Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2020-04-13-minutes-public-works-study-session
KITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday April 13, 2020 -1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Request to Approve a Resolution to Select Watershed Science and Engineering and Northwest Hydraulic Consultants for Hydraulics and Hydrology Professional Services Contracts supporting Public Works for up to a Three Year Period 3. Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas 4. Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility District 5. Public comment is not accepted during this meeting. In-person attendance is currently prohibited per the Washington Governor's Proclamation No. 20-28 until April 23, 2020. The meeting can be viewed at http://www.aveapturealLcom/Media/KittitasCountyWA.aspx" G. Other business 7. Adjourn Created on 4/7/2020 9:57:16 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG Regular Meeting MONDAY 1:30 PM APRIL 13, 2020 Board members present: Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner Cory Wright Others: Mark Cook, Candie Leader, Public Works At 1:30 pm Chairman Brett Wachsmith opened the Public Works Study Session. Mark Cook requested to add three (3) items under Other Business: Coleman Creek Culvert Replacement Project; Big Boulder Creek Project and Fairview Road Project. REQUEST TO APPROVE A RESOLUTION TO SELECT WATERSHED SCIENCE AND ENGINEERING AND NORTHWEST HYDRAULIC CONSULTANTS FOR HYDRAULICS AND HYDROLOGY PROFESSIONAL SERVICES Mark Cook gave background on the On -Call Consultant selection process and stated this award is for Hydraulics and Hydrology Services. Mark Cook explained that at the last agenda session this award was omitted and is the final award for On -Call Services. Commissioner Brett Wachsmith made a motion to approve Resolution 2020-080 to Select Watershed Science and Engineering and Northwest Hydraulic Consultants for Hydraulics and Hydrology Professional Services. Commissioner Cory Wright seconded said motion. Motion passed 3-0. REQUEST TO APPROVE A RESOLUTION FOR THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH THE CITY OF KITTITAS Mark Cook gave background on the Public Facilities process and expla-ned that after discussions Conference of Governments made recommendations for awards after a second call of applications were submitted. Mark Cook continued that the City of Kittitas was awarded $151,375 for 2020 and this agreement releases the funding for project use. Chairman Brett Wachsmith made a motion to approve Resolution 2020-081 for the Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas. Commissioner Cory Wright seconded said motion. Motion passed 3-0. 2020-04-13 MINUTES REQUEST TO APPROVE A RESOLUTION FOR THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH SNOQUALMIE PASS UTILITY DISTRICT Mark Cook gave background on the project submitted by Snoqualmie Pass Utility District to the Conference of Governments (CCG) for consideration. Mark Cook continued that COG elected to not fund the project during the second round of reviewed applications. Mark Cook added that after discussion with the Board of County Commissioners and the imoortance of the project to Kittitas County the Board elected to award $250,000 from the fund reserves to the project. Discussion was held. Chairman Brett Wachsmith made a motion;to approve Resolution 2020-082 for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility District. Commissioner Cory Wright seconded said motion. Motion passed 3-0. OTHER BUSINESS: Mark Cook gave background on the Coleman Creek project and stated that no procurement bids were received for the project. Mark Cook continued that he has spoken with legal and moving forward to negotiate directly with a supplier and should see the resolution supporting this action next week to keep the project on schedule. Mark Cook stated that one bid was received for the Big Boulder Bridge Replacement project. Mark Cook continued that the bidder did omit one form from the submittal, and he is working with legal on a resolution to address the issue and go forward with award. Mark Cook added that the project will be done in the fall. Mark Cook reported that staff received a good response on the bid for the Upper Kittitas County Maintenance Facility with two (2) bids being received. Mark Cook added that award for the project is scheduled for the May 5th agenda session. Meeting adjourned at 1:46 pm KITTITAS COUNTY COMMISSIONERS 2020-04-13 MINUTES KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2020 -_ oba SELECTING WATERSHED SCIENCE AND ENGINEERING AND NORTHWEST HYDRAULIC CONSULTANTS AS PUBLIC WORKS ON-CALL TASK ORDER CONSULTANTS FOR UP TO A THREE-YEAR PERIOD OF SERVICE AND AUTHORIZING THE PUBLIC WORKS DIRECTOR SIGN THE CONTRACT DOCUMENTS WHEREAS: The Department of Public Works (PW) prepared a solicitation for engineering and professional services consistent with state law and county code in January 2020; and WHEREAS: PW docketed a request to solicit for engineering and professional services on the Board of County Commission general business agenda on January 21, 2020; and WHEREAS: The Board of County Commissioners did direct PW proceed with solicitation efforts and said process concluded with submittals being received on February 13, 2020; and WHEREAS: Consistent with solicitation advertising an internal review team of PW reviewed and scored all hydraulic and hydrology engineering submittals; and WHEREAS: The consensus of the reviewers selects Watershed Science and Engineering and Northwest Hydraulic Consultants for professional services contracts for up to a three-year period (two-year base with possible third year extension if mutually agreed upon); NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby select Watershed Science and Engineering and Northwest Hydraulic Consultants for standard professional services contracts (acceptable to the Prosecuting Attorney's Office); BE IT FURTHER RESOLVED the Public Works Director is directed to sign said contracts on behalf of the Board of County Commissioners. DATED this 13`x' day of April 2020, at Ellensburg, UNrN\irrrrrin lsuttttU� ❑ Clerk ofthe Board- Julie Kjorsvik 0116evu lerk of the Board- Mandy Buchholz Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY,WASHINGTON Vice -Chairman Cory Wright, Commissioner BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO: 2020 -n. RESOLUTION TO APPROVE THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH THE CITY OF KITTITAS WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds may only be used to finance public facilities serving economic development purposes in rural counties and finance personnel in economic development offices in the State of Washington; and WHEREAS: The 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas has been executed by said entity with funding available January 1, 2020; and NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners hereby approves the attached 2020 Dis�rgsped County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas. , ADOPTED this 13th day of April 2020. `,."``G�MMISS/0ti' o •� � z~ A: �� a k of the Ro' 't Julie Kjorsvik `17CpUN-Nl 11 BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Osl CJ; eputy Clerk of the Board- Mandy Buchholz "4"6 61 J'� Cory ng t, Commissioner 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT BETWEEN KITTITAS COUNTY AND CITY OF KITTITAS This Contract dated o' 15. , 2020 is made and entered into by and between KITTITAS COUNTY `County"), a subdivision of the State of Washington, and CITY OF KITTITAS ("Funding Recipient"). WHEREAS, the purpose of this Agreement is to provide for public facility construction and foster economic development opportunities within Kittitas County; NOW THEREFORE, in consideration or attached and incorporated and made Recipient mutually agree as follows: Section 1. Scope of Work. of the terms and conditions contained herein, part hereof, the County and the Funding a. Funding Recipient shall provide the services and staff described in its Application for Funds submitted to the Council of Govemments, attached hereto as Exhibit "A" which is attached hereto and incorporated herein by this reference. b. Except as otherwise specifically provided in this Agreement, Funding Recipient shall furnish the following as required to perform the services, described in Paragraph (a) above, in accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items furnished or required to be furnished, together with all other obligations performed, or required to be performed, by Funding Recipient under this Agreement are collectively referred to herein as "Services." Section 2. Payment. a. As full compensation for satisfactory performance of the Funding Recipient Services, the County agrees to pay Funding Recipient the sum of one hundred fifty one thousand three hundred and seventy five dollars ($151,375). b. Additional payment terms: The County will make payment to the Funding Recipient only on a reimbursement basis, as receipts for any items including marketing and/or advertising are submitted to the County. c. Requests for reimbursements must be submitted to: Kittitas County Public Works Attn: Joyce White 411 North Ruby, —Suite 1 Ellensburg, WA 98926 is ce.white co.kittitas.wa.us Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 1 d. Reporting requirements of your events will be required on prescribed forms from the Kittitas County Public Works Department. Section 3. Performance by Funding Recipient. a. Funding Recipient shall not (by contract, operation of law or otherwise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the County's option. b. Funding Recipient shall at all times be an independent Funding Recipient and not an agent or representative of the County with regard to performing the Services. Funding Recipient shall not represent that it is, or hold itself out as, an agent or representative of the County. In no event shall Funding Recipient be authorized to enter into any Agreement or undertaking for or on behalf of the County. It is understood that the Funding Recipient and the Funding Recipient's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County. c. Funding Recipient shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in effect, of any govemmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services). Funding Recipient shall furnish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Funding Recipient agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the term of this Agreement. d. The County and the Funding Recipient agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or failure or delay in making) such inspection or approval shall not relieve Funding Recipient of its responsibility to perform the Services in accord with this Agreement, notwithstanding the County's knowledge of defective or non -complying performance, or the substantiality or ease of discovering the same. Funding Recipient shall provide the County with sufficient, safe, and proper facilities and equipment for such inspection and free access to such facilities. This contract is subject to review by any Federal or State auditor, Funding Recipient shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. Funding Recipient shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Funding Recipient shall provide the County access to (and the County shall have the right to examine, audit and copy, with or without notice) all of Funding Recipient's books, documents, papers and Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 2 records related to the Services or this Agreement. g. Funding Recipient understands and acknowledges that Funding Recipient is solely responsible for its own reporting and accounting of all state, federal, social security, and local taxes, of every nature, arising from Funding Recipient's performance of this Agreement. All compensation received by the Funding Recipient will be reported to the Internal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. Section 4. _Release, Indemnity, and Hold Harmless. The County assumes no liability for the Funding Recipient's actions under this Agreement. Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabilities, damages, and expenses, (including, but not limited to, reasonable attorney fees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: Any fault, negligence, strict liability or product liability of Funding Recipient in connection with the Services for this Agreement; Any lien asserted upon any property of the County in connection with the Services for this Agreement; • Any failure of Funding Recipient, or of the Services, to comply with any applicable law, ordinance, rule, regulation, order, license, permit and other requirement, now or hereafter in effect, of any governmental authority; or C Any breach of or default under this Agreement by Funding Recipient. Section S. Compliance with Public Records Law. a. In compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. In the event a public records request is made to the County for documents created in relation to this Agreement, should legal uncertainty arise regarding the disclosability of any documents under federal or state public records laws, the County shall provide notice to Funding Recipient pursuant to Washington's public records act, chapter 42.56 RCW, to allow Funding Recipient to seek a court injunction. c. The County specifically shall not be liable to Funding Recipient for the County's release under public records laws of any documents not protected by trademark, copyright or other law. Distressed County Sales and Use Tax infrastructure Improvement Program Funding Agreement Page 3 Section 6. Industrial Insurance Waiver. With respect to performance of this Agreement and as to any claims against the County, its Additional Insureds, officers, agents and employees, the Funding Recipient expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to Funding Recipient's employees and agrees that the obligations to indemnify, defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Funding Recipient. This waiver is mutually negotiated by the parties to this Agreement. Section 7. Insurance and Endorsements. a. The County may require through a request in writing that the Funding Recipient provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Funding Recipient, its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Funding Recipient or any of its employees, agents or representatives. c. Should the County require such liability insurance, the Funding Recipient agrees to provide proof of insurance prior to commencing performance of this Agreement. d. Copies of the County's written request and the insurance documents provided by Funding Recipient shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Funding Recipient shall furnish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Section 8. Termination. The County may, by written notice thereof to Funding Recipient, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Funding Recipient is in breach or default. Upon receiving such notice of termination, Funding Recipient- shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice. In the event the County terminates the Funding Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of the date of the notice of termination. Distressed County Sales and Use TaX Infrastructure Improvement Program Funding Agreement Page 4 Section 9. Miscellaneous. a. Funding Recipient shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreement without the County's prior written consent. b. This Agreement embodies the entire Agreement between the County and Funding Recipient, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties. c. Notice for any purpose under this Agreement, except service of process, shall be given by the Funding Recipient to the Kittitas County Commissioners and the Kittitas County Public Works Director, 411 North Ruby, Suite 1, Ellensburg, WA 98926. For all purposes under this Agreement, any notice by the County to the Funding Recipient shall be given to the Funding Recipient's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, certified mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs. e. This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrument. Funding Recipient warrants to the County that the individual signing on Funding Recipient's behalf has the requisite power and authority to enter into and to perform Funding Recipient's obligations under this Agreement. Funding Recipient further warrants to the County that Funding Recipient has made no misrepresentation or misleading statement in connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Funding Recipient's ability to perform its obligations under this Agreement. g. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought to enforce this Agreement or any of its terms shall be in Kittitas County, State of Washington. Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 5 KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS l Cory Wright, Commissioner .71 y i � O Y 'A#,EST- z Clerk of the BdArd- APPROVED AS TO FORM. Deputy Prosecuting Attorney CITY OF KITTITAS f Rep# entative Address 15 C q CIL 6 % Telephone Dated:.— -�-7 Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 6 Kittitas County Distressed County Sales and Use Tax Grant Application, Guidelines & Instructions Deadline: Monday, July 15, 2019 Return completed application )� PP b P y 5:00 M Return To: Kittitas County Department of Public Works 411 North Ruby Street, Suite #1 Ellensburg, Washington 98926 The Kittitas County Public Facilities Fund solicits applications from various entities within the County. To assist applicants completing successful grant applications, the Council of Governments has created policies that are available to all applicants upon request. These policies reside within the Public Works Department (509) 962-7523.' Seeflon I — Sales and Use Tar Funds Current Washington State iaw authorizes the legislative authority of a rural county to impose a sale and use tax in accordance with the terms of chapter 82, Revised Code of Washington (RCW). In Kittitas Count-, according to RCW 82.14.370, the rate of the tax shall not exceed .09 percent of the selling price in the case of a sales tax or the value of the article used in the case of a use tax. The tax imposed is deducted from the amount of tax otherwise required to be collected or paid over to the department of revenue under chapter 82.08 or 82.12 RCW. Kittitas County has authorized this tax and compiles the funds annually for distribution throughout the county to qualifying organizations in the i+arm of reimbursable grants. Most applications are considered during an annual grant application process, in some cases, applications may be considered outside of the regularly -scheduled annual process. ['or consideration during the annual grant process. applications must be completed in full and submitted by the 5:00 PM due date on the application materials to the Department of Public Works. Incomplete and/or late applications will not be considered. Applications may not be changed or amended by the applicant after the deadline for submission. Permissible Uses According to Law Funds awarded as reimbursable grants under this process may be used for the following: I. To finance public facilities serving economic development purposes. 2. To finance personnel in economic development offices. According to RCW 82.14.370, in order to qualify for financing the public facility must be listed as an item in the officially adopted county overall economic development plan. or the economic development section of the county's comprehensive plan, or the comprehensive plan of a city or town located within the county, "Public facilities" means bridges, roads, domestic and industrial water facilities, sanitary sewer facilities, earth stabilization, storm sewer facilities, railroad. electricity. natural gas, buildings, structures, telecommunications infrastructure, and port facilities in the state of Washington. "Economic development purposes" means those purposes which facilitate the creation or retention of businesses and jobs in a county. "Economic development office" means an office of a county, port districts, or an associate development organization as defined in RCW 43.330.010 which promotes economic development purposes within the county, Funds Availabilit , All funds awarded under this program will be available in the form of reimbursable grants. The funds Arill be available for reimbursement beginning January 1" of the calendar year following the award notification. unless othenvise allowed by the Kittitas County Board of Commissioners. The award process is defined in COG Policy 2018-01, Kittitas County recognizes that some projects may be large and complex, requiring multiple funding sources and years to complete. In that regard. awarded funds will remain available for reimbursement for a period of two years following the award notification. Any unexpended funds will be returned to the Distressed County Sales and Use Tai: Grant Fund and made available for future applications. Formal requests for extension of the two-year deadline for reimbursement may be made in writing to the Kittitas County Board of Commissioners (BOCC). The BOCC has final say on all extension requests. All reimbursement requests must be submitted to the Kittitas County Department of Public works for payment. Review Process The county is required to consult with all cities. towns, and port districts located within the county and the associate development organization serving the county to ensure that any expenditures of these funds meets the {foals of chapter 130, Laws of 2004 and the requirements of RCW 82.14.370. To comply with this requirement, the county will seek the assistance of the Council of Governments (COG), The COG is comprised of two representatives from each municipality vdthin Kittitas County, including Roslyn. South Cie Elum. Cie Elum. Ellensburg, Kittitas, and Kittitas County. The Council of Governments (COG) will review all applications and score them based on the information provided by the applicant and the Project Rating, Criteria as presented in the application. The COG will then make funding recommendations to the Kittitas County BOCC. The review and award process is defined in COG policy 2018-02. All applicants will be notified as to the date and time of review of their application by the COG. All applicants will be given the opportunity to present their application to the COG and answer questions. The BOCC will consider recommendations for grant awards by the COG at a later date. The BOCC Will make all grant awards. The decision of the BOCC is considered final. Section 2 -- Application Instructions Grant applicants shall follow- the instructions below in preparing their proposal. o Complete the supplied application forms using a computer. No hand written forms. • Do not use graphics or formatting embellislunnents beyond those �,%ithin the application. e Answer each question and sub -question individually in each section. o Leave in the question and directions. This way we will be sure of the question you are answering, and it will also facilitate easy review for the Council of Governments (COG). e Use single spaced 12 point Times New Roman or similar font. Make certain you are answering the questions. For instance, if the question asks "how." please answer how, not whether or when. Please also include the following: A detailed 8 %2" x I Y' vicinity map that clearly shows the project. A signature from the local/regional economic development organization supporting the project. Any other information pertinent to the application you would like the COG to consider. Applications are due by 5:00 PM, Monday, July 15, 2019 at the Kittitas County Department of Public Works Office. You will be notified that your application has been received and accepted by the COG. Kittitas County Department of Public Works Distressed County Sales and Use Tax Grant Fund 411 North Ruby Street. Suite I Ellensburg, WA 98926 Please submit 1 original and 12 copies of the entire application (13 total). Note: Incomplete applications will be rejected. Questim l/tstructions AnnIicant Information (page I,of the application): Please fill in all areas completely. 'nie applicant is the agency requesting funding. The of name will be considered the leader of the project for the applicant agency. The contact should also be the individual who will present the project and will be available for questions from the COG. Annlicant Thresholds (page I of the aRplicationl: Your project must meet each of these requirements to be considered, Please check each box and include the necessary documentation with your application. If your project does not meet all of the listed requirements and/or your application does not include the necessary documentation to support your claims, it will not be considered for funding. Project Budeet (nage 2 of the application): The top line (Distressed County Funds Requested) is to list how much funding you are asking the COG to consider awarding your project. The columns to the right then ask you to include the specific breakdown as to how and in what phase or phases (if a construction project) the money will be utilized. Please be as accurate as possible. The following lines and columns are for other funding sources you have secured or for which you have applied. Again, please be as accurate as possible and fill in the final column for each signifying the status of the funding source (whether or not the funding has been secured). The "Project Total" line is for the total cast of the project the application represents. The sum ofall the funding sources lines should accurately add to the figure listed here. Additionally. please also accurately include the breakdown for phases listed to the right, again making sure the sums of the previous columns are equal to the amount placed on each line. Distressed County Fund Matching Ratio a e 2 of thea lication : This line is to show what percentage of the total project budget the applicant is providing in local funding. For instance, if the total proje=ct budget is $100.000 and the application is for $50,000 with combined other funding sources of another $50,000 and the local funding source component is $20.000, the Ratio would be 20%. A simple equation to answer this question from the Project Budget is: (Local Government * Other (if a local funding source)) J Project 'i'c�tal Distressed County Fund Matching Ratio (convened to a percentage) Protect Narrative (starts on nage 3 of the application): Please answer each question and sub -question completely. Incomplete applications will not be considered for funding. You may attach additional information necessary to answer the questions as needed. Special Instructions: Please review the following instructions as listed below for specific questions in the Project Narrative. uestion 6: Please attach the pertinent sections of the agency`s plans as listed with which the application is consistent. Question 9: Please attach a copy of any feasibility or predeyelopment studies. Ouestion 11: You must inciude the key assumptions (if any) and their justifications. methodology, and calculations upon which your businesses created/retained estimate is based. Simply providing a number or approximate number will not be considered a complete answer and will result in your application being rejected from consideration. Question 12: You must include the key assumptions (if any) and their,justitications, methodology, and calculations upon which your jobs created/retained estimate is based. Simply providing a number or approximate number will not he considered a complete answer and will result in your application being rejected from consideration. Potential Exarrrple Ansiney- for oijestinn 12: We have completed a .surrez of local contractors likel1• to hid on a pt•oject such as this. Our results (data provided as attachment) show that dace to current economic conditions, a greater .supEoly ft►r budding services nece.ssarj' f it this project exists in the local market than demand for thoseseri-Ices. As a ►•est(h. most f)f those .surveyed indicate lower levels ofeniplayistent than in the past, including reducing irorkfarce levels tip to SU% anti-iw intermiliew it ork with extended periods vfien gvi•art) lul-ofJ due to luck of'work. A project this size, according to our estimates (data provided as attachment) trill require (,k) skilled construction laborers for ulJproximalely (X period of time), (X) subcontractors entploy-ing (.V) laborers for I plyioximately (11 I)eHod of lime). and )fell asM support sl a� (adnTi►TiSIrQI1, e c Ie) cal, ntanagcentent) for (,V pe,•iod ii►)te). The agent r is-ill also he entpinving a half time project i?attciger to oversee the project. !lost studies (tiro examples attached) believe that Washington Stator's building industin, is onl}, beginning io recover and maj! serer reach employment) le els previously seen. JC eeping that in iniad and being conse►9'atib`e ti*ile taking into account the current economic environment gf'Upper Kiltitas C'ouno� and e.sl)ecially the depressed construction indust►}•, we estintate at least (x) jobs trill he retained fior at least (X) months { the tern? of the construction phase of the project). hr addition, as the ag+enc.t, does not currently employ! a qualified prujecl manager, cit least One part-time prufe.s,siunal job trill he created far the same period. "Phis, of cou se docs not c'ons'ider ant, impact to other local.sul)pliers and supporting businesses ta,hich will cerlainll' provide services fit- this prctject as well as those ti-ho are directly empinved as a result afthe project. Klttftas County Department of Public Works DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION The Distressed County Sales and Use Tax Infrastructure improvement Program supports improvements to infrastructure systems that foster economic development in Kittitas County. The goal is to create economic opportunity through infrastructure investment. APPLICANT INFORMATION Applicant: City of Kittitas Contact Flame: Mayor Patricia Cort Address: Address: City: Telephone: E-mail Address: 207 N Main PO Box 719 Kittitas INAZIp: 98934 509-968-0220 FAX: 509-968-0223 clerk@cityofkittitas.com Project Location: Main Street - Kittitas Jurisdiction Population: 1,450 Project Title: Main Street Lift Station APPLICATION THRESHOLDS Applicant Requirement: Check -off: ® 1. The project is Improvement to an infrastructure systems) linked to economic development, ® 2. A detailed 8 % X 11" vicinity map that clearly shows the project is Included in the application package. ® 3. Distressed County funds are not being substituted for other funds that are already secured. ® 4. The project involves traditional improvements, instead of "non-traditional' improvements eligible for "Enhancement" funding ® 5. Applicant has submitted only one application this round. ® S. The locallregional economic development organization has been informed of the project. 6 W A "9 9z 06 cn>- IL Ln C G LO 00 !CI •� L Yw � O� c a, Ln co m +R C CD y LO m W 06 U 0 Ln0 M r -I � 69 69 69 if 69 bg 0 0 LO o l- w 110 Ln 60 69 119 69 60 w Ln M r -i t 0 Lr) m i �rl E O � r-ppI p\ Ln m .10 .a O 0 LO 3 G a? N Im 0 C_ V �oLL U.U) Z:. Ln D �i U as N fA y � 1l4 4R IA 6I? 6F! 0 Ln0 M r -I � 69 69 69 if 69 bg 0 0 LO o l- w 110 Ln 60 69 119 69 60 w Ln M r -i t 0 Lr) m i �rl E O � r-ppI p\ Ln m .10 O 0 LO 0 N 0 Ln �i N � � 1l4 4R IA 6I? 6F! C_ O Ln 0 t i-1 Q co C� 1 N tip O 68, 69 69 0 Ln0 M r -I � 69 69 69 if 69 bg 0 0 LO o l- w 110 Ln 60 69 119 69 60 w Ln M r -i t 0 Lr) m i �rl E O � r-ppI p\ Ln m .10 r- 0 C_ G t C� 1 O d Q LL aCi O a` p O a y o � r- PROJECT NARRATIVE 1. Project Description: Describe the scope of work. Indicate the major work involved, including a brief comoarison of existina and or000sed conditions. This project will construct an 8 -inch gravity sewer main, grinder pump station, 1,5 -inch sewer force main and a fl- inch force main to provide sanitary service to businesses south of Railroad Avenue and to support future develop- ment. The lift station will be constructed at the south end of the project and pump wastewater north in the 1.5 -inch force main to Railroad Avenue, into the City's existing sewer system. The 4 -inch force main will not be active at the conclusion of construction; it would be installed to encourage future commercial / industrial development on unde- veloped lands south of the project area. The City applied for and received a COG grant in 2016 to support design and construction of sewer improvements in the project area. Through completing designs, it was learned that addi- tional funds are needed for construction. Construction dewatering will be more extensive than what was originally budgeted for due to the high groundwater table in the area. Native soils will be saturated and not suitable for backfill so greater quantities of bank run gravel for trench backfill will be needed than was originally planned for. It was also learned that a cultural resources survey will be needed, adding additional costs to the project. 2. Explain the specific infrastructure Issues the project addresses and how they are linked to economic development improvements. Some existing businesses in the project area must store their waste in holding tanks and then have it pumped into trucks for transport to the City wastewater treatment plant. This process is costly and inconvenient. Some businesses have expressed concerns to the City regarding the costs and hassle of having to deal with sewage storage and disposal, and this project will help ensure these businesses remain committed to staying in the community. Existing business provide approximately 40 jobs in the area. Establishing a sanitary sewer system in the area will also promote the development of other businesses along Main Street south of Railroad Avenue, Including the planned industrial area. This area is regionally important due to the lack of industrial zoned land available in the County. 3. Preliminary Engineering Phase: Estimated Start Date: Jan. 2020 Estimated End Date: Apr. 2020 Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that may slow phase progress). Preliminary construction plans, specifications and a cost estimate have been prepared for the project, using 2016 COG funds and City funds. The improvements shown along Main Street on the current plans extend to approxi- mately 850 feet south of the intersection of Railroad Avenue.The City recently completed a Wastewater Collection System Planning report. The report determined that long term development of the industrial area will require sub- stantial infrastructure improvement to adequately build out the entire area, which would otherwise delay the com- pletion of this project to serve existing businesses. The intent of the project is to provide immediate sanitary sewer services to existing users, and to encourage future development in the immediate vicinity and in areas to the south towards the interstate. 4. Right of Way Phase: Estimated Start Date: Jan. 2020 Is It Required? Yes X No Estimated End Date: Apr. 2020 Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that may slow phase progress). This phase will be completed in tandem with the engineering phase so that construction will not be delayed due to right-of-way project requirements. Based on design work that has already been com- pleted, it`s anticipated that temporary construction easements will be needed to construct sewer services and pump station improvements. 5. Construction Phase: Estimated Start Date: May 2020 Estimated End Date: Oct. 2020 Please explain phase status (work already completed. In progress, awaiting funding, etc„ and factors that may slow phase progress). Construction will begin following the completion of the preliminary engineering and right-of-way phases. 6. Indicate If the project Is consistent with the following applicable state, regional and local plans and prioritization processes: © Overall Economic Development Plan - Officially Adopted El Comprehensive Land Use Plan- Officially Adopted 2007 ® Capital f=acility Pian -Officially Adopted 2007 0 Community Action Pian (or other community-based plan) - Officially Adopted ® Six -Year Transportation Improvement Plan - Officially Adopted Updated 2014 ® Site-specific development plans; e.g., Community Master Plan -Officially Adopted 2012 Sewer Feasibility Study © Other 7. Explain how this Infrastructure project has been coordinated, or will be coordinated with other jurisdictions, such as counties, cities, stateMaderal agencies, and with leconomic development organizations during planning, design, financing, construction and/or operation phases. The City had worked for more than seven years and spent more than $80,000.00 in legal and administrative fees to expand its southeast UGA. During this process, the City worked with Kittitas County, the Kittitas County Chamber of Commerce, Conference of Government, and the Department of Commerce to identify the adopted UGA. As the recipient of a 2014 COG grant, the City completed a Wastewater Collection System Planning Report to plan the sewer needs for the UGA area to enable economic development in the South Kittitas area. This application is meant to be another "leg of that process" for the purposes of providing City sewer services to existing businesses south of Railroad Av- enue. The businesses in this area provide a substantial number of jobs, and sales tax revenue to the City and have expressed significant interest in remaining at their current locations, dependent upon the City's implementation of delivering sewer service. Providing sewer service will also aid the City with compliance with the Department of Ecology for industrial businesses in these locations. The City will work with the Department of Ecology and the Department of Health in the planning and construction of the sewer improvements. S. Explain how the Infrastructure project will helpmeet the economic development goals of your community and/or region. If this project is not done, will the anticipated private development still take place? This infrastructure project will help to meet the economic development goals of the City by both retaining existing jobs and promoting the development of new jobs. If the project is not completed, it is possible that the existing businesses may seek to relocate elsewhere so that they will have access to sanitary sewer services, rather than being forced to store and pump their own wastewater. Additionally, the City has been approached by several new businesses seeking to locate in Kittitas. Each time the businesses learn that there are no sewer facilities, they choose other locations that already have sewer facilities available. The primary reason for this is the high cost to extend sewer service to this area. Completing these improvements will help to make the area more attractive to future development by lowering the cost to potential businesses to extend sewer service to this area. 9. Describe any feasibility or predevetopment studies that demonstrate the linkage between the proposed Distressed County Infrastructure improvements and the anticipated economic outcomes. Conversations between the City and the business owners in this area have identified the desire for these businesses to remain in Kittitas, their need for sewer service, and their intent to relocate if sewer service cannot be obtained. 10. Indicate if other needed Infrastructure (e.g., sewer, water, power) is In place or if there is a plan for getting it In place. This area has all of the other infrastructure it needs, including water, power, roadway access, and pedestrian facilities, but it lacks the proposed sanitary sewer services. This is the final piece of infrastructure needed in order for existing and future businesses to have access to all necessary services. 11. Indicate the Estimated Plumber of 9usineese8 Created/Rete€nad by the Prolect. 5 There are five existing businesses that need these services to be established. Establishing a sewer system in this location will also encourage development of the industrially zoned land south of railroad Ave. 12. Indicated the Estimated Number of .lobs Created/Retained by the Project. 0 It has been estimated that the existing businesses employ approximately 44 people. Additional jobs will also be created by future businesses that will locate in the service area. Submit* the original application to: Kittitas County Department of Public Works 411 N. Ruby, Suite 41 Ellensburg, WA 98926 10 Applicant Certification Certification is hereby given that the information provided is accurate and the applicable attachments aiv complete and included as part of the application package. I certify that application thresholds are met at the time of application. 