HomeMy WebLinkAboutRes-2020-026BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION No.2o2o- 0 2b RESOLUTION TO AUTHORIZE CONTRACT AMENDMENT EXECUTION WHEREAS, Kittitas County and Contractor entered into a professional services contract on November 6,2013; and WHEREAS, section 12 of the contract authorizes modifications that are in writing and signed by the parties; and WHEREAS, both the County and the Contractor desire to amend the contract in the manner detailed in the attached Contract Change that is hereby incorporated by this reference; NOW THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Kittitas County, Washington, authorizes execution of the contract amendment attached hereto and incorporated herein. DATED this tgtu day of 2020, at Ellensburg, Washington. BOARD OF IONERS Commissioner A of the [J Deputy Clerk of Board \Aspecl fao*trrrtNG Contract Change Contract No.: 27 Project No.: 150338 Date: February 3,2020 Client: Kittitas County Project Name: Potential Aquifer Recharge Site - Naneurn Kittitas County (County) has broad coverage in its water bank for developable lots in the County, as well as full back-mitigation for existing rural exempt users through its implementation efforts frorn 2009 to 2019.In 2020, the County's goal is to: l. Expand parcel suitability in areas where significant development potential remains and a mitigation project is likely to be successful. Aspect Consulting, LLC (Aspect) has been assisting the County on water bank implementation since 2014 and proposes to provide technical assistance as follows: Task 1: Upper Teanaway and Naenum Mitigation Developable lots exist in these subbasins that, despite the County's best efforts, do not have a likely full-season water right identified for acquisition and mitigation. The County has developed options for mitigation in these locations by collecting funds for in-lieu non-water right acquisition projects, and by paftnering with local developers on a consumptive use recharge pilot. Potential exists to develop regional aquifer recharge sites in the Teanaway and Naenum basins that can mitigation for the remaining developable lots using a future cost-share with those lot owners. Depending on local site conditions, opportunities rnay also exist for instream flow enhancement goals as part of the Yakima Integrated Plan, and funding from that source or the Streamflow Restoration Grant Program may exist if the proof of concept can be demonstrated. To investigate the feasibility of regional mitigation in these hard-to-serve areas, Aspect will: A. Coordinate with the County to identify and describe potential priority locations in the Upper Teanaway and Naenum basins. B. Describe the ownership and access characteristics of these sites. C. Use geologic and soil mapping to predict ranges of infiltration rates that could be available in target locations. D. Use analyticalmethods to estimate likely fate, transport, and timing of water at the sites. Aspect will complete this work on a time- and-materials basis, not-to-exceed: $ 10,000 CostDescription of Work Bainbridge lsland Office: Bellingham Office: Bend Office: Seattle Office: Ponland Office: Wenatchee Office: Yakima Office: 350 Madison Avenue North, Bainbridge lsland, WA 981 10 907 Harris Avenue, Suite 301, Bellingham, WAgB225 532 SW 13th St., Ste. 103. Bend, OR 97702 710 2nd Ave. Suite 550, Seattle, WA 98104 522 SW Fifth Avenue, Suite 301, Portland, OR 97204 23 South Mission Street, Suite C, Wenatchee, WA 98801 123 East Yakima Avenue, Suite 200, Yakima. WA 98901 www.aspectco nsu lting.co m (206) 780-9370 (360) 746-8964 (971 ) 865-5896 12061 328-7443 (971 ) 865-5890 (509) 888-5766 (509) 895-5957 Vt1 50338 Kittitas County General Permit Tech nical Assistance\Contracts\Proposal Material\CC27-20200203-1 50338-KittitasCountyNan eum RechargeSite.docx Change Order No. 27 Project No. 15033 8 E. Provide example water budgets for typical Package A and Package B mitigation requirements. Aspect will summarize its findings in a technical memo and meet with the County. The goal is to provide foundational proofofconcept support at these sites for one or more grant applications inthe 2021funding cycle for a pilot demonstration project. Aspect will complete this work on a time-and-materials basis, not to exceed $10,000. This change amends contract between Aspect Consulting, LLC and Client dated November 6,2013 and incorporates the attached Schedule of Charges. Except as amended above, all terms and conditions of contract apply to this contract change. By: Printed Name: DanielR. Haller, PE Principal Water Resoulc&s Engineer YakimaOffice: ASPECT CONSULTING, LLC a limited liabilitl, company CLIENT ,-yyl tPrinted Name/Date: By: Page 2