My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_CRP_Bullfrog Road
>
Meetings
>
2020
>
02. February
>
2020-02-04 10:00 AM - Commissioners' Agenda
>
Resolution_CRP_Bullfrog Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 1:18:52 PM
Creation date
1/30/2020 1:18:49 PM
Metadata
Fields
Template:
Meeting
Date
2/4/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution to Authorize the Addition of Bullfrog Road Repaving to the 2020 Annual Construction Program and Assign a County Road Project Number
Order
16
Placement
Consent Agenda
Row ID
59667
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: February 4, 2020 <br />ACTION REQUESTED: Request to Approve a Resolution to Authorize the Addition <br />of Bullfrog Road Repaving to the 2020 Annual <br />Construction Program and Assign a County Road Project <br />Number <br />BACKGROUND: In early December 2019, significant roadway deterioration <br />became apparent along the entire length of Bullfrog Road. <br />Staff has filled nearly 100 potholes in the past several <br />months and recently the Board reduced the speed limit to <br />35 MPH along the entire roadway — minimizing ongoing <br />damage to vehicles. Public Works anticipates grinding <br />(milling) the existing roadway surface and then placing a <br />new two-inch asphalt overlay along the entire length of <br />Bullfrog Road. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Approve the Resolution to authorize the addition of <br />Bullfrog Road Pavement Repaving to the 2020 Annual <br />Construction Program and assign a County Road Project <br />Number. <br />HANDLING: Return one original to Public Works <br />ATTACHMENTS: Resolution <br />LEAD STAFF: Mark R. Cook, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.