11,W4 ��AL4& Sign Arc of Official Representative Sponsoring Agency (If Applicable) Signature of Agency Representative Typed or Printed Name Date Date Date Associate Economic Deveiiopment Organization Notification The organization listed below has received notification of this project as demonstrated by the signature of the organization's representative. k#-- CO. QwA6r ofGivnerce Name of Organization A70AAMi'- CEO Sign tare of Rep se to ive SIS! Date Kittitas County Department of Public Works Conceptual Approval Approval of the project feasibility, scope and estimated costs. Signature of Kittitas County DPW Representative Typed or Printed Name c7 -l5 -,/e-01- Date KITTITAS COUNTY DEPARTMENT OF PU13LIC WORKS DISTRESSED COUNTY INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION DUE DATES FY 2020 Distressed County Infrastructure Improvement Program, applications are initially due to Kittitas County Department of Public Works for conceptual approval of the infrastructure project. Distressed County Infrastructure Improvement Program appiicants are invited to appear at the COG meeting when the project's criterion is revie%rd. APPLICATIONS DUE 2020 Application due Date COG MEETING DATES COG Meetings July 15, 2019............................................................August 2019 COG Meeting **Funding available January I, 2020 12 4'**,, -NL r 16, 71 In •i" kr' BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO: 2020 - RESOLUTION TO APPROVE THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH SNOQUALMIE PASS UTILITY DISTRICT WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds may only be used to finance public facilities serving economic development purposes in rural counties and finance personnel in economic development offices in the State of Washington; and WHEREAS: The 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility District has been executed by said entity with funding available January 1, 2020; and NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners hereby approves the attached 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility. ADOP` ED 414s 13th day of April 2020. o- ❑ Clerk of the Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTIT S COUNTY, WAS GTON Brett Mchsvilth, Chairman s,Rn aura siadac , Vice -Chairman 'Deputy Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT BETWEEN KITTITAS COUNTY AND SNOQUALMIE PASS UTILITY DISTRICT This Contract dated 1041d4q , 2020 is made and entered into by and between KITTITAS COUNTY ("County"), a subdivision of the State of Washington, and SNOQUALMIE PASS UTILITY DISTRICT ("Funding Recipient"). WHEREAS, the purpose of this Agreement is to provide for public facility construction and foster economic development opportunities within Kittitas County; NOW THEREFORE, in consideration of the terms and conditions contained herein, or attached and incorporated and made a part hereof, the County and the Funding Recipient mutually agree as follows: Section 1. Scope of Work. a. Funding Recipient shall provide the services and staff described in its Application for Funds submitted to the Council of Governments, attached hereto as Exhibit "A" which is attached hereto and incorporated herein by this reference. b. Except as otherwise specifically provided in this Agreement, Funding Recipient shall furnish the following as required to perform the services, described in Paragraph (a) above, in accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items furnished or required to be furnished, together with all other obligations performed, or required to be performed, by Funding Recipient under this Agreement are collectively referred to herein as "Services." Section 2. Payment. a. As full compensation for satisfactory performance of the Funding Recipient Services, the County agrees to pay Funding Recipient the sum of two hundred fifty thousand dollars ($250,000). b. Additional payment terms: The County will make payment to the Funding Recipient only on a reimbursement basis, as receipts for any items including marketing and/or advertising are submitted to the County. c. Requests for reimbursements must be submitted to: Kittitas County Public Works Attn: Joyce White 411 North Ruby, — Suite 1 Ellensburg, WA 98926 ioyce.white@co.kittitas.wa.us Distressed County Soles and Use Tax Infrastructure Improvement Program Funding Agreement Page T d. Reporting requirements of your events will be required on prescribed forms from the Kittitas County Public Works Department. Section 3. Performance by Funding Recipient. a. Funding Recipient shall not (by contract, operation of law or otherwise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the County's option. b. Funding Recipient shall at all times be an independent Funding Recipient and not an agent or representative of the County with regard to performing the Services. Funding Recipient shall not represent that it is, or hold itself out as, an agent or representative of the County. In no event shall Funding Recipient be authorized to enter into any Agreement or undertaking for or on behalf of the County. It is understood that the Funding Recipient and the Funding Recipient's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County. c. Funding Recipient shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in effect, of any governmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services). Funding Recipient shall fumish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Funding Recipient agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the term of this Agreement. d. The County and the Funding Recipient agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or failure or delay in malting) such inspection or approval shall not relieve Funding Recipient of its responsibility to perform the Services in accord with this Agreement, notwithstanding the County's knowledge of defective or non -complying performance, or the substantiality or ease of discovering the same. Funding Recipient shall provide the County with sufficient, safe, and proper facilities and equipment for such inspection and free access to such facilities. This contract is subject to review by any Federal or State auditor. Funding Recipient shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. Funding Recipient shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Funding Recipient shall provide the County access to (and the County shall have the right to examine, audit and copy, with or without notice) all of Funding Recipient's books, documents, papers and Distressed County Soles and Use Tax Infrastructure Improvement Program Funding Agreement Page 2 records related to the Services or this Agreement. g. Funding Recipient understands and acknowledges that Funding Recipient is solely responsible for its own reporting and accounting of all state, federal, social security, and local taxes, of every nature, arising from Funding Recipient's performance of this Agreement. All compensation received by the Funding Recipient will be reported to the Internal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. Section 4. Release IndlemnitV. and Hold Harmless. The County assumes no liability for the Funding Recipient's actions under this Agreement. Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabilities, damages, and expenses, (including, but not limited to, reasonable attorney fees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: • Any fault, negligence, strict liability or product liability of Funding Recipient in connection with the Services for this Agreement; • Any lien asserted upon any property of the County in connection with the Services for this Agreement; • Any failure of Funding Recipient, or of the Services, to comply with any applicable law, ordinance, rule, regulation, order, license, permit and other requirement, now or hereafter in effect, of any governmental authority; or • Any breach of or default under this Agreement by Funding Recipient. Section 5. Compliance with Public Records Law. a. In compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. In the event a public records request is made to the County for documents created in relation to this Agreement, should legal uncertainty arise regarding the disclosability of any documents under federal or state public records laws, the County shall provide notice to Funding Recipient pursuant to Washington's public records act, chapter 42.56 RCW, to allow Funding Recipient to seek a court injunction. c. The County specifically shall not be liable to Funding Recipient for the County's release under public records laws of any documents not protected by trademark, copyright or other law. Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 3 Section 6. Industrial Insurance Waiver. With respect to performance of this Agreement and as to any claims against the County, its Additional Insureds, officers, agents and employees, the Funding Recipient expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to Funding Recipient's employees and agrees that the obligations to indemnify, defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Funding Recipient. This waiver is mutually negotiated by the parties to this Agreement. Section 7. Insurance and Endorsements. a. The County may require through a request in writing that the Funding Recipient provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Funding Recipient, its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Funding Recipient or any of its employees, agents or representatives. c. Should the County require such liability insurance, the Funding Recipient agrees to provide proof of insurance prior to commencing performance of this Agreement. d. Copies of the County's written request and the insurance documents provided by Funding Recipient shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Funding Recipient shall furnish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Section 8. Termination. The County may, by written notice thereof to Funding Recipient, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Funding Recipient is in breach or default. Upon receiving such notice of termination, Funding Recipient shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice. In the event the County terminates the Funding Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of the date of the notice of termination. Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement Page 4 Section 9. Miscellaneous. a. Funding Recipient shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreement without the County's prior written consent, b. This Agreement embodies the entire Agreement between the County and Funding Recipient, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties. c. Notice for any purpose under this Agreement, except service of process, shall be given by the Funding Recipient to the Kittitas County Commissioners and the Kittitas County Public Works Director, 411 North Ruby, Suite 1, Ellensburg, WA 98926. For all purposes under this Agreement, any notice by the County to the Funding Recipient shall be given to the Funding Recipient's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, certified mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs. e. This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrument. Funding Recipient warrants to the County that the individual signing on Funding Recipient's behalf has the requisite power and authority to enter into and to perform Funding Recipient's obligations under this Agreement. Funding Recipient further warrants to the County that Funding Recipient has made no misrepresentation or misleading statement in connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Funding Recipient's ability to perform its obligations under this Agreement. g. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought to enforce this Agreement or any of its terms shall be in Kittitas County, State of Washington. Distressed County Sayles and Use Tax Infrastructure Improvement Program Funding Agreement Page 5 KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS Cory Wright, Commissioner Cj T} _ Clerk ficfih ora c9i APPROVED AS TO FORM: Deputy Prosecuting Attorney SNOQUALMIE PASS UTILITY DISTRICT Representative 37d 7(,Ovw ff4 0 Address ala s- q�1- 64�v Telephone Dated: 1I1' Y ,1-0o16 Distressed County Sales and Use Tax infrastructure Improvement Program Funding Agreement Page 6 Kittitas County Department of Public Works DISTRESSED COUNTY SALES AND USE TAX INFRAS.T]C I'fi1E IMPROVEMENT PROGRAM APPLICATION The Distressed County Sales and Use Tax Infrastructure improvement Program supports improvements to Infrastructure systems that foster economic development In Kittitas County. The goal Is to create economic opportunity through Infrastructure Investment. APPLICANT INFORMATION Applicant: Snoqualmie Pass Utility District Contact Name: Tom Hastings, General Manager Address: P.O. Box 131 Address: 370 Treatment Plant Road City: Snoqualmie Pass WA Zip: 98068 Telephone: 425.434.6633 FAX: E-mail Address: THastings@snopass.org Project Location: Jurisdiction Population; Project Title. Snoqualmie Pass Utility District - Phase 1 Wastewater Treatment Facility APPLICATION THRESHOLDS Applicant Requirement: Check -off - 4 1. The project Is improvement to an infrastructure system(s) linked to economic development. 2. A detailed SIN' X 11" vicinity map that clearly shows the project is Included in the application package. fez fou_• ;3ttarhed Pm�; Ufl!4v ViLlnit� Map. A%ailab€t Dc-alo `'ricni Areai.'.-aeat1011 Mcp. tend Site Nan. 3. Distressed County funds are not being substituted for other funds that are already secured. 4. The project involves traditional Improvements, instead of "non-traditionar improvements eligible for "Enhancement" funding. q S. Applicant has submitted only one application this round. 4 6. The locallregional economic development organization has been Informed of the project. co> - I E I =�Z LLv m oll U) o � C5 �' Q 0 o .. 00 �0r" CL ~ 0 � rtr o a w ow 0w aw a a a� s o v QO 0 ca o . z a Of 0 r W N 7 A C o 40 r O Im o V tv w c w o w a w o w C9 w C. w a„ Z � � c o d � O to n. CL o .0 IL tm `� ig w 40 w w www o u s sA, Z o ° -C �LD CL . aw a w 0 w 0 w 0 w 0 w 0 0 s ers w �; = O W C � aU7 F G6 .0 I UIS. QCL �W, a ci C C OO p G O w iQ C6 °�' N � .r' C ,E C VIE °oma o�LU Q s & c B C O 'a 3 GD M d o O U):Oflw ~ ISA doggy w LL v o HN .y EL Cl) o m a v o Q C Efs N J a O a 400. d * (A U.`= Q PROJECT NARRATIVE 1. Project description: Describe the scope of work. Indicate the major work involved, including a brief comparison of existing and proposed conditions. Commercial and residential, domestic water and sewer services are provided in the Snoqualmie Pass area by a Special Purpose District (SPD) named Snoqualmie Pass Utility District (SPUD or Utility District). Currently, the Utility District uses a two -lagoon treatment plant and land -applies treated water on a spray field owned by the United States Forest Service (USFS). Department of Ecology (ECOLOGY) and the USFS no longer support the spray field treatment of the area's wastewater as a sustainable and desirable treatment solution. The Utility District plans to construct the first phase of a new Wastewater Treatment Facility (WWTF) in 2020 on its current property and will upgrade the existing treatment facility completely by 2025 in subsequent phases. Phase 1 of the new W WTF includes constructing a Membrane Bio Reactor (MBR) to treat 20,000 to 30,000 gallons per day (gpd) which is about 10% of the current plant capacity. The MBR includes an influent screen, anoxic tank with mixer, pre -aeration tank with aerators and blower equipment, a membrane tank in which two banks of membranes filter the water, followed by an ultraviolet light disinfection system, prior to being discharged to Coal Creek. The Phase 1 project also includes the development of a new well in Kittitas County. There are economic and environmental benefits of increasing water flow in Coal Creek provided the treatment of the wastewater can be done to National Pollutant Discharge Elimination System (NPDES) standards. Economically, the Utility District can gain additional water rights equivalent to five times the amount of water discharged to Coal Creek using foreign water credits. The increase in domestic water rights immediately provides the necessary capacity to allow development since Snoqualmie Pass's existing water rights are very limited. In fact, the Utility District self-imposed a building water moratorium until September 2019 while they repaired water system leaks, installed new water meters with remote read out capabilities and implemented conservation measures. Increased housing development in Kittitas County increases tax base and stimulates residential and commercial vitality in this recreation and tourist -based area. Environmental benefits include reducing the amount of effluent being sprayed onto forest land and producing an effluent of sufficient quality to discharge to Coal Creek, augmenting the stream flow. The following project phases will provide the capability to store up to 13 million gallons of water to boost water flow when fish need Coal Creek to supply viable passage and spawning areas. Design and estimates are being developed by the Utility District for Phase 1 and are being incorporated in the District's Water System Plan, General Sewer Plan, and Facility Plan. The Phase I treatment facility will provide operational data to optimize the sizing of the full capacity WWTF, planned to be in service in 2025. The new facility will produce an effluent of sufficient quality to augment water flow in Coal Creek without adversely affecting the Creek's water characteristics. The existing lagoons will be repurposed; one lagoon will be used as an equalization basin prior to the MBR, and the other lagoon will act as a treated water storage reservoir to maximize stream augmentation during the spawning season, 2. Explain the specific Infrastructure issues the project addresses and how they are linked to economic development improvements. The Utility District manages and operates a two -lagoon treatment plant and spray field for land application on a portion of forest owned by USFS. ECOLOGY and USFS no longer support the spray field treatment of the area's wastewater as a sustainable and desirable treatment solution. To discharge to a nearby surface water, a higher level of treatment is required. The community's interested developers have placed pressure on the Special Purpose District (SPD) and Kittitas County to provide additional water services to support their projects in the Snoqualmie Pass area. To strategize changes that could affect water treatment, water rights, and economic development, the Snoqualmie Pass Utility District initiated development of three interrelated planning documents in April 2018: a Water System Plan, a GeneraI Sewer Plan, and a Facility Plan. The General Sewer Plan will replace the previous Snoqualmie Pass Utility District Comprehensive Sewer Plan dated June 1994 and revised August 1995. The Water System Pian will update the current Water System Plan that expires in the spring of 2020. Advancements in wastewater treatment have made discharging into rivers and creeks an environmentally sound practice provided treatment can be done to National Pollutant Discharge Elimination System (NPDES) standards. Discharging the treated water from the MBR system will allow the Utility District to obtain a foreign water right credit from the clean effluent they discharge to Coal Creek. Because the Snoqualmie Pass area has reached limitations on water rights, development has stalled. Commercial and residential, domestic water and sewer services are provided in the Snoqualmie Pass area by the Utility District. The area placed a water moratorium on itself. The moratorium was lifted in September 2019 following water system leak repairs and conservation measures. To support planned developments, the Utility District has been creative and considering holistic solutions which can address both economic vitality and environmental needs. The Phase 1 project initiates best practices immediately and will provide the Utility District with the area -specific data needed to expand the WWTF in subsequent phases until 100°fo of the effluent is treated with MBR technology. Wastewater treatment improvements are being planned to be expanded as needed to meet the long- term service area needs. The Utility District anticipates the number of residences and businesses will double when current planned developments are completed. However, water right limitations are expected to be reached in 2020 unless additional water rights are obtained. The Utility District's customers include ski resorts and supporting services to travelers on Interstate 90 (I-90) such as rest areas, gas stations, hotels, stores, and restaurants. Multiple conversations with the ski resorts have already been initiated to explain the planned improvements to the water system and wastewater treatment facility. The Utility District's additional water capacity, because of the wastewater improvements, would encourage residential construction. An increase in residents during recreational and tourist seasons allows commercial enterprises to draw employees during the seasons in which they would be needed most. Increases in capacity can allow commercial operations to consider off-peak strategizing to expand operating days and evening use. Related but separate ski resort improvements are being planned to accommodate increased demand. Currently, an estimated 30,000 people travel to Snoqualmie Pass area in the winter on peak weekend days. Increased snow -making, expanding hours, adding days to the season, and expanding evening skiing, can increase the number of customers the ski resorts can serve while lessening the peak demand impact of seasonal tourism on other infrastructure systems such as transportation and parking. Expanding employee coverage over longer operating hours and on additional days will increase the number of full-time equivalent employees at the resorts and in supporting services in the Snoqualmie Pass area. 3. Project Construction: Estimated Start Date: May 2020 Estimated End Date: November 2020 Please explain phase status of the project (bid ready, design complete or preliminary design). Preliminary Design will be completed upon approval of the Facility Plan and the General Sewer Plan. The Utility District is preparing to begin construction of Phase l in May 2020. The installation of the Phase 1 W WTF MBR will be completed by November 2020. 