Loading...
HomeMy WebLinkAboutResolution_Big Boulder_ContechKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: April 21, 2020 ACTION REQUESTED: Request to Approve a Resolution to Award the Big Boulder Bridge Procurement Contract to Contech Engineering BACKGROUND: Public Works completed Phase I of the Big Boulder Bridge Replacement Project (CRP No. 296-18) summer of 2019. Recently, Public Works solicited for bridge procurement of the permanent sixty -foot structure. Contech Engineering was the only bid responder. The returned bid package failed to return the required "Bid Form" although a bid bond was provided. Public Works suggests that the Board waive the bid form irregularity and award the procurement contract to Contech Engineering. The published engineer's range was: $78,375 - $86,625. Contech Engineering's bid is for: $75,969. INTERACTION: Public Works RECOMMENDATION: Award the Big Boulder Bridge procurement contract to Contech Engineering for $75,969 HANDLING: Return one original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Mark R. Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS 6YL17.���l�lrr[.j.9•l[e'yC�7�l RESOLUTION NO. 2020 - AWARDING CONTECH ENGINEERING THE PROCUREMENT CONTRACT FOR A SIXTY FOOT METAL GIRDER BRIDGE FOR USE AT BIG BOULDER CREEK — CRP #296-18 WHEREAS: Public Works is finalizing Phase 2 construction plans and specifications permanently replacing the failed wood bridge at Big Boulder Creek (CRP #296- 18); and WHEREAS: Recognizing probable project impacts from the current ongoing COVID 19 pandemic; and WHEREAS: Public Works recently advertised for suppliers providing the required sixty -foot metal girder bridge as a means of furthering the likelihood of successful installation summer/fall of 2020; and WHEREAS: The Engineer's estimate for the sixty -foot metal girder bridge structure published advertising range was: $78,375-$86,625; and WHEREAS: One supplier did respond with a quote of $75,969 but failed to provide the required bid bond form; and WHEREAS: The required bid bond was supplied in the response and Public Works desires the Board of County Commissioners waive this slight bid irregularity allowing award of the procurement contract to Contech Engineering; NOW, THEREFORE BE IT RESOLVED that, pursuant to RCW 39.04.280, competitive bidding is suspended as to this project. The COVID-19 outbreak has caused vast economic disruption and damage due to the necessary social distancing precautions and associated government -imposed lockdowns. This economic consequence is a part of the emergency. To combat that aspect of the emergency the county wishes to stimulate the economy by continuing to pursue various public works which are essential construction under the Governor's Stay At Home Order. BE IT FURTHER RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby waive the bid bond form from Contech Engineering's procurement advertisement response and award the Big Boulder Metal Girder Bridge procurement contract for $75,969 to Contech Engineering. DATED this 21 st day of April 2020, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner