HomeMy WebLinkAbout2020-03-09-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday March 9, 2020 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Request to Approve a Resolution to authorize the Director of Airport Operations Signature
on Grant Application Documents for Bowers Field Runway 7125 Design using 2020 Airport
Fund Reserves.
3. Request to Approve a Resolution to authorize the Director of Airport Operations Signature
on Grant Application Documents for Bowers Field Runway 7125 Construction using 2020
Airport Fund Reserves.
4. Request to Approve a Resolution to authorize the Director of Airport Operations to Sign the
Grant Application with the Federal Aviation Administration Funding Additional Environmental
Assessment Work at Bowers Field committing Airport Fund Reserves as Grant Match.
5. Request to Approve a Lease for Lot C-38 of the Kittitas County Airport Amended Binding
Site Plan along with buildings upon said Lot wiht Ellensburg Pallets, LLC.
S. Request to Approve a Resolution to authorize the Chairs Signature on Watershed Science
and Engineering Task Order No. 7 Amendment No. 2.
7. Request to Approve a Resolution to award Highway Infrastructure Funding (Rural) and
Highway Infrastructure Funding (Urban) Funds to Kittitas County Public Works.
8. Request to Approve a Resolution to award Unobligated Surface Transportation Block Grant
Funds to Kittitas County Public Works.
9. Request to Approve a Notice of Call for Sealed Bids for the Supply of a Steel Modular
Bridge.
10. Request to Approve a Notice of Call for Sealed Bids for the Coleman Creek Culvert
Replacement -Structure Only.
11. Easton School District Traffic Control Measures Request
12. Council of Governments Staff Support Assignment
13. Other business
14. Adjourn
Created on 3/6/2020 9:26:02 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY
1:30 PM
MARCH 9, 2020
Board members present: Vice -Chairman Laura Osiadacz, Commissioner
Cory Wright
Others: Mark Cook, Candie Leader, Arden Thomas, Public Works; Dan
Carlson, Calvana Carper, Mike Flory, Community Development Services;
Neil Caulkins, Prosecuting Attorney's Office, Ben1amin West, Director
of Airport Operations; Three (3) Members of the Public
At 1:30 pm Vice --Chairman Laura Osiadacz opened the Public Works Study
Session.
Mark Cook requested to move Item Twelve (12) to Item Two (2) to allow
Dan Carlson to be present if any questions are had.
COUNCIL OF GOVERNMENTS STAFF SUPPORT ASSIGNMENT
Mark Cook gave background on the Public Facilities Fund and the level
of involvement by Public Works getting material packages ready for
Council of Government (COG) meetings. Mark Cook continued that he
met with Dan Carlson, Director of Community Development Services
(CDS) to discuss transferring the staffing of COG to Public Works.
Mark Cook added that when planning questions or issues arise Public
Works staff would consult with CDS and a CDS staff member could
attend COG meetings as a member of the audience if necessary.
Discussion was held. Staff was directed to make the staffing change
starting with the April COG meeting.
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE DIRECTOR OF AIRPORT
OPERATIONS TO SIGN THE GRANT APPLICATION WITH THE FEDERAL AVIATION
ADMINISTRATION FUNDING ADDITIONAL ENVIRONMENTAL ASSESSMENT WORK AT
BOWERS FIELD COMMITTING AIRPORT FUND RESERVES AS GRANT MATCH
Mark Cook stated that due to time constraints items related to Bowers
Field were placed on the Public Works Study Session for
consideration.
Mark Cook gave an update of the Environmental Assessment and
explained the Federal Aviation Administration's process for apply for
grants for matching funds. Mark Cook stated that a resolution of
support and understanding is required as part of the grant
application package. Mark Cook stated that the match would need to
come from airport fund reserves. Discussion was held. Commissioner
Cory Wright made a motion to approve Resolution 2020-047 to Authorize
the Director of Airport Operations to Sign the Grant Application with
2020-03-09 MINUTES
the Federal Aviation Administration Funding Additional Environmental
Assessment Work at Bowers Field Committing Airport Fund Reserves as
Grant Match. Vice -Chairman Laura Osiadacz seconded the motion.
Motion passed.
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE DIRECTOR OF AIRPORT
OPERATIONS SIGNATURE ON GRANT APPLICATION DOCUMENTS FOR BOWERS FIELD
RUNWAY 7/25 DESIGN USING 2020 AIRPORT FUND RESERVES
Mark Cook gave background on the project and explained the grant
requirements related to the grant match. Mark Cook stated that
Runway 7/25 is not eligible for Federal Aviation Administration
funding however, staff felt it was appropriate to attempt to secure
additional funding for the project. Mark Cook added that this grant
application would be for the design of Runway 7/25 and that the
Department of Commerce grant that was slated to be used for design is
still pending approval. Discussion was held. Commissioner Cory
Wright made a motion to approve Resolution 2020-045 to Authorize the
Director of Airport Operations Signature on Grant Application
Documents for Bowers Field Runway 7/25 Design Using 2020 Airport Fund
Reserves. Vice -Chairman Laura Osiadacz seconded the motion. Motion
passed.
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE DIRECTOR OF AIRPORT
OPERATIONS SIGNATURE ON GRANT APPLICATION DOCUMENTS FOR BOWERS FIELD
RUNWAY 7/25 CONSTRUCTION USING 2020 AIRPORT FUND RESERVES
Mark Cook stated that this item is similar to the last two items for
Bowers Field. Mark Cook gave background on the construction plans
for Runway 7/25 and the grant match for this application is available
in airport fund reserves. Mark Cook continued that if the grant
application isn't successful then there is a loan program that could
be applied for to help offset costs. Discussion was held.
Commissioner Cory Wright made a motion to approve Resolution 2020-046
to Authorize the Director of Airport Operations Signature on Grant
Application: Documents for Bowers Field Runway 7/25 Construction Using
2020 Airport Fund Reserves. Vice -Chairman Laura Osiadacz seconded
the motion. Motion passed.
REQUEST TO APPROVE A LEASE FOR LOT C-38 OF THE KITTITAS COUNTY
AIRPORT AMENDED BINDING SITE PLAN ALONG WITH BUILDINGS UPON SAID LOT
WITH ELLENSBURG PALLETS LLC
Mark Cook stated that Ellensburg Pallets LLC is requesting a five (5)
year lease for Lot C-38 at Bowers Field. Mark Cook continued that
with the current economic model of the business, Ellensburg Pallets
LLC requested to use only a portion of the lot. Mark Cook added that
the new rate will be at the fourteen cents ($.14) as set by the Board
of County Commissioners. Discussion was held. Commissioner Cory
Wright made a motion to approve a Lease for Lot C-38 of the Kittitas
County Airport Amended Binding Site Plan along with Buildings Upon
2020-03-09 MINUTES
Said Lot with Ellensburg Pallets LLC. Vice -Chairman Laura Osiadacz
seconded the motion. Motion passed.
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE CHAIR'S SIGNATURE ON
WATERSHED SCIENCE AND ENGINEERING TASK ORDER NO. 7 AMENDMENT NO. 2
Mark Cook introduced Arden Thomas, Water Resource Manager to present
the next agenda item.
Arden Thomas gave background on the Reecer Creek FEMA Flood Hazard
Mapping project and stated that FEMA has requested the County tie
into the new mapping with the existing maps. Arden Thomas continued
that this request requires additional funds for the Consultant to
ccmplete. Commissioner Cory Wright made a motion to approve
Resolution 2020-048 to Authorize the Chair's Signature on Watershed
Science and Engineering Task Order No. 7 Amendment No. 2. Vice -
Chairman Laura Osiadacz seconded the motion. Motion passed.
REQUEST TO APPROVE A RESOLUTION TO AWARD HIGHWAY INFRASTRUCTURE
FUNDING (RURAL) AND HIGHWAY INFRASTRUCTURE (URBAN) FUNDS TO KITTITAS
COUNTY PUBLIC WORKS
Mark Cook gave background on the Highway Infrastructure Funding
Program and stated that with the approval of amending the Six Year
Transportation Improvement Program and Annual Construction Program
adding Bullfrog Road repairs this allows that project to be eligible
for additional funding through this program. Discussion was held.
Commissioner Cory Wright made a motion to approver Resolution 2020-
049 to Award Highway Infrastructure Funding (Rural) and Highway
Infrastructure (Urban) Funds to Kittitas County Public Works. Vice -
Chairman Laura Osiadacz seconded the motion. Motion passed.
REQUEST TO APPROVE A RESOLUTION TO AWARD UNOBLIGATED SURFACE
TRANSPORTATION BLOCK GRANT FUNDS TO KITTITAS COUNTY PUBLIC WORKS
Mark Cook stated that staff was recently noticed that the City of
Kittitas was not in a position to use funds from the Surface
Transportation Block Grant that was awarded for 2020. Mark Cook
continued that Public Works would like to obligate those funds for
Bullfrog Road repairs and obligate the City of Kittitas funding to
2021 to align with the timeline of their project. Commissioner Cory
Wright made a motion to approve Resolution 2020-050 to Award
Unobligated Surface Transportation Block Grant Funds to Kittitas
County Public Works. Vice -Chairman Laura Osiadacz seconded the
motion. Motion passed.
2020-03-09 MINUTES
REQUEST TO APPROVE A NOTICE OF CALL FOR SEALED BIDS FOR THE SUPPLY OF
A STEEL MODULAR BRIDGE
Mark Cook gave background on the project that placed the temporary
bridge structure at Big Boulder Creek. Mark Coon stated that with
timelines staff would like to go out to bid to procure the structure
itself and bid the installation at a later date. Mark Cook added
that this will be a two week advertisement. Discussion was held.
Commissioner Cory Wright made a motion to approve a Notice of Call
for Sealed Bids for the Supply of a Steel Modular Bridge. Vice -
Chairman Laura Osiadacz seconded the motion. Motion passed.
REQUEST TO APPROVE A NOTICE OF CALL FOR SEALED BIDS FOR THE COLEMAN
CREEK CULVERT REPLACEMENT - STRUCTURE ONLY
Mark Cook gave background on the project and stated that the funding
secured was the first-time staff had applied for grant funding
through the Brian Abbott Fish Barrier Removal Program. Mark Cook
continued that the timeline for this project is aggressive, however
staff feels it's important to show that local government is poised to
deliver this kind of project in a timely manner. Mark Cook added
that procurement of this type of structure is lengthy, but the
project is slated to remain on schedule. Discussion was held.
Commissioner Cory Wright made a motion to approve a Notice of Call
for Sealed Bids for the Coleman Creek Culvert Replacement - Structure
Only. Vice -Chairman Laura Osiadacz seconded the motion. Motion
passed.
EASTON SCHOOL DISTRICT TRAFFIC CONTROL MEASURES REQUEST
Mark Cook gave background on the ongoing traffic issues in Upper
County with traffic bypassing I-90 during closures and construction.
Mark Cook stated that staff received a request from the Easton School
District for the deployment of interactive speed signs and crosswalk
improvements in the area of the school. Mark Cook added that the
cost is around eighty-five hundred dollars ($8500). Discussion was
held. Staff was directed to move forward with the request.