4. Indicate If the project is consistent with the following applicable state, regional and local plans and prioritization processes: Snoqualmie Pass Sub -Area Comprehensive Plan - Master Plan - Officially Adopted November 1992. Snoqualmie Pass's Master Plan was first included in the December 2006 update to the Kittitas County Comprehensive Plan and is included in full as Appendix 2 of Kittitas County's Transition 2040 comprehensive plan (adopted June 2019). To comply with the GMA, this Master Plan must be consistent with the land use element and other elements in Transition 2040. Specifically, the Utility District is using the recently completed land use inventory and guidelines presented in Transition 2040, together with the development permits approved by Kittitas County, as the basis for comparing growth and forecasts for wastewater service demand in the Snoqualmie Pass service area. If dramatic revisions are made by Kittitas or King County to the SNOPPAC recommendations, the Utility District will revise and update the Master Plan accordingly. Facility Plan - The draft Plan will be forwarded to Kittitas County and Department of Commerce for review by 121112019. Snoqualmie Pass is in the process of updating its Facility Plan to comply with the GMA. To comply with the GMA, the Facility Plan must be consistent with Transition 2040. Since the Facility Plan was incomplete at the time the sewer system plan was prepared, the Utility District will use the current year and projections in Transition 2040. Specifically, the Utility District is using the recently completed land use inventory and Land use guidelines presented in Transition 2040, together with the development permits Approved by Kittitas County, as the basis for comparing growth and forecasts for wastewater service demand in the Snoqualmie Pass service area. Community Action Plan (or other community-based pian) - The Summit at Snoqualmie Master Development Plan - Officially Approved by the United States Forest Service in November 2008 Other: Snoqualmie Pass Utility District Water System Plan - Adopted May 2013. Other: Snoqualmie Pass Draft Water System Plan (2020 Update) - Will be forwarded to Kittitas County and Department of Commerce for review by 1/1012020. Other: Snoqualmie Pass Draft General Sewer Plan (2019) - Will be forwarded to Kittitas County and Department of Commerce for review by 121112019. 10 5. Explain how this infrastructure project has been coordinated, or will be coordinated with other jurisdictions, such as counties, cities, statelfederal agencies, and with economic development organizations during planning, design, financing, construction and/or operation phases. The Utility District has been in ongoing conversations and consultation with ECOLOGY both with the Water Resources and Water Quality departments. Because the Snoqualmie Pass area spans two counties, King County and Kittitas County, the Utility District communicates with staff from both counties. The next meeting with Kittitas County is scheduled for November 6, 2019. In addition to communicating with County staff, the Utility District has reached out to the Department of Fish and Wildlife, Washington Department of Transportation, the Confederated Tribes and Bands of the Yakama Nation, and the Bureau of Reclamation. There is no organized local economic development agency in the unincorporated service area of the Utility District. Instead, the Utility District is in infrequent contact with the economic development departments of both King County and Kittitas County and in frequent contact with commercial customers such as the ski resorts. The current General Manager is making inroads into all county and state -level agencies and met with an informal technical team at the Infrastructure Assistance Coordinating Council (IACC) conference in Wenatchee in October 2019. The team consisted of: Mr. Hastings, one representative from HLA Engineering and Land Surveying, Inc., two representatives from Department of Health, one representative from ECOLOGY, and one representative from United States Department of Agriculture. During the team meeting, the Utility District was able to provide the concept of the Phase 1 project and receive comments and recommendations from the agencies present. 6. Explain how the infrastructure project will help meet the economic development goals of your community and/or region. If this project is not done, will the anticipated private development still take place? The current water system capacity is nearly exhausted and in 2018 the Utility District self-imposed a water moratorium due to water right limitations. After the Utility District was able to implement several conservation improvements, the moratorium was lifted in September 2019, making 100 ERU connections available for sale. Kittitas County has approved three developments totaling over 590 residences. The 100 additional ERUs are expected to be exhausted in 2020 and will not provide guaranteed service to the current planned developments in this unincorporated area. Though the service area spans two counties, all growth is confined to areas solely in Kittitas County at this time. Phase 1 treats wastewater to standards adequate to allow the effluent from the wastewater treatment plant to be discharged to Coal Creek. When fully constructed, in subsequent phases, the W WTF will eliminate the use of the spray field located on forest service land. The water being discharged to Coal Creek allows the Utility District to gain foreign water right credits adequate to support their service area development through full buildout. Phase 1 is anticipated to allow an additional 1,000 ERUs to the system. The Utility District conservatively estimates that commercial demand will consume six to seven ERUs for every 100 residential connections. The construction of Phase 1 effectively doubles the domestic water capacity of the Utility District and will allow expansion of existing economic operations, promote continued residential development, and encourage new commercial development to provide services supporting an invigorated and growing community. Water demand increases, based on conversations with the ski resorts, over the next 5 to 7 years will likely be 40% - 50% above current levels with a minimum of 30% of the increase dedicated to snowmaking. 11 If the project is not accomplished, the moratoriums will likely continue. Currently, the water capacity issues call for a 6 -month review cycle to determine available ERUs and whether another moratorium is necessary, halting all future development. 7. Describe any feasibility or predevelopment studies that demonstrate the linkage between the proposed Distressed County Infrastructure improvements and the anticipated economic outcomes. The Utility District's substantially drafted Facility Plan (due by 12/112019) identifies Phase 1 specifically as the top priority project. An engineer's estimate and design sketches have been developed to completely discuss the concept and feasibility of constructing the MBR system. Phase I represents the alternative treatment of 10% of the Utility District's wastewater. Data collection received during implementation of Phase 1 will allow the Utility District to fine-tune the implementation of the MBR system for 100% of the WWTF effluent. Even with successful treatment applied to only 10% of the wastewater, the resulting credits to the Utility District immediately allow an additional 1,000 ERUs for development in the service area. The recognition of economic opportunity is immediate and directly connected to the project. 8. Indicate if other needed infrastructure (e.g., sewer, water, power) is in place or N there is a plan for getting it in place. Replacing the WWTF with the MBR system provides the required sewer and water capacity to support the planned developments in the area. Without the proposed improvements, new construction will be limited, and growth will be stagnant. Discussions for power to the WWTF for Phase 1 has already begun. As the credits are made available, the ongoing discussions between the utility providers and Kittitas County planning and permitting staff will need to increase. 9. Indicate the Estimated Number of Businesses Created/Retained by the project. Phase 1 is estimated to allow an additional 1,000 ERUs to be sold through the Utility District. The Utility District conservatively estimates that commercial demand will consume six to seven connections for every 100 residential connections, and currently approximately 700 residential connections are platted. Estimation for future need is based on current residential/commercial mix of customers in the service area. The construction of Phase 1 effectively doubles the domestic water capacity of the Utility District, will promote continued residential development, allow expansion of existing commercial operations, and encourage new commercial development. The increase in ERUs provides the Utility District the opportunity to meet the residential demand already promised by Kittitas County during approvals for development planning. Water will not be the Iimiting factor when issuing building permits and the full pre -planning process can work more smoothly for Kittitas County because of the increase in water rights in this area of the unincorporated county. Additional connections can be a combination of single family and multi -family configurations. Short-term employment will be increased due to construction of residences. Additionally, an increase in the population of the Snoqualmie Pass area will spur additional jobs to service the increase in residents. The Utility District's General Manager has been involved in multiple discussions with different ski resorts in the service area. The Summit at Snoqualmie Master Plan (Summit Master Plan) identifies the improvements and enhancements being planned for each of the ski areas. This project allows the ski resorts to grow at their desired pace without fear of water moratoriums causing development or expansion stagnation. 12 During Ski Season For example, one improvement called for in the Summit Master Plan involves replacing two -seat ski lifts with four -seat ski lifts. The improvement increases the number of people being moved throughout the area and allows for efficient movement of the more than 1.2 million visitors per season. Hospitality jobs will increase to meet the demands of the rise in number of visitors. Lighting the slopes will lengthen the time the ski resorts can operate, resulting in an increase of Full- time Equivalents (FTEs). Phase 1 will sustain increased services at the resorts for many occupations such as food service -related employees, customer service employees like those who assist with equipment rentals, ski instructors, and operator and maintenance -related employees. Additional water capacity will allow the ski resorts to increase their snow -making operations and extend days of the ski season to bring a new level of predictability and reliability to the ski area. Stabilization of the ski environment can cut down loss of employees' hours due to fluctuations of precipitation throughout the ski season. The amount and quality of snow (snow conditions) contributes directly to the desirability of outdoor snow activities such as skiing, snow shoeing, and sledding. Each of these types of activities have employees supporting the outdoor snow experience. Increasing number of days increases FTEs. The ripple effect for support services which cater to the travelling public on 1-90 are anticipated to effect employee hours at locations such as restaurants and gas stations in the immediate area and will likely increase business and the demand for lodging in nearby communities. Off -Season The Summit at Snoqualmie Master Plan (Summit Master Plan) identifies the improvements and enhancements being planned for implementation throughout the year. This project allows the ski resorts to grow off-season operations without fear of water moratoriums causing development or expansion stagnation. Hiking, biking, and other outdoor activities are being actively developed by the resorts. The Utility District's project is needed to support the additional demands on the wastewater and domestic water systems. Phase 1 provides for the increase in water rights necessary to sustain the area's year-round aspirations. The FTEs to cover the non -winter season operations will be in addition to the customary winter -time staffs at the resorts. New support businesses will be required to provide non -winter equipment and lessons for outdoor activities other than snow -related. With entertainment available throughout the year, and the proximity to the Seattle job market, residents may move their primary residence to this more robust community increasing the full-time residential use and employment in the Utility District's service area. 10. Indicate the Estimated Number of Short Term and/or Permanent Jobs CreatedlRetained by the Project. Short-term and long-term employment created or retained by the Utility District's Phase I project has been explored qualitatively in the previous section. The water moratorium squelched economic opportunity for steady and sustainable growth in the Snoqualmie Pass area. The water moratorium has been lifted and through conservation efforts and repairs to address leaking infrastructure, the Utility District was able to offer 100 ERUs to businesses and residents for development. Phase 1 of constructing a new WWTF provides capacity for 1,000 ERUs immediately. When future phases are completed, the water right credits the Utility District will receive provide capacity for up to 3,000 additional ERUs. 13 Existing commercial operations such as the ski resorts will use the additional water capacity to add hours to their ski -related operating time in the form of night skiing, add days to their operating season by increasing their snow -making operations, and add year-round operations to their facilities adding diversity and the need for more FTEs. Kittitas County has approved developments that are independent of the limited capacity of the Utility District's domestic water and wastewater systems. Phase I constructs an innovative MBR treatment system which can produce effluent of high quality that can be discharged to Coal Creek. Coal Creek benefits from augmented creek flow enhancing the aquatic systems, including flora and fauna. Phase 1 benefits the Utility District and Kittitas County by increasing the water rights obtained through the direct discharge to Coal Creek. The needed water and wastewater capacities allow the planned developments to move forward in a sustainable manner. The new construction sparks short-term construction jobs. The average home in Snoqualmie Pass requires three seasons to complete. Approximately 1,000 new ERUs will be available for connections to development immediately. The commercial vs. residential mix of ERU consumption has historically been about 7 commercial connections for every 100 residents. The usual support businesses of services for residential will be supplemented with new business types to cater to year-round outdoor activities. List of links to references in this application: Snoqualmie Pass Utility District Home page: http://snonass.orgI 2013 Snoqualmie Pass Utility District Water System Plan, May 2013: hit ://sno ass.or w - content/uploads/2018/05/2013-Water--Co=rehensive-Plan.odf Kittitas County Comprehensive Plan, December 2016: hLtps://www.co. kifitas.wa.us/uploads/documents/cds/comp- plan/2016/2016%201206%20Comlp%o20Plan%20per%24Kittitas%2QCo%200.rd%202016-023.pdf Snoqualmie Pass Sub -Area Comprehensive Plan — Master Plan https://www.co.kittitas.wa.us/cds/snppac/Snogualmie%20Subarea%20PI;an Current.pdf The Summit at Snoqualmie Master Development Plan, November 200$: his://suininitatsnoqualmie.com/developnient-plan Submit the original application to: Kittitas County Department of Public Works 411 N. Ruby, Suite #1 Ellensburg, WA 98426 14 Applicant Certification Certification is hereby given that the information provided is accurate and the applicable attachments are complete and included as part of the application package. I certify that application thresholds are met at the time of application. _Tom Hastings General Manager Signature of Official Representative -- Sponsoring Agency (If Applicable) Signature of Agency Representative T(I ryi T -i A,>t t /l � S Typed or Printed Name 11/6/2019 Date /l= 6/1 Date /1- 6'r/ Date Associate Economic Development Organization Notification The organization listed below has received notification of this project as demonstrated by the signature of the organization's representative. Name of Organization Signature of Representative Date Kittitas County Department of Public Works Conceptual Approval Approval of the project feasibility, scope and estimated costs. Signature of Kittitas County DPW Representative Typed or Printed Name Date is KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS DISTRESSED COUNTY INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION DUE DATES FY 2020 Distressed County Infrastructure Improvement Program, applications are initially due to Kittitas County Department of Public Works for conceptual approval of the infrastructure project. Distressed County Infrastructure Improvement Program applicants are invited to appear at the COG meeting when the project's criterion is reviewed. APPLICATIONS DUE 2020 Al2Rlication due Date COG MEETING DATES COG Meetings November 8, 20119.........................................................December 2019 COG Meeting "Funding available January 1, 2020 16 N w E S Okanogan; Port Ajp!4,3-, Everett Ian 7NY Bellevue Seattle h, cofria Ephrata 111' MID 6 take Ellonsb4rg �rdaen 12 Ism Othello.:' L Yakima Spettle 0 caellevue �KI NG COUNTY n4vl PozooSunpyzdj*p ear �onwd7k We wj"!Ole 'Ind I -907 KITTITAS COUNTY ,D Ellensburg UW Riva IWW 10= 110-2--19 Y&V=6 WA 989M FILE NAMES; 509.966,70M Fox 5M.965DRAWING:EwhbIte dwj HLA 38W WnWingW JAmd ftyeying, IM —.WaciviL— DESIGNED BY- IFF ENTERED BY. IFF Std SNOQUALMIE PASS UTILITY DISTRICT VICINITY MAP N W:.E 0 375 750 1,500 6W!siiii 19022 110-25-19 FLE NAMES: DRAVAMM ahblbLdvoc DESIGNED Ift. ENTERED BY: SNOQUALMIE PASS UTILITY DISTRICT AVAILABLE DEVELOPMENT AREAS 282 River Reed 4w HLA Yakima,WA 9M 509.966.700D Flat 509.965.3800 WlmdSuyeftlm I ww.bMwlxm rr 19022 110-25-19 FLE NAMES: DRAVAMM ahblbLdvoc DESIGNED Ift. ENTERED BY: SNOQUALMIE PASS UTILITY DISTRICT AVAILABLE DEVELOPMENT AREAS 282 River Reed 4w HLA Yakima,WA 9M 509.966.700D Flat 509.965.3800 WlmdSuyeftlm I ww.bMwlxm 19022 110-25-19 FLE NAMES: DRAVAMM ahblbLdvoc DESIGNED Ift. ENTERED BY: SNOQUALMIE PASS UTILITY DISTRICT AVAILABLE DEVELOPMENT AREAS N w,# 0 750 7,500 3,000 W4V 6 SERVICE AREA - SNOQUALMIE - PASS LAva RW Ytkima, WA 48982 2809.966.70DO 309.966.'1000 Fu 504.965.3800 Engineering and LW &rmft Inc . 19023 110-25-19 FILE NAME 4VANG: Exhiblt&dwg BY: aFP a Y., am SNOQUALMIE PASS UTILITY DISTRICT LOCATION MAP v — t I I6Lw \ HEArW()-RF5� BUILD1;;G N W *& 0 25 50 100 s O m a 'HASE 2 & M9 71 WWTP NEW AEROBIC DIGESTER VNEW "COVERED l "DRYi"rl C! S I� PHASE 1 PROJECT INCLUDES DOMESTIC WATER WELL LOCATED IN KITTITAS COUNTY. WELL LOCATION TBD. IRW2 11-01-10 FILE NAM M BY: BY: SNOQUALMIE PASS UTILITY DISTRICT SITE PLAN 2803 lover Roel t L� Yakima, 48902 . Fswmu 504.965.3800 b0eermg and Lind Sluveymg, Inc. www.hwva.om IRW2 11-01-10 FILE NAM M BY: BY: SNOQUALMIE PASS UTILITY DISTRICT SITE PLAN Snoqualmle Pass Utility District Wastewater Treatment Plant Improvements HLA Pro ect Na. 19022, 18090 11/5/2019 PAGE 1 OF 2 Item Description Unit Unit Cost Overatill Overall Cost Phase I: 25,000 GPD MBR Facility (Packaged MBR unit in pre-engineered metal bldg (WxS0') 2020 Start-up 1 Mobilization LS $30,000.00 1 $30,000.00 2 Clearing and Grubbing LS $15,000.00 1 $15,000.00 3 Crushed Surfacing Base Course CY $30.00 100 $3,000.00 4 Tie in to existing inflenf piping and extend to MBR LS $100,000.0.0 1 $100,000:00 5 Influent Pump LS $15,000.00 1 $15,000.00 6 MBR Package Equipment LS $1,000,000.00 1 $1,000,000.00 7 MBR Building, Complete LS $550,000.00 1 $550,000.00 8 Outfall Piping LS $20.000.00 1 $20,000.00 9 Slud a Discharge Piping to Lagoon 1 LS $10,000.00 1 $10,000.00 10 UV System LS 1 $50,000.00 1 $50,000.00 11 l2Ox2O Headworks building with screen LS $200,000-001 1 $200,000.00 92 Electrical and uontrolsystem improvements, Complete LS 100 000.00i Phase I Subtotal: $100000.00 $2,093,000.00 7.9% STATE SALES TAX $165,347.00 TOTAL_ $2,258,347.00 En in®erin : 12% $200,000.00 Construction Services: 15% Phase I Grandoto nc u n ont n enc Phase ll: 350,000 GPD MBR Facility with Solids Handling In pre-engineered bldg (150'x60') 2022 Start-up $250,000.00 13,114,L99.00 1 Mobilization L5 $100,000.00 1 $100,000.00 2 Clearing and Grubbing LS $50,000.00 1 $50,000.00 3 Crushed Surfacing Base Course CY .$50.00 300 $15,000.00 4 Second MBR Influent Screen LS $100,000.00 1 $100,000.00 5 Influent Pumps from Lagoon 1 LS $100,000.00 1 $100,000.00 6 MBR Equipment LS $2,000,000.00 1 $2,000,000.00 7 MBR Building Addition, Complete with process tanks LS $1,500,000.00 1 $1,500,000.00 8 Outfall Piping LS $20,000.00 1 $20,000.00 9 Sludge Discharge Piping to Lagoon 1 LS $100,000.00 1 $100,000.00 10 UV Sygern LS $250,000.00 1 $250,000.00 11 jElectrical and Control System Improvements, Complete LS $500,000.00 1 $500,000.00 12 Site Process Piping, Complete LS $120,000.00 1 $120,000.00 13 Operations/Lab Building Improvements, Complete LS $50,000.00 1 $50,000.00 14 Well Pump and Motor, Complete LS $10,000.00 1 $10,000.00 15 Engine Generator and Transfer Switches, Complete LS $250,000.00 1 $2.50,000.00 16 Site Grading and Drainage, Complete LS $20,000.00 1 $20,000.00 Crushed SurfacingBase Course. TON $30.00 1,000 $30,000.00 E196-incfi HMA Cl. Y. inch PG 64-28 TON $165.00 120 $19,800.00 Cement Concrete Sidewalk, Incl. ggregate ase SY $150.00 60 $9,000.00 Phase 11 Subtotal: 5,243,800.00 7.9% STATE SALES TAX $414,260.00 TOTAL $5,658,060.00 Engineering: 10% $500,000.00 Construction Services: 1596 $750,000.00 Phase 11 Grand Totalin clud Ing5 n enc 7 944 269.00 GAPROJECTS12019119022G111-5-19 Preliminary Cost Estimate.xlsx Snoqualmie Pass Utility District Wastewater Treatment Plant Improvements MLA Pro'ect No. 19022 18090 11/5/2019 PAGE 2 OF 2 Ilt�eom Description Unit Unit Cost (Overall uan ty Overall Cost Phase 111: Lagoon 1 Improvements (Use Phase I bldg for Aeration Equipment) - 2023 completion 1 Remove sludge from Lagoon 1 LS $75,000.00 1 $75,000.00 1 Reline Existing La ooni, Com lite LS $200,000.00 1 $200,000.00 2 Lagoon Aeration Equip, Com lets Install in Phase I Bldg) LS $150,000-00 1 $150,000.00 3 Liner Bedding and BaCkfillerie CY Ido.010 3 500 $140.000.00 Phase III Subtotal: $565,000.00 7.9% STATE SALES TAX $44,635.00 TOTAL $609,635.00 Engineering: 10% $60,000.00 Construction Services: 10% 0,000.00 aseIII rarand Total(Inc l-01`5in ont n enc 839 080.00 Phase IV: Lagoon 2 sludge removal and Improvements - 2024 completion 1 Remove sludge from Lagoon 2 LS $275,000.00 1 $275,000.00 2 Remove piping and aeration d users from Lagoon 2 1 LS 50 000.00 1 $50,000.00 Phase III Subtotal: $325,000.00 7.9% STATE SALES TAX $25,675.00 TOTAL $350,675.00 Engineering: 10% $35,000.00 Construction Services: 10% $35.000.00 Phase IV GrandTotal (including 1 ontin en 3 778.00 pmbinde Phase I - IVI S12,381:7:24.00 GAPROJECTSM19091322MI1-5-19 Preliminary Cost EstimateAsx KITTTTAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION ,STAFF REPORT STUDY SESSION DATE: April 13, 2020 ACTION REQUESTED: Request to Approve a Resolution to Select Watershed Science and Engineering and Northwest Hydraulic Consultants for Hydraulics and Hydrology Professional Services Contracts supporting Public Works for up to a Three -Year Period BACKGROUND: PW continues relying on hydraulic and hydrology engineering consults absent a licensed County Engineer on staff. On 01121/2020; the Department requested and received permission from the Board to solicit for professional services (consistent with state law and County policy). Responders provided qualifications for review on 02/13/2020. Staff has completed review of responder information and recommends the selection of Watershed Science and Engineering and Northwest Hydraulic Consultants for standard professional contracts_ The contracts are in place for a two-year base period with a third potential year if mutually agreed upon. INTERACTION: Public Works, RECON01ENDATION: Offer standard professional service contracts to Watershed Science and Engineering and Northwest Hydraulic Consultants for hydraulics and hydrology engineering services. HANDLING: Return one original to Public Works. ATTACHMENTS: Resolution. LEAD STAFF: Mark R. Cook, Director. BOARD OF COUNTY CONMSSIONERS COUNTY OF KITTTTAS STATE OF WASHINGTON RESOLUTION NO. 2020 - SELECTING WATERSHED SCIENCE AND ENGINEERING AND NORTHWEST HYDRAULIC CONSULTANTS AS PUBLIC WORKS ON-CALL TASK ORDER CONSULTANTS FOR UP TO A THREE-YEAR PERIOD OF SERVICE AND AUTHORIZING THE PUBLIC WORKS DIRECTOR SIGN THE CONTRACT DOCUMENTS WHEREAS: The Department of Public Works (PW) prepared a solicitation for engineering and professional services consistent with state law and county code in January 2020; and WHEREAS: PW docketed a request to solicit for engineering and professional services on the Board of County Commission general business agenda on January 21, 2020; and WHEREAS: The Board of County Commissioners did direct PW proceed with solicitation efforts and said process concluded with submittals being received on February 13, 2020; and WHEREAS: Consistent with solicitation advertising an internal review team of PW reviewed and scored all hydraulic and hydrology engineering submittals; and WHEREAS: The consensus ofthe reviewers selects Watershed Science and Engineering and Northwest Hydraulic Consultants for professional services contracts for up to a three-year period (two-year base with possible third year extension ifmutually agreed upon); NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest ofthe public, does hereby select Watershed Science and Engineering and Northwest Hydraulic Consultants for standard professional services contracts (acceptable to the Prosecuting Attorney's Office); BE IT FURTHER RESOLVED the Public Works Director is directed to sign said contracts an behalf of the Board of County Commissioners. DATED this 130' day of April 2020, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS IU=AS COUNTY, WASHINGTON Attest: Brett Wachsmith, Chairman ❑ Clerk ofthe Board- Julie Kjorsvik Deputy Clerk of the Brand- Mandy Buchholz Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: April 13, 2.020 ACTION REQUESTED: Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas BACKGROUND: Kittitas County Conference of Governments (COG) met to review the second round of 2020 submitted applications. COG recommended awarding $1.51,375 to the City of Kittitas. This Agreement is the final step in the award process. INTERACTION: Public Works; City of Kittitas RECO-N V1ENDATION: Approve & Sign the Resolution and the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement: HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution.; 2020 Distressed County Sales and Use Tax infrastructure Improvement Program Agreement LEAD STAFF: Mark Cook Director of Public Works BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO: 2020 - RESOLUTION TO APPROVE THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH THE CITY OF KITTITAS WHEREAS: The 1999 Legislature did pass RCW 82,14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds may only be used to finance public facilities serving economic development purposes in rural counties and finance personnel in economic development offices in the State of Washington; and WHEREAS: The 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas has been executed by said entity with funding available January 1, 2020; and NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners hereby approves the attached 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Kittitas. ADOPTED this 13th day of April 2020. Attest: El Cleric of the Board- Julie Ki orsvik BOARD OF COUNTY COhSHSSIONERS KITTITAS COUNTY, WASHLNGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman 0 Deputy Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT BETWEEN KITTITAS COUNTY AND CITY OF KITTITAS This Contract dated 2020 is made and entered into by and between KITTITAS COUNTY ("County"), `a subdivision of the State of Washington, and CITY OF KITTITAS ff undirig Recipient"). WHEREAS, the purpose of this Agreement is to provide for public facility construction and foster economic development opportunities within Kittites County; NOW THEREFORE, in consideration of the terms and conditions contained herein, or attached and incorporated and made a part hereof, the County and the Funding Recipient mutually agree as follows: Section 1. Scone of Work. a. Funding Recipient shall provide the services and staff described in its Application for f=unds submitted to the Council of Governments, attached hereto as Exhibit "A" which is attached hereto and incorporated herein by this reference. b. Except as otherwise specifically provided in this Agreement, Funding Recipient shall fumish the following as required to perform the services, described in Paragraph (a) above, in accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items fumished or required to be fumished, together with all other obligations performed, or required to be performed, by Funding Recipient under this Agreement are collectively referred to herein as "Services." Section 2. Payment. a. As full compensation for satisfactory performance of the Funding Recipient Services, the County .agrees to pay Funding Recipient the sum of one hundred fifty one thousand three hundred and severity five dollars ($151,375). b. Additional payment terms: The County will make payment to the Funding Recipient only on a reimbursement basis, as receipts for any items including marketing and/or advertising are submitted to the County. c. Requests for reimbursements must be submitted to: Kd tas County Public Works Attn: Joyce White 411 North Ruby, — Suite 1 Ellensburg, WA 98926 io ce.whit co.kittitas.wa.us Dbtressed County Saks and Use Tax 1nfhmtn.&U a 1mproWmentPm9mm Ffrnding AgmMenntt 1 d, Reporting requlreme�ts of your events will be required on prescribed forms from the Kittites County public Works Department Section & Performance by Funding Recipient. a. Funding Recipient shall not (by contract, operation of law or otherwise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the County's option. b. Funding Recipient shall at all times be an independent Funding Recipient and not an agent or representative of the County with regard to performing the Services. Funding Recipient shall not represent that it is, or hold itself out as, an agent or representative of the County. In no event shall Funding Recipient be authorized to enter into any Agreement or undertaking for or on behalf of the County. It is understood that the Funding Recipient and the Funding Recipient's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County. c. Funding Recipient shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in effect, of any govemmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services). Funding Recipient shall furnish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Funding Recipient agrees to obtain all required licenses and permits, and further agrees to keep them In full force and effect during the term of this Agreement. d. The County and the Funding Recipient agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of rage, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or fallure or delay in making) such inspection or approval shall not relieve Funding Recipient of its responsibility to perform the Services in accord with this Agreement, notWthstanding the County's knowledge of defective or non -complying performance, or the substantiality or ease of discovering the same. Funding Recipient shall provide the County with sufficient, safe, and proper facilities and equipment for such inspection and free access to such facilities. This contract is subject to review by any Federal or State auditor. Funding Recipient shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable govemmental entity. Funding Recipient shall preserve and maintain all financial records and records relating to performance of Services under this Agreement far six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Funding Recipient shall provide the County access to (and the County shall have the right to examine, audit and'oopy, with or without notice) all of Funding Recipient's books, documents, papers and Distressed County Saks and Use Tax lnfrasducture Imprnvement Proffrom Funding Agreement2 records related to the Services or this Agreement. Q. Funding Recipient understands and acknowledges that Funding Recipient is solely responsible for Its am reporting and accounting of all state, federal, social security, and local taxes, of every nature, arising from Funding Recipient's performance of this Agreement. All compensation received by the Funding Recipient will be reported to the Internal Revenue Service at the end of the calendar year In accord with the applicable IRS regulations. Section 4. Release. Indemnity, and Hold Harrniess. The County assumes no liability for the Funding Recipient's actions under this Agreement. Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabllitles, damages, and expenses, (including, but not limited to, reasonable attorney flees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: Any fault, negligence, strict liability or product liability of Funding Recipient In connection with the Services for this Agreement; Any lien asserted upon any property of the County In connection with the Services for this Agreement; Any failure of Funding Recipient, or of the Services, to comply with any applicable law, ordinance, rule, regulation, order, license, permit and other requirement, now -or hereafter in effect, of any governmental authority, or Any breach of or default under this Agreement by Funding Recipient. Section 5. Qgmpliance with Public Records Law. a. In compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. In the event a public records request is made to the County for documents created in relation to this Agreement, should legal uncertainty arise regarding the disclosabiiity of any documents under federal or stare public records laws, the County shall provide notice to Funding Recipient pursuant to Washington's public records act, chapter 42.56 RCW, to allow Funding Recipient to seek a court injunction. c. The County specifically shall not be liable to Funding Recipient for the County's release under public records laws of any documents not protected by trademark, copyright or other law. Distressed County Sales and Use Tax Irr>rrosinrcture ImpravernentPftgram Funding Agree �e 3 SWdOn 6. -Industrial Insurance Waive With rGsPod to perfamence of this Agreement and as to any claims against the County, its Additional insureds, officers, agents and employees, the Funding Recipient expressly waives its immunity under Title 51 of the Revised Code of Washington, the industrial Insurance Act, for injuries to Funding Recipient's employees and agrees that the obligations to indemnify, defend and hold harmiess provided in this Agreement extend to any claim brought by or on behalf of any employee of the Funding Recipient This waiver is mutually negotiated by the Parties to this Agreement. Section 7. Insurance and Endorsements, a. The County may require through a request in writing that the Funding Recipient provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Funding Recipient, Its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (Including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Funding Recipient or any of its employees, agents or representatives. C. Should the County require such liability insurance, the Funding Recipient agrees to provide proof of insurance prior to commencing performance of this Agreement d. Copies of the County's written request and the insurance documents provided by Funding Recipient shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance Is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Funding Recipient shall famish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Aqgtion 8. Termination, The County may, by written notice thereof to Funding Recipient, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Funding Recipient is in breach or default. Upon receiving such notice of termination, Funding Reciplent• shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in Me notice. In the event the County terminates the Funding Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of the date of the notice of termination. Dbtmssed County Saves and. Use Tax'Afins"aune improvement Pragrem ftndhV AgmeMent4 Section 9. Milcellaneous. a_ Funding Recipient shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreehnent without the County's prior written consent. b. This Agreement embodies the enttie Agreement beiwaen the County and Funding Recipient, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties, a Notice for any purpose under this Agreement, except service of process, shall be given by the Funding Recipient to the Kittitas County Commissioners and the Kam County Public Wbrks Director, 411 North Ruby, Suite 1, Ellensburg, WA 98926. For all purposes under this Agreement, any notice by the County to the Funding Recipient shall be given to the Funding Recipient's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, oerlifred mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in Interpreting or construing the provisions of such sections or paragraphs. e. This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrument. f. Funding Recipient warrants to the County that the individual signing on Funding Recipient's behalf has the requisite power and authority to enter into and to perform Funding Recipient's obligations under this Agreement Funding Recipient further warrants to the County that Funding Recipient has made no misrepresentation or misleading statement in Connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Funding Recipient's ability to perform its obligations under this Agreement- G. greement g. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shell not atfiec:t the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the tarms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought. to enforce this Agreement or any of its terms shall be in Ofitas County, State of Washington. Distressed County Sales and Use 'rOx 10f=&Ixture lrrrproirement Program Frmding Agreement Page 5 KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS Brett Wa' chsmith, Chair Laura Osiadecz, Viae. Chair Cory Wright, Commissioner Dated: ATTEST: Cleric of the Board APPROVED AS TO FORM: Deputy Prosecuting Attorney CITY OF KITTITAS PID -&1111 Address Telephone Dated:. 3' 1 % -az—.,D} Distressed County Safes and Use Tax InfMSvvMre Improvement Pmgmm Funding Agree = � Kittitas County Distressed County Sales and Use Tax Grant Application, Guidelines & Instructions Deadline: Monday, July 15, 2019 01?1G11V4j Return completed application by 5:00 PM Return To: Kittitas County Department of Public Works 411 North Ruby Street, Suite # i Ellensburg, Washington 38926 The Kittitas County Public Facilities Fund solicits applications fmm various entities within the County. To assist applicants completing successful grant applications, the Council of Govemments has created policies that are available to all applicants upon request. These policies reside within the Public Works Department (509) 962-7523. Section I — Sales and Use Taro Funds Current Washington State law authorizes the legislative authority Of rural county to impose a sale and use tax in accordance with the terms of chapter $2, Revised Code of Washington (AM. In Kittitas County, according to RCW 82.14.370. the rate of the tax shall not exceed .09 percent of the selling price in the case of a sales tax or the value of the article used in the case ora use talc. The tax imposed is deducted from the amount of tax otherwise required to be collected or paid over to the department of revenue under chapter 82.08 or 82.12 RCW. Kittitas County] has authorized this tax and compiles the funis annually for distribution throughout the county to qualifying organizations in the form of reimbursable grants. Most applications ane c-unsidered during an annual grant application process. In some cases, applications may be considered outside of the regularly -scheduled annual process. ror corssideration during the annual grant process} applications must be completed in full and submitted by the 5:00 PM due slate on the application materials to the Department of Public Works. Incomplete and/or lett applications will not be considered. Applications may not be changed or amended by the applicant after the deadline for submission. Permissible Uses According to Law Funds awarded as reimbursable grants under this process may be used for the following: 1. To Finance public facilities serving economic development purposes. 