My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-024 Bullfrog Rd
>
Meetings
>
2020
>
02. February
>
2020-02-04 10:00 AM - Commissioners' Agenda
>
Res-2020-024 Bullfrog Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:43:16 AM
Creation date
2/12/2020 10:43:11 AM
Metadata
Fields
Template:
Meeting
Date
2/4/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution to Authorize the Addition of Bullfrog Road Repaving to the 2020 Annual Construction Program and Assign a County Road Project Number
Order
16
Placement
Consent Agenda
Row ID
59667
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 300-20 JOB NO: RC2002-ST <br />IT IS HEREBY RESOLVED Bullfrog Road #92275 MP 0.00-2.70 <br />Bullfrog Road is currently experiencing significant pavement failure creating a hazard for the traveling public. Work will <br />include milling the existing roadway and overlaying with hot mix asphalt to provide a new roadway surface for Bullfrog <br />Road. <br />ARTERIAL ❑ <br />ACCESS IZ_ <br />This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36 75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 200,000 <br />CONSTRUCTION ENGINEERING <br />$ 25,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />$ 250,000 <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 1,300,000 <br />SUB -TOTAL <br />$ 1,300,000 <br />TOTAL PROJECT COST <br />$ 1,525,000 <br />GRANTOR OTHER FUNDS <br />Grant Source: STBG <br />$ 650,000 <br />1,s <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />925,000 <br />Mark Cook, P.E. <br />Interim County Engineer <br />Cj THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT #11 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />>� THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCItl RCW 36.77.020 ET.SEQ. <br />11 �l . • .. �'+ FI <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCO�NA CORDAIVC�UDfYTH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this q "_) day of -C �` L 2020. 4 j r O <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY„•WASHING N <br />�_' <br />- <br />Brett W c sm Chair <br />g:\base\forms\eng\crp-frm 1/28/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.