HomeMy WebLinkAboutRes-2020-023 Vantage Highway ProjectBOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 - 0 � 3
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS FOR THE VANTAGE HIGHWAY
PROJECT, CRP 298-19
WHEREAS: The Vantage Highway Project Federal funds (HSIP) will be used to install
and upgrade non-compliant guardrail, and protect hazardous slopes along
Vantage Highway MP 21.25 — MP 27.51; and
WHEREAS: This project will be tied with a Rural Arterial Program project, which will
repair and provide an asphalt overlay on all lanes of Vantage Highway to
build surface depth and structural capacity at the same location; and
WHEREAS: In preparation to advertise the project for design in the spring of 2020
Public Works is requesting the Washington State Department of
Transportation to release the Federal Funds for design; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the Vantage
Highway Project, CRP 298-19.
DATED on this 4th day of February, 2020, at Ellensburg, Washington.
Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
f
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY,,,WASHINGTON
Chairman
Vice -Chairman
Cory Wright, Commissioner
Washington State
Adw
MPDepartment of Transportation
Local Agency Federal Aid
Project Prospectus
Prefix Route ( ) Date 1/16/2020
Federal Aid
Pro ect Number HSIP 2020 DUNS Number 01-020-2547
�
LocalAgency CRP 298-19 RC 1913 i WSDO y 1 Federal Employer 91-601349
Project Number ` Use Onl J Tax ID Number
Agency CA Agency Federal Program Title
Kittitas County Yes ❑ No ❑✓ 20.205 Other
Project Title Start Latitude N 46°57'31.23" Start Longitude W 120° 7'22.99"
Vantage Highway End Latitude N 46°56'56.04" End Longitude W 119059'44.22"
Project Termini From -To Nearest City Name Project Zip Code (+4)
21.25 27.51 Ellensburg 98950-AO21
Begin Mile Post End Mile Post Length of Project Award Type
21.25 27.51 _ 6.26 Miles ❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
21.25 27.51 19 Kittitas
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
South Central Region 13 8
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar) Nearest Hundred Dollar Nearest Hundred Dollar) Month Year
P. E. 355,343 252,943 102,400 March 2020
R/W
10
0
0
Const.
3,104,887
2,052,687
1,052,200
April 2021
Total
13,460,230
2,305,630
1,154,600
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
MP 21.25-23.36 = 38', MP 23.36-27.51=26'
MP 21.25-23.36 = 3 lanes, MP 23.36-27.51 = 2 lanes
The segment has non compliant guardrail, and many hazardous slopes. This segment shows HMA distress in
the form of transverse and longitudinal cracking, with significant annual maintenance and repair costs.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
HMA repair and an asphalt overlay on all lanes in an attempt to build surface depth and structural capacity.
Federal funds will be used to install/upgrade guardrail.
Local Agency Contact Person Title Phone
Darren Case Construction Manager (509)962-7523
Mailing Address City State Zip Code
411 N Ruby St, Suite 1 Ellensburg WA 98926
By
Approving. Authority
Project Prospectus
Title County Engineer/Public Works Director
DgW'V
007 Form 140-101 Y$Sg
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County
Vantage Highway
1/16/2020
Type of Proposed Work
Project Type (Check all that Apply)
Roadway
Width Number of Lanes
❑ New Construction ❑ Path / Trail ❑ 3-R 26-38
2-3
0 Reconstruction ❑ Pedestrian / Facilities ❑ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban ❑ Minor Arterial
❑ Urban ❑ Minor Arterial
Functional
❑✓ Rural ❑ Collector
E]MajorMajor Collector
❑ Rural ❑ Collector
El major Collector
Classification
E] NHS
0 Minor Collector
❑
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
❑ Flat ❑ Roll 0 Mountain
Flat ❑ Roll ❑ Mountain
Posted Speed
50
Design Speed
50
Existing ADT
586
Design Year ADT
Design Year 2020
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Kittitas County Public Works / Consultant
Construction Will Be Performed By
Contractor
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Revised 04/2015
Others
80 %
Contract
100
0 Class II - Categorically Excluded (CE)
❑✓ Projects Requiring Documentation
(Documented CE)
Previous Editions Obsolete
Agency
20 %
Agency
Page 2
Agency
Kittitas County
Right of Way
Project Title
Vantage Highway
❑✓ No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation
contract can be accomplished
within the exiting right of way.
Railroad _
❑✓ No railroad work required
[:]All railroad work will be completed prior to the start of
the construction contract
❑ Relocation Req
Date
1/16/2020
Utilities
❑ No utility work required
❑✓ All utility work will be completed prior to the start
of the construction contract
❑ All utility work will be completed incoordination I ❑ All the railroad work will be completed incoordination
with the construction contract _ with the construction contract J
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utility adjustments needed will be identified when survey and preliminary design are done. The utility
companies will be notified of the conflicts and be required to either temporarily move or relocate their utility
out of the projects way prior to construction. It is anticipated that this will include communication and fiber
optic buried lines in conflict with guardrail post locations.
FAA Involvement
I Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No
FiRemarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agent ittita County P I is W
Date �� J ��G� By -
ayorlCh airpersen
DOT Form 140-101 Page 3
Revised 04/2015 Previous Editions Obsolete