Meeting adjourned at 2:26 pm
2020-03-09 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Vice -Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 00 — d5
DEMONSTRATING THE BOARD OF COUNTY COMMISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD RUNWAY 7/25 DESIGN AND
AUTHORIZING THE DIRECTOR OF AIRPORT OPERATIONS TO EXECUTE THE
AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County intends to submit Airport Aid Applications to Washington State
Department of Transportation Aviation (WSDOT) for Design of Runway 7125
Rehabilitation at Bowers Field Airport (ELFT); and
WHEREAS: The current anticipated total project funding is estimated to be $84,173; and
WHEREAS: WSDOT requires local sponsors of airports to provide a minimum of a five
percent (5%) match to all awarded grants for projects ineligible for Federal
Aviation Administration (FAA) funding; and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project is estimated at
approximately $4,209, which is in the 2020 Airport Fund budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the funding request for Bowers Field Runway 7125 design and
authorize the Director of Airport Operations to execute the Airport Aid
Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted funds in the amount of approximately $4,209 to match funding for the
project.
DATED this 9th day of March 2020, at Ellensburg, Washington.
}}}l}11111111111f1y/
est
a $'QQrd
- Julie Kjorsvik
"Noll l l l l l }1t}
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Brett Wachsmith, Chair
&Ln , Vice Chair
Cory Wright, Commissioner
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. -01(9
DEMONSTRATING THE BOARD OF COUNTY COMMISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD RUNWAY 7/25 REHABILITATION AND
AUTHORIZING THE DIRECTOR OF AIRPORT OPERATIONS TO EXECUTE THE
AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County intends to submit Airport Aid Applications to Washington State
Department of Transportation Aviation (WSDOT) for the Construction of the
Runway 7/25 Rehabilitation Project at Bowers Field Airport (ELI); and
WHEREAS: The current anticipated total project funding is estimated to be $1,230,757; and
WHEREAS: WSDOT requires local sponsors of airports to provide a minimum of a 5% match
to all awarded grants for projects ineligible for Federal Aviation Administration
(FAA) funding; and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project is estimated at
approximately $61,538, which is in the Airport budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the funding request for Bowers Field Runway 7125 Rehabilitation
and authorize the Director of Airport Operations to execute the Airport Aid
Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted Airport funds in the amount of approximately $61,538 to match funding
for the project.
DATED this 9th day of March 2020, at Ellensburg, Washington.
0Mlss/0ti%,,
2l�
=A�s
:=
~le rk of the B- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Brett Wachsmith, Chair
T-�:o
Osia acz, Vice Chair
r
Cory Wright, Commissioner
BOARD OF COUNTY COYMSSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
DEMONSTRATING THE BOARD OF COUNTY COMMISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD AND AUTHORIZING THE DIRECTOR
OF AIRPORT OPERATIONS TO EXECUTE THE AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County is currently working to finalize the Environmental Assessment
(EA) supporting the Airport Capital Improvement Plan; and
WHEREAS: Preliminary environmental analysis has identified sufficient wetland and flooding
making completion of the Environmental Assessment unlikely without additional
environmental analysis exceeding current project funding; and
WHEREAS: Kittitas County intends to submit Airport Aid Applications to the Federal
Aviation Administration (FAA) and Washington State Department of
Transportation Aviation (WSDOT) for an (EA) — Advanced Design at Bowers
Field airport (ELN) generating the additional analysis required for the FAA to
make the required environmental determination supporting the Airport Capital
Improvement Plan; and
WHEREAS: The current anticipated total project funding is estimated to be $444,000, with
$400,000 using FAA Non -primary Entitlement (NPE) funds; and
WHEREAS: FAA requires local sponsors of airports to provide a 10% match to all awarded
grants; and
WHEREAS: WSDOT may be able to assist Kittitas County meeting grant match obligations by
providing half of the local match (equal to 50/6); and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project (without WSDOT
funding assistance) is estimated at approximately $44,000, which is in the Airport
budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the grant match funding request supporting additional EA work
for Bowers Field and authorize the Director of Airport Operations to execute the
Airport Aid Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted funds in the amount of approximately $44,000 to match funding for the
proj ect.
DATED this 9th day of March 2020, at Ellensburg, Washington.
0
Nerk of the -*W- Julie Kjorsvik
�/'''`s1
❑ D L1
%IF er of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Brett Wachsmith, Chair
C
Osia acz, Vice Chair
Cory Wright, Commissioner
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. � � �J
AUTHORIZING THE CHAIR'S SIGNATURE ON WATERSHED SCIENCE AND
ENGINEERING TASK ORDER NO.7 AMENDMENT NO.2 - REECER CREEK FEMA
FLOOD HAZARD ANALYSIS AND MAPPING
WHEREAS: Watershed Science and Engineering (WSE) is an approved professional service
provider selected from an open solicitation and master contract award process in
2017; and
WHEREAS: Public Works has received a grant from the Federal Emergency Management
Agency supporting flood hazard analysis and mapping for approximately seven (7)
mules of Reecer Creek; and
WHEREAS: WSE has Task Order No. 7 requested by Public Works supporting the FEMA grant
award; and
WHEREAS: The Scope of Budget and Budget for Task Order No. 7 must be revised to meet the
Federal Emergency Management Agency's requirements to complete this project
requiring Board of County Commissioners authorization.
NOW, THEREFOREBE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on WSE Task Order No.
7 Amendment 2; Reecer Creek FEMA Flood Hazard Analysis and Mapping.
DATED this 9h day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Brett Wachsmith, Chairman
Attest: CL2 C—)
Clerk of the Board- Julie Kjorsvik
E
aura acz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
Cot
E5 ... TO)
NF L
K'� ^��, KITTZTAEi CO
DEPARTMENT OF PUBLIC WORKS
t
KITTITAS COUNTY
Formal Task Order Document
WATERSHED Science & Engineering
Task Order Number 7
Amendment 2
Maximum Amount Payable $64,980 Completion Date
12/31/2020
The general provisions and clauses of Local Agency Agreement Number KCPW2017-
19E["2 shall be in full force and effect for this Task Order.
Location of Project: Kittitas County
Project Title: Reecer Creek FEMA Flood Hazard Analysis and Mapping
Amendment Summary: This amendment to Task Order No. 7 changes the Scope of Work and
increases the budget.
Description of Work added to Existing Scope of Work: FEMA is expected to issue a Letter of
Final Determination for Kittitas County county -wide map updates in April 2020. Those updated
maps will become effective six months later, in October 2020. WSE will update the Reecer
Creek LOMR study materials to tie into the updated FEMA mapping: WSE will acquire and
review updated FEMA modeling and mapping; update the Reecer Creek LOMR hydraulic model
to tie into updated FEMA models; and update Floodplain Workmaps and Annotated Flood
Insurance Rate Maps for the LOMR showing tie-ins to preliminary mapping.
Cost Estimate: $5,000 is added to the Maximum Amount Payable, increasing the current
maximum amount payable from $59,980 to $64,980.
Project Schedule: There is no change to the project schedule. The completion date remains
1213112020
Agency Signature:
Consultant Signature
Date:
Date: Feb 27, 2020
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -Q49
HIGHWAY INFRACTRUCTURE FUNDING AWARD
WHEREAS: Highway Infrastructure funds were awarded to Kittitas County in 2018 in the
amount of $56,439 (Urban) and $73,143 (Rural); and
WHEREAS: Kittitas County Public Works has current projects on the State Transportation
Improvement Plan that qualify and require additional funding; and
WHEREAS: Kittitas County Public Works is proposing a project award list to the Board of
County Commissioners for funding consideration; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award Highway Infrastructure (HIP) funding in the
amount defined as attached to said resolution.
DATED this'9th day of March 2020, at Ellensburg, Washington.
Attest:
Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
k` �G551�4M1+S I r!!!
o
CoUJN o'����
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ASSENT
Brett Wachsmith, Chairman
a Os' acz, Vice -Chairman
Cory Wright, Commissioner
HIGHWAY INFRACTRUCTURE FUNDING
1. Bullfrog Road — Road Number 922751VIilepost 0.00 — 2.70; Kittitas County Public
Works Projcct Number RC2002-ST; County Road Project Number (CRP) 300-200;
Resolution No. 2020-024; Rural $73,143
2. University Way and Reecer Creek Intersection Signal; Kittitas County Public Works
Project Number RC1592-F 1; County Road Project Number (CRP) 293-18; Resolution
No. 2019-028; Urban $56,439
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
SURFACE TRANSPORTATION BLOCK GRANT AWARDS
WHEREAS: Federal Transportation Funding is available to local agencies via the Surface
Transportation Block Grant (STBG) projects administered by Kittitas County; and
WHEREAS: Approximately $504,000 is available for rural and urban transportation
improvement projects; and
WHEREAS: Local agencies in the County submitted grant applications for calendar years
2018-2020 that were reviewed and scored by the STBG technical committee and
awarded; and
WHEREAS: City of Kittitas requests their award (Resolution 2018-088) for obligation in 2020
to be moved to 2021 for project funding; and
WHEREAS: Kittitas County Public Works has projects that need additional funding and can
receive obligated funds for 2020 due the request by City of Kittitas to move their
obligation out to 2021 on awarded funds;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award additional STBG Grant funding in the amount
defined as attached to said resolution.
DATED this 9th day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
��t}t1111 I I f Irl lrrr11�'
MIS�si�,z`,,, Brett Wachsmith, Chairman
��,�,oM
~�
l Aihejklyd- Julie Kjorsvik
Laura iad , Vice -Chairman
..ePutyPtgl&if the Board- Mandy Buchholz
Cory Wright, Commissioner
SURFACE TRANSPORTATION BLOCK GRANT FUNDING
1. Bullfrog Road — Road Number 92275 Milepost 0.00 — 2.70; Kittitas County Public
Works Project Number RC2002-ST; County Road Project Number (CRF) 300-200;
Resolution No. 2020-024; Rural $446,000
2. University Way and Reecer Creek Intersection Signal; Kittitas County Public Works
Project Number RCI 592-F1; County Road Proj ect Number (CRP) 293-18; Resolution
No. 2019-028; Urban $61,000
KITTITAS COUNTY AIRPORT
DEPARTMENT OF PUBLIC WORKS
LEASE
THIS LEASE made and entered into this 1 st day of January, 2020 by and between Kittitas
County, a municipal corporation in the State of Washington, hereinafter referred to as the LESSOR,
and Ellensburg Pallets LLC, a Washington Corporation with a Washington, Secretary of State UBI
number of 603402078, hereinafter referred to as the LESSEE.
WITNESSETH:
The Lessor hereby agrees to lease to the Lessee, and the Lessee hereby agrees to lease from the
Lessor, the following described real property (hereinafter the "Property"):
See Exhibit `A" attached hereto, also described as:
The North 305.00 feet of Lot C-38 of that certain Record of Survey recorded in Book 42, Page 170, under
Auditor's File No. 202001150034, records of Kittitas County, Washington.
Containing 99,630 square feet.
