HomeMy WebLinkAbout2019-08-12-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday August 12, 2019 - 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Request to Approve a Resolution Awarding the Design and Environmental Permitting Contract for the Kachess Lake Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate scope of work and sign the required local agency agreement. 3. Request to Approve a Resolution Awarding the Design and Environmental Permitting Contract for the Naneum Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate scope of work and sign the required local agency agreement. 4. Out of State Travel and Training Discussion 5. Bowers Field Taxi -Lane Construction Discussion 6. Bakers Road Truck Traffic Discussion 7. East Taneum Road Speed Study Two (2) Results 8. Other business 9. Adjourn Created on 818/2019 8:02:21 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG Regular Meeting MONDAY 1:30 PM AUGUST 12, 2019 Board members present: Chairman Cory Wright; Vice -Chairman Brett Wachsmith Others: Mark Cook and Candie Leader, Public Works and One (1) Member of the Public At 1:30 pm Chairman Cory Wright opened the Public Works Study Session. One (1) item was removed from the Agenda - Out of State Travel and Training Discussion REQUEST TO APPROVE A RESOLUTION AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING CONTRACT FOR THE KACHESS LAKE ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO NEGOTIATE SCOPE OF WORK AND SIGN THE REQUIRED LOCAL AGENCY AGREEMENT Mark Cook presented the resolution for consideration. Mark Cook stated that this project is being funded with STBG funds and staff received seven (7) responses for the project. Mark Cook continued that four (4) reviewers from Public Works scored the submittals with Jacobs being the selected consultant for the project. Commissioner Wright inquired about the timeline on getting the negotiations and scope of work completed with Mark Cook replying about two (2) weeks. Vice -Chairman Brett Wachsmith made a motion to approve Resolution 2019-127 Awarding the Design and Environmental Permitting Contract for the Kachess Lake Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate Scope of Work and sign the required Local Agency Agreement. Chairman Cory Wright seconded the motion. Motion passed. REQUEST TO APPROVE A RESOLUTION AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING CONTRACT FOR THE NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO NEGOTIATE SCOPE OF WORK AND SIGN THE REQUIRED LOCAL AGENCY AGREEMENT Mark Cook stated that the project for Naneum Road Culvert Replacement Project is a similar funded project as Kachess Lake Road. Mark Cook commented that there is recurrent flooding in this area and staff received eight (8) responses for the project and had the same four (4) staff reviewers. Mark Cook added that Jacobs was also selected for this project. Vice -Chairman Brett Wachsmith made a motion to approve Resolution 2019-128 Awarding the Design and Environmental Permitting Contract for the Naneum Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate Scope of Work and 2019-08-12 MINUTES signed the required Local Agency Agreement. Chairman Cory Wright seconded the motion. Motion passed. BOWERS FIELD TAXI LANE CONSTRUCTION DISCUSSION Mark Cook stated that staff recently met with two potential lessees for property at Bowers Field. Mark Cook continued that these lots would have private hangars constructed on them, however, the area where the lots are located do not have utilities or taxi lanes constructed. Mark Cook added that he is requesting to add the costs for these improvements into the 2020 budget and potentially lease these lots at a higher rate to recover some of the improvement costs. Discussion was held. Staff was directed to pursue the costs associated with the improvements and program into the budget for 2020. BAKERS ROAD TRUCK TRAFFIC DISCUSSION Mark Cook stated that there has been a long standing issue with construction traffic accessing Bakers Road to bypass the internal road network of Suncadia. Mark Cook commented that he has attempted to work out a solution with Suncadia but has not been successful. Mark Cook continued that the traffic is using the Evergreen Valley neighborhood as a shortcut upsetting residents. Mark Cook added that as an emergency solution he had staff place barricades on Bakers Road so large vehicles could not travel on the roadway. Mark Cook stated that the Board could pass an Ordinance restricting truck traffic and then it becomes an enforcement issue. Discussion was held. Staff was directed to remove the barricades and schedule a meeting with Suncadia and Fire District No. 6 to discuss the issue. TANEUM ROAD EAST SPEED STUDY TWO (2) RESULTS Mark Cook stated that at a previous study session he presented speed study results for Taneum Road East and after discussion the Board directed staff to conduct