HomeMy WebLinkAbout2019-11-12-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Special Meeting Tuesday November 12, 2019 - 9:00 PM Commissioners" Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Request to Approve a Resolution to Appoint Public Works Director to County Engineer for a period not to exceed six months ending April 13, 2020 3. Request to Approve a Resolution Authorizing Chair Signature on Century West Engineering Task Order No. 2 - Runway 7125 Rehabilitation Design 4. Request to Approve a Resolution Authorizing Chair Signature on KPFF Task Order No. 16 - Suppiement No. 3 for Big Boulder Creek Bridge Replacement 5. Liberty Bridge at Swauk Creek Discussion 6. Other business 7. Adjourn Created on 111812019 8:20:16 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG Special Meeting MONDAY 1:00 PM NOVEMBER 12, 2019 Board members present: Chairman Cory Wright, Vice -Chairman Brett Wachsmith, Commissioner Laura Osiadacz Others: Mark Cook and Candie Leader, Public Works and Two (2) Members of the Public At 1:00 pm Chairman Cory Wright opened the Public Works Study Session. Mark Cook stated he had no additional items to add to the agenda. REQUEST TO APPROVE A RESOLUTION TO APPOINT THE PUBLIC WORKS DIRECTOR TO COUNTY ENGINEER FOR A PERIOD NOT TO EXCEED SIX MONTHS ENDING APRIL 13, 2020 Mark Cook stated that the one (1) year anniversary of the second extension of being acting County Engineer is expiring. Mark Cook gave background on the steps being made for the job description and the path to advertise for the position. Mark Cook added that the Board will be sending a letter to the County Road Administration Board (CRAB) summarizing the plan forward along with the resolution to extend his time as acting County Engineer if approved. Discussion was held. Vice -Chairman Brett Wachsmith made a motion to approve Resolution 2019-165 to appoint the Public Works Director to County Engineer for a period to not exceed six (6) months ending April 13, 2020. Commissioner Laura Osiadacz seconded the motion. Motion passed 3-0. REQUEST TO APPROVE A RESOLUTION AUTHORIZING CHAIR SIGNATURE ON CENTURY WEST ENGINEERING TASK ORDER NO. 2 - RUNWAY 7/25 REHABILITATION DESIGN Mark Cook gave background on the Department of Commerce grant in process for work at Bowers Field. Mark Cook stated that he requested a task order from Century West Engineering, the consultant for Bowers Field, for the design of Runway 7/25. Mark Cook continued that the original scope costs came in higher than expected. Mark Cook stated that he rewrote the scope with'a cost that better fits the budget. Chairman Cary Wright inquired if this approval could be delayed so additional research could be done. Discussion was held. Vice - Chairman Brett Wachsmith made a motion to approve Resolution 2019-166 authorizing Chair signature on Century West Engineering Task Order No. 2 - Runway 7/25 Rehabilitation Design. Commissioner Laura Osiadacz seconded the motion. Motion passed 3-0. 2019-11-12 MINUTES REQUEST TO APPROVE A RESOLUTION AUTHORIZING CHAIR SIGNATURE ON KPFF TASK ORDER NO. 16 - SUPPLEMENT NO. 3 FOR BIG BOULDER CREEK BRIDGE REPLACEMENT Mark Cook gave background on the project and the use of the bridge for recreational purposes. Mark Cook stated that once the original project went out to bid a mandatory site visit with any contractors wanting to bid was scheduled to look at the scope of work. Mark Cook continued that at this site visit three (3) contractors attended and stated that they would not be able to bid the project as presented. Mark Cook added that a redesign was done to place a temporary bridge and the task order being presented will be for the permanent structure. Discussion was held. Vice -Chairman Brett Wachsmith made a motion to approve Resolution 2019-167 authorizing Chair signature on KPFF Task Order No. 16 - Supplement No. 3 for Big Boulder Creek Bridge Replacement. Commissioner Laura Osiadacz seconded the motion. Motion passed 3-0. LIBERTY BRIDGE AT SWAUK CREEK DISCUSSION Mark Cook reported that Forest Service staff contacted him regarding an upcoming timber sale and the use of the bridge for the project. Mark Cook stated that currently the bridge is load rated and the load limits cannot be adjusted to utilize the bridge in its existing condition. Mark Cook continued that it could be possible to deploy a temporary bridge over the current structure to help facilitate this project however; further research needs to be done for this option. Mark Cook added that he is requesting direction from the Board of County Commissioners (BOCC) on the use of staff time and approximately a budget of ten thousand dollars ($10,000) to explore options further. Discussion was held. Staff was directed to explore options using the budget suggested. Meeting adjourned at 1:30 pm 2019-11-12 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 -_I �5, EXTENDING THE PUBLIC WORKS DIRECTOR AS INTERIM COUNTY ROAD ENGINEER FOR AN ADDITIONAL SIX MONTHS ENDING APRIL 13, 2020 WHEREAS: The Board of County Commissioners appointed the Public Works Director as Interim County Road Engineer pursuant to Resolution 2019-077; and WHEREAS: The term of the appointment ends on November 13, 2019, and WHEREAS: Public Works and Human Resources have worked together creating a revised job description (ATTACHMENT A) for Deputy Director/County Engineer and completed a market study setting compensation for the new position; and WHEREAS: The hiring process is expected to exceed the extension date of November 13, 2019 established by the Board with Resolution 2019-077 for hiring a full time replacement County Road Engineer; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby extend the Public Works Director as Interim County Engineer for an additional period of six months ending on April 13, 2020. DATED this 12th day of November, 2019, at Ellensburg, Washington. \\\`010 a 1111^ rrrgr//// :o- =; rwest;,.•.• IYIL1lSL�1 �Mrk of the Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON 7 ory Wright, C man ,zz -2- Lf !!�-- &r/Deputy /Brett ac smith, Vice -Chairman ad"Deputy Clerk of the Board- Mandy Buchholz laur-&'b cz, Commissioner BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 AUTHORIZING THE CHAIR'S SIGNATURE ON CENTURY WEST ENGINEERING TASK ORDER NO. 2 — RUNWAY 7/25 REHABILITATION DESIGN WHEREAS: Century West Engineering is currently the service provider to Public Works selected from County procurement process in 2019; and WHEREAS: Task Order No. 2 with Century West Engineering has submitted Task Order No. 2 for Runway 7/25 Rehabilitation and Bidding Services in the amount of $84,173; and WHEREAS: Funding for Task Order No. 2 is anticipated through a pending Department of Commerce Grant; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on Century West Engineering Task Order No. 2 for Runway 7/25 Rehabilitation. Design. DATED this 12th day of November, 2019, at Ellensburg, Washington. ,,.0 5,`N SEAL AZ ❑ 1&k"o"fle Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Brett WachMith, Vice -Chairman L�eDeputy Clerk of the Board- Mandy Buchholz \74A Q ccabsia ommissioner w�srrURY N a 1 N P E f l w 0 TASK ORDER #2 (r3) AGREEMENT AND AUTHORIZATION FOR ENGINEERING CONSULTING SERVICES By this Agreement dated November 6, 2019, the Kittites County (Client) authorizes Century West Engineering Corporation (Consultant) to cavy out and complete the following Services in consideration of the mutual covenants set forth in the Professional Services Agreement (Master Agreement), executed between Kittitas County and CW EC, and dated on October 7, 2019; and for projects with Federal funding the fallowing attachment: FAA Professional Servriw (A/E) contract Parovisions. Project: Task Order fit Bowers Field Airport: Runway 7-25 Rehabilitation Design Services Project No.: 12436. Scope of Services: The scope of services for the Runway 7-25 Rehabililation project, is as detailed in 1he attaches! Exhibit A "Scope of Work." Opinion of Probable Coats: The fee for services for the Runway 7-25 Rehabilitation project, at the Bowers Feld Airport, is set at $84,173 (lump sum). Personnel labor feces and expenses are detailed in the attached Exhibit B "Fee Summary." Attoohnents: Exhibit A: Century West Scope of Work Exhibit B: Century West Fee Summary Exhibit C: FAA Profmionaf Service (A/E) Contract Proo9 on s. Kittitae County By: Title: Date: Century est :nearing Corporation By. Title: f%F—WOEW 7 Date: t r ? ahoWESTTURY _W.1- -_- ' N G 'P N E E R I N G Exhibit A Scope of Work November 1, 2019_r3 Design Services for Bowers Field Airport Runway 7-25 Rehabilitation GENERAL PROJECT DESCRIPTION, BACKGROUND, & PURPOSE/NEED The scope of the project is to provide engineering design and bidding services for the proposed pavement maintenance on Runway 7-25 at the Bowers Field Airport. The Airport is owned by Kittitas County and is located 2 miles north of the City of Ellensburg. Runway 7-25 at Bowers Field has been previously closed due to unsuitable pavement conditions. Additionally, the previous runway crossed with Runway 29. A previous FAA funded project undertook breaking the pavement between the runways. The Runway 25 pavement was pulverized (full depth reclamation) on either side of Runway 29. 3,700 of Runway 7 pavement was left for an intended future pavement rehabilitation and reopening of the shortened runway. The existing pavement is in poor condition and in need of complete reconstruction. As of the last WSDOT inspection in 2018, the pavement is listed with the following sections and PCI values: • 1,166 LF at west end of runway 0 17 PCI on center 50'; 23 PCI on 50' edges 0 3" AC; 3" aggregate base course; 5" aggregate subbase • Remaining approximate 2,534 LF of runway 0 34 PCI on center 50'; 45 PCI on 50' edges 0 3" AC; 6" aggregate subbase In order to restore the operation of Runway 7-25, the pavement is planned to be rehabilitated via a maintenance overlay. The scope elements of the maintenance overlay project is as follows: The center 60 feet of the existing runway pavement will be recycled with in- place full depth reclamation in accordance with Specification P-207 and a new layer of HMA (WSDOT) will be overlaid on top of the resulting asphalt 1of11 CENTURY URY E N G I N E E R I N G aggregate base course mixture. The existing cross sectional shed grade is anticipated to be maintained. Pavement strength is anticipated to be designed to support small aircraft up to 12,500 pounds. The runway is anticipated to be designated as B -I (small) as indicated in the current Airport Layout Plan. • The outermost 45 feet on either side of the existing runway pavement will be removed and recycled in accordance with Specification P-207 and seeded, similar to what was undertaken on the 2018 Pavement Break Project (AIP 3-53-0026-014-2018). • The final runway size will be approximately 370Q'X60' and the thresholds will be relocated to the proposed future locations depicted on the current ALP. It is anticipated the runway will not be lighted and will operate under visual conditions. Flight procedures may be sought and implemented in the future, but are not part of the assumed initial condition to be implemented within this project. There will be no modifications to existing taxiway geometry. Airfield taxiway improvements depicted on the ALP are being evaluated as part of an ongoing Environmental Assessment and will be implemented as part of a future project. • Existing drainage patterns will remain unchanged and surfaces disturbed by construction are not anticipated to extend beyond the existing pavement limits. No drainage improvements are included within the project. With the exception of Taxiway C, existing taxiways will be maintained to access the re -opened and shortened Runway 7-25. Taxiway C will be disconnected from the runway and will be fully removed as part of a downstream project. Existing closure X markings on all other taxiways will be removed as part of this project. It is assumed that back taxi access to the new Runway 25 end will be from the existing Taxiway F. At this time no new taxiway will be established to the new Runway 25 end. • Existing Runway 7-25 signage will be adjusted in location, or new non - illuminated signage will be installed as necessary. The following tasks are proposed for completion of this project: 2of11 CENTURY WEST E N G I N E E R I N G A. DESIGN SERVICES TASK 1— PROJECT MANAGEMENT/ ADMINISTRATION Task 1 Work Items: 1. Carry out project administration including, but not limited to monitoring design and project schedules, coordination of project with the County, monitoring and reporting technical and budget issues to the County, and preparation of monthly consultant invoices for submittal to the County. It is assumed the design phase of the project will extend over a 4 month period. 2. Coordinate internal project team and sub -consultants. Two sub -consultants (geotechnical and survey) are anticipated for this project. This effort includes coordinating sub -consultant field work. 3. Conduct in-house QA/QC review of design elements and project deliverables. 4. Develop and provide a project schedule to the Airport. 5. Prepare FAA form 7460 for coordination with FAA's Obstruction Evaluation / Airport Airspace Analysis (OE / AAA). Although no FAA funding is anticipated for this project, coordination and submission of the 7460 form is still required for construction on the airfield. 6. Prepare 7480 forms and submit to FAA for runway re-establishment. This task assumes ongoing coordination with the FAA for runway establishment approval and input of the runway data into the National Flight Data Center (NFDQ and published plates. 7 The construction funding for this project is undetermined at this time. As the County identifies and secures funding for construction, Century West will identify and evaluate any design standard requirements associated with the acceptance of the funding source that will need to be accommodated in the design approach. Should any construction funding source requirements require design elements in conflict with the assumed project elements stated in the description above; a supplemental task order will be undertaken to address any additional design efforts required. Primary Task 1 Deliverables: • Project schedule. • FAA form 7460 (pdf) • FAA form 7480 (pdf) 3of11 CENTURY W///W E N G I N E E R I N G TASK 2 - DESIGN SURVEY & PROJECT BASE MAP SET UP (KPG) It is assumed a partial project survey and base map were previously prepared as part of the separate Airfield Environmental Assessment project. Previous topographic survey data collected included Runway 7-25 pavement grades at a 25 foot grid and included centerline and edge grades. Previous topographic survey also included off -pavement grades within an area 500' wide centered on runway centerline for the full runway length plus 300' beyond each runway end. Drainage features, signs, edge lights, reflectors and utilities were also included as part of this effort. As the Runway 25 end of pavement has since been modified, supplemental grade data is necessary. To support runway profile and RSA grading design, and to ensure proposed runway end points are accurate; and to ensure the runway has a clear approach; additional survey data to be collected and mapped will include: • Tie to established local control points. • As -built survey new Runway 25 pavement end established at completion of pavement break project. • Additional topographic survey off the new Runway 25 end of pavement. • Proposed runway threshold/end clear approach field verification Task 2 Work Items: 1. Supplemental Topographical Survey Services This task includes the following: + Validate horizontal and vertical control that was completed as part of the Airfield Environmental Assessment project. Re-establish horizontal and vertical control as necessary. Horizontal and vertical control shall be tied into horizontal (NAD 83(2011)) and vertical control (NAVD 88) points used for the previous topographic survey effort. Validate one benchmark for elevation control and a minimum of two additional points for horizontal control. Utilize Airport PACs and/or SACS if available. • Conduct topographic surveying for the Runway 25 end of pavement: o Determine the location and elevation of the end of runway pavement at runway centerline; o Determine the location and elevation of the end of runway pavement at the outermost edges of runway pavement; o Determine the location and elevation of the end of runway pavement at 25 -foot increments along the end of pavement. 4of11 ShOCENTURY WEST E N G 1 N E E R! N G Conduct topographic surveying for an area 500 feet wide centered on the Runway 7-25 centerline by 300 feet beyond the new Runway 25 end of pavement: o Collect topographic survey points on a 50'x50' max grid spacing. Elevations on pavement areas shall be accurate to 0.01 feet and elevations in unpaved areas shall be accurate to 0.05 feet. Incorporate the data collected from the survey into the digital terrain model that was developed as part of the Airfield Environmental Assessment project. A contour map at a scale of 1"=50' will be developed for use in the design and shall be provided to the engineer in PDF and AutoCAD or XML format. The contour interval shall be 0.5 feet. 2. Clear Approach Field Verification Perform field survey to check and verify the approach surfaces of Runway 7 and Runway 25. Field survey for this task will include: • Three shots/views for each runway end. For each runway end/threshold, set up instrument on runway centerline and each edge of approach surface. (Locations will be offset from runway end/threshold as necessary to allow for instrument height.) • Set instrument to view approach surface slope (5.0% for Runway 07 and 5.0% for Runway 25); observe if any obstructions appear within approach slope angle. Take photos through instrument view finder to show results. • If any trees, towers, fences, roadways, and other structures or terrain features appear to be obstructions to the approach surfaces based on these field checks, provide information regarding obstruction type (tree vs. structure, etc.) and general location (east/west of runway centerline, etc) so that additional follow up can be included with final design scope if necessary. Primary Task 2 Deliverables: • Survey base map (CAD and PDF) TASK 3 — GEOTECHNICAL INVESTIGATION (HWA Geosciences) Geotechnical Analysis on Runway 7-25 will be undertaken to verify existing conditions of the pavement section, subgrade, and aggregate base materials of Runway 7-25 to inform the pavement rehabilitation design. 