Kittitas County reserves the right of access to the Southern portion of said Lot C-38 for Kittitas County and
any assigns by a 20' wide access, the centerline of which is described as follows:
Beginning at the Northwest corner of Lot C-38, thence N88009151"E, 57.70 along the North line of said lot
to the true point of beginning of 20' wide strip;
Thence S05°12122"E, 156.65 feet;
Thence S3038114"E, 188.73 feet to the South line of lease area and terminus of 20' wide strip.
AND
Three (3) buildings upon Lot C-38 of the Kittitas County Amended Binding Site Plan described as (1) 800
square foot Quonset and (1)168 square foot Cider Block Building.
This lease is made in accordance with Chapter 2.81 KCC. This lease is subject to the provisions of
Chapter 59.12 RCW as currently existing of hereafter amended.
1.
2020. TERM: The term of this lease shall be 5 years and will commence on the Is' day of January
Ellensburg Pallet — Industrial Area PAGE 1
KITTITAS COUNTY AIRPORT
2. RENT: Rent shall be paid in advance on an annual basis, with the first payment due on or
before the 1st day of January of each year and continuing thereafter until termination of this
lease. The rental for each year shall be as follows:
Term
Rental Rate (Ground Lease)
($.14 per Sq. Ft)
Not Includine Leasehold Tax*
01101/20-12131/20
$13,948.20
01/01121-12131/21
$ 13,948.20
01/01/22 —12/31 /22
,948.20
01/01/23 —12/31123
_"I
$ 13,948.20
01/01/24 —12/31/24
$ 13,948.20
01/01/25
Renegotiate
*The current Leasehold Excise Tax Rate is 12.84% as determined by the State of Washington and is subject to change.
Term
Rental Rate for Building(s)
($•1225 per Sq. Ft)
N2t Including Leasghold
Tax*
01/01/20 — 121 1120
$3,127.96
01/01/21-12131/21
$3,127.96
01101 22 — 12/3 1122
$3,127.96
01/01L23 —12/31/23
$3,127.96
01/01/24 —12/31124
$3,127.96
01/01/25
Renegotiate —d
`The current Leasehold Excise Tax Rate is 12.84% as determined by the State of Washington and is subject to change.
A. JanuM 1 2020 through December 31 2024.
LESSEE promises and agrees to pay rent to LESSOR at the rate of ($0.14 per square
foot) per year for the leased premises, made on or before the 10th day of each month
in which such payment is due. This is the "then current rate" per square foot of leased
property used for "aeronautical purposes" as set by Bowers Field. Payments shall be
made to Kittitas County Department of Public Works. Any rental payment past due
shall accrue a delinquency charge of eighteen percent (181/o) per annum, levied
monthly.
B. For that area only used for storage, manufacturing, warehousing and/or other business
uses associated with pallet construction, reconstruction and distribution, LESSEE
promises and agrees to pay rent to LESSOR at the rate of ($0.14 per square foot) per
year for the leased premises, made on or before the 10' day of each month in which
such payment is due. The rate for this square footage shall be in lieu of the rate
established in Paragraph A above and is not additive for that square footage that is
used.
PAGE 2
KITTITAS COUNTY AIRPORT
C. January 1.2021: Effective this date, the monthly lease payment shall be increased by
one and one-half percent (1.5%) as a set lease rate increase. The lease rate shall
increase by 1.5% each year thereafter, i.e. January 1, 2019/2020/2021/2022.
3) ADJUSTMENT OF RENTAL., Effective January 1, 2024, the United States
Bureau of Labor Statistics Consumer Price Index (CPI), Seattle -Everett Metropolitan
Area, All Urban Consumers - Base Year 1984 average shall be computed for the
years 2019 through 2023. If the CPI average is higher for the previous five (5) years
than the 1.5% per year used the previous five (5) years, the rate increase applicable
January 1, 2024, shall be this average CPI increase. This new average rate increase
shall be used for the next five (5) calendar years, i.e. January 1, 2024 through 2028.
Effective January 1, 2024, the adjustment of the lease rate shall be accomplished in a similar
manner. The previous five (5) years US Bureau of Labor Statistics CPI average will be
computed (2019 through 2023) and compared to the increase made over the preceding five
(5) years. The higher rate shall apply for the next five (5) years. This methodology shall
be used throughout the remaining years of the agreement
The rent shall not decrease in the event of a decrease in the Consumer Price In. over any
five (5) year period. If the average CPI for any five-year period is less than the rate used the
previous five (5) years, the higher rate shall continue to apply.
Modifications to the rental rate per square foot of airport property shall be based on the then
current "aviation" (direct aeronautical) or "commercial" (non -aeronautical) standard rate as
set by LESSOR and the specific property areas being leased.
4. LEASEHOLD TAX: In addition to any rental herein provided, the Lessee shall pay to the
Lessor the leasehold tax as set forth by the State of Washington in Chapter 61, Laws of 1976,
Second Executive Session (R.C.W. 82.29A) or as amended. The tax shall be due and payable at
the same time the rental charged herein is due and payable.
5. FIRE PROTECTION ASSESSMENT In addition to any rental herein provided, the Lessee
shall pay a fee which shall be in lieu of taxes for fire protection services. The annual rate
shall be based upon the annual fire assessment determined by the Kittitas County Assessor
and Kittitas Valley Fire & Rescue to be calculated on January l st of the current year. The
assessment shall be pro -rated monthly, due and payable concurrently with the monthly lease
payment.
6. UTILITIES: The Lessee shall pay for extension of and all utility services supplied to the
premises. Any such extensions shall be subject to the advance review of the Lessor.
7. PURPOSE: It is understood by Lessee that only construction and repair of wooden, plastic, or
metal commercial pallets may be conducted on the premises. In the event that the Lessee
conducts any other business or operations other than pallet construction and pallet repair, the
Lessor may terminate this lease by giving ninety (90) days written notice to Lessee,
notwithstanding the notice provisions of Section 22 herein. In the event of termination by Lessor
PAGE 3
KITTITAS COUNTY AIRPORT
pursuant to this section, all rents shall be pro -rated to the date Lessee shall have restored the
premises to the Lessor in accordance with the terms of the lease agreement governing Lessee's
duties to restore the premises to Lessor upon expiration of the lease term.
8. RULES AND REGULATIONS: The Lessee agrees to comply with all pertinent rules and
regulations of the federal, state and local governments, as well as the rules, regulations,
ordinances, and minimum standards of the Kittitas County Airport (Bowers Field), as are
presently in effect and may in the future be adopted. The rules, regulations, ordinances and
minimum standards of the Kittitas County Airport (Bowers Field) are made a part of this
Agreement and shall have the same effect as though written herein. A copy of the Kittitas
County Airport Standards is on file in the office of the Kittitas County Department of Public
Works.
9. IMPROVEMENTS: Upon termination of this lease, for whatever reason and under
whatever circumstances, all improvements remaining upon the leased premises become the
property of Lessor, free and clear, without any liability of Lessor to Lessee. Should Lessor
desire the removal of Lessee's improvements upon the date of lease termination, Lessor shall
give Lessee written notice to remove all improvements and return the premises to its state as
before the lease at least thirty (30) days prior to the termination date for the lease. Upon
removal, the premises shall be left in a neat and orderly condition, without debris and shall be
graded level. Should the premises not be left in such condition, after Lessee received such
notice, Lessor may remove improvements and repair the premises and seek reimbursement
from Lessee in any manner allowed by law.
No construction may be made without prior obtaining of appropriate permits, the
responsibility for which is that of Lessee.
10. REPAIRS: The maintenance and repair of the structures including, but not limited to, repair of
roof, foundation and exterior walls and other improvements shall be the responsibility of the
Lessee, including utilities within the leased area.
The Lessee further agrees that it will not commit waste and that it will keep said premises in a
safe, sanitary, neat, presentable, and otherwise good condition, and in general shall comply with
all the applicable governmental rules, ordinances and regulations as may be required or imposed
by such authorities on said premises and shall comply with any direction pursuant to law of any
public officer or officers who shall be empowered to enforce local, state and federal rules,
regulations and ordinances upon the Lessee with, respect to the said premises or the use,
occupancy, or control thereof and shall not suffer any improper or offensive use of said
premises.
11. AREA MAINTENANCE: Lessee shall, during the term of this lease, maintain the area between
the building and boundary line of said lease to the satisfaction of the Lessor. The area shall be
kept free of all debris, weeds and brush for the term of this lease. Lessee shall reimburse the
Kittitas County Weed Board or Kittitas County Department of Public Works for any costs
incurred in the event that the County Weed Board or Kittitas County Department of Public
Works undertakes noxious weed or vegetation control measures.
12. INSURANCE: The Lessee shall obtain and maintain in force during the term of this agreement
a liability insurance policy, which provides protection for bodily injury (including death) and
PAGE 4
KITTITAS COUNTY AIRPORT
property damage. Said insurance shall provide coverage by the Lessee to any employees or
permittees of the Lessee, and shall name the Lessor as coinsured.
(a) Liability insurance policy shall have the following provisions, at a minimum:
(i) Premises and leased area liability coverage in an amount not less than
$1,000,000 - each occurrence.
(ii) Provide for not less than thirty (30) days in advance a written notice to
Kittitas County regarding any material change or termination of the
policy.
(b) Lessee hereby releases Lessor of and from every and all right, claim and
demand that Lessee may hereafter have against Lessor, its successors or assigns,
arising out of or in connection with any loss or losses occasioned by fire and
such items as are included under the normal extended coverage clauses of
insurance policies, and does hereby waive all rights of subrogation in favor of
insurance carriers against Lessor arising out of any losses occasioned by fire and
such items as are included under the normal extended coverage clauses of fire
insurance policies, and sustained by Lessee in or to the said premises and leased
area.
(c) The Lessee shall provide the Lessor with a copy of said insurance policy prior to
the commencement date of this lease.
13. AIRPORT TRAFFIC: It is understood and agreed that the Lessee's use of said premises and
leased area shall not in any manner interfere or restrict the use of aircraft landings, take -offs,
storage of aircraft, taxiing, and movement of ground vehicles. Lessee shall comply with all rules
and regulations of the Federal Aviation Administration, Washington State Department of
Transportation Aeronautics Division, and the Kittitas County Airport Standards.
14. HiJNTING: Hunting or discharging of firearms will not be permitted on or from said premises
or leased area.
15. NOTICES: Any notice given by one party to the other in connection with this agreement shall
be in writing and shall be sent by certified or registered mail, return receipt requested as follows:
(a) If to Lessor, addressed to:
Kittitas County Department of Public Works
411 N. Ruby, Suite #1
Ellensburg, Washington 98926
(b) If to Lessee, addressed to:
Valente Arellano
Ellensburg Pallets LLC
900 Falcon Road
Ellensburg, WA 98926
PAGE 5
KITTITAS COUNTY AIRPORT
Notice shall be deemed to have been received on the third day after the date of mailing.
16. ATTORNEY FEES: In case Lessor shall bring suit to recover any rent due hereunder, or for
breach of any provision of this lease, or to recover possession of the leased premises, or if
Lessee shall bring any action for any relief against Lessor, declaratory or otherwise, arising out
of this lease, the prevailing party shall recover reasonable attorney fees which shall be
determined and taxed by the court as part of the costs of such action.
17. RIGHTS OF THE U.S. GOVERNMENT: The Lessor holds title to the Property herein leased,
partially by virtue of a deed from the United States Government. A copy of said deed is
available for inspection at the office of the Kittitas County Department of Public Works, hereto
and made a part of this instrument as though fully set forth herein. Lessee agrees that it will do
nothing which will cause the Lessor to be in violation of the terms of said deed. Lessee
furthermore agrees that it has had ample opportunity to review said deed and is aware of all of
the terms and conditions therein.
1$. ASSIGNMENT: The Lessee shall not assign this lease nor sublet any portion thereof without
first obtaining the written consent of the Lessor.
19. HOLD HARK flLSS: The Lessee hereby agrees to defend, indemnify and hold harmless the
Lesser from any and all claims or demands whatsoever arising out of any loss, damage, or injury
to persons or property resulting from the Lessee's use or occupancy of said premises and leased
area, or caused by the acts or neglect of the Lessee, his agents or employees.
20. BANKRUPTCY: It is further agreed and understood that in case of the insolvency or
bankruptcy of the Lessee, or any assignment for the benefit of creditors or the appointment of a
receiver for the Lessee, this lease shall be immediately forfeited and shall be of no further force
and effect, and that the Trustee in Bankruptcy, Receiver, or Assignee for the benefit of creditors
shall not have any rights whatsoever in the demised premises.
21. DEFAULT: In the event the Lessee shall fail to comply with any of Lessee's commitments,
duties or responsibilities under this lease, or any of its conditions or terns as herein stated, the
Lessor may terminate this lease by giving ten (10) days written notice of the conditions or terms
being violated. If said failures are not corrected within the ten (10) day period, this lease may be
terminated and the Lessor shall be entitled to peaceably retake possession of the premises.
22. MODIFICATION OR TERMINATION: Lessee and Lessor agree that Lessor may, at Lessor's
sole discretion, modify the terms of this lease in whole or in part, including but not limited to
any term or condition of this lease, including cancelling the unexpired portion of this lease and
re -letting the property to another tenant, in the event that any regulation governing airports or
county property is amended in a way that impacts the Lessor's ability to lease, use, control,
protect, or maintain the Property. For the purposes of this section, "regulation" is defined to
include, but is not limited to: case law interpreting any rule or regulation; any federal rules and
regulations, including Federal Aviation Administration rules and regulations; state rules and
regulations; and local rules, regulations and ordinances.
In the event that Lessor shall elect to modify or terminate this lease, Lessor shall do so only upon
one hundred twenty (120) days written notice, notifying Lessee, at Lessee's address of record,
that the lease to which this applied is being so modified or terminated.
PAGE 6
KITTITAS COUNTY AIRPORT
Upon receipt of such notification, and in the event the notification specified modification of the
lease short of termination, Lessee shall have sixty (60) days in which to notify Kittitas County of
Lessee's intention to continue the lease as modified or of Lessee's intention to treat the lease as
terminated.
In the event that Lessee elects to treat the lease as terminated, all rents shall be pro -rated to the
date Lessee shall have restored the premises to the Lessor in accordance with the terms of the
lease agreement governing Lessee's duties to restore the premises to Lessor upon expiration of
the lease term.
It is further agreed that neither such modification or termination of this lease nor any subsequent
re -letting of the premises, in whole or in part, shall give rise to any cause of action for damages
or any other form of relief by Lessee against Lessor or any successor lessee.
In the event of such modification or termination, Lessee understands that other than a refund of
any unearned rent prorated to the date Lessee has restored the premises to Lessor, Lessee shall
have no claim for compensation as occasioned by said modification or termination.
23. WAIVER: No assent, express or implied, by the Lessor to any breach of any of Lessee's
covenants, agreements, conditions or terms hereof shall be deemed or taken to be a waiver of
any succeeding breach of any covenant, agreement, condition or term hereof.
24. VENUE. In the event of any litigation between Lessor and Lessee arising out of this lease, the
venue for such action shall lie in Kittitas County, notwithstanding any contrary provision of the
Revised Code of Washington.
25. APPLICAaILITY: The covenants, agreements, terms and conditions contained in this lease
shall apply to and be binding upon Lessor and Lessee and their respective heirs, executors,
administrators, successor and assigns.
26. INTEGRATION: Exhibits and Recitals are incorporated herein by this reference. This Lease
embodies the entire agreement between the parties with respect to the subject matter herein
contained. No amendments or modifications hereof shall be enforceable unless in writing,
signed by the party to be charged.
PAGE 7
KITTITAS COUNTY
AIRPORT
IN WITNESS WHEREOF, the Lessor and Lessee have signed their names and affixed their seals the
day and year first above written.
Attest:
Clerk of the Board- Julie Kjorsvik
\,\` ❑ Deprurty'Clerk of the Board- Mandy B
_ o
LESSOR:
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Brett Wachsmith, Chairman
ONe z, Vice -Chairman
uchholz
Cory Wright, Commissioner
LESSEE:
ELLENSBURG PALLETS LLC
Address:
900 Falcon Road
Ellensburg, WA 98926
PAGE 8
KITTITAS COUNTY
Exhibit A:
Legal Description of Property
AIRPORT
The North 305.00 feet of Lot C-38 of that certain Record of Survey recorded in Book 42, Page 170, under
Auditor's File No. 202001150034, records of Kittitas County, Washington.
Containing 99,630 square feet.
Kittitas County reserves the right of access to the Southern portion of said Lot C-38 for Kittitas County and
any assigns by a 20' wide access, the centerline of which is described as follows:
Beginning at the Northwest corner of Lot C-38, thence N88009151"E, 57.70 along the North line of said lot
to the true point of beginning of 20' wide strip;
Thence S05012'22"E, 156.65 feet;
Thence S303811411E, 188.73 feet to the South line of lease area and terminus of 20' wide strip.
AND
Three (3) buildings upon Lot C-38 of the Kittitas County Amended Binding Site Plan described as (1) 800
square foot Quonset and (1)168 square foot Cider Block Building.
Situs Address: 900 Falcon Road
Ellensburg, WA 98926
PAGE 9
Page 1 of 1
Public Notice
Kittitas County, Ellensburg WA
This call for sealed bids is for the Design, Fabrication, Finishing and Transporting of a 60 foot Steel Modular Bridge. Bids
are due by March 26, 2020 at 10:00 am, at which time bids will no Ionger be accepted. Bids will be opened at the office of
Kittitas County Public Works, 411 North Ruby Street, Suite 1, Ellensburg, Washington on March 26, 2020 at 10:00 am.
All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in
an amount equal to five percent (511/o) of the amount of such bid proposal. Should the successful bidder fail to enter into such
contract and furnish satisfactory performance and payment bonds within the time stated in the specifications, the bid
proposal deposit shall be forfeited to the Kittitas County Public Works.
The right is reserved to reject any and all bids and to waiver informalities in the bidding.
Complete digital project bidding documents, including pians and specifications, are available at www.guestcdn.com. You
may download the digital plan documents for $15 by inputting Quest project #6872103 on the website's Project Search
page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership
registration, downloading, and working with this digital project information.
Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, WA 98926.
The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to
2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the
Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued
pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full
opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, national origin, or seg in consideration for an award.
The improvement for which bids will be received is described below:
This Contract provides for the Design, Fabrication, Finishing and Transporting of a 60 -foot Steel Modular Bridge for
Kittitas County Public Works, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard
Specifications.
Specifications may be seen at the office of the Board of Commissioners and online at http://www.co.kittitas.wa.us/notices/
of the
Publish.
Daily Record: 03/12/2020; 03/19/2020
Daily Journal of Commerce: 03/12/2020; 03/19/2020
file W/C/Users/candie. leader/AppDataALoca/Packages/Microsoft.MicrosoftEdge_8wekyb3... 3/3/2020
Page 1 of 1
Public Notice
Kittitas County, Ellensburg WA
This call for sealed bids is for the Coleman Creek Culvert Replacement - Structure. Bids are due by March 26, 2020 at 10:00
a.m., at which time bids will no longer be accepted. Bids will be opened at the office of Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, Washington on March 26, 2020 at 10:00 a.m.
All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in
an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such
contract and furuish satisfactory performance and payment bonds within the time stated in the specifications, the bid
proposal deposit shall be forfeiter) to the Kittitas County Public Works.
The right is reserved to reject any and all bids and to waiver informalities in the bidding.
Complete digital project bidding documents, including plans and specifications, are available at www.questcdzl.com. You
may download the digital plan documents for $15 by inputting Quest project #6872181 on the website's Project Search
page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership
registration, downloading, and working with this digital project information.
Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, WA 98926.
The Kittitas County in accordance with. Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to
2000d4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the
Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued
pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full
opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, national origin, or sea in consideration for an award.
The improvement for which bids will be received is described below:
This Contract provides for the fabrication and transportation of a pre -cast flat slab bridge structure approximately 27 -feet
long by 52 -feet wide. The work consists of flat slab prestressed superstructure and precast concrete substructure including
weld ties, lifting embeds, and smooth bar dowels and the fabrication and transportation of reinforcing steel for the cast-in-
place
ast in-
place traffic barrier, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications.
Not included in this work is installation the cast -in-place concrete traffic barrier.
Specifications may be seen at the office of the Board of Commissioners and online at http:l/www.co.kittitas.wa.us/notices/
rY Lr
of the Board �
Publish:
Daily Record: 03/12/2020; 03/19/2020
Daily Journal of Commerce: 0311212020; 03/19/2020
file:///C:/Userslcandie.leader/AppDatalLocallPackages/Microsoft.MicrosoftEdge 8wekyb3... 3/3/2020
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE; March 9, 2020
ACTION REQUESTED: Request to Approve a Resolution to authorize the Director
of Airport Operations Signature on Grant Application
Documents for Bowers Field Runway 7/25 Design using
2020 Airport Fund Reserves
BACKGROUND: During the 2019 State Legislative Session, the Board of
County Commissioners submitted a Capital Budget
Request supporting design for rehabilitating runway 7/25 at
Bowers Field. That request is now bogged down with the
Department of Commerce pending reauthorization from the
legislature. The Director of Airport Operations now desires
seeking funding support for the design effort from
Washington State Aviation Division (WSDOT). A
resolution stating Board authorization of grant matching
funds is required with grant submittal.
INTERACTION: Public Works/Airport Operations.
RECOMMENDATION: Approve the Resolution to authorize the Director of Airport
Operations signature on WSDOT grant application
documents committing 2020 Airport Fund reserves as grant
match.
HANDLING: Return one original to Airport Operations
ATTACHMENTS: Resolution.
