HomeMy WebLinkAboutRes-2019-160 OverlayRESOLUTION NO. d O I c:;-I ft:; 0 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF. KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 298-19 JOB NO: RC1913-I1 IT IS HEREBY RESOLVED that the Vantage Highway Overlay MP 21.25 -MP 27.51 Vantage Highway (MP 21.25 -MP 27.51) received damage to the roadbed during windmill farm installation efforts. Public Works has annually repaired rutting and asphalt failure since wind farm operations began several years _ago. Work will include an overlay of hot mix asphalt to provide a structural base for Vantage Highway. A companion project is planned to replace guardrail in the road segment. ARTERIAL l8J ACCESS 0 This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: I PURPOSE PRELMINARY ENGINEERING CONSTRUCTION ENGINEERING RIGHT-OF-WAY ACQUISITION SUB-TOTAL County Forces CONSTRUCTION CONTRACT CONSTRUCTION SUB-TOTAL TOTAL PROJECT COST GRANT OR OTHER FUNDS Grant Source: RAP/HSIP TOTAL COUNTY ROAD FUND ALLOCATION AMOUNT TOTALS $ 175,000 $ 25,000 $ 60,000 $ 260 ,000 $ $ 2,400 ,000 $ 2,400,000 $ 2,660_,000 $ 2,194,259 $ 475 ,741 7'~·---":?~ v ,a,c Mark Cook, P.E. Interim County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS ITEM NO. 6 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 [8] D IT IS FURTHER RESOLVED THAT: BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ~hair g:\base\forms\eng\crp-frm 10/28/2019