5of11 WEST�fURY E N G I N E E R I N G Task 3 Work Items: Geotechnical work will be performed as follows: 1. Geotechnical tasks: • Conduct Falling Weight Deflectometer (FWD) testing of Runway 7-25 (3,700' length x 60' width), analyze data, and report the findings. • Perform select coring of Runway 7-25 (3,700' length and 60' width) to determine existing pavement depths and approximate aggregate base depths and report findings. • Determine existing subgrade density (compaction), gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material. • Determine existing aggregate base density (compaction), gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material. • Determine gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material of pulverized and blended asphalt/base aggregate mix anticipated to be generated from the reclamation process. + Catalog the presence of any ground water and/or low strength (unstable) subgrade areas. Primary Task 3 Deliverables: • Draft Geotechnical Report • Final Geotechnical Report TASK 4- NEPA REVIEW AND DOCUMENTATION The FAA has determined the Runway 7-25 project to be Categorically Excluded from further environmental review pursuant to FAA Order 9050.9F, paragraph 5-6.4 (e). This determination was provided by FAA via email on October 25, 2019. Task 4 Work Items: This effort is not required. Primary Task 4 Deliverables: • None 6of11 ►iWESTTURY E N G I N E E R I N G TASK 5- ELECTRICAL, LIGHTING, SIGNAGE, & NAVAIDs It is assumed an electrical investigation and electrical lighting, signage, or NAVAID design is not required for this project. If electrical analysis and design is required, this work will be covered under a separate contract task order. Task 5 Work Items: 1. This effort is not anticipated for this project and is not included within this scope of work. Primary Task 5 Deliverables: None TASK 6- 90% DESIGN Task 6 Work Items: 1. Review task 2 survey data and consolidate plan set base drawing from survey base map prepared under task 2 and previous EA survey data. 2. Review and analyze clear approach survey data. Prepare and document clear approach findings in technical memorandum. 3. Review geotechnical data and draft report. Provide comments and coordinate HWA's preparation of final report. 4. Verify or design the pavement transverse and profile grade design. Grade design is anticipated to closely approximate existing grades, as the improvements are only anticipated to replace the inner 60 feet of the existing 150 foot wide pavement area. Slight grade adjustments will be evaluated to ensure surfaces drain surface water and provide suitable operational surfaces. 5. Develop a pavement section design utilizing the FAARFIELD program. The design will developed to support small aircraft (12,500# and under). 6. Develop a construction safety and phasing plan and document for the proposed work that maintains safe operations during construction. 7. Verify and design runway pavement markings for the rehabilitated runway. Pavement markings will be designed per FAA standards. Pavement markings will include taxiway lead-in markings. 7of11 CENTURY lsheWEST E N G I N E E R I N G 8. Assess any signage updates necessary with the rehabilitation project. As necessary layout and design non -illuminated signage improvements to be implemented with the project. 9. Prepare 90% level plans for proposed improvements; 18 plan sheets are anticipated. Anticipated plan sheets include: Cover Sheet Legend & Notes Project Site & Survey Control Plan Site Safety and Phasing Plan (1) Site Safety and Phasing Plan (2) Safety & Phasing Notes Erosion and Sediment Control Plan Erosion and Sediment Control Notes and Details Runway 7-25 Rehabilitation Plan & Profile (1) Runway 7-25 Rehabilitation Plan & Profile (2) Runway 7-25 Rehabilitation Plan & Profile (3) Runway 7-25 Rehabilitation Plan & Profile (4) Runway 7-25 Rehabilitation Plan & Profile (5) Grading Details and Typical Sections (1) Grading Details and Typical Sections (2) Pavement. Marking and Signage Plan (1) Pavement Marking and Signage Plan (2) Pavement Marking and Signage Details 10. Prepare 90% level draft bidding documents. Bidding documents will include bidding/contract specifications, general and special provisions, technical provisions, and other related sections and forms. Specifications will be developed per WSDOT/APWA standards, supplemented with FAA standard specifications as applicable. 11. Prepare 90% level quantity and construction cost estimates for the project. 12. Review NPDES requirements. Prepare Notice of Intent (NOI) for Airport/County signature and submittal to Department of Ecology (DOE). It assumed that a Storm Water Pollution Prevention Plan (SWPPP) will be prepared by the contractor to receive coverage under the NPDES Construction Stormwater General Permit prior to beginning construction. 13. Prepare four sets of 90% level plans and specifications. Two sets will be submitted to the Airport and two sets will be kept for reference. 8of11 CENTURY WEST ENGINEER I NG 14. Attend a 90% review meeting (via phone or web conference) with the Airport to review preliminary design and cost. The project manager and project engineer will attend the meeting. Key design components will be developed to a level consistent with a 90% level of completion. Primary Task G Deliverables: • 90% level plan documents (18 sheets) • 90% level draft bidding documents (specifications) • 90% level quantity and construction cost estimate G Draft NOI for Airport signature and submittal to DOE TASK 7- FINAL DESIGN Task 7 Work Items: 1. Review 90% level review comments from Airport; address and respond to comments. 2. Prepare final plans for proposed improvements; 18 plan sheets are anticipated. 3. Prepare final bidding documents. 4. Prepare final quantity and construction cost estimates for the project. 5. Prepare four sets of final plans and specifications. Two will be submitted to the Airport, and two sets will be kept for reference. Primary Task 7 Deliverables: • Final plan documents (18 sheets) • Final bidding documents (specifications) • Final quantity and construction cost estimate B. ASSUMPTIONS/EXCLUSIONS 1. This project is deemed a NEPA categorical exclusion (CATER). No environmental site investigations will be performed, and a CATEX checklist will NOT be prepared. 2. Noise contour updates for the new runway configuration are not included within this scope of work. 9of11 %WNZCENTURY WEST ENGI NEE RING 3. It is assumed an electrical investigation and electrical lighting, signage, or NAVAID design is not required for this project. PAPI's, VASI's, edge lights, REIL's, or any other lighting or NAVAID's are not included within this project. The project is limited to non -illuminated sign relocations/installations. 4. No surface or subsurface drainage improvements are included within the scope of the project. It is assumed the existing shed section and drainage patterns will be maintained within this project. 5. The obstruction verification efforts within this scope are limited to visual field survey checks. No aerial mapping or AGIS survey analysis of airspace and obstructions will be performed within this task. Additionally, if obstructions are identified during the field verification, further obstruction analysis or AGIS level surveys would be included in a subsequent task order. 6. It is assumed the County will prepare and conduct their own SEPA review. Preparation of a SEPA checklist is not included in this scope of work. If deemed necessary at a later time, this effort will be covered under a separate contract task order. 7. It is assumed a County clearing and grading permit will not be required for this project. If deemed necessary at a later time, this effort will be covered under a separate contract task order. 8. Preparation of a DBE plan and DBE goals is not included within this scope of work. If necessary, this work will be conducted in a separate contract task order. 9. The County shall send the invitation to bid to media outlets for advertisement and pay advertising fees directly. 10. It is assumed the County will conduct the bid opening and will prepare the construction contracts with the awarded contractor. The Consultant will not attend the bid opening. 11. Bidding and construction administration support services is not included in this scope of work and will be included in a future contract task order. 12. Pen and Ink updates to the Airport Layout Plan will be required by the FAA. Pen and Ink ALP updates are not included within this scope, but will be part of a future construction support task order. 10 of 11 CENTURY WEST E N G I N E E R I N G 13. The re -opening of the runway assumes visual approaches only. No approach procedures are anticipated to be implemented at this time, and coordination for this would be included within a future task order C. PROJECT SCHEDULE The general anticipated project schedule is as follows: • Fall 2019 —Winter 2020 Project Design • Spring 2020 Bid (pending construction funding) 0 Summer 2020 Construction (pending construction funding) A detailed project schedule will be developed as part of Task 1 per this scope of work. 11 of 11 PROJECT TITLE: BOWERS FIELD AIRPORT -RUNWAY 7-25 REHABILITATION Ground RT. Travel: Per Unit Trips CLIENT: KITTITAS COUNTY Lodging $0.00 0 1.0 $D.00 Rental CarlFueVMilage $0.600 3 223 1.0 $401 JOB NUMBER 50.00 0 0 1.0 $0.00 Meals 530.00 1.0 $0.00 Misc. expenses: EXHIBIT B PRINCIPAL SR PROD PROS SR PROD PROD CADD $50.00 POSTAGE VP/ENGR MGR PM ENGR ENGR ENGR DSGN CLER. TOTAL PROJECT TASK PROJECT TASK $217.00 $200.00 $151.00 $125.00 5113.00 $95.00 $77.00 HRS COST COST DESIGN & BIDDING SERVICES $6,802.00 Geotechnical (HWA) 1,0 $10,765.00 TASK I -Project MaoagementlAdm-nristration $15,228.00 1 Project Administration (4 month period) 0 12 2 2 0 12 $3,876.00 2 On-site Field Coordinate Project Team (2 trips) 0 1 0 16 0 0 17 $2,200,00 3 Conduct in-house QA/QC 12 0 0 0 0 0 12 $2,400.00 4 Provide Project Schedule 2 0 2 0 0 0 4 $650.00 5 Prepare FAA Form 7460 & FAA Coordination 2 0 4 0 0 0 6 $900.00 6 Prepare FAA Form 7480 & FAA Coordination 10 2 I6 0 0 0 28 $4,302,00 7 Assess Construction Funding Design Standards 0 2 0 0 0 0 6 $900.00 TASK 2 -Design Survey & Survey Base Map Set Up 1-2 Supplemental Topographic Survey KPG fee listed in subconsultam section TASK 3 -Geotechnical Investigation 1 Geotechnical Investigation HWA fee listed in subconsultant section TASK 4- NEPA Review and Documentation 1 Not applicable 1 Not included TASK 5- Electrics{, Lighting, Signage, & NAVAiDS 1 Not applicable 1 Not included TASK 6.90% Design $36,787.00 1 Survey Data Review& Plan Set Base Map I 0 4 0 0 0 5 $700.00 2 Clear Approach Survey Data Review & Memo " 4 0 0 0 6 $900.00 3 Geotec . Findings & Report Review 0 - 4 D 0 0 6 $900.00 4 Pavement Transverse and Profile Grade Design 0 0 20 - 0 0 24 $3,028.00 5 Pavement Section Design 0 2 0 10 10 0 0 22 $2,780.00 6 Construction Safety & Phasing Plans/Document 0 4 0 t0 0 0 14 $2,050.00 7 Design Runway Pavement Markings 0 1 0 2 4 0 7 $902.00 8 Non -Illuminated Signage Adjustment Design 0 1 0 4 0 0 S $700.00 9 900A Plans (18 sheets) 0 4 12 56 0 56 0 128 $14,372.00 10 90% Bidding Documents (Specifications) 0 2 16 32 0 0 8 58 $7,432.00 11 909A Quantities and Cost Estimate 0 1 4 6 0 0 12 $1,529.00 12 NPDES Assessment and NOI 0 0 1 2 0 0 3 $401.00 13 Prepare Submittal Set 0 0 2 1 4 7 $643.00 14 9D% Review Meeting (Phone Conference) 0 1 0 2 0 3 $450.00 TASK 7 -Final Design $13,320.00 I Review and Address 90% comments 2 0 4 4 0 0 10 51,352.D0 2 Final Plans (IS sheets) 0 2 12 24 0 24 O 62 57,252.00 3 Final Bidding Documents (Specifications) 0 2 4 8 0 0 8 22 $2,620.0[1 4 Final Quantities and Cost Estimate 0 1 1 2 4 0 0 8 $1,053.00 5 Prepare Final Submittal Set 0 2 0 2 D 1 4 9 $1,043.00 Labor Subtotal 0 71 53 240 30 82 36 512 $65,335.00 $65,335.00 EXPENSES Subtotal - Expenses $1,271.40 Subtotal - Subconsultants $17,567.00 Total - $84,173 Coat Air Ground RT. Travel: Per Unit Trips Trips Days Miles Markup Lodging $0.00 0 1.0 $D.00 Rental CarlFueVMilage $0.600 3 223 1.0 $401 Airfare 50.00 0 0 1.0 $0.00 Meals 530.00 1.0 $0.00 Misc. expenses: MISC $100,00 PHOTOCOPIES $50.00 POSTAGE $2000 PRp4TpJG $500.00 PLATTING $200.00 HEI.n SUPPLIES $0,00 Sub -Consultants: Topographic Survey (KPG) 1.0 $6,802.00 Geotechnical (HWA) 1,0 $10,765.00 Subtotal - Expenses $1,271.40 Subtotal - Subconsultants $17,567.00 Total - $84,173 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - 161 AUTHORIZING CHAIR SIGNATURE ON SUPPLEMENT NO.3 TO TASK ORDER NO. 16 WITH KPFF FOR BIG BOULDER CREEK BRIDGE REPLACEMENT WHEREAS: The Kittitas County Board of County Commissioners (Board) did authorize the Big Boulder Bridge Replacement with KPFF on 10/20/2018 (Resolution 2018- 160); and WHEREAS: The Board supplemented the KPFF task order with two supplements to the original Task Order No. 16 (Resolutions 2018-203 and 2019-099); and WHEREAS: No contractors elected to bid the KPFF permanent bridge replacement design; and WHEREAS: Public Works has negotiated a revised final design that several contractors have noticed their willingness to bid; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby supplement KPFF Task Order No. 16 for $20,000.00 for a final Task Order cost of. $248,000.00. DATED this 12th day of November, 2019, at Ellensburg, Washington. ❑ Clerk of the Board- Julie Kjorsvik k7�De ty Clerk of the Board- Mandy Buchholz tt, : , BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON 1601 Fifth Avenua, Suite 1600 Seattle, WA 98101 206.622,5822 kpff.com October 25, 2019 Mark Cook, PE Kittitas County Public Works 411 North Ruby, Suite 1 Ellensburg, WA 98926 Subject: ICttitas County On -Call Agreement KCPW 2017-19ENG2 Supplement #3 for Task Order 16 Dear Mark: This letter addresses the scope and fee for additional work discussed between the County and KPFF conforming to the project goals and final development of the PS&E contract documents. The new scope items are to prepare revised contract bid documents for a 60 foot bridge span with precast footings. Pursuant to accomplishing this additional work, we request an additional budget of $20,000, bringing our total not -to -exceed amount for this Task Order to $248,000. A breakdown of the additional fee for Task 16 is attached. Additional tasks for Supplement #2 include: 1.70, 3.52 and 6.60. If you have any questions, please feel free to call me at (206) 926-0442. KIT 31WALI3 CO DEPARTMENT OF PUBLIC WORKS Kr=A8 COUNTY Formal Task Order Document KPFF Task Order Number 016 Maximum Amount Payable $248,000 Completion Date 12/30/2019 The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- 19ENG2) shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: Big Boulder Creek Bridge Replacement Description of Work: KPFF will prepare the PS&E documents for the replacement of the Big Boulder Creek Bridge in coordination with Kittitas County staff. The design team includes: KPFF — Project Management, Structural and Civil Engineering Hart Crowser — Geotechnical Engineering Watershed Science and Engineering — Hydraulic Engineering Jacobs — Environmental/Permitting Tentative Project Advertisement is April 2020, but will be dependent on permitting, fish windows, and bridge procurement schedules. The existing timber bridge is located on Cle Elum Valley Road over Big Boulder Creek approximately three miles north of the Salmon La Sac Campground. The bridge is currently posted for a 5 Ton weight limit due to scour at the timber sill foundation. The County prefers to replace the bridge with a single lane prefabricated superstructure. TASK 1 PROJECT MANAGEMENT KPFF will manage the development of the PLANS, SPECS & ENGINEERING COST ESTIMATE (PS&E) in such a manner to ensure the County is able to achieve the desirable bidding date. This effort will include appropriate in-house duties such as invoicing, contract ���GA•,,CpDES ... TO 7} ,per IaTHFAS COUNTY KZTTZTgM CO DEPARTMENT OF PUBLIC WORKS compliance assurance, file and staff organization, client communications (emails and telephone), and general project oversight. Project Management tasks include: 1.1 Project Team Management and Coordination 1.2 Monthly Progress Reports/Invoices (Assume 8) 1.3 Monthly Project Progress Meetings/Minutes (Assume 8 meetings, held via teleconference) 1.4 Coordination with WDFW (Assume 8 hours) 1.5 Management Reserve - allocation of the reserve funds for additional out of scope tasks based on written approval of the County 1.6 Project team coordination for addendum & design change 1.7 Project team coordination for revised design TASK 2 STRUCTURAL ENGINEERING KPFF shall perform the structural engineering analysis and design of the Big Boulder Creek Bridge substructure. KPFF shall perform appropriate analysis and design calculations in accordance with the most current edition (at the time of NTP) of the WSDOT Bridge Design Manual (BDM) and the AASHTO LRFD Bridge Design Specifications, and the Local Agency Guidelines. Considering the location and use of the bridge, alternative criteria, such as Forest Service guidelines, may be considered to reduce construction costs. TASK 2.1— Project Kickoff Meeting and Site Visit A project kickoff meeting will be held at the existing bridge site. TASK 2.2 — Alternative Analysis Memo Brief memo to summarize site constraints, design criteria and preferred bridge structure TASK 2.3 — Development of PS&E/Contract Bid Documents TASK 2.31— Plan and Calculation Preparation • Project Cover Sheet • General Notes and Quantities • Bridge Layout - plan and elevation • Structural notes • Foundation Plan — Layout • Foundation Design and Details �c IDES ... zor c� KITTrrAS COUNTY ZKKXWWX ALS CO DEPARTMENT OF PUBLIC WORKS Wingwali Layout/Details TASK 2.32 — Structural Special Provisions TASK 2.33 — Cost Estimate TASK 2.34 — Deliverable preparation TASK 2.40 — Quality Control Checks and Reviews TASK 2.50 — Technical Collaboration Structural design engineers will coordinate with survey, civil, geotechnical, hydraulics and environmental engineers for project design and contract coordination. TASK 2.60 — Construction Support If needed to provide support during construction to respond to RFI's and review submittals. TASK 2.70 — Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for 1 year rather than originally anticipated 3 month duration. TASK 2.80 — Revise Contract Documents Update plans, specifications and estimate and issue and addendum to the contract bid documents as necessary to limit 2019 construction work to installation of temporary detour road and bridge. TASK 3 GEOTECHNICAL ENGINEERING TASK 3.10 — Planning and Research Hart Crowser will review readily available geologic maps and water well logs that cover the site vicinity, and other reports and plans provided by others (if any) for general information regarding subsurface soil and groundwater conditions and geologic hazards. #,DES ... To 7Y,pC 0.0 KZTTZTgB CO WWW 9 DEPARTMENT OF PUBLIC WORKS Kl'I13TA5 CUUNTY Hart Crowser will coordinate field explorations with KPFF, Kittitas County, USFS, drilling subcontractors, and internal staff. If required, Hart Crowser will submit a traffic control plan for review by the County. TASK 3.20 — held Work TASK 3.21— Site Reconnaissance and Utility Locates Hart Crowser will conduct a reconnaissance to get familiarized with the site. Relevant features will be noted, and the proposed exploration location marked for the utility locators. Hart Crowser will notify "One -Call" service for public utility locates. TASK 3.22 — Field Explorations Hart Crowser will advance one boring near the south side of the bridge. (The north side of the bridge cannot be accessed with drilling equipment due to load restrictions.) The boring will be advanced using a TSi 150CC Sonic Drill, which can typically penetrate through boulders and similar materials. The boring will be advanced until one of the following criteria is reached: 1) the boring penetrates 10 feet into rock, 2) refusal occurs within nested boulders, or 3) we reach a depth of 50 feet. If thick soil layers (sand, gravel, etc.) are encountered, then occasional soil samples will be obtained by driving split -spoon samplers in accordance with the standard penetration test (SPT) procedure (American Society for Testing and Materials [ASTM] D 1586). Hart Crowser will observe the exploration, log the subsurface conditions, collect representative soil and rock samples, and transport the samples to the laboratory. for further visual evaluation and testing. The borehole will be backfilled in accordance with Department of Ecology regulations. The upper 1 foot of the borehole will be patched with gravel surfacing. Excess spoils from the borehole will be spread on the ground adjacent to the borehole. If required, Hart Crowser's subcontractors will provide traffic control services during drilling. TASK 3.23 — Sample Review and Laboratory Testing Soil and rock samples obtained from the explorations will be visually classified in the field by Hart Crowser and in Hart Crowser's geotechnical laboratory based on the Unified Soil Classification System (USCS) and ASTM classification methods. Hart Crowser will conduct a series of geotechnical laboratory tests on selected soil and bedrock samples obtained from the explorations to evaluate the engineering and index properties of the site soils. The specific tests conducted will depend upon actual �C ; pDES... TO 7" KZTZ`ZTA{� G"Q DEPARTMENT OF PUBLIC WORKS �sCO,.Iffy conditions encountered. For budgeting purposes, Hart Crowser has assumed the tests will include up to eight moisture content determinations, one Atterberg limits determination, three grain -size distribution tests, and one unconfined compressive test. TASK 3.30 — Office Work TASK 3.31— Engineering Analysis and Consultations Hart Crowser will conduct engineering analyses to evaluate seismic hazards, ground settlement, abutment stability, foundation and retaining wall alternatives and design parameters, and earthwork guidelines. Engineering analysis will be completed in general conformance with appropriate Washington State Department of Transportation (WSDOT) design manuals. Hart Crowser will consult with the design team regarding their findings and foundation alternatives. TASK 3.32 --- Geotechnical Reporting Hart Crowser will prepare a geotechnical report to document their findings and recommendations. The geotechnical report will address design and construction issues, including: • Site and boring location plan(s); Description of subsurface soil, rock, and groundwater conditions; Site preparation and earthwork recommendations; Seismic hazards and WSDOT-based seismic design parameters; Temporary and permanent abutment foundation alternatives, design recommendations, and stability; • Retaining wall alternatives and design parameters; and • Construction considerations. A draft report will be provided to the design team for review and comments. A final report will be prepared that addresses review comments from the design team. TASK 3.33 —Project Management and Meetings Hart Crowser will provide geotechnical project management and support services, including coordinating staff and subcontractors and conducting telephone consultations and email communications with the design team. Hart Crowser will attend up to one meeting at KPFF's office. ppEs ... 7Y17p�eC IQTITTAS COUNTY KITTITAS CO DEPARTMENT OF PUBLIC WORKS TASK 3.40 — Construction Support The geotechnical engineer will provide support during construction to respond to RFI's or changes in field conditions. TASK 3.50— Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for I year rather than originally anticipated 3 month duration. TASK 3.60— Revise Geotechnical Recommendation for 60ft Span Hart Crowser will provide geotechnical project management and support services, including coordinating staff and conducting telephone consultations and email communications with the design team. Hart Crowser will attend up to two teleconferences. Hart Crowser will conduct engineering analyses to provide revised estimates of ground settlement and abutment stability for a precast concrete abutment system for the revised bridge length. Hart Crowers will also develop geotechnical design parameters and evaluate global stability for the GRS-IBS system alternative. Engineering analysis will be completed in general conformance with appropriate Washington State Department of Transportation (WSDOT) design manuals. Hart Crowser will consult with the design team regarding their findings. Hart Crowser will prepare a geotechnical report supplemental to document their findings and recommendations. The supplement will address design and construction issues, including: Updated foundation design and construction considerations Updated abutment settlement and global stability estimates and construction considerations Geotechnical design parameters for the GRS-IBS system • GRS-IBS settlement and global stability estimates and construction considerations A draft supplement will be provided to the design team for review and comments. A final supplement will be prepared that addresses review comments from the design team. �G DFA ... rn IGMTAS COUNTY KZTTITgS CO DEPARTMENT OF PUBLIC WORKS Hart Crowser will start analysis and reporting immediately upon receiving notice to proceed (NTP). We estimate that the engineering analyses and draft geotechnical report supplement should be completed approximately 3 weeks after NTP. However, Hart Crowser will consult with the design team regularly to provide the results of our analyses and recommendations. TASK 4 HYDRAULIC DESIGN Watershed Science & Engineering (WSE) will provide hydraulic engineering services for the Big Boulder Creek Bridge Replacement Project in Kittitas County, Washington. WSE will lead the hydraulic engineering portions of the project which will include completing the following tasks. TASK 4.10 — Data Collection and Review WSE will collect and review existing data and information needed to complete the hydraulic investigation. Data will include but not be limited to topographic maps including LiDAR data, historical aerial photos, flood data, bridge maintenance records, and anecdotal information on past flood events from County maintenance staff. Assumptions: • County will supply relevant data they possess TASK 4.20 — Site Inspection WSE will conduct a one -day field inspection to examine the crossing and Big Boulder Creek. WSE will examine hydraulic and geomorphic characteristics, sediment transport, debris flow potential, lateral erosion, and scour. Assumptions: • NTP is received in time to allow WSE to visit the site before snow fall. TASK 4.30 — ChanneI Survey WSE will survey up to eight cross sections and a longitudinal profile of the stream channel as part of the site inspection task above. WSE will merge the stream channel data with the County's survey to develop a single topographic base map required for the hydraulic investigation. Assumptions: County will or has collected detailed topographic data within the road right -of --way. 3H1Z11VxWAL13 Co DEPARTMENT OF PUBLIC WORKS IUMTAs COUNTY TASK 4.40 — Hydrology WSE will use USGS regional regression equations to estimate annual instantaneous peak design flow rates. The design event for flow and scour will be the 100 -year flood and the check flood for potential damage will be the 500 -year event. The 500 -year event is not the design event, it is solely used to assess risk in -order to identify any remaining significant erosion or scour issues that might need to be addressed in the design. Assumptions: • USGS regression equations will provide reasonable estimates for the 100 -year and 500 - year annual instantaneous peak flows. If they do not, WSE will use alternative methods to estimate the flows. TASK 4.50 -- Hydraulic Analysis WSE will develop a simple HEC -RAS model of Big Boulder Creek in the vicinity of the bridge crossing using topographic base map. The model will not be calibrated because observed discharge/highwater marks are not available. Instead, WSE will use engineering judgment to select and adjust model parameters. The model will be used to help size the bridge waterway, to provide data required to evaluate lateral erosion and scour potential, and to develop countermeasures. TASK 4.50 — Channel Stability and Scour Assessment WSE will determine if lateral erosion, local scour, ice, or debris flows pose a threat to the proposed crossing. If they do, WSE will work with KPFF to address these hazards in the design. Assumptions: These hazards will be addressed through modifications the structure itself (e.g. deeper foundations, longer bridge, etc.) and not through design and installation of external countermeasures (e.g. riprap). If countermeasures are required, the optional task at the end of this scope will be completed. TASK 4.70 — WDFW and Permit Coordination It is anticipated that WDFW personnel have an idea of the length of crossing they would like to see at the site. WSE will work with WDFW personnel, the County, and Jacobs (the company that will acquire the project permits) to collectively arrive at a bridge length that is acceptable to all parties. An allowance is provided for WSE's lead engineer to participate in one meeting with WDFW personnel in Ellensburg. Assumutions: �G ,DES ... -o7NEc� _ DEPARTMENT OF PUBLIC WORKS [a1T[TAS COUNTY • A reasonable bridge length will be agreed to that the County can afford to build. TASK 4.80 — Hydraulic Design Report WSE will prepare a hydraulic design report to summarize and document the results of the investigation. It will include the recommended NBIS Scour Code rating for the new structure, a code that the County will need for their records. Assam tiA ions: • A draft of the report will be provided to the County and KPFF for review. Upon receipt of comments, WSE will refine the report and submit a final version as a PDF. TASK 4.90 — Meetings and Administration An allowance is provided for WSE personnel to attend one meeting at KPFF's Seattle office to discuss the design and one meeting in Ellensburg to meet with the County. Assumptions: WSE will develop concept sketches of the countermeasures which will be provided to KPFF. KPFF will prepare detailed plans to be incorporated into the project plan set. • WSE will recommend specifications for the countermeasures. • WSE has included a modest cost for this task in the accompanying cost estimate. This estimate will be revisited and may need to be revised once the type and scale of countermeasures required are identified. • At this time it is assumed that scour and erosion protection countermeasures are not necessary and have not been included in the fee TASK 4.100 — Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place abutments. Evaluate design for using temporary detour bridge for 1 year rather than originally anticipated 3 month duration. TASK 5 ENVIRONMENTAL/PERMITTING The Jacobs team will deliver Environmental Documentation and Permitting in coordination with KPFF and Kittitas County staff. TASK 5.10 — Project Management r�AaEs... rn'Ne KZTTZTJLS CKYUMWIF DEPARTMENT OF PUBLIC WORKS 1. Project planning, team direction and coordination and ongoing client communication 2. Project Controls a. Prepare monthly invoices and back-up, and monthly progress reports. b. Monitoring and updating Environmental delivery schedule. 3. Deliverables a. Monthly progress reports and invoices TASK 5.20 — Agency Coordination Agency Coordination a. Coordinate with Kittitas County Public Works, Kittitas County Community and Development Services, Department of Fish and Wildlife, Department of Ecology, US Army Corps of Engineers, and other agencies as needed. b. Coordination items include impact analysis, permits required and timelines, and facilitated review of project milestones as needed. TASK 5.30 — NEPA/SEPA Documentation 1. NEPA/SEPA Documentation a. Research and prepare one (1) NEPA Categorical Exclusion (CE) form b. Research and prepare one (1) SEPA Checklist and Draft DNS if needed TASK 5.40 — Biological Assessment 1. Biological Assessment a. Field Reviews b. Prepare one (1) Biological Assessment, assumed to be formal consultation with both Services. c. Provide ongoing coordination with agencies throughout the review/approval process. TASK 5.50 — NHPA Section 106 NHPA Section 106 Evaluation a. Develop Area of Potential Effects (APE) and coordinate with SHPO. b. Evaluate cultural and historic resources within the project area of effect as per Section 106 requirements. TASK 5.60 — JARPA Package Preparation and Submittal DARPA Preparation and Submittal a. Populate and submit one (1) 7ARPA application package. b. Coordination with federal and/or state agencies for the following permits: i. Corps 404 permit, United States Army Corps of Engineers (Assumes Nationwide Permit) ii. Hydraulic Permit Approval (HPA), WA State Dept. of Fish & Wildlife iii. Ecology 401 permit review including development of TESC and SWPPP TASK 5.70 — Local Permits or Approvals ��CA�AES ... rty �ECO1 �� �, HITTIT�iB CO DEPARTMENT OF PUBLIC WORKS M=A� 1. Local Permits or Exemptions a. Coordinate with Kittitas County CDS on SEPA, Shorelines, and Critical Areas requirements. TASK 5.80 — Biology Support During Construction 1. Support services during construction, including worksite isolation support, fish salvage and removal, planting or site stabilization guidance up to 40 hours. This task is not subject to Assumption la. TASK 5.90 — Permit Update Submit updated permits to reflect revised bridge span. Update permits to allow single creek crossing for equipment to install temporary bridge and detour roadway. Assumptions: • Coordination with FHWA or WSDOT Local Programs will not be required. • The Biological Assessment that will be prepared will be "Likely to Adversely Affect" for Bull Trout and Steelhead, and will require formal consultation with both USFWS and NMFS. • The US Army Corps of Engineers will issue a CWA Section 404 T WP 14. No individual permit will be required. Section 106 will be determined as "May Affect", and will require SHPO concurrence • The Department of Ecology will issue a Letter of Verification for CWA Section 402. No individual permit will be required. • No wetlands will be impacted by the project. This Scope does not include wetland delineations or reporting. • No NPDES Permit will be required. • SEPA will be exempt. • If the level of effort and cost for permit or approval acquisition is higher than the budget amount, Jacobs will coordinate with KPFF and the County to determine amendments as needed. • No mitigation planning is included in this scope of work. TASK 6 CIVII.IROADWAY ENGINEERING KPFF will provide civil engineering support for the replacement of Big Boulder Creek Bridge. Civil design criteria will be Kittitas County Code Chapter 12- Roads and Bridge Standards and as supplemented by the WSDOT Design Manual or AASHTO's Policy on Geometric Design of Highway and Streets. �c ors... ro axgc . . �G� KZTTZTAS CO x, DEPARTMENT OF PUBLIC WORKS lu=m cou TASK 6.1— Civil Project Management • Attend six (6) progress meetings via teleconference. • Prepare invoice progress reports TASK 6.2 — Development of PS&E/Contract Bid Documents Plan Preparation far 30%, 75%, 100% draft, 100% Ad • Site Preparation • Roadway plan and profile • Typical sections and details • Detour plan, profile and typical section Full Closure Signage Plan Supporting Work: • CiviI stream grading for stream bypass. • Prepare Stormwater Site plan and Construction Stormwater Pollution Prevention Civil Special Provisions • Provide WSDOT run list format civil technical special provisions Civil Cost Estimate • Provide quantities and unit prices for civil elements of work TASK 6.3 — Quality Control Checks and Reviews KPFF senior civil engineering staff will QC all civil design deliverables. TASK 6.40 — Construction Support If needed to provide support during construction to respond to BFI's and review submittals. TASK 6.50 — Revise Contract Documents Update plans, specifications and estimate and issue an addendum to the contract bid documents as necessary to limit 2019 construction work to installation of temporary detour road and bridge. TASK 6.50 — Revise Contract Documents for 60ft Span Update plans, specifications and estimate and issue revised contract bid documents as necessary for a 60ft long bridge. GA,pDES... i"pCq' Gkk KZTTITA44 CO DEPARTMENT OF PUBLIC WORKS Assumptions: • Existing ROW and survey basemap control provided by County will be depicted on civil drawings. Temporary Construction Easement (TCE) limits will be defined on Civil Site Preparation plan. Legal Descriptions of TCE's, including TCE documentation and acquisition will be performed by the County. • Temporary Erosion and Sediment Control (TESC) plans will not be provided, a performance spec will be used for TESC. For Stormwater Management it is assumed the project is considered Road Preservation per SWMMEW Section 2.1.4 and therefore only needs to meet core requirement #1 and #2 as scoped above. Preparation of the Construction SWPPP will be a bid item and prepared by the Contractor. Approach guardrail systems will not be required. Bridge railings will be signed with hazard object markers. PROJECT DELIVERABLES: 1. Alternatives Analysis Memo (Draft and Final) 2. 30% Plan Set (Permit set. 3 sheets estimated. Layout, Elevation, Cross-section, structural notes, Cost Estimate) 3. 75% Plan Set (6-8 sheets, updated cost estimate, GSP run -list, 30% comment resolution) 4. 100% Draft Plans (6-8 sheets, updated cost estimate, PDF of GSP's or run -list and PSE files, pending final review by county, 75% comment resolution and complete PS&E) 5. 100% Stamped and Signed Plans (Contract Documents — bid ready) 6. Geotechnical report (Draft PDF and Final PDF + 3 hard copies) 7. One (1) NEPA CE and ECS Form 8. One (1) NBFA Section 106 Compliance Memo 9. One (1) Biological Assessment (Formal Consultation) 10. One (1) SEPA Checklist (Unless Exempt) 11. One (1) 7ARPA package for delivery to USACE, WDFW, and WDOE 12. Local Agency correspondence for each permit, approval, or exemption PROJECT ASSUMPTIONS: COUNTY to provide KPFF with the project survey base map. County will collect additional data as necessary as requested by KPFF. Contours shall be in at least 2 foot increments and shall preferably extend at least 200 feet to the north, south, east and west of the proposed project limits to include all utilities, driveways, ditches, � ,QPM ... TO 77reC x=�rTZTAas co _ 9 DEPARTMENT OF PUBLIC WORKS *C=AS COUNT] ROW/property lines and other items which are reasonably likely to impact the bridge layout and design. 2. KPFF to provide specifications related to the PS&E they develop (bridge portion only). 3. New bridge is assumed to be designed for one 12 foot lane, and two 2 foot shoulders and no sidewalks. 4. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as prescribed by COUNTY Civil roadway design. 5. There will be no drains on the bridge. 6. Bridge superstructure is assumed to be prefabricated and designed and supplied by the Contractor during construction. 7. Load rating report will be provided by bridge superstructure supplier. 8. COUNTY will prepare Division 1 and assemble special provision package and bid package. 9. COUNTY will acquire 60ft prefabricated bridge superstructure separately from this Contract. Cost Breakdown: See Attached Project Schedule: KPFF will provide a PDF of the plans for the 30%, 75%, and 100% design at the dates shown below. For efficiency, the design will continue following milestone submittal while the county performs review of the submitted plans. The COUNTY will endeavor to complete and return to KPFF all comments as soon as possible following receipt of them, but in no case more than 10 business days following the submittal date. Milestone Milestone Description — Structural Description — Civil Delivery Date ! 30% NTovember Permit set. 3 sheets estimated. I Permit set. Roadway plan 2018 Layout, Elevation, Cross- :and profile and detour section, basic notes plan and profile. Typical sections. 75% January 2019 6-8 sheets, all items including ; 5-7 sheets, all items further development of the including further notes, specs, and quantities. development of the notes, specs, and quantities. 100 % Draft s March 2019 6-8 sheets, all items developed 5-7 sheets, all items and ready for construction, ,developed and ready for pending final review by County. construction, pending `. &DC.t...'r- VP K1rriTAS COUNTY KI'TTITA.15 CO DEPARTMENT OF PUBLIC WORKS Completion Date: January 30, 2020 Agency Signature: Consultant Signature: i Date: t�/j ` Date: Complete PS&E. final review by County. Complete PS&E. 100% Stamped April 2019 Stamped and Signed Contract Stamped and Signed and Signed Documents — bid ready. Contract Documents — bid ready. Addendum June 2019 Prepare amendments Prepare amendments 100% Draft December Draft 100% for 60ft Structure Draft 100% for 60ft 2019 Structure 100% December Stamped and signed Contract Stamped and signed Stamped 2019 Documents Contract Documents Completion Date: January 30, 2020 Agency Signature: Consultant Signature: i Date: t�/j ` Date: Exhibit D-1 KPFF Consulting Engineers Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement Klttitas County On -Call Task Order #16: BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost Fixed Fee (FF) Classification Principal Project Manager :Technical Specialist Structural Task Lead ;Project Engineer !Design Engineer .CAD Technician Project Coordinator Intern ;Admin Reimbursables Weage Airfare Per Diem Subcontract LBlank)__ Subtotal Tota! Negotiated _ Hours X Hourly Rate - Cost 18.00 136.25% $171.52 = 28.00% Direct Hourly Rate $ 64.91 $ 45.29 $ 64.91 $ 45.29 $ 43.27 $ 36.93 $ 46.04 $ 28.85 $ 22.00 $ 23.08 $ 22,868.20 208.00 X Tota! Negotiated _ Hours X Hourly Rate - Cost 18.00 X $171.52 = $ 3,087.44 121.00 X $119.68 = $ 14,481.14 46.00 X $171.52 = $ 7,890.14 154.00 X $119.68 = $ 18,430.54 200.00 X $114.34 = $ 22,868.20 208.00 X $97.59 = $ 20,298.21 278.00 X $121.66 = $ 33,821.67 20.00 X $76.24 = $ 1,524.72 0.00 X $58.14 = $ - 0.00 X $60.99 = $ - 0.00 X $0.00 = $ - 0.00 X $0.00 = $ - 0.00 X $0.00 = $ Subtotal $ 122,402.05 220 Miles x $O.545/mile) (Allowance) (Hotel + Meals @ $#.## x # ir:; s '(Sub Name & Task) (Allowance) Subconsultant Costs (See Exhibit E) Management Reserve $ 119.90 $ 119.90 $109,418.04 $15,673 GRAND TOTAL: $247,612.99 Exhibit E-1 Hart Crowser, Inc. Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 1,100.00 224.46% 4,500.00 $ 2,500.00 $ 105.00 Fixed Fee (FF) 28.00% Classification Direct Hourly Total X Negotiated = Cost Rate Hours Hourly Rate Principal $ 88.86 0.00 X $313.20 = $ - _Senior Principal $ 74.38 38.00 X $262.16 = $ 9,962.07 Senior Associate $ 62.22 0.00 X $219.30 = $ - Associate $ 52.63 0.00 X $185.50 = $ - Senior Project $ 43.70 0.00 X $154.03 = $ - Project $ 36.06 70.00 X $127.10 = $ 8,896.80 Senior Staff $ 32.22 38.00 X $113.56 = $ 4,315.38 Staff $ 26.50 0.00 X $93.40 = $ - Senior Drafter $ 32.04 14.00 X $112.93 = $ 1,580.99 Drafter $ 30.23 0.00 X $106.55 = $ - _Project Assistant $ 29.96 13.00 X $105.60 = $ 1,372.76 Subtotal $ 26,128.00 Reimbursables Mileaae Laboratory Testing Drilling Sub. Traffic Control Sub. B&O Tax on Subs Subtotal (500 Miles x $0.545/mile) Hart Crowser Laboratory - Task 2.3 Holt Services - Task 2.2 Northwest Barricade - Task 2.2 1.5% of Holt and Northwest Barricade $ 218.00 $ 1,100.00 $ 4,500.00 $ 2,500.00 $ 105.00 $ 8,423.00 GRAND TOTAL: $34,551.00 Exhibit E-1 Watershed Science & Engineering Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost Fixed Fee (FF) Classification Principal Senior Engineer 1 Junior Engineer Contract Administrator Reimbursables Mileage Airfare Per Diem Subcontract (Blank) Subtotal 188.43% 28.00% Direct Hourly Rate $ 67.31 $ 59.62 $ 30.77 $ 30.00 Total Negotiated Hours X Hourly Rate - Cost 76.00 X $212.99 = $ 16,187.17 5.00 X $188.66 = $ 943.28 95.00 X $97.37 = $ 9,249.72 3.00 X $94.93 = $ 284.79 Subtotal $ 26,664.95 (400 Miles x $0.545/mile) (Allowance) (Hotel + Meals @ $#.## x # trips) (Sub Name & Task) (Allowance) $ 218.00 $ 218.00 GRAND TOTAL: $26,882.9511 Exhibit E-1 Jacobs Engineering Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 117.00% Fixed Fee (FF) 28.00% Classification Env. Group Lead Env. Project Manager Permit Lead Sr. Cultural Cultural Field Tech Env. Engineer Jr Biologist Technical Editor Admin Reimbursables Mileage Airfare Per Diem Subcontract (Blank) Subtotal Direct Hourly Rate $ 66.15 $ 47.83 $ 33.80 $ 76.13 $ 28.00 $ 33.63 $ 33.80 $ 45.55 $ 25.00 Total Negotiated Hours X Hourly Rate - Cost 54.00 X $162.07 = $ 8,751.65 66.00 X $117.18 = $ 7,734.11 100.00 X $82.81 = $ 8,281.00 2.00 X $186.52 = $ 373.04 50.00 X $68.60 = $ 3,430.00 30.00 X $82.39 = $ 2,471.81 181.00 X $82.81 = $ 14,988.61 9.00 X $111.60 = $ 1,004.38 4.00 X $61.25 = $ 245.00 Subtotal $ 47,279.59 (500 Miles x $0.545/mile) (Allowance) (Hotel + Meals @ $144/day x 3days) (Sub Name & Task) T (Allowance) $ 272.50 $ 432.00 $ 704.50 GRAND TOTAL: $47,984.09 October 25, 2019 KPFP Conxbtlng Ergime. KPFF BIG BOULDER CREEK BRIDGE REPLACEMENT Pdnapal MmmW i d CAD speasFell Shask Lid Endtial pneer iadnaaan Project ..- or Item SCOPE OF WORK ;17162 $119.58 $171.62 $119.69 ;114.34 $121.86 $76.24 1 PROJECT MANAGEMENT 1.10 Project Team Merm9earent and Coord whoa so F7,581 1.20 Monthly Progress Reportsfinvoices a 12 $1.972 1.30 Monthly Project Progress Meelirgs/Mb utes 16 6 $2,972 1.40 Coordinetimwith WOFW 6 --$967 �- 1.60 Teem Coor16nagon for design change 8 p997 70 Team Coordination for revised desi n 7 –1838 -- Labor Subtotal: 787 1F F74,1ri 1q)ff Page 1 VS October 25, 2019 KPFF Candling &ginsers KPFF BIG BOULDER CREEK BRIDGE Pda�oel Pmied T d- sin al p o act CAD Prd'ad REPLACEMENT Manager Spuciafat Tack Lead E,gineer Ted nldan Coed nate Kum SCOPEOFWORK $171.62 $114.96 $171.62 $119.66 MU.34 $121.66 $76.24 6 CIVIL ENGINEERING 6.10 act Management 2 4 $2,762 6.20 PSSE Bid Dora 31e N"ration Plan (90!1001100 Ad) 2 14 $4D79 Roadway plan and profRe (3019011001100 Ad) 2 20 _ $6,690 Typical Sedions and Details (W1001100 Ad) 2 12 $3.250 Detour plan, profile 6 typloal section 4 24 58.5" �306'g01100J100 Ad FLOI o QWM signage Plan 2 12 $3250 Cavil Stream grading for bypass an cVor 2 12.571 vino dwM Stommzter Slee plan and CSPP 6 $2,Y25 Civil Special prWaians 2 $1A00 Civil Cod Estimate 2 $1.W9 6.30 OC Reviews 6 $1629 6.40 Coretnetllon Support 2 _ $1009 6.50 Revise centrad documanis to remove 6 6 6 $2446 nmaMFdhi a mak 6.60 Revise wntract documents for 6083 n 44 30 $9.710 Labor Subtotal: 0 0 12 0 74 126 9 $47,619 _ $a= Libor Sn :j 16 111 46 I" 2ty0 Vii Raleroursabla Sime:: i Pegs 2 of 8 Ochober 25, 2019 Hart ermser, :cm HC BIG BOULDER CREEK BRIDGE REPLACEMENT Seder PHndpal pdndpal $" AnodaLe Saab Associate Proled PMjad SenlwSlalf SWI Senior Droner wager Project Assistem Rem SCOPE OF WORK ;313.20 ;282.18 $219.30 $585.50 $154.03 $127.10 5'13.56 $99A0 5412.1K !0106.55 $105.170 1 PROJECT MANAGEMENT 1,10 Project Team Management and Coordination 1.20 MorOr!y Progress Reporls invuicas 1.30 MonOiy Prated Progress MeelingslMlnulm 1.40 Cmn9natlan with WDFW--- 1.60 Team Coordination for design change 1.70 Team Coordination for mind desim Labor Subtotal: 2 STRUCTURAL ENGINEERING 0 0 0 0 6 0 0 0 00 0 $0 210 Proped ladran Meeting and Site Visit 220 Alteme0va Analysis Memo . 2.30 Deve!opment of PS&FiContrad Bid DOW.T,e.-Ite - 2.91 Plan and Co!culatim Preparation - - - Cover Sheet General Notes, Quantities, Bridge Layout- plan and elevation - - -- FouraloV n. Plan -layout -- Footing Details - . WingwallLayout I Dotala TemporarylDelour Bridge Layout 232 SlnrLtural Spacial Provisions 233 Coat Estimate _ _ 234 Dsl!veraWe Preparation (30%. 75%, 100%2 hr. aacF. 240 puelity Colt,o! Chadm and Reviews 1 _ 2so Technlca! Callaboralion {Survey, Civil, GootechN! H l urs aMl 2.60 oac. - 270 Feosib:i;:y Review for 60'span bridge - 271 Reviver d temporary bridga details for l year in sanice 2.WRevrse contract documents to remove _ anent bridge work LaborSubtotal:1 GEOTECHNICAL ENGINEERING 0 0 a 0 0 0 0 0 0 0 0 S0 3.10 PlanNng and Research 2 2 2 $t,gOE 3.20 Fleld Work 3.21 Site Reconnalssance and Utility L.ocatas I a ;t,098 3.22 Field Explorations 1 1 12 1 3.23 Sample Review& LabomtoTy TesSn 4 1 I $022 5.30 Office Work _. 331 Eng1neer1nq Analysis and Consultations 4 1s a 2 ! q,2t7 'T 332 Geotachrira: Reporting 6 12 3 4 4 ;0,818 3.33 Project Iden einem and Mewl B 2 923011 3.40 Conslz�cd nSupport 1 4 8.50 FeaslbI Reviewforfi0' span bridge 23.61 Rav!ew W temporary bridge datalls fa 1 year In service ::2 94 2 1 a - SiB+ $8,816 13.52 Revise Gedachnlcal Recommandatlons for BOft S Laboraabtofal: 4 NTL)KAULlU Er4UllQF1m IIG 0 80 0 0 0 70 80 0 14 0 18 fZ0,12$ tie.<23 4.10 Data Collection and Review 4.20 She Inapadon -_--- _-_ 4.30 C1lannel Survey 4.40 Hydrology 4.50 mul:c Analysis ..- 4.610 Channel Stabirrty and Scour Assassmen - -- - 4.70 WOMI and Parmlt Coordination 4.00 "mul'.c Investigation Report - - 4.90 Maet!ngs & Administration 4100 FeaW6 Wine ter 60' span bridge-- 4.9171 Rsv'aw of Wmpomry bridge details for 1 year in se•. v:m - - s Labor Sadists!: 0 0 0 0 0 0 l! 0 0 0 4 5g 5 ENVIRONMENTAL DOCUMENTATION & PERMITTING 610 PmkU Nan amen _ :.20 Agerey Coordination 630 NEPAl3EPA Doeumerrtelion _ 640 BIcIc#cW Asaeaamant 1 660 NFPA Section 105 Evaluation -- - -_ 6610 JARPA Package Preparation and Submittal 670 Local Perils and Approvals- S0b Biology Support During CorreWdior, O oral &SO jPermnit Update - SO'Brl a Labor Subtotal: 0 0 0 1 a 1 0 a a 0 0 0 0 a0 11qPff Page 3 of 8 October 28, 2019 Hnt Grooves, Inc. RC BIG BOULDER CREEK BRIDGE REPLACEMENT Itenior Pyeypa senior P indPal Assodma waodata Senior P led P olact sa ar s a6 sob aanlor Drefrer D�Oe Prolan. Assisted Item I SCOPE OF WORK $313.20 5282.78 $219.30 Sia5.50 $154.00 6127.10 (113.68 $93A0 $112.85 $108.55 $106.60 $ CIVIL ENGINEERING 6.10 ftt d Marnagernom 6.20 PS&E Bid Docs — Site Preparation Plan (901100/100 Ad) -_--- Roadway plan and profdo (30/9011001100 Ad) _ Typical Sections and Details 1901i0OM00Ad) D.Wur plan, proRle &typical sedlon 019071001100 Ful! dosure signago pia:: ..._ _ Chit Stream grading for bypass andfor abutments no drewi — -- -- _ - — Swrnwater Site P;an and CSPP _-- CNII Special Prevls!ons Civil Coat Estimate _ 6.30 CC Reviews 6.40 Constnation Support 6.60 PWw wntract cl a rnnrft to remove Permanent bridge work .... — — -- 8.60 Revise contract dowmems for WR Labor 0 6 6 0 — 9 0 -- o — e 11.4 o I a a$o 13 fociRWlsbsltu lx'pI L Paye 4 of 8 October 25, 2019 1 Wekrshed Sdencea Englneedng WSE 61G BOULDER CREEK BRIDGE Pdndpal Strad ed ` I Juni" ilWmtilskdo REPLACEMENT Enpneer 1 Engineer t r Item I SCOPE OF WORK 5212.98 5188.66 697.37 $97.93 1 PROJECT MANAGEMENT 1.10 Project Team Management and Ca rdlnadcn 1.20 Monthly Progress Repwisgmrol®a --- 1.30 Monthly Project Progress MeefingdMinutes 1.40 Coordination with WDFW 1 1.80 Team Coordination for design change 1.70 Team Coordination for revised desion Labor 9ubcotal: e 8 a a So 2 STRUCTURAL ENGINEERING 2.10 Project NieW Meeting and Sba Moret 2.20 Alternative Andysis Mamo 230 Development of PSBFJContrad gid Documents 2.31 Plan and Calculation PreparaJor. CoverSheet Genarel Nota% OuenMM Bridge Layout -plan and elwation Foundation Plan - Layout Foiling Detaiie Wingwall 1Detsiis -�--- -- TemporaryZeLour Bridge L.aystf - - - - 232 S"du al Special provision 2.33 Cost E511mas _ 234 Deliverable Preparatm (30%, 75%. 100%2 hr. each - 240 Quality Car" Checks and Reviews Technical Collaboration (Survey, Civil, 250 Geotachnica% Hvdmdlm. Frvironmerle) 260 u ontiLIpport. r.:n:ta 4 slot w needed 270 Feasibility Reviewfor 50' span bits 2.71 Review of temporary bridge deta'is for 1 year ;n service - 2.80 Revise wrJrad dow:nents to remove mianent bdd a work _ Labor SuLtafth 4;EWMCHNICAL ENGINEERING 0 1 8 0 1 a is 3.10 lRannirig and Research 3.20 Field Work _ 3.21 Site Reconnaissance and Utility Locates 3.22 Field 6cpioretions 3.23 Sample Review 8 Testing 3.30 Office Work 3.31 Engineering Analysis and Consufttlws 3.32 Geotadmkal Reporting 3.33 Pmjed Management and Meelings-- 3.40 lConstrue6on Support .. 3.50 IFeasMIftyRewiwftrWspsnbdclgs - ._. 3.61 Review of temporary bridge delalk for 1 year in service 352 Revise Geotechnical Recanmentlatars for Labor Suirictal: 4 HYDRAULIC ENGINEERING 0 a o a M 4.10 Date Cdiectorh and Review 1 2 8 S+ 2tl5 4.20 Site Inspection a a _.$2.4.483-. - --_ 4.30 Channel Survey 2 4 _ _ $615 4.40 Hydrology 2 4 Sats _ --52.592 4.50 HydroulicAnelyals 2 1 20 4.30 Channel Stability and scour Assaeament { 10 4.70 WDFW and Penni Coor iination 12- _ 4.80 Hydraulic Investigation Report 20 4 16 59.372 -_--52%14_ 4.90 MeetingsSAdmini Moon 10 3 2 4,100 Feesibitry Review far W openbdd 4 8 1 ft,729 4.f01 Review of femporory bridge dela'Is for 1 year . I m cervi® 4 4 41.271 Optic-- rwl... _. .... _....----- �� Page 5 of S October 25, 2019 WaWnhed Srlance A Engl—dag WSE BIG BOULDER CREEK BRIDGE REPLACEMENT Seniv 'I PrFrapai Engineer 1 Junior • COAS1eG Engineer dminrNara r gem SCOPE OF WORK $274.98 S16fl6e $97.57 W4.93 8 CIVIL ENGINEERING 6,10 Prject lWanagernent 6.20 PSdE Bid Dors Sias Prepare0on Plan (9W10W100 Ad) RoadkW plan and protlls (30W1001100Ad) TWcal Sedans and Detsh (OW1=100 Ad) —Y---___ Detour plan, preflle S typical section 30f90110W100 Ad _ Full dasure signage plan Civil Stream grading for bypose andlor abutn:ente no dread _ j Stanm doter She plan and CSPP Civil Special Provisions Civil Coat Estimate i - -------- - 6.90 QG Revlaap •`- 6.40 ConeVuclion Sui 6.50 Rwlse carvtdacumsnls:u remove anemwl i 6.60 Revise conlrad documents for SIRS Labor Subtotal: 0 0 0 0 $8 $2iLIF5 kpff Page e of 8 October 25, 2019 Jacob. Engineering JE BIG BOULDER CREEK BRIDGE thaw. Gnxc PernO Sr. I CFldd I E�IInneer eial0glal T.Mlral Admin! REPLACEMENT i Lmd Man Lead aJlu el Tech Edtar It--I SCOPE OF WORK $162.07 SnT.1e $02.81 $186.52 $66.60 88238 Met $111.60 $81.25 1 PROJECT MANAGEMENT 1.10 Project Team Management and Coordlrmdlon 1i IM Mordhly Progress RepmteAnvolaes tw Monthly Project Progress Meelings/Minules 1.40 Caordnaaanvr:th WDFW 1.60 Team Caordinatlon for deal n change 1.70 Teem Cmrdlnation for revised deli n Labor Srb4ofel: a a o a 0 0 11 0 a #a 2 STRUCTURAL ENGINEERING 2.10 lPrcded Kickv9 MasHiN, and Site Malt 2.20 Atlemative Anelysis Memo Devetopmem d PSdElCantrad B.d 2..'w Documents ! _ 2.31 Wan and Calcalad-n Preparation Cover Sheet General hates, QuarlNes, Bridge Layout -plan and alevadw Foundation Plan - Layout Footing Details WinowelfLa 1l Details 7emponary/Eidm Bidge Laym. 2.32 3trucltual Spedal Prov!dona 283 Coat Estimate 2.34 Oefivenable Preparation(30%75'6,100%2 hr. mch 2.40 Quality CmaN! Clhecka and Reviews 250 Tednlcal Cdlabam8or. (Burvey, cwt. Geotechrdcal, Hvd=1151 Emkonmental 2B0 Construction Supped. 1mris. 270 Feasiblilly Review for 60' open bridge_ 27f Reviewd lemporahy bridge deta!ls for 1 year In sawlce 280 Revise emsbact dallmenls to remove mann briclas work Labor SuI;WW: GEOTECHNICAL ENGINEERING a a , a 0 g 0 4 0 o so ' 110 Panning and Research 120 Field Work 321 Site Reconnalssance and Utility Locates 3.22 Field Exploration 8.29 Sample Ravim a LabaratM Testng 3.30 IMF= Work 3.31 Engimedn Anatyaie and CansullaSons _ 3.32 Gectechnicsl Rspodnq 3.33 Project UarwNwent and Meeti 140 Construction Support T 150 FeasIblllty Review for SD' span Midge 151 Review of temporary b6d9c details for 1 year in servlce Bevies Geotechnical Rawmeationfor 652 Soft Soan Laser SuMefal: 4 HYDRAULIC ENCAMERNG 0 0 0 0 0 0 0 0 d W 4.10 Data Col 'mend Review 4.20 B?ts I cion _ 4.40 Channel Susy 4.40 Hydrology 4.50 Hydraulic Analysis 4.50 Chahml Stability and Scour Assessment _ 4.70 WOFW and Pennk CoPldfnaCun 4.80 Hydreulie !iwestlgetlon Report 4.90 Meetings a Adminlstnation _ 4.100 Feaslbllity Revlew for 50' brido 4.101 Review of temporary bridge dafai!a for-. year in service w r Opib nal t LPb0r SatylgON: S brAVIKOINIM nI UMLIMENTATION8 PERNMING 0 0 0 0 4 a 0 1 0 0 So 5.10 IPMect hUnagement 2 1 14 4 $2,210 5.20 Agency Coordination 3 6 _ $1,072 5.30 NEPAISEPA Documentation 1 5 30 $3.232 540 Biological Assmmerd 40 2c 6e 5 $17,934 550 NHPA Section 106 Evaluation i 4 2 50 2 54,667 E60 JARPA Package Pnepianallon and SubrrfOal 1 5 6 2 40 r2-0 55,522 5.70 Local Permits and Approvals 1 J 1a $I.m 5.80 Biology Support During Cons;rucaon C lions 2 40 $3.547 ago Permit Update-80'8 S e 14 4a $7,867 _ Labor BshbMF+S= 54 a6 100 2 s0 30 1h 9 $47,286 1q)ff Page 7 of 8 October 25, 2019 Jacobs Engineering JE IBIG BOULDER CREEK BRIDGE REPLACEMENT Enr. Group Eav' permx Lead Mp )d Lead Sr. CUti"W Cuff" F6d Ear' Enp—I8lologlsl ' Temmca' Edllw Admin Ilam SCOPE OF WORK $182.07 $117.18 MAI ;188.82 668.60 SA2.3g 1 Met $111.80.58!.28 6 CML ENGINEERING 8.40 P ed Managernmrl B,ZO PSSE I3itl Dace Silo Pnepera5an Plan 9W100.'100 Ad1 Roadway plan and pro01e (31190hOW100 Ad) Typical Sw4.ne and DOWIS (90/10W100 Ad) Detour alien, profile &typlul ¢action 30/9W100I700 Full dosure sgnage plan Civil Stream grading Ter bypass ancUw abutments nc dmvAn I 86srmwebar Site plan and CBPP Civil Special Provisions Clog Cost Estimate 8.30 OC Reviews 8,40 Construction Su rt 1 6.50 Revive cm tract tlOcuments to remove anent bridge work 6.60 Revise contact documents for 60fl Span Laheraubtatal: _ Mrart rnn: iRadmbW*AAAF Sum' 6 5 L0—L 8 115 w00 8 0 g +3g - 0 m 0 0 0 66 161 9 a ss7 7AH ri765., lqyff Page S of a KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: November 12, 2019 ACTION REQUESTED: Request to Approve a Resolution to Appoint Public Works Director to County Engineer for a period not to exceed six months ending April 13, 2020. BACKGROUND: Resolution 2019- placed the Public Works Director (PWD) as Acting County Road Engineer for a period of six months ending November 13, 2019. The County Road Administration Board is requesting Board action extending the PWD placement period. CRAB has been made aware of ongoing recruitment efforts towards securing a full-time County Road Engineer. INTERACTION: Public Works, Auditor's Office RECOMMENDATION: Approve a Resolution Appointing the Public Works Director to serve as Interim County Engineer for an additional period of time not exceeding six months in duration (April 13, 2020). HANDLING: Return one original to Public Works; One copy to the Auditor's Office. ATTACHMENTS: Resolution LEAD STAFF: Mark R. Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - EXTENDING THE PUBLIC WORKS DIRECTOR AS INTERIM COUNTY ROAD ENGINEER FOR AN ADDITIONAL SIX MONTHS ENDING APRIL 13, 2020 WHEREAS: The Board of County Commissioners appointed the Public Works Director as Interim County Road Engineer pursuant to Resolution 2019-077; and WHEREAS: The term of the appointment ends on November 13, 2019, and WHEREAS: Public Works and Human Resources have worked together creating a revised job description (ATTACHMENT A) for Deputy Director/County Engineer and completed a market study setting compensation for the new position; and WHEREAS: The hiring process is expected to exceed the extension date of November 13, 2019 established by the Board with Resolution 2019-077 for hiring a full time replacement County Road Engineer; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby extend the Public Works Director as Interim County Engineer for an additional period of six months ending on April 13, 2020. DATED this 12th day of November, 2019, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Brett Wachsmith, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Laura Osiadacz, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: November 12, 2019 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on Century West Engineering Task Order No. 2 Runway 7-25 Rehabilitation Design BACKGROUND: Century West Engineering was awarded the contract for Bowers Field General Planning and Engineering Services in September 2019 (Resolution 2019-145). Task Order No. 2 for Runway 7-25 Rehabilitation Design Services is being submitted for Board consideration in the amount of $84,173. The initial design budget provided the Washington State Department of Commerce (2019 Capital grant) is for $80,000. The balance will be paid from Fund 101 reserve funds in the absence of re -scoping the Commerce grant. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution authorizing the Chair's signature on Century West Engineering Task Order No. 2 — Runway 7-25 Rehabilitation Design. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution; Task Order No. 2 LEAD STAFF: Mark R. Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - AUTHORIZING THE CHAIR'S SIGNATURE ON CENTURY WEST ENGINEERING TASK ORDER NO.2 — RUNWAY 7/25 REHABILITATION DESIGN WHEREAS: Century West Engineering is currently the service provider to Public Works selected from County procurement process in 2019; and WHEREAS: Task Order No. 2 with Century West Engineering has submitted Task Order No. 2 for Runway 7/25 Rehabilitation and Bidding Services in the amount of $84,173; and WHEREAS: Funding for Task Order No. 2 is anticipated through a pending Department of Commerce Grant; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on Century West Engineering Task Order No. 2 for Runway 7125 Rehabilitation Design. DATED this 12th day of November, 2019, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner E TURY' Exhibit A Scope of Work November 1, 2019_r3 Design Services for Bowers Field Airport Runway 7-25 Rehabilitation GENERAL PROJECT DESCRIPTION, BACKGROUND, & PURPOSE/NEED The scope of the project is to provide engineering design and bidding services for the proposed pavement maintenance on Runway 7-25 at the Bowers Field Airport. The Airport is owned by Kittitas County and is located 2 miles north of the City of Ellensburg. Runway 7-25 at Bowers Field has been previously closed due to unsuitable pavement conditions. Additionally, the previous runway crossed with Runway 29. A previous FAA funded project undertook breaking the pavement between the runways. The Runway 25 pavement was pulverized (full depth reclamation) on either side of Runway 29. 3,700 of Runway 7 pavement was left for an intended future pavement rehabilitation and reopening of the shortened runway. The existing pavement is in poor condition and in need of complete reconstruction. As of the last WSDOT inspection in 2018, the pavement is listed with the following sections and PCI values: * 1,166 LF at west end of runway 0 17 PCI on center 50'; 23 PCI on 50' edges a 3" AC; 3" aggregate base course; 5" aggregate subbase • Remaining approximate 2,534 LF of runway a 34 PCI on center 50'; 45 PCI on 50' edges 0 3" AC; 6" aggregate subbase In order to restore the operation of Runway 7-25, the pavement is planned to be rehabilitated via a maintenance overlay. The scope elements of the maintenance overlay project is asfollows: • The center 60 feet of the existing runway pavement will be recycled with in- place full depth reclamation in accordance with Specification P-207 and a new layer of HMA (WSDOT) will be overlaid on top of the resulting asphalt 1 of 11 as CENTURY 1�"ET fV _.E, R 11,--G.,, aggregate base course mixture. The existing cross sectional shed grade is anticipated to be maintained. Pavement strength is anticipated to be designed to support small aircraft up to 12,500 pounds. The runway is anticipated to be designated as B-1 (small) as indicated in the current Airport Layout Plan. • The outermost 45 feet on either side of the existing runway pavement will be removed and recycled in accordance with Specification P-207 and seeded, similar to what was undertaken on the 201E Pavement Break Project (AIP 3-53-0026-014-2018). • The final runway size will be approximately 3700'X60' and the thresholds will be relocated to the proposed future locations depicted on the current ALP. • It is anticipated the runway will not be lighted and will operate undervisual conditions. Flight procedures may be sought and implemented in the future, but are not part of the assumed initial condition to be implemented within this project. • There will be no modifications to existing taxiway geometry. Airfield taxiway improvements depicted on the ALP are being evaluated as part of an ongoing Environmental Assessment and will be implemented as part of a future project. a Existing drainage patterns will remain unchanged and surfaces disturbed by construction are not anticipated to extend beyond the existing pavement limits. No drainage improvements are included within the project. With the exception of Taxiway C, existing taxiways will be maintained to access the re -opened and shortened Runway 7-25. Taxiway C will be disconnected from the runway and will be fully removed as part of a downstream project. Existing closure X markings on all other taxiways will be removed as part of this project. It is assumed that back taxi access to the new Runway 25 end will be from the existing Taxiway F. At this time no new taxiway will be established to the new Runway 25 end. 4 Existing Runway 7-25 signage will be adjusted in location, or new non - illuminated signage will be installed as necessary. The following tasks are proposed for completion of this project: 2of11 ......... fN. U. A. DESIGN SERVICES TASK 1— PROJECT MANAGEMENT/ ADMINISTRATION Task 1 Work Items: 1. Carry out project administration including, but not limited to monitoring design and project schedules, coordination of project with the County, monitoring and reporting technical and budget issues to the County, and preparation of monthly consultant invoices for submittal to the County. It is assumed the design phase of the project will extend over a 4 month period. 2. Coordinate internal project team and sub -consultants. Two sub -consultants (geotechnical and survey) are anticipated for this project. This effort includes coordinating sub -consultant field work. 3. Conduct in-house QA/QC review of design elements and project deliverables. 4. Develop and provide a project schedule to the Airport. 5. Prepare FAA form 7460 for coordination with FAA's Obstruction Evaluation / Airport Airspace Analysis (OE / AAA). Although no FAA funding is anticipated for this project, coordination and submission of the 7460 form is still required for construction on the airfield. 6. Prepare 7480 forms and submit to FAA for runway re-establishment. This task assumes ongoing coordination with the FAA for runway establishment approval and input of the runway data into the National Flight Data Center (NFDC) and published plates. 7. The construction funding for this project is undetermined at this time. As the County identifies and secures funding for construction, Century West will identify and evaluate any design standard requirements associated with the acceptance of the funding source that will need to be accommodated in the design approach. Should any construction funding source requirements require design elements in conflict with the assumed project elements stated in the description above; a supplemental task order will be undertaken to address any additional design efforts required. Primary Task 1 Deliverables: • Project schedule. • FAA form 7460 (pdf) • FAA form 7480 (pdf) 3of11 CENTURY E: ra 0.1 W' RV .E-Ts . a .N€ TASK 2 - DESIGN SURVEY & PROJECT BASE MAP SET UP (KPG) It is assumed a partial project survey and base map were previously prepared as part of the separate Airfield Environmental Assessment project. Previous topographic survey data collected included Runway 7-25 pavement grades at a 25 foot grid and included centerline and edge grades. Previous topographic survey also included off -pavement grades within an area 500' wide centered on runway centerline for the full runway length plus 300' beyond each runway end. Drainage features, signs, edge lights, reflectors and utilities were also included as part of this effort. As the Runway 25 end of pavement has since been modified, supplemental grade data is necessary. To support runway profile and RSA grading design, and to ensure proposed runway end points are accurate; and to ensure the runway has a clear approach; additional survey data to be collected and mapped will include: • Tie to established local control points. • As -built survey new Runway 25 pavement end established at completion of pavement break project. • Additional topographic survey off the new Runway 25 end of pavement. • Proposed runway threshold/end clear approach field verification Task 2 Work Items: 1. Supplemental Topographical Survey Services This task includes the following: * Validate horizontal and vertical control that was completed as part of the Airfield Environmental Assessment project. Re-establish horizontal and vertical control as necessary. Horizontal and vertical control shall be tied into horizontal (NAD 83(2011)) and vertical control (NAVD 88) points used for the previous topographic survey effort. Validate one benchmark for elevation control and a minimum of two additional points for horizontal control. Utilize Airport PACs and/or SACS if available. • Conduct topographic surveying for the Runway 25 end of pavement: o Determine the location and elevation of the end of runway pavement at runway centerline; o Determine the location and elevation of the end of runway pavement at the outermost edges of runway pavement, o Determine the location and elevation of the end of runway pavement at 25 -foot increments along the end of pavement. 4of11 rr��C��ENT RY -- • Conduct topographic surveying for an area 500 feet wide centered on the Runway 7-25 centerline by 300 feet beyond the new Runway 25 end of pavement: o Collect topographic survey points on a 50'x50' max grid spacing. • Elevations on pavement areas shall be accurate to 0.01 feet and elevations in unpaved areas shall be accurate to 0.05 feet. Incorporate the data collected from the survey into the digital terrain model that was developed as part of the Airfield Environmental Assessment project. A contour map at a scale of 1"=50' will be developed for use in the design and shall be provided to the engineer in PDF and AutoCAD or XML format. The contour interval shall be 0.5 feet. 2. Clear Approach Field Verification Perform field survey to check and verify the approach surfaces of Runway 7 and Runway 25. Field survey for this task will include: • Three shots/views for each runway end. For each runway end/threshold, set up instrument on runway centerline and each edge of approach surface. (Locations will be offset from runway end/threshold as necessary to allow for instrument height.) • Set instrument to view approach surface slope (5.0% for Runway 07 and 5.0% for Runway 25); observe if any obstructions appear within approach slope angle. Take photos through instrument view finder to show results. • If any trees, towers, fences, roadways, and other structures or terrain features appear to be obstructions to the approach surfaces based on these field checks, provide information regarding obstruction type (tree vs. structure, etc.) and general location (east/west of runway centerline, etc) so that additional follow up can be included with final design scope if necessary. Primary Task 2 Deliverables: O Survey base map (CAD and PDF) TASK 3 — GEOTECHNICAL INVESTIGATION (HWA Geosciences) Geotechnical Analysis on Runway 7-25 will be u nderta ken to verify existing conditions of the pavement section, subgrade, and aggregate base materials of Runway 7-25 to inform the pavement rehabilitation design. 5of11 CE TURP '- Task 3 Work Items: Geotechnical work will be performed as follows: 1. Geotechnical tasks: • Conduct Falling Weight Deflectometer (FWD) testing of Runway 7-25 (3,700' length x 60' width), analyze data, and report the findings. 4 Perform select coring of Runway 7-25 (3,700' length and 60' width) to determine existing pavement depths and approximate aggregate base depths and report findings. • Determine existing subgrade density (compaction), gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material. • Determine existing aggregate base density (compaction), gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material. • Determine gradations, soil characteristics, and modulus/California Bearing Ratio (CBR) values of material of pulverized and blended asphalt/base aggregate mix anticipated to be generated from the reclamation process. • Catalog the presence of any ground water and/or low strength (unstable) subgrade areas. Primary Task 3 Deliverables: • Draft Geotechnical Report • Final Geotechnical Report TASK 4- NEPA REVIEW AND DOCUMENTATION The FAA has determined the Runway 7-25 project to be Categorically Excluded from further environmental review pursuant to FAA Order 1050.1 F, paragraph 5-6.4 (e). This determination was provided by FAA via email on October 25, 2019. Task 4 Work Items: This effort is not required. Primary Task 4 Deliverables: None 6of11 CE TUR.Y EST TASK 5- ELECTRICAL, LIGHTING, SIGNAGE, & NAVAIDS It is assumed an electrical investigation and electrical lighting, signage, or NAVAID design is not required for this project. If electrical analysis and design is required, this work will be covered under a separate contract task order. Task 5 Work Items: This effort is not anticipated for this project and is not included within this scope of work Primary Task 5 Deliverables: • None TASK 6- 90% DESIGN Task 6 Work Items: 1. Review task 2 survey data and consolidate plan set base drawing from survey base map prepared under task 2 and previous EA su rvey data. 2. Review and analyze clear approach survey data. Prepare and document clear approach findings in technical memorandum. 3. Review geotechnical data and draft report. Provide comments and coordinate HWA's preparation of final report. 4. Verify or design the pavement transverse and profile grade design. Grade design is anticipated to closely approximate existing grades, as the improvements are only anticipated to replace the inner 60 feet of the existing 150 foot wide pavement area. Slight grade adjustments will be evaluated to ensure surfaces drain surface water and provide suitable operational surfaces. 5. Develop a pavement section design utilizing the FAARFIELD program. The design will developed to support small aircraft (12,500# and under). 6. Develop a construction safety and phasing plan and document for the proposed work that maintains safe operations during construction. 7. Verify and design runway pavement markings for the rehabilitated runway. Pavement markings will be designed per FAA standards. Pavement markings will include taxiway lead-in markings. 7of11 C TU EN RY. T F `� 8. Assess any signage updates necessary with the rehabilitation project. As necessary layout and design non -illuminated signage improvements to be implemented with the project. 9. Prepare 90% level plans for proposed improvements; 18 plan sheets are anticipated. Anticipated plan sheets include: Cover Sheet Legend & Notes Project Site & Survey Control Plan Site Safety and Phasing Plan (1) Site Safety and Phasing Plan (2) Safety & Phasing Notes Erosion and Sediment Control Plan Erosion and Sediment Control Notes and Details Runway 7-25 Rehabilitation Plan & Profile (1) Runway 7-25 Rehabilitation Plan & Profile (2) Runway 7-25 Rehabilitation Plan & Profile (3) Runway 7-25 Rehabilitation Plan & Profile (4) Runway 7-25 Rehabilitation Plan & Profile (5) Grading Details and Typical Sections (1) Grading Details and Typical Sections (2) Pavement Marking and Signage Plan (1) Pavement Marking and Signage Plan (2) Pavement Marking and Signage Details 10. Prepare 90% level draft bidding documents. Bidding documents will include bidding/contract specifications, general and special provisions, technical provisions, and other related sections and forms. Specifications will be developed per WSDOT/APWA standards, supplemented with FAA standard specifications as applicable. 11. Prepare 90% level quantity and construction cost estimates for the project. 12. Review NPDES requirements. Prepare Notice of Intent (NO[) for Airport/County signature and submittal to Department of Ecology (DOE). It assumed that a Storm Water Pollution Prevention Plan (SWPPP) will be prepared by the contractor to receive coverage under the NPDES Construction Stormwater General Permit prior to beginning construction. 13. Prepare four sets of 90% level plans and specifications. Two sets will be submitted to the Airport and two sets will be kept for reference. 8of11 CE TURP 1�T 14. Attend a 90% review meeting (via phone or web conference) with the Airport to review preliminary design and cost. The project manager and project engineer will attend the meeting. Key design components will be developed to a level consistent with a 90% level of completion. Primary Task 6 Deliverables: * 90% level plan documents (18 sheets) * 90% level draft bidding documents (specifications) * 90% level quantity and construction cost estimate * Draft NOI for Airport signature and submittal to DOE TASK 7- FINAL DESIGN Task 7 Work Items. 1. Review 90% level review comments from Airport; address and respond to comments. 2. Prepare final plans for proposed improvements; 18 plan sheets are anticipated. 8. Prepare final bidding documents. 4. Prepare final quantity and construction cost estimates for the project. 5. Prepare four sets of final plans and specifications. Two will be submitted to the Airport, and two sets will be kept for reference. Primary Task 7 Deliverables: Final plan documents (18 sheets) * Final bidding documents(specifications) • Final quantity and construction cost estimate B. ASSUMPTIONS/EXCLUSIONS 1. This project is deemed a NEPA categorical exclusion (LATEX). No environmental site investigations will be performed, and a CATEX checklist will NOT be prepared. 