an additional study to see if any recreational traffic would be captured. Mark Cook presented the results from the second study and commented that the results didn't change much from the first study. Mark Cook suggested moving forward with setting a public hearing for the Board to hear from residents in the area and that his recommendation will be to not lower the speed limit. Staff was directed to set a public hearing at an upcoming agenda session. Meeting adjourned at 1:54 pm IPI -41 &X61:6IVAIV, I I LI l41 KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, Cory Wright, Chairman BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE, OF WASHINGTON RESOLUTION NO. 2019 -_Laq AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE KACHESS LAKE ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK AND FEE FOR SAID PROJECT WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to state and federal procurement regulations; and WHEREAS: Seven (7) qualified engineering firms responded to the request for qualifications with process closing on June 27, 2019; and WHEREAS: A review committee of Public Works staff evaluated responses and reviewers have selected Jacobs as the preferred firm to provide said services; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Public Works Director to negotiate a scope of work and fee with Jacobs for the design and environmental permitting for the Kachess Lake Road Culvert Replacement Project and authorizes the signature of the Public Works Director on the required local agency agreement providing an acceptable scope of work and fee is successfully negotiated. DATED this 12th day of August, 2019, at Ellensburg, Washington. Attest: Clerk of the Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ❑ Deputy Clerk of the Board- Mandy Buchholz ABSENT �pMMlgs/O (J Laura Osiadacz, Commissioner 'SEAL "S,cQUNTY `NPS BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - 11/ AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK AND FEE FOR SAID PROJECT WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to state and federal procurement regulations; and WHEREAS: Eight (8) qualified engineering firms responded to the request for qualifications with process closing on June 27, 2019; and WHEREAS: A review committee of Public Works staff evaluated responses and reviewers have selected Jacobs as the preferred firm to provide said services; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Public Works Director to negotiate a scope of work and fee with Jacobs for the design and environmental permitting for the Naneum Road Culvert Replacement Project and authorizes the signature of the Public Works Director on the required local agency agreement providing an acceptable scope of work and fee is successfully negotiated. DATED this 12th day of August, 2019, at Ellensburg, Washington. Attest: ?'Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ABSENT Laura Osiadacz, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 12, 2019 ACTION REQUESTED: Request to Approve a Resolution Awarding the Design and Environmental Permitting Contract for the Kachess Lake Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate scope of work and sign the required local agency agreement. BACKGROUND: Public Works produced a Statement of Qualifications that seeks to hire a consultant for Design and Environmental Permitting services for the Kachess Lake Road Replacement Project. The Board of County Commissioners directed Public Works advertise for said services by issuing a Request for Qualifications in the local paper of record. Seven (7) qualified firms responded to the request for qualifications process closing on June 27, 2019. A review committee of Public Works evaluated the proposal and reviewers have selected Jacobs to perform design and environmental permitting services for said project. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution to Award the Design and Environmental Permitting Contract to Jacobs for the Kachess Lake Road Culvert Replacement Project and Authorize the Director of Public Works to negotiate scope of work and fee and sign the required local agency agreement upon successful negotiation. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Mark Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE KACHESS LAKE ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK AND FEE FOR SAID PROJECT WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to state and federal procurement regulations; and WHEREAS: Seven (7) qualified engineering firms responded to the request for qualifications with process closing on June 27, 2019; and WHEREAS: A review committee of Public Works staff evaluated responses and reviewers have selected Jacobs as the preferred firm to provide said services; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Public Works Director to negotiate a scope of work and fee with Jacobs for the design and environmental permitting for the Kachess Lake Road Culvert Replacement Project and authorizes the signature of the Public Works Director on the required local agency agreement providing an acceptable scope of work and fee is successfully negotiated. DATED this 12th day of August, 2019, at Ellensburg, Washington BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Brett Wachsmith, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Laura Osiadacz, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 12, 2019 ACTION REQUESTED: Request to Approve a Resolution Awarding the Design and Environmental Permitting Contract for the Nanuem Road Culvert Replacement Project to Jacobs and Authorize the Director of Public Works to negotiate scope of work and sign said the required local agency agreement. BACKGROUND: Public Works produced a Statement of Qualifications seeking to hire a consultant for Design and Environmental Permitting services for the Naneum Road Replacement Project. The Board of County Commissioners directed Public Works advertise for said services by issuing a Request for Qualifications in the local paper of record. Eight (8) qualified firms responded to the request for qualifications process closing on June 27, 2019. A review committee of Public Works evaluated the proposal and reviewers have selected Jacobs to perform design and environmental permitting services for said project. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution to Award the Design and Environmental Permitting Contract to Jacobs for the Naneum Road Culvert Replacement Project and Authorize the Director of Public Works to negotiate scope of work and fee and sign the required local agency agreement once negotiated. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Mark Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK AND FEE FOR SAID PROJECT WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to state and federal procurement regulations; and WHEREAS: Eight (8) qualified engineering firms responded to the request for qualifications with process closing on June 27, 2019; and WHEREAS: A review committee of Public Works staff evaluated responses and reviewers have selected Jacobs as the preferred firm to provide said services; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Public Works Director to negotiate a scope of work and fee with Jacobs for the design and environmental permitting for the Naneum Road Culvert Replacement Project and authorizes the signature of the Public Works Director on the required local agency agreement providing an acceptable scope of work and fee is successfully negotiated. DATED this 12th day of August, 2019, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Brett Wachsmith, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Laura Osiadacz, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 12, 2019 TOPIC: Out of State Travel and Training ACTION REQUESTED: Authorize Out of State Training for Water Resource Manager Thomas LEAD STAFF: Mark R. Cook RECOMMENDATION: Authorize out of state travel and training for Water Resource Manager Thomas. BRIEFING SUMMARY: • Floodplain Manager Hodges is retiring 12-31-2019 • Floodplain Manager training is being offered 10-21 through 10-24, 2019 in Lewiston, ID • Water Resource Manager Thomas will serve as Floodplain Manager upon successful completion of the FEMA course and associated certification exam BACKGROUND: For the past several years, Planner III Hodges has served as the County's Floodplain Manager. Karen's pending retirement creates a critical gap in the County's floodplain management program. Water Resources Manager Thomas is offering to serve as the County's Floodplain manager following Hodges' retirement. DISCUSSION: FEMA is providing the required floodplain manager training course in Lewiston, ID in October. The course is generally three days and a certification exam is offered following the course. Public Works (PW) desires having Thomas go through the training and subsequent exam allowing some additional time if a second exam is needed. In the absence of a certified floodplain manager, PW will likely have to contract floodplain permit review to an outside consultant. FISCAL IMPACTS: The course is free. Travel is estimated at approximately $800 - $1,000 (meals, lodging and fuel). The adopted 2019 budget provides $6,000 for training. ATTACHMENTS: Exhibit 1: FEMA course flyer Page 1 of 2 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT EXHIBIT l: FEMA COURSE FLYER Page 2 of 2 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT I Managing Floodplain Development through the National Flood Insurance Program (NFIP) Date: October 21-24, 2019 Location: Lewiston, ID Course Description: Hosted by FEMA Region X and the Idaho State Department of Resources. This course is designed for local officials responsible for administering their local floodplain