HomeMy WebLinkAboutRes-2020-026BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
No.2o2o- 0 2b
RESOLUTION TO AUTHORIZE CONTRACT AMENDMENT EXECUTION
WHEREAS, Kittitas County and Contractor entered into a professional services contract on November
6,2013; and
WHEREAS, section 12 of the contract authorizes modifications that are in writing and signed by the
parties; and
WHEREAS, both the County and the Contractor desire to amend the contract in the manner detailed in
the attached Contract Change that is hereby incorporated by this reference;
NOW THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Kittitas County,
Washington, authorizes execution of the contract amendment attached hereto and
incorporated herein.
DATED this tgtu day of 2020, at Ellensburg, Washington.
BOARD OF IONERS
Commissioner
A
of the
[J Deputy Clerk of Board
\Aspecl
fao*trrrtNG
Contract Change
Contract No.: 27 Project No.: 150338 Date: February 3,2020
Client: Kittitas County
Project Name: Potential Aquifer Recharge Site - Naneurn
Kittitas County (County) has broad coverage in its water bank for developable
lots in the County, as well as full back-mitigation for existing rural exempt users
through its implementation efforts frorn 2009 to 2019.In 2020, the County's goal
is to:
l. Expand parcel suitability in areas where significant development potential
remains and a mitigation project is likely to be successful.
Aspect Consulting, LLC (Aspect) has been assisting the County on water bank
implementation since 2014 and proposes to provide technical assistance as
follows:
Task 1: Upper Teanaway and Naenum Mitigation
Developable lots exist in these subbasins that, despite the County's best efforts,
do not have a likely full-season water right identified for acquisition and
mitigation. The County has developed options for mitigation in these locations by
collecting funds for in-lieu non-water right acquisition projects, and by paftnering
with local developers on a consumptive use recharge pilot. Potential exists to
develop regional aquifer recharge sites in the Teanaway and Naenum basins that
can mitigation for the remaining developable lots using a future cost-share with
those lot owners. Depending on local site conditions, opportunities rnay also exist
for instream flow enhancement goals as part of the Yakima Integrated Plan, and
funding from that source or the Streamflow Restoration Grant Program may exist
if the proof of concept can be demonstrated. To investigate the feasibility of
regional mitigation in these hard-to-serve areas, Aspect will:
A. Coordinate with the County to identify and describe potential priority
locations in the Upper Teanaway and Naenum basins.
B. Describe the ownership and access characteristics of these sites.
C. Use geologic and soil mapping to predict ranges of infiltration rates that could
be available in target locations.
D. Use analyticalmethods to estimate likely fate, transport, and timing of water
at the sites.
Aspect will complete
this work on a time-
and-materials basis,
not-to-exceed:
$ 10,000
CostDescription of Work
Bainbridge lsland Office:
Bellingham Office:
Bend Office:
Seattle Office:
Ponland Office:
Wenatchee Office:
Yakima Office:
350 Madison Avenue North, Bainbridge lsland, WA 981 10
907 Harris Avenue, Suite 301, Bellingham, WAgB225
532 SW 13th St., Ste. 103. Bend, OR 97702
710 2nd Ave. Suite 550, Seattle, WA 98104
522 SW Fifth Avenue, Suite 301, Portland, OR 97204
23 South Mission Street, Suite C, Wenatchee, WA 98801
123 East Yakima Avenue, Suite 200, Yakima. WA 98901
www.aspectco nsu lting.co m
(206) 780-9370
(360) 746-8964
(971 ) 865-5896
12061 328-7443
(971 ) 865-5890
(509) 888-5766
(509) 895-5957
Vt1 50338 Kittitas County General Permit Tech nical Assistance\Contracts\Proposal Material\CC27-20200203-1 50338-KittitasCountyNan eum
RechargeSite.docx
Change Order No. 27
Project No. 15033 8
E. Provide example water budgets for typical Package A and Package B
mitigation requirements.
Aspect will summarize its findings in a technical memo and meet with the
County. The goal is to provide foundational proofofconcept support at these sites
for one or more grant applications inthe 2021funding cycle for a pilot
demonstration project. Aspect will complete this work on a time-and-materials
basis, not to exceed $10,000.
This change amends contract between Aspect Consulting, LLC and Client dated November 6,2013 and
incorporates the attached Schedule of Charges. Except as amended above, all terms and conditions of
contract apply to this contract change.
By:
Printed Name: DanielR. Haller, PE
Principal Water Resoulc&s Engineer
YakimaOffice:
ASPECT CONSULTING, LLC
a limited liabilitl, company
CLIENT ,-yyl tPrinted Name/Date:
By:
Page 2