HomeMy WebLinkAboutResolutionDickeyCreekBridgeProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: November 5, 2019 ACTION REQUESTED: Request to Approve the Resolution Authorizing the replacement of the bridge crossing Dickey Creek #16203 on North Fork Teanaway Road MP 2.84- 2.85. BACKGROUND: The Dickey Creek Bridge is functionally obsolete and currently load restricted. Funding has been authorized by the Federal Land Access Program for this project in the amount of $3,191,000. Public Works will replace the current bridge with a wider, longer structure that will safely provide access and reduce flood impacts while restoring the natural river process. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the replacement of the Dickey Creek Bridge #16203. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, CRP No 295-19 LEAD STAFF: Mark Cook, Director RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 295-19 JOB NO: RC2090-FL IT IS HEREBY RESOLVED that the Dickey Creek Bridge #16203 Replacement mile post 2.84-2.85; is established. The Dickey Creek Bridge is functionally obsolete and currently load restricted. The project will replace the bridge with a wider and longer structure that will safely provide access for all vehicles, bicyclists, and pedestrians, while reducing flood impacts and restoring natural river processes. ARTERIAL ❑ ACCESS This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELIMINARY ENGINEERING $ 560,000 CONSTRUCTION ENGINEERING $ 100,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL F3,029,0000 Count Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 3,029,000 SUB -TOTAL $ TOTAL PROJECT COST $ 3,689,000 GRANT OR OTHER FUNDS $ 3,191,000 Grant Source: FLAP Is TOTAL COUNTY ROAD FUND ALLOCATION 498,000 Mark Cook, P.E. Interim County Engineer ® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS ITEM NO. 10 ❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of , 2019. Attest: BOARD OF COUNTY COMMISSIONERS ;Clerk of the Board KITTITAS COUNTY, WASHINGTON Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner g:\base\forms\eng\orp-frm 10/28/2019