2. Noise contour updates for the new runway configuration are not included within this scope of work. 9of11 CENTURY • `ET 3. It is assumed an electrical investigation and electrical lighting, signage, or NAVAID design is not required for this project. PAPI's, VASI's, edge lights, REIL's, or any other lighting or NAVAID's are not included within this project. The project is limited to non -illuminated sign relocations/installations. 4. No surface or subsurface drainage improvements are included within the scope of the project. It is assumed the existing shed section and drainage patterns will be maintained within this project. 5. The obstruction verification efforts within this scope are limited to visual field survey checks. No aerial mapping or AGIS survey analysis of airspace and obstructions will be performed within this task. Additionally, if obstructions are identified during the field verification, further obstruction analysis orAGIS level surveys would be included in a subsequent task order. 6. It is assumed the County will prepare and conduct their own SEPA review. Preparation of a SEPA checklist is not included in this scope of work. If deemed necessary at a later time, this effort will be covered under a separate contract task order. 7 It is assumed a County clearing and grading permit will not be required for this project. If deemed necessary at a later time, this effort will be covered under a separate contract task order. S. Preparation of a DBE plan and DBE goals is not included within this scope of work. If necessary, this work will be conducted in a separate contract task order. 9. The County shall send the invitation to bid to media outlets for advertisement and pay advertising fees directly. 10. It is assumed the Countywill conduct the bid opening and will prepare the construction contracts with the awarded contractor. The Consultant will not attend the bid opening. 11. Bidding and construction administration support services is not included in this scope of work and will be included in a future contract task order. 12. Pen and Ink updates to the Airport Layout Plan will be required by the FAA. Pen and Ink ALP updates are not included within this scope, but will be part of a future construction support task order. 10 of 11 T A, on- .e�::,:ZENITURT:� .............. 13. The re -opening of the runway assumes visual approaches only. No approach procedures are anticipated to be implemented at this time, and coordination for this would be included within a future task order. C. PROJECT SCHEDULE The general anticipated project schedule is as follows: • Fall 2019 —Winter 2020 Project Design • Spring 2020 Bid (pending construction funding) • Summer 2020 Construction (pending construction funding) A detailed project schedule will be developed as part of Task 1 per this scope of work. 11 of 11 PROJECT TITLE: BOWERS FIELD AIRPORT - RUNWAY 7-25 REHABILITATION CLIENT: KITTITAS COUNTY JOB NUMBER: EXHIBIT B PRINCIPAL SR PROD PRO= SR. PROD PROJ CADD VPIENOR MOR PM ENGR ENGR ENGR DSGN CLER. TOTAL PROJECT' TASK PROIECTTASK 3217.00 5200.00 $151.00 $125.00 5113.00 $85.00 577.00 HRS COST COST DESIGN & BIDDING SERVICES TASK f -Project ManagementlAdministrAtion $15,228.00 I Project Administration (4 mm& period) 0 12 2 2 0 0 12 28 $3,876.00 2 On-site Field Coordinate Project Team (2 trips) 0 1 0 16 0 0 0 17 32,200.00 3 Conduct in-house QA/QC 0 12 0 0 0 0 12 $2,400.00 4 Provide P:njectSchedule 0 2 2 0 it 0 4 5650.00 5 Prepare FAA Farm 7460 & FAA Coordination 0 2 4 0 0 0 6 $900.00 6 Prepare FAA Form 748C & FAA Cocadmation 0 10 2 16 0 11 0 28 54,302.00 7 Asessa Construction. Finding Design Standards 0 2 0 0 0 0 6 $900.00 TASK 2 -Design Survey &. Survey Base MAP Set Up 1.2 Supplemental Topographic Survey KPG fee listed in euboonaultard section TASK 3 -Geotechnical Investigation 1 Geotechnical Imvertigation HWA fee listed in subconsultard section TASK 4- NEPA Review and Documentation 1 No, applicable I Not included TASKS Electrical, Lighting, Signage, & NAVAIDS 1 Not applicable 1 Not included TASK 6-90% Design S36,7B7.00 1 Survey Data Review & Plmr Set Base Map 0 1 0 4 0 0 0 5 $700.00 2 Clear Approach Survey Data Review & Memo 0 2 0 4 0 0 0 6 5900.00 3 Geotech Findiaga & Report Review 0 2 0 4 0 0 0 6 5900.00 4 Pavement Transverse and Profile Grade Design 0 0 2 20 2 0 24 S3,02&00 5 Pavement Section Design 0 2 0 to 10 0 22 52,780.00 6 Construction Safety & Phasing PlanalDocument 0 4 0 10 0 0 14 $2,050.00 7 Design Runway Pavemerd Markings 0 1 0 2 4 0 0 7 $902.00 8 Nam -Illuminated Signage Adjustment Design 0 1 0 4 0 0 0 5 $700.00 9 90% Plans (18 sheets) 0 4 12 56 0 56 0 128 $14,372.00 10 90% Bidding Documents (Specifications) 0 2 16 32 0 0 8 58 $7,432.00 11 90% Quantities and Cast Estimate 0 1 1 4 6 0 0 12 $1,529.00 12 NPDES Away ment and NOI 0 0 1 - 0 0 3 S40L00 13 Prepare Submitted Set 0 0 0 - 0 L 4 7 $643.00 14 90% Review Meeting (Phare Conference) 0 1 0 0 0 3 3450.00 TASK 7 -Final Design 513,320.00 I Review and Address 90% commend 0 2 0 4 4 0 10 51,352.00 2 (Final Plans (18 sheets) 0 2 12 24 0 24 0 62 57,252.00 3 Find Bidding Documents (Specifications) 0 2 4 8 0 0 8 22 $2,620.00 4 Fnml Quantities and Coal Estimate 0 1 1 2 4 0 0 8 $1,053.00 5 Prapars Final Sabmittal Set 0 2 0 2 0 L 4 9 31,043.00 Labor Subtotal EXPENSES: Travel: Lodging RentalC /Fm"ilsge Airfare Meals ]Misr. expenses: MISC PHOTO COPIES POSTAGE PRINTING PLOTTING FIELD SUPPLIES Sub -Consultand: Tcpograpidc Survey (LPG) Geotechnical (FWA) 0 71 53 240 30 82 36 112 $65,335.00 565,335.00 Cast Air Ground R.T. Per Unit Trips Trips Days Niles Markup $0.00 0 1.0 $0.600 3 223 1.0 $0.00 0 0 1.0 $30.00 0 1.0 LO 1.0 $0.00 $401 So.00 $0.00 $100.00 550.00 $20.00 $500.00 3200.00 $0.00 56,802.00 510,765.00 Subtotal - Expenses 31,271.40 Subtotal - Subconrultents 517,567.00 Total - $84,173 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: November 12, 2019 ACTION REQUESTED: Request to approve a Resolution Authorizing Chair Signature on KPFF Task Order No. 16, Supplement No. 3 - Big Boulder Creek Bridge Replacement BACKGROUND: Responding to a Forest Service load restriction to the Big Boulder Creek Bridge in 2018, Public Works engaged KPFF for a bridge replacement design (Resolution 2018- 160 for $173,000). The resignation of the Engineering Services Manager necessitated an additional $35,000 in engineering costs with Supplement No. 1. The lack of project bidders forced Public Works to reduce the bridge replacement design to setting a temporary bridge only with Supplement No. 2. The total cost for design services is now $228,000. Public Works has negotiated a final supplement in the amount of $20,000 to produce a revised final design that targets the placement of a 60 foot bridge on precast foundations. Sub -consultants Watershed Science and Engineering and Jacobs are not requesting additional compensation for the redesign effort. Sub -consultants Hart Crowser (Geotechnical) and KPFF civil division are seeking compensation with a minimal amount from KPFF Bridge Division. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution authorizing the Chair's signature on KPFF Task Order No, 16, Supplement No. 3 for Big Boulder Creek Bridge Replacement. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Task Order No. 16, Supplement No. 3 with KPFF LEAD STAFF: Mark R. Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019 - AUTHORIZING CHAIR SIGNATURE ON SUPPLEMENT NO.3 TO TASK ORDER NO. 16 WITH KPFF FOR BIG BOULDER CREEK BRIDGE REPLACEMENT WHEREAS: The Kittitas County Board of County Commissioners (Board) did authorize the Big Boulder Bridge Replacement with KPFF on 10/20/2018 (Resolution 2018- 160); and WHEREAS: The Board supplemented the KPFF task order with two supplements to the original Task Order No. 16 (Resolutions 2018-203 and 2019-099); and WHEREAS: No contractors elected to bid the KPFF permanent bridge replacement design; and WHEREAS: Public Works has negotiated a revised final design that several contractors have noticed their willingness to bid; NOW, THEREFORE BE ff RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby supplement KPFF Task Order No. 16 for $20,000.00 for a final Task Order cost of: $248.,000.00. DATED this 12th day of November, 2019, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 kpff.com October 25, 2019 Mark Cook, PE Kittitas County Public Works 411 North Ruby, Suite 1 Ellensburg, WA 98926 Subject: Kittitas County On -Call Agreement KCPW 2017-19ENG2 Supplement #3 for Task Order 16 Dear Mark: 5 wr6l_ :9J This letter addresses the scope and fee for additional work discussed between the County and KPFF conforming to the project goals and final development of the PS&E contract documents. The new scope items are to prepare revised contract bid documents for a 60 foot bridge span with precast footings. Pursuant to accomplishing this additional work, we request an additional budget of $20,000, bringing our total not -to -exceed amount for this Task Order to $248,000. A breakdown of the additional fee for Task 16 is attached. Additional tasks for Supplement #2 include: 1.70, 3.52 and 6.60. If you have any questions, please feel free to call me at (206) 926-0442. �EGA�,p,7E6... 7y3 7HEco1 L� KIITMS CO1UN 'Y KITTITASi CO MW DEPARTMENT OF PUBLIC WORKS Formal Task Order Document KPFF Task Order Number 016 Maximum Amount Payable $248,000 Completion Date 12/30/2019 The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- 19ENG2) shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: Big Boulder Creek Bridge Replacement Description of Work: KPFF will prepare the PS&E documents for the replacement of the Big Boulder Creek Bridge in coordination with Kittitas County staff. The design team includes: KPFF — Project Management, Structural and Civil Engineering Hart Crowser — Geotechnical Engineering Watershed Science and Engineering — Hydraulic Engineering Jacobs — Environmental/Permitting Tentative Project Advertisement is April 2020, but will be dependent on permitting, fish windows, and bridge procurement schedules. The existing timber bridge is located on Cle Elum Valley Road over Big Boulder Creek approximately three miles north of the Salmon La Sac Campground. The bridge is currently posted for a 5 Ton weight limit due to scour at the timber sill foundation. The County prefers to replace the bridge with a single lane prefabricated superstructure. TASK 1 PROJECT MANAGEMENT KPFF will manage the development of the PLANS, SPECS & ENGINEERING COST ESTIMATE (PS&E) in such a manner to ensure the County is able to achieve the desirable bidding date. This effort will include appropriate in-house duties such as invoicing, contract Goas...m� DEPARTMENT OF PUBLIC WORKS Eff=AS COUNW compliance assurance, file and staff organization, client communications (emails and telephone), and general project oversight. Project Management tasks include: 1.1 Project Team Management and Coordination 1.2 Monthly Progress Reports/Invoices (Assume 8) 1.3 Monthly Project Progress Meetings/Minutes (Assume 8 meetings, held via teleconference) 1.4 Coordination with WDFW (Assume 8 hours) 1.5 Management Reserve - allocation of the reserve funds for additional out of scope tasks based on written approval of the County 1.6 Project team coordination for addendum & design change 1.7 Project team coordination for revised design TASK 2 STRUCTURAL ENGINEERING KPFF shall perform the structural engineering analysis and design of the Big Boulder Creek Bridge substructure. KPFF shall perform appropriate analysis and design calculations in accordance with the most current edition (at the time of NTP) of the WSDOT Bridge Design Manual (BDM) and the AASHTO LRFD Bridge Design Specifications, and the Local Agency Guidelines. Considering the location and use of the bridge, alternative criteria, such as Forest Service guidelines, may be considered to reduce construction costs. TASK 2.1— Project Kickoff Meeting and Site Visit A project kickoff meeting will be held at the existing bridge site. TASK 2.2 — Alternative Analysis Memo Brief memo to summarize site constraints, design criteria and preferred bridge structure TASK 2.3 — Development of PS&ElContract Bid Documents TASK 2.31—Plan and Calculation Preparation • Project Cover Sheet General Notes and Quantities Bridge Layout - plan and elevation Structural notes Foundation Plan — Layout Foundation Design and Details �L �nVS... ro ' c F, DEPARTMENT OF PUBLIC WORKS MTTITAS COUNTY • Wingwall Layout/Details TASK 2.32 — Structural Special Provisions TASK 2.33 — Cost Estimate TASK 2.34 — Deliverable preparation TASK 2.40 — Quality Control Checks and Reviews TASK 2.50 — Technical Collaboration Structural design engineers will coordinate with survey, civil, geotechnical, hydraulics and environmental engineers for project design and contract coordination. TASK 2.60 — Construction Support If needed to provide support during construction to respond to BFI's and review submittals. TASK 2.70 — Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for 1 year rather than originally anticipated 3 month duration. TASK 2.80 — Revise Contract Documents Update plans, specifications and estimate and issue and addendum to the contract bid documents as necessary to limit 2019 construction work to installation of temporary detour road and bridge. TASK 3 GEOTECHNICAL ENGINEERING TASK 3.10 — Planning and Research Hart Crowser will review readily available geologic maps and water well logs that cover the site vicinity, and other reports and plans provided by others (if any) for general information regarding subsurface soil and groundwater conditions and geologic hazards. hDs...-0 oa` der �a r E=ASCOUNTY HZTT=TAB. CO DEPARTMENT OF PUBLIC WORKS Hart Crowser will coordinate field explorations with KPFF, Kittitas County, USFS, drilling subcontractors, and internal staff. If required, Hart Crowser will submit a traffic control plan for review by the County. TASK 3.20 — Fleld Work TASK 3.21— Site Reconnaissance and Utility Locates Hart Crowser will conduct a reconnaissance to get familiarized with the site. Relevant features will be noted, and the proposed exploration location marked for the utility locators. Hart Crowser will notify "One -Call" service for public utility locates. TASK 3.22 — Field Explorations Hart Crowser will advance one boring near the south side of the bridge. (The north side of the bridge cannot be accessed with drilling equipment due to load restrictions.) The boring will be advanced using a TSi 150CC Sonic Drill, which can typically penetrate through boulders and similar materials. The boring will be advanced until one of the following criteria is reached: 1) the boring penetrates 10 feet into rock, 2) refusal occurs within nested boulders, or 3) we reach a depth of 50 feet. If thick soil layers (sand, gravel, ctc.) are encountered, then occasional soil samples will be obtained by driving split -spoon samplers in accordance with the standard penetration test (SPT) procedure (American Society for Testing and Materials [ASTM] D 1586). Hart Crowser will observe the exploration, log the subsurface conditions, collect representative soil and rock samples, and transport the samples to the laboratory for further visual evaluation and testing. The borehole will be backfilled in accordance with Department of Ecology regulations. The upper 1 foot of the borehole will be patched with gravel surfacing. Excess spoils from the borehole will be spread on the ground adjacent to the borehole. If required, Hart Crowser's subcontractors will provide traffic control services during drilling. TASK 3.23 — Sample Review and Laboratory Testing Soil and rock samples obtained from the explorations will be visually classified in the field by Hart Crowser and in Hart Crowser's geotechnical laboratory based on the Unified Soil Classification System (USCS) and ASTM classification methods. Hart Crowser will conduct a series of geotechnical laboratory tests on selected soil and bedrock samples obtained from the explorations to evaluate the engineering and index properties of the site soils. The specific tests conducted will depend upon actual G0ppES ... Tb Tt/E 10yriTAS WuNTY KZTTZTg45i CO DEPARTMENT OF PUBLIC WORKS conditions encountered. For budgeting purposes, Hart Crowser has assumed the tests will include up to eight moisture content determinations, one Atterberg limits determination, three grain -size distribution tests, and one unconfined compressive test. TASK 3.30 — Office Work TASK 3.31— Engineering Analysis and Consultations Hart Crowser will conduct engineering analyses to evaluate seismic hazards, ground settlement, abutment stability, foundation and retaining wall alternatives and design parameters, and earthwork guidelines. Engineering analysis will be completed in general conformance with appropriate Washington State Department of Transportation (WSDOT) design manuals. Hart Crowser will consult with the design team regarding their findings and foundation alternatives. TASK 3.32 -- Geotechnical Reporting Hart Crowser will prepare a geotechnical report to document their findings and recommendations. The geotechnical report will address design and construction issues, including: • Site and boring location plan(s); • Description of subsurface soil, rock, and groundwater conditions; • Site preparation and earthwork recommendations; Seismic hazards and WSDOT-based seismic design parameters; Temporary and permanent abutment foundation alternatives, design recommendations, and stability; Retaining wall alternatives and design parameters; and Construction considerations. A draft report will be provided to the design team for review and comments. A final report will be prepared that addresses review comments from the design team. TASK 3.33 — Project Management and Meetings Hart Crowser will provide geotechnical project management and support services, including coordinating staff and subcontractors and conducting telephone consultations and email communications with the design team. Hart Crowser will attend up to one meeting at KPFF's office. �`4�ApBs... KZTTZTg93 4c4oiumw b DEPARTMENT OF PUBLIC WORKS MTMAS COUNf1' TASK 3.40 — Construction Support The geotechnical engineer will provide support during construction to respond to RFI's or changes in field conditions. TASK 3.50— Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for 1 year rather than originally anticipated 3 month duration. TASK 3.60— Revise Geotechnical Recommendation for 60ft Span Hart Crowser will provide geotechnical project management and support services, including coordinating staff and conducting telephone consultations and email communications with the design team. Hart Crowser will attend up to two teleconferences. Hart Crowser will conduct engineering analyses to provide revised estimates of ground settlement and abutment stability for a precast concrete abutment system for the revised bridge length. Hart Crowers will also develop geotechnical design parameters and evaluate global stability for the GRS-IBS system alternative. Engineering analysis will be completed in general conformance with appropriate Washington State Department of Transportation (WSDOT) design manuals. Hart Crowser will consult with the design team regarding their findings. Hart Crowser will prepare a geotechnical report supplemental to document their findings and recommendations. The supplement will address design and construction issues, including: • Updated foundation design and construction considerations • Updated abutment settlement and global stability estimates and construction considerations • Geotechnical design parameters for the GRS-ISS system • GRS-IBS settlement and global stability estimates and construction considerations A draft supplement will be provided to the design team for review and comments. A final supplement will be prepared that addresses review comments from the design team. ..r.pPES... TO ao- E=rrA5 CO 3kKZTTX13rJk 9 CO DEPARTMENT OF PUBLIC WORKS Hart Crowser will start analysis and reporting immediately upon receiving notice to proceed (NTP). We estimate that the engineering analyses and draft geotechnical report supplement should be completed approximately 3 weeks after NTP. However, Hart Crowser will consult with the design team regularly to provide the results of our analyses and recommendations. TASK 4 HYDRAULIC DESIGN Watershed Science & Engineering (WSE) will provide hydraulic engineering services for the Big Boulder Creek Bridge Replacement Project in Kittitas County, Washington. WSE will lead the hydraulic engineering portions of the project which will include completing the following tasks. TASK 4.10 — Data Collection and Review WSE will collect and review existing data and information needed to complete the hydraulic investigation. Data will include but not be limited to topographic maps including LiDAR data, historical aerial photos, flood data, bridge maintenance records, and anecdotal information on past flood events from County maintenance staff. Assumptions: • County will supply relevant data they possess TASK 4.20 — Site Inspection WSE will conduct a one -day field inspection to examine the crossing and Big Boulder Creek. WSE will examine hydraulic and geomorphic characteristics, sediment transport, debris flow potential, lateral erosion, and scour. Assurn tions: • NTP is received in time to allow WSE to visit the site before snow fall. TASK 4.30 — Channel Survey WSE will survey up to eight cross sections and a longitudinal profile of the stream channel as part of the site inspection task above. WSE will merge the stream channel data with the County's survey to develop a single topographic base map required for the hydraulic investigation. Assumptions; County will or has collected detailed topographic data within the road right-of-way. DES -TO 7c�G KZTTZTAB COUNTY DEPARTMENT OF PUBLIC WORKS EaFFITA8 CUUNTY TASK 4.40 — Hydrology WSE will use USGS regional regression equations to estimate annual instantaneous peak design flow rates. The design event for flow and scour will be the 100 -year flood and the check flood for potential damage will be the 500 -year event. The 500 -year event is not the design event, it is solely used to assess risk in -order to identify any remaining significant erosion or scour issues that might need to be addressed in the design. Assumptions: USGS regression equations will provide reasonable estimates for the 100 -year and 500 - year annual instantaneous peak flows. If they do not, WSE will use alternative methods to estimate the flows. TASK 4.50 — Hydraulic Analysis WSE will develop a simple HEC -RAS model of Big Boulder Creek in the vicinity of the bridge crossing using topographic base map. The model will not be calibrated because observed discharge/highwater marks are not available. Instead, WSE will use engineering judgment to select and adjust model parameters. The model will be used to help size the bridge waterway, to provide data required to evaluate lateral erosion and scour potential, and to develop countermeasures. TASK 4.60 — Channel Stability and Scour Assessment WSE will determine if lateral erosion, local scour, ice, or debris flows pose a threat to the proposed crossing. If they do, WSE will work with KPFF-to address these hazards in the design. Assumptions: These hazards will be addressed through modifications the structure itself (e.g. deeper foundations, longer bridge, etc.) and not through design and installation of external countermeasures (e.g. riprap). If countermeasures are required, the optional task at the end of this scope will be completed. TASK 4.70 — WDFW and Permit Coordination It is anticipated that WDFW personnel have an idea of the length of crossing they would like to see at the site. WSE will work with WDFW personnel, the County, and Jacobs (the company that will acquire the project permits) to collectively arrive at a bridge length that is acceptable to all parties. An allowance is provided for WSE's lead engineer to participate in one meeting with WDFW personnel in Ellensburg. Assumptions: p9E5... To 126 4o- * . r` ... L. 3kKI1rTxgrAL0 CO ► DEPARTMENT OF PUBLIC WORKS • A reasonable bridge length will be agreed to that the County can afford to build. TASK 4.50 — Hydraulic Design Report WSE will prepare a hydraulic design report to summarize and document the results of the investigation. It will include the recommended NBIS Scour Code rating for the new structure, a code that the County will need for their records. Assumptions: A draft of the report will be provided to the County and KPFF for review. Upon receipt of comments, WSE will refine the report and submit a final version as a PDF. TASK 4.90 — Meetings and Administration An allowance is provided for WSE personnel to attend one meeting at KPFF's Seattle office to discuss the design and one meeting in EIlensburg to meet with the County. Assam tiU ons: • WSE will develop concept sketches of the countermeasures which will be provided to KPFF. KPFF will prepare detailed plans to be incorporated into the project plan set. • WSE will recommend specifications for the countermeasures. WSE has included a modest cost for this task in the accompanying cost estimate. This estimate will be revisited and may need to be revised once the type and scale of countermeasures required are identified. • At this time it is assumed that scour and erosion protection countermeasures are not necessary and have not been included in the fee TASK 4.100 — Feasibility Review Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for cast -in-place abutments. Evaluate design for using temporary detour bridge for I year rather than originally anticipated 3 month duration. TASK 5 ENVIRONMENTAL/PERMITTING The Jacobs team will deliver Environmental Documentation and Permitting in coordination with KPFF and Kittitas County staff. TASK 5.10 — Project Management ��pgG/,9Fs ... TO 3NEC KZTTZTA93 CO DEPARTMENT OF PUBLIC WORKS IQTMAS - 1. Project planning, team direction and coordination and ongoing client communication 2. Project Controls a. Prepare monthly invoices and back-up, and monthly progress reports. b. Monitoring and updating Environmental delivery schedule. 3. Deliverables a. Monthly progress reports and invoices TASK 5.20 — Agency Coordination 1. Agency Coordination a. Coordinate with Kittitas County Public Works, Kittitas County Community and Development Services, Department of Fish and Wildlife, Department of Ecology, US Army Corps of Engineers, and other agencies as needed. b. Coordination items include impact analysis, permits required and timelines, and facilitated review of project milestones as needed. TASK 5.30 — NEPA/SEPA Documentation 1. NEPA/SEPA Documentation a. Research and prepare one (1) NEPA Categorical Exclusion (CE) form b. Research and prepare one (1) SEPA Checklist and Draft DNS if needed TASK 5.40 — Biological Assessment 1. Biological Assessment a. Field Reviews b. Prepare one (1) Biological Assessment, assumed to be formal consultation with both Services. c. Provide ongoing coordination with agencies throughout the review/approval process. TASK 5.50 — NHPA Section 106 1. NHPA Section 106 Evaluation a. Develop Area of Potential Effects (APE) and coordinate with SHPO. b. Evaluate cultural and historic resources within the project area of effect as per Section 106 requirements. TASK 5.60 — JARPA Package Preparation and Submittal 1. JARPA Preparation and Submittal a. Populate and submit one (1) JARPA application package. b. Coordination with federal and/or state agencies for the following permits: i. Corps 404 permit, United States Army Corps of Engineers (Assumes Nationwide Permit) ii. Hydraulic Permit Approval (HPA), WA State Dept. of Fish & Wildlife iii. Ecology 401 permit review including development of TESC and SWPPP. TASK 5.70 — Local Permits or Approvals ;,nors ... To zw�c x31=31WA15 CO ti. DEPARTMENT OF PUBLIC WORKS [a1-rrrns counrrY 1. Local Permits or Exemptions a. Coordinate with Kittitas County CDS on SEPA, Shorelines, and Critical Areas requirements. TASK 5.80 — Biology Support During Construction 1. Support services during construction, including worksite isolation support, fish salvage and removal, planting or site stabilization guidance up to 40 hours. This task is not subject to Assumption 1a. TASK 5.90 — Permit Update Submit updated permits to reflect revised bridge span. Update permits to allow single creek crossing for equipment to install temporary bridge and detour roadway. Assumptions: • Coordination with FHWA or WSDOT Local Programs will not be required. • The Biological Assessment that will be prepared will be "Likely to Adversely Affect" for Bull Trout and Steelhead, and will require formal consultation with both USFWS and NMFS. • The US Army Corps of Engineers will issue a CWA Section 404 NWP 14. No individual permit will be required. • Section 106 will be determined as "May Affect", and will require SHPO concurrence The Department of Ecology will issue a Letter of Verification for CWA Section 402. No individual permit will be required. • No wetlands will be impacted by the project. This Scope does not include wetland delineations or reporting. No NPDES Permit will be required. • SEPA will be exempt. • If the level of effort and cost for permit or approval acquisition is higher than the budget amount, Jacobs will coordinate with KPFF and the County to determine amendments as needed. • No mitigation planning is included in this scope of work. TASK 6 CIVILIROADWAY ENGINEERING KPFF will provide civil engineering support for the replacement of Big Boulder Creek Bridge. Civil design criteria will be Kittitas County Code Chapter 12- Roads and Bridge Standards and as supplemented by the WSDOT Design Manual or AASHTO's Policy on Geometric Design of Highway and Streets. -A, VS ... To The c ]G=AS COUNTYf f� IKZTTZTgiS CO DEPARTMENT OF PUBLIC WORKS TASK 6.1— Civil Project Management • Attend six (6) progress meetings via teleconference. • Prepare invoice progress reports TASK 6.2 — Development of PS&ElContract Bid Documents Plan Preparation for 30%, 75%, 100% draft, 100% Ad • Site Preparation Roadway plan and profile Typical sections and details • Detour plan, profile and typical section Full Closure Signage Plan Supporting Work: • Civil stream grading for stream bypass. • Prepare Stormwater Site plan and Construction Stormwater Pollution Prevention Civil Special Provisions • Provide WSDOT run list format civil technical special provisions Civil Cost Estimate • Provide quantities and unit prices for civil elements of work TASK 6.3 — Quality Control Checks and Reviews KPFF senior civil engineering staff will QC all civil design deliverables. TASK 6,40 — Construction Support If needed to provide support during construction to respond to RFI's and review submittals. TASK 6.50 — Revise Contract Documents Update plans, specifications and estimate and issue an addendum to the contract bid documents as necessary to limit 2019 construction work to installation of temporary detour road and bridge. TASK 6.50 — Revise Contract Documents for 60ft Span Update plans, specifications and estimate and issue revised contract bid documents as necessary for a 60ft long bridge. DEPARTMENT OF PUBLIC WORKS IQTPITA5 COUNTY Assam tip ons: • Existing ROW and survey basemap control provided by County will be depicted on civil drawings. Temporary Construction Easement (TCE) limits will be defined on Civil Site Preparation plan. Legal Descriptions of TCE's, including TCE documentation and acquisition will be performed by the County. - Temporary Erosion and Sediment Control (TESC) plans will not be provided, a performance spec will be used for TESC. For Stormwater Management it is assumed the project is considered Road Preservation per SWMMEW Section 2.1.4 and therefore only needs to meet core requirement #1 and #2 as scoped above. Preparation of the Construction SWPPP will be a bid item and prepared by the Contractor. • Approach guardrail systems will not be required. Bridge railings will be signed with hazard object markers. PROJECT DELIVERABLES: Alternatives Analysis Memo (Draft and Final) 2. 30% Plan Set (Permit set. 3 sheets estimated. Layout, Elevation, Cross-section, structural notes, Cost Estimate) 3. 75% Plan Set (6-8 sheets, updated cost estimate, GSP run -list, 30% comment resolution) 4. 100% Draft Plans (6-8 sheets, updated cost estimate, PDF of ESP's or run -list and PSE files, pending final review by county, 75% comment resolution and complete PS&E) 5. 100% Stamped and Signed Plans (Contract Documents — bid ready) 6. Geotechnical report (Draft PDF and Final PDF + 3 hard copies) 7. One (1) NEPA CE and ECS Form 8. One (1) NHPA Section 106 Compliance Memo 9. One (1) Biological Assessment (Formal Consultation) 10. One (1) SEPA Checklist (Unless Exempt) 11. One (1) JARPA package for delivery to USACE, WDFW, and WDOE 12. Local Agency correspondence for each permit, approval, or exemption PROJECT ASSUMPTIONS: 1. COUNTY to provide KPFF with the project survey base map. County will collect additional data as necessary as requested by KPFF. Contours shall be in at least 2 foot increments and shall preferably extend at least 200 feet to the north, south, east and west of the proposed project limits to include all utilities, driveways, ditches, �CP�pL+rs...'fo 7NFC DEPARTMENT OF PUBLIC WORKS INICI=AS .N•Y ROW/property lines and other items which are reasonably likely to impact the bridge layout and design. 2. KPFF to provide specifications related to the PS&E they develop (bridge portion only). 3. New bridge is assumed to be designed for one 12 foot lane, and two 2 foot shoulders and no sidewalks. 4. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as prescribed by COUNTY Civil roadway design. 5. There will be no drains on the bridge. 6. Bridge superstructure is assumed to be prefabricated and designed and supplied by the Contractor during construction. 7. Load rating report will be provided by bridge superstructure supplier. 8. COUNTY will prepare Division 1 and assemble special provision package and bid package. 9. COUNTY will acquire 60ft prefabricated bridge superstructure separately from this Contract. Cost Breakdown: See Attached Project Schedule: KPFF will provide a FDF of the plans for the 30%, 75%, and 100% design at the dates shown below. For efficiency, the design will continue following milestone submittal while the county performs review of the submitted plans. The COUNTY will endeavor to complete and return to KPFF all comments as soon as possible following receipt of them, but in no case more than 10 business days following the submittal date. Milestone Milestone Description — Structural Description — Civil Delivery Date 30% November Permit set. 3 sheets estimated. Permit set. Roadway plan ' 2018 Layout, Elevation, Cross- and profile and detour section, basic notes plan and profile. Typical sections. 7S % January 2019 6-8 sheets, all items including 5-7 sheets, all items further development of the including further notes, specs, and quantities. development of the notes, specs, and quantities. 100 % Draft March 2019 6-8 sheets, all items developed 5-7 sheets, all items and ready for construction, developed and ready for pending final review by County. construction, pending �ha[AtW�.—TOT Y IUMTASCCMNT KITTIT2LE3 COUNTY DEPARTMENT OF PUBLIC WORKS Completion Date: January 30, 2020 Agency Signature: Consultant Signature: Date: Date: IT/11 Complete PS&E. final review by County. Com fete PS&E. 100% Stamped April 2019 Stamped and Signed Contract Stamped and Signed and Signed Documents — bid ready. Contract Documents — bid ready. Addendum June 2019 Prepare amendments Pr are amendments 100% Draft December Draft 100% for 60ft Structure Draft 100% for 60ft 2019 Structure 100% December Stamped and signed Contract Stamped and signed Stamped 2019 Documents Contract Documents Completion Date: January 30, 2020 Agency Signature: Consultant Signature: Date: Date: IT/11 Exhibit D-1 KPFF Consulting Engineers Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement Kltt►tas County On -Call Task Order #96. BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 136.25% Fixed Fee (FF) 28.00% Classification Direct Hourly Total X Negotiated _ - Cost Rate Hours Hourly Rate Principal $ 64.91 18.00 X $171.52 = $ 3,087.44 Protect Manager $ 45.29 121.00 X $119.68 = $ 14,481.14 _ Techrsical Specialist T $ 64,91 46.00 X $171.52 = $ 7,890.14 Structural Task Lead $ 45.29 154.00 X $119.68 = $ 18,430.54 Project Engineer $ 43.27 200.00 X $114.34 = $ 22,868.20 -Design Engineer _$ 36.93 208.00 X $97.59 = $ 20,298.21 CAD Techmdar, $ 46,04^ 278.00 X $121.66 = $ 33,821.67 Project Coordinator $ 28.85 20.00 X $76.24 = $ 1,524.72 Intern $ 22.00 0.00 X $58.14 = $ - Admin $ 23.08 0.00 X $60.99 = $ - ��� 0.00 X $0.00 = $ - ���W�_�__. � 0.00 X $0.00 = $ - ' 0.00 x $0.00 - $ - Subtotal $ 122,402.05 Reimbursables Mileage 220 Miles x $0.546/mile) $ 119.90 Airfare (Allowance) Per Diem (Hctel + Meals @ $#.## x # trips) Subcontract (Sub Name & Task) Allowance) Subtotal $ 119.90 Subconsultant Costs (See Exhibit E) Management Reserve $109,418.04 $15,673 GRAND TOTAL: $247,612.99 Exhibit E-1 Hart Crowser, Inc. Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 224.46% Mileage (500 Miles x $0.545/mile) $ 218.00 Fixed Fee (FF) Hart Crowser Laboratory - Task 2.3 28.00% 1,100.00 Drilling Sub. Holt Services - Task 2.2 $ 4,500.00 Classification Direct Hourly Total X Negotiated = Cost Subtotal Rate Hours Hourly Rate Senior Principal $ 88.86 0.00 X $313.20 = $ - Principal $ 74.38 38.00 X $262.16 = $ 9,962.07 Senior Associate $ 62.22 0.00 X $219.30 = $ - Associate $ 52.63 0.00 X $185.50 = $ Project $ 43.70 0.00 X $154.03 = $ - _Senior Prolect $ 36.06 70.00 X $127.10 = $ 8,896.80 Senior Staff $ 32.22 38.00 X $113.56 = $ 4,315.38 Staff $ 26.50 0.00 X $93.40 = $ - Senior Drafter $ 32.04 14.00 X $112.93 = $ 1,580.99 Drafter $ 30.23 0.00 X $106.55 = $ - Project Assistant $ 29.96 13.00 X $105.60 = $ 1,372.76 Subtotal $ 26,128.00 Reimbursables Mileage (500 Miles x $0.545/mile) $ 218.00 Laboratory Testing ^ Hart Crowser Laboratory - Task 2.3 $ 1,100.00 Drilling Sub. Holt Services - Task 2.2 $ 4,500.00 Traffic Control Sub. Northwest Barricade - Task 2.2 $ 2,500.00 B&O Tax on Subs 1.5% of Holt and Northwest Barricade $ 105.00 Subtotal $ 8,423.00 GRAND TOTAL: $34,551.00 Exhibit E-1 Watershed Science & Engineering Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 188.43% Fixed Fee (FF) 28.00% Classification Principal Senior Engineer 1 Junior Engineer Contract Administrator Reimbursables Mileage Airfare Per Diem Subcontract (Blank) _ Subtotal Direct Hourly Rate $ 67.31 $ 59.62 $ 30.77 $ 30.00 Total X Negotiated _ Hours $ Hourly Rate 76.00 X $212.99 5.00 X $188.66 = 95.00 X $97.37 = 3.00 X $94.93 = (400 Miles x $0.545/mile Cost $ 16,187.17 $ 943.28 $ 9,249.72 $ 284.79 Subtotal $ 26,664.95 (Allowance) (Hotel + Meals @ $#.## x # trips) (Sub Name & Task) (Allowance) $ 218.00 $ - $ 218.00 GRAND TOTAL: $26,882.95 Exhibit E-1 Jacobs Engineering Consultant Fee Summary Negotiated Hourly Rate Consultant Agreement BIG BOULDER CREEK BRIDGE REPLACEMENT Overhead (OH) Cost 117.00% Fixed Fee (FF) 28.00% Classification Direct Hourly Total X Negotiated = Cost Rate Hours Hourly Rate Env, Group Lead $ 66.15 54.00 X $162.07 = $ 8,751.65 Env. Project Manager $ 47.83 66.00 X $117.18 = $ 7,734.11 Permit Lead $ 33.80 100.00 X $82.81 = $ 8,281.00 Sr. Cultural $ 76.13 2.00 X $186.52 = $ 373.04 Cultural Field Tech $ 28.00 50.00 X $68.60 = $ 3,430.00 Env. Engineer Jr $ 33.63 30.00 X $82.39 = $ 2,471.81 Biologist $ 33.80 181.00 X $82.81 = $ 14,988.61 Technical Editor $ 45.55 9.00 X $111.60 = $ 1,004.38 Admin $ 25.00 4.00 X $61.25 = $ 245.00 Subtotal $ 47,279.59 Reimbursables Mileage (500 Miles x $0.5451mile) $ 272.50 Airfare (Allowance) _ - $ - Per Diem (Hotel + Meals @ $144/day x 3days) $ 432.00 Subcontract (Sub Name & Task) $ - (Blank) Allowance) $ - Subtotal $ 704.50 GRAND TOTAL: $47,984.05 October 25. 2619 KPFF C-inging EngYieers KPFF BIG BOULDER CREEK BRIDGE REPLACEMENT Pdncfpel PmJeu TeehNcal Shudural PmJect CAD -P-,q-- Menew 6pecia6sl Task t.aad Eiglneer Te hNaen Coordnseor 11 Item SOOPE OF WORK $171MIS119.681 $171.62 $119.66 5714.64 $121.66 $76.74 1 PROJECT MANAGEMENT 1.10 Project Team Management and Coordination so $7,181 1.20 Monthly Prowess ReporWirwolces 8 12 61.872 1.30 MordNy Projed Progress MwirgdMim"s 16 6 _ $2872 1.40 CoordinatimWthWOFW a --sBe1 1.60 Team Caordina6an for design change 6 S9si 1.70 Team Coordlna8en for revised deal 7 SEaB Labor Subtotat: 167 18 $10.178 S17B.90 I Page 1 of Ootober25, 2018 KPFF COmatling Englnees KPFF BIG BOULDER REPLACEMENT CREEK BRIDGE Princpnl Mmmger BpedatlGt Tmkl.ead Eng -1 Technical Strudral in T-M�idan c� iP..' loan I SCO PEOFWORK 5171.52 $1t9.6a $1T1.62 $119.66 $114.34 $121.66 $7624 6 CIVIL ENGINEERING 6.10 Pro)eg Management 2 1 4 $2.7=2__ 6.70 PSdE Bad Docs Ste Preparation plan(901t001100 Ad) 2 14 $9,079 Roadway plan and profile (3(%P601100f100 Ad) 2 20 S5.5so Typical Sections and Details (9011001100 Ad) 2 12 $3,250 Detour plan, pm0de 8 typkad section 30180!1001100 Ad 4 24 $6.500 Full closure signage plan 2 12 $3260 Civil Bkeam grading for bypees andfor abutments no drawl s 2 $2571 StOMMA r Slte pdan ared CSPP a $2,826 CHIT Spooled Provisions 2 SIAW Civil Coat Eslimate 2 i7,00g 6.30 OC Reviews 6 _ S1;p2a F40 Cm*uc6on Support 2 $1.036 8150 Revise mntrad doornents to remove rmenenl hrl a work 80 Revise contract documents far 60ft S n 6 e i 44 8 so 4W'49 $9 710 Leber Sublepl: if Amq Leto P um 1 Reimbuftable sum- a 1 0 12 _ _0 1 74 — 15 121 #e 154 gpi --- 126 0 $47,BW p r �eis,ri - - $128 y .y 1qPff Pegs 2 of 8 October 25, 2019 Hart C-ser, Ina HC BIG BOULDER CREEK BRIDGE REPLACEMENT senior Principe) Prindpal senhr 5elaor ,Asextate Proied prep senlorstag stare �iilor Omaer PrOI°d DrdW Aadamrs 11 Ilam I SCOPE OF WORK $313.20 $252.16 $219.30 $1116,80 $164.83 ;127.10 8113.58 $83,40 $112.93 ;106.55 $1us.50 1 PROJECT MANAGEMENT 1.10 Project Team Management and Coordination 1.20 Monthly Pfogresa Repoltallrnoicas --- 1.30 MonNy Project Progress Mcelings/Mlnutes 1.40 Coordinaeonwrih WDFW _-.-.-.. 1.60 Team CooMinatlon for design charl�le 1.70 Teem i,00rdinaLon for I.Iis.d &$,g" ---_ Labor Subtelal: 2 STRUCTURAL ENGINEERING a 0 o p a 8 a 0 0 0 0 $o 2.10 Pro act KidmH Meetln and Site Visa 2.20 A!' tNe Anajreis Meme -- 290 Development of PS&EICoM.rect Bid Documents - --- ---� 2.31 Plen and Calculaeon Preparailon- Caver Sheet General Notes, Quan' I -. Bridge L - plan oral elevagon _- FoundationPlan- Layout. _-- --- Fooling Details --- - - Wlnff"ll Layoul I Details TemponoylUeto r Bride 2.32 Strue&W Spedel PravWons 12.83 Coal Estimate -. ..._ 2.34 Deliverable Pleperalidn (3n%, 75%,100% 2- hr. each 2.40 lQuOly Control Chadrs and Revlewa Technical Cdlaboretion (Survey, Civil, 2"� Geotedpntcal H Itm Fmfronmema[ � - -- - 2 on uppart 4uminis, e. 2.20 Fasaibili Revlaw far 80' span bridge _"- 2 71 Review of temporarybridge detallsfur 1 year in service ----' i 2.� Ravlea o0nbad documents to remove rmenem fond xnnk Lahar SubWtab: GEOTECHNICAL ENGINEERING 0 0 0 0 0 0 0 0 a 0 0 80 3.10 Planningand Research 2 2 2 ;1,008 9.20 Field Work ' 9.21 Site Reearr,aiaeance and U811 Locales 7 S- 3.22 Fidtd Explorations 1 7 12 81,732 - 3.29 Sam ie Review & Labors Testing 4 1 3.30 OfffM Work-- 3.31 Engineering Analysis ars CansWffitlons 1 4 16 8 2 fer!'i7 3.32 Geotechnical Repordn 1 6 12 3 4 4 L7,31$ 3.33 Pro ed Management and Meet) s 2 3.40 Constill Sn1p rt 4 3.60 Feea3o1111y R4wlewfar e0'$pen bridge: 2 2 1 1067 351 ReVIeW 01 temporary bridge details for 1 year In service 352 RevleeGeotechnicalRscommendstlonsfor BOft S n { 2 34 2 - )781-'" -_ $s,;tri - Lebor Subtatal: _ - 4 R"LIC ie614Eww'O - 4 0 - - - tis - - a a 0 70 - - 17 88 a 1 14 1 0 18 - --- - $29,125 $0,423 4.10 Data Call"Itian and ReviO,a 4.20 Site lnspeaken AX I- =2umay 4.40 y I ., .._ 4.50 Hydmullc Analysis -- ' - - - 4.60 Channel Stability and Scour As smerl i ----- - - ' 4.70 WDFW and Permit Caordlnafw Hydrauliclrnsatlgat lon Repot t Meadinp&Administration -- 14.100 Fe"b00y Rawl" for 60' apart bridge I 4.101 Review of temporary bridge detsCs for t year I In service - Optic nal - Lobar Subtahl: 5 ENVIRONMENTAL DOCUMENTATION &I PERMITTINO i 0 a 0 0 0 0 0 0 0 0 0 $0 5.10 IProjeolManagamerd 1 5.20 Agency Coordination I - 5.30 NEPAISEPA Doc"Mantelian 5.40 Bidvgkal Aeees$menl 5.60 NHPA Section 106 Evaluation ' 5.60 JARPA Package Pmparatlon and Submlttat ' 5.70 Local Permits and Approvals I 5'80 Biology Suppurl Poring Conctrucbon O L!onel -"---.. 5.90 Permit Update -60'Bddge ,.,... I - - Labor Subtalat:' a 0 0 0 0 0 4 0 0 0 a $0 iq)ff Page 3 o` B October 25, 2019 Hart Crm er, Inc. IC BIG BOULDER CREEK BRIDGE REPLACEMENT Smllor princlpel vrtnapal Senior Associate Seim Proyd Serdar5lart I StnO Senior orartm Draltm pmject r yte,q Ilan SCOPE OF WORK 531919 526216 $218.30 $185.50 $164A3 §127.78 $113.56 $93.40 $11289 $78fi.55 $109,e8 0 CML ENGINEERING 6.10 Project Wanagamenl 6-20 PW Bid Docs Site PnMeradon Plan (gl(r1G01100 Ad} Roadway plan end pronto (3 IM11001100Ad) — Typtcal Sections and Details (9011001100 Ad) Detour plan, prune d typical se0m f3QW1W100Ad)-- RAI closure signEge plan Clvll Stream grading forbypass arWor ShAments no draviingal - - - - Stommeter Site plan and CSPP CIA! Special Pm mom -_--_-� - Civil Cost Es!Imate 6.30 QC Reviews 8.40 Corla0ueAon Support I_-- -- - 6.50 Revise contract docurnerds to remove nnanant bridge work _-- d.60 Revise cm9recl dacumer9s Labor Subtotal: 1-Obor Sum: paMWUr'aibllY Surn 0 a 0 at 0 0 a p 0 0 0 0 76 39 — 0 I 0 0 _ - 11 0 n 0 41 $0 FbF,729 i y�2� l� Page 4 of 8 0daber25,2018 Waheehed Science d Engineering WSE BiG BOULDER CREEK BRIDGE REPLACEMENT Senior Junior Q0^trecl Prirrcfpel engt+eerl Engineer Adminr letmlo ll mann I SCOPE OF WORK $212.98 5188.88 $97.37 $94.93 1 PROJECT MANAGEMENT 1.10 Project Team Management and Coordnstion I." MordWy Pragress Repmtslinvoices 1.30 Monthly Projed Progress Meslings/Minutas 1.40 Coordination with WDFW 1.60 Team Coordination for design change _ '.i Team Coordlnallon for revised deal n Labor Subtotal: 0 0 8 o $0 2 37RUCTURAL ENGINEERING 2.10 Pro ed Klckcrlf Meeting and Site tAdt 2.20 Allemative Analysis Memo 230 Development of PSBEIContract Bid Documents - - -- -- -- 231 Pian and CaloWation Preparation Cover Sheet _ - General Notes, Ouantlaes, -- BrIdge LaW. - plan anti sleval'mn Farndellon Plan - Layout Footing Details Wingwall Leyotd l DeleRs Temporarylpeloix add Layout 1----- -- 232 S1ructmal Special Provisions 233 Coal EMIrnate 2.34 Deliverable Preparation (30%, 75%, 1001A 2 hr. each 2.40 Quality Control MAcks and Review& TedlNcal Calle6oretion {Survey. Civil, Gm achnka; Hydraulics. Environmental 2 Construallon SupporL IKFrS, UU13MMIS, 270 Feasibility Reel" for a0' span bridge 271 Revlww of temporary bridge details for 1 year In service ents to remove 280 Revieacrnrbacl d,:mm rmanem brad xnrk -- Labor Subtotal: GEOTECHNICAL ENGINEERING 0 1 0 1 0 0 $6 3.70 Planning and Research 3.20 Field Woknn 9,2i Site Reooslssancs and Utility Locates - --- 3.22 Reid 6nplarellons _ 3.23 Sam la Review a Laboratory Testing 3.30 ORlce Work - 3.31 Engineering Analysis and Canaulleaanrs 3.32 Geotadmical Reporiin man am 3.33 PMent and Meelings 3.40 Congbucgan Support 9.50 Feasibiligr Review, for 60' span bridge Review o<tempon" bridge details for t year 8.51 Fn sewlee 3.52 Rsvlse Geotechnical Recommandatiorw for n ... __. ... _ Labor SL&Nftl: nr VrWVLM FRVIRCCRIr1G 0 0 a D M 4.10 112ft Collection end Review 2 6 $1,2tM 4,20 Site lnapecdon e e 4.30 Chennel Sury 2 4 _ _112,4u3 $Bi6 4.40 Hydreiagy 2 4 $615 4.50 Hydmu;lc Anatysd 2 1 20 4.60 Channel Stability and Scour Aasas mnem 10 16 ;a,eee 4.70 WDFW and Permit Coordination 1 12 4 PRO 4.80 Hydredlc Investigation Report 20 4 to !16,972 4.80 Meetings B AdmiNeLraaent 10 3 2 $2,612 4.100 FsasibiiI4 Review for 60'span bridge 4 8 1 $1,729 4.101 Review of lemporery bridge detalls for 1 year 4.101 In service 4 4 sl.2d, _ Optic nal Labor Subtotal: 5 ENVIRONMENTAL DOCUMENTATION & PERMITTING 76 5 86 8 8%,195 $218 5.10 IPmjed Managment 5.20 lAgency Coordination - 5.30 NEPAISEPA Documentation 5.40 B!c&cgWl Assessment - .... 5.50 NHPA Sedan 108 Evaluation 5.60 JARPA Package Preparation and Submittal 5.70 Local Pewits and Approvals -_--_-- E80 Biology Support During Construction(Optionao Ion 5.80 Penult Update - W Bridge i I Lobar ttubbfal: 0 1 0 0 e W Tcpff Page 5 of 8 October 25, 2019 W.xahad 6d-® a Enp.W i; WSE BiG BOULDER CREEK BRIDGE ! �r,dael REPLACEMENT sen nr I Ensnesrt Junior I� l Engineer AdWirigraItem SCOPE OF WORK $212.99 $188.66 $97.57 $9995 6 CIVILENGINEERING 6.10 Project MaragerrienL 6.20 PS&E Bid Docs Sits Preparation Plan (90IMID0 Ad) i Roadway pian and prd0a (30190031?t10 Ad) Typical Sections and 7eleils {90ltOG100 Adj Detour plan, proills &typical section I 301901700f100 Ad Ii ll Full doslrra 4i5na0e pEar. - - -- -- - - _ --- Civil Stream grading fa•bypass sndlor abubmanta no dra+r. st �- Stamwater Slto plan and CSPP CIA Special Previsions Civil Cost Estimate ---�-- --�--�- 6.30 QC Reviews ..--...._....,., _ 6.40 lConstruclon Support B... Revue cantrac! documents to remove ererd bddoe work A_ - 6.60 Revise centrad documents far 00 8an GM Subtotal: a LeBar Son:: '6 RalmburcaLra Soni' a 5 a 0 9$ 3 k L $0 26,iWS 1211 _f. IqH L Page 6 of S October 25, 2018 Jacobs Engineering JE BIG BOULDER CREEK BRIDGE REPLACEMENT Era. G vup Lead �L pone, Sr. Sr. Cult a I Engines E.Blot Id Technical Main Mom load Cultural Rod °g Edmr Techhorn SCOPEOFWORK $162.07 $117.18 IS02.81 $188.52 $86.80 $82.89 $62.81 $111.60 $6126 1 PROJECT MANAGEMENT 1.10 "ect 7aam Management arld Coordination 1.20 Monthly Progress Reporlal!rnoices 1.30 Monthly Project Progress MeetingslMiraEes 1.40 Coordination with WDFW 1.60 Team Coordinatlon for des!gn change 7.70 Teem Coordinatlon for revised dealon Labor Subtotal: row 2 STRUCTURAL ENGINEERING 0 1 0 0 0 0 0 0 0 0 6g 210 Pro act FOrdaofll Meati and Slle 'Ash 2.20 Altema6ve Anay6!s Memo 230 Davatepmerd of PB$EfCordracl Bid Documents 2.31 Plan and Caln:latlon Preparation Cover Sheet Genera! Notes, Quantities, Bridge Le oul - Man and alevalton _ Foundation Plan - Layout Fooling DrtaGs WingvMl Layout! Details Temporary/Detour Bridge u! 2.32 Struot ral Special Provisions 2.33 Cost Estlmats 234 Deliverable Preparation (30q, 75%,11)0%2 hr. each I 240 Quality Control Checks and Revlon 2 60 Techr9cal Callaboralion (Survey, Civil, Geotechriwl Hnanl!cs E Imnmenta 2 :uchon upport s, m r, a c. a needed - 2.70 Fesafblilty Rawl" for W Van bridge 2.71 Revlew of temporary bridge deta8s for 1 year In 9ONICe 280 Bevies contract tlacumenta m ""weanentbraid = Labor Subtotal: GEOTECHNICAL ENGINEERING 0 0 1 0 0 1 0 1 a o a 0 50 3.10 Planning and Research 3.20 Ffeld Wank 3.21 Site Recennsissarrce and Utility Locates 3.22 F!e;d Explorat!ons _ 9.29 Sample Review A Laboratory Testing 3.30 Office Work W 3.31 Engirseming Araiyais and Consulle8ons 332 Geotechnical Reporting 133 P. 'ect Management and Meetings 34D Canatrmctlon Su ort 3.60 Feasidlfty Review Por w Span bridge LL. 9.61 Review of temporary bridge details for 1 year in swvlcs Revlae Geote"hndcal Recummenclarkm for 3.02BOBS an Labor BYbtatel: 4 thORAULiC FWGIa1GGIVHti 0 0 0 4 1 0 1 0 $0 A10 jData Cdieodon and Revirw 4.20 S'te Inspection 430 Channel Survey 4.40 Flydrolog 4.50 Hydraulic Analysis 4.60 Channel Stability and Scour Aaeesareem 4.70 WDFW and Permit Caordlnatian 4.80 Hydraullo Investigation Report 4.00 Meetings AAdminist 4. Too Feasibility Rerlesrllor 60'spon bridge 4.101 Pa iew of temporary bridge details for 1 year In service Qptlo nal Labor Subtotal: S ENVIRONMENTAL DOCUMENTATION i PERMITTING 0 1 D I 0 0 5.10 Project Managemenl 2 14 4 $2210 120 Agency Coordination 3 5 $1,072 130 NEPAISEPA Dacumenlation 1 5 30 _ $9282 140 Biological Assessment 40 20 06 5 $17,9x4 150 NHPA Section 106 Evaluation 1 4 2 50 2 $4,�T 100 JARPA Package Preparation and Submittal I 5 40 10 5 2 y6,a22- 170 Local Pamits and Approvals 1 3 A $1,858 180 B!ology Support During Constuc!!un O Borrel 2 4 $$3,547 5.80 Permit Update - 60' Bdd 5 8 14 20 40 $7,$57 . _ .... � Labor Subtotal: 54 � .. a8 Igo 1 60 80 761 ! 4 1147,28a kPff Pegs 7 of 8 October 25, 2019 Jacobs Engnevdng JE BIG BOULDER CREEK BRIDGE REPLACEMENT any. GroupP Lead Mare a jw Permx sr. °Flee Lead Cu6urel Tech �� alababt Tachemd Amin Jr FAIbr Item SCOPB OFWORK $1b207 $117.18 $82.81 111156.1521 $88.80 1 882.99 1 $84.87 $117.80 126 6 CIVIL ENGINEERING 6.10 Project Management 6.20 PSAE Bid DWA Site Prep radon Pian {80!1001100 Ad) Roadway plan and profile (30610!1001100 Ad) Typical Sacdons and Dafaiis (9011001100 Ad) Detour plan, profile & Weal section 9001700 Ad FVI closure sWnage plan CYII Stream grading for bypass andlor abutments no drewi Stomnvater Site plan and CSPP _ Civil Special Provlslorre civil Cast Estimate 6.30 QC Reviews 6.40 Construction Support 6.90 Revise wntrect documerda to remove permanent brill ewodr 6.60 Revise contract documents for 600 Span I Labor Subtotal_ d*Fsm: F�1rn Wie Stan' d M g a p 0 0 901E _ � id 0 .39 C 0 0 1 a d $0 H7— 5705 v 1 FU Page 8 of 8 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: November 12, 2019 TOPIC: Liberty Bridge at Swank Creek ACTION REQUESTED: Direct Staff Pursue Temporary Access Options LEAD STAFF: Mark R. Cook RECOl MffiNDATION: Direct that staff evaluate options allowing Forest Service (FS) timber sale vehicle access over the load limited bridge in Liberty at Swauk Creek. BRIEFING SUMMARY: • The existing bride in Liberty at Swauk Creek is load limited. • The FS desires conducting a timber sale in Liberty in the near future. • FS and County staff are having conversations regarding potential options supporting access to the desired timber sale. BACKGROUND: Abutments at Liberty Road-Swauk Creek Bridge have been deteriorating for some time. In December 2017, Public Works requested an Administrative Load Rating be established for the bridge. KPFF (PW structural engineering consultant) developed the requested load rating stipulating that "Overload trucks shall not be permitted to use bridge". The load rating is problematic for supporting the proposed FS timber sale. DISCUSSION: Public Works maintains an inventory of temporary bridges that provide load rating up to 93,000 pounds. These bridges can be configured to meet the load demands of the FS's desired timber sale. Conversations with FS staff confirm timber We duration's can extend to five years or more. The reality of the sale duration provides additional challenges to supporting heavy loads over a temporary bridge. PW is seeking Board of County Commission approval to expense County resources defining potential options supporting access to the proposed timber sale. PW proposes: site investigation, project coordination with FS staff, consultation with PW structural engineers KPFF, preliminary engineering and cost analysis along with the preparation of a preliminary feasibility report. This proposed work program will define viability of temporary bridge deployment and the financial resources necessary supporting access to Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMIVIISSIONERS WORK SESSION STAFF REPORT the proposed timber sale. Initial permitting requirements will also be evaluated to better define project timelines. FISCAL ITAPACTS: Fiscal impacts are undetermined at this time. PW suggests and initial project budget of $10,000 developing the requested feasibility study. ATTACHMENTS: Exhibit 1: Administrative Bridge Rating Summary Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMVHSSIONERS WORK SESSION STAFF REPORT IW4anIl lllf� Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMIVIISSIONERS WORK SESSION STAFF REPORT ADMINISTRATIVE BRIDGE RATING SUMMARY 07101 Liberty Road 08103700 Concrete Chanr 40 ft 38 ft Unknown 1977 Unknown, assur 10/1/2015 FIELD EVALUATION DATE: 6/27/2017 see NBI ratings below RATING & EVALUATION BY: T. Whiteman. PE CHECKED BY: M. L. Frymoyer, PE, SE YEAR OF ADTT: 2014 ADTT: 9 17 ADMINISTRATIVE LOAD RATING RESULTS DESIGN RATING Rating Factor YL Rating -WSBIS TonsJ1553/1552 tem No. HS - 20 Inventory0.49 1.75 17556/1555 HS - 20 Operating0.64 1.35 23 LEGAL & NRL LOADS Rating Factor Posting Load (Tons) WSBIS Item No. AASHTO 1 (Type 3 1.00 - 2587 AASHTO 2 (Type 3S-2 1.00 - 2588 AASHTO 3 (Type 3-3 1.00 - 2589 Notional Rating Load NRL 0.69 - 2590 Special Haul Vehicle (SU4) 0.88 23 2591 Special Haul Vehicle (SU5) 0.83 25 2592 Special Haul Vehicle (SU6) 0.76 26 2593 Special Haul Vehicle (SU7) 0.72 27 2594 PERMIT LOADS Rating Factor Rating - Tons WSBIS Item No. WSDOT Overload 1 0.75 36 2595 WSDOT Overload 2 0.71 73 2596 1. Recommended posting of bridge for SU4, SU5, SU6, and SU7 vehicles. 2. Overload trucks shall not be permitted to use bridge. Posting recommendation based on span length (assumed capacity based on similar channel girder section). Administrative Load Ratings is based on 1) a 2097 site visit to evaluate structural condition of the primary gravity load carrying members by two certified bridge inspectors and licensed engineers 2) assumption of design load based on year of construction and WSDOT guidelines and 3) judgement of the Engineer which includes review of the latest bridge inspection report, similar girder type and truck traffic using the bridge Rating factors are based on guidelines in WSDOT Bridge Inspection Manual (2097), Section 5.02C for Bridges with Unknown Structural Components. Future reduction of the IVB! Ratings shown below requires a re-evaluation of this load rating by a qualified RATING METHOD (WSBIS 155111554): 0 BRIDGE CONDITION BASED ON FIELD EVALUATION PERFORMED BY CERT. BRIDGE INSPECTOR/ PROF. ENGINEER; NBI - SUPERSTRUCTURE 7 Good Condition NBI - SUBSTRUCTURE 7 Good Condition Bridge No. 07101 Bridge Name Liberty Field Evaluation Date — 6/27/2017 ZAwl I Roadway Bridge Elevation r 1 ,.w+a•- ,� .� i lw.: rt ..� tiv �� '�=vx{ ��7;� cCr 'u 'r,-9 ' , ' ...+r�.;....�.-. t....�., �asu: �''�.�t�:aS�i�.'��'�Lu.��:ai7r`' La.•t"�'r[ '-- �a'�+a,:� _ . Typical Condition • shiftdrwow Typical Condition