2. To finance personnel in economic development offices. According to RCW 82.14.370, in order to qualify for financing the public facility trust be listed as an item in the officially adopted county overall economic devvlopmeni plan. or the economic development section of the county's comprehensive plan, or the comprehensive plan of a city Or town located Aithin the county. "Public facilities" means bridges, roads, domestic and industrial water facilities, sanitary sewer facilities. earth stabilization, storm sewer facilities, railroad, electricity, natural gas„ buildings, structures. telecommunications infrastructure, and port fuel)ities in the state of Washington. "Economic development purposes' means those purposes which facilitate the creation or retention of businesses and jobs in a county. "Economic development office" means an office of a county, port districts, or an associate development organization as defined in RCW 43.330.010 which promotes economic developmem purposes within the county. Funds Auailebilitp All funds awarded under this program will be available in the form of reimbursable grants. The funds will be available for reimbursement beginning January V of'the calendar year following the award notification, unless otherwise allowed by the Kittitas County Board of Commissioners. The award process is defined in COG Policy 2019-01. Kittitas County recognizes that some projects may be large and complex. requiring multiple funding sources and years to complete. In that regard, awarded funds will remain available for reimbursement for a period of My years following the award notification. Any unexpended funds will be resumed to tic Distmssed County Sales and Use Tax Grant FwW and made available for future applications. Formal requests for extension of the two-year deadline for reimbursement may be made in writing to the Kittitas County Board of Commissioners (BOCC). The BOCC has final say on all extension requests. All reimbursement requests must be submitted to tete Kittitas County Department of Public Works for payment. Review Process The county is required to consult with all cities, towns. and port districts located within the county and the associate development organization serving the county to ensure that any expeaditures of then funds meets the goals of chapter 130, Laws of 2004 and the requirements of RCW 82.14.370. To comply with this requirement, the county will seek the assistance of the Council of Governments (COQ). The COG is comprised of two representatives from each municipality within Kittitas County, including Roslyn. South Cle Elute. Cie Elum, Ellensburg, Kittitas, and Kittitas County, The Council of Clovernrnents (COO) wilt re%iew all applications and score them based on the information provided by the applicant and the Project Rating Criteria as presented in the application. The COG will then make holding recornmendations to the Kittitas County BOCC. The review and award process is defined in COG policy 2018-02. All applicants will be notified as to the date and time of review of their application by the COO. All applicants will be given the opportunity to present their application to the COO and answer questions. The BOCC will consider recommendations for grant awards by the COO at a later date. The BOCC will stake all grant awards. The decision of the BOCC is considered final. Section l — Application Instructians Grant applicants shall follow the instructions below in preparing their proposal. o Complete the supplied application forms using a computer. No hand written forms, o Do not use graphics or formatting embellishments beyond those within the application. Anpmr each question and sub-qucstion individually in each section. a Leave in the question and directions. This gray we will be sura of the question you are answering. and it will also facilitate easy review for the Council of Governments (COG). 4 Use single spaced 12 point Times New Roman or similar font. 4 Make certain you are answering the questions. For instance, if the question asks "how; , please answer how, not whether or when. Please also include the ibllowing: A detailed 8 %" x 1 l" vicinity map that clearly shows the project. A signature frorn tate local/Mional economic development organization supporting the project Any other information pertinent to the application you would like the COG to consider, Appliattions are due by 5:00 PM, Monday, July 15, 2819 at the Kittitas County Department of Public Work: Office. You will be notified that your application has been received and accepted by the COG. Kittitas County Department of Public Works Distressed County Sales and Use Tax Grant Fund 411 North Ruby Street. Suite I Ellensburg, WA 98926 Please submit 1 original and 12 copies of the entire application (13 total). Note: Incomplete applications will be rejected. Question Instructions ADRWnt Information l of !he li tion : Please fill in all areas completely. The applicant is the agency requesting funding. The contact name will be considered the leader of the project for the applicant agency. The contact should a1Rn be the individual who will present the project and will be available for questions from the COG. ADDUcant Thresholds i of the a R tin : Your project must meet each of these requirements to be considered. Please check each box and include the necessary documentation *ith )Our application. if Your project does not meet all of the listed requirements and/or your application does not include the necessary documentation to support your claims. it will not be considered for funding. PYR"ect Budget 2 of UK applicatiour. The top line (Distressed County Funds Requested) is to fist haw much funding you are asking the COG to consider awarding your project. The columns to the right then ask you to include the specific breakdown as to how and in what phase or phases (if a construction projoct) the money will be utilized. Please be as accurate as possible. The following lines and columns are for other funding sources you have secured or for which you have applied. Again, please be as accurate as possible and fill in the final column for each signifying the status of the funding source (whether or not the funding has been secured). The "Project Total" lime is for the total cost of the project the application represents. The sum of all the funding sources lines should accurately add to the figure listed here. Additionally, please also accurately include the breakdown for phases listed to the right, again making sure the sums of the pm ions columns are equal to the amount placed on each line. Distressed County bnd Ra 2 of the AppReation). This line is to show what percentage of the total project budget the applicant is providing in local funding, For instance. if the total project budget is $100,000 and the application is for $50,000 with combined other funding sources of another $30,000 and the local funding source component is $20.000, the Ratio would be 20% A simple equation to answer this question from the Project Budget is: (Local Government + Other (if a local funding source)) / Project Total Distressed County Fund Matching Ratio (converted to a percentage) Emlect NArmtfi►e (starts an ONE 3 -Of the analication): Please answer each question and sub,question completely. incomplete applications will not be considered for funding. You may attach additional inforn ation necessary to answer the questions as needed. Special instrnetiona: Piease review the following instructions as listed below for specific eiuestions in the Project Norrsthe: 'on 6: Please attach the pertinent sections of the agency's plans as listed with which the application is consistent. Question 9: Please attach a copy of any feasibility or prcdevelopment studies. Ottsallso 111: You must include the key assumptions (if any) and their, justification. methodology, and calculations upon which your businesses created/retained estimate is based, Simply providing a number or approximate number will not be considered a complete answer and will result In your application being rejected from consideration. Otmtfon Ix: You must include the key assumptions (if any) and their justifications, methodology. and calculations upon which your jobs created/retained estimate is based, Simply providing a number or approximate number will not be considered a complete answer and will result in your application being rejected from consideration. Potential Example Anstrer, for Question 12: We hmv completed a sm"vey of lacer! contractors likely to hid are a p-oJeel .sych as this. Our resultx (data prorided as attuchmeno sham, that dire to Current economic conditions, a greater supply for building services necessary,for this project exists in the local market than: demand fir Hoose sen-ices. As a res,rlt. most of►hose xrrrvvyed indicule lower levels ofemplayment than in the past, including reducing a•orkforee tenets up to 50% and,irr intermittent Hark w-Ith extended periods of►e;nprarcrr.j, lgwf .w dere to lack of livor k A "eel this aloe. according to our estimates (data prrn•lded as attachrameni) gill require (X) skilled corratructior, laborers far approximately (X period of bore). (,V) cubLvwrractars employing ()l) laborers fw appa oxinrately+ (X period ofbene), and u till us (X) support slaft'Ods,inixtrative, clerical managetnent),for (-Vperiod Ume). The agency ,011 also he enrpin,Ving a half lime project manager to Oversee the project. Most studies (tw,n samples attached) heellere than Washington ,State 's building indastn' is oniy beginning to rarer and may neivr reach employment lei elr preriously seen. Keeping that in mind axed being wnsrnarth-v t4-hile taking into account the current evanomle enrirrrrrrrmenl elf tipper ki►tltas ['aunty and es)mclally the depressed constPWIlort trrdue10', u-c es►inrate X least (x) jobs will he retalned for at least M. iminths (the tern, of the ronstr►a livn phase of he projecl), hr addf►tarr. as she ugencv dues not currently emplay a qual(fied project manager. at 1e►asr one hurt-time prxrfrsrionul jcrb will he created for the same period. IM, of cour-w does not cr nxide'r any impact In Other loexrl.rulpliers and srrlVrting businesses tchich ivill certainly provide ser►•lces for this preYeet as Well as ►hose Woo are directly employed as u reswlt ofthae pa�oject. I{tttitas County Department of Public Works DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM APPIJICATION The Distressed County Sales and Uss Tax Infrastructure improvement Prognmi supports improvements to Infrastructure systems that foster economic development In Kittitas County. The goal is to create economic opportunity through Infrastructure Investment. APPLICANT INFORMATION Applicant: City of Kittitas Contact Name: Mayor Patricia Cort Address: 207 N Main Address: PO Box 719 City: Kittitas WAZIp: 98934 Telephone; 509-958-0220 FAX: 509-968-0223 Email Address: clerk@cityofkittitas.com Project Location: Main Street - Kittitas Jurisdiction Population: 1"4,50 Project Title., Main Street Lift Station APPLICATION THRESHOLDS Applicant Requirement: Check -0A: a I. The project Is Improvement to an infrastructure systerrgsl linked to economic development. ® 7. A detailed 8 % X 11" vicinity map that clearly shows the project is Included In the application package. 3. Distressed County funds are not being substituted for other fiends that are already secured. ® 4. The project hwolves traditional improvements, Instead of "non-traditional" Improvements eligible for "Enhancement" funding ® 5. Applicant has submitted only one application this round. ® B. The locapr+egional economic development organimtlon has been Informed of the project. � I C Z L. 2 s� 10 d) a fA c 0 a� 71 or 0 s N m rat 0 Sc z c U. U. U) L d Q L, Ln m M M sh to d r +' Ln 49 W � H 0 10 d) a n fA c 0 a� 71 Ln 0 s N m rat 0 li L d c L, � sh d r +' H Ln a o in , N ko N rF rq d� 1A f/1 iA ri 40 0 o L7 Ln 6 wo- Q LO LO a r � n fA c E a� 71 IULy n Q a� w t s m rat li L d c V � d n PROJECT NARRATIVE 7. Project Description; Describe the scope of work. Indicate the major work involved. Inc€ceding a brief rompprlson of existina end oronosed conditions. This project will construct an 64nch gravity sewer main, grinder pump station, 1.6 -Inch sewer force main and a 4 - inch force main to provide sanitary service to businesses south of Railroad Avenue and to support future develop- ment. The lift station will be constructed at the south and of the project and pump wastewater north in the 1.5 -Inch force main to Railroad Avenue, Into the City's existing sewer system. The 44nch force maim will not be active at the conclusion of construction; it would be installed to encourage future commercial / industrial development on unde- veloped lands south of the project area. The City applied for and received a COG grant in 2010 to support design and construction of sewer Improvements In the project area. Through completing designs, it was seamed that addl- tional funds are needed fior construction. Construction dewatering will be more extensive than what was originally budgeted for due to the high groundwater table in the area. Native soils will be saturated and not suitable for bermil so greater quantities of bank run gravel for trench backfill will be needed than was originally planned for. It was also learned that a cultural resources survey will be needed, adding additional costs to the project. 2. Explain the specific Infrastructure Issues the project addresser► and how they are linked to economic development Improvements. Some existing businesses In tate project area must stare their waste In holding tanks and then have it pumped Into trucks for transport to the City wastewater treatment plant. This process is costly and Inconvenient. Some businesses have expressed concems to the City regarding the costs and hassle of having to deal with sewage storage and disposal, and this project will help ensure these businesses remain comm tted to staying In the corrununityr. Existing business provide approodmately 40 jobs in the area. Estabilehing a sanitary sewer system in the area will also promote the development of other businesses along Main Street south of Railroad Avenue, Including the planned industrial area. This area is regionally Important due to the lack of Industrial zoned land available In the County. 3. Preliminary Engineeffng Phase; E-sttmated StertDate: Jan. 2020 EatimeW End Date: Apr. 2020 Please explain phase status (work already completed, In progress, awaiting funding, etc., and factors that may slow phase program). Preliminary construction plans, speclftcatlons and a cost estimate have been prepared for the project, using 2016 COG funds and City funds. The improvements shown along Main Street on the current plans extend to approx€- mately SW feet south of the intersection of Railroad Avenue.The City recently completed a Wastewater Collection System Planning report. The report determined that long term development of tete Industrial area will require sub- stantial Infrastructure improvement to adequately build out the entire area, which would otherwise delay the earn-- pletion of this project to serve existing businesses. The intent of the project is to provide Immediate sanitary sewer services to existing users, and to encourage future development In the immediate vicinity and In areas to the south towards the Interstate. 4. Right of Way Phase: Is It Required? Yes _K_ No Esiirnated gUrt Date. Jan. 2020 Estimated End Dar APr • 2020 Piease axpialn phase status {work already completed, In gess, awaiting funding, etc., and factors that may slow phase progress}. This phase will be completed in tandem with the engineering phase so that construction will not be delayed due to fight -of -way project requirements. Based on design work that has already been com- pleted, irs anticipated that temporary construction easements will be needed to construct sewer services and pump station Improvements. 5. Cormtruction Phase: Estimated Start Date: May 2020 Estimated End Data: Oct. 2020 Please explain phase status (work already completed, In progress, awaiting funding, atx., and factors that may slow phase propressj Construction will begin following the complalm of the preliminary engineering and right-of-way phases. 6. Indicate If the pnOa is consistent with the foltovring applIcahle state, retinal and local plans and priorNfatt n processes: ❑ Overall Economic Development Pian - Officlally Adopted, ® Compos he- elve Land Use FUn - Oi!#I Mit Adopted 2007 ® Capital FOCU ty Plan -Officially Adopted 2007 13 Community Action Plan (or other community-based plan) - D11WWly Adopted ® Six -Year Transportation Improvement Plan -- Officislhr Adopted Updated 2 014 ® Sift-specl8c development plans; e.g., Cornmunky M mtsr Plan - OfAclally Adgftd 2 012 Seger Feasibility Study W " 1 T. Explain hour this Infrastructure pro)ect Ass been 000dinated, or will ba veordkmtted with other Jurisdictions, such as counties, Fldee, stateMederal igen les, and with teconomta development organizations during planning. design, fh*ncing, construction andfor operation phases. The City had worked for more than seven years and spent more than $80,000.00 in legal and adminisMIve fees to expand Its southeast UGA. During this process, the City worked with Kittitas County, the Kidbs County Chamber of Commerce. Conference of Government, and the Department of Commerce to identify the adopted UGA. As the recipient of a 2014 COG grant, the City completed a Wastewater Collection System Planning Report to plan the sewer needs for the UGA area to enable economic development In the South Kms area. This application is meant to be another "leg of that prooess" for the purposes of providing City sower servioes to existing businesses south of Railroad Av- enue. The businesses in this area provide a sli I n al number of jobs. and sales tax revenue to the City and have expressed significant interest in remaining at #Wr current Iocatlons, dependent upon the City's implementation of delivering sewer service. Providing sewer service will also aid the City with compliance with the Department of Ecology for Industrial businesses In these locations. The City wid work with the Department of Ecology and the Department of Health In the planning and construction of the sewer improvements. S. Explain horn the IMrastrurture project vrtll help meet the economic development goats of your community andlor region. If this project k not done, will the anticipated private development still take place? This infrastructure project will help to meet the economic development goals of the City by both retaining existing jobs and promoting the development of new jobs. If the project is not completed, It is possible that the existing businesses may seek to relocate elsewhere so that they will have access to sanitary sewer services, rather than being forded to store and pump their awn wastewater. Addldonally, the City has been approached by several new businesses seeking to locate in KMtas. Each time the businesses learn that there are no sewer facilities, they choose other locations that already have sewer facilities available. The primary reason for this Is the high cost to extend sewer service to this area. Completing these Improvements will help to make the area more attractive to future development by lowering the cost to potential businesses to extend sewer service io this area. 8. Describe any feasibility or predevelopment study that demonstrate the linkage between the proposed Distressed County Infrastructure improvements and the anticipated economic outcomes. Conversations between the City and the business owners in this area have identified the desire for these businesses to remain In KRMs, their need for sewer service, and their intent to relocate If sewer service cannot be obtained. 90. Indicate H other needed Infrastructure (e.g., sewer, water, power) is In place or if there Is a plan for getting It In place. This area has all of the other Infras4vcture it needs, Including water, power, roadway access. And pedestrian facilites, but It lacks the proposed sanitary sewer services. This Is the final piece of infrastructure needed in order for existing and future businesses to have access to all necessary services. 11. Indicate the Eallmated Number of 6ualnesses CreatedMetsined bw the Prolect_ 5 There are five existing businesses that need these services to be established. Establishing a sewer symam in this k cation will also encourage development of the Industr{ally zoned land south of Railroad Ave. 12. indicated the Estimated Number of Jobs CroeateMetalned by the Project. -- _4 0 it has been estimated that the existing businesses employ approximately 40 people. Additional jobs will also be created by future businesses that will locate In the service area. Submit the original application to: Klttitas County Department of Public Works 411 N. Ruby, Suite #1 Ellensburg, WA 98926 [a Applicant Certification Certification is hereby given that the infor ration provided is accurate and the applicable attachments are complete and included as part of the application package. 1 certify that application thresholds are met at the time of application. 11,00KA /S6*'zLw, SE re of Oftial Representative 10 Sponsoring Agency (if Applleable) Signature of Agency Representative Typed or Prlated Name Date Date Date i Associate Economic Development Organization Notification The organization listed below has recehled notification of this project as demoastrattd by the signature of the organization's representstive. Name o Organization r Sign rye of R ive I If's Date Kittitas County Department of Public Works Conceptual Approval Approval of the project feasibility, scope and estimated costs. 7"ZLkemgz-�' Signature of Kittit x County DPW Representative A Awlw'- 9 amzs Typed or Printed Name r 15'f Date KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS DISTRESSED COUNTY INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION DUE DATES FY 2020 Distressed County Infrastructure Impro%vmnt urogram, applications are initially due to Kittitas County Department of Public Works for conceptual approval of the infrastructureproiect. Distressed County Infrastructure Improvement Program applicants are imnted to appear at the COG meeting when the project's criterion is miewed. APPLICATIONS DUE 2020 9 icafi n due Date COG MEETING DATES COG Meetings July 15, 2019............................................,...............August 2019 COG Meeting "Funding available January 1, 2020 IN 3 - PCL ARRJ KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: April 13, 2020 ACTION REQUESTED: Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility District BACKGROUND: Kittitas County Conference of Governments (COG) met to review the second round of 2020 submitted applications. COG. recommended awarding $250,000 to Snoqualmie Pass Utility District. This Agreement is the final step in the award process. INTERACTION: Public Works; Snoqualmie Pass Utility District RECON 0ONDATION: Approve & Sign the Resolution and the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement HANDLING: Return one (1) original to Public Warks ATTACHMENTS: Resolution; 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement LEAD STAFF: Mark Cook Director of Public Works BOARD OF COUNTY COMMISSIONERS COUNTY OF h TIZTI`AS STATE OF WASHINGTON RESOLUTION NO: 2020 - RESOLUTION TO APPROVE THE 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WTTH SNOQUALMIE PASS UTILITY DISTRICT WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These fiords may only be used to finance public facilities serving economic development purposes in rural counties and finance personnel in economic development offices in the State of Washington; and WHEREAS: The 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility District has been executed by said entity with funding available January 1, 2020; and NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners hereby approves the attached 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Snoqualmie Pass Utility. ADOPTED this 13th day of April 2020. Attest: 11 Clerk of the Board- Julie Kjorsvik BOARD OF COUNTY COABIISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner 2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT BETWEEN KITTITAS COUN'`Y AND SNOQUALMIE PASS UTILITY DISTRICT This Contract dated 114AAA X , 2020 is made and entered into by and between KITTITAS COUNTY (°County'}, a subdivision of the State of Washington, and SNOQUALMIE PASS UTILITY DISTRICT ("Funding Regipient")_ WHEREAS, the purpose of this Agreement is to provide for public facility construction and foster economic devebpment opportunities within Kittitas County; NOW THEREFORE, in consideration of the terms and conditions contained herein, or attached and incorporated and made a part hereof, the County and the Funding Recipient mutually agree as follows: Section 1. Scope of Work. a. Funding Recipient shall provide the services and staff described in its Application for Funds submitted to the Council of Governments, attached hereto as Exhibit "A" which is attached hereto and incorporated Therein by this reference, b. Except as otherwise specifically provided in this Agreement, Funding Recipient shall furnish the following as required to perform the services, described in Paragraph (a) above, In accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items furnished or required to be furnished, together with all other obligations perbrmed, or required to be performed, by Funding Recipient under this Agreement are collectively referred to herein as YServiees.'° Section 2. Payment. a. As full compensation for satisfactory performance of the Funding Recipient Services, the County agrees to pay Funding Recipient the sum of two hundred fifty thousand dollars ($250,000). b. Additional payment terms: The County will make payment to the Funding Recipient only on a reimbursement basis, as receipts far any items including marketing and/or advertising are submitted to the County. c. Requests for reimbursements must be submitted to: lCrttitas County Public Mrks Attn: Joyce White 411 North Ruby, — Suite 1 Ellensburg, WA 98926 iolCe.whiteQco. kittitas.wa. u s Distressed County Sales and Use Tax Infras&wwre improvement pmgmm FundingAgme> d. Reporting requirements of your events will be required on prescribed forms from the IQttitas County Public Works Department. Section 3. Performance by Funding Reci lent. a. Funding Recipient shall not (by contract, operation of law or otherwise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the CourWs option. b. Funding Recipient shall at all times be an independent Funding Recipient and not an agent or representative of the County with regard to performing the Services. Funding Recipient shall not represent that it is, or hold itself out as, an agent or representative of the County. In no event shall Funding Recipient be authorized to enter into any Agreement or undertaking for or on behalf of the County. It is understood that the Funding Recipient and the Funding Recipient's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County.' c. Funding Recipient shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in OWL of any governmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services), Funding Recipient shall famish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Funding Recipient agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the tern of this Agreement. d. The County and the Funding Recipient agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or failure or delay In making) such inspection or approval shall not relieve Funding Recipient of its responsibility to perform the Services in accord with this Agreement, notwithstanding the County's knowledge of defective or non -complying performance, or the substantiality or ease of discovering the same. Funding Recipient shall provide the County with sufficient, safe, and proper facilities and equipment For such inspection and free access to such facilities. f. This contract is subject to review by any Federal or State auditor. Funding Recipient shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. Funding Recipient shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Funding Recipient shall provide the County access to (and the County shall have the right to examine, audit and copy, with or without notice) all of Funding Recipient's books, documents, papers and Distressed County sales and Use Tax infrastructure lmpr+omment Progriam Funding Agreement2 records related to the Services or this Agreement g. Funding Recipient understands and acknowledges that Funding Recipient Is solely responsible for its own reporting and 6ccounting of all state, federal, social security, and local taxes, of every nature, arising from Funding Recipient's performance of this Agreement. All compensation received by the Funding Recipient will be reported to the Inlaemal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. Section 4. Release Indemnity, and Hold Harmless, The County assumes no liability for the Funding Recipient's actions under this Agreement. Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabilities, damages, and expenses, (ncluding, but not limited to, reasonable attomey fees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: Any fault, negligence, strict liability or product liability of Funding Recipient in connection with the Services for this Agreement; Any lien asserted upon any property of the County in connection with the Services for this Agreement; Any failure of Funding Recipient, or of the Services, to comply with any applicable law, ordinance, Tulle, regulation, order, license, permit and Other requirement, now or hereafter in effect, of any governmental authority; or 0 Any breach of or default under this Agreement by Funding Recipient. faction 5. Compliance with Public Records Law. a. In compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. In the event a public records request is made th the County far documents created in relation to this Agreement, should legal uncertainty arise regarding the disciosability Of any documents under federal or state public records laws, the County shall Provide notice to Funding Recipient pursuant to Washington's public records act, chapter 42.58 RCW, to allow Funding Recipient to seek a court injunction. c. The County specifically shall not be liable to Funding Recipient for the County's release under public records laws of any documents not protected by trademark, copyright or other law. Distressed County Sales and use Tax 1nf vsbucture Improvement Prot mm Funding Agreement3 Section S. Industrial Insurance Waiver. With respect to performance of this Agreement and as to -any claims against the County, its Additional Insureds, officers, -agents and employees, the Funding Recipient expressly waives its immunity under Title 51 of the Revised Code of VM3shington, the Industrial Insurance Act, for injuries to Funding Recipient's employees and agrees that the obligations to indemnify, defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Funding Recipient This waiver is mutually negotiated by the parties to this Agreement. action 7. Insurance and Endorsem nts. a. The County may require through a request in writing that the Funding Recipient provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Funding Recipient, its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Funding Recipient or any of its employees, agents or representatives. c. Should the County require such liability insurance, the Funding Recipient agrees to provide proof of insurance prior to commencing performance of this Agreement d. Copies of the County's written request and the insurance documents provided by Funding Recipient shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Funding Recipient shall fumish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect Section S. Termination. The County may, by written notice thereof to Funding Recipient, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Funding Recipient is in breach or default. Upon receiving such notice of termination, Funding Recipient shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice. In the event the County terminates the Funding Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of the date of the notice of termination. Di Dressed County Soles and Use Tax WMSDUcterre IMMOvement Program Funding Agreownt 4 Section 9. Miscellaneous. a. Funding Recipient shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreement without the County's prior written consent. b. This Agreement embodies the entire Agreement between the County and Funding Recipient, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties. c. Notice for any purpose under this Agreement, except service of process, shall be given by the Funding Recipient to the Kittiias County Commissioners and the Kittitas County Public Worms Director, 411 North Ruby, Suite 1, Ellensburg, WA 9882. For all purposes under this Agreement, any notice by the County to the Funding Recipient shall be given to the Funding Recipient's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, certified mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs. e. This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrumerrt. f. Funding Recipient warrants to the County that the individual signing on Funding Recipient's behalf has the requisite power and authority to enter into and to perform Funding Recipient's obligations under this Agreement. Funding Recipient further warrants to the County that Funding Recipient has made no misrepresentation or misleading statement in connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Funding Recipient's ability to perform its obligations under this Agreement. g. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought to enforce this Agreement or any of its terms shall be in Kittitas County, State of Washington. Distressed County Sales and use 'tax lnfrMnwtum improvement Pnopram Funding Agreement page 5 KITTITAS COUNTY SNOQUALMIE PASS UTILITY DISTRICT BOARD OF COUNTY COMMISSIONERS 'T� 17 7?I Brett Wachsmith, Chair Representative Laura Osladacz, Vice- Chair Cory Wright, Commissioner Dated: ATTEST: Clerk of the Board APPROVED AS TO FORM: Deputy Prosecuting Attomey 3 7 Tri. f >f4ff4I Address �*�5-'3y(-d4W Telephone Dated: Al's 0 Dbtressed County Safes and Use Tax fnfras&ucture Improvement Program funding Agy" Poge 6 Kltdtes county Department of Public Works . DISTRESSED COUNTY SALES AND USE TAX INFRAmUCT uRE. IMPROVEMENT PROGRAM APPLICATION The Distressed County Sales and Use Tex Infrastructure improveHmod Program supports Improvements to infrastructure systeme that faster economic development In Kkdtas County. The goal Is to create economic opportunity through Idirastructure investu ertt. APPLICANT INFORMATION Applies Smqualmie Pass Utility District Contact Now: Tom Hastings, Gaseral Manager Address: P.O. Box 131 -- Address: 370 Treauna 1. Plant Road CRY: Snoqualmie Pass WA 33p= i$068 Telephone: 425.434.6633 PAX: E-mail Address: THasti�p ,Ors Project Location: Jurlawcdvn Popuiadan: Project Title: Snoqualmie Pass Utility District - Phase I Wastewater Tr+ hnem Facility APPLICATION THRESHOLDS Applicant ltequimmenh Chaak-otl; 4 1. The project to Ingxwement to an In re system(s) Inked to economic development 4 L A defialled W X 11" vicinity map that dearly show: the pnojsat Is Inluded in the application package. "ee fc-14 �,Vlte hid S-iogL.,abnie gin L'•P F;i) Map. r'!'1aOeti ti, cpi fni I iv,i.iion m. r,, Pmt, 'ss.1:£ Man. 4 3. Distressed Count funds aro not being subs hated for otIm funds that are already secured. 4 4. The prof act Involim traditional improvan aft, I d of-non4raditlonel" improveneenb eligible for "Enhencetment" funding. 5. Appacsret has submitted only one application this roan& B. The b=grsglon■l aconomlc daveiopmont orgenizatlon has been informed of the project. O> - C i e LLso z F OL F- u w w w w w w a w IL L� M w w w w M CO) iia ' w w w w w 40 46 E ca .s v �lu $ a' rr � 22 PER ce wILI . 10 CD LL LL E .. D` Q Or iR af! J at s a 41W LL O �5 PROJECT NAlliI UTTVE f. Projset D"Grlptken: lasscrito the scope of work. Indicate the major work Involved, Including a brief carnpadson of existing and proposed conditions. Cormmemial and residential, domestic water and sewer services are provided in the Snoqualmie Pass area by a Special Purpose District (SPD) named Snoqualmle Pass Utility District (SPUD or Utility District). Currently, the Utility District uses a two -lagoon treatment plant and land -applies treated water on a spray field owned by the United States Forest Service (USFS). Department of Ecology (ECOLOGY) and the USFS no longer support the spray field treatment of the area's wastewater as a sustainable and desirable tmatment solution. The Utility District plans to construct the first phase of a new Wastewater Treatment Facility (WWTF) in 2020 on its current property and will upgrade the existing treatment facility completely by 2025 in subsequent phases. Phase 1 of the new W WTF includes constructing a Membrane Bio Reactor (MBR) to treat 20,000 to 30,000 gallons per day (gpd) which is about 10% of the current plant capacity. The MBR includes an influent screen, anoxic tank with mixer, pre -aeration tonic with aerators and blower equipment, a membrane tank in which two banks of membranes filter the water, followed by an ultraviolet light disinfection system, prior to being discharged to Coal Creek. The Phasc I project also includes the development of a new well in Kittitas County. There are economic and environmental benefits of increasing water flow in Coal Creek provided the treatment of the wastewater can be done to National Pollutant Discharge Elimination System (NPDES) standards. Economically, the Utility District can gain additional water rights equivalent to five times the amount of water discharged to Coal Creek using foreign water credits. The increase in domestic water rights immediately provides the necessary capacity to allow development since Snoqualmie Pass's existing water rights are very limited. In fact, the Utility District self-imposed a building water moratorium until September 2019 while they repaired water system leaks, installed now water meters with remote read out capabilities and implemented conservation measures. Increased housing development in Kittitas County increases tax base and stimulates residential and commercial vitality in this recreation and tourist -based. area. Environmental benefits include reducing the amount of effluent being sprayed onto forest land and producing an effluent of sufficient quality to discharge to Coal Creek, augmenting the stream flow. The following project phases will provide the capability to store up to 13 million gallons of water to boost water flow when fish need Coal Creek to supply viable passage and spawning areas. Design and estimates are being developed by the Utility District for Phase 1 and are being incorporated in the District's Water System Plan, General Sewer Plan, and Facility Plan. The Phase I treatment facility will provide operational data to optimize the sizing of the full capacity WWTF, planned to be in service in 2025. The new facility will produce an effluent of sufficient quality to augment water flow in Coal Creek without adversely affecting the Creek's water characteristics. The existing lagoons will be repurposed; one lagoon will be used as an equalization basin prior to the MBR, and the other lagoon will act as a treated water storage reservoir to maximize stream augmentation during the spawning season. 2. Explain the specific Inframbucture Issues the project addresses and how they are linked to economic development improvements, The Utility District manages and operates a two -lagoon treatment plant and spray field for land application on a portion of forest owned by USPS. ECOLOGY and USFS no longer support the spray field treatment of the area's wastewater as a sustainable and desirable treatment solution. To discharge to a nearby surface water, a higher level of treatment is required. The community's interested developers have placed pressure on the Special Purpose District (SPD) and Kittitas County to provide additional water services to support their projects in the Snoqualmie Pass ansa. To strategize changes that could affect water treatment, water rights, and economic development, the Snoqualmic Pass Utility District initiated development of three interrelated planning documents in April 241 S. a Water System Plan, a General Sewer Plan, and a Facility Plan. The General Sewer Plan will replace the previous Shoqualmie Pass Utility District Comprehensive Sewer Plan dated June 1994 and revised August 1995. The Water System Plan will update the current Water System Plan that expires in the spring of 2020. Advancernents in wastewater treatment have made discharging into rivers and creeks an environmentally sound practice provided treatment can be done to National Pollutant Discharge Elimination System (NPDES) standards. Discharging the treated water from the MBR system will allow the Utility District to obtain a foreign water right credit from the clean effluent they discharge to Coal Creek. Because the Snoqualmie Pass area has reached limitations on water rights, development has stalled. Commercial and residential, domestic water and sewer services are provided in the Snoqualmie Pass area by the Utility District. The area placed a water moratorium on itself. The moratorium was lifted in September 2019 following water system leak repairs and conservation measures. To support planned developments, the Utility District has been creative and considering holistic solutions which can address both economic vitality and environmental needs. The phase i project initiates best practices immediately and will provide the Utility District with the area -specific data needed to expand the WWTF in subsequent phases until 100% of the eilrluent is treated with MBR technology. Wastewater treatment improvements are being planned to be expanded as needed to meet the long term service area needs. The Utility District anticipates the number of residences and businesses will double when current planned developments are completed. However, water right limitations are expected to be reached in 2020 unless additional water rights are obtained. The Utility District's customers include ski resorts and supporting services to travelers on Interstate 90 (I-90) such as rest areas, gas stations, hotels, stores, and restaurants. Multiple conversations with the ski resorts have already been initiated to explain the Planned improvements to the water system and wastewater treatment facility. The Utility District's additional water capacity, because of the wastewater improvements, would encourage residential construction. An increase in residents during recreational and tourist seasons allows commercial wMiprises to draw employees during the seasons in which they would be needed most. Increases in capacity can allow commercial operations to consider off-peak strategizing to expand operating days and evening use. Related but separate ski resort improvements are being planned to accommodate increased demand. Currently, an estimated 30,000 people travel to Snoqualmie Pass area in the winter on peak weekend days. Increased snow -making, expanding hours, adding days to the season, and expanding evening skiing, can increase the number of customers the ski resorts can serve while lessening the peak demand impact of seasonal tourism on other infrastructure systems such as transportation and parking. Expanding employee coverage over longer operating hours and on additional days will increase the number of full-time equivalent employees at the resorts and in supporting services in the Snoqualmie Pass area. 3. Project Construction: Estimated Start Data: May 2020 Estimated End Data: November 2020 Planes explain phase status of the project (bid ready, design c:omplets or preliminary design). Preliminary Design will be completed upon approval of the Facility Plan and the General Sewer Plan. The Utility District is preparing to begin construction of Phase 1 in May 2020. The installation of the Phase 1 WWTF MSR will be completed by November 2020. Indicate If the project Is consistent with the following applicable atom, regional end local plans and prioritization processes: Snoqualmle Pass Sub Jonas Comprehensive Plan — Master Plan — Otllclally Adopted November 1992. Snoqualmie Pass's Master Plan was first included in the December 2001; update to the Kittitas County Comprehensive Flan and is included in full as Appendix 2 of Kittitas County's fr widon 2040 comprehensive plan (adopted June 2019). To comply with the GMA, this Master Plan must be consistent with the land use Element and other elements in Rawifiorr 2040. Specifically, the Utility District is using the recently completed Iand use inventory and guidelines presented in Pawitiorr 2040, together with the development permits approved by Kinites County, as the basis fbr comparing growth and fiorecum for wastewater service demand in the Snoqualmie Pass service area. If dramatic revisions are made by Kittitas or King County to the SNOPPAC recommendations, the Utility District will revise and update the Master Plan accordingly. Facility Plan —The draft Plan will be 1brwarded to Klltltas County and Department of Commerce for review by 12!1!201!. Snoqualmie Pass is in the process of updating its Facility Plan to comply with the GMA. To comply with the GMA, the Facility Plan must be consistent with Trarrssdan 2040. Since the Facility Plan was incomplete at the time the sewer system plan was fid, the Utility District will use the current year and projections in T) mskim 2040. Specifically, the Utility District is using the recently completed land use inventory and Land use guidelines presented in Tnmr ton 2040, tom with the development permits Approved by Kittites County, as the basis for comparing growth and forecasts for wastewater service demand in the Snogtlalmie Pass service area Community Action Plan (or other communion -based pian) — The Summit at Snoqualmle Master Development Plan - Officially Approved by the United States Forest Service In November 2008 Other: Snoqualmie Pass Utility District Water System Plan — Adopted May 2018. Other: Snoqualmle Pose Draft Water System Plan (2020 Update) - Will be forwarded to Kittites County and Department of Commerce for review by IM012020. Other: Snoqualmle Pass Draft General Sewer Plan (2019) - Will be forwarded to Kkdtas County and Department of Commerce for review by 12!1/2014. 10 1. Explain how this infrastructure project has been coordinated, or will be coordinated with other Jurlsdictions. such as counties, cities, statelfederal agencies, and with economic development organizations during planning, design, financing, construction andlor operation pheees. The Utility District has been in ongoing conversations and consultation with ECOLOGY both with the Water Resources and Water Quality departments. Because the Snoqualmie Pass area spans two counties, King County and Kittitas County, the Utility District communicates with staff from both counties. The next meeting with Kittitas County is scheduled for November 6, 2019. In addition to communicating with County staff', dee Utility District has reached out to the Department of Fish and Wildlife, Washington Department of Transportation, the Confederated Tribes and Bands of tate Yakama Nation, and the Bureau of Reclamation. There is no organized local econamic development agency in the unincorporated service area of the Utility District. Instead, the Utility District is in infrequent contact with the economic development departments of both King County and Kittitas Comity and in firquent contact with commercial customers such as the ski resorts. The current General Manager is making inroads into all county and state -level agencies and met with an informal technical team at the Infrastructure Assistance Coordinating Council (IACC) conference in Wenatchee in October 2019. The team consisted of; Mr. Hastings, one representative Brom HLA Engineering and Land Surveying, Inc., two representatives from Department of Health, one representative from ECOLOGY, and one representative from United States Department of Agriculture. During the team meeting, the Utility District was able to provide the concept of the Phase 1 project and receive comments and recommendations from the agencies present. 6. Explain crow the Infrastructure project will helpmeet the economic dwek*nwd goals of your community endlor region. If this project is not done, will the entlelpated Pdvete developrrrerrt still take place? The current water system capacity is nearly exhausted and in 2018 the Utility District self-imposed a wafter moratorium due to water right limitations. After the Utility District was able to implement several conservation improvements, the moratorium was lifted in September 2019, making 100 ERU connections available for sale. Kittitas County has approved three developments totaling over 590 residences. The 100 additional ERUs are expected to be exhausted in 2020 and will not provide guaranteed service to the current planned developments in this unincorporated area. Though the service area spans two counties, all growth is confined to areas solely in Kittitas County at this time. Phase I treats wastewater to standards adequate to allow the effluent from the wastewater treatment plant to be discharged to Coal Creek. When fully constructed, in subsequent phases, the WWTF will eliminate the use of the spray field located on forest service land. The water being discharged to Coal Creek allows the Utility District to On foreign water right credits adequate to support their service area development through full buildout. Phase 1 is anticipated to allow an additional 1,000 ERUs to the system. The Utility District conservatively estimates that commercial demand will consume six to seven ERU9 for every 100 residential connecfons. The construction of Phase 1 effectively doubles the domestic water capacity of the Utility District and will allow expansion of existing economic operations, promote continued residential development, and encourage new commercial development to provide services supporting an invigorated and growing community. Water demand increases, based on conversations with the ski resorts, over the next 5 to 7 years will likely be 40% - 50°% above current levels with a minimum of 30% of the increase dedicated to snowmaking. Il If the project is not accomplished, the moratoriums will likely continue. Currently, the water capacity issues call for a 6 -month review cycle to determine available ERUs and whether another moratorium is necessary, halting all future development. 7. Describe any feasibility or predevelopment studies that demonstrate the linkage between the proposed Distressed County Infrastructure improvements and the andtlpated economic outcomes. The Utility District's substantially drafted Facility Plan (due by 12/U2019) identifies Phase 1 specifically as the top priority project. An engineer's estimate and design sketches have been developed to completely discuss the concept and feasibility of constructing the MBR system. Phase 1 represents the alternative treatment of 10% of the Utility District's wastewater. Data collection received during implementation of Phase 1 will allow the Utility District to fine-tune the implementation of the MBR system for 1 t10OA of the W WTF effluent. Even with successful treatment applied to only 10% of the wastewater, the resulting credits to the Utility District immediately allow an additional 1,000 ERUs for development in the service area. The recognition of economic opportunity is immediate and directly connected to the project. B. lndirsft If other needed infrastructure (e.g., sewer, grater, power) is In place or If there Is a pian for getting It in place. Replacing the WWTF with the MBR system provides the required sewer and water capacity to support the planned developments in the area. Without the proposed improvements, new construction will be limited, and growth will be stagnant. Discussions for power to the W WTF for Phase 1 has already begun. As the credits are made available, the ongoing discussions between the utility providers and Kittitas County planning and permitting staff will need to increase. 9. indicans the Estimated Number of Businesses Createdlletained by the Project. Phase 1 is estimated to allow an additional 1,000 ERUs to be sold through the Utility District. The Utility District conservatively estimates that commercial demand will consume six to seven connections for every 100 residential connections, and currently approximately 700 residential connections are platted. Estimation for future need is based on current residential/commercial mix of customers in the service area. The construction of Phase 1 effectively doubles the domestic water capacity of the Utility District, will promote continued residential development, allow expansion of existing commercial operations, and encourage new commercial development. The increase in ERUs provides the Utility District the opportunity to meet the residential demand already promised by Kittites County during approvals for development planning. Water will not be the limiting factor when issuing building permits and the full pre -planning process can want more smoothly for Kittkas County because of the increase in water rights in this area of the unincorporated county. Additional connections can be a combination of single family and multi -family configurations. Short-term employment will be increased due to construction of residences. Additionally, an increase in the population of the Snoqualmie Pass area will spur additional jobs to service the increase in residents. The Utility District's General Manager has been involved in multiple discussions with different ski resorts in the service area. The Summit at Snoqualmie Master PIan (Summit Master Plan) identifies the improvements and enhancements being plumed for each of the ski areas. This project allows the ski resorts to grow at their desired pace without fear of water moratoriums causing development or expansion stagnation. 12 Durb g Ski Season For example, one improvement called for in the Summit Master Plan involves replacing two-seat ski lifts with four-seat ski lifts. The improvement increases the number of people being moved throughout the area and allows for efficient movement of the more than 1.2 million visitors per season. Hospitality jobs will increase to meet the demands of the rise in number of visitors. Lighting the slopes will lengthen the time the ski resorts can operate, resulting in an increase of Full- time Equivalents (FTEs). Phase I will sustain increased services at the resorts for many occupations such as food service-related employees, customer service employees like those who assist with equipment rentals, ski instructors, and operator and maintenance-related employees. Additional water capacity will allow the ski resorts to increase their snow-making operations and extend days of the ski season to bring a new level of predictability and reliability to the ski area. Stabilization of the ski environment can out clown loss of employees' hours due to fluctuations of precipitation throughout the ski season_ The amount and quality of snow (snow conditions) contributes directly to the desirability of outdoor snow activities such as skiing, snow shoeing, and sledding. Each of these types of activities have employees supporting the outdoor snow experience. Increasing number of days increases FTEs. The ripple effect for support services which cater to the travelling public on I-40 are anticipated to effect employee hours at locations such as restaurants and gas stations in the immediate area and will likely increase business and the demand for lodging in nearby communities. Off-season The Summit at Snoqualmie Master Plan (Summit Master Plan) identifies the improvements and enhancements being planned for implementation throughout the year. This project allows the ski resorts to grow off-season operations without fear of water moratoriums causing development or expansion stagnation. Hiking, biking, and other outdoor activities are being actively developed by the resorts. The Utility District's project is needed to support the additional demands on the wastewater and domestic water systems. Phase l provides for the increase in water rights necessary to sustain the area's year-round aspirations. The FTEs to cover the non-winter season operations will be in addition to the customary winter-time staffs at the resorts. New support businesses will be required to provide non-winter equipment and lessons for outdoor activities other than snow-related. With entertainment available throughout the year, and the proximity to the Seattle job market, residents may move their primary residence to this mare robust community increasing the full-time residential use and employment in the Utility District's service area. 10. Indicate the Estinrat d Number of Short Tenn and/or Permanent Jogs Cnwtad/Retaln&d by the Prgect. Short-term and long-term employment created or retained by the Utility District's Phase I project has been explored qualitatively in the previous section. The water moratorium squelched economic opportunity for steady and sustainable growth in the Snoqualmie Pass area. The water moratorium has been lifted and through conservation efforts and repairs to address leaking infrastructure, the Utility District was able to offer 100 ERUs to businesses and residents for development. Phase l of constructing a new WWTF provides capacity for 1,000 ERUs immediately. When future phases are completed, the water right credits the Utility District will receive provide capacity for up to 3,000 additional ERUs. 13 Existing commercial operations such as the ski resorts will use the additional water capacity to add lours to their dd-mkftd opera time in the form of night slding, add days to their operating season by increasing their snow-maldng operations, and add year-round operations to their facilities adding diversity and the need for more FTEs. Kittitas Ca mty has approved developments that are independent of the limited cap aty of the Utility District's domestic weber and wastewater systems. Phase 1 conxuucts an innovative MBR treatment system which can produce a filum of high quality that can be discharged to Coal Creek. Coal Creek benefits flom augmented creek flow enhancing the aquatic systems, including tiara and fauna. Phase 1 benefits the Utility District and Kittitas County by increasing the water rights obtained throw the direct disclzge to Coal Cr=L The needed water and wastewater capacities allow the planned developments to move forward in a sustainable manner. The new construction sparks shat term mon jobs. The average hme m Snoqualmie Pass requires three seasons to complete. Approximately 1,000 new ERUs will be available for conncctiams to development intnedh tely. The conmwcial vs. residential mix of ERU consumption. has historically been about 7 commercial connections for every 100 rewdaft. The usual support busies of services for residential will be sttpplameated with new business types to tatter to year-round oatdoor activities. List Of Ham to Wfirences in thia mplication: Snoqualmk Pass Utility District Home page: htip://sngM.ororS1 2013 Snoqualmie Pass Utility District Water System Plan, Any 2013: htip:/Isnop�ss,c�ry�wp�- on ntl 1 cis! / -Watt -C,m r h w� ive-Plan f Kittitat County Comprehtasive Plea, Deeamber 2016; /Avww.co.ki 'ter .wa.us/ t sM c 201 &201 x201206°1020%o c ° / . 't ° -o° OCirdn1202016,702 3. pdf Sm qudlmie Pses Sub -Area Comprehensive Plan — Master Plan n ie° OPlan elf The Summit at Snoguslmfe Master Development Plans:, November 2808: s:/lsui i a v l - l Submit the original application to: Kittiitas County Department of Public Works 411 N. Ruby, Suite #1 Ellensburg, WA 98926 14 Applicant Certification Certification is hereby given that the information provided is accurate and the applicable attachments are compIcte and included as part of the application package. I certify that application dweaholds am met at the time of spplication. Tom !Lafts, Ciencral Manawr t I/6ao19 Signature of Oliicial Rept+eaentative Date Sponsoring Agency (if Applicable) 2 Signature of Agency (Representative "A Ty}sed or Printed Name c" ! Date Date Associate Economic Development [)organization Notification The organiratlon listed belay has received notification of this project as demonstrated by the signature of the orpubaatioa's repro rotative. Name of Organization Signature of Representative - - Date Kittitas County Department of Public Works Conceptual Approval Approval of the project feasibility, scope and estimated costa. Signature of Kittitas County DPW Representtaitve Typed or Printed Name Date Is KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS DISTMSED COUNTY INFRASTRUCTURE IMPROVEMENT PROGRAM APPLICATION DUE DATES FY ?AZO Distressed County Infrastructure Improvement Program, applications are initially due to Kittitas County Department of Public Works for conceptual approval of the infutructure project. Distressed County Infrastructure Improvement Program applicants are invited to appear at the COG meeting when the project's criterion is reviewed. APPLICATIONS DUE 20 Apgligatipa COG MEETING DATES COG Meetings November S, 2019.........................................................Decemiber 2019 COG hating **Funding available January 1, 2020 16 N W40 *P s Ingham ham as - •� ` �fa1r11M� •; , PwtAj 4 orob ph M��zo r SiRII Ids ok ' a w YA MONTY _201IMPMAX14 SNOQUALMIE PASS }HLASIOMMIN UTILITY DISTRICT MclNRY MAP Mp ori sr: vp Y''�'"� MAW InSM 61fM - tadU d$ne*Ir- W&WAMMUM p W NMQM eta: er. aa�o N d 375 750 1 5fl0 SNOQUALMIE PASS UTILITY DISTRICT AVAILABLE De4ELOPMENTAREAS 2M River Rad Y&VmWAMM �-Ike,'� HLA soseao NMQM eta: er. aa�o N d 375 750 1 5fl0 SNOQUALMIE PASS UTILITY DISTRICT AVAILABLE De4ELOPMENTAREAS N 100 E3 PHASE 2 MRM W"wTF m• a tFIN�� EWF/' wt, RD'S'UI1_ f3ltJr; � DHASE I PROJECT INCLUDES DOMESTIC WATER WELL OCATED IN KITTITAS COUNTY. WELL LOCATION TBD. F`EW AERCIC DIGESTER, `F'EW DS Mftwftd » +lam -10 SNOQUALMIE PASS WA MW a ** Ewft UTILITY DISTRICT HLA w.w3rd. wm mxon W. *7 lorrQ or w7 Snoquaimle Pass Utility District Wastewater Treatment Plant Improvements HLA Pre ad No.19022,18= 110M19 PAGE 1 OF 2 e --]Description Unit Unit Cost OO SII Phase I: 25.000 GPD MBR Facility (Padreged MBR unit in pre-engineered metal bldg (84'rc6 ) 2020 swrt{rp Overall Cost 1 Mobllizetion LS1 000.00 2 Clean and Grub LS $15000.00 1 11,61000.00 3 Crushed Surfacim Base Course CY $30.00 100 $3,000.00 4 lie In to wds&g lnflwdp!ping and ardend to MBR LS $100,00000 1 $100,000.00 5 Influent Pump,LS $15.0m.00 1 $15 000.00 6 MBR LS $1,000,000.00 1 1,000,000.00 7 MBR Buftg, Co' lets LS $550 004.00 1 $550,000.00 8 Outfall Piping LS W.000.00 1 $20,000.00 9 S{ a Dische a Pipirm to 6ffioQn 1 LS $10,000.001 1 $10.000.D0 10 UVISOL5 $50.000.001 1 .000.00 1147x24Headworks rdiding with screen LS um.000.0011 12 19WE—al ana controlm ImMvemww. complete LS 6100,000.ODI 1 $100,000,22 Pharr* 1. Subtiatd: 83 000.00 7.9% STATE SALES TAX $165,347.00 TOTAL E •need : 12% —12,268,L41.00 $200 000.00 Seryl : 1696 000.00 has* I G"md Total tincluding 1676 Conungeneyk, Phase ll: 350.000 GPD MER Facility with Solids Hendling In pre-engineered bldg (1 M601 2022 Sart-up Mobil astion LS ,000.00 i 100 ,00020 C# and GrubbingLS $5000000 1 $50.000.00 F34 Crushed Surface BaseCourse CY 50.00 300 15 000.00 Second MBR Influent Screen LS $1DD.ODD.00 1 $100,000.00 ln&*M Pumps from Lagoon 1 LS $1D0 400.00 1 $100,00,00 6 MBR Equipmerd LS $2,000,ODD.00 1 $2,000 000.00 7 MBR Building Addition Com with procesis tanks LS s1 500,000.00 1 $115W,000. 8 Outfall PIPIna LS $20,O0D.04 1 ,000.00 9 Slu a Dischaw PLWng to Lagoon i ES $100 000.00 1 1001004.00 10 UVm LS $250,000.00 1 $250,000.00 11 IEW&W and Control SWem Impirowments, Complete LS $5D0,000.OD 1 $500,000.00 12 Site Procan Piping,Complete LS $120,000.D0 1 $120,000.00 t3 0 Builidingi Improveml-ft Com lett LS sm,000.00 1 $50,000,00 14 Well Pump and Mohr Com ete L$ $10,ODD.00 1 $10,000.00 15 Engine Generator and Transfer Switches, Com LS $250 000.00 1 250 OOO.00 18 Site GradlEg and Dralygle, Complete LS $20 OOD 1 120,008 DO 17 Crashed Suftdna Sass Course, TON $30.00 11000 _130,000.00 18 HMA CI. % inch PG 94-28 TON $165.00 120 319,800.OD 19 84nch Cafnerd Goncr&W Sidgak. 1nc1299ffE8:S:e Y 11LO.00 00 S9.000.02 Phase If Subtptsl• $6,243&20.-M 7.9% STATE SALES TAX $414,2$4.00 TOtAL. $5 ON 080.00 E need : 10% $500 000.00 Phasell sAiction &a=s Granoote nc n 15% en 50 000.00 7 Bl3af0 G:1PROjECTSM1911 9022Q11-6-10 Preliminary Goss Ealmataida Snoqualmlef Pass Utility District - 1115@019 Wastewater Treatment Plant Improvements HLA H0. 19022 18090 PAGE 2 OF 2 Iteyrr Description Na Unit Unit Cosi Overall Cast uOverall Phase 10: Lagoon 1 Improvements (Use Phase I Wdig for Aeration EqulpmenO - 2018 compieVon 1 Remove sludge from L@gcqp 1 LS2$160 1 75 000.00 1 Reilne EWati L oonl Cam LS 1 $200,000,00 2 Aer�alicn uE els Install in Phase I Bldg)L3 20Q0. 1 150.000.00 g an II CY 3500 $140000,00 Phase III ubtptal: 5"500000 719% STATE~ SALES TAX $44 $35.00 TOTAL 608835.00 $110,635. 00 E i 10% Sw 000.00 Construction 10°X0 S80.000.00I ase 91 WMU Tawl Uncluclingn ,00 Phase IV: Lagoon 2 sludge Removed and lmplo"mards - 2024 completion 1 Reprove SIUMe from UNcon 2 1 2 KKWV9 P png 61f1 Remon GMLMM from Uvoon 2 LS M.000.0 1 M I S50.00m00 Phase III Subtoiat: 25 000.00 7.9% STATE SALES TAX $25.675.00 TOTAL, 350,575.00 En ineerirf : 10% ;06,000.00 Qnstrua� So 10% S35,.00 ase IV Grandnchming 15% Conungi—pnW., ZIMMAZO CoMbInded Phase - IVI 1131al xam 0AMOJECT$1? URIOMMI 1-5.19 PnMW*k®q Cod EGM* t6.xfuc