HomeMy WebLinkAbout2019-12-09-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular. Meeting Monday December 9, 2019 -1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. ELN Environmental Assessment Advanced Design Memorandum 3.2019 Joint Planning Conference Update 4. Towns to Teanaway Trailhead Support Request 6.1-976 Update C. Executive Session RCW 42.3C.1 10(b) To consider the selection of a siW or the acquisition of real estate by lease or purchase when public knowledge regarding such consideration would cause a likelihood of increased price. 7. Other business B. Adjourn Created on 1215/2019 4:30:03 PM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG Regular Meeting MONDAY 1:30 PM DECEMBER 9, 2019 Board members present: Chairman Cory Wright, Vice -Chairman Brett Wachsmith, Commissioner Laura Osiadacz Others: Mark Cook and Candie Leader, Public Works; Lindsey Ozbolt, Community Development Services and Four (4) Members of the Public At 1:34 pm Chairman Cory Wright opened the Public Works Study Session. Mark Cook stated he had no additional items to add to the agenda. ELN ENVIRONMENTAL ASSESSMENT ADVANCED DESIGN MEMORANDUM Mark Cook gave background on the project and stated that as developments occur he has been keeping the Board up to date. Mark Cook stated to support the need and cost for a sixty (60) percent design the FAA requested an advanced design memorandum outlining the flood and wetland issues at Bowers Field and how this information will help support the future construction of the parallel taxiway and extension of Runway 11/29. Mark Cook continued that the issue of mitigation will need to be figured out as well. Mark Cook added that a task order with Century West Engineering was approved for the drafting of the design memorandum and the FAA is supportive of the additional design. Discussion was held. 2019 JOINT PLANNING CONFERENCE UPDATE Nark Cook stated that staff along with Washington State Department of Transportation - Aviation Division and the Federal Aviation Administration (FAA) held the joint planning conference call last week. Mark Cook explained that this is an annual call to review the Capital Improvement Plan for Bowers Field and program funding for projects. Mark Cook continued that with the additional design for the EA being done the timeline of the programmed projects needed to be adjusted. Mark Cook added that the call was productive and the relationship between staff and the FAA continues to grow in a positive manner. Discussion was held. All three members of the Board stated they are supportive of the action of the memorandum being drafted. TOWNS TO TEANANWAY TRAILHEAD SUPPORT REQUEST Mark Cook stated that the Department continues to be approached by agencies in supporting recreation projects in the county. Mark Cook continued that recently he met with Nicky Pasi with Mountains to Sound Greenway Trust to discuss Public Works staff assisting in the scoping 2019-12-09 MINUTES and construction of trailhead parking lots and improvements in Ronald, Roslyn and Cie Elum area. Mark Cook added that annually Public Works has a budget for path and trails; however, he does not have a cost on this project yet. Discussion was held. Staff was directed to scone the projects and brief the Coalmine Trails Committee of the projects as well. I-976 UPDATE Mark Cook provided background on I-976 and the action voters took to implement thirty (30) dollar vehicle tabs. Mark Cook stated that King County and City of Seattle filed an injunction to stop the initiative and Superior Court ruled in favor of the injunction. Mark Cook added that Governor Inslee noticed the Secretary of Transportation that projects that haven't been implemented were to be placed on hold until further notice. Mark Cook stated that this includes the I-90 widening project from Easton to Snoqualmie Pass. Discussion was held. EXECUTIVE SESSION At 2:26 pm Chairman Cory Wright announced the Board along with Mark Cook, Public Works Director would enter into an Executive Session to consider the selection of a site or the acquisition of real estate by lease or purchase when public knowledge regarding such consideration would cause a likelihogd of increased price. At 2:41 pm the Board reconvened out of Executive Session and stated an additional ten (10) minutes was needed for further discussion. At 2:51 the Board reconvened out of Executive Session and staff was directed to pursue discussions of possible acquisition. Meeting adjourned at 2:53 pm, 2019-12-09 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 9, 2019 TOPIC: ELN Environmental Assessment Advanced Design Memorandum ACTION REQUESTED: Support Staff Action LEAD STAFF: Mark R. Cook RECOMMENDATION: Support staff's action issuing a memorandum requesting advanced design authorization from the Federal Aviation Administration (FAA) completing the environmental assessment (EA) for Bowers Field (ELN). BRIEFING SUVLNIARY: • The EA supporting ELN capital improvements is stalled pending resolution of wetland and flooding issues • During the past several months, staff has worked with Century West Engineering (CW) and the FAA mapping the path towards finalizing the EA • Staff recently issued a Task Order to CW authorizing the development of a memorandum stating the case for advanced design authorization from the FAA (Exhibit 1) • The memorandum was recently completed and transmitted to the FAA (Exhibit 2) BACKGROUND: During most of 2018 and all of 2019 staff and CW have been working towards completing the EA process with FAA supporting pending ELN capital improvements. Runway 11129 flooding appears to be mitigatable but has associated floodplain and wetland issues tied to proposed site improvements. Preliminary wetland delineations suggest significant wetlands associated with proposed capital improvement actions. Wetland impacts will likely trigger an individual permit from the United States Corps of Engineers Spokane District. DISCUSSION: FAA regional environmental staff is suggesting general impacts to wetlands and floodplains are likely insufficiently defined at the present time supporting an environmental determination of project impact. Responding to this observation, staff issued a Task Order to CW preparing a memorandum laying out the argument for FAA authorization of advanced design. Advanced design to 60 percent is being sought to finalize the environmental determination supporting ELN- capital improvements. Page 1 of 4 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT FISCAL POPACTS: CW estimates the cost of the advanced design between $400,000 and $500,000. Staff is requesting funding support from the FAA implementing 60 percent design. ATTACE[MENT S : Exhibit 1: Task Order authorizing advanced design memorandum Exhibit 2: Advanced Design Memorandum Page 2 of 4 PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT 1:0:4:nb-lago TASK ORDER AUTHORIZING ADVANCED DESIGN MEMORANDUM Page 3 of 4 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT TCENTURY ZZs wfst TASK ORDER #1 JAGR,EEMtNT AND AUTHORgATION FOR ENGIN15M Iii CONSUL.TIMG SERVICES 14- this Ag�rrient dated October 29, 2019, the K tlitas Q .Unty (Clii�nt)° authorizes Cenitui `Nem I<ngitieorlllg C rea t irirl: (t;o:n. suttantj to carry: out and e:ompkge the follov�!i'ng Serrricos h i onslderaation of the mutual Crivt riarits sed forth ;ire the Professiortel Services A;greermnt (.Master greernant), executed: WhQeen: Kittitas County ai d GWE-C, and.. datedon +october:7, 2019 and far. projects with Federal fundingttie following attachment FAA Professional 5`arvke:(AIIE� PrGjecir. Task Order #1..S6Wtrs FW d Ak� En4irommut Advanced :Design.tust ica Ian. Memo Stype & ssrV[Cw Tbo:sco of servicee for the aulysis and prepatation of a, justification merna:to the FAA Vii' advanced design for the. Envli irhert al Aetie srriai►k°pact; is as:&%iled in the attad a t Exhibit "Soope'c3'f'W6* " Gphildn of Pkobahle,Costs: The..fea for san+i s for.the: analysis end preparatim of a justification memo to the .FAA for advanced;Oesig.n. for the Environmental Asses.0naM.projed, at the Bowers Field Aieport, i6.9et Of tI6;9 (time ariit expense; not to:exc ). PersonneLlaborrfees and expensesare. detailed:in: the attached.F-xhibit 0 "Feo.Summary: A ftadWnortta Exhibit A Century West asps of Work ehibit S 0laritttr' 11Vest Fete: .Sumary Exhibit C: FAA Professional aetvrce (AIE) zon"ct Provisions, +Century We4 Eqgin"ing.C-orperat *n lK ttitas— Ounty Bowers Recd Airport Envirohmer>ital Aissessmieht for lA sport dlht. arvrrements. Advanced Desiegr Justif ce# on Memo Task Order #1 Scope of work °xt"bo �fK 201.E i Bowers FieldAlrport (kELN or "the Airport"] it.t whed artd'dOmtOd'bV K ttites CQuhty (:County or",the Gwoor"), acid is located.near EHen,$.bur&VashJhktOn. The Airport serves general aviation (GA);,user5, and does not haste:scf edwle eorttmerdA.I airline ervice. The Airport is classified as a 6A airport by the Federal&Wtion Akiministratroh j:FAAj National Pian of integrated Airport 8Vstems (HPI ), The. Airport ES located'oorth of U.S..,Route 9t1 and nortb of VlenOurg's ky tenter; in Kittitas County,: Washington. The Airport has an elevation of 1,763 f emt above mean sea level (1VI.$0. BACKGROUND An envirbnimentalassettrnerit i,s under Wrary perthe pr-00tas scope ofw6rk°and contract dated.August 7,2018. Theprojects-i.ncludedirr the Proposed Action 'were 4efirted:int.h nir:nlrlenta,nt, Rurposi ::OM Meed dacurnerat,: approved by the FAA on duly 31, 2019. The. Wfiold flopd .rnttiga:tlon cinder project 2 s:based on'histor`tcal seasonal flooding experienced on the.airport; The proposed airport imprc verinent .Veins are si inMwized in Table 1 as fo IMS.'. 'cable`i. `5urrmaryr of Prosed Action praiect ! De!seriptlim Full-length parallel taxiway(newJ, mor#ification.of-ex-MinB;Tax Way F,.,and iions'ttoction:bf additional airfield taxiways (taxiwayconnecfions to fuure Runways 7»2:5. ends): based on ARC B-II.startdar*- i rolect w71 includad . roir%ge 2 Runways 11/29 Rehabilitation Rehabilitate existirtg;.rurtwalr foto et ARC B.11 cleSi rl :Star dards 'tminate existing aligned taxiway at Runway. 29 end. Prgject:will Ind ude.drainaae Improvements r»er is compatible with fla d.rriitigatiosi improvements in: Project 02: Airfield Flood Mitlptkm lmpmv#raents to allevike occU mente of traeaiixed flooding t Cr Runway 1 . and In other areas of Airport whilei :not: Increasing; fk►od exposure. da+uvrts ream Of the airport: r ongruct hao r taxi ,lane s for fctt; re hanger 004efa gbiith.of the main aprons. Pr:.pjeCt will include drainage 1.mprovernents: compatlble, with (food mitikOtidri inrrprovernpas ;in:IMM ect. ##2.. Oowef5 Field At pgrdoproieemp*EA �dv�arued r�es�{a,lu�trfica4�.hderan touter 2$ �if1�J�;r2 The roriginat scope of workldentlfiei an initial assfimptictn'th-at OV wetla RO: PerrTOUbt (SeClon 404) Would be undertaken: as a ""WWWe": piarffilt, % bsequent field 4.hvestigaflons,;and identification of delineated wetlands overlaid with :the:-prdposed-airfield iMprovements have been idePt!fl0d:tDbe at a level anticipated to.:reqWrOan 'Ind!WduarUa.lon 404 00mit. Phone coordination with the Corps..of triginevs. ReIgulatery feadforlhis area (David Moore) Indicates t . hA . t any PropoW resviting infill ov.prOkSacreis reRutatedwetiand would requireanindiVidij a.lPeOlvit- Fyrthermpfe,the proposed project Actiont wiltre O -reflood . m - ts: to alleviate Wigation ft*t"Vernen .1 floOOOnditidna over RunwaV 29.: bdens ive site drainageAmprovements: are also apti . cipated. with the. proposed prIDect improvements, the drainage improvements ; %OWneed to be: Incompliiince with 2 CUrOpt s. w DOE standards as as work with the prG.P. osed.. flood mitigation Im Improvements will .have .t.o address the on-iairffeld flpod.ingissues withoUt"!00-atingany down-Streato Impacts W surr.6.0008. ProPertlos. The proposed improvornentSrareantidi,pated to retivire a FEIVIA Letter of Map Rovigion (LO"MMito address an.tteipaked.tharigosin the jo.0-Yea.r 1`16od zone. Based on the'deve loping: complexity ofthe:Project, the F: in an entall Wed: 9-2440,.ha s indicated IC fhatundertaking advanced des.- t ft rmitting withih Jg.n q su.ppo pe i the E& appears warranted. and reasonible. As wicated. in the email from the FAA: hicfefbo d ovarl 1.0.. M�sKivrr on !J 0,16 ::i A,. aw- - yyjw); of qJ!;4h. svr(�., d -f v O-Ased on this FAA.dipection, 0 justification Me=. js.bejrig: reolred Wbe submiftd to the FAA, for their review and approval,, in order to facifttatt- proceedift fwward wftsco Oingth#:EAadv#*ed design proif,ect. tasks. An:eXample justification me mora ndijn� was provided by the FAA, to. be used as theetemPlate. for.develapiog the. Bowers F ield ;i4VaOCed:doSJSP jostific6tion The :antit-f0ated optcorne of:IW effort: is: to secure formal co, ncurrebO from the FAA onrocee p ding to advanced. desigo, detertnine grant timing for the advanced design, and: infbrML the subsequent scoOing of the:advanced design task order. ,:.Eff;.O.qs.supporting:the:p,rep,arailon of theFAA.adVah. des i9ri juA'Iftafion mennoranidUrn Incitide Oftett$.;by both Century West Engineering staff, and'ESA Jsub-com4 f1t)L�tIff.�EffaltS Ito. . . �suppGfting they preparation of t e F dvapeed design t. .. incl die the fo 116WIn work h . AXe gnjvst!flcq lorimemorlandim u tasks-, i . SERViCIESTO SE:PERFORIVIED ANPIROVICItO BY THEECC)NSULT, . AN i T TWI — PROIECT MANAGEMENT/ COORDINATIOMADMINIStKATION: 1.1 carry aw. proje ' a iadnainj! strat Ion including : but. hot limited tol monitodngthe taskaer schedule, coordination of the. prpfiw with the CounR y and. FAA, team. coardinatlod,� monitoring W. a d re portingt lec h ni'talond:budgetissue8tothL-Couhty:andfAA,.preparatian E4we F d Airwrfl : - FA . . . le). ; mprbypmonts Aft anced� D6*n JuAffic.gorsUL-MO 6" 0, Q her.2% WIS9j2. of monthly �onstilta�nt.invoices fpr s:ubmittaitci.the County. Effortinclurlesiden*ingarid preparation of antitipatedfutoreadvanced design/W. '#ngse . hedule options. (CWE.;& ESA) 12 bnTs1te coordination meeting botWoO11the COUVY, the FAA, CeAt*. Weit staff, and ESA -staff to Worm and familiarize the: FAA environmental re tf p.reseniAvvq:ofprojectpara qt� ers and neRdt, (CINE &ksA) 1.3 UndertAlm Up to two subsequent plicift to6rdination meetings. bei wOen the County,. Century West staff; and ESA staff; to further coardinatepermifting and advanced design FAA mquirements, (CWE & ESA) 14 Undertake a web -conference meetin t g bietwoen the CW.n Y). Corps of Engirioers, Century West staff, and ESA staff, to: idehflk in . n ./cOnfir Jdividual level wetland permMing requirements and associated levels of required design. Effort iocludes ti.Ing preparation And =rd(natjon, (CWE & ESA) TASK 2! .. TECHNICAL RESEARCH/AlyVAKEWPOSION A.ISTIFICATION MEMO. PREPARATION 2-:1 Research and docurnelitJorisdittibnal requfrentents relative, to the site and Settlbh.404 Individual Permit. Mq Uirbraeots. This: task Will define theadv.anceddes*n/permittin S levels to: be detailed and requested Inthe Jus.ti.f.i.catiah.(6eenoriinctUm.:(C.WE:,& f$A) 12 Preparation. of a, Graft: Advanced Design'Justification M ro Draft merno distill lde tif .. project history, y. required need:f6r adVaniced des.ignjo.choical advanced design, task levels required, projectschedule planning level ..o.stim.atesf.o.ra.dya"ce.ddesighta4.ks,:aodtiti!dng a0d:eligiblfity. Of-FAMOOding for the advahc*d4esign. Draft Memo will be:subrnittedto the CountY for review and comment; This effort iricludes:one phone toordi.natfq4 Meeting bet-ween'CAIWOry West. and the ZQu nty: W rdView �the draft docurrient: prior to submission to.the FAA. Draft mem Q. will besubsequently submitted to therAA for:reviow, (CWE draftQ ESA provlde:su:ppo.rt. docum.eptation, 2.1 FAA reviewcoordination meating(tonforelict call) between the County, the FAA ,:CemtOyy Wesfstaff, and ESA staff, Ao. review the d raftmemo content and determine FAA. supported advanced design Us k.s to. Inform subsequent sc6ping,. (CWE: & ESA 2.4 Preparation of a Final. ,Advanced [Design: justificatfor),M .0mo. F-111al memo will addressany FAA tqmMthts. identified during the FAA conferebcO call ident-ified in task 23, Final merna wits be submitted to the FAA for acre -W & ESA). E . . ptAnce, (C Deliverablow Draft merno (electronic format) Final'memote-Jectrorfic fdrTnat) Bv.ww'F..Fi04dAirport laipravements EA ActvantOd Desio Ju.stiffication MeM& 600.ber 28',,20? �J2 FEE 11MMATr: rdTTITAS'COUI TY , GOWERS;MD AUMMT 'ENVIFWNMr:NTAL ASSESMENT dune 7;=2078. . yk9 �' .8r. pt6J. .p g�Wa10.6n �aha.0 Admin.... - OP . ..._,..... ,_;_,• _._.� :. ,Preslum! 1 1uf...oggW', Ri anp�auwr er En inafr- fn ,aro ,Su 'e- ..,, 4;"W Rain .,.., . � .I .$217,00 .00 llmms - 157v 11250 ,.siiS.dO: - 197#1-. Nours. Tuna31.a80f .... �eBA.: . .. .. .. - Ti51i Task 1- p1010 7:MANJNGEfdUMIAQE�I+I1dYik4ii0N _ _ W i1 _°layRCt AGtRloisla�i9h: 4 .5795:00 1.2 'Fa1Asa plop:FiefdGobal!lne68n 5 ' � 9 37.W9ttro b1 tifi0:00 L31._ MIT" A Cooadkl811on q f.i GaPsa3:ErzgdlesPsiNettand Y�lebCreihte hEeaung. �2_.._,... - .Y.____ 7 - 5970.00.': 't 0. ; iE PNuf�',�C;gEeEAnc#9A fisrrcEo DE"M ; _ - Usk s jMTWt A memo! { : 2.9 ecaRMdKipgmanttnlRekkr�l.PPrrn�WAqulAemehli - 1 I- 4�. 