HomeMy WebLinkAboutResolutionVantageHwyColemanCreekProjectKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: November 5, 2019
ACTION REQUESTED: Request to Approve the Resolution Authorizing the
replacement of the Vantage Highway Coleman
Creek culvert.
BACKGROUND: The Coleman Creek culvert at Vantage Highway
(MP 3.87- MP 4.27) is a barrier to fish passage. This
project follows other fish barrier removal projects
in the same watershed and is primarily funded by
the Washington State Department of Recreation
and Conservation. Public Works will replace the
existing culvert with a fish passage structure.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the
replacement of the Vantage Highway Coleman
Creek culvert.
HANDLING: Return two (1) originals to Public Works
ATTACHMENTS: Resolution; CRP No 299-19
LEAD STAFF: Mark Cook, Director
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
CRP NO: 299-19 JOB NO: RC1990-FP
IT IS HEREBY RESOLVED that the VANTAGE HIGHWAY AT COLEMAN CREEK MP 3.87 - MP 4.27
Vantage Highway provides a regionally significant east -west connection through the lower county, providing access to
recreation, ranching and farming areas, and growing residential areas. The current structure is a fish barrier and must be
removed to provide fish passage upstream. This project follows other fish barrier removal projects in the same
watershed. Kittitas County Public Works will replace the culvert carrying Coleman Creek under Vantage Highway with a
larger culvert or bridge structure to allow fish passage.
ARTERIAL
ACCESS ❑
This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby
ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of
Public Works' estimate, is hereby made in the amounts and for the purposes shown:
PURPOSE
AMOUNT
TOTALS
PRELMINARY ENGINEERING
$ 255,000
CONSTRUCTION ENGINEERING
$ 25,000
RIGHT-OF-WAY ACQUISITION
$ 20,000
SUB -TOTAL
$ 300,000
Count Forces CONSTRUCTION
$
CONTRACT CONSTRUCTION
$ 1,336,565
SUB -TOTAL
$ 1,336,565
TOTAL PROJECT COST
$ 1,636,565
GRANT OR OTHER FUNDS
$ 1,336,080
is
Grant Source: RCO
TOTAL COUNTY ROAD FUND ALLOCATION
300,485
Mark Cook, P.E.
Interim County Engineer
® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM AS
ITEM NO. 7
❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN
ACCORDANCE WITH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ.
❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND
WAC 136-18.
ADOPTED this day of , 2019. Attest
BOARD OF COUNTY COMMISSIONERS I Clerk of the Board
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner
g:\base\forms\en&rp-frm 1 012 812 01 9