HomeMy WebLinkAbout2019-09-09-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday September 9, 2019 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution Awarding the Design and Environmental Permitting
Contract for the Vantage Highway Coleman Creek Culvert Replacement Project to KPG and
Authorize the Director of Public Works to negotiate scope of work and sign said required local
agency agreement.
3. Bowers Field Engineering and Planning Services Contract Award
4. AirPac Airlines Discussion
5. Other business
6. Adjourn
Created on 9/5/2019 3:54:58 PM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM SEPTEMBER 9, 2019
Board members present: Chairman Cory Wright, Vice -Chairman Brett
Wachsmith, Commissioner Laura Osiadacz
Others: Mark Cook and Candie Leader, Public Works; Calvana Carper, Dan
Carlson, Pat Nicholson, Ryan McAllister, Community Development
Services and Zero (0) Members of the Public
At 1:50 pm Chairman Cory Wright opened the Public Works Study Session.
No additional items were added to the agenda.
REQUEST TO APPROVE A RESOLUTION AWARDING THE DESIGN AND ENVIRONMENTAL
PERMITTING CONTRACT FOR THE VANTAGE HIGHWAY COLEMAN CREEK CULVERT
REPLACEMENT PROJECT TO KPG AND AUTHORIZE THE DIRECTOR OF PUBLIC WORKS
TO NEGOTIATE A SCOPE OF WORK AND SIGN SAID REQUIRED LOCAL AGENCY
AGREEMENT
Mark Cook presented the resolution for consideration and gave
background on the project stating that this is a fish barrier removal
project and staff worked with Washington State Department of Fish and
Wildlife (WDFW) on design. Mark Cook continued that the project was
nominated for funding and 1.5 million dollars was awarded. Mark Cook
added that three (3) firms responded to the solicitation and staff is
recommending award to KPG. Vice -Chairman Brett Wachsmith made a
motion to approve Resolution 2019-141 Awarding the Design and
Environmental Permitting Contract for the Vantage Highway Coleman
Creek Culvert Replacement Project to KPG and Authorize the Director of
Public Works to Negotiate Scope of Work and Sign said required Local
Agency Agreement. Commissioner Laura Osiadacz seconded the motion.
Motion passed 3-0.
BOWERS FIELD ENGINEERING AND PLANNING SERVICES CONTRACT AWARD
Mark Cook stated that staff recently solicited for Engineering and
Planning Services for Bowers Field and received four (4) responses.
Mark Cook continued that three (3) members of county staff reviewed
the submittals and three (3) interviews were conducted. Mark Cook
added that after interviewing the three (3) firms, one (1) member of
the interview team selected JUB and the other three (3) selected
Century West. Discussion was held. Vice -Chairman Brett Wachsmith
made a motion to direct staff to prepare enabling documents to award
Bowers Field Engineering and Planning Services Contract to Century
West. Commissioner Laura Osiadacz seconded the motion. Motion passed
3-0.
2019-09-09 MINUTES
AIRPAC AIRLINES DISCUSSION
Mark Cook reported that staff was contacted by a company contracted
with United Parcel Service (UPS) to fly freight to Bowers Field from
Spokane for deliveries. Mark Cook continued that he is suggesting an
airport use agreement similar to what was required by Iasco when those
operations were conducted at Bowers Field. Mark Cook added that he
will work on some figures to come up with an appropriate fee and bring
back the agreement for Board consideration. Discussion was held.
Additionally, Mark Cook stated that staff is working with Hospice and
Friends on an event at Bowers Field scheduled for October 5th, 2019 in
conjunction with Women in Aviation with Central Washington University
to promote the pending 2020 fly -in event. Mark Cook added that the
County would be contributing items for the event.
Meeting adjourned at 2:03 pm
2019-09-09 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019 - 1 +L
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
VANTAGE HIGHWAY COLEMAN CREEK CULVERT REPLACEMENT PROJECT
TO KPG AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE
SCOPE OF WORK AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations and existing Task Order consultant
contracts; and
WHEREAS: Three (3) qualified engineering firms responded to the request for qualifications
with the process closing on August 23, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected KPG as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with KPG for the design and environmental permitting for the Vantage Highway
Coleman Creek Culvert Replacement Project and authorizes the signature of the Public Works
Director on the required local agency agreement providing an acceptable scope of work and fee
is successfully negotiated.
DATED this 9th day of September, 2019, at Ellensburg, Washington.
""00 1110
1�7d s
�/R pp��P
�erk of the Board- Julie Kjorsvik
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory—Vrr ght, Chairman
achsmi, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
LkuWbsiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 9, 2019
ACTION REQUESTED: Request to Approve a Resolution Awarding the
Design and Environmental Permitting Contract for
the Vantage Highway Coleman Creek Culvert
Replacement Project to KPG and Authorize the
Director of Public Works to negotiate scope of work
and sign said the required local agency agreement.
BACKGROUND: Public Works produced a Statement of
Qualifications seeking to hire a consultant for
Design and Environmental Permitting services for
the Vantage Highway Coleman Creek Culvert
Replacement Project. Three (3) qualified firms
responded to the request for qualifications process
closing on August 23, 2019. A review committee of
Public Works evaluated the proposal and reviewers
have selected KPG to perform design and
environmental permitting services for said project.
INTERACTION: Public Works
RECOMMENDATION: Approve a Resolution to Award the Design and
Environmental Permitting Contract to KPG for the
Vantage Highway Coleman Creek Culvert
Replacement Project and Authorize the Director of
Public Works to negotiate scope of work and fee
and sign the required local agency agreement once
negotiated.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019 -
AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE
VANTAGE HIGHWAY COLEMAN CREEK CULVERT REPLACEMENT PROJECT
TO KPG AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE
SCOPE OF WORK AND FEE FOR SAID PROJECT
WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to
state and federal procurement regulations and existing Task Order consultant
contracts; and
WHEREAS: Three (3) qualified engineering firms responded to the request for qualifications
with the process closing on August 23, 2019; and
WHEREAS: A review committee of Public Works staff evaluated responses and reviewers
have selected KPG as the preferred firm to provide said services; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Public Works Director to negotiate a scope
of work and fee with KPG for the design and environmental permitting for the Vantage Highway
Coleman Creek Culvert Replacement Project and authorizes the signature of the Public Works
Director on the required local agency agreement providing an acceptable scope of work and fee
is successfully negotiated.
DATED this 9th day of September, 2019, at Ellensburg, Washington
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Brett Wachsmith, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Laura Osiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 09, 2019
TOPIC: ELN Task Order Contract Award
ACTION REQUESTED: Acknowledge Public Works Decision Awarding a Task
Order Contract for Engineering and Planning Services
at ELN to Century West Engineering
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Acknowledge Public Works decision awarding a task order contract for engineering and
planning services at Bowers Field to Century West Engineering.
BRIEFING SUMMARY:
• Solicitation for engineering and planning services at ELN resulted in three firms
selected to interview
• Interviews were conducted with: JUB, W11 Pacific and Century West Engineering
• The interview team consisted of: Public Works Director/Airport Manager,
Administrative Assistant, the Director of Community Development Services and the
Chair of the Airport Advisory Committee
• Three review committee members agreed on Century West with one member
preferring JUB
BACKGROUND:
Public Works solicited for task order contracting of ELN engineering and planning services
in June 2019. Review of submittal materials identified three reviewers with three separate
selections. Following a discussion with the Board of County Commissioners, the Chair of
the Advisory Committee was added to the final interview committee.
DISCUSSION:
Following interviews during the week of August 19 — 23, staff all selected Century West
Engineering for a Task Order contract (2019 — 2022). The Chair of the Advisory Committee
selected JUB for the task order contract.
FISCAL IMPACTS:
Individual tasks are negotiated within the contract for cost. Task Orders exceeding $50,000
are brought to the Board of County Commissioners for approval consideration.
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMNIISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMP
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 9, 2019
TOPIC: AirPac Airlines
ACTION REQUESTED: Direct Staff Prepare a Use Agreement with AirPac
Airlines
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct that staff prepare a use agreement with AirPac Airlines for commercial use of
ELN.
BRIEFING SUMMARY:
• United Parcel Service (UPS) is receiving commercial package delivery of air
freight at ELN. The activity is starting up and is expected to continue into the
fixture.
• The County has required use agreements in the past for commercial activities at
ELN.
BACKGROUND:
UPS is now receiving air freight from deliveries from AirPac at ELN. It is assumed that
these deliveries minimize the amount of ground freight to Yakima Airport. The County's
first use agreement for commercial users of ELN was with IASSCO Flight Training; the
previous Central Washington University flight training contractor. The fee was based on
intensity of use for runway and ramp operations.
DISCUSSION:
Requiring a use agreement with AirPac is consistent with past practice at ELN. Staff
proposes verifying intensity of flight operations with AirPac and developing a use
agreement and annual fee with AirPac.
FISCAL IMPACTS:
Commercial flight operations generate additional wear and tear on all pavement surfaces
at ELN. Mitigating for use is one potential cost recovery mechanism offsetting the
additional maintenance demand cost.
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT