
^ 1I1 w R w
�a 611'q
1-x �. R a NOOO6Y� I w
611D /
__ venin
lo-l6-.wozo-000z \
L 6fS E� s'gig'�3l-wh 180 gy CC
d 8 e e R9999ffgR1,9w 111 B 111P H
ICA 4,4
@@y4yP4y886a��RRapgRT z N
lGillig
93333 #.a,m€€; v a z\
Q s 6��.s Rgssg�1 11'; � � �
g x y gi$
�a6�5 � y8 ��n95 �� n I.�.I
eg iggl�s � 3 � �$� m C9 A�Y •� L
�L
-.1 'ILLI
atr wx
r�!\ �nLl 7
7s
OL S
xtr. x
� O�OL1 M'
3. te.i
8
C
CO'OLI CO'0.1
s�
I
6rmz
I aavLx
-
C 4i: 4Si
APO tS
1 4ii
Sc�5j4S�8 �
$ N
Y88
$
E Yp8 8 g n
I
'6P1N Wx0 Y"OCtY.aN
6021
is .ax
CC
�I m
s.+en.as
�
is ca
se 1a8
�a 611'q
1-x �. R a NOOO6Y� I w
611D /
__ venin
lo-l6-.wozo-000z \
L 6fS E� s'gig'�3l-wh 180 gy CC
d 8 e e R9999ffgR1,9w 111 B 111P H
ICA 4,4
@@y4yP4y886a��RRapgRT z N
lGillig
93333 #.a,m€€; v a z\
Q s 6��.s Rgssg�1 11'; � � �
g x y gi$
�a6�5 � y8 ��n95 �� n I.�.I
eg iggl�s � 3 � �$� m C9 A�Y •� L
7s
18 18� Ly
i
��
CO'OLI CO'0.1
I �
Si
RM
A;,c
I
'6P1N Wx0 Y"OCtY.aN
n, I
Ex4MFN1
PC
,I
WMC 32S1..lWl
x.4[..
I
6056
! rcxu sxxu-
......�
�a 611'q
1-x �. R a NOOO6Y� I w
611D /
__ venin
lo-l6-.wozo-000z \
L 6fS E� s'gig'�3l-wh 180 gy CC
d 8 e e R9999ffgR1,9w 111 B 111P H
ICA 4,4
@@y4yP4y886a��RRapgRT z N
lGillig
93333 #.a,m€€; v a z\
Q s 6��.s Rgssg�1 11'; � � �
g x y gi$
�a6�5 � y8 ��n95 �� n I.�.I
eg iggl�s � 3 � �$� m C9 A�Y •� L
P6
��oim � pFm§�yu
�g
-99$
RM
'6P1N Wx0 Y"OCtY.aN
n, I
Ex4MFN1
PC
6056
�a 611'q
1-x �. R a NOOO6Y� I w
611D /
__ venin
lo-l6-.wozo-000z \
L 6fS E� s'gig'�3l-wh 180 gy CC
d 8 e e R9999ffgR1,9w 111 B 111P H
ICA 4,4
@@y4yP4y886a��RRapgRT z N
lGillig
93333 #.a,m€€; v a z\
Q s 6��.s Rgssg�1 11'; � � �
g x y gi$
�a6�5 � y8 ��n95 �� n I.�.I
eg iggl�s � 3 � �$� m C9 A�Y •� L
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: August 12, 2019
TOPIC: Bakers Road Truck Traffic
ACTION REQUESTED: Direct Staff Prepare an Ordinance Restricting Truck
Traffic on Bakers Road at Swiftwater Drive
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct that staff prepare an Ordinance for Board consideration restricting truck through
traffic on Bakers Road at Swiftwater Drive.
BRIEFING SUMMARY:
• Long term access issue with Suncadia at Bakers Road
• Public Works (PW) has declined to pursue requested road vacation by Suncadia
• Suncadia restricts access via a locked gate at SR 903
• Suncadia construction traffic terrorizes the local community every construction
season as they avoid the locked gate
• Recently, Public Works placed jersey barrier allowing cars to navigate past the
barriers but prohibiting larger truck traffic
• Numerous calls both pro and con have been pouring in through last week
• It appears that construction traffic is driving around the barricades outside of
public right of way and onto private property
BACKGROUND:
For the past several years, PW has tried to manage access of construction traffic on
Bakers Road at Swiftwater Drive. Suncadia management has expressed dis-satisfaction
with PW decision not to pursue vacation of Bakers Road. In response, Suncadia
Management manipulates locked gates forcing construction traffic through Evergreen
Valley to Bakers Road.
DISCUSSION:
PW believes the long term solution to minimizing Suncadia construction impact on the
Evergreen Valley community it to develop legislation limiting construction traffic on
Bakers Road at Swiftwater Drive. A brief conversation with FD 6 last week affirms
ongoing access issues with Suncadia management. It is unfortunate that Suncadia
construction traffic feels compelled to access Suncadia via Bakers Road. While PW is
friendly to the construction industry, the Bakers Road/Swiftwater Drive is not designed to
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMNUSSIONERS WORK SESSION STAFF REPORT
manage the kinds and amount of traffic being forced through the intersection owing to
decisions being made by Suncadia management.
FISCAL IMPACTS:
Minimal costs to date: placing barricades.
ATTACHMENTS:
Exhibit l: Site map
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY CON/aUSSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: SITE MAP
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
• t, . .3 .,_��
r
6 Y �
cn
CL
r
.�s • r_ `et'
i�'rf 1 ''�;F'` .���_l���/�`'� .off', i�i` .'y�`1�, a , _ ". rr YY.f�✓y�� X 5� � e-+
10,
< •� 1�.� r'F•�'r+mow; ��� " ;f'� � � ' �s;+�, +'� /•¢y��� ) �'� j
„ • mi i t Y