7 S1'907..03' 0"10-W Lit Pre re dTeh.A.Gwnced'Deslyn:hud0udrn3ian'o.-. 1, i. y - -.-.•�.-�.�.____._._ 8. FlRpiaf Wq4 pReWki�trinitlkigd 1752104 bS75.t10 2,4.-_ Adve�iospl?ea+9rt.]uetlfisadonlV�ma .. ... __._.. TBackHudlBk_. —_..• --------^ 0' -- s - I. 0 ------------ a Q91. -. _-1ta19_Po-. ....-1#,01Q;09 14 34,...w..._i 0 Wmis !n-f7oY5l.PI6ti 6 ..... .: . Repnll:Prkfin0',,Wd17kFirxaiaianseae:&iteptlne. ..� ... valga,- Por"'OM Q 4px-dei+ _— ........ . ......:. � t �'sso00 Tafil 9ub%UMUXatat FM — .. • ..•�..._..• 688:09 . ....................... ictal FMJR4 FBe - EXHIBIT 2: ADVANCED DESIGN MEMORANDUM Page 4 of 4 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT *.ft0FCENTURY I i' . WEST '` E N G I N E E R I N G KITTITAS COUNTY - BOWERS FIELD AIRPORT TO: CAYLA MORGAN, FAA FROM: CENTURY WEST ENGINEERING DATE: NOVEMBER 27, 2019 RE: ADVANCED DESIGN NEEDS FOR NEPA ANALYSIS OF PROPOSED AIRFIELD IMPROVEMENTS CC: MARK COOK, K[TTITAs COUNTY CANDIE LEADER, KITTITAs COUNTY MARY VARGAS, FAA 1. PROJECT BACKGROUND Century West Engineering (CWE) is preparing an Environmental Assessment (EA) on behalf of Kittitas County and Federal Aviation Administration (FAA) for a series of airport improvement projects intended to accommodate current and forecast aircraft activity at Bowers Field Airport (ELN). The proposed projects were originally defined in the Airport Master Plan and are depicted on the Airport Layout Plan (ALP), which received final FAA approval in November 2018. An airfield flood mitigation project is also being evaluated as part of the EA due to historical seasonal flooding experienced on the airport. The proposed projects are as follows: PARALLELTAxiWAY FOR RUNWAY 11/29 & CONNECTOR TAxiwAYs — This project involves construction of a new full-length parallel taxiway adjacent to Runway 11/29 and associated connector taxiways between the parallel taxiway and Runway 11/29. It also involves modification of existing Taxiway F to resolve non-standard geometry and construction of a new taxiway between the Runway 11/29 parallel taxiway, Runway 7-25 and the terminal apron area. RUNWAY 11/29 REHABILITATION &AIRFIELD FLOOD MITIGATION—This project will rehabilitate existing Runway 11/29 to meet ARC B -Il design standards and eliminate an existing aligned taxiway at the Runway 29 end. It will also make improvements to alleviate the occurrence of localized flooding on Runway 11/29. HANGARTAxILANES--This project will construct new hangar taxilanes to serve future hangar developments south of the main apron area. 2. CURRENT EA SCOPE OF SERVICES The current EA scope of services provides funding for National Environmental Policy Act (NEPA) analysis and approximately 25 percent design for all project elements in support of this analysis. The current scope includes five major tasks: 1) Project Management/Administration; 2) Proposed Action, Purpose and Need, and Alternatives; 3) Environmental Permitting and Coordination; 4) Environmental Assessment; and 5) DBE. The following discussion is intended only to outline portions of the current scope of work which will require additional effort based on unforeseen circumstances uncovered during the initial Bowers Field Airport Environmental Assessment Page 1 Advanced Design Needs for NEPA Analysis November 27, 2019 CENTURY WEST. E N G I N E E R I N G E' S design analysis. Section 3 of this report provides a discussion of the circumstances that have changed since the original scope of work was approved. 2.1. LEVEL OF PRELIMINARY DESIGN The Proposed Action, Purpose and Need, and Alternatives task of the original scope included a subtask for preliminary design, which identified work elements required to get the project design to 25 percent completion but no further. The subtask included preliminary runway and taxiway layout and grading design per FAA standards, preliminary storm drainage design, a draft cost estimate, and preliminary 25 percent design plans. Topographic survey was conducted as part of the Proposed Action, Purposed and Need, and Alternatives task, but geotechnical investigation was not included in the original scope. 2.2. LIMITS OF ENVIRONMENTAL STUDY Within the original scope of work, the airfield flood mitigation component of the project necessitated the definition of two main study areas: the direct study area and the indirect study area. The direct study area was defined as, "an area which encompasses the entire construction footprint for airport improvements." The indirect study area was defined as, "an area which encompasses the entire Airport and off-site property to the north on which there is potential for floodplain related effects to nearby Mercer and Whiskey Creeks." The Environmental Permitting and Coordination task included subtasks for cultural resources survey, environmental inventory of threatened & endangered (federal and state) species, wetland delineation, and floodplain assessment. Airfield flood mitigations were initially expected to occur within the direct study area and off-site wetland mitigations were not anticipated to be required. Therefore, the cultural resources survey, environmental inventory, and wetland delineations were limited to the direct study area. The indirect study area was reserved for the floodplain assessment subtask. The original scope assumed that existing mapping resources, such as County maps and National Wetland Inventory (NWI) maps, accurately estimated the presence and general extent of wetlands on the airfield within the direct and indirect study areas. 2.3. PERMITTING SUBMITTALS The Environmental Permitting and Coordination task of the original scope included another subtask for preparation of required permit/consultation submittals. Permit applications and supporting documents were to be provided to the following agencies: + DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION —Project description and graphics depiction of the area of potential effect (APE) and Cultural Resources Report. • TRIBAL CONTACTS— Project description and graphic depiction of the APE and Cultural Resources Survey/Report. • US ARMY CORPS OF ENGINEERS (CORPS); DEPARTMENT OF ECOLOGY (ECOLOGY); KITTITAS COUNTY— Wetlands Delineation Report, Mitigations Plan (if needed),.and Joint Aquatic Resources Permits Application (DARPA). If wetland impacts are encountered, it was anticipated a Nationwide Permit from the Corps and Ecology would be required and that a Critical Areas Permit from the County would be required. • KmrrmsCOUNTY — Floodplains Assessment Report, Floodplain Development Permit Application. Bowers Field Airport Environmental Assessment Page 2 Advanced Design Needs for NEPA Analysis November 27, 2019 V**//CENTURY FWEST E N G I N E E R I N G p- E' S 4 • KIrrITAs COUNTY— State Environmental Policy Act (SEPA) Checklist. It was anticipated that the County would issue a Determination of Non -Significance (DNS) or Mitigated DNS. • WASHINGTON DEPARTMENT OFFISH AND WILDLIFE —Hydra u I ic Project Approval. 3. WHAT HAS CHANGED/ISSUES WITH THE CURRENT SCOPE OF SERVICES Since the current scope of services was approved, two unanticipated issues have come up. 3.1. WETLAND IMPACTS Issue: Initial wetland delineations and preliminary design of the proposed improvements identified a larger wetland impact than originally anticipated based upon NWI maps, triggering a Section 404 Individual Permit rather than a Nationwide Permit. The threshold for wetland impacts to be covered by the Section 404 Nationwide Permit applicable to this project is 0.5 acres. The Draft Wetland Delineation Report, conducted under the original scope of work, identified 37 separate wetlands within the direct study area. Preliminary design of the proposed improvements identified over 8 acres of wetland impacts and over 13 acres of wetland buffer impacts. As such, our regulatory permit lead from the Corps of Engineers Seattle Regulatory District has confirmed that the project will need to obtain a Section 404 Individual Permit, which will require a greater level of both design and justification to ensure that impacts can be more accurately calculated, reported, and mitigated. Further, the permit application will require an alternatives analysis under Section 404(1)(b) which demonstrates that different alternative project designs were considered that avoid and minimize impacts to aquatic resources to the greatest degree possible. In addition, the Washington Department of Ecology (Ecology) will require an Individual Section 401, Water Quality Certification. Wetland mitigation is now anticipated to be larger in scale and would require identification of suitable off-site mitigation alternatives, for at least a portion of the mitigation. Identification of suitable off-site mitigation areas would need long lead-times due to property availability and negotiation of conservation easements. As a result, the project schedule is critically tied to the processing of the Section 404 Individual Permit; therefore, addressing wetland impacts and mitigation strategies is the critical path as the airfield project environmental assessment progresses. As such, the 25 percent design level provided for in the current scope is not sufficient based on the current project needs. Additional effort is needed to more accurately determine items such as: • Project design alternatives that mitigate flood issues, and minimize impacts to aquatic resources; • Documentation of where wetland fill has been avoided and minimized to the degree feasible; • Cut and fill quantities, locations of impact, and sources, including drainage improvements associated with flood mitigations; • Development of wetland impact overview plans and sections; • Identification and feasibility of off-site wetland mitigation areas within the same watershed; • Site assessment and wetland delineations for selected off-site mitigation area; • Cultural resources assessment of off-site wetland mitigation area; • Development of a wetland mitigation report and conceptual plan; Bowers Field Airport Environmental Assessment Page 3 Advanced Design Needs for NEPA Analysis November 27, 2019 �CENTURY Xk E N G t N E E R I N • Wetland mitigation design drawings. 3.2. FLOOD MITIGATION Issue: The preferred alternative identified by initial flood mitigation alternatives analysis requires construction of drainage improvements outside of the direct study area and within the limits of the 100 - year floodplain. This was determined to be unavoidable as all other on-site improvements that were evaluated resulted in a worsening of downstream flooding. Due to unexpected direct impacts outside the direct study area, additional cultural resources and wetland delineation efforts will need to be expanded to encompass the limits of flood mitigation improvements. Hydraulic modelling of the proposed flood mitigation indicates that the improvements will result in a reduction in downstream flooding between Whiskey and Mercer Creeks by adding additional flood storage infrastructure on the northwest side of the airfield. The added upstream storage and subsequent downstream flooding reduction are likely to affect the current 100 -year flood limits of Whiskey and Mercer Creeks. This revision in flood limits will require additional permitting and coordination with the Federal Emergency Management Agency (FEMA), which was not originally anticipated in the project scope. The County is also in the midst of revising the existing flood conditions shown in the current Flood Insurance Rate Map (FIRM). The proposal of drainage improvements which will further revise the FIRM will require close coordination between the project team and FEMA. A greater level of design will also be required to accurately perforin the "No Net Loss" and mitigation analysis associated with the County's Floodplain Development Permit application. In addition to the anticipated direct floodplain impacts, the Draft Environmental Inventory Memo has identified the potential for summer run steel head trout within the southwestern study area in Whiskey Creek. The Century West project team is unable to make an effects determination without further development of the flood mitigation and stormwater management design. It is likely that a Biological Assessment (BA) will be required during the Individual Permit process to determine effects to downstream federally -listed fish. Additional effort is required for items such as: FEMA coordination and permitting; Further flood mitigation design; • Site assessment and wetland delineations within the limits of flood mitigation impacts; ■ Cultural resources assessment within flood mitigation impact zone; • Effects to stream flow and downstream fish habitat related to proposed flood attenuation; 0 Further threatened and endangered species investigation and BA efforts as required. Section 4 of this memo, Permit Submittal Requirements, provides a list of the application materials required for the environmental permits, the level of engineering required for those materials and whether the effort required is included in the current scope of services or will require additional effort. The additional effort required to prepare and submit the environmental permits and to complete the NEPA analysis is documented in Section 0 of this memo, The Washington Department of Ecology must Bowers Field Airport Environmental Assessment Page 4 Advanced Design Needs for NEPA Analysis November 27, 2019 CENTURY "41/h/FWEST E N G I N E E R 1 N G issue the Section 401 Water Quality Certification in advance of the Corps Section 404 Individual Permit. Public noticing and coordination with stakeholders and Tribes is also required for the Individual Permit. Thus, the overall timeline for securing the required permits for the proposed airfield improvements is anticipated to be between 12 and 24 months. Advanced Engineering Design & environmental investigation Needed to Complete NEPA Analysis. 4. PERMIT SUBMITTAL REQUIREMENTS Environmental permits relevant to the proposed improvements will need to be submitted to the approving agencies before the Draft EA can be published and released for public comment. Due to unanticipated and unavoidable wetland and floodway impacts, these permit applications will require -a greater level of design than included in the original scope of work. The necessary permit applications require that the following materials be addressed to a level that is sufficient for approval by the regulatory authorities and will not subsequently require substantive changes, as the project schedule cannot support revising or resubmitting the permit application. To prepare permit applications that meet the needs of the regulatory authorities, additional design effort is required for some project components. TABLE 1 provides a list of the submittal requirements for anticipated permits, indicates if the permit application was included in the original scope of work, and the level of design needed to prepare each component of the permit application. TABLE 1. SUBMITTAL REQUIREMENTS FOR ANTICIPATED PERMITS Bowers Field Airport Environmental Assessment Page 5 Advanced Design Needs for NEPA Analysis November 27, 2019 -g °L I c °p CL c t c °° a �L cc� o� s12 Permit oi C cr (Issuing Agency) Submittal Requirements 3 I IU Conditional Letter Written description of the project No Not 25% No of Map Revision Scoped (FEMA) MT -2 Application form signed by applicant, certifying engineer, and community affected by No Not 25% ii No the revision ; Scoped I Community acknowledgement form No i i Not 25% I Scoped No Hydrologic analysis (modeling) No Not 60% Yes Scoped Certified topographic work map No Not 1 60% Yes Scoped Bowers Field Airport Environmental Assessment Page 5 Advanced Design Needs for NEPA Analysis November 27, 2019 ►��CEN WESTTURY E N G I N E E R I N G Bowers Field Airport Environmental Assessment Page 6 Advanced Design Needs for NEPA Analysis November 27, 2019 CL CL v� m u Cn $ W d a 0 My Permit YG7 `- °J � C T '- -0 Cr (Issuing Agency) Submittal Requirements Annotated FIRM showing revised boundary delineations of the: • 100 -year floodplain • 500 -year floodplain I Not Regulatory floodway and how it ties into No Scoped 60% Yes the boundary delineation on the effective FIRM at the downstream and upstream ends of the revised reach Cut/fill report I No Not 60% Yes Scoped Proposed preliminary plans certified by Not I registered Professional Engineer No Scoped 60% Yes Documentation of Endangered Species Act Not compliance No Scoped 60% Yes Clean Water Act Project description including description of work Section 404/401 within waters and wetlands Yes 25% 60% Yes Joint Aquatic Resource Permit Description of construction methods for removal I Yes 25% 60% Yes and/or fill activities Application (JARPA) Construction timeline Yes 25% 60% Yes (USAGE and WA Removal volumes, dimensions, duration, and Ecology) materials by wetland/waterbody Yes 25% 60% Yes Fill volumes, dimensions, duration, and materials by wetland/waterbody Yes 25% 60% Yes Project purpose and need Yes 25% 60% Yes Draft and Final Alternatives Analysis No Not 60% Yes Scoped Mitigation concept Yes 25% 60% Yes Identifying and determining required ratios for I Not wetland impact to mitigation I No Scoped 60% Yes List of adjacent property owners Yes 25% 60% Yes Coastal zone certification Yes 25% N/A No Bowers Field Airport Environmental Assessment Page 6 Advanced Design Needs for NEPA Analysis November 27, 2019 VWESTTURY E N G f N E E R f N G Permit (Issuing Agency) Submittal Requirements Signed DARPA form and application fee i JARPA Drawings: Site plan showing staging and i construction access, existing and proposed contours, stormwater outfalls, ordinary high water, wetlands, impact areas within wetlands and waterbodies, staging areas, construction access, and mitigation area JARPA Drawings: Cross section drawing showing existing and proposed elevations, impact areas within wetlands and waterbodies, and ordinary high water and wetlands (U -� 60% 1 Yes m sLdna n m I W Ln dLn v a. c c a o c o -p o 2 m-0 o 2! oCr -0 Cr Yes 25% 60% Yes Yes I 25% 6090 Yes Yes 25% ; 60% Yes Draft and Final Biological Assessment (BA) No i i ScNot oped 60% 1 Yes Draft and Final Archaeological Report for Section Yes; Within Direct Study 106 Compliance 25% 60% Yes ! Area Only Yes; Within Draft and Final Inadvertent Discovery Plan Direct Study 25% ; 60% Yes Area Only Critical Areas Proposed development figure Yes 25% 60% Yes Approval (Kittitas Final conditions site plan figure showing the County) impacts to the sensitive area or encroachment within the vegetated corridor and the final Not sensitive area/vegetated corridor NO Scoped 60% Yes easement/track limits. It also includes details of mitigation for associated impacts. j Critical Areas Report and Mitigation Concept Wetland data sheets I Yes; Within Direct Study 25% 60% Yes i Area Only Yes; Within Direct Study I 25% 60% Yes Area Only Bowers Field Airport Environmental Assessment Page 7 Advanced Design Needs for NEPA Analysis November 27, 2019 %7ZWESTTURY r FSA E N G I N E E R I N G The Washington Department of Ecology must issue the Section 401 Water Quality Certification in advance of the Corps Section 404 Individual Permit. Public noticing and coordination with stakeholders and Tribes is also required for the Individual Permit. Thus, the overall timeline for securing the required permits for the proposed airfield improvements is anticipated to be between 12 and 24 months. 5. ADVANCED ENGINEERING DESIGN & ENVIRONMENTAL INVESTIGATION NEEDED TO COMPLETE NEPA ANALYSIS Advanced engineering design will advance the 25 percent design to 60 percent design for all improvements except items such as electrical load calculations and pavement marking layout which are not required to allow the environmental permits to be submitted. Advanced environmental investigation will perform additional site analysis required for permit submittal and completion of the Draft EA. All improvements will follow the requirements of Advisory Circular (AC) 150/5300-13A, Airport Design; AC 150/5370-10 Standards for Specifying Construction of Airports; AC 150/5370-2G Operations Safety on Airports during Construction; and other current advisory circulars as required. All deliverables required in this section shall be submitted to Kittitas County and FAA ADO for review in the form of one compiled draft and one compiled final submittal. 5.1. ADVANCED ENGINEERING DESIGN TAXIWAY AND RUNWAY This task will include advancing the preliminary engineering (25% design) to an approximately 60% level for the following work elements: Bowers Field Airport Environmental Assessment Page S Advanced Design Needs for NEPA Analysis November 27, 2019 13 J bo to G N ip c o c o� o Permit o °' > Cr '0 rr (issuing Agency) Submittal Requirements U 3 U ° Q Yes; Within Wetland rating forms and figures Direct Study 25% 60% Yes Area Only Yes; Within I Off-site Mitigation Plan Drawings Direct Study 25% i 60% Yes Area Only Floodplain Signed application form and fee Yes 25% 25% No Development Project Description Yes 25% 25% No Permit (Kittitas County) Estimated Project Cost Yes 25% 60% Yes Yes 25% 60% Yes Site Grading Plan & Fill Quantities No Net Loss & Mitigation Analysis Yes 25% 60% Yes The Washington Department of Ecology must issue the Section 401 Water Quality Certification in advance of the Corps Section 404 Individual Permit. Public noticing and coordination with stakeholders and Tribes is also required for the Individual Permit. Thus, the overall timeline for securing the required permits for the proposed airfield improvements is anticipated to be between 12 and 24 months. 5. ADVANCED ENGINEERING DESIGN & ENVIRONMENTAL INVESTIGATION NEEDED TO COMPLETE NEPA ANALYSIS Advanced engineering design will advance the 25 percent design to 60 percent design for all improvements except items such as electrical load calculations and pavement marking layout which are not required to allow the environmental permits to be submitted. Advanced environmental investigation will perform additional site analysis required for permit submittal and completion of the Draft EA. All improvements will follow the requirements of Advisory Circular (AC) 150/5300-13A, Airport Design; AC 150/5370-10 Standards for Specifying Construction of Airports; AC 150/5370-2G Operations Safety on Airports during Construction; and other current advisory circulars as required. All deliverables required in this section shall be submitted to Kittitas County and FAA ADO for review in the form of one compiled draft and one compiled final submittal. 5.1. ADVANCED ENGINEERING DESIGN TAXIWAY AND RUNWAY This task will include advancing the preliminary engineering (25% design) to an approximately 60% level for the following work elements: Bowers Field Airport Environmental Assessment Page S Advanced Design Needs for NEPA Analysis November 27, 2019 ///VCESTTURY E N G I N E E R N G • Site demolition of existing airfield features • Geometric layout of runway and taxiway improvements • Layout of proposed electrical lighting and signage improvements • Taxiway profile and site grading design • Temporary erosion and sediment control • Site geotechnical investigation for the purposes of pavement design • Airfield pavement design • Construction phasing for each individual project • Layout, and sizing of airfield storm drainage improvements r- 114"1 l: A Draft Advanced Airfield Engineering Design Memorandum will be prepared to document the design rationale that is implemented. This memorandum will be finalized following a County and FAA review meeting to discuss comments on the draft memorandum. While it is anticipated that the design will be advanced to a level of approximately 60%, the plans that will be developed are intended to serve as an overview and documentation of the design rather than full 60% bid documents. It is also expected that electrical engineering and load calculations will not be required for airfield lighting and signage improvements at this time. Deliverables: a Draft and Final Geotechnical Report • Draft and Final 60 Percent Advanced Airfield Design Plans • Draft and Final Advanced Airfield Engineering Design Memorandum 5.2. ADVANCED FLOOD MITIGATION DESIGN The design for the proposed flood mitigation improvements will be advanced. Additional alternatives analysis will be performed to ensure the optimal and least impactful solution is implemented. The design will include layout, sizing and grading for flood mitigation BMP's and will incorporate the calculated outflows from the airfield storm drainage design into the hydrologic model. Drawings depicting the layout, sizing and grading for the proposed improvements will be incorporated into the Advanced Airfield Design Plan deliverable from Section 5.1 of this memo. The Floodplain Assessment Report deliverable will be amended from the effort that has been performed to date. Deliverables: • Draft and Final Floodplain Assessment Report • Draft and Final Stormwater Design Report and Improvement Plans Bowers Field Airport Environmental Assessment Page 9 Advanced Design Needs for NEPA Analysis November 27, 2019 W*Z/CEN WESTTURYi#+ E N G I N E E R I N G 44 5.3. ADVANCED ENVIRONMENTAL INVESTIGATION AND DESIGN Additional environmental site reconnaissance will be required in areas where flood mitigation improvements are required outside the original direct study area. Additional work will also be required at the selected off-site mitigation area. The following work elements are anticipated: • Supplemental cultural resources investigations • Additional wetland delineations and stream assessments Supplemental evaluation of flood mitigation design to determine effects on threatened/endangered species • Preparation of biological assessment, if deemed necessary by threatened/endangered species effects determination • Wetland delineations and/or reconnaissance on the selected mitigation site • Professional survey to provide topographical information for the property and recording of a conservation easement • Archaeological / cultural resource review The Cultural Resources Survey Technical Report, Wetland Delineation Report, and Environmental Inventory Memo deliverables from the effort completed to date will be updated based on the findings of the supplemental design and site investigations. The need to obtain a Section 404 Individual Permit triggers the requirement for a wetland mitigation design for an off-site mitigation area, which will be completed in conjunction with the advanced airfield engineering design, advanced flood mitigation design and permit application process. Deliverables: • Draft and Final Cultural Resources Survey Technical Report • Draft and Final Wetland Delineation Report • Draft and Final Environmental Inventory Memo Draft and Final Biological Assessment (if needed) • Draft and Final Wetland Mitigation Report and Conceptual Design • Draft and Final 60 Percent Wetland Mitigation Design Drawings 5.4. DRAFT PROJECT COST ESTIMATE A 60 percent project cost estimate will be prepared. It will include all proposed construction cost elements associated with the 60 percent design plans. Deliverables: • Draft and Final 60 Percent Project Cost Estimate Bowers Field Airport Environmental Assessment Page 10 Advanced Design Needs for NEPA Analysis November 27, 2019 FCENTURY WEST E N G I NEER ING 5.5. PROJECT MANAGEMENT, ACCOUNTING, QA/QC, AND TEAM MEETINGS The advanced engineering design tasks will extend the schedule required to complete the NEPA analysis. (See Section 7, Estimated Schedule Impact, for a discussion on the anticipated schedule impact). Thus, additional project management and accounting will be required. Further internal coordination between the Project team as well as QA/QC of each of the deliverable documents will be needed. Coordination with FAA ADO as the design progresses from 25% to 60% will also be required in order to review design progress. 6. ESTIMATED COST Based on the project needs outlined in Sections 4 and 5 or this memo, the Rough Order of Magnitude cost for the proposed work effort is anticipated to be between $400,000 and $500,000. 7. ESTIMATED SCHEDULE IMPACT Work to support the NEPA analysis began in August 2018. The Final EA was anticipated to be completed around January 2020 with the environmental finding anticipated in February 2020 (a total duration of 18 months). Assuming the process to review and approve the Advanced Engineering Design work discussed in this memorandum is completed by the end of !November 2019, the anticipated completion date of the environmental finding is March 2022; an extension in the NEPA analysis schedule of 25 months. Approximate timelines for when the work would occur include: WAdvanced Design/Permitting Project Phases Timeline Advanced Design Scoping & Contract December 2019 — February 2020 Advanced Engineering 60% Preliminary Design Alternatives i February 2020 — May 2020 i i Field Investigations & Site Coordination (Wetland, Flood, Cultural, Biological, FEMA, DOE, COE Coordination) April 2020 —June 2020 Advanced Engineering 60% Draft Final Design Alternatives July 2020 — October 2020 Identify Wetland Mitigation Areas & Alternatives September 2020 —January 2021 Permitting Submittal Preparation & Mitigation Design/Coordination !October 2020 -February 2021 ' Advanced Engineering 60% Final Design Alternatives I October 2020 - February 2021 I j Submit Permit Applications February 2021 Permitting Agency Coordination February 2021— September 2021 Draft EA July 2021—September 2021 I Bowers Field Airport Environmental Assessment Page 11 Advanced Design Needs for NEPA Analysis November 27, 2019 WO&wESTTURY E N G I N E E R I N G Public Meeting and Comments ! September 2021—January 2022 Final EA January 2022— February 2022 I Environmental Finding February 2022 — March 2022 Additional timelines beyond the scope of the EA are as follows: Future Project Phases Timeline Final Design June 2022—March2023 Bidding March 2023 —May 2023 Construction Summer/Fall 2023 8. REQUEST Kittitas County is unable to float the funds required to advance design to support permit applications and complete the NEPA analysis until a final design grant is able to be issued. As the County currently has $400,000 of Non -Primary Entitlement funds carried over from previous years, this would be able to fund an effort of approximately $445,000, which sits within the anticipated rough order of magnitude range for advanced design and permitting efforts. Kittitas County requests that the FAA authorize the use of Non -Primary Entitlement funds to support the advanced design effort required to complete the NEPA analysis. This action allows the critical EA milestones moving forward. Bowers Field Airport Environmental Assessment Page 12 Advanced Design Needs for NEPA Analysis November 27, 2019 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMIVIISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 9, 2019 TOPIC: 2019 Joint Planning Conference ACTION REQUESTED: Support Staff Actions Implementing ELN 2020 — 2025 Capital Improvement Plan LEAD STAFF: Mark R. Cook RECONL'VIENDATION: Support staff actions implementing the Federal Aviation Administration ELN 2020 — 2025 Capital Improvement Plan (ACIP). BRIEFING SUMMARY: • The annual joint planning conference with Washington. State Department of Transportation Aviation Division (WSDOTA) and the Federal Aviation Administration (FAA) was held on December 4, 2019 • Staff is requesting several changes to the approved ACIP • FAA region (Seattle) is supporting staff's request to go to sixty percent (60%) design on the 11/29 taxiway and 11/29 reconfiguration Additional funding is being sought by the FAA in the next several weeks • Staff is requesting $2M in additional funding for wetland mitigation • Staff is requesting that taxiway construction be pushed to 2024 and 11129 reconfiguration be set back to 2025 BACKGROUND: Annually, Public Works (PW) airport staff phone conferences with WSDOTA and the FAA on matters concerning ELN. The most recent conference focused on the ongoing Environmental Assessment and PW request for advanced design. The request for advanced design is being driven by the draft wetland identification mapping and flood attenuation proposal. These two actions have significant probable impact to ACIP implementation. DISCUSSION: FAA Seattle appears supportive of staff s request for advanced design. An estimated $400,000 is likely defining wetland and floodplain impact supporting a final environmental determination by FAA Seattle staff. A likely requirement resulting from wetland impact is an individual project permit from the United States Army Corps of Engineers (USACE). PW staff anticipates mitigating wetland impact at a ratio of seven Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT to one (7:1). Currently, the FAA prefers othite mitigation for wetland impact. This suggests that PW is well served to begin planning for wetland mitigation immediately. Given the timeline associated with wetland bank creation, PW desires pushing the construction of the parallel taxiway back to 2024. Any delay of the approved ACIP has associated funding risk. Associated with the recognition that ACIP delay is inevitable, given wetland and floodplain issues, reconfiguration of runway 11129 delay is likely to 2025. The FAA is just now beginning the planning cycle for 2025 airport improvements. This early planning action supports delay of 11/29 reconfiguration. The process of ACIP delay and associated funding implications is complex. There is a potential that supplemental county funding may be required to keep ACIP implementation on schedule. FISCAL LVTACTS: Known impacts to finalizing the EA are defined and FAA is responding with additional funding. Staff is requesting an additional grant supporting wetland mitigation in the amount of $2 million. ATTACHMENTS: Exhibit 1: Revised ACIP schedule Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: REVISED ELN ACIP SCHEDULE Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT a aj a a` p m 3 m a m n a 3m I v 3 j I { a �ggg g$rI'I os Er 9 n IL�4 ••"22� tl S Q y 3 � y3 It qQo qPa � pi $ � s� k is] ea 2 a iF Era a¢gn p 33 a 9 2 a 8 2g ag9 p gppyS�07 g � E A � 3 � w � � B s a s �i sI N s 8 8 S $ s $ S o PI pI $ $ $ S S $ S S u rL � $ s s• s � s{ KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 9, 2019 TOPIC: Towns to Teanaway Trailhead Support Request ACTION REQUESTED: Support the Request for Assistance from Public Works LEAD STAFF: Mark R. Cook RECOMMENDATION: Support the request for trailhead improvements. BRIEFING SUMMARY: Towns to Teanaway is completing a network of recreation trails in the Ronald, Roslyn and Cle Elum area (Exhibit I) The group desires assistance from Public Works improving two key trailhead areas (Ronald and No. 5 Mine Road — Exhibit 2) Improvements entail: Clearing and grubbing, grading, wheel stop installation, trailhead signage and general landscaping (others) BACKGROUND: Public Works maintains an annual budget line item for "paths and trails" (542-5426-000). The proposed 2020 budget has approximately $5,000 in various line items targeting trail improvements. Recently, staff met with a "Trails to Teanaway" representative (Ms. Nicky Pasi) discussing possible Public Works support. DISCUSSION: The requested work is easily supported by Public Works. Providing the Board of County Commissioners expresses project support, staff will conduct site reconnaissance, develop a project budget and advise any additional actions required amending the annual construction program and/or 2020 budget impacts. FISCAL EMPACTS: Project costs are undetermined at this time. A planning level cost estimate of $20,000 is offered pending validation and subsequent project development efforts. ATTACHMENTS: Exhibit 1: Trails to Teanaway trail network map Exhibit 2: Ronald and Cle Elum site maps Page I of 3 PUBLIC WORKS BOARD OF COUNTY COMIISSIONERS WORK SESSION STAFF REPORT EXHIBIT I.- TRAELS TO TEANAWAY TRAIL NETWORK MAP Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY CONRvIISSIONERS WORK SESSION STAFF REPORT ■ coo _71 EXHIBIT 2: RONALD AND CLE ELLM SITE MAPS Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY CON IISSIONERS WORK SESSION STAFF REPORT % 0 w 06 .� O D) 'co co0 (D W % CU CO70 u m 4) CU C;)a) CU _ �b C 2 2 C: c) 0 w Y { � 41 r ' L 0 0-4 w - 06 C N m O C p U a3 cc LV Q} Cto _o) -a ■_CU C U) cu m 'a �M CU I- N N � i UC7UC�U1--CSU KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY C0NNUSSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: December 3, 2019 TOPIC: I-976 Update ACTION REQUESTED: Informational — No Action Requested LEAD ,STAFF: Mark R. Cook RECOMMENDATION: Monitor the legislature's response to legal actions being taken. BRIEFWG SUMMARY: • 1-976 recently implemented $30 car renewal fees statewide • Legal challenge has stalled implementation (Seattle and King County et al) Plaintiffs are asking that the initiative be ruled unconstitutional and be prevented from taking effect • Washington State Department of Transportation (WSDOT) recently issued a notice to all regions postponing implementation of projects not underway • I-90 widening to Easton is on hold BACKGROUND: State residents recently passed initiative 976 capping vehicle registration fees at $30. Immediately, Seattle and other large urban cities petitioned the courts for relief implementing the initiative. Last week, relief was granted by King County Superior Court delaying implementation of the $30 car renewal fees. DISCUSSION: Washington State Office of Financial Management (OF ML) estimates a loss of $19 billion in state revenue in the next six years. Responding to the passage of I-976, Governor Inslee directed WSDOT postpone all projects not underway (EXHIBIT 1). This action immediately impacts the start of I-90 widening to Easton. Staff has been finalizing conditions of approval with WSDOT for the pending widening. Recently, staff and Commissioner Osiadacz conferenced with WSDOT South Central Region management on relocating the weigh station at North Bend to exit 80 (Cle Elum); and it is unknown if the relocation is impacted by the Governor's directive. FISCAL P PACTS: Any tax revenue generated by the I-90 widening to Easton are put on hold. ATTACHMENTS: Exhibit 1: WSDOT notice to regions Page 1 of 2 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: WSDOT NOTICE TO REGIONS Page 2 of 2 PUBLIC WORKS BOARD OF COUNTY CONBUSSIONERS WORK SESSION STAFF REPORT "TAR Washington State 7ransportetlon Building Park DePoWtMe t of �i�M P.Q. Box 473Qo Avenue S. E. Olympla, WA 98504-7300 380-705-7000 TrY;1-800-833-6388 www,vrsdot.wa gov November 26, 2019 In response to the passage of I-976 and resulting cuts to transportation revenue sources, Governor Inslee directed WSDOT to postpone projects not yet underway. By delaying the obligation of funds, WSDOT provides the Governor and Legislature more funding flexibility as they determine how to amend the 2019-21 transportation budget to implement I-976 during the legislative session. WSDOT knows that the loss to transportation accounts used byour agency during the 2019-21 biennium is estimated to be $451 million out of a $6.7 billion biennial budget, assuming an implementation date of Dec. 5, 2019. For 2021-23, the effect for the full biennium is estimated at $645 million, and for 2023-25 the revenue loss is estimated at $726 million. This is a significant loss to specific programs supported by our agency budget. The attached list identifies delayed projects including: * Construction projects that add capacity to the transportation system scheduled to go out to advertisement in the next six months (including any unexecuted consultant agreements related to these projects). * State funded local agency projects with no executed agreement or projects that have a portion of the funds not under agreement. * Rail grant projects with no executed agreements. Public Transportation grant projects with no executed agreement and/or no purchase order of equipment or vehicles have yet been placed. WSDOT is assuming a delay of these projects for at least six months. It is important to note that projects and grants not included in the attached list may also be affected by legislative deliberations to amend the 2019-21 transportation budget to reflect passage of I-976. Additionally, all new grant funded project solicitations will be on hold until we are given further direction by the Legislature and Governor. The work to determine which projects are postponed is not simple, nor a task taken lightly. This list reflects deliberative work as transportation projects are complex. Each project is unique in terms of current project phase, how they are funded and structured— often a blend of local, state and federal dollars — and all required close examination to determine what postponement could mean from a funding and contractual perspective. If you have questions or concerns, you should contact the following WSDOT staff: Capacity expanding projects, please contact your WSDOT region administrator: o Northwest region administrator, Mike Cotten, (206) 440-4693 o Olympic region administrator, John Wynands, (360) 357-2658 o Southwest region administrator, Carley Francis, (360) 905-2001 o South Central region administrator, Todd Trepanier, (509) 577-1620 o North Central region administrator, Dave Bierschbach, (509) 667-3001 o Eastern region administrator, Mike Gribner, (509) 324-6010 Local agency projects, Kathleen Davis, (360) 705-7871 Rail grant projects, Ron Pate, (3 60) 705-6903 Public transportation grant projects, Brian Lagerberg, (360) 705-7878, or Don Chartock, (360) 705-7928 November 26, 2019 Page Two This list does not include preservation, specific safety-related projects, fish passage, or specific grant projects designed to serve or keep vulnerable populations safe. Preservation and safety projects will move forward and are critical to the safe operation of our multimodal transportation system. Fish passage projects are also moving forward to ensure the state meets the federal court injunction deadline. Grant projects that are designed to serve or keep vulnerable populations safe include programs such as bike/ped safety grants, safe routes to school grants and public transportation programs like state special needs and rural mobility grants. We are all navigating a challenging situation. It will be months before we have a definitive plan in the form of an amended 2019-21 transportation budget by the Legislature and the Governor. My commitment to you is an open, two-way dialogue as we move forward into the legislative session. Sincerely, Roger Millar, P.E., FASCE, FAICP Secretary of Transportation WSDOT 6 Month Construction Project Deferral List 11/26/19 501213X U i MNme ;viae Hili to i rencntown v is - tsuua New mpway 12 E.01213 X Butlit Now Highway 10OM-200.1 109065K I-90/Raging River Bridge to Bandera Vic - Stormwater Retrofit 090 A09065K Stormwater Retrofit IM -2M 809936E SR 9915 Krug St Vac to Roy St - Viaduct Replacement 099 U09904D S Surface Street Connezttons 1034-15M 501213X US 12/Nine Mile Hill to Frenchtown Vic - Build New Highway 12 E01218V Irrigation Relocation under IM I00591R I-5/Northbound On -Ramp at Bakerview - Improvements 005 A53904B ?vht3gation Site under 1M 509093B 1-90/E.aston Ilill to W Easton I/C WB - Replace Bridge and Build Detour 090 E09093B Replace Bridge -Build Detour IOM -15M 3161324, SR 161/31st Ave SW Overpass - Imptovements 161 C16132D Widening & Interchange Impi under IM 5395040 US 395/Ridgeline Drive - Construct Interchange 395 E395040 Construct Interchange IOM-I5M 150907E SR 50911-5 & SR 516 I/C to 28th/24th Ave S - SR 509 Completion Stage 1 509 4,50907E Widening &. Toll Lunen 200M -300M 5090160 1-90/Canyon Rd Interchange - EB Ramp Terminal Improvements 090 E090160 Compact Roundabout under 1M 6000151 US 395/NSC Spokane Rivet to Columbia - Shared Use Path 000 F000151F Shared Use Path 10M -15M 500009W I-90, US 97 & SR 970 Ellensburg Vic - CED Planning and Mitigation 970 E00009W Reach Assessment/Gap Analysis under 1M 100591R I-5/Northbound On -Ramp at Bakeiview - Improvements 005 A00591R Construct NB On -Ramp 4M -5M 100521X I-51NB Seneca St to Olive Way - Mobility Improvements 005 A00522W Add Additional Lane 15M -20M 401419B SR 141E of Bingen - Poit of Khckztat Access Improvements 014 D01419B Grade separated Rail Crossing 10M -15M 600015M US 395/NSC Sprague Ave to Spokane River 395 F00015L Construct New Lanes 45M -50M 4501194, SR 501+1-5 :o Port of Vancouver - Intersection and Profile Improvements 501 D50120A Roadway Improvements 4M -5M 100910K SR 9/SR 204 Intersection - Improvements 009 A00910M Additional NB Lane 5M -10M 609049L I-90Batker to Harvard - Improve Interchangas and Local Roads 090 P09049L Connect Local Roads 1M -2M 609049M 1-90/Barker Rd Intersection Improvements 090 F09049M EB Off -Ramp Roundabout 1M -2M 609067D I-90/Medical Lake UC to Geiger Field I/C - Reconstruction - Phase 2 090 F09067D Upgrade Interchange 5M -10M 852005E SR 520/1-5 Interchange - Improvement 520 U52005E HOV Ramp connection 60M -70M 609049R 1-90Baiker to Harvard - WB on -Ramp Improvement 090 F09049R WB ramp improvements 2M -3M 6090495 I-90Barker to Harvard - Add Lane Harvard Rd Bridge 090 F09049S Add Lane to Bridge 3M -4M 539503X US 395/Pasco - Flamingo Mobile Home Park. Noise Walls 395 E39503X Install Noise Walls 2M -3M 5240030 SR 240/Richland Corridor Improvements 240 E240030 Intersection Improvements IM -2M Page 1 of 1 State Funded Local Agency Projects Deferral List 11/26/19 L200000.) Bauit Urmmd Sic 562P Mam 3mxi Frojc.cti W roanmg L2000120 !Bellingham Chchard Drive Extension (11kchwood Ave) 1-2000328 Bingen Bmgen Walnut Cteek & Maple Rariroad Ciosbing L2000339 B-Cma-ton SR 343 Warren Ave Bridge Pedestrian Improvements L200O274 Chelan rratfli.impiovcments L2220059 Covington SR 516 Jenkins Creek to 185th PI SE L2000104 Covington Covington Connector L1000224 DuPont Dupont-SteilacoomRd Improvements L1000283 I bdetal Way South 314th St Imptovtmeute L1000087 Fife 1-5/Port of Tacoma Interchange L1000249 Island C o Union to Ken's Cornet Tiatl L1000182 Issacaah SR 900 -12th Ave NW Enhanced Turning Capacity L2000263 Kenmore SR 522 Crossing Study WLBTRSTL iKirg Ce. Wilburton Trestle 02000078 King Co Redmond Ridge',vE Roundabout L2000277 Kiickitat Co. Courtney Road L1000244 Lake Forest Pall SR 104140th Plate NE Rouodabour L1000282 Lewis Co. Mickelson Parkway L1000222 Longview BtechSomtBxtcnslon N52400R Lvnnwood ' 196th Street SW (Si 524: 48th Ave-37tb Ave) L2000242 Maryavillt Cententaidl Trail GomtbEbm -Phase 3 1,1000/95 :Mountlake Terrace Main Street Revitalization L2000066 Pasco ixwibSneetOverpass 1,2000205 Port of Centralia 1-51 Mcuen Street Connector L2000262 Port of Vancouver Columbia River Rendissanoc 1nu1 Connet�tion N30500R Poulsbo Noll Road South Segment L1000081 Redmond Community Fatalities Dist iot lmptavements L1000250 -Renton I-405/44th Gateway Signage & Green-Scaping Improvements -L1000193 Renton Biomon Way EUdge - Seramu Retrofit and Painting L2000132 Richland Duportail Street Bridge L1o00284 Ridgefield Ridgefield South I -S Access Planning_ L1000094 Saminamish Issaquah -Fall City Road L1000260 -Shelton Wallace Morland and Shelton Spnngs Road Intersection 5 2uo sons muon nor under ogteemanc 9,727 Construction not under agreement 800 1,500 193 C:onshuation not under agreembnt 13,010 Construction rot under agreement 22,360 C arstruction not under agteemen_t 3,900 300 16,200 Stage 2 Construction not under agreement 860 1:500 300 2,500 800 1.500 650 750 - 1000 9,985 Construction not under agreement 463 Construchon noetinder agreamm 360 13,600 Construction not under agreement 6,843 Construction cot under agreement 500 5,359 WSDOT CWA contribution -Consinction rot under agreement 1212019 Ad IBM 1,819 Stage 4 C insbucuon request scope Change - 1212019 Ad 17M -18M 210 2,380 Construthonnot undei agreement 1,685 'Stage 2 Construction not under agreement 250 1,500 Stage 2 Construction not under agreement 650 State Funded Local Agency Projects Deferral List 11!26!14 L1000148 Shoreline SR 523 -145th Street 12,500 ,L2000272 Stanwood 90th Avenue NW Extension (4ilungAve) 500 Coushuctronnotundetagreement -12/2019Ad 3M -4M. L1000285 'Washougal Washougal 32nd SL Underpass Design & Permitting 300 L2W0342 I aluma 48th l Washington Improvements 650 I.2000341 Yakima 72nd / Washington Improvements 1,000 Rail Grant Project Deferral List 11/26/19 700401A Spokane Spangle & Palouse Railway SSPR- Marshall to Oaksdale Track Rehab (2019 TRAP) % 780 700602A Washington Easter Railway Washington Eastern - Track Rehab - MP 11-24, 37-57 (2019 FRAP) $ 812 720201A Columbia Walla Walla Railroad Columbia Walla Walla Railroad - Aggregate Hopper Cars (2019 FRAP) $ 312 744210A Puget Sound and Pacific Railroad Puget Sound & Pacific Railroad - Hoquiam Bridge (2019 FRAP) $ 874 741001A Connell Connell Rail Interchange - Construction $ 9,550 71042ZA Spokane International Airport Spokane Airport Transload Facility $ 500 Public Transportation Grant Project Deferral List 11/26/19 Project Iead kgency Number (PIN) Title Program 2019-21 Award (actual amount) 20190003 Ben Franklin Transit Ben Franklin Transit: West Pasco Multimodal Hub Re Tonal Mobility $ 3,206,721 20190004 City of Kant City of Kent: Rapid Ride Facility Passenger Amenities & Access Improvements. Regional Mobility $ 1,235,955 20190007 Ben Franklin Transit Ben Franklin Transit: Du ortail Multimodal Hub Regional Mobility $ 1,356 559 20190008 Ben Franklin Transit Ben Franklin Transit: Downtown Pasco Multimodal Hub Regional Mobility $ 1,551,958 20190009 Seattle DOT Seattle DOT: Market/45th Ra idRide Re Tonal Mobility $ 4,000,000 20190010 Spokane Transit Authority Spokane Transit Authority: Cheney HP Transit Cor, Imp. & Vehicle Acquisition Regional Mobility $ 2,303,000 20190011 CityofBurien City ofBurien: Ambaum Blvd and H Line Transit Pathway Improvements Regional Mobility $ 10,000,000 20190016 City of Longview-RiverCities Transit City of Longview-RiverCities Transit:Lexington Connector Exp. Regional Mobility $ 292,000 20190A19 Spokane County Spokane County CTR Office: Liberty Lake Shuttle Regional Mobility $ 112,600 02000032 King County Metro King County Metro - Route 40 NordWte to Downtown Transit (Tier) Projects $ 1,000,000 N/A Ben Franklin Transit Replace and/or Purchase 120 new vans vanpool $ 2_574,000 N/A Clallam Transit Replace and/or Purchase 10 new vans Vanpool $ 214 500 N/A Communi Transit Replace and/or Purchase 26 new vans Vanpool $ 1,499,200 NIA C-TRAN Replace and/or Purchase 1 new vans Van ool $ 21,450 N/A Garfield Coun Replace and/or Purchase 2 new vans Vanpool $ 74 700 N/A Grant Transit Replace and/or Purchase 5 new vans Vanpool $ 169,950 NIA Grays harbor Transit Replace and/or Purchase 5 new vans vanpool $ 107,250 N/A Intercity Transit Replace and/or Purchase 12 new vans Vanpool $ 257,400 N/A Island Transit place and/or Purchase 24 new vans Be Vanpool $ 514,800 N/A King County Metro Replace and/or Purchase 188 new vans vanpool $ 2,898,700 N/A Kitsap Transit Replace and/or Purchase 15 new vans Vanpool $ 321,750 N/A Skagit Transit Replace and/or Purchase 7 new vans Y---2001 $ 150,150 NIA Spokane Transit Authority Replace and/or Purchase 8 new vans Vanpool $ 359,700 NIA Sound Transit Regional Transit Marketing Program Transit Coordination $ 1,000,000