Loading...
HomeMy WebLinkAboutRes-2020-036 Maint Rock materialsBOARD OF COLINTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO 902o^03L/ TO AWARD THE BID TO FURNISH MAINTENANCE ROCK MATERIALS FOR ONE (1) CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO SIGN CONTRACT DOCUMENTS WHEREAS: A Notice of Call for Bids was approved and signed on February 4,2020, to furnish Maintenance Rock Materials for 2020; and WHEREAS: Sealed bids were opened on February 20,2020 at2'.00 pm in the Kittitas County Public Works Office and one (1) bid was received, and WHEREAS: The Public Works Department recommends that the responsible bid of Ellensburg Cement Products, Inc. be accepted for Schedules "A", "B" and "C" for Maintenance Rock Materials for one (1) calendar year following contract execution; and NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the bid for 2020 Maintenance Rock Materials to Ellensburg Cement Products, Inc. for Schedules " N' , "8" , and "C" , upon such terms and conditions as specified in the Proposal submitted by said bidder(s); and BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the contract documents upon such terms and conditions specified in the Proposal submitted by said bidder(s). DATED this 3rd day of March202O, at Ellensburg, Washington. BOARD OF COLINTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON cory oard- Julie Kjorsvik Vice-Chairman of the Board- Mandy Buchholz Brett Commissioner 2020 Maintenance Rock Materials Bid Opening February 20,2020 at 2:00 p.m. SCHEDULE 'A' County to Provide Labor and Equipment to Load Materials ITEl$ t*o. ETTIitATEg QUAilNTY {ln To}*8}Loeaiisn lTEil AEgCRIPTIST{Ellensburg Cement Products I PRrcE PER ToN I rorru, eruce BIDDER PRICE PER TOt'l TOTAL FRICE 1 12,000 4,700 5,800 2,400 1,600 Ellensburg East Kittitas BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfacing 3/8 to No. 10 BST Crushed Surfacing 3/8 to No. 10 Maintenance Sand $10.35 $10.35 $10.35 $13.50 $13.50 $124,200.00 $48,645.00 $0.00 $0.002 3 Cle Elum Ellensburg $60,030.00 $32,400.00 $2,600.00 $33,800.00 $0.00 $0.004 5 Cle Elum $o.oo $0.00b4,000 4,000 1,000 Ellensburg $8.45 $8.45 $7.85 $7.85 $7.95 $7.95 $7.95 $7.95 7 8 Cle Elum Maintenance Sand 1 1/4" Crushed Surfacing Base Course I 1/4" Crushed Su rfacing Base Courst 5/S" Crushed Top Course 5/S" Crushed Surfacinq Top Course $33,800.00 $7,850.00 $7,850.00 $15,900.00 $15,900.00 $0.00 $0.00 $0.00 $0.00 Ellensburg 9 1.000 Cle Elum 10 2,000 Ellensburg 11 2,000 Cle Elum $0.00 $0.00 $0.00 12 1,000 Ellensburg 21l2" Ballasl $7,950.00 13 1,000 Cle Elum 2112" Ballast $7,950.00 $417,875.00 $33,430.00 8.00% Sub-total before Tax -$0.00 $0.00SALES TAX -8.00% Total Schedule "A" -$451,305.00 $0.00 SCHEDULE ''A'' 2020 Maintenance Rock Materials Bid Opening February 20,2020, at 2:00 p.m. SCHEDULE 'B' Vendor to Provide Labor and Equipment to Load Materiats 1 2 3 4 5 6 7 8 o 10 11 12 13 {la 12,000 Ellensburg 4,700 East Kittitas 5,800 Cle Elum 2,400 Ellensburg 1,600 Cle Elum 4,000 Ellensburg 4,000 Cle Elum 1,000 Ellensburg 1,000 Cle Elum 2,000 Ellensburg 2,000 Cle Elum 1,000 Ellensburg 1,000 Cle EIum lT8trt oEScHPnOil BST Crushed Su rfacing 1/2 to No. 4 BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfacing 1/2 to No. 4 BST Crushed Surfagllrg 3/8 to No. 10 BST CLqted 9yrfacrng 3/8 to No. 1 Maintenance Sand Maintenance Sand 1 1/4" Crushed Surfacing Base Course 1 1/4" Crushed Surfacing Base Course 5/8"c rus hed Su rfaci ng lqp Co urse 2112" Ballasl 2112" Ballasl Sub-total before Tax - SALES TAX - Ellensburg Gement Products I nruce nen ron I TorAL pRrcE BIDDER PRICE PERITor{ frorn-rrucr $10.60 $10.60 $10.60 $13.75 $13.75 $8.70 $8.70 $8.1 0 $8.10 $8.20 $8.20 $8.00 $8.00 8.00% $127,200.00 $49 820.00 $61,480.00 $33,000.00 $22,000.00 $34,800.00 $34,800.00 $8,100.00 $8,100.00 $16,400.00 $16,400.00 $8,000.00 00 0.00 $428,100.00 $34 248.00 8.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Schedule "B" -$462,348.00 $0.00 SCHEDULE ''B'' 2020 Maintenance Rock Materials Bid Opening February 20,2020, at 2:00 p.m. SCHEDULE'C' Vendor to Provide Labor and Equipment to Load Materials ELLENSBURG CEMENT BIDDER 15 Per Ton (Ellensburg)Select Borrow $4.10 $4.10 $0.00 16 Per Ton (Cle Elum)Select Borrow $6.10 $6.10 $0.00 17 Per Ton (Ellensburg)Liqht Loose Riprap $24.10 $24.10 $0.00 18 Per Ton (Cle Elum)Light Loose Riprap $24.10 $24.10 $0.00 19 Per Ton (Ellensburg)Quarry Spalls $8.35 $8.3s $0.00 20 Per Ton (Cle Elum)Quarry Spalls $8.35 $8.35 $0.00 SALES TAX -8.00%8.00%$0.00