management ordinance. The course will focus on the National Flood Insurance Program (NFIP) and concepts of floodplain management, maps and studies, ordinances administration, and the relationship between floodplain management and flood insurance. Target Audience: Local officials responsible for administering local floodplain management ordinances, including floodplain management administration, building inspectors, code enforcement/ zoning officers, planners, city/county managers, attorneys, engineers, and public work officials. Federal/state/regional floodplain managers are also encouraged to attend. The course is designed for those officials with less than three years of floodplain management experience. Funding: Tuition is free for those accepted; there are no travel/salary stipends available for this offering and all incurred costs are the responsibility of the attendee or sending organization. Prerequisites: Flood Insurance Rate Map (FIRM) tutorial at htQ2://wwvv.floodmgps.fema.gov/tutorials/ of firm.swf (30 minutes) Federal Insurance Studies (FIS) tutorial at: littl2://wvv-w.floodmags.feina.gov/tutorials/ of fis.svvf (40 minutes) Course Coordinator: Michelle Schmeling FEMA Region X Floodplain Management Specialist Phone: (425) 487-4640 Michelle. Sc hmeling@Tema. dhs. gov Accommodation Requests: Idaho State Department of Resources and the Federal Emergency Management Agency (FEMA) , Region X are committed to providing access, equal opportunity and reasonable accommodation in its services, programs, activities, education and employment for individuals with disabilities. To request disability accommodation, contact Michelle Schmeling at least ten working days in advance at the above contact info. To apply: Please see the next page for the "Application Procedures and Points of Contact" I Application Procedures and Points off Contact To Apply: State and Local Attendees: FEMA Form 119-25-1 Application: All FEMA Form 1 19-25-1 applications must be hctp://tra ning.fema.gov/Apply/ 1 19-25-1.12df submitted through the appropriate state training officer (listed below), who will then forward the Applicants will need to put their Student form to the FEMA Region X Training Team. Identification (SID) in place of their social security number. If you do not yet have a SID, just follow these three simple steps to obtain one: Alaska Jeffrey McKenzies://cdp.dhs. Step ]:To register, go to: htto _`' r State Training Officer gov/femasid/. Phone: (907) 428-7021 s Step 2: Click on the "Register for a FEMA SID" ' Fax: (907) 428-7009 button in the middle of the screen. leffrey.McKenziga,alaska.gov Step 3: Follow the instructions and provide Idaho the necessary information to create your Gary Leeder account. 1 State Training and Exercise Section Chief Enrollment confirmations will be sent Phone: (208) 258-6509 approximately 30 -days prior to the course via Fax: (208) 422-3044 email. GLeeder a,imd.idaho.gov Federal Employees and Tribal Oregon Partners: Karen Layng Your supervisor must sign a completed FEMA State Training Officer Form 119-25-1 application and then forward to It Phone: (503) 378-3231 FEMA -R10 -Training@ erna.dhs.gov Fax: (503) 373-7833 Karen.LayngL@state. onus Washington Justin Fordice State Training Program Supervisor Phone: (253) 512-7056 Fax: (2S3) 512-7206 EMD.Trainin a mil.wa.gov KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 12, 2019 TOPIC: ELN Taxi -lane Construction ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff prepare cost estimates for extending utilities and constructing two taxi -lanes at ELN supporting pending private hangar leases. BRIEFING SUMMARY: • Five (5) pending lessees require new taxi -lanes to access ELN parcels • Utilities (sewer, water, electric and gas) should be extended prior to taxi -lane construction • The Airport Fund (10 1) does not have sufficient cash reserves likely needed for taxi -lane construction • Economic development plan for ELN is likely one year away from delivery BACKGROUND: Five (5) private pilots have put deposits down for leasing lots inside the fence at ELN for building private hangars. The location of the lots requires the construction of two separate taxi -lanes extending from the existing apron area to back lots located along Bowers Road. DISCUSSION: Taxi -lane construction is envisioned in the current ELN Master plan. The cost of utility extension is likely the most expensive part of the taxi -lanes. The Board must consider the impact of seeking total cost recovery for project costs against the lots benefited or recognize the cost of development is incidental to leasing up available rental area airside at the airport. Supplemental funding is required for the taxi -lane to go forward in design and construction is 2020. Once an engineering and planning consultant is selected for ELN, the design and construction oversight tasks can be undertaken. Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY CONINUSSIONERS WORK SESSION STAFF REPORT FISCAL IMPACTS: Public Works is estimating the combined cost of utility extension at $155/per lineal foot (using recent Suncadia bonding estimates). The cost of taxi -lane construction is estimated at being $40,000 (using recent Suncadia bonding estimates). Design is estimated at $50,000. The likely combined project cost is: $130,000 to $150,000. ATTACHMENTS: Exhibit 1: Binding site plan lots 1-15-H13 Page 2 of PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: TAXI -LANE SUPPORTING LOTS H5 -H13 Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT ^ 1I1 w R w �a 611'q 1-x �. R a NOOO6Y� I w 611D / __ venin lo-l6-.wozo-000z \ L 6fS E� s'gig'�3l-wh 180 gy CC d 8 e e R9999ffgR1,9w 111 B 111P H ICA 4,4 @@y4yP4y886a��RRapgRT z N lGillig 93333 #.a,m€€; v a z\ Q s 6��.s Rgssg�1 11'; � � � g x y gi$ �a6�5 � y8 ��n95 �� n I.�.I eg iggl�s � 3 � �$� m C9 A�Y •� L �L -.1 'ILLI atr wx r�!\ �nLl 7 7s OL S xtr. x � O�OL1 M' 3. te.i 8 C CO'OLI CO'0.1 s� I 6rmz I aavLx - C 4i: 4Si APO tS 1 4ii Sc�5j4S�8 � $ N Y88 $ E Yp8 8 g n I '6P1N Wx0 Y"OCtY.aN 6021 is .ax CC �I m s.+en.as � is ca se 1a8 �a 611'q 1-x �. R a NOOO6Y� I w 611D / __ venin lo-l6-.wozo-000z \ L 6fS E� s'gig'�3l-wh 180 gy CC d 8 e e R9999ffgR1,9w 111 B 111P H ICA 4,4 @@y4yP4y886a��RRapgRT z N lGillig 93333 #.a,m€€; v a z\ Q s 6��.s Rgssg�1 11'; � � � g x y gi$ �a6�5 � y8 ��n95 �� n I.�.I eg iggl�s � 3 � �$� m C9 A�Y •� L 7s 18 18� Ly i �� CO'OLI CO'0.1 I � Si RM A;,c I '6P1N Wx0 Y"OCtY.aN n, I Ex4MFN1 PC ,I WMC 32S1..lWl x.4[.. I 6056 ! rcxu sxxu- ......� �a 611'q 1-x �. R a NOOO6Y� I w 611D / __ venin lo-l6-.wozo-000z \ L 6fS E� s'gig'�3l-wh 180 gy CC d 8 e e R9999ffgR1,9w 111 B 111P H ICA 4,4 @@y4yP4y886a��RRapgRT z N lGillig 93333 #.a,m€€; v a z\ Q s 6��.s Rgssg�1 11'; � � � g x y gi$ �a6�5 � y8 ��n95 �� n I.�.I eg iggl�s � 3 � �$� m C9 A�Y •� L P6 ��oim � pFm§�yu �g -99$ RM '6P1N Wx0 Y"OCtY.aN n, I Ex4MFN1 PC 6056 �a 611'q 1-x �. R a NOOO6Y� I w 611D / __ venin lo-l6-.wozo-000z \ L 6fS E� s'gig'�3l-wh 180 gy CC d 8 e e R9999ffgR1,9w 111 B 111P H ICA 4,4 @@y4yP4y886a��RRapgRT z N lGillig 93333 #.a,m€€; v a z\ Q s 6��.s Rgssg�1 11'; � � � g x y gi$ �a6�5 � y8 ��n95 �� n I.�.I eg iggl�s � 3 � �$� m C9 A�Y •� L KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 12, 2019 TOPIC: Bakers Road Truck Traffic ACTION REQUESTED: Direct Staff Prepare an Ordinance Restricting Truck Traffic on Bakers Road at Swiftwater Drive LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct that staff prepare an Ordinance for Board consideration restricting truck through traffic on Bakers Road at Swiftwater Drive. BRIEFING SUMMARY: • Long term access issue with Suncadia at Bakers Road • Public Works (PW) has declined to pursue requested road vacation by Suncadia • Suncadia restricts access via a locked gate at SR 903 • Suncadia construction traffic terrorizes the local community every construction season as they avoid the locked gate • Recently, Public Works placed jersey barrier allowing cars to navigate past the barriers but prohibiting larger truck traffic • Numerous calls both pro and con have been pouring in through last week • It appears that construction traffic is driving around the barricades outside of public right of way and onto private property BACKGROUND: For the past several years, PW has tried to manage access of construction traffic on Bakers Road at Swiftwater Drive. Suncadia management has expressed dis-satisfaction with PW decision not to pursue vacation of Bakers Road. In response, Suncadia Management manipulates locked gates forcing construction traffic through Evergreen Valley to Bakers Road. DISCUSSION: PW believes the long term solution to minimizing Suncadia construction impact on the Evergreen Valley community it to develop legislation limiting construction traffic on Bakers Road at Swiftwater Drive. A brief conversation with FD 6 last week affirms ongoing access issues with Suncadia management. It is unfortunate that Suncadia construction traffic feels compelled to access Suncadia via Bakers Road. While PW is friendly to the construction industry, the Bakers Road/Swiftwater Drive is not designed to Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMNUSSIONERS WORK SESSION STAFF REPORT manage the kinds and amount of traffic being forced through the intersection owing to decisions being made by Suncadia management. FISCAL IMPACTS: Minimal costs to date: placing barricades. ATTACHMENTS: Exhibit l: Site map Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY CON/aUSSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: SITE MAP Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT • t, . .3 .,_�� r 6 Y � cn CL r .�s • r_ `et' i�'rf 1 ''�;F'` .���_l���/�`'� .off', i�i` .'y�`1�, a , _ ". rr YY.f�✓y�� X 5� � e-+ 10, < •� 1�.� r'F•�'r+mow; ��� " ;f'� � � ' �s;+�, +'� /•¢y��� ) �'� j „ • mi i t Y