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
DEMONSTRATING THE BOARD OF COUNTY COMMISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD RUNWAY 7/25 DESIGN AND
AUTHORIZING THE DIRECTOR OF AIRPORT OPERATIONS TO EXECUTE THE
AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County intends to submit Airport Aid Applications to Washington State
Department of Transportation Aviation (WSDOT) for Design of Runway 7/25
Rehabilitation at Bowers Field Airport (ELN); and
WHEREAS: The current anticipated total project funding is estimated to be $84,173; and
WHEREAS: WSDOT requires local sponsors of airports to provide a minimum of a five
percent (5%) match to all awarded grants for projects ineligible for Federal
Aviation Administration (FAA) funding; and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project is estimated at
approximately $4,209, which is in the 2020 Airport Fund budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the funding request for Bowers Field Runway 7/25 design and
authorize the Director of Airport Operations to execute the Airport Aid
Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted funds in the amount of approximately $4,209 to match funding for the
proj ect.
DATED this 9th day of March 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COIVMSSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chair
Laura Osiadacz, Vice Chair
Cory Wright, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to approve a Resolution to authorize the Director
of Airport Operations Signature on Grant Application
Documents for Bowers Field Runway 7/25 Construction
using 2020 Airport Fund Reserves
BACKGROUND: The Director of Airport Operations desires seeking funding
support for the construction of runway 7/25 at Bowers
Filed from Washington State Aviation Division (WSDOT).
A resolution stating Board authorization of grant matching
funds is required with grant submittal.
INTERACTION: Public Works/Airport Operations.
RECOMMENDATION: Approve the Resolution to authorize the Director of Airport
Operations signature on WSDOT grant application
documents committing 2020 Airport Fund reserves as grant
match for Runway 7/25 construction.
HANDLING: Return one original to Airport Operations.
ATTACHMENTS: Resolution.
LEAD STAFF: Mark R. Cook, Director.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
DEMONSTRATING THE BOARD OF COUNTY COMtVIISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD RUNWAY 7/25 REHABILITATION AND
AUTHORIZING THE DIRECTOR OF AIRPORT OPERATIONS TO EXECUTE THE
AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County intends to submit Airport Aid Applications to Washington State
Department of Transportation Aviation (WSDOT) for the Construction of the
Runway 7125 Rehabilitation Project at Bowers Field Airport (ELI); and
WHEREAS: The current anticipated total project funding is estimated to be $1,230,757; and
WHEREAS: WSDOT requires local sponsors of airports to provide a minimum of a 5% match
to all awarded grants for projects ineligible for Federal Aviation Administration
(FAA) funding; and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project is estimated at
approximately $61,538, which is in the Airport budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the funding request for Bowers Field Runway 7125 Rehabilitation
and authorize the Director of Airport Operations to execute the Airport Aid
Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted Airport funds in the amount of approximately $61,538 to match funding
for the project.
DATED this 9th day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chair
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice Chair
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to Approve a Resolution to authorize the Director
of Airport Operations to Sign the Grant Application with
the Federal Aviation Administration Funding Additional
Environmental Assessment Work at Bowers Field
Committing Airport Fund Reserves as Grant Match
BACKGROUND:
Kittitas County Airport consultant Century West
Engineering has been working to complete the required
Federal Aviation Administration (FAA) Environmental
Assessment (EA) supporting the Airport Capital Facility
Plan. Last year, preliminary design identified probable
wetland and floodplain impacts requiring additional
environmental work. The FAA is offering supplemental
funding for the effort. The Board of County
Commissioners is required to notice the FAA of grant
match funding support as a condition of grant application.
INTERACTION:
Public Works/Airport Operations,
RECONE%IENDATION:
Approve the Resolution to Authorize the Director's
signature on grant application documents.
HANDLING:
Return one original to Airport Operations,
ATTACHMENTS:
Resolution.
LEAD STAFF:
Mark R. Cook, Director.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
DEMONSTRATING THE BOARD OF COUNTY COMNIISSIONERS SUPPORT FOR
AIRPORT AID APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION
AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AVIATION DIVISION FOR BOWERS FIELD AND AUTHORIZING THE DIRECTOR
OF AIRPORT OPERATIONS TO EXECUTE THE AIRPORT AID APPLICATIONS
WHEREAS: Kittitas County is currently working to finalize the Environmental Assessment
(EA) supporting the Airport Capital Improvement Plan; and
WHEREAS: Preliminary environmental analysis has identified sufficient wetland and flooding
making completion of the Environmental Assessment unlikely without additional
environmental analysis exceeding current project funding; and
WHEREAS: Kittitas County intends to submit Airport Aid Applications to the Federal
Aviation Administration (FAA) and Washington State Department of
Transportation Aviation (WSDOT) for an (EA) -- Advanced Design at Bowers
Field airport (ELN) generating the additional analysis required for the FAA to
make the required environmental determination supporting the Airport Capital
Improvement Plan; and
WHEREAS: The current anticipated total project funding is estimated to be $444,000, with
$400,000 using FAA Non -primary Entitlement (NPE) funds; and
WHEREAS: FAA requires local sponsors of airports to provide a 10% match to all awarded
grants; and
WHEREAS: WSDOT may be able to assist Kittitas County meeting grant match obligations by
providing half of the local match (equal to 5%); and
WHEREAS: The Airport Funding Application requires that funding applicants submit a
Resolution of Support from the Board of County Commissioners, stipulating that
local matching funds have been budgeted for the project; and
WHEREAS: The Airport's portion of matching funds for this project (without WSDOT
funding assistance) is estimated at approximately $44,000, which is in the Airport
budget as fund reserve;
NOW, THEREFORE BE IT RESOLVED the Kittitas County Board of County
Commissioners declares it be in the best interest of Bower Field Airport, and does
hereby support the grant match funding request supporting additional EA work
for Bowers Field and authorize the Director of Airport Operations to execute the
Airport Aid Application; and
BE IT FURTHER RESOLVED that the Kittitas County Board of County Commissioners have
budgeted funds in the amount of approximately $44,000 to match funding for the
proj ect.
DATED this 9th day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASFIFNGTON
Brett, Wachsmith, Chair
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice Chair
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to Approve a Lease for Lot C-38 of the
Kittitas County Airport Amended Binding Site
Plan along with buildings upon said Lot with
Ellensburg Pallets, LLC.
BACKGROUND: Ellensburg Pallets LLC has requested to extend
their lease term for another five (5) year period
for Lot C-38 of the Kittitas County Airport
Binding Site Plan along with said buildings on
the lot for continued distribution of new and
refurbished pallets. Lot C-38 is located in the
Industrial area at Bowers Field.
INTERACTION:
Ellensburg Pallets LLC has agreed to the new
lease terns and current lease rate of fourteen (14)
cents per square foot. They also requested to
abandon use of one of the buildings on said lot as
it no longer is necessary for operations.
Public Works; Ellensburg Pallets, LLC
RECOMMENDATION: Approve and sign the Lease for Lot C-38, along
with said buildings of the Kittitas County
Airport Amended Binding Site Plan with
Ellensburg Pallets, LLC.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Lease
LEAD STAFF: Mark Cook, Director of Public Works
; KITTITAS COUNTY AIRPORT
DEPARTMENT OF PUBLIC WORKS
LEASE
THIS LEASE made and entered into this 1 st day of January, 2020 by and between Kk tas
County, a municipal corporation in the State of Washington, hereinafter referred to as the LESSOR,
and Ellensburg Pallets LLC, a Washington Corporation with a Washington Secretary of State U131
number of 603402078, hereinafter referred to as the LESSEE.
WITNESSETH:
The Lessor hereby agrees to lease to the Lessee, and the Lessee hereby agrees to lease from the
Lessor, the following described real property (benhudler the "Property"):
See Exhibit `A" attached hereto, also described as:
The North 305.00 feet of Lot C-38 of that certain Record of Survey recorded in Book 42, Page 170, under
Auditor's File No. 202001150034, records of Kittitas County, Washington.
Containing 99,630 square feet.
Kittitas County reserves the right of access to the Southern portion of said Lot C-38 for Kittitas County and
any assigns by a 20' wide access, the centerline of which is described as follows:
Beginning at the Northwest corner of Lot C-38, thence N88009151"E, 57.70 along the North line of said lot
to the true point of beginning of 20' wide strip;
Thence S05012122"E,156.65 feet;
Thence S3038114"E, 188.73 feet to the South line of lease area and terminus of 20' wide strip.
AND
Three (3) buildings upon Lot C-38 of the Kittitas County Amended Binding Site Plan described as (1) 800
square foot Quonset and (1)168 square foot Cider Block Building.
This lease is made in accordance with Chapter 2.81 KCC. This lease is subject to the provisions of
Chapter 59.12 RCW as currently existing of hereafter amended.
1. 2020. TERM: The term of this lease shall be 5 years and will commence on the ? day of January
Ellensburg Pallet - Industrial t rea PAGE 1
KITTITAS COUNTY AIRPORT
2. RENT: Rent shall be paid in advance on an annual basis, with the first payment due on or
before the 1st day of January of each year and continuing thereafter until termination of this
lease. The rental for each year shall be as follows:
Term
Rental Rate (Ground Lease)
($.14 per Sq. Ft)
Not In udine Leasehold ax*
01/01/20 — 12/31/20
01101121-12/31/21
$ 13,948.20
$13,948.20
01/01/22 712131122
$13,948.20
01/01/23 —12/31/23
$ 13,948.20
01/01/24-12131/24
$ 13,948.20
01/01/25
Renegotiate
*The current Leasehold Excise Tax Rate is 12.84% as determined by the State of Washington and is subject to change.
Term
Rental Rate for Building(s)
($.1225 per Sq. Ft)
Not Including Leasehold
Tag*
01/O1 20 —121 1120
$3,127.96
01191/21 — la31121
$3,127.96
01Q1122 —1 31/22
$3,127.96
011Q1 /23 —12131123
$3,127.96
01/01/24 —12/31/24
$3,12796
01/01/25
Renegotiate
*Ae current Leasehold Excise Tax Rate is 12.84%, as determined by the State of Washington and is subject to change.
A. jqaM 1 2020 through December 31 2024.
LESSEE promises and agrees to pay rent to LESSOR at the rate of ($0.14 per square
foot) per year for the leased premises, made on or before the 10th day of each month
in which such payment is due. This is the "then current rate" per square foot of leased
property used for "aeronautical purposes" as set by Bowers Field. Payments shall be
made to Kittitas County Department of Public Worms. Any rental payment past due
shall accrue a delinquency charge of eighteen percent (18%) per annum, levied
monthly.
B. For that area only used for storage, manufacturing, warehousing and/or other business
uses associated with pallet construction, reconstruction and distribution, LESSEE
promises and agrees to pay rent to LESSOR at the rate of ($0.14 per square foot) per
year for the leased premises, made on or before the 10' day of each month in which
such payment is due. The rate for this square footage shall be in lieu of the rate
established in Paragraph A above and is not additive for that square footage that is
used.
PAGE 2
KITT'ITAs COUNTY AIRPORT
C. JW_UW 1.2021: Effective this date, the monthly lease payment shall be increased by
one and one-half percent (1.5%) as a set lease rate increase. The lease rate shall
increase by 1.5% each year thereafter, i.e. January 1, 2019120201202112022.
3) ADJUSTMENT OF RENTAL: Effective January 1, 2024, the United States
Bureau of Labor Statistics Consumer Price Index (CPI), Seattle -Everett Metropolitan
Area, All Urban Consumers - Base Year 1984 average shall be computed for the
years 2019 through 2023. If the CPI average is higher for the previous five (5) years
than the 1.5% per year used the previous five (5) years, the rate increase applicable
January 1, 2024, shall be this average CPI increase. This new average rate increase
shall be used for the next five (5) calendar years, i.e. January 1, 2024 through 2028.
Effective January 1, 2024, the adjustment of the lease rate shall be accomplished in a similar
manner. The previous five (5) years US Bureau of Labor Statistics CPI average will be
computed (2019 through 2023) and compared to the increase nude over the preceding five
(5) years. The higher rate shall apply for the next five (5) years. This methodology shall
be used throughout the remaining years of the agreement
The rent shall not decrease in the event of a decrease in the Consumer Price Index over any
five (5) year period. If the average CFI for any five-year period is less than the rate used the
previous five (5) years, the higher rate shall continue to apply.
Modifications to the rental rate per square foot of airport property shall be based on the then
current "aviation" (direct aeronautical) or "commercial" (non -aeronautical) standard rate as
set by LESSOR and the spec property areas being leased.
4. LEASEHOLD TAX: In addition to any rental herein provided, the Lessee shall pay to the
Lessor the leasehold tax as set forth by the State of Washington in Chapter 61, Laws of 1976,
Second Executive Session (R-C.W. 82.29A) or as amended. The tax shall be due and payable at
the same time the rental charged herein is due and payable.
5. FIRE PROTECTION ASSE MENT In addition to any rental herein provided, the Lessee
shall pay a fee which shall be in lieu of taxes for fire protection services. The annual rate
shall be based upon the annual fire assessment determuned by the Kittitas County Assessor
and Kittitas Valley Fire & Rescue to be calculated on January I' of the current year. The
assessment shall be pro -rated monthly, due and payable concurrently with the monthly lease
payment.
6. UTILITIES: The Lessee shall pay for extension of and all utility services supplied to the
premises. Any such extensions shall be subject to the advance review of the Lessor.
7. PURPOSE: It is understood by Lessee that only construction and repair of wooden, plastic, or
metal commercial pallets may be conducted on the premises. In the event that the Lessee
conducts any other business or operations other than pallet construction and pallet repair, the
Lessor may terminate this lease by giving ninety (90) days written notice to Lessee,
notwithstanding the notice provisions of Section 22 herein. In the event of termination by Lessor
PAGE 3
KITTITAE COUNTY AIRPORT
pursuant to this section, all rents shall be pro -rated to the date Lessee shall have restored the
premises to the Lessor in accordance with the terms of the lease agreement governing Lessee's
duties to restore the premises to Lessor upon expiration of the lease term
8. RULES AND REGULATIONS: The Lessee agrees to comply with all pertinent rules and
regulations of the federal, state and local governments, as well as the rules, regulations,
ordinances, and minimum standards of the Kittitas County Airport (Bowers Field), as are
presently in effect and may in the future be adopted. The rules, regulations, ordinances and
minimum standards of the Kittitas County Airport (Bowers Field) are made a part of this
Agreement and shall have the same effect as though written herein. A copy of the Kittitas
County Airport Standards is on file in the office of the Kittitas County Department of Public
Works.
9. MT&QVEMENTS: Upon termination of this lease, for whatever reason and under
whatever circumstances, all improvements remaining upon the leased premises become the
property of Lessor, free and clear, without any liability of Lessor to Lessee. Should Lessor
desire the removal of Lessee's improvements upon the date of lease termination, Lessor shall
give Lessee written notice to remove all improvements and return the premises to its state as
before the lease at least thirty (30) days prior to the termination date for the lease. Upon
removal, the premises shall be left in a neat and orderly condition, without debris and shall be
graded level. Should the premises not be left in such condition, after Lessee received such
notice, Lessor may remove improvements and repair the premises and seek reimbursement
from Lessee in any manner allowed by law.
No construction may be made without prior obtaining of appropriate permits, the
responsibility for which is that of Lessee.
10. REPAIRS: The maintenance and repair of the structures including, but not limited to, repair of
roof, foundation and exterior walls and other improvements shall be the responsibility of the
Lessee, including utilities within the leased area.
The Lessee fiu-ther agrees that it will not commit waste and that it will keep said premises in a
safe, sanitary, neat, presentable, and otherwise good condition, and in general shall comply with
all the applicable governmental rules, ordinances and regulations as may be required or imposed
by such authorities on said premises and shall comply with any direction pursuant to law of any
public officer or officers who shall be empowered to enforce local, state and federal rules,
regulations and ordinances upon the Lessee with respect to the said premises or the use,
occupancy, or control thereof and shall not suffer any improper or offensive use of said
premises.
11. AREA MAINTENAN E: Lessee shall, during the term of this lease, maintain the area between
the building and boundary line of said lease to the satisfaction of the Lessor. The area shall be
kept free of all debris, weeds and brush for the term of this lease. Lessee shall reimburse the
Kittitas County Weed Board or Kittitas County Department of Public Works for any costs
incurred in the event that the County Weed Board or Kittitas County Department of Public
Works undertakes noxious weed or vegetation control measures.
12. INS CE: The Lessee shall obtain and maintain in force during the term of this agreement
a liability insurance policy, which provides protection for bodily injury (including death) and
PAGE 4
KiTTiTAS COUNTY AIRPORT
property damage. Said insurance shall provide coverage by the Lessee to any employees or
permittees of the Lessee, and shall name the Lessor as coinsured.
(a) Liability insurance policy shall have the following provisions, at a minimum:
(i) Premises and leased area liability coverage in an amount not less than
$1,000,000 - each occurrence.
(ii) Provide for not less than thirty (30) days in advance a written notice to
Kittitas County regarding any material change or termination of the
policy.
(b) Lessee hereby releases Lessor of and from every and all right, claim and
demand that Lessee may hereafter have against Lessor, its successors or assigns,
arising out of or in connection with any loss or losses occasioned by fire and
such items as are included under the normal exuded coverage clauses of
in�e policies, and does hereby waive all rights of subrogation in favor of
insurance carriers against Lessor arising out of any losses occasioned by fire and
such items as are included under the normal extended coverage clauses of fire
insurance policies, and sustained by Lessee in or to the said premises and leased
area.
(c) The Lessee shall provide the Lessor with a copy of said insurance policy prior to
the commencement date of this lease.
13. AIRPQRT TRAFFIC: It is understood and agreed that the Lessee's use of said premises and
leased area shall not in any manner interfere or restrict the use of aircraft landings, take -offs,
storage of aircraft, taxiing, and movement of ground vehicles. Lessee shall comply with all rules
and regulations of the Federal Aviation Administration, Washington State Department of
Transportation Aeronautics Division, and the Kittitas County Airport Standards.
14. HUNTING: Hunting or discharging of firearms will not be permitted on or from said premises
or leased area.
15. MUM: Any notice given by one party to the other in connection with this agreement shall
be in writing and shall be sent by certified or registered mail, return receipt requested as follows:
(a) If to Lessor, addressed to:
Kittitas County Department of Public Works
411 N. Ruby, Shite #1
Ellensburg, Washington 98926
(b) If to Lessee, addressed to:
Valente Arellano
Ellensburg Pallets LLC
900 Falcon Road
Ellensburg, WA 98926
PAGE 5
KITTITAS COUNTY AIRPORT
Notice shall be deemed to have been received on the third day after the date of mailing.
16, ATTORNEY FEES: In case Lessor shall bring suit to recover any rent due hereunder, or for
breach of any provision of this lease, or to recover possession of the leased premises, or if
Lessee shall bring any action for any relief against Lessor, declaratory or otherwise, arising out
of this lease, the prevailing party shall recover reasonable attorney fees which shall be
determined and taxed by the court as part of the costs of such action.
17. RIGHTS OF THE U.S. GOVERNMENT: The Lessor holds title to the Property herein leased,
partially by virtue of a deed from the United States Government. A copy of said deed is
available for inspection at the office of the Kittitas County Department of Public Works, hereto
and made a part of this instrument as though fully set forth herein. Lessee agrees that it will do
nothing which will cause the Lessor to be in violation of the terms of said deed. Lessee
fiutherimore agrees that it has had ample opportunity to review said deed and is aware of all of
the terms and conditions therein.
18. ASSIGNMENT: The Lessee shall not assign this lease nor sublet any portion thereof without
first obtaining the written consent of the Lessor.
19. HOLD HARMLESS: The Lessee hereby agrees to defend, indemnify and hold harmless the
Lesser from any and all claims or demands whatsoever arising out of any loss, damage, or injury
to persons or property resulting from the Lessee's use or occupancy of said premises and leased
area, or caused by the acts or neglect of the Lessee, his agents or employees.
20. BANKRUPTCY: It is fiuther agreed and understood that in case of the insolvency or
bankruptcy of the Lessee, or any assignment for the benefit of creditors or the appointment of a
receiver for the Lessee, this lease shall be immediately forfeited and shall be of no further force
and effect, and that the Trustee in Bankruptcy, Receiver, or Assignee for the benefit of creditors
shall not have any rights whatsoever in the demised premises.
21. DEFAULT: In the event the Lessee shall fail to comply with any of Lessee's commitments,
duties or responsibilities under this lease, or any of its conditions or terms as herein stated, the
Lessor may terminate this lease by giving ten (10) days written notice of the conditions or terms
being violated. If said failures are not corrected within the ten (10) day period, this lease may be
terminated and the Lessor shall be entitled to peaceably retake possession of the premises.
22. MODIFICATION OR TERMINATION: Lessee and Lessor agree that Lessor may, at Lessor's
sole discretion, modify the terms of this lease in whole or in part, including but not limited to
any term or condition of this lease, including cancelling the unexpired portion of this lease and
re -letting the property to another tenant, in the event that any regulation governing airports or
county property is amended in a way that impacts the Lessor's ability to lease, use, control,
protect, or maintain the Property. For the purposes of this section, "regulation" is defined to
include, but is not limited to: case law interpreting any Wile or regulation; any federal rules and
regulations, including Federal Aviation Administration rules and regulations; state rules and
regulations; and local rules, regulations and ordinances.
In the event that Lessor shall elect to modify or terminate this lease, Lessor shall do so only upon
one hundred twenty (120) days written notice, notifying Lessee, at Lessee's address of record,
that the lease to which this applied is being so modified or terminated.
PAGE 6
KITTITAS COUNTY AIRPORT
Upon receipt of such notification, and in the event the notification specified modification of the
lease short of termination, Lessee shall have sixty (60) days in which to notify Kittitas County of
Lessee's intention to continue the lease as modified or of Lessee's intention to treat the lease as
terminated.
In the event that Lessee elects to treat the lease as terminated, all rents shall be pro -rated to the
date Lessee shall have restored the premises to the Lessor in accordance with the terms of the
lease agreement governing Lessee's duties to restore the premises to Lessor upon expiration of
the lease term.
It is further agreed that neither such modification or termination of this lease nor any subsequent
re -letting of the premises, in whole or in part, shall give rise to any cause of action for damages
or any other form of relief by Lessee against Lessor or any successor lessee.
In the event of such modification or termination, Lessee understands that other than a refund of
any unearned rent prorated to the date Lessee has restored the premises to Lessor, Lessee shall
have no claim for compensation as occasioned by said modification or termination.
23. WAIVER: No assent, express or implied, by the Lessor to any breach of any of Lessee's
covenants, agreements, conditions or terms hereof shall be deemed or taken to be a waiver of
any succeeding breach of any covenant, agreement, condition or term hereof.
24. VENUE. In the event of any litigation between Lessor and Lessee arising out of this lease, the
venue for such action shall lie in Kittitas County, notwithstanding any contrary provision of the
Revised Code of Washington.
25. APPLICABILITY: The covenants, agreements, terms and conditions contained in this lease
shall apply to and be binding upon Lessor and Lessee and their respective heirs, executors,
administrators, successor and assigns.
26. INTEGRATION: Exhibits and Recitals are incorporated herein by this reference. This Lease
embodies the entire agreement between the parties with respect to the subject matter herein
contained. No amendments or modifications hereof shall be enforceable unless in writing,
signed by the party to be charged.
PAGE 7
KITTITAa COUNTY AIRPORT
IN WITNESS WHEREOF, the Lessor and Lessee have signed their names and affixed their seals the
day and year first above written.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
LESSOR:
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
LESSEE:
ELLENSBURG PALLETS LLC
;rte
Address:
900 Falcon Road
Ellensburg, WA 98926
RAGE 8
KITTITAS COUNTY AIRPORT
Exhibit A:
Legal Description of Property
The North 305.00 feet of Lot C-38 of that certain Record of Survey recorded in Book 42, Page 170, under
Auditor's File No. 202001150034, records of Kittitas County, Washington.
Containing 99,630 square feet.
Kittitas County reserves the right of access to the Southern portion of said Lot C-38 for Kittitas County and
any assigns by a 20' wide access, the centerline of which is described as follows:
Beginning at the Northwest corner of Lot C-38, thence N8800915111E, 57.70 along the North line of said lot
to the true point of beginning of 20' wide strip;
Thence S05012'22"E, 156.65 feet;
Thence S3°38' 14"E, 188.73 feet to the South line of lease area and terminus of 20' wide strip.
Three (3) buildings upon Lot C-38 of the Kittitas County Amended Binding Site Plan described as (1) 800
square foot Quonset and (1)168 square foot Cider Block Building.
Situs Address: 900 Falcon Road
Ellensburg, WA 98926
PAGE 9
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMNUSSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
TOPIC: Amendment to Watershed Sciences and Engineering Task Order
ACTION REQUESTED: Approve a Resolution to Authorize the Chair's Signature on
Watershed Science and Engineering Task Order No. 7
Amendment No. 2.
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Approve a Resolution to Authorize the Chair's Signature on Watershed Science and
Engineering Task Order No. 7 Amendment No. 2.
BRIEFING SUMMARY:
• Kittitas County has contracted with Watershed Sciences and Engineering to
conduct a flood hazard analysis at Reccer Creek and update the Federal
Emergency Management Agency (FEMA) flood map. Funding for this work is
from FEMA and the Flood Control Zone District
* FEMA has identified additional work that needs to be done to complete this
project. This additional work is needed to tie-in the new mapping with the new
flood maps due April 2020.
• This additional work is necessary for the County to meet its grant deliverables.
• This additional work will result in an increase in Task Order cost.
• There is sufficient funding in the Flood Control Zone District budget to cover the
identified cost increase.
• Staff recommends that the Board of County Commissioners approve this scope of
work and cost increase.
BACKGROUND:
On October 10th, 2017 the Board of County Commissioners authorized Chair Signature
on a Task Order No. 7 with Watershed Sciences and Engineering to conduct Reecer
Creek Flood Hazard Analysis and Mapping. Recently, the Federal Emergency
Management Agency (FEMA) has identified additional work that needs to be done before
the project is completed. This additional work is needed to tie-in the new Reecer Creek
flood mapping with the new flood mapping that will be issued by FEMA this year. Task
Order No. 7 has been amended to reflect the increase in project scope and budget. There
was a previous amendment which extended the timeline only (no increase in cost).
Page 1 of 2
PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION STAFF REPORT
DISCUSSION:
The work identified by Watershed Sciences and Engineering is necessary for the County
to meet its grant deliverables for the FEMA grant funding.
FISCAL EMPACTS:
The cost increase is $5,000, increasing the maximum amount payable under this task
order from $59,980 to $64,980. There is sufficient funding in the Flood Control Zone
District budget to cover the identified cost increase. A portion of the increased cost will
be covered by cost savings in other costs covered by our FEMA grant.
ATTACHMENTS:
Resolution; Watershed Science and Engineering Task Order No. 7 Amendment No. 2.
Page 2 of 2
PUBLIC WORKS BOARD OF COUNTY CONIlVIISSIONERS WORK SESSION STAFF REPORT
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.
AUTHORIZING THE CHAIR'S SIGNATURE ON WATERSHED SCIENCE AND
ENGINEERING TASK ORDER NO.7 AMENDMENT NO.2 - REECER CREEK FEMA
FLOOD HAZARD ANALYSIS AND MAPPING
WHEREAS: Watershed Science and Engineering (WSE) is an approved professional service
provider selected from an open solicitation and master contract award process in
2017; and
WHEREAS: Public Works has received a grant from the Federal Emergency Management
Agency supporting flood hazard analysis and mapping for approximately seven (7)
miles of Reecer Creek; and
WHEREAS: WSE has Task Order No. 7 requested by Public Works supporting the FEMA grant
award; and
WHEREAS: The Scope of Budget and Budget for Task Order No. 7 must be revised to meet the
Federal Emergency Management Agency's requirements to complete this project
requiring Board of County Commissioners authorization.
NOW, THEREFOREBE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on WSE Task Order No.
7 Amendment 2; Reecer Creek FEMA Flood Hazard Analysis and Mapping.
DATED this 9h day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
GC vJ*S ...mnuc
DEPARTMENT OF PUBLIC WORKS
1anWA3 COUNTY
Formal Task Order Document
WATERSHED Science & Engineering
Task Order Number 7
Amendment 2
Maximum Amount Payable $649980 Completion Date
12/31/2020
The general provisions and clauses of Local Agency Agreement Number KCPW2017-
19HYD2 shall be in full force and effect for this Task Order.
Location of Project: Kittitas County
Project Title: Reecer Creek FEMA Flood Hazard Analysis and Mapping
Amendment Summary: This amendment to Task Order No. 7 changes the Scope of Work and
increases the budget.
Description of Work added to Existing Scope of Work: FEMA is expected to issue a Letter of
Final Determination for Kittitas County county -wide map updates in April 2020. Those updated
maps will become effective six months later, in October 2020. WSE will update the Reecer
Creek LOMR study materials to tie into the updated FEMA mapping: WSE will acquire and
review updated FEMA modeling and mapping; update the Reecer Creek LOMR hydraulic model
to tie into updated FEMA models; and update Floodplain Workmaps and Annotated Flood
Insurance Rate Maps for the LOMR showing tie-ins to preliminary mapping.
Cost Estimate: $5,000 is added to the Maximum Amount Payable, increasing the current
maximum amount payable from $59,980 to $64,980.
Project Schedule: There is no change to the project schedule. The completion date remains
12/31/2020
Agency Signature: Date:
r
Consultant Signature: Date: Feb 27, 2020
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to approve a Resolution to award Highway
Infrastructure Funding (Rural) and Highway Infrastructure
Funding (Urban) Funds to Kittitas County Public Works.
BACKGROUND: The 2018 Omnibus bill provided WA an additional $34.1
million in Highway Infrastructure funding of which Kittitas
County was allocated $129,582 between urban and rural.
Kittitas County has an obligation to WSDOT to stay
current on awarded funding. Kittitas County has projects in
need of funding, is current with obligations and
recommends awarding the funds for Public Works projects
in need of additional funding resources.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to award Highway Infrastructure
Funding (Rural) and Highway Infrastructure Funding
(Urban) Funds to Kittitas County Public Works.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution; Highway Infrastructure Funding Project List
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
HIGHWAY INFRACTRUCTURE FUNDING AWARD
WHEREAS: Highway Infrastructure funds were awarded to Kittitas County in 2018 in the
amount of $56,439 (Urban) and $73,143 (Rural); and
WHEREAS: Kittitas County Public Works has current projects on the State Transportation
Improvement Plan that qualify and require additional funding; and
WHEREAS: Kittitas County Public Works is proposing a project award list to the Board of
County Commissioners for funding consideration; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award Highway Infrastructure (HIP) funding in the
amount defined as attached to said resolution.
DATED this 9th day of March 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kj orsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
HIGHWAY INFRACTRUCTURE FUNDING
1. Bullfrog Road —Road Number 92275 iN ilepost 0.00 — 2.70; Kittitas County Public
Works Project Number RC2002-ST; County Road Project Number (CRY) 300-200;
Resolution No. 2020-024; Rural $73,143
2. University Way and Reecer Creek Intersection Signal; Kittitas County Public Works
Project Number RCI 592-F 1; County Road Project Number (CRP) 293-18; Resolution
No. 2019-028; Urban $56,439
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to approve a Resolution to award Unobligated
Surface Transportation Block Grant Funds to Kittitas
County Public Works.
BACKGROUND: The Surface Transportation Block Grant (STBG) provides
flexible funding to be used by localities for projects to
preserve and improve the conditions and performance on
eligible infrastructure. Kittitas County is lead in managing
the funds that are awarded within Kittitas County. In the
fiscal year of 2020, City of Kittitas is not in position to
obligate an award of $504,000. Kittitas County proposes to
move the City of Kittitas from 2020 to 2021 aligning the
funding with the delivery of their project. Moving this
award provides additional funding for 2020 needing
obligation. Kittitas County has projects in need of funding
that qualify for said funds.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to award 2020 STBG Grant
Funding as recommended.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution; STBG recommended project funding awards
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
SURFACE TRANSPORTATION BLOCK GRANT AWARDS
WHEREAS: Federal Transportation Funding is available to local agencies via the Surface
Transportation Block Grant (STBG) projects administered by Kittitas County; and
WHEREAS: Approximately $504,000 is available for rural and urban transportation
improvement projects; and
WHEREAS: Local agencies in the County submitted grant applications for calendar years
2018-2020 that were reviewed and scored by the STBG technical committee and
awarded; and
WHEREAS: City of Kittitas requests their award (Resolution 2018-088) for obligation in 2020
to be moved to 2021 for project funding; and
WHEREAS: Kittitas County Public Works has projects that need additional funding and can
receive obligated funds for 2020 due the request by City of Kittitas to move their
obligation out to 2021 on awarded funds;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby award additional STBG Grant funding in the amount
defined as attached to said resolution.
DATED this 9th day of March 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
SURFACE TRANSPORTATION BLOCK GRANT FUNDING
1. Bullfrog Road — Road Number 92275 Milepost 0.00 — 2.70; Kittitas County Public
Works Project Number RC2002-ST; County Road Project Number (CRP) 300-200;
Resolution No. 2020-024; Rural $446,000
2. University Way and Reecer Creek Intersection Signal; Kittitas County Public Works
Project Number RCI 592-F 1; County Road Project Number (CRP) 293-18; Resolution
No. 2019-028; Urban $61,000
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED: Request to Approve a Notice of Call for Sealed
Bids for the Supply of a Steel Modular Bridge.
BACKGROUND: Public Works has been working on the
completion of the bid package for the
procurement of a permanent bridge to replace
the failing Big Boulder Creek Bridge on Forest
Service Road 4330.
INTERACTION:
The bid package will include bid requests for
design, fabrication, finishing and transporting a
60 foot bridge structure.
Call for bids are advertised in the legal
newspaper of record and the Daily Journal of
Commerce.
Bids are scheduled to be opened on March 26,
2020 at 10:00 a.m. in the Public Works
Department.
Public Works
RECOMMENDATION: Move to approve Notice of Call for Sealed Bids
for the Supply Steel Modular Bridge and direct
staff to advertise as requested.
HANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Notice of Call for Sealed Bids
LEAD STAFF- Mark Cook
Director of Public Works
Page 1 of 1
Public Notice
Kittitas County, Ellensburg WA
This call for sealed bids is for the Design, Fabrication, Finishing and Transporting of a 60 foot Steel Modular Bridge. Bids
are due by March 26, 2020 at 10:00 am, at which time bids will no longer be accepted. Bids will be opened at the office of
Kittitas County Public Works, 411 North Ruby Street, Suite 1, Ellensburg, Washington on March 26, 2020 at 10:00 am.
All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in
an amount equal to five percent (51/o) of the amount of such bid proposal. Should the successful bidder fail to enter into such
contract and furnish satisfactory performance and payment bonds within the time stated in the specifications, the bid
proposal deposit shall be forfeited to the Kittitas County Public Works.
The right is reserved to reject any and all bids and to waiver informalities in the bidding.
Complete digital project bidding documents, including plans and specifications, are available at ww.w.questcdn.com. You
may download the digital plan documents for $15 by inputting Quest project #6872103 on the website's Project Search
page. Please contact QuestCDN.com at 952-233-1632 or info@qucstcdn.com for assistance in free membership
registration, downloading, and working with this digital project information.
Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, WA 98926.
The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to
2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the
Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued
pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, disadvantaged business enterprises as deemed at 49 CFR Part 26 will be afforded full
opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, national origin, or seg in consideration for an award.
The improvement for which bids will be received is described below:
This Contract provides for the Design, Fabrication, Finishing and Transporting of a 60 -foot Steel Modular Bridge for
Kittitas County Public Works, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard
Specifications.
Specifications may be seen at the office of the Board of Commissioners and online at http://www.co.kittilas.wa.us/notices/.
Clerk of the Board
Publish:
Daily Record: 03/1212020; 03/19/2020
Daily Journal of Commerce: 03/12/2020; 03/19/2020
file:///C:/Userslcandie.leaderlAppData/Local/Packages/Microsoflt.MicrosoftEdge_8wekyb3... 3/3/2020
Page 1 of 1
For more information, contact Public Works
All bid submittals shall become the property of Kittitas County.
Kittitas County reserves the right to reject all bids and re -advertise if necessary.
f le:///C:lUserslcandie.leader/AppDatalLocaUPackages/Microsoft.MicrosoftEdge_8wekyb3... 3/3/2020
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
ACTION REQUESTED. Request to Approve a Notice of Call for Sealed
Bids for the Coleman Creek Culvert
Replacement — Structure Only.
BACKGROUND: Public Works has been working on the
completion of the bid package for the
fabrication and transportation of a flat slab
prestressed superstructure and precast
concrete substructure that will be used to
replace two culverts on Vantage Highway that
are fish passage barriers.
INTERACTION:
The bid package will include bid requests for
fabrication and transportation of the structure
and the reinforcing steel for the traffic barrier.
Call for bids are advertised in the legal
newspaper of record and the Daily Journal of
Commerce.
Bids are scheduled to be opened on March 26,
2020 at 10:00 a.m. in the Public Works
Department.
Public Works
RECOMMENDATION: Move to approve Notice of Call for Sealed Bids
for the Coleman Creek Culvert Replacement —
Structure Only- and direct staff to advertise as
requested.
HANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Notice of Call for Sealed Bids
LEAD STAFF- Mark Cook
Director of Public Works
Page 1 of 1
Public Notice
Kittitas County, Ellensburg WA
This call for sealed bids is for the Coleman Creek Culvert Replacement - Structure. Bids are due by March 26, 2020 at 10:00
a.m., at which time bids will no longer be accepted. Bids will be opened at the office of Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, Washington on March 26, 2020 at 10:00 a.m.
All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in
an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such
contract and furnish satisfactory performance and payment bonds within the time stated in the specifications, the bid
proposal deposit shall be forfeited to the Kittitas County Public Works.
The right is reserved to reject arty and all bids and to waiver informalities in the bidding.
Complete digital project bidding documents, including plans and specifications, are available at www.questcdn.com. You
may download the digital plan documents for $15 by inputting Quest project #/6872181 on the website's Project Search
page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership
registration, downloading, and working with this digital project information.
Informational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Works, 411
North Ruby Street, Suite 1, Ellensburg, WA 98926.
The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to
2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the
Secretary, Part 21, Nondiscrimination in Federally -Assisted Programs of the Department of Transportation issued
pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full
opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, national origin, or sex in consideration for an award.
The improvement for which bids will be received is described below:
This Contract provides for the fabrication and transportation of a pre -cast flat slab bridge structure approximately 27 -feet
long by 52 -feet wide. The work consists of flat slab prestressed superstructure and precast concrete substructure including
weld ties, lifting embeds, and smooth bar dowels and the fabrication and transportation of reinforcing steel for the cast -in-
place traffic barrier, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications.
Not included in this work is installation the cast -in-place concrete traffic barrier.
Specifications may be seen at the office of the Board of Commissioners and online at http://www.co.kittitas.wa.us/notices/
Clerk of the Board
Publish:
Daily Record: 03/12/2020; 03/19/2020
Daily Journal of Commerce: 03/1212020; 03/19/2020
file:IIIC:IUserslcandie.leaderlAppData Loca"ackages/Microsoft.MicrosoftEdge_8wekyb3... 3/3/2020
Page 1 of 1
For more information, contact Public Works
All bid submittals shall become the property of Kittitas County.
Kittitas County reserves the right to reject all bids and re -advertise if necessary.
file:III C:/Userslcandie.leaderlAppData/Local/Packages/Microsoft.Mi crosoftEdge_8wekyb3 ... 3/3/2020
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY,SESSION STAFF REPORT
STUDY SESSION DATE: March 9, 2020
TOPIC: Easton School District Traffic Control Measures Request
6
ACTION REQUESTED: Direct Staff on Traffic Control Measures Request
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff to purchase and/or partner with the Easton School District on traffic control
measures on Railroad Avenue in Easton.
BRIEFING SUMMARY:
• Staff recently received a request from the Easton School District (ESD),
• ESD is requesting two (2) interactive speed limits signs.
• Additional crosswalk identification improvements are also being requested.
BACKGROUND:
With the increased traffic and intermittent road closures on I-90 Easton is experiencing
heavy traffic on Railroad Street where the school is located. Travelers are traveling the
above posted speed limit and with no steady traffic enforcement ESD is requesting
support from Public Works for additional signage. Additionally, there is no curbs and/or
sidewalks in Easton and with students, parents and staff going to school creates a safety
hazard.
DISCUSSION:
Currently, the Upper Kittitas County Trattic Advisory Committee is being formulated. In
the absence of this Committee, Public Works is continuing to manage ongoing issues and
concerns with safety and increased traffic along the I-90 Corridor. Public Works is
tasked with problem solving with area residents and stakeholders for solutions regarding
traffic control measures. Public Works proposes discussing options with ESD and
possibly partnering on the costs for the requested signage and additional crosswalk
improvements if within both the Public Works budget and the budget of ESD.
FISCAL IMPACTS:
Current estimate is $8,409.03 for labor, signs and materials for installation of radar speed
signs and crosswalk improvements.
ATTACHMENTS:
Easton School District letter of request.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY CONMSSIONERS WORK SESSION' STAFF REPORT
February 25, 2020
Kittitas County Public Works
Attn: Mark Cook
411 N Ruby, Suite 1
Ellensburg, WA 98926
Dear Mr. Cook,
Easton School District No. 28
P. O. Box 8
1893 Railroad Street
Easton, Washington 98925
(509) 656-2317 fax (509) 656-2585
www.easton.wednet.edu
2!+20
zF-"ryrnr 0i lqp v- minme
As Easton is rural and unincorporated, there is little or no traffic enforcement on a regular
basis. During times of heavy traffic or during road closures on 1-90, vehicles try to
bypass the freeway and often speed through Easton on Railroad Street at 50 mph. Also,
local traffic typically exceeds the posted speed limit. There are no curbs or sidewalks in
the Easton and many children, parents, and visitors coming to the school for activities and
sporting events walk on the shoulders of Railroad Street.
The Easton School Board of Directors would like to explore with you the possibility of
installing two interactive speed limit signs in front of the school and improving the
crosswalk identification between the school and the playground. We would be happy to
meet with you at your convenience.
Sincerely,
Amy Grove
Easton Schc
Jen Phillips
Easton Scho
John Jense /G
Easton School 16istrict Board V6ector ~"
April Simonson
Easton School Di rict Board Director
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION S'1AFF REPORT
STUDY SESSION DATE: March 9, 2020
TOPIC: Council of Governments Staff Support Assignment
ACTION REQUESTED: Direct Public Works Staff the Council of Governments
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct Public Works staff the Council of Governments (CoG).
BRIEFING SUMMARY:
• Public Works administers the Public Facilities Fund (108).
• Community Development Services currently provides staff support to the CoG.
• For the past several years, CoG's main workload annually consists of taking
actions with the Public Facility Fund.
• The Director of Community Development Services and the Public Works Director
both agree that Public Works is a better fit providing staff support to the Council
of Governments.
BACKGROUND:
Currently, Community Development Services provides staff support to the CoG. Public
Works administers the Public Facilities Fund. The primary workload for CoG in recent
years has been reviewing and recommending funding for various Public Facility grant
applications.
DISCUSSION:
The Director of Community Development Services and the Public Works Director both
agree that Public Works is a better fit providing staff support to the Council of
Governments. Public Works is prepared to accept the staffing assignment from the Board
following the March meeting of the CoG.
FISCAL IMPACTS:
Additional costs associated with staffing CoG are budgeted within Public Works 2020
Administrative budget.
ATTACHMENTS:
None.
Page 1 of 1
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT