Loading...
HomeMy WebLinkAbout2019_KittitasCountyHMP_Volume2_For Adoption2019 Kittitas County Hazard Mitigation Plan VOLUME 2: PLANNING PARTNER ANNEXES Kittitas County Public Works Department January 2019 Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes January 2019 Kittitas County HAZARD MITIGATION PLAN VOLUME 2: PLANNING PARTNER ANNEXES JANUARY 2019 Prepared for: Kittitas County 205 West 5th Avenue, Suite 108 Ellensburg, Washington 98926 Prepared by: Dewberry 8401 Arlington Blvd Fairfax, VA 22031 Jacobs Engineering Inc. 32 North 3rd Street, Suite 304 Yakima, WA 98901 Cover Photo Credits: Bottom-left photo: Washington Department of Natural Resources Top-left and bottom-right photos: Kittitas County Conservation District Top-right photo: Kittitas County i Kittitas County Hazard Mitigation Plan; Volume 2—Planning Partner Annexes TABLE OF CONTENTS PART 1— INTRODUCTION ................................................................................................ 1 Chapter 1. Planning Partner Participation ............................................................................... 1 1.1. Background ............................................................................................................................................ 1 1.2. The Planning Partnership ....................................................................................................................... 1 1.3. Annex-Preparation Process .................................................................................................................... 2 1.4. Final Coverage Under the Plan .............................................................................................................. 4 1.5. Acronyms ............................................................................................................................................... 5 PART 2— ANNEXES FOR MUNICIPALITIES .................................................................... 1 Chapter 2. Unincorporated Kittitas County Annex ................................................................. 1 2.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 2.2. Jurisdiction Profile ................................................................................................................................. 1 2.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 2.4. Hazard Risk Ranking ............................................................................................................................. 2 2.5. Capability Assessment ........................................................................................................................... 2 2.6. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 3 2.7. Future Needs to Better Understand Risk/Vulnerability ......................................................................... 3 2.8. Hazard Area Extent and Location .......................................................................................................... 3 Chapter 3. City of Cle Elum Annex .......................................................................................... 1 3.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 3.2. Jurisdiction Profile ................................................................................................................................. 1 3.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 3.4. Hazard Risk Ranking ............................................................................................................................. 2 3.5. Capability Assessment ........................................................................................................................... 2 3.6. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 3 3.7. Hazard Area Extent and Location .......................................................................................................... 3 Chapter 4. City of Ellensburg Annex ....................................................................................... 1 4.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 4.2. Jurisdiction Profile ................................................................................................................................. 1 4.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 3 4.4. Hazard Risk Ranking ............................................................................................................................. 3 4.5. Capability Assessment ........................................................................................................................... 3 4.6. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 4 4.7. Future Needs to Better Understand Risk/Vulnerability ......................................................................... 4 4.8. Additional Comments ............................................................................................................................ 4 4.9. Hazard Area Extent and Location .......................................................................................................... 5 Chapter 5. City of Roslyn Annex .............................................................................................. 1 5.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 5.2. Jurisdiction Profile ................................................................................................................................. 1 TABLE OF CONTENTS ii 5.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 5.4. Hazard Risk Ranking ............................................................................................................................. 2 5.5. Capability Assessment ........................................................................................................................... 3 5.6. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 3 5.7. Future Needs to Better Understand Risk/Vulnerability ......................................................................... 3 5.8. Hazard Area Extent and Location .......................................................................................................... 3 Chapter 6. Town of South Cle Elum ......................................................................................... 1 6.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 6.2. Jurisdiction Profile ................................................................................................................................. 1 6.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 6.4. Hazard Risk Ranking ............................................................................................................................. 2 6.5. Capability Assessment ........................................................................................................................... 2 6.6. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 2 PART 3— FIRE AND RESCUE DISTRICT ANNEXES ....................................................... 1 Chapter 7. Fire District #1 Annex ............................................................................................. 1 7.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 7.2. Jurisdiction Profile ................................................................................................................................. 1 7.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 7.4. Hazard Risk Ranking ............................................................................................................................. 2 7.5. Applicable Regulations and Plans .......................................................................................................... 2 7.6. Classification in Hazard Mitigation Programs ....................................................................................... 2 7.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 2 Chapter 8. Fire District #7 Annex ............................................................................................. 1 8.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 8.2. Jurisdiction Profile ................................................................................................................................. 1 8.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 3 8.4. Hazard Risk Ranking ............................................................................................................................. 3 8.5. Applicable Regulations and Plans .......................................................................................................... 3 8.6. Classification in Hazard Mitigation Programs ....................................................................................... 3 8.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 3 8.8. Future Needs to Better Understand Risk/Vulnerability ......................................................................... 3 8.9. Additional Comments ............................................................................................................................ 4 Chapter 9. Fire District #51 Annex ........................................................................................... 1 9.1. Hazard Mitigation Plan Point of Contact ............................................................................................... 1 9.2. Jurisdiction Profile ................................................................................................................................. 1 9.3. Jurisdiction-Specific Natural Hazard Event History .............................................................................. 2 9.4. Hazard Risk Ranking ............................................................................................................................. 2 9.5. Applicable Regulations and Plans .......................................................................................................... 2 9.6. Classification in Hazard Mitigation Programs ....................................................................................... 3 9.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ....................................... 3 9.8. Future Needs to Better Understand Risk/Vulnerability ......................................................................... 3 PART 4— UTILITY DISTRICT ANNEXES .......................................................................... 1 Chapter 10. Snoqualmie Pass Utility District Annex .............................................................. 1 10.1. Hazard Mitigation Plan Point of Contact ............................................................................................. 1 10.2. Jurisdiction Profile ............................................................................................................................... 1 10.3. Jurisdiction-Specific Natural Hazard Event History ............................................................................ 2 TABLE OF CONTENTS iii 10.4. Hazard Risk Ranking ........................................................................................................................... 2 10.5. Applicable Regulations and Plans ........................................................................................................ 2 10.6. Classification in Hazard Mitigation Programs ..................................................................................... 2 10.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ..................................... 2 Chapter 11. Kittitas PUD #1 Annex .......................................................................................... 1 11.1. Hazard Mitigation Plan Point of Contact ............................................................................................. 1 11.2. Jurisdiction Profile ............................................................................................................................... 1 11.3. Jurisdiction-Specific Natural Hazard Event History ............................................................................ 2 11.4. Hazard Risk Ranking ........................................................................................................................... 2 11.5. Applicable Regulations and Plans ........................................................................................................ 2 11.6. Classification in Hazard Mitigation Programs ..................................................................................... 3 11.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ..................................... 3 PART 5— SCHOOL DISTRICT ANNEXES ......................................................................... 1 Chapter 12. Kittitas School District #403 Annex ..................................................................... 1 12.1. Hazard Mitigation Plan Point of Contact ............................................................................................. 1 12.2. Jurisdiction Profile ............................................................................................................................... 1 12.3. Jurisdiction-Specific Natural Hazard Event History ............................................................................ 2 12.4. Hazard Risk Ranking ........................................................................................................................... 2 12.5. Applicable Regulations and Plans ........................................................................................................ 2 12.6. Classification in Hazard Mitigation Programs ..................................................................................... 2 12.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ..................................... 2 Chapter 13. Cle Elum – Roslyn School District #404 Annex .................................................. 1 13.1. Hazard Mitigation Plan Point of Contact ............................................................................................. 1 13.2. Jurisdiction Profile ............................................................................................................................... 1 13.3. Jurisdiction-Specific Natural Hazard Event History ............................................................................ 2 13.4. Hazard Risk Ranking ........................................................................................................................... 2 13.5. Applicable Regulations and Plans ........................................................................................................ 2 13.6. Classification in Hazard Mitigation Programs ..................................................................................... 3 13.7. Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives ..................................... 3 PART 6— CONSERVATION DISTRICT ANNEXES ........................................................... 1 Chapter 14. Kittitas County Conservation District Annex ...................................................... 2 14.1. Hazard Mitigation Plan Point of Contact ............................................................................................. 2 14.2. Jurisdiction Profile ............................................................................................................................... 2 14.3. Kittitas County Conservation District Natural Hazard History ........................................................... 3 14.4. Hazard Risk Ranking ........................................................................................................................... 4 14.5. Capability Assessment ......................................................................................................................... 4 14.6. Hazard Mitigation Action Plan and Evaluation of recommended Initiatives ...................................... 4 14.7. Future Needs to Better Understand Risk/Vulnerability ....................................................................... 4 Appendices A. Planning Partner Expectations B. Procedures for Linking to the Hazard Mitigation Plan C. Jurisdictional Annex Instructions and Template for Municipalities D. Jurisdictional Annex Instructions and Template for Special-Purpose Districts Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 1— INTRODUCTION 1 Chapter 1. Planning Partner Participation 1.1. BACKGROUND The Federal Emergency Management Agency (FEMA) encourages multi-jurisdictional planning for hazard mitigation. Such planning efforts require all participating jurisdictions to fully participate in the process and formally adopt the resulting planning document. Chapter 44 of the Code of Federal Regulations (44 CFR) states: “Multi-jurisdictional plans (e.g. watershed plans) may be accepted, as appropriate, as long as each jurisdiction has participated in the process and has officially adopted the plan.” (Section 201.6.a(4)) In the preparation of the Kittitas County Hazard Mitigation Plan, a Planning Partnership was formed to leverage resources and to meet requirements of the federal Disaster Mitigation Act of 2000 (DMA) for as many eligible local governments in Kittitas County as possible. The DMA defines a local government as follows: “Any county, municipality, city, town, township, public authority, school district, special district, intrastate district, council of governments (regardless of whether the council of governments is incorporated as a nonprofit corporation under State law), regional or interstate government entity, or agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or Alaska Native village or organization; and any rural community, unincorporated town or village, or other public entity.” There are two types of Planning Partners in this process, with distinct needs and capabilities: incorporated municipalities (cities and the County); and special purpose districts. 1.2. THE PLANNING PARTNERSHIP Initial Solicitation and Letters of Intent The planning team solicited the participation of the County and all County-recognized special purpose districts at the outset of this project. All eligible local governments and special purpose districts in the planning area were invited to participate. All interested local governments were provided with a list of planning partner expectations developed by the planning team and were informed of the obligations required for participation. Local governments wishing to join the planning effort were asked to provide the planning team with a “letter of intent to participate” that agreed to the planning partner expectations (see Appendix A) and designated a point of contact for their jurisdiction. In all, formal commitment was received from 13 planning partners by the planning team, and the Kittitas County Planning Partnership was formed. Maps for each participating city are provided in the individual annex for that city. These maps will be updated periodically as changes to the partnership occur, either through linkage or by a partner dropping out due to a failure to participate. Planning Partner Expectations The planning team developed the following list of planning partner expectations, which were confirmed at the kickoff meeting: – Each partner will provide a “Letter of Intent to Participate.” CHAPTER 1. PLANNING PARTNER PARTICIPATION 2 – Each partner will support and participate in the selection and function of the Steering Committee overseeing the development of the plan. Support includes allowing this body to make decisions regarding plan development and scope on behalf of the partnership. – Each partner will provide support for the public involvement strategy developed by the Steering Committee in the form of mailing lists, possible meeting space, and media outreach such as newsletters, newspapers or direct-mailed brochures. – Each partner will participate in plan development activities such as Steering Committee meetings, public meetings or open houses, workshops and planning partner training sessions, and public review and comment periods prior to adoption. Attendance will be tracked at such activities, and attendance records will be used to track and document participation for each planning partner. No minimum level of participation will be established, but each planning partner should attempt to attend all such activities. – Each partner will be expected to perform a “consistency review” of all technical studies, plans, and ordinances specific to hazards identified within the planning area to determine the existence of plans, studies or ordinances not consistent with the equivalent documents reviewed in preparation of the County plan. For example: if a planning partner has a fl oodplain management plan that makes recommendations that are not consistent with any of the County’s basin plans, that plan will need to be reviewed for probable incorporation into the plan for the partner’s area. – Each partner will be expected to review the risk assessment and identify hazards and vulnerabilities specific to its jurisdiction. Contract resources will provide jurisdiction-specific mapping and technical consultation to aid in this task, but the determination of risk and vulnerability will be up to each partner. – Each partner will be expected to review the mitigation recommendations chosen for the overall county and determine if they will meet the needs of its jurisdiction. Projects within each jurisdiction consistent with the overall plan recommendations will need to be identified, prioritized and reviewed to determine their benefits and costs. – Each partner will be required to create its own action plan that identifies each project, who will oversee the task, how it will be financed and when it is estimated to occur. – Each partner will be required to sponsor at least one public meeting to present the draft plan at least two weeks prior to adoption. – Each partner will be required to formally adopt the plan. It should be noted that by adopting this plan, each planning partner also agrees to the plan implementation and maintenance protocol established in Volume 1. Failure to meet these criteria may result in a partner being dropped from the partnership by the Steering Committee, and thus losing eligibility under the scope of this plan. Linkage Procedures Eligible local jurisdictions that did not participate in development of this hazard mitigation plan may comply with DMA requirements by linking to this plan following the procedures outlined in Appendix B. 1.3. ANNEX-PREPARATION PROCESS Templates Templates were created to help the Planning Partners prepare their jurisdiction-specific annexes. Since special purpose districts operate differently from incorporated municipalities, separate templates were CHAPTER 1. PLANNING PARTNER PARTICIPATION 3 created for the two types of jurisdictions. The templates were created so that all criteria of Section 201.6 of 44 CFR would be met, based on the partners’ capabilities and mode of operation. Each partner was asked to participate in a technical assistance workshop during which key elements of the template were completed by a designated point of contact for each partner and a member of the planning team. The templates were set up to lead each partner through a series of steps that would generate the DMA -required elements that are specific for each partner. The templates and their instructions can be found in Appendices C and D to this volume of the hazard mitigation plan. Workshop Workshops were held for Planning Partners to learn about the templates and the overall planning process. Topics included the DMA, the Kittitas County plan background, the templates, risk ranking, developing the action plan, and cost/benefit review. In the writing of this plan, separate sessions were held for special purpose districts and municipalities, in order to address each type of partner’s needs. The sessions provided technical assistance and an overview of the template completion process. Attendance at this workshop was mandatory under the planning partner expectations established by the Steering Committee. There was 95-percent attendance of the partnership at these sessions. During the 2019 update process, individual meetings were held with each participating jurisdiction to update each annex. In the risk-ranking exercise, each planning partner was asked to rank each risk specifically for its jurisdiction, based on the impact on its population or facilities. Cities were asked to base this ranking on probability of occurrence and the potential impact on people, property and the economy. Special purpose districts were asked to base this ranking on probability of occurrence and the potential impact on their constituency, their vital facilities and the facilities’ functionality after an event. The methodology followed that used for the countywide risk ranking presented in Volume 1. A principal objective of this exercise was to familiarize the partnership with how to use the risk assessment as a tool to support other planning and hazard mitigation processes. Tools utilized during these sessions included the following: – The Kittitas County risk assessment results – Hazard maps for all hazards of concern – Special district boundary maps that illustrated the sphere of influence for each special purpose district partner – Hazard mitigation catalogs • Federal funding and technical assistance catalogs Prioritization 44 CFR requires actions identified in the action plan to be prioritized (Section 201.c.3.iii). The planning team and steering committee developed a methodology for prioritizing the action plans that meets the needs of the partnership and the requirements of 44 CFR. The actions were prioritized according to the following criteria: – High Priority—Project meets multiple plan objectives, benefits exceed cost, funding is secured under existing programs, or is grant eligible, and project can be completed in 1 to 5 years (i.e., short term project) once funded. – Medium Priority—Project meets at least 1 plan objective, benefits exceed costs, requires special funding authorization under existing programs, grant eligibility is questionable, and project can be completed in 1 to 5 years once funded. CHAPTER 1. PLANNING PARTNER PARTICIPATION 4 – Low Priority—Project will mitigate the risk of a hazard, benefits exceed costs, funding has not been secured, project is not grant eligible, and time line for comp letion is long term (5 to 10 years). These priority definitions are dynamic and can change from one category to another based on changes to a parameter such as availability of funding. For example, a project might be assigned a medium priority because of the uncertainty of a funding source, but be changed to high once a funding source has been identified. The prioritization schedule for this plan will be reviewed and updated as needed annually through the plan maintenance strategy. Benefit/Cost Review 44 CFR requires the prioritization of the action plan to emphasize a benefit/cost analysis of the proposed actions. Because some actions may not be implemented for up to 10 years, benefit/cost analysis was qualitative and not of the detail required by FEMA for project grant eligibility under the Hazard Mitigation Grant Program (HMGP) and Pre-Disaster Mitigation (PDM) grant program. A review of the apparent benefits versus the apparent cost of each project was performed. Parameters were established for assigning subjective ratings (high, medium, and low) to costs and benefits as follows: – Cost ratings: – High—Existing funding levels are not adequate to cover the costs of the proposed action; implementation would require an increase in revenue through an alternative s ource (for example, bonds, grants, and fee increases). – Medium—The action could be implemented with existing funding but would require a re- apportionment of the budget or a budget amendment, or the cost of the action would have to be spread over multiple years. – Low—The action could be funded under the existing budget. The action is part of or can be part of an existing, ongoing program. – Benefit ratings: – High—The action will have an immediate impact on the reduction of risk exposure to life and property. – Medium—The action will have a long-term impact on the reduction of risk exposure to life and property or will provide an immediate reduction in the risk exposure to property. – Low—Long-term benefits of the action are difficult to quantify in the short term. Using this approach, projects with positive benefit versus cost ratios (such as high over high, high over medium, medium over low, etc.) are considered cost-beneficial and are prioritized accordingly. It should be noted that for many of the strategies identified in this action plan, funding might be sought under FEMA’s HMGP or PDM programs. Both of these programs require detailed benefit/cost analysis as part of the application process. These analyses will be performed on projects at the time of application preparation. The FEMA benefit-cost model will be used to perform this review. For projects not seeking financial assistance from grant programs that require this sort of analysis, the Partners reserve the right to define “benefits” according to parameters that meet their needs and the goals and objectives of this plan. 1.4. FINAL COVERAGE UNDER THE PLAN Of the 19 committed planning partners, 12 fully met the participation requirements specified by the Steering Committee. The principal requirement not met by the other partners was completion of the jurisdictional annex template following the workshops. Eighteen of the partners attended the workshop, but only 12 subsequently submitted completed templates. Only those 12 jurisdictions are included in this volume and CHAPTER 1. PLANNING PARTNER PARTICIPATION 5 will seek DMA compliance under this plan. The remaining jurisdictions will need to follow the linkage procedures described in Appendix B of this volume. Table 1-1 lists the jurisdictions that submitted letters of intent and their ultimate status in this plan. Table 1-1. Planning Partner Status Jurisdiction Letter of Intent Attended Workshop? Completed Template? Will Be Covered by This Plan? Kittitas County Yes Yes Yes Yes City of Cle Elum Yes Yes Yes Yes City of Ellensburg Yes Yes Yes Yes City of Roslyn Yes Yes Yes Yes Town of South Cle Elum Yes Yes Yes Yes Fire District #1 Yes Yes Yes Yes Fire District #7 Yes Yes Yes Yes Fire District #51 Yes Yes Yes Yes Snoqualmie Pass Utility District Yes Yes Yes Yes Kittitas PUD #1 Yes Yes Yes Yes Kittitas School District #403 Yes Yes Yes Yes Cle Elum – Roslyn School District #404 Yes Yes Yes Yes Kittitas County Conservation District Yes Yes Yes Yes 1.5. ACRONYMS The following acronyms are used in this volume of the Kittitas County Hazard Mitigation Plan: – AFG: Assistance to Firefighters Grant – CDS: Community Development Services – CEMC: Cle Elum Municipal Code – CERSD: Cle Elum Roslyn School District – CWU: Central Washington University – ECC: Ellensburg City Code – FEMA: Federal Emergency Management Agency – FIS: Flood Insurance Study – GMA: Growth Management Act – HMGP: Hazard Mitigation Grant Program – KCC: Kittitas County Code – KCFD: Kittitas County Fire District – NOAA: National Oceanic and Atmospheric Administration – PDM: Pre-Disaster Mitigation Grant Program – PUD: Public utility district – RCW: Revised Code of Washington – SHELDUS: Spatial Hazard Events and Losses Database for the United States – SMP: Shoreline Management Plan – WDFW: Washington Department of Fish and Wildlife – WSDOT: Washington State Department of Transportation Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 2— ANNEXES FOR MUNICIPALITIES 1 Chapter 2. Unincorporated Kittitas County Annex 2.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Karen Hodges Department of Public Works 411 N Ruby Street, Suite 1 Ellensburg, WA 98926 Telephone: 509-962-7523 Email: karen.hodges@co.kittitas.wa.us Mark Cook, Director Department of Public Works 411 N Ruby Street, Suite 1 Ellensburg, WA 98926 Telephone: 509-962-7523 Email: mark.cook@co.kittitas.wa.us 2.2. JURISDICTION PROFILE The following is a summary of key information about Kittitas County and its history: Date of Incorporation— November 1883. Current Population— The population of Kittitas County was 46,205 as of July 1st, 2017 based on the US Census population estimates. Population Growth— Kittitas County was the fifth fastest growing county based on populations in the 2000 and 2010 census, with a growth rate of 2.3 percent. Between 2010 and 2017, Kittitas County experienced a 1.8 percent growth rate. Location and Description— Kittitas County is located in the center of Washington State. It is bounded to the west by the crest of the Cascade Range, separating Kittitas County from the Seattle/Puget Sound region. It is bounded to the north by the Wenatchee National Forest and Alpine Lakes Wilderness region. The eastern boundary is the Columbia River, separating Kittitas County and the agricultural lands of the Columbia Plateau region. Its southern boundary is the urban and agricultural region of the Yakima Valley. The county has a total area of 2,333 square miles, 36 square miles of which is water. Kittitas County has a diverse landscape, ranging from forested Alpine Lakes Wilderness and snow-capped Cascade Mountains in the north and west areas of the County to the scabland and cliff-lined canyons of the Columbia River and Yakima River in the east and south areas. In the valleys are rich farmlands that produce the County’s largest cash crop-timothy hay. Timothy hay is grown commercially by estimated 200-250 farmers on 25,000 to 30,000 acres of land at an estimated annual value of more than $30 million. Jurisdiction Vulnerability to Hazards— Unincorporated Kittitas County has an overall low vulnerability to avalanche, drought, and volcano hazards, and an overall high vulnerability to severe weather events. While many areas of Unincorporated Kittitas County are exposed to an avalanche hazard, vulnerability is relatively low due to minimal development in the Cascade Range. Based on the three dam failure scenarios used in this plan, 10% of the population and 6% of property is at risk of dam failure. The area has high exposure to earthquakes, and various earthquake scenarios result in losses up to 3% of building value. Unincorporated Kittitas County has 772 buildings (5% of assessed building value) located in the 100- or 500-year floodplain, and therefore a moderate vulnerability to flood events. It is the only jurisdiction within Kittitas County with buildings exposed to Landslide Hazard Areas. 365 buildings are exposed, which represent 3.6% of the area’s assessed value. The areas also has a high vulnerability to wildfires, with 34% of buildings exposed to the 0-30 Year Fire Interval. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 2 Brief History— The County was organized in November 1883 by the Washington Territorial Legislature. It was partitioned from what was then the northern part of Yakima County. There are numerous interpretations of the name, which is from the language of the Kittitas American Indians. According to one source, it “has been said to mean everything from ‘white chalk’ to ‘shale rock’ to ‘shoal people’ to ‘land of plenty.’ Most anthropologists and historians concede that each interpretation has some validity depending upon the particular dialect spoken.” Climate— Kittitas County has a wide range of annual precipitation: from 147 inches in western Kittitas County to 6 inches in eastern Kittitas County. The average seasonal snowfall varies from 434 inches each season at Snoqualmie Pass to less than 30 inches in eastern Kittitas County. Countywide, the average winter maximum temperature is around 30 degrees F and the average daily minimum temperature is around 20 degrees F. The lowest temperature on record, which occurred at Snoqualmie Pass on February 1, 1922, is –48 degrees F. In summer, the average maximum temperature is around 65 degrees F and the average daily minimum temperature is around 50 degrees F. The highest temperature, which occurred in Ellensburg on July 26, 1928, is 110 degrees. Governing Body Format— Kittitas County has three elected Commissioners who are empowered to set county policy, adopt laws, implement them, and, except for the responsibilities of other elected officials, carry out day-to-day operations of the County. Development Trends— With its proximity to the Seattle metropolitan area and vast supply of recreational land, Kittitas County has been called “Seattle’s backyard.” Most development in the Cle Elum area has been for recreation or second homes. Most of the development has occurred in mountainous and forested areas, and many hillsides have been cleared and roads constructed to provide access to these lands. The County has also seen a rise over the past decade of families buying houses in the Cle Elum area and commuting daily to the Seattle area. In the Ellensburg area, growth and development have been steady. Much development has been on the flat lands of the Kittitas Valley on what was previously farmland. 2.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 2-1 lists all past occurrences of natural hazards in the county. Repetitive loss records are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: 14 in Kittitas County, 3 of which are in unincorporated areas. – Number of Repetitive Flood Loss Properties that have been mitigated: 0 2.4. HAZARD RISK RANKING Table 2-2 presents the ranking of the hazards of concern. 2.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table 2-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 2-4. The assessment of the jurisdiction’s fiscal capabilities is presented in Table 2-5. Classifications under various community mitigation programs are presented in Table 2-6. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 3 2.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 2-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 2-8 identifies the priority for each initiative. Table 2-9 ummarizes the mitigation initiatives by hazard of concern and the six mitigation types. 2.7. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Kittitas County has prioritized the collection of LIDAR data, a nd will continue to do so in the future. Preliminary Flood Insurance Rate Maps (FIRMs) for Kittitas County were available at the time of the 2019 plan update. The County will continue to update flood maps and regulations with any updated FIRMs or other relevant flood data. The County will also prioritize updating data on critical facilities. This will include developing a process for collecting and maintaining the data, adopting a database to store the data, and coordinating with GIS staff to create geospatial records of the critical facilities. 2.8. HAZARD AREA EXTENT AND LOCATION Hazard area extent and location maps for the Kittitas County area are included in Volume 1 of this hazard mitigation plan. These maps are based on the best available data at the time of the preparation of this plan, and are considered to be adequate for planning purposes. Table 2-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment* Landslide 06/07/1970 A steep hillside about 7 miles northwest of Ellensburg tumbled down, tore out an irrigation flume, destroyed a half mile of roadway and pushed about 1,000 feet of the highway into the Yakima River. Landslide 08/28/1971 N/A Severe Storms And Flooding (DR-492) 12/13/1975 N/A Drought 3/31/1977 N/A Severe Storms, Mudslides, & Flooding (DR-545) 12/10/1977 N/A Volcanic Eruption, Mt. St. Helens (DR-623) 5/21/1980 N/A Severe Storms & Flooding (DR-883) 11/26/1990 N/A Landslide 4/24/1995 A slide and debris flow 120 feet wide and 800 feet long took out a large section of Kittitas Reclamation District main canal about 12 miles west of Ellensburg south of the Bristol Flats area, sending debris into the Yakima River. Severe Storms, High Wind, And Flooding (DR- 1079) 1/3/1996 N/A High Winds, Severe Storms, & Flooding (DR-1100) 2/9/1996 N/A CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 4 Type of Event Date Preliminary Damage Assessment* Severe Winter Storms, Land & Muds Slides, & Flooding (DR-1159) 1/17/1997 N/A Severe Storm & Landslide 7/3/1998 A severe thunderstorm dropped more than 3 inches of rain in less than 1 hour on the flanks of Manastash Ridge and caused swift-moving debris flows in scoured channels down the slopes of the Yakima River Canyon. Earthquake (DR-1361) 3/1/2001 N/A Wind 5/19/2001 $20,000a Wind 10/23/2001 $30,000a Winter Weather 11/28/2001 $50,000a Elk Heights Fire 7/30/2004 N/A Avalanche 1/7/2009 $500,000a Severe Winter Storm, Landslides, Mudslides, & Flooding (DR-1817) 1/30/2009 $10,000,000a Severe Winter Storm And Record And Near Record Snow (DR-1825) 3/2/2009 N/A Landslide 10/10/2009 $12,500,000a Lightning 09/19/2010 $60,000a Wind 11/15/2010 $33,333a Severe Winter Storm, Flooding, Landslides, And Mudslides (DR-1963) 2/25/2011 N/A Severe Storm & Flooding 5/15/2011 Wildfire (Taylor Bridge) 8/13/2012 $59.8 Million Dollars Wildfire (Table Mountain) 9/19/2012 $3.2 Million Dollars Wildfire (Colockum Tarps) 7/29/2013 $7.6 Million Dollars Wildfire (Saddle Mountain) 7/18/2014 Wildfire (Snag Canyon) 8/2/2014 $14 Million Dollars Wildfire (Jolly Mountain) 7/2/2017- 7/22/2017 $55 Million Dollars Wildfire (Ryegrass Coulee) 7/10/2018 $3 Million Dollars *Damage estimates from SHELDUS CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 5 Table 2-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Wildfire 54 2 Flood 39 3 Earthquake 36 4 Drought 27 4 Severe Weather 27 5 Landslide 18 6 Avalanche 18 7 Dam Failure 13 8 Volcano 9 9 Seiche 6 Table 2-3. Legal and Regulatory Capability Capability Category Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Yes No No Yes KCC 14.04 Building Code- adopts the 2015 edition of the IBC Zoning Code Yes No No Yes KCC 17 Zoning Subdivisions Yes No No Yes KCC 16 Subdivisions Post Disaster Recovery No No No No Real Estate Disclosure No No No Yes RCW 64.06.020 Growth Management Yes No No Yes RCW 36.70A Site Plan Review Yes No No No KCC 14.04 Building Code Special Purpose (flood management, critical areas) Yes Yes No Yes KCC 14.08 Flood Damage Protection, 2003; Flood Control Zone District Critical Areas Yes Yes No Yes KCC 17A.05 Critical Areas (2018 Draft Form) Planning Documents CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 6 General Plan Yes No No Yes The Kittitas County Comprehensive Plan is mandated by the Growth Management Act. Updated annually. Floodplain or Basin Plan Yes No No No Kittitas County Flood Control Zone District Stormwater Plan No No No No Eastern WA Stormwater Management Plan Capital Improvement Plan No No No No The 2011 Capital Facilities Plan, is adopted as part of the 2016 Comprehensive Plan. Habitat Conservation Plan No No No No Economic Development Plan Yes No No No The Economic Development Plan is a part of the Comprehensive Plan, and the Economic Development Strategic Plan prepared by the Economic Development Group of Kittitas County has been adopted by reference into the 2016 Kittitas County Comprehensive Plan. Emergency Response Plan Yes No No Yes Kittitas County Comprehensive Emergency Management Plan, 2012 Shoreline Management Plan Yes No No Yes Shoreline Master Program, 2016 Post Disaster Recovery Plan No No No No Table 2-4. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Yes Kittitas County Public Works (PW): Director, County Engineer, Planner. Kittitas County Community Development Services (CDS): Planner. Engineers or professionals trained in building or infrastructure construction practices Yes PW: County Engineer, Construction Manager, Director. Planners or engineers with an understanding of natural hazards Yes PW: Director, County Engineer, Planner. Staff with training in benefit/cost analysis Yes PW: Planner. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 7 Staff/Personnel Resources Available? Department/Agency/Position Floodplain manager Yes PW: Planner. Surveyors Yes PW: Survey crew. Personnel skilled or trained in GIS applications Yes PW: Planners, Floodplain Managers, Engineering Techs. CDS: Planners. Information Services: GIS Analyst. Assessor: Cadastral Technician. Various other county departments have employees with GIS experience. Scientist familiar with natural hazards in local area Yes By contract: CWU, WSDOT, NOAA, WDFW. Emergency manager Yes Sheriff’s Office: Emergency Management Operations Commander, Kittitas County Search and Rescue Grant writers Yes Numerous Kittitas County employees with grant writing experience. Table 2-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service No Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds Yes Withhold Public Expenditures in Hazard-Prone Areas No State Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers Eligible: Yes Accessible: No CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 8 Table 2-6. Community Classifications Program Participating? Classification Date Classified Community Rating System Yes — — Building Code Effectiveness Grading Schedule Yes 4/4 — Public Protection Fire District #1 Yes 6 — Fire District #2 Yes 8 — Fire District #3 Yes 7 — Fire District #4 Yes 8 — Fire District #6 Yes 7 — Fire District #7 Yes 8 — Fire District #8 Yes 8 — Storm Ready No — — Firewise Yes High 2018 Table 2-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #KC-1—Maintain and readopt, as necessary, the Kittitas County Flood Control Zone District. New and Existing Flood 1, 2, 3, 4, 6, 7, 8, 9, 10 Public Works 10,000 Medium General Fund, Road Fund Short-term Initiative #KC-2—Enhance the flood warning system on major rivers and streams within Kittitas County including strengthening the computer interface and upgrading and increasing the number of weather stations. New and Existing Flood 1, 6, 9 Sheriff, Public Works 100,000 Medium Grants, Road Fund, General Fund, Other agency funds Short-term Initiative #KC-3—Continue participation and improve rating in the Community Rating System. New and Existing Flood All Public Works, CDS 10,000 Low General Fund Short-term, ongoing Initiative #KC-4—Where appropriate, support retrofitting, purchase, or relocation of structures in hazard- prone areas to protect them from future damage, with priority for properties exposed to repetitive losses. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 9 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Existing All Hazards 1, 2, 8, 10 Public Works, CDS 5,000,000 High HMGP Long-term Initiative #KC-5—Adopt appropriate regulatory standards that will reduce the risk to natural hazards through updates to existing code affecting critical areas regulations, flood hazard regulations, shoreline regulations, and to the county’s growth management comprehensive plan. New and Existing All Hazards 1, 3, 4, 9, 10 Public Works, CDS 25,000 Low General Fund, grants Short-term Initiative #KC-6—Annually disseminate a floodplain information brochure to all floodplain area or flood risk households. New and Existing Flood 1, 2, 6, 10 Public Works, CDS 10,000/year General Fund Short-term, ongoing Initiative #KC-7—Retrofit, rehabilitate or replace vulnerable road facilities, bridges and infrastructure throughout Kittitas County. Existing All except drought and severe weather 1, 8 Public Works High HMGP, Roads Fund Long-term Initiative #KC-8—Replace undersized bridges and culverts throughout Kittitas County. Existing Flood 1, 8 Public Works High HMGP, Roads Fund Long-term Initiative #KC-9—Continue to maintain compliance and good standing under the National Flood Insurance Program. New and Existing Flood 1, 2, 3, 4, 6, 8, 10 CDS, Public Works 10,000 General Fund Short-term, ongoing Initiative #KC-10—Update the Kittitas County Comprehensive Flood Management Plan. New and Existing Flood All CDS, Public Works 250,000 Medium General Fund Short-term Initiative #KC-11—Where feasible, seek to elevate at-risk structures within the floodplain to an adequate freeboard that is commensurate with the flood risk. The measure of feasibility will be willing participation by the property owner and the cost-effectiveness of the project. Existing Flood 1, 8 Public Works 5,000,000 High HMGP, Road Fund Short-term Initiative # KC-12—Upgrade or install stream gauges on rivers and streams with a flow greater than 20 cubic feet per second. New and Existing Flood, Dam Failure 1, 7 Public Works, CDS 100,000 Medium HMGP, grants Short-term, ongoing Initiative # KC-13—Conduct a study of all County-owned facilities to determine their vulnerability to natural hazards. Conduct a seismic retrofit or other mitigation to identified vulnerable structures. Existing Earthquake 1, 8 Facilities Medium HMGP, General Fund Long-term Initiative # KC-14—Begin a public outreach effort to educate landowners about Firewise and Fire Adapted Communities programs, defensible space around structures, non-combustible building materials, fuel reduction and other wildfire prevention tactics. Place information boards in key areas of the County. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 10 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline New and Existing Wildfire 1, 6 County Fire Marshal 20,000 Low HMGP, grants Short-term, ongoing Initiative # KC-15—Perform fuel reduction projects in high wildfire risk areas and areas with identified need throughout Kittitas County. New and Existing Wildfire 1, 2, 3, 6, 10 County Fire Marshal $70,000 Low HMGP, grants Short-term, ongoing Initiative # KC-16—Enhance the subdivision code and building code to include updated fire code requirements. New Wildfire 1, 2, 3, 4, 10 County Fire Marshal, CDS Low General Fund Short-term Initiative # KC-17—Continue to improve and preserve fire apparatus access throughout the County, including access through private gates. New and Existing Al Hazards 1, 2, 8 Fire Marshal, Public Works Medium HMGP, Road Fund Short-term, Long-term, Ongoing Initiative # KC-18—Identify seiche hazard areas and adopt higher regulatory standards to protect structures within the identified areas. New Seiche 1, 2, 3, 7, 8, 10 Public Works, CDS Medium General Fund Long-term Initiative # KC-19—Continue to adopt land use policies that prohibit the placement of habitable structures in high risk landslide and avalanche areas. New Landslide & Avalanche 1, 2, 3, 4, 10 CDS 25,000 General Fund Short-term Initiative # KC-20—Strengthen/harden critical road facilities from the impacts of all hazards for which they have exposure and vulnerability. New and Existing All Hazards 1, 8 Public Works High HMGP, Road Fund Long-Term depends on funding Initiative # KC-21—Proactively manage hazardous tree removal from public areas, and educate private property owners about management of their own trees. Existing Severe Storm 1, 9, 10 Public Works, CDS Low General Fund, Road Fund Short-term, ongoing Initiative # KC-22—Use the best available data and science to continually update the County risk assessment as new information becomes available (hydrologic, geologic, topographic, etc.). New and Existing All Hazards 1, 3, 7 Public Works, CDS HMGP, General Fund, Road Fund Short-term Initiative # KC-23—Integrate the hazard mitigation plan into future updates of the Kittitas County Comprehensive Plan. New All Hazards All CDS 250,000 General Fund Short-term Initiative # KC-24—Continue to support the implementation, monitoring, maintenance and updating of this plan. CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 11 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline New and Existing All Hazards All Public Works Low HMGP, General Fund, Road Fund Short-term, ongoing Initiative # KC-25—Integrate goals, objectives and initiatives of the Kittitas County Hazard Mitigation Plan into existing County regulations and programs where appropriate. New and Existing All Hazards All All County regulatory agencies Low General Fund, Road Fund Short-term Initiative #KC-26—Maintain an active public outreach strategy using available multiple media to inform the public how to personally prepare for and mitigate the hazards of concern. New and Existing All Hazards 1, 6 Public Works, CDS, Sheriff Low General Fund Short-term Ongoing Initiative #KC-27—Support detailed ash fall studies. New and Existing Volcano 1, 7, 9 Public Works, CDS Low HMGP, General Fund, Road Fund Long-term Initiative #KC-28—Identify and create new impounded water sources. New and Existing Drought 1, 7 Public Works Medium HMGP, Grant, Other Long-term Initiative #KC-29—Educate the public on drought resistance and encourage the use of water saving landscaping, irrigation methods and farming practices. New and Existing Drought 1, 6, 7, 9, 10 CDS, Kittitas County Conservation District Low General Fund, Grants Short-term Initiative #KC-30—Improve irrigation conveyance systems to reduce water loss through earthen canals and ditches. New and Existing Drought 1, 8, 9, 10 CDS, Kittitas County Conservation District High HMGP, Irrigation Districts and Companies Long-term Initiative #KC-31—Enhance the existing dam failure early warning system. New and Existing Dam Failure 1, 6 CDS, Public Works Medium HMGP, Grants Long-term Initiative #KC-32—Set the course for sustained operations of critical county functions by the development of a continuity of operations plan and/or a post-disaster recovery plan. New and Existing All Hazards 1,6,9 Emergency Management Medium General Fund, DHS grant funding Long term Initiative #KC-33—Continue to support through active participation the “county-wide” initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 All County Agencies Low General Fund Short-term Ongoing CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 12 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #KC-34—Consider participation in the National Weather Service “Storm Ready” program. New and Existing Flood, Severe Weather 6,7,9 Emergency Management Low General Funding, NWS grant funding Short-term Table 2-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* KC-1 10 High Medium Yes No Yes High KC-2 3 High Medium Yes Yes No Medium KC-3 10 Medium Low Yes No Yes High KC-4 4 High High Yes Yes No Medium KC-5 5 High Low Yes Now Yes High KC-6 4 Low Low Yes No Yes High KC-7 2 High High Yes Yes No Medium KC-8 2 High High Yes Yes No Medium KC-9 7 Medium Low Yes No Yes High KC-10 10 Medium Medium Yes Yes No Medium KC-11 2 High High Yes Yes No Medium KC-12 2 High Medium Yes Yes No Medium KC-13 2 Medium Medium Yes Yes No Medium KC-14 5 Low Low Yes No Yes High KC-15 2 High Low Yes Yes Yes High KC-16 5 Medium Low Yes No Yes High KC-17 5 Medium Medium Yes Yes Yes High KC-18 3 Medium Medium Yes Yes No Medium KC-19 3 Medium Low Yes No Yes High KC-20 6 High High Yes Yes No Medium KC-21 5 Medium Low Yes Yes Yes High KC-22 2 Medium Medium Yes Yes Yes High KC-23 3 Medium Low Yes No Yes High KC-24 3 Medium Low Yes Yes Yes High KC-25 10 Medium Low Yes No Yes High KC-26 10 Low Low Yes No Yes High KC-27 10 Low Low Yes No No Low KC-28 2 Medium Medium Yes No No Medium CHAPTER 2. UNINCORPORATED KITTITAS COUNTY ANNEX 13 Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* KC-29 2 Low Low Yes No No Medium KC-30 5 High High Yes Yes No Medium KC-31 4 High Medium Yes No Yes High KC-32 3 High Medium Yes Yes No Medium KC-33 3 High Low Yes Yes Yes High KC-34 3 High Low Yes Yes Yes High * See Section 1.3 for definitions of high, medium and low priorities. Table 2-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 5, 19, 23, 24, 25, 33 4, 7, 20 22, 24, 26, 33 5 17, 20, 32 Dam failure 5, 23, 24, 25, 33 4, 7, 11, 20 22, 24, 26, 33 5 12, 20, 31, 32 Drought 5, 23, 24, 25, 33 4 22, 24, 26, 29, 33 5 32 28, 30 Earthquake 5, 13, 23, 24, 25, 33 4, 7, 13, 20 22, 24, 26, 33 5 17, 20, 32 13 Flood 1, 3, 5, 9, 10, 23, 24, 25, 33 1,3,4, 7, 8, 9, 10, 11, 20 1,3, 6, 9, 10, 22, 24, 26, 33 1,3, 5, 10 1, 2, 3, 9, 10, 12, 17, 20, 31, 32,34 1, 3, 10 Landslide 5, 19, 23, 24, 25, 33 4, 7, 20 22, 24, 26, 33 5 17, 20, 32 Severe Weather 5, 23, 24, 25, 33 4, 20 22, 24, 26, 33 5, 21 12, 17, 20, 32, 34 Seiche 5, 18, 23, 24, 25, 33 4, 7, 18, 20 18, 22, 24, 26, 33 5 17, 20, 32 Volcano 5, 23, 24, 25, 27, 33 4, 20 22, 24, 26, 33 5 17, 20, 32 Wildfire 5, 15, 16, 23, 24, 25, 33 4, 7, 15, 20 14, 22, 24, 26, 33 5, 15 17, 20, 32 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. 1 Chapter 3. City of Cle Elum Annex 3.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Edwin Mills, Fire Chief 301 Pennsylvania Ave Cle Elum, WA. 98922 Telephone: 509-674-1748 Email: firechief@cityofcleelum.com Lucy Temple, City Planner 119 W. 1st St. Cle Elum, WA 98922 Telephone: 509-674-2262 Email: lucy@cityofcleelum.com 3.2. JURISDICTION PROFILE The following is a summary of key information about the jurisdiction and its history: • Date of Incorporation - Cle Elum was officially incorporated on February 12, 1902. • Current Population - 1,872 as of 2010 (US Census). The American Community Survey estimated a population of 1,993 in 2017. • Population Growth - The City of Cle Elum has had a growth rate of approximately 7.3 percent since 2000 according to City-Data.com. • Location and Description - The City of Cle Elum is located in Upper Kittitas County at Milepost 83 on Interstate 90 east of Snoqualmie Pass (47°11'39"N 120°56'15"W). It is bordered on the north by the Cle Elum Ridge and the south by South Cle Elum Ridge, including Peoh Point. It has a total land area of 3.22 sq. mi. It is a neighbor town to the City of Roslyn. It is at an altitude of 1,913 feet. The City of Cle Elum sits on the east slopes of the Central Cascade mountain range in the center of Washington State. This area is historically significant for its rich natural resources, fish and wildlife and cultural resources. • Jurisdiction Vulnerability to Hazards— Cle Elum, along with all jurisdictions in Kittitas County, has an overall low vulnerability to avalanche, drought, landslide, and volcano hazards, and an overall high vulnerability to severe weather events. Based on the three dam failure scenarios used in this plan, 62% of Cle Elum’s population and property is at risk of dam failure. Cle Elum has high exposure to earthquakes, and various earthquake scenarios result in losses up to 8% of building value. Cle Elum has 174 buildings (19% of assessed building value) located in the 100- or 500- year floodplain, and therefore a high vulnerability to flood events. Cle Elum has moderate vulnerability to wildfires, with 2% of buildings exposed to the 0-30 Year Fire Interval. • Brief History - The founders of Cle Elum were Thomas L. Gamble (later known as Judge Gamble) and Walter J. Reed. Mr. Gamble took up a quarter section of land in Section 26, Township 20 North, and Range 15 East, in April 1883 with the intent of farming the land. Mr. Reed took a claim adjoining Mr. Gamble’s on the west. On those two preemptive claims the town was laid out. The date of these filings was three years prior to the discovery of coal. Scattered discoveries of coal ledges had been made in 1883 and 1884, but in 1886 a definite discovery of a large ledge of good coal in paying quantities made it clear that an important stage had come in the history of the region and populations in the region began to increase. Meanwhile, the Northern Pacific Railway was seeking a route over the Cascade Mountains. On October 11, 1886, the first Northern Pacific Railroad train pulled into the new Cle Elum station. Following the arrival of the railway, the small CHAPTER 3. CITY OF CLE ELUM ANNEX 2 town began to grow rapidly. In 1913, steps were taken to improve automobile access across the Cascade Mountains via Snoqualmie Pass. A $1,500,000 levy was approved in 1913 to improve and expand the state’s highways. The majority of the levy ($590,743) went to construction of the Sunset Highway between Spokane and Seattle. This major cross-state highway would pass directly through Cle Elum’s business district. As one of the first towns reached after traveling east across the pass, Cle Elum would benefit from the road’s construction. That same year, reflecting on the prosperity of the coal mines, the city’s second bank was chartered. By 1914, Cle Elum’s population had risen to 3,000 from about 100 at the turn of the century. Cle Elum’s greatest disaster occurred on June 25, 1918 when a fire wiped out over 70 acres of the city (29 city blocks), with over $500,000 dollars in damage. The cause was determined to be a discarded cigarette butt thrown into a pile of garbage behind a theater. Thirty businesses and 205 houses were destroyed, leaving more than 1,800 people homeless. Following the incident, aid poured in from across the state. The Red Cross brought tents from Camp Lewis to house misplaced citizens while soldiers were sent from Ellensburg to guard businesses. Yakima and Portland, Oregon also sent aid to the city. Fortunately no lives were lost in the incident. High insurance rates on Cle Elum’s many wooden structures inhibited many people from purchasing it. One of the few buildings in downtown Cle Elum to survive the fire was the Cle Elum State Bank Building, built in 1906 and still standing today. The rest of downtown was quickly rebuilt of brick and many of these buildings still stand. • Climate - Cle Elum gets 22 inches of rain per year. Snowfall is 81 inches. The number of days with any measurable precipitation is 117. On average, there are 199 sunny days per year in Cle Elum. The July high is around 81 degrees. The January low is 20. The city’s comfort index, which is based on humidity during the hot months, is a 75 out of 100, where higher is more comfortable. The US average on the comfort index is 44. • Governing Body Format - The City of Cle Elum is governed by a mayor and a seven person council. • Development Trends - With its proximity to the Seattle metropolitan area and vast supply of recreational land, Kittitas County has been called “Seattle’s backyard.” The majority of development in the Cle Elum area has been for recreational or second homes. Historically, most of the development has occurred in mountainous and forested areas, and many hillsides have been cleared and roads constructed to provide access to these lands. The County has also seen a rise over the past decade of families buying houses in the Cle Elum area and commuting daily to the Seattle area. 3.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 3-1 lists all past occurrences of natural hazards in the county. Repetitive loss records are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: 2 – Number of Repetitive Flood Loss Properties that have been mitigated: 0 3.4. HAZARD RISK RANKING Table 3-2 presents the ranking of the hazards of concern. 3.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table 3-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 3-4. The CHAPTER 3. CITY OF CLE ELUM ANNEX 3 assessment of the jurisdiction’s fiscal capabilities is presented in Table 3-5. Classifications under various community mitigation programs are presented in Table 3-6. 3.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 3-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 3-8 identifies the priority for each initiative. Table 3-9 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. 3.7. HAZARD AREA EXTENT AND LOCATION Hazard area extent and location maps for the City of Cle Elum are included at the end of this chapter. These maps are based on the best available data at the time of the preparation of this plan, and are considered to be adequate for planning purposes. Table 3-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Flood Event (DR-1817) 1/30/2009 61,688 Earthquake 02-28-2001 N/A Earthquake 05-03-1996 N/A Earthquake 01-29-1995 N/A Earthquake 02-14-1981 N/A Earthquake 04-29-1965 N/A Table 3-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Flood 27 2 Wildfire 27 3 Earthquake 24 4 Dam Failure 18 5 Severe Weather 18 6 Landslide 10 7 Volcano 6 8 Drought 5 9 Avalanche 1 10 Seiche 0 CHAPTER 3. CITY OF CLE ELUM ANNEX 4 Table 3-3. Legal and Regulatory Capability Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Yes Yes No Yes Title 15 CEMC adopts the 2009 IBC, 7/27/2010 Zoning Code Yes No No No Title 17, CEMC, 2001 Subdivisions Yes No No No Title 16, CEMC, 2005 Post-Disaster Recovery No No No No Real Estate Disclosure No No Yes Yes RCW 64.06.020 Growth Management Yes No No Yes RCW 36.70A Site Plan Review Yes No No Yes Title 15 CEMC, 2010 Special Purpose (flood management, critical areas) Yes No No No Flood damage Prevention: Title 15, Chapter 15.24; 2002 Critical Areas: Title 18, CEMC, 2010 Building Code Yes Yes No Yes Title 15 CEMC adopts the 2009 IBC, 7/27/2010 Planning Documents General Plan Yes No No Yes Floodplain or Basin Plan Yes No No No Kittitas County Comprehensive Floodplain Management Plan, 1996 Stormwater Plan Yes No No No Capital Improvement Plan Yes No No No 5-year CIP, updated annually for streets, water, sewer and drainage Habitat Conservation Plan No No No No Economic Development Plan Yes No No No Economic Development Group of Kittitas County & Chamber Emergency Response Plan No No No No Upper County Emergency Management Plan (working with Perteet and other local jurisdictions) in progress Shoreline Management Plan Yes Yes No No Post-Disaster Recovery Plan No No No No CHAPTER 3. CITY OF CLE ELUM ANNEX 5 Table 3-4. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Y Lucy Temple, City Planner Ben Annen, City Engineer Engineers or professionals trained in building or infrastructure construction practices Y Robert Omans, CBO Planners or engineers with an understanding of natural hazards Y Lucy Temple, City Planner Ben Annen, City Engineer Staff with training in benefit/cost analysis N Floodplain manager Y Lucy Temple, City Planner Surveyors Y City Engineers, or contractor Personnel skilled or trained in GIS applications Y Lucy Temple, City Planner Scientist familiar with natural hazards in local area N Emergency manager N Grant writers Y Lucy Temple, City Planner Table 3-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Y Capital Improvements Project Funding Y Authority to Levy Taxes for Specific Purposes Y User Fees for Water, Sewer, Gas or Electric Service Y Incur Debt through General Obligation Bonds Y Incur Debt through Special Tax Bonds Y Incur Debt through Private Activity Bonds N Withhold Public Expenditures in Hazard-Prone Areas N State Sponsored Grant Programs Y Development Impact Fees for Homebuyers or Developers N Other N Table 3-6. Community Classifications Participating? Classification Date Classified Community Rating System No — — Building Code Effectiveness Grading Schedule Yes 3/3 — Public Protection Yes 6/9 — Storm Ready No — — Firewise Yes — 2009 (first) CHAPTER 3. CITY OF CLE ELUM ANNEX 6 Table 3-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #CE-1—Consider participation in the Community Rating System New and Existing Flood All City Council Low General Fund Short-term Initiative #CE-2—Adopt appropriate regulatory standards that will reduce the risk of natural hazards through updates to existing code affecting critical areas regulations, flood hazard regulations, shoreline regulations, and updates to the county’s comprehensive plan. New All Hazards 1, 3, 4, 9, 10 Community Development Low General Fund Short-term Initiative #CE-3—Provide Pre-Disaster Mitigation by repairing the left bank of the Yakima River adjacent to Interstate 90 and Hanson Ponds. Acquire funding to complete design, permitting, and construction of the repair. Existing Flooding 1, 3, 10 Public Works Medium FEMA HMGP Immediate Initiative #CE-4—Continue to maintain compliance and good standing under the National Flood Insurance Program. New and Existing Flood 1, 2, 3, 4, 6, 8, 10 Community Development Low General Fund Short-term, ongoing Initiative #CE-5—Consider participation in the National Weather Service “Storm Ready” program. New and Existing Flood, Severe Weather 6, 7, 9 Public Works Low General Fund Short term Initiative #CE-6—Where appropriate, support retrofitting, purchase, or relocation of structures in hazard- prone areas to protect structures from future damage, with properties with exposure to repetitive losses as a priority. Existing All Hazards 1, 2, 8, 10 Community Development High HMGP Funding, Local Contribution Long-term, depends on funding Initiative #CE-7—Continue to support participation in the “Firewise” program by expanding the number of project sites within Cle Elum and promoting Firewise strategies through active community outreach. New and Existing Wildfire 1, 3, 6, 7, 9 Community Development Low General Fund Short-term, ongoing Initiative #CE-8—Set the course for sustained operations of critical city functions by the development of a continuity of operations plan and/or a post-disaster recovery plan. New and existing All Hazards 1, 6, 9 Emergency Management Staff Medium General Fund, DHS Grant Funding Long-term Initiative #CE-9—Educate the public on natural hazards, the risks they pose and way to reduce those risk through existing public information programs with the City. New and Existing All Hazards 6, 7, 9 City Council Low General Fund Short-term, ongoing Initiative # CE-10—Continue to support the implementation, monitoring, maintenance and updating of this plan. CHAPTER 3. CITY OF CLE ELUM ANNEX 7 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline New and Existing All Hazards All City Council, Fire Chief Low HMGP, General Fund, Road Fund Short-term, ongoing Initiative #CE-11—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5, 6, 9 All City Agencies Low General Fund Short-term, ongoing Initiative #CE-12—Implement fuels reduction strategies and maintain vegetation to reduce wildfire intensity in the Wildland Urban Interface across all property ownerships. New and Existing Wildfire 1, 3, 4, 8, 10 All City Departments Medium General Fund Short-term, ongoing Initiative #CE-13—Provide emergency power for all city facilities and utilities. New and Existing All Hazards 1, 10 All City Departments High HMGP Grant Funds Short-term Initiative #CE-14—Protect backup water source by relocating the Cle Elum River backup wellfield controls to higher ground. Existing Flood, Dam Failure 1, 8 Public Works High HMGP Grant Funds Short-term Initiative #CE-15— Implement alternative methods and strategies to provide sustainable vegetation and debris removal in the Wildland Urban Interface by incorporating equipment to better dispose and reuse material i.e., Tub Grinders. Sustainable processing of vegetation and organic matter can ultimately lead to new opportunities for biomass energy utilization and material needed for restoration. New and Existing Wildfire 1, 7, 10 Public Works Medium HMA Funds, General Funds Ongoing, Short- term CHAPTER 3. CITY OF CLE ELUM ANNEX 8 Table 3-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* CE-1 10 Medium Low Yes No Yes Medium CE-2 5 High Low Yes No Yes High CE-3 3 High Medium Yes Yes No High CE-4 7 Medium Low Yes No Yes High CE-5 3 High Low Yes Yes Yes High CE-6 4 High High Yes Yes No Medium CE-7 5 High Low Yes Yes Yes High CE-8 3 High Medium Yes Yes No Medium CE-9 3 Low Low Yes Yes Yes High CE-10 10 High Low Yes Yes Yes High CE-11 3 Medium Low Yes No Yes High CE-12 5 High Medium Yes Yes Yes Medium CE-13 2 High High Yes Yes No High CE-14 2 High High Yes Yes No High CE-15 3 High Medium Yes Yes No Medium * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 3. CITY OF CLE ELUM ANNEX 9 Table 3-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 2, 10 6 9, 11 8, 13, 14 Dam failure 2, 10 6, 14 9, 11 8, 13, 14 Drought 2, 10 9, 11 8, 13, 14 Earthquake 2, 10 6 9, 11 8, 13, 14 Flood 1, 2, 4, 10 1, 4, 6, 14 1, 4, 9, 11 1, 3, 4 1, 4, 5, 8, 13, 14 1, 3 Landslide 2, 10 6 9, 11 8, 13, 14 Severe Weather 2, 10 6 9, 11 5, 8, 13, 14 Seiche 2, 10 6 9, 11 8, 13, 14 Volcano 2, 10 6 9, 11 8, 13, 14 Wildfire 2, 7, 10, 12 6, 7, 12, 15 7, 9, 11 7, 15 8, 13, 14 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. CHAPTER 3. CITY OF CLE ELUM ANNEX 10 Figure 3-1. Cle Elum Critical Facilities CHAPTER 3. CITY OF CLE ELUM ANNEX 11 Figure 3-2. Cle Elum Minimum Temperatures CHAPTER 3. CITY OF CLE ELUM ANNEX 12 Figure 3-3. Cle Elum Maximum Temperature CHAPTER 3. CITY OF CLE ELUM ANNEX 13 Figure 3-4. Cle Elum Average Annual Precipitation CHAPTER 3. CITY OF CLE ELUM ANNEX 14 Figure 3-5. Cle Elum Potential Wind Power CHAPTER 3. CITY OF CLE ELUM ANNEX 15 Figure 3-6. Cle Elum Dam Inundation Area for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 16 Figure 3-7. Easton Dam Inundation Area for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 17 Figure 3-8. Keechelus and Kachees Dam Inundation Area for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 18 Figure 3-9. Cle Elum Special Flood Hazard Areas CHAPTER 3. CITY OF CLE ELUM ANNEX 19 Figure 3-10. Cle Elum Liquefaction Susceptibility CHAPTER 3. CITY OF CLE ELUM ANNEX 20 Figure 3-11. NEHRP Seismic Soil Site Classes for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 21 Figure 3-12. Cle Elum Earthquake Scenario Peak Ground Acceleration for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 22 Figure 3-13. Horse Heaven Hills Earthquake Scenario Peak Ground Acceleration for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 23 Figure 3-14. Mill Creek Earthquake Scenario Peak Ground Acceleration for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 24 Figure 3-15. Rattlesnake Wallula Earthquake Scenario Peak Ground Acceleration for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 25 Figure 3-16. Saddle Mountain Earthquake Scenario Peak Ground Acceleration for the City of Cle Elum CHAPTER 3. CITY OF CLE ELUM ANNEX 26 Figure 3-17. Cle Elum Wildland Fire Hazard Areas CHAPTER 3. CITY OF CLE ELUM ANNEX 27 Figure 3-18. Cle Elum Mean Fire Return Interval 1 Chapter 4. City of Ellensburg Annex 4.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Kirsten Sackett, Community Development Director 501 N. Anderson Ellensburg, WA 98926 Telephone: 509-962-7232 Email: sackettk@ci.ellensburg.wa.us Ryan Lyyski, Public Works & Utilities Director 501 N. Anderson Ellensburg, WA 98926 Telephone: 509-962-7230 Email: lyyskir@ci.ellensburg.wa.us 4.2. JURISDICTION PROFILE The following is a summary of key information about the jurisdiction and its history: – Date of Incorporation —1883 – Current Population — 18,174 as of 2010 Census. The American Community Survey estimated a population of 18,957 in 2016. – Population Growth — The population growth rate for the City of Ellensburg has remained low but consistent throughout the past few decades, with clear correlation to changes in student population at Central Washington University (CWU). The highest percent increase occurred between the 1990 and 2000 Census, at 19.8%. The decade between the 2000 and the 2010 Census, saw the City population increase by 2,760, an 18 percent increase and an average annual growth rate of 1.8 percent. During the seven years after the 2010 census, the City population increased by 2,152, a 10.3 percent increase and an average annual growth rate of 1.47%. – Location and Description — The City of Ellensburg is in central Kittitas County at the intersection of Interstate 90, Interstate 82, and US Highway 97 and is near the center of Washington State. The elevation is approximately 1,500 feet with topography sloping gradually from northeast to southwest and the Yakima River. The City is located in a fertile plateau valley adjacent to the Yakima River, with ridges and mountains associated with the Cascade mountain range surrounding it. The surrounding area is primarily composed of irrigated agricultural land or semi-arid desert lands that are not irrigated. Six perennial creeks that convey runoff and snow melt water from the mountain range watersheds to the north run through the developed City from the northeast to the southwest where they flow into the Yakima River which t hen flows into the Columbia River some 130 miles to the south. In addition, three large irrigation canals traverse the City from the northwest to the southeast and provide irrigation water to the surrounding agricultural lands. Interstate 90, Interstate 82 and US Highway 97, which all intersect at Ellensburg, provide direct access to the Puget Sound area in the west, Canada to the north, and the greater US to the south and east. BNSF Railway has a main line that runs through the City. Central Washington University is located in Ellensburg and as of 2018 has a student population of approximately 11,500, in addition to the associated staff. The City has two national historic districts—the Downtown National Historic District and the First Railroad Historic District—which consist of commercial and residential structures from the late 1800s and help make the City a regional historic preservation destination. CHAPTER 4. CITY OF ELLENSBURG ANNEX 2 – Jurisdiction Vulnerability to Hazards— Ellensburg, along with all jurisdictions in Kittitas County, has an overall low vulnerability to avalanche, drought, landslide, and volcano hazards, and an overall high vulnerability to severe weather events. Based on the three dam failure scenarios used in this plan, 8% of Ellensburg’s population and 5% of property is at risk of dam failure. Ellensburg has high exposure to earthquakes, and various earthquake scenarios result in losses up to 3% of building value. Ellensburg has 791 buildings (17% of assessed building value) located in the 100- or 500-year floodplain, and therefore a high vulnerability to flood events. Ellensburg has moderate vulnerability to wildfires, with 5% of buildings exposed to the 0-30 Year Fire Interval. – Brief History—Ellensburg is located on the western slopes of the Columbia Plateau, site of some dramatic geological events that have occurred over time. Basaltic lava flows took place some 15 million years ago, with a series of giant glacial flood events after the ice age. The largest documented flood in geologic history occurred when a very large water body in the Montana region suddenly breached, causing huge volumes of water to rapidly sweep across the basaltic plateau as it made its way westward to sea level at the Pacific Ocean. More recently, in 1980 Mt. St. Helens, one of a string of active volcanoes in the Cascade Mountain Range, erupted and caused significant property damage and loss of life in the immediate vicinity of the mountain; Ellensburg was impacted with significant ash from that eruption, causing property damage, health issues, and general disruption to the normal activities of the community. Those events have shaped the landscape of central and eastern Washington where Ellensburg is located. The first inhabitants of the Ellensburg area were the Psch-wan-wap-pams (stony ground people) also known as the Kittitas band of the Yakama or Upper Yakama Tribe. The Ellensburg area was one of the few areas in Washington where both camas and kouse (a root used make to bread) grew, which made it an important gathering place for regional tribes. Eventually fur trading and missionary activity entered the valley in the 1860s and by the end of that decade a trading post known as “Robber’s Roost” was established. The late 1800s saw the community prosper as the Northern Pacific Railroad established a rail siding facility in Ellensburg in 1886 that helped create markets for cattle, dairy products, timber, wool and hay. There was speculation that as part of the region’s effort to petition Congress to admit Washington into the union in 1889, Ellensburg would be named the new state capitol due to its central location. A disastrous fire on July 4, 1889, fanned by the winds that regularly flow down from the Cascade Mountain Range to the west, ended that speculation and destroyed most of the downtown business district and many homes. The community rebuilt itself, using brick and stone masonry rather than wood, within a year. Although Ellensburg lost the state capitol decision to Olympia, the new State Legislature established the Washington State Normal School (a teacher’s college now known as Central Washington University) in Ellensburg. The school opened in 1891 with 86 students and today CWU has an enrollment exceeding 11,000 students, occupies approximately 380 acres, is the county’s largest employer with more than 1,300 employees, and is estimated to contribute some $190 million annually to the local economy. The timing of the fire and the rapid reconstruction of the destroyed downtown produced a unified and attractive appearance dominated by late Victorian architectural styles that have subsequently been filled in with a few early twentieth-century neoclassic and art deco-styled buildings. That historical style has defined the community and continues to serve as one of its biggest assets. Ellensburg has grown from its re-birth and has established itself as a vital, rooted, and unique community in which the residents consider it as being a quiet, clean, comfortable, safe, and family-oriented city. CHAPTER 4. CITY OF ELLENSBURG ANNEX 3 – Climate—Ellensburg has strong summers and winters. Temperatures vary considerably within the seasons. There are four distinct seasons and a strong and regular breeze from the west throughout much of the year. Average mean temperatures range in the high 50s F with summertime temperatures averaging near 80° F and winter lows often getting below freezing. The mountains to the west and north effectively block much of the rain from the “wet” side of the state, producing a dry climate with less than 10 inches of rain a year. The combination of large snow pack in the mountains, strong westerly winds and occasional unseasonal warm rain events, however, results in regular flood events from February through May for the streams that run from the mountains through the city to the Yakima River. – Governing Body Format—The City of Ellensburg utilizes the council-manager form of government with a city manager hired by the city council. The city council elects a mayor and mayor pro tem from the council to serve two-year terms. The City also uses an appointed planning commission to provide land use policy recommendations to City Council and to hear conditional use permit applications. The City also retains the services of a Hearing Examiner to hear quasi-judicial land use permit application matters and provide recommendations to City Council. A number of citizen boards and commissions have been established to provide recommendation and guidance to council on a variety of issues, including the downtown, the environment, energy, historic preservation, parks and recreation, library, arts and affordable housing. – Development Trends—Beginning in the late 1990s and continuing up to the economic downturn in the late 2000s, the City experienced greater than usual growth, primarily in residential structures, although the population growth did not ma tch that rate of residential growth. That is primarily due to the housing boom in the early to mid-2000s and the reality that Ellensburg is a college town and it became easier for some families to purchase a second, speculative residence in which to house their child while attending CWU and to utilize the rent payment from roommates to pay the mortgage. The economic downturn of the late 2000s, stifled the growth spurt for a period of time, but Ellensburg is again seeing slow and steady growth. 4.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 4-1 lists all past occurrences of natural hazards in the county. A Repetitive Loss (RL) property is any insurable building for which two or more claims of more than $1,000 were paid by the National Flood Insurance Program (NFIP) within any rolling ten-year period, since 1978. Repetitive loss records in the City of Ellensburg are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: 0 – Number of Repetitive Flood Loss Properties that have been mitigated: 0 4.4. HAZARD RISK RANKING Table 4-2 presents the ranking of the hazards of concern. 4.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table 4-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 4-4. The assessment of the jurisdiction’s fiscal capabilities is presented in Table 4-5. Classifications under various community mitigation programs are presented in Table 4-6. CHAPTER 4. CITY OF ELLENSBURG ANNEX 4 4.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 4-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 4-8 identifies the priority for each initiative. Table 4-9 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. 4.7. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The biggest future need to better understand risk/vulnerability would be a re-mapping of the floodplain by FEMA. Ellensburg annually experiences sheet-flow floods, and the floods are not uniformly in flood locations identified on the 1981 FIRM maps. People suffer property damage but are not within a FIRM floodplain and are not eligible for federal flood insurance. People want to develop their properties that are not identified in the floodplain but that consistently flood, and it becomes a regulatory issue for which there is no solid documented basis to regulate the property for flooding. FEMA is in the process of digitizing the existing 1981 FIRMs, and is currently working with Kittitas County to remap tributaries that run through the City using LiDAR technology. 4.8. ADDITIONAL COMMENTS Due to its climate and topography, Ellensburg is prone to unpredictable flood events when there is significant snow pack in the foothills surrounding the City during early and late winter and a heavy rain event occurs combined with warm temperatures and strong winds (strong winds are the norm for this area). The creek that experiences the flood event varies and is dependent on the temperature and the degree of compactness of the snowpack within the creek watersheds. The result is significant overbank flow in the six creeks that run northeast to southwest through the developed city toward the Yakima River, which becomes sheet-flow flooding over large areas of the community. This regular pattern of flooding does not pose major risks to life, but it does cause significant annual damage to public and private property. Although the City’s risk rating for the flood hazard is 36 the regularity of annual flooding and associated property damage makes this hazard risk much higher. The City of Ellensburg already incorporates green infrastructure into its stormwater development standards, which are approved by the Department of Ecology to minimize flood impacts and improve water quality. In addition, because most of the City’s historic downtown structures are masonry buildings constructed in the late 1880s, they are not likely to perform well in earthquake events. The 2001 Nisqually Earthquake, while causing significant damage to the Puget Sound region, in particular the older historic structures, did not cause significant damage in Ellensburg. However, a more local earthquake event, or a much stronger event in the Puget Sound region would likely cause significant property loss and the potential for significant personal injury in the historic downtown area if the two-story brick buildings were to collapse. Retrofitting those historic structures would be an expensive task that is beyond the City’s ability to address and beyond the individual property owner’s ability to finance. Large earthquake events in the Puget Sound region also will likely result in significant logistical problems for the Ellensburg community. I-90 is the major east/west interstate that connects the more rural eastern Washington to the more populated western Washington. Large-scale earthquake damage in the Puget Sound region will likely cause serious disruption to food service delivery from the regional warehouses located in Puget Sound, as well as damage to telecommunications. And if the event is serious enough there is likely to be an exodus of displaced Puget Sound residents seeking shelter elsewhere and if the interstate is open Ellensburg is the first larger city over the mountain passes from Puget Sound and is likely to be impacted by displaced Puget Sound people seeking a safe place. CHAPTER 4. CITY OF ELLENSBURG ANNEX 5 4.9. HAZARD AREA EXTENT AND LOCATION Hazard area extent and location maps for the City of Ellensburg are included at the end of this chapter. These maps are based on the best available data at the time of the preparation of this plan, and are considered to be adequate for planning purposes. CHAPTER 4. CITY OF ELLENSBURG ANNEX 6 Table 4-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Severe Flooding 05/24/17 N/A Severe Flooding 03/12/17 N/A Severe Flooding 02/18/16 N/A Severe Flooding 02/22/12 N/A Severe Flooding 5/15/11 N/A Severe Flooding 03/31/11 N/A Severe Flooding 3/25/11 N/A Severe Flooding 01/17/11 N/A Severe Flooding 01/30/09 N/A Severe Flooding 01/07/09 N/A Earthquake (Nisqually) 03/01/01 N/A Severe Winter Storm 01/17/97 N/A Severe Winter Storm/Flooding 02/09/96 N/A Storms/High Winds/Floods 01/03/96 N/A Flooding, Severe Storm 11/26/90 N/A Severe Flooding 8/21/90 N/A Severe Winter Weather 01/18/86 N/A Severe Storm 12/24/80 N/A Volcanic Eruption, Mt. St. Helens 05/21/80 N/A Severe Storms, Flooding 12/10/77 N/A Severe Storms, Flooding 12/13/75 N/A Heavy Rains & Flooding 12/29/64 N/A Table 4-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Earthquake 36 2 Flood 36 3 Severe Weather 36 4 Dam Failure 30 5 Volcano 24 6 Landslide 6 7 Drought 3 8 Wildfire 3 9 Avalanche 0 10 Seiche 0 CHAPTER 4. CITY OF ELLENSBURG ANNEX 7 Table 4-3. Legal and Regulatory Capability Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Y N N Y 2015 International Building Codes Zoning Code Y N N Y Title 15 ECC Subdivisions Y N N N Title 15 ECC Post Disaster Recovery Y N N Y Stormwater Utility Adopted Real Estate Disclosure N N N N Growth Management Y N N N Comprehensive Plan, SEPA and Critical Areas Site Plan Review Y N N N GMA compliant 2013 ECC Update Special Purpose (flood management, critical areas) Y N N N Site plans are reviewed for compliance with codes and development regulations Building Code Y N N Y 2015 International Building Codes Planning Documents General or Comprehensive Plan Y N N Y Floodplain or Basin Plan Y Y N Y GMA compliant with 2017 Update Stormwater Plan N N N N Capital Improvement Plan Y Y N Y Adopted stormwater utility in 2009 and adopted the Eastern Washington Stormwater Development Guidance Manual 2004, updated 2018 and the current stormwater development standards with the City of Ellensburg Habitat Conservation Plan Y N N N Specific 6-Year and more general 12 and 18-year plans included in Comp Plan Economic Development Plan N N N Y Regulated through Critical Area Ordinance in ECCDivision VI Emergency Response Plan Y N N N An element in the City Comp Plan, in conjunction with Ellensburg Business Development Authority Strategic Plan Shoreline Management Plan Y N N N Contracted for through Fire District Post Disaster Recovery Plan N N N Y Adopted by reference the Kittitas County SMP. City SMP adopted 2016 CHAPTER 4. CITY OF ELLENSBURG ANNEX 8 Table 4-4. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Y Community Development – Planners Public Works and Energy Services-Engineers Engineers or professionals trained in building or infrastructure construction practices Y Building Department – Building Inspectors Public Works and Energy Services-Engineers Planners or engineers with an understanding of natural hazards Y Public Works – Flood Hazards Staff with training in benefit/cost analysis Y Various departments with basic capability Floodplain manager Y Community Development Director Surveyors Y Hire as needed Personnel skilled or trained in GIS applications Y IT Department – GIS division Scientist familiar with natural hazards in local area Y Hire as needed Emergency manager Y Contracted with Fire District Grant writers Y On-call contract grant writers Table 4-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Y Capital Improvements Project Funding Y Authority to Levy Taxes for Specific Purposes Y User Fees for Water, Sewer, Gas or Electric Service Y Incur Debt through General Obligation Bonds Y Incur Debt through Special Tax Bonds Y Incur Debt through Private Activity Bonds N Withhold Public Expenditures in Hazard-Prone Areas N State Sponsored Grant Programs Y Development Impact Fees for Homebuyers or Developers Y Other Table 4-6. Community Classifications Participating? Classification Date Classified Community Rating System No — — Building Code Effectiveness Grading Schedule Yes 4/4 — Public Protection Yes 4/9 — Storm Ready No — — Firewise No — — CHAPTER 4. CITY OF ELLENSBURG ANNEX 9 Table 4-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative E-1—West Ellensburg Flood Mitigation Project – Reecer and Currier Creeks from I-90 to University Way, Alliance Short Plat/CenterPoint Business Park Acquisition to Create Floodplain and Extend Levee Existing/New Flooding 1, 3, 6, 7, 9, 10 City $7,000,000, High Grants Included in 6- Year Capital Facility Plan Initiative E-2—Wilson Creek Flood Control Project Existing/New Flooding 1, 3, 6, 7, 9, 10 City $8,900,000, High General Fund, Bonds, Grants Long-term, depends on funding Initiative E-3—Update FEMA Floodplain Maps Existing/New Flooding 1, 3, 4, 5, 6, 7, 9, 10 City High General Fund, FEMA RiskMAP program, Grants Long Term, depends on funding Initiative E-4—Clear storm drains and culverts for stormwater management Existing Flooding 1, 6, 7, 10 City High Stormwater Utility Funds Seasonally Clean ½ the City every 2 Years Initiative E-5—Enhance existing stormwater facilities that lack capacity or functionality and construct new local stormwater facilities where there is identified need. Existing/New Flooding 1, 6, 7, 10 City High Stormwater Utility, Grants Ongoing Initiative E-6—Control land use in flood-prone areas (by zoning setbacks, greenways, and buffers) New Flooding 1, 2, 3, 4, 5, 6, 7, 9, 10 City Low HMGP Long Term Initiative E-7—Acquisition of flood-prone structures and conversion of land to open space Existing/New Flooding 1, 2, 3, 4, 5, 6, 7, 8, 10 City High Grants Ongoing, depends on funding Initiative E-8—Continue to maintain compliance and good standing under the National Flood Insurance Program. Existing/New Flooding 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City low General fund Ongoing Initiative E-9—Where appropriate, support retrofitting, purchase, or relocation of structures in hazard-prone areas to protect structures from future damage, with repetitive loss and severe repetitive loss properties as priority. Existing All Hazards 1, 2, 8, 10 City high HMGP Long Term Initiative E-10—Conduct a seismic retrofit of the Ellensburg Public Safety Building that houses the Ellensburg Police Department and Kittitas Valley Fire And Rescue (Fire District) Headquarters. Existing Earthquake 1, 2, 5, 6, 7, 8, 9, 10 City medium HMGP, General Funds, Bonds Long Term CHAPTER 4. CITY OF ELLENSBURG ANNEX 10 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative E-11—Collect improved data (hydrologic, geologic, topographic, etc.) to assess risks and vulnerabilities. Existing/New All Hazards 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City medium Grants, General fund Ongoing Initiative E-12—Consider adoption of appropriate regulatory standards, through updates as needed and/or required, affecting critical areas regulations, flood hazard regulations, shoreline regulations, and to the city’s growth management comprehensive plan. New Flooding 1, 2, 3, 4, 5, 6, 7, 9, 10 City medium General fund Ongoing Initiative E-13—Inform and educate the public on hazard mitigation and preparedness via the city’s website. Existing All Hazards 1, 2, 5, 6, 10 City low General fund Ongoing Initiative E-14 —-Replace inadequately sized culvert for Reecer Creek at University Way. Existing Flooding 1, 2, 7, 8, 9, 10 City high Grants, Road Fund, CIP Long Term Initiative E-15—Relocate City-owned critical facilities out of identified high hazard risk zones Existing All Hazards 1, 2, 5, 7, 8, 9, 10 City Unknown HMGP, Bond Long Term Initiative E-16—Install stream gauge stations with communication links for early flood warning on all local tributaries Existing/New Flooding 1, 7, 9 City $160,000 Stormwater Utility, Grants, Kittitas County Flood District Short-term Initiative E-17—Consider participation in the Community Rating System New and existing Flood 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 City low General fund Short-term Initiative E-18—Continue to support the implementation, monitoring, maintenance and updating of this plan. New and Existing All Hazards All City Council, Community Development Low HMGP, General Fund, Road Fund Short-term, ongoing Initiative E-19—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 All City Agencies Low General Fund Short-term, Ongoing Initiative E-20—Consider participation in the National Weather Service “Storm Ready” program. New and Existing Flood, Severe Weather 6, 7, 9 Public Works Low General Fund Short-term Initiative E-21— Gateway Project: $4 million dollar project to treat (infiltrate) 2 miles of stormwater on University Way. Funded by Ecology, slated for 2019-2021. New Flooding 1, 6, 7, 10 City High Stormwater Utility, Grants Funded CHAPTER 4. CITY OF ELLENSBURG ANNEX 11 Table 4-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* E-1 6 High High Y Y Y High E-2 6 High High Y Y N High E-3 8 High High Y Y N High E-4 4 High High Y N Y High E-5 4 High High Y Y Y High E-6 9 High Medium Y Y N High E-7 9 High High Y Y Y High E-8 10 High Low Y N Y High E-9 4 Medium High N Y N Low E-10 8 Medium High N Y N High E-11 10 High High Y Y N High E-12 9 Medium Medium Y N N Medium E-13 5 Medium Low Y N Y Medium E-14 6 High High Y Y N High E-15 7 Medium High N Y N Medium E-16 3 High Low Y Y Y High E-17 10 Medium Low Y N Y Medium E-18 10 High Low Y Y Y High E-19 3 Medium Low Y N Y High E-20 3 High Low Y Y Y High E-21 4 High High Y Y Y High * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 4. CITY OF ELLENSBURG ANNEX 12 Table 4-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 18 18, 19 19 Dam Failure 18 6, 9, 11, 12, 13, 15 13, 18, 19 19 9, 15 Drought 18 18, 19 19 Earthquake 18 9, 10, 11, 15 13, 18 10, 19 9, 10, 15 Flood 1, 2, 3, 4, 5, 16, 17, 18 1, 2, 3, 4, 5, 6, 7, 9, 11, 12, 13, 14, 15, 16, 17 6, 8, 12, 13, 16, 17, 18, 19 3, 11, 12, 17 17, 19, 20 1, 2, 3, 4, 5, 9, 14, 15, 16, 17, 21 Landslide 18 18, 19 19 Severe Weather 18 1, 2 13, 18, 19 1, 2 19, 20 1, 2 Seiche 18 18, 19 19 Volcano 18 13, 18, 19 19 Wildfire 18 18, 19 19 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. CHAPTER 4. CITY OF ELLENSBURG ANNEX 13 Figure 4-1. Ellensburg Critical Facilities CHAPTER 4. CITY OF ELLENSBURG ANNEX 14 Figure 4-2. Ellensburg Minimum Temperatures CHAPTER 4. CITY OF ELLENSBURG ANNEX 15 Figure 4-3. Ellensburg Maximum Temperatures CHAPTER 4. CITY OF ELLENSBURG ANNEX 16 Figure 4-4. Ellensburg Average Annual Precipitation CHAPTER 4. CITY OF ELLENSBURG ANNEX 17 Figure 4-5. Ellensburg Potential Wind Power CHAPTER 4. CITY OF ELLENSBURG ANNEX 18 Figure 4-6. Cle Elum Dam Inundation Area for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 19 Figure 4-7. Keechelus & Kachees Dam Inundation Area for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 20 Figure 4-8. Ellensburg Special Flood Hazard Areas CHAPTER 4. CITY OF ELLENSBURG ANNEX 21 Figure 4-9. Ellensburg Landslide Hazard Areas CHAPTER 4. CITY OF ELLENSBURG ANNEX 22 Figure 4-10. Ellensburg Liquefaction Susceptibility CHAPTER 4. CITY OF ELLENSBURG ANNEX 23 Figure 4-11. NEHRP Seismic Soil Classes for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 24 Figure 4-12. Cle Elum Earthquake Scenario Peak Ground Acceleration for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 25 Figure 4-13. Horse Heaven Hills Earthquake Scenario Peak Ground Acceleration for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 26 Figure 4-14. Mill Creek Earthquake Scenario Peak Ground Acceleration for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 27 Figure 4-15. Rattlesnake Wallula Earthquake Scenario Peak Ground Acceleration for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 28 Figure 4-16. Saddle Mountain Earthquake Scenario Peak Ground Acceleration for the City of Ellensburg CHAPTER 4. CITY OF ELLENSBURG ANNEX 29 Figure 4-17. Ellensburg Wildland Fire Hazard Areas CHAPTER 4. CITY OF ELLENSBURG ANNEX 30 Figure 4-18. Ellensburg Mean Fire Return Interval 1 Chapter 5. City of Roslyn Annex 5.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Michelle Geiger, Planning and Building Official PO Box 451 Roslyn, WA 98941 Telephone: 509-304-8337 Email: planner@ci.roslyn.wa.us Myke Woodwell, Public Works Director PO Box 451 Roslyn, WA 98941 Telephone: 509-649-3105 Email: publicworks@ci.roslyn.wa.us 5.2. JURISDICTION PROFILE The following is a summary of key information about the jurisdiction and its history: – Date of Incorporation - 1886 – Current Population—893 – Population Growth - While Roslyn has experienced a 12.4 percent decrease in population from 2000 to 2011, the surrounding communities and county have seen a net increase in population. – Location and Description - Roslyn is nestled in the foothills of the east-central Cascades in predominantly Ponderosa pine and Douglas fir forest. The City is a gateway to the Alpine Lakes Wilderness Area and Lake Cle Elum. To the north of Roslyn there is a 300+ acre urban forest that is abutted by 20-acre parcels and Plum Creek Timber holdings to the top of the Cle Elum Ridge. To the west is the township of Ronald, to the east Cle Elum, and south is the Master Planned Resort of Suncadia. SR 903 runs through Roslyn from the southeast to the northwest. Exit 80 (just east of Snoqualmie Pass) is the turn off for Roslyn from Interstate 90, which runs from Seattle to Spokane (and beyond). – Jurisdiction Vulnerability to Hazards - Roslyn, along with all jurisdictions in Kittitas County, has an overall low vulnerability to avalanche, drought, landslide, and volcano hazards, and an overall high vulnerability to severe weather events. Unlike other jurisdictions, none of Roslyn’s population or property is at risk of dam failure. Roslyn has high exposure to earthquakes, and various earthquake scenarios result in losses up to 1% of building value. Roslyn has 16 buildings (3% of assessed building value) located in the 100 - or 500-year floodplain, and therefore a moderate vulnerability to flood events. Roslyn has moderate vulnerability to wildfires, with 9% of buildings exposed to the 0-30 Year Fire Interval. – Brief History - Incorporated in 1886, the coal-mining town of Roslyn played an important role in Washington State history. Extensive coal fields in the area fueled the Northern Pacific Railroad’s trains during construction and early operation of a direct rail line through the Cascade Mountains. Men from coal mining regions in the United States, Europe and elsewhere came to work in the mines. English, Italian and Slavic immigrants were among the early settlers and a significant proportion of the town’s early residents were foreign born. In 1888, responding to a strike, the Northern Pacific Coal Company recruited more than 300 African-American miners from Virginia, North Carolina and Kentucky and brought them, with their families, to work in the CHAPTER 5. CITY OF ROSLYN ANNEX 2 mines. At one time, 24 ethnic groups and nationalities were living in Roslyn. Today, many of the original families continue to make Roslyn their home. – Climate - The climate of Roslyn is a mountainous climate that can be quite variable. Summers are generally warm and sunny; the months of July, August and September are usually characteristic of this season. The average temperatures in the high 70s to the mid-80s with a highest recorded temperature of 105ºF in 1967. There is little to no rainfall during these months, and the danger of wildfire is extremely high. Winter is typically at its peak from November through February and typically has temperatures ranging from the mid-teens to mid-30; the lowest recorded temperature was –33ºF in 1950. Most of the precipitation falls during these months in the form of snow with heavy accumulations. Average snowfall for the City of Roslyn is 78.5 inches per year. This is also the period when Roslyn experiences flooding events, when there is a rain-on-snow event. This occurs when warm moist air from the Pacific is channeled into the area, often leading to extended periods of rain. – Governing Body Format - Roslyn is governed by an elected mayor/council form of government with seven council seats. The City is run through the administrative office. Current departments include Administrative/Finance, Planning, Public Works, and Volunteer Fire Department. The Police Department is a part of a regional partnership between Roslyn, Cle Elum, and the Town of South Cle Elum. The City operates a water system managed through the Public Works Department. The City provides water to the City of Roslyn, Kittitas Water District #2 (Ronald), the Roslyn/Cle Elum School District, and other homes and businesses south of the City. The water source is Domerie Creek, located approximately 5-½ miles from Roslyn on the east side of the Cle Elum River. Water is gravity fed from the source to a slow sand filtration treatment plant located outside of Ronald, where it continues to a 1 million gallon reservoir above the Roslyn historic cemeteries. Sanitary services are provided by the City of Roslyn in its transmission facilities and a Regional Wastewater Treatment plant located in and owned by the City of Cle Elum. The Kittitas Water District #2 (Ronald) is connected to the transmission system at Runje Field. Sewage flows via gravity toward Roslyn’s old sewage lagoons where flow data is captured as it continues towards Cle Elum. One 5-acre lagoon is maintained as a stormwater attenuation facility during times of heavy rain and flood events. Fire service is provided by the Roslyn Fire Department, which has a 100-percent volunteer staff and one fire station. – Development Trends - There are significant impacts due to increase development pressures outside of the city limits. Little to no regulation of grade and fill through the county and increased impervious surfaces have created increased stormwater runoff that causes the City’s stormwater system to flood on a regular basis. The City of Roslyn is currently working with engineers to complete a stormwater study and create a stormwater utility to help and protect public and private property from such incidences. 5.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 5-1 lists all past occurrences of natural hazards in the county. Repetitive loss records are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: 0 – Number of Repetitive Flood Loss Properties that have been mitigated: 0 5.4. HAZARD RISK RANKING Table 5-2 presents the ranking of the hazards of concern. CHAPTER 5. CITY OF ROSLYN ANNEX 3 5.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table 5-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 5-4. The assessment of the jurisdiction’s fiscal capabilities is presented in Table 5-5. Classifications under various community mitigation programs are presented in Table 5-6. 5.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 5-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 5-8 identifies the priority for each initiative. Table 5-9 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. 5.7. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The City of Roslyn is in need of an updated detailed flood study. The July 2014 City of Roslyn Stormwater Comprehensive Plan revealed the City’s stormwater system is undersized. Several areas in the City are classified as being in a flood hazard area, when they are in reality outside it, and several areas are classified as outside the flood hazard area, but have recently flooded. Additionally, recent infrastructure projects have potentially altered stormwater flow and the floodplain, and new development is stressing the already undersized stormwater system. 5.8. HAZARD AREA EXTENT AND LOCATION Hazard area extent and location maps for the City of Roslyn are included at the end of this chapter. These maps are based on the best available data at the time of the preparation of this plan, and are considered to be adequate for planning purposes. CHAPTER 5. CITY OF ROSLYN ANNEX 4 Table 5-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Wildfire 8/11/2017 N/A Flooding 3/31/2011 N/A Flooding 1/17/2011 N/A Flooding 1/9/2009 $51,446.96 Winter Weather 12/2008 $5,113.04 Winter Weather 12/15/2006 $150,000a Drought 5/2005 N/A Winter Weather 1/17/2005 $333a Drought 5/2004 N/A Drought 7/2001 N/A Earthquake 2/28/2001 N/A Winter Weather 1/14/1998 N/A Winter Weather/Flooding 12/27/1996 N/A Winter Weather 1/6/1996 $5,333a Flooding 02/1995 N/A Flooding 11/1995 N/A Winter Weather 2/18/1993 $2,381a Winter Weather 12/8/1992 $714a Winter Weather 12/29/1990 $1,282a Flooding 11/25/1990 N/A Winter Weather 2/1/1989 $128,205a Winter Weather 12/2/1985 N/A Winter Weather 1/2/1974 $5,000a Winter Weather 1/24/1972 $25,642a Winter Weather 12/30/1968 N/A Table 5-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Flood 54 2 Wildfire 54 3 Severe Weather 51 4 Earthquake 30 5 Drought 18 6 Volcano 16 7 Landslide 6 8 Dam Failure 1 9 Avalanche 0 10 Seiche 0 CHAPTER 5. CITY OF ROSLYN ANNEX 5 Table 5-3. Legal and Regulatory Capability Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Y N N Y RMC, IBC/IRC 2015 Zoning Code Y N N Y Title 18 RMC, WA GMA 2007 Subdivisions Y N N Y Title 17 & 18 RMC Post Disaster Recovery Y N Y Y Eastern Washington Stormwater Management Plan Real Estate Disclosure N N Y Y RCW 64.06.020 Growth Management Y N N Y RCW 36.70A Site Plan Review Y N Y Y WA GMA 2007 Special Purpose (flood management, critical areas) Y N N N Title 18 RMC Planning Documents General Plan Y N N Y City of Roslyn, Washington Updated Comprehensive Plan 2008 Floodplain or Basin Plan Y N Y Y RMC Title 15.15 Stormwater Plan Y N N Y Eastern Washington Stormwater Management Plan; City of Roslyn Stormwater Comprehensive Plan Capital Improvement Plan Y N N Y City of Roslyn Capital Improvement Plan, City of Roslyn Stormwater Comprehensive Plan Habitat Conservation Plan Y N Y Y Roslyn Urban Forest Land Stewardship Plan Economic Development Plan Y N N Y City of Roslyn, Washington Updated Comprehensive Plan Emergency Response Plan N N N N Upper Kittitas County Emergency Response Plan in development Shoreline Management Plan N N N Y Post Disaster Recovery Plan N N N N CHAPTER 5. CITY OF ROSLYN ANNEX 6 Table 5-4. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Y Planning Dept./City of Roslyn/Planner, Perteet, Inc. (Engineer) Engineers or professionals trained in building or infrastructure construction practices Y Perteet, Inc. (Engineer) Planners or engineers with an understanding of natural hazards Y Perteet, Inc. (Engineer) Staff with training in benefit/cost analysis Y Floodplain manager Y City of Roslyn Planner Surveyors Y Perteet, Inc. (Engineer) Personnel skilled or trained in GIS applications Y Perteet, Inc. (Engineer) Scientist familiar with natural hazards in local area Y Perteet, Inc. (Engineer) Emergency manager N Grant writers Y Staff and Contracted Table 5-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Y Capital Improvements Project Funding Y Authority to Levy Taxes for Specific Purposes Y User Fees for Water, Sewer, Gas or Electric Service Y Incur Debt through General Obligation Bonds Y Incur Debt through Special Tax Bonds Y Incur Debt through Private Activity Bonds N Withhold Public Expenditures in Hazard-Prone Areas Can, but don’t State Sponsored Grant Programs Y Development Impact Fees for Homebuyers or Developers Y Other N Table 5-6. Community Classifications Participating? Classification Date Classified Community Rating System No — — Building Code Effectiveness Grading Schedule Yes 3/3 — Public Protection Yes 6/9 — Storm Ready No — — Firewise Yes Mod/High 2001/2011 CHAPTER 5. CITY OF ROSLYN ANNEX 7 Table 5-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #R-1—Utilize and enhance existing programs to raise public awareness about natural hazards, the risk they pose and ways to reduce those risks. New and Existing All Hazards 1, 2, 3, 4, 5, 6, 9 City Low General Fund Short-term, Ongoing Initiative #R-2—Maintain political support for hazard mitigation and response planning and programs by annually monitoring the progress of initiatives identified in this plan. New and Existing All Hazards 1, 2, 3, 4, 5, 9 City Low General Fund Short-term, Ongoing Initiative #R-3—Leverage mitigation opportunities by establishing and maintaining partnerships between public and private sectors Existing All Hazards 1, 5, 9 City Low General Fund Ongoing Initiative #R-4— Develop a continuity of operations plan and/or a post-disaster recovery plan to sustain operation of critical Town functions. New and existing All Hazards 1, 6, 9 City Medium General Fund, DHS grant funding Long-term, depends on funding Initiative # R-5—Replace vulnerable bridge crossings with restrained piping where feasible and cost-effective. Existing Flood, Dam Failure, Earthquake 1, 7 City High Grants, Loans, Enterprise & Surplus Funds Short-term, Ongoing Initiative #R-6—Replace main transmission waterline (to bridge) Existing Earthquake 1, 7 City $2,000,000, High Grants, Loans, Enterprise & Surplus Funds Short-term Initiative #R-7—Replace main transmission waterline (bridge to treatment plant) Existing Earthquake 1, 7 City High Grants, Loans, Enterprise & Surplus Funds Long-term, depends on funding Initiative #R-8—Replace main transmission waterline (treatment plant to reservoir) Existing Earthquake 1, 7 City High Grants, Loans, Enterprise & Surplus Funds Long-term, depends on funding Initiative #R-9—Complete replacement of pinch point (stormwater system) at Penn Place Apartments New and Existing Flooding 1, 7, 8 City High Grants, Loans, Enterprise & Surplus Funds Short-Term, depends on funding Initiative #R-10—Replace V-ditch catch basins with Type-40 catch basins New and Existing Flooding 1, 7, 8, 10 City Medium Grants, Loans, Enterprise & Surplus Funds Short-term, Ongoing Initiative #R-11—Replace trunk lines and add access points for stormwater system CHAPTER 5. CITY OF ROSLYN ANNEX 8 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline New and Existing Flooding 1, 7, 8 City High Grants, Loans, Enterprise & Surplus Funds Long-Term, depends on funding Initiative #R-12—Construct adequate intake structures at inlets to stormwater system New and Existing Flooding 1, 7, 8, 9, 10 City High Grants, Loans, Enterprise & Surplus Funds Long-term, depends on funding Initiative #R-13—Create channel roughness and other water-retaining systems in the Roslyn Urban Forest New and Existing Flooding 1, 9, 10 City High Grants, Loans, Enterprise & Surplus Funds Long-Term, depends on funding Initiative #R-14—Provide adequate drainage for road beds and trails in the Roslyn Urban Forest New and Existing Flooding, Severe weather 1, 9, 10 City High Grants, Loans, Enterprise & Surplus Funds Long-term, depends on funding Initiative #R-15—Maintain shaded fuel break at forested perimeter of the Roslyn Urban Forest New and Existing Wildfire 1, 2, 4, 10 City Low Grants & General Fund Short-term, Ongoing Initiative #R-16—Implement Roslyn Urban Forest Land Stewardship Plan and dry site management techniques to increase forest health and Firewise entire forest New and Existing Wildfire 1, 2, 10 City High Grants & General Fund Long-term, depends on funding Initiative #R-17—Purchase water tender for fire department New and Existing Wildfire 1, 6, 9 City/RFD High AFG Grants & General Fund Short-term, depends on funding Initiative #R-18—Provide wildland fire training for fire department New and Existing Wildfire 1, 6, 9 City/RFD Low AFG Grants & General Fund Short-term, Ongoing Initiative #R-19—Maintain road beds in the Roslyn Urban Forest for emergency traffic New and existing Wildfire 1, 9, 10 City Medium AFG Grants & General Fund Short-term, depends on funding Initiative #R-20—Retrofit buildings for earthquake protection (focusing on historic structures) Existing Earthquake 1, 2, 4, 7, 8 City High Grants Long-term, depends on funding Initiative #R-21—Purchase land for stormwater retention (Duck Town) New and Existing Flooding, Severe Weather 1, 4, 7, 8, 10 City High Grants, Stormwater Funds Long-term, depends on funding CHAPTER 5. CITY OF ROSLYN ANNEX 9 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #R-22—Clear and maintain creeks that capture flows from storm system (Pioneer Park/Runje Field & Duck Town) New and Existing Flooding 1, 2, 8, 10 City Medium Grants, Stormwater Funds Short-term Initiative #R-23—Install adequate stormwater system in Brookside Neighborhood New and Existing Flooding 1, 2, 10 City High Grants, Stormwater Funds Long-term, depends on funding Initiative #R-24—Install adequate stormwater system in Downtown core New and Existing Flooding 1, 2, 10 City High Grants, Stormwater Funds Long-term, depends on funding Initiative #R-25—Install adequate stormwater system in Pioneer Park/Runje Field New and Existing Flooding 1, 2, 10 City High Grants, Stormwater Funds Long-term, depends on funding Initiative #R-26—Install adequate stormwater system in 5th Street Addition neighborhood New and existing Flooding 1, 2, 10 City High Grants, Stormwater Funds Long-term, depends on funding Initiative #R-27—Install adequate stormwater system in 3rd Street neighborhood New and Existing Flooding 1, 2, 10 City High Grants, Stormwater Funds Long-term, depends on funding Initiative #R-28—Manage potential increased runoff from new development by adopting regulations that require new developments to mitigate their impacts. New Flooding, Severe Weather 1, 2, 3, 4, 7, 9, 10 City/County Low General Fund Short-term Initiative #R-29—Reduce water system losses with waterline upgrades and repairs Existing Drought 1, 2, 4, 5, 6, 7, 9 City Medium Water Fund/Grants Short-term, Ongoing Initiative #R-30—Adopt development practices that require new developments to bury utility cables in business zones and major transportation routes New and Existing Severe Weather 1, 2, 4, 8, 9 City Low Developer Short-term Initiative #-31—Continue to support the implementation, monitoring, maintenance and updating of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards All City Low HMGP, General Fund, Road Fund Short-term, ongoing CHAPTER 5. CITY OF ROSLYN ANNEX 10 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #R-32—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 All City Agencies Low General Fund Short-term, Ongoing Initiative #R-33—Consider participation in the National Weather Service “Storm Ready” program. New and Existing Flood, Severe Weather 6, 7, 9 City Low General Fund Short term Initiative #R-34—Conduct a detailed flood study for the City of Roslyn New and Existing Flood 1, 3, 6, 7, 9 City Medium General Fund, Grants Short-term CHAPTER 5. CITY OF ROSLYN ANNEX 11 Table 5-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* R-1 7 Medium Low Yes Yes Yes High R-2 7 Medium Low Yes Yes Yes High R-3 3 Medium Low Yes No Yes High R-4 1 High High Yes No Yes Medium R-5 2 High Medium Yes Yes Yes Medium R-6 2 High High Yes Yes No High R-7 2 High High Yes Yes No High R-8 2 Medium High No Yes No High R-9 3 High High Yes Yes No Medium R-10 4 High Medium Yes Yes Yes High R-11 3 High High Yes Yes No High R-12 5 High High Yes Yes No High R-13 3 High High Yes Yes No Medium R-14 4 Medium Low Yes Yes Yes Medium R-15 5 High Medium Yes Yes No Medium R-16 3 Medium Medium Yes Yes No Medium R-17 3 High Medium Yes Yes No High R-18 3 High Low Yes No Yes High R-19 3 Medium Medium Yes Yes Yes Medium R-20 5 Medium High No Yes No Low R-21 5 High High Yes Yes No Medium R-22 4 Medium Medium Yes Yes No Medium R-23 3 High High Yes Yes No Low R-24 3 High High Yes Yes No High R-25 3 High High Yes Yes No Low R-26 3 High High Yes Yes No Low R-27 3 High High Yes Yes No Low R-28 7 High High Yes Yes Yes High R-29 7 Medium Low Yes Yes Yes Medium R-30 5 Medium Medium Yes No Yes Medium R-31 10 Medium Low Yes Yes Yes High R-32 3 Medium Low Yes Yes Yes High R-33 3 High Low Yes Yes Yes High R-34 5 High Medium Yes Yes Yes High * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 5. CITY OF ROSLYN ANNEX 12 Table 5-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche — — — — — — Dam Failure 1, 2, 3, 4, 31 1, 2, 3, 4, 5 1, 2, 3, 31, 32 1, 2, 3 1, 2, 3, 32 1, 2 Drought 1, 2, 3, 4, 29, 31 1, 2 1, 2, 29, 31, 32 1, 2, 29 1, 2, 3, 32 1, 2 6 Earthquake 1, 2, 3, 4, 5, 6, 7, 8, 20, 31 1, 2, 3, 4, 20 1, 2, 3, 31, 32 1, 2, 3 1, 2, 3, 32 1, 2, 5, 6, 7, 8, 20 Flood 1, 2, 3, 4, 9, 10, 11, 12, 13, 14, 21, 22, 23, 24, 25, 26, 27, 28, 31, 34 1, 2, 3, 4, 9, 10, 11, 12, 13, 14, 21, 22, 23, 24, 25, 26, 27, 28 1, 2, 3, 31, 34, 33 1, 2, 3, 28 1, 2, 3, 32, 33 1, 2, 9, 10, 11, 12, 13, 23, 24, 25, 26, 27 Landslide 31 31, 32 32 Severe Weather 1, 2, 3, 4, 31, 34 1, 2, 3, 4, 30 1, 2, 3, 31, 34, 33 1, 2, 3 1, 2, 3, 32, 33 1, 2, 30 Seiche — — — — — — Volcano 1, 2, 3, 4, 31 1,2, 3, 4 1, 2, 3, 31 1, 2, 3 1, 2, 3 1, 2 Wildfire 1, 2, 3, 4, 15, 16, 19, 31 1, 2, 3, 15, 16, 17, 18, 19 1, 2, 3, 31 1, 2, 3, 15, 16, 17, 18, 19 1, 2, 3, 17, 18 1, 2 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. CHAPTER 5. CITY OF ROSLYN ANNEX 13 Figure 5-1. City of Roslyn Critical Facilities CHAPTER 5. CITY OF ROSLYN ANNEX 14 Figure 5-2. City of Roslyn Minimum Temperatures CHAPTER 5. CITY OF ROSLYN ANNEX 15 Figure 5-3. City of Roslyn Maximum Temperatures CHAPTER 5. CITY OF ROSLYN ANNEX 16 Figure 5-4. City of Roslyn Average Annual Precipitation CHAPTER 5. CITY OF ROSLYN ANNEX 17 Figure 5-5. City of Roslyn Potential Wind Power CHAPTER 5. CITY OF ROSLYN ANNEX 18 Figure 5-6. City of Roslyn Special Flood Hazard Areas CHAPTER 5. CITY OF ROSLYN ANNEX 19 Figure 5-7. City of Roslyn Liquefaction Susceptibility CHAPTER 5. CITY OF ROSLYN ANNEX 20 Figure 5-8. NEHRP Seismic Soil Site Classes for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 21 Figure 5-9. Cle Elum Earthquake Scenario Peak Ground Acceleration for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 22 Figure 5-10. Horse Heaven Hills Earthquake Scenario Peak Ground Acceleration for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 23 Figure 5-11. Mill Creek Earthquake Scenario Peak Ground Acceleration for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 24 Figure 5-12. Rattlesnake Wallula Earthquake Scenario Peak Ground Acceleration for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 25 Figure 5-13. Saddle Mountain Earthquake Scenario Peak Ground Acceleration for the City of Roslyn CHAPTER 5. CITY OF ROSLYN ANNEX 26 Figure 5-14. City of Roslyn Mean Fire Return Interval 1 Chapter 6. Town of South Cle Elum 6.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Jim DeVere, Mayor P.O. Box 160 South Cle Elum, WA 98943 Telephone: (509) 674-4322 Email: cjdevere@msn.com Scott McKenzie, Superintendent P.O. Box 160 South Cle Elum, WA 98943 Telephone: (509) 674-4322 Email: sce@inlandnet.com 6.2. JURISDICTION PROFILE The following is a summary of key information about the jurisdiction and its history: – Date of Incorporation—August 20, 1911 – Current Population—575 as of 2011 – Population Growth—The population in the Town of South Cle Elum (Town) increased 21 percent between 2000 and 2010, averaging 2.32 percent per year. Based on the American Community Survey estimates, the population of the Town decreased from 532 in 2010 to 524 in 2016. Future population growth is limited by remaining available water connections. – Location and Description—South Cle Elum is bordered on the north by the Yakima River and the City of Cle Elum. Interstate 90 is also to the north. Unincorporated Kittitas County surrounds the Town to the east, south and west. Mt. Peoh is to the south, Lookout Mountain is to the east, Mt. Stuart is to the north and the Cascades are to the west. The Iron Horse State Park and the John Wayne Trail run along the Town’s southern border. – Jurisdiction Vulnerability to Hazards— South Cle Elum, along with all jurisdictions in Kittitas County, has an overall low vulnerability to avalanche, drought, landslide, and volcano hazards, and an overall high vulnerability to severe weather events. Based on the three dam failure scenarios used in this plan, 95% of South Cle Elum’s population and 98% of property is at risk of dam failure. South Cle Elum has high exposure to earthquakes, and various earthquake scenarios result in losses up to 10% of building value. South Cle Elum has 61 buildings (25% of assessed building value) located in the 100- or 500-year floodplain, and therefore a high vulnerability to flooding. South Cle Elum has moderate vulnerability to wildfires, with 5% of buildings exposed to the 0-30 Year Fire Interval. – Brief History—South Cle Elum was initially developed to serve the Milwaukee Railroad. In mid-1909, the Chicago, Milwaukee & Puget Sound Railway chose Cle Elum as a division point between the Coast and Columbia divisions on its future transcontinental line—first as a water, fuel and crew change location, and later as a full service repair shop, complete with roundhouse. After electrification, a substation was added. The population during this time was split between railroaders, coal miners and loggers. When the Milwaukee Railroad went into receivership in the late 1970s, the State of Washington converted the right-of-way into a state park. – Climate—Located between the Cascade Mountains and the plains of central Washington, the Town of South Cle Elum enjoys four distinct seasons. The seasons are tempered by the Town’s elevation at close to 2,000 feet above sea level. Summers are usually dry and warm to hot, with CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 2 high temperatures between 80ºF and 100ºF and mostly westerly breezes that make the weather seem somewhat cooler. Cooler temperatures and changing foliage mark the change toward winter weather, which generally arrives between Thanksgiving and Christmas . Winter can bring temperatures from +20ºF to –20ºF. Colder temperatures usually come in January. In the spring, the snow melts and temperatures warm again. – Governing Body Format—The town of South Cle Elum is governed by a five-member council and a mayor. This governing body is elected to four-year terms. This body will assume responsibility for adoption, implementation and maintenance of this plan. – Development Trends—Development in South Cle Elum trends towards residential uses at this time and into the foreseeable future. The Town does have space for some light industry and commercial development, but selectively so. Urban growth boundaries are going to be static except to the east, where the city hopes to expand in the future. 6.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 6-1 lists all past occurrences of natural hazards within the jurisdiction. Repetitive loss records are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: 1 – Number of Repetitive Flood Loss Properties that have been mitigated: 0 6.4. HAZARD RISK RANKING Table 6-2 presents the ranking of the hazards of concern. The 2018 plan rankings remained the same as the previous plan update. 6.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table 6-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 6-4. The assessment of the jurisdiction’s fiscal capabilities is presented in Table 6-5. Classifications under various community mitigation programs are presented in Table 6-6. 6.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 6-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 6-8 identifies the priority for each initiative. Table 6-9 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 3 Table 6-1. Natural Hazard Events Type of Event FEMA Disaster # (if applicable) Date Preliminary Damage Assessment Flood Event FEMA 1817 DR 2009 61,688.00 Earthquake 02-28-2001 N/A Earthquake 05-03-1996 N/A Earthquake 01-29-1995 N/A Earthquake 02-14-1981 N/A Earthquake 04-29-1965 N/A Table 6-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Flood 27 2 Wildfire 27 3 Earthquake 24 4 Dam Failure 18 5 Severe Weather 18 6 Landslide 10 7 Volcano 6 8 Drought 5 9 Avalanche 1 CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 4 Table 6-3. Legal and Regulatory Capability Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Yes Yes No Yes Title 15 SCEMC adopts the 2009 IBC, 7/27/2010 Zonings Yes No No No Title 17, SCEMC, 2001 Subdivisions Yes No No No Title 16, SCEMC, 2005 Stormwater Management No No No No Post Disaster Recovery No No Yes Yes RCW 64.06.020 Real Estate Disclosure Yes No No Yes RCW 36.70A Growth Management Yes No No Yes Title 15 SCEMC, 2010 Site Plan Review Yes No No No Flood damage Prevention: Title 15, Chapter 15.24; 2002 Critical Areas: Title 18, SCEMC, 2010 Special Purpose (flood management, critical areas) Yes Yes No Yes Title 15 SCEMC adopts the 2009 IBC, 7/27/2010 Planning Documents General or Comprehensive Plan Yes No No Yes Floodplain or Basin Plan Yes No No No Kittitas County Comprehensive Floodplain Management Plan, 1996 Stormwater Plan Yes No No No Capital Improvement Plan Yes No No No 5-year CIP, updated annually for streets, water, sewer and drainage Habitat Conservation Plan No No No No Economic Development Plan Yes No No No Economic Development Group of Kittitas County & Chamber Emergency Response Plan No No No No Shoreline Management Plan Yes Yes No No Post Disaster Recovery Plan No No No No CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 5 Table 6-4. Administrative and Technical Capability Staff/Personnel Resources Available? Planners or engineers with knowledge of land development and land management practices Yes Engineers or professionals trained in building or infrastructure construction practices Yes Planners or engineers with an understanding of natural hazards Yes Staff with training in benefit/cost analysis As-needed basis Floodplain manager Yes Surveyors Yes Personnel skilled or trained in GIS applications Yes Scientist familiar with natural hazards in local area As-needed basis Emergency manager Yes Grant writers Yes Table 6-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Yes Capital Improvements Project Funding Yes Authority to Levy Taxes for Specific Purposes Yes User Fees for Water, Sewer, Gas or Electric Service Yes Incur Debt through General Obligation Bonds Yes Incur Debt through Special Tax Bonds Yes Incur Debt through Private Activity Bonds No Withhold Public Expenditures in Hazard-Prone Areas No State Sponsored Grant Programs Yes Development Impact Fees for Homebuyers or Developers No Other Table 6-6. Community Classifications Participating? Classification Date Classified Community Rating System No -- -- Building Code Effectiveness Grading Schedule Yes 3/3 -- Public Protection No -- -- Storm Ready No -- -- Firewise No -- -- CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 6 Table 6-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative SCE #1—Retrofit sewer mains in flood hazard areas. Existing Flood, Earthquake 1,2,3,4,5 Town High, $500,000 General Fund, Capital improvements project funding, FEMA Hazard Mitigation Grants Long-term, depends on funding Initiative SCE #2—Retrofit water mains within the flood hazard areas. New and Existing Flood, EQ 1,2,3,4,5 Town High $750,000 General Fund, Capital improvements project funding, FEMA Hazard Mitigation Grants, CDBG Long-term, depends on funding Initiative SCE #3—Maintain and retrofit existing localized flood control structures. Existing Flood 1,2,3,4,5 Town Low $24,000 General Fund Short-term Ongoing Initiative SCE #4—Retrofit all critical infrastructure to enhance resilience to all hazards. Existing All Hazards 1,2,3,4,5 Town High General Fund, Capital improvements project funding, FEMA Hazard Mitigation Grants Long-term, depends on funding Initiative SCE #5 —Adopt appropriate regulatory standards that will reduce the risk of natural hazards through updates to existing code affecting critical areas regulations, flood hazard regulations, shoreline regulations, and updates to Kittitas County’s comprehensive plan. New All Hazards 1,3,4,9,10 Town Low General Fund Short-Term Initiative SCE #6—Continue to maintain compliance and good standing under the National Flood Insurance Program. New and Existing Flood 1,2,3,4,6,8,1 0 Town Low General Fund Short-term, ongoing Initiative SCE #7— Retrofit the overflow for the municipal water supply. Existing All Hazards 1,2,8 Town High, $150,000 General Fund, Water Fund Reserve Mid-Term Initiative SCE #8—Participate in Firewise and conduct a study on wildfire prevention and policies. New and existing Wildfire 1,3,6,7,9 Town Low General Fund, Pre- Disaster Mitigation Grant Program Short-term Initiative SCE #9—Where appropriate, support retrofitting, purchase, or relocation of structures in hazard- prone areas to protect structures from future damage, prioritizing properties exposed to repetitive losses. Existing All Hazards 1,2,8,10 Town High Hazard Mitigation Grant Program, Local contribution Long-Term depends on funding CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 7 Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative SCE #10—Develop a continuity of operations plan and/or a post-disaster recovery plan to sustain operation of critical Town functions. New and existing All Hazards 1,6,9 Emergency Managemen t Staff Medium General fund, Dept. of Homeland Security grant funding Long-term Initiative SCE #11—Educate the public on natural hazards, the risks they pose, and ways to reduce those risk through existing public information programs with the Town. New and Existing All Hazards 6,7,9 Town Low General Fund Short-term Ongoing Initiative SCE #12—Continue to support implementation, monitoring, maintenance and updating of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards All Town Low HMGP, General Fund, Road Fund Short-term, ongoing Initiative SCE #13—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 Town Low General Fund Short-term Ongoing Initiative SCE #14—Maintain and retrofit critical transportation infrastructure (particularly infrastructure allowing access to the town) New and Existing All Hazards 1,8 Town Medium General Fund, Capital improvements project funding, FEMA Hazard Mitigation Grants Ongoing CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 8 Table 6-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/ Budgets? Priority* 1 5 High High Yes Yes No Medium 2 5 High High Yes Yes No High 3 5 High Medium Yes No Yes High 4 5 High High Yes Yes No Medium 5 5 Medium Low Yes No Yes High 6 7 Medium Low Yes No Yes High 7 3 High Medium Yes Yes Yes High 8 5 High Medium Yes Yes No Medium 9 4 High High Yes Yes No Medium 10 3 High Medium Yes Yes No Medium 11 3 Low Low Yes No Yes High 12 10 Medium Low Yes Yes Yes High 13 3 Medium Low Yes No Yes High 14 2 High Medium Yes Yes Yes High * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 9 Table 6-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 5, 12, 13 4, 7, 9, 14 11, 12, 13 -- 10, 13, 14 -- Dam failure 5, 12, 13 4, 7, 9, 14 11, 12, 13 -- 10, 13, 14 -- Drought 5, 12, 13 4, 7, 9 11, 12, 13 -- 10, 13 -- Earthquake 5, 12, 13 1, 2, 4, 7, 9, 14 11, 12, 13 -- 10, 13, 14 -- Flood 5, 6, 12, 13 1, 2, 3, 4, 6, 7, 9, 14 6, 11, 12, 13 -- 6, 7, 10, 13, 14 -- Landslide 5, 12, 13 4, 7, 9, 14 11, 12, 13 -- 10, 13, 14 -- Severe Weather 5, 12, 13 4, 7, 9, 14 11, 12, 13 -- 7, 10, 13, 14 -- Volcano 5, 12, 13 4, 7, 9, 14 11, 12, 13 -- 10, 13, 14 -- Wildfire 5, 8, 12, 13 4, 7, 8, 9, 14 8, 11, 12, 13 8 8, 10, 13, 14 -- Notes: 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural syste ms. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 10 Figure 6-1. Town of South Cle Elum Critical Facilities CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 11 Figure 6-2. Town of South Cle Elum Minimum Temperature CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 12 Figure 6-3. Town of South Cle Elum Maximum Temperature CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 13 Figure 6-4. Town of South Cle Elum Average Annual Precipitation CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 14 Figure 6-5. Town of South Cle Elum Potential Wind Power CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 15 Figure 6-6. Town of South Cle Elum Special Flood Hazard Areas CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 16 Figure 6-7. Town of South Cle Elum Liquefaction Susceptibility CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 17 Figure 6-8. NEHRP Seismic Soil Site Classes for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 18 Figure 6-9. Cle Elum Earthquake Scenario Peak Ground Acceleration for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 19 Figure 6-10. Horse Heaven Hills Earthquake Scenario Peak Ground Acceleration for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 20 Figure 6-11. Mill Creek Earthquake Scenario Peak Ground Acceleration for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 21 Figure 6-12. Rattlesnake Wallula Earthquake Scenario Peak Ground Acceleration for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 22 Figure 6-13. Saddle Mountain Earthquake Scenario Peak Ground Acceleration for the Town of South Cle Elum CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 23 Figure 6-14. Town of South Cle Elum Liquefaction Susceptibility CHAPTER 6. TOWN OF SOUTH CLE ELUM ANNEX 24 Figure 6-15. Town of South Cle Elum Mean Fire Return Interval Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 3— FIRE AND RESCUE DISTRICT ANNEXES CHAPTER 7. FIRE DISTRICT #1 ANNEX 1 Chapter 7. Fire District #1 Annex 7.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Brandon Schmidt Fire Chief PO Box 34 / 10700 N. Thorp Hwy Thorp Wash. 98946 Telephone: 509-964-2435 Email: kcfd1@fairpoint.net Craig George Fire Commissioner Chairman PO Box 34 / 10700 N. Thorp Hwy Thorp Wash. 98946 Telephone: 509-964-2435 Email: kcfd1@fairpoint.net 7.2. JURISDICTION PROFILE Kittitas County Fire District #1 is mostly a rural area with small to medium residential areas interspersed through the wildland-urban interface areas. The District provides emergency medical service and fire protection on over 43.5 sq. miles, which is intersected by 11 miles of Interstate 90, 10 miles of SR 10, 9 miles of SR 97, 12 miles of the Yakima River, and 12 miles of BNSF Railway track. All of this service is provided by a crew of 28 volunteer firefighters, 9 of which are emergency medical technicians. Funding comes to the junior taxing district through property taxes and grants. The following is a summary of key information about the jurisdiction: – Population Served— 2500 as of 2009 (Amended) – Land Area Served— 43.5 sq. miles – Value of Area Served—The estimated value of the area served by the jurisdiction is $171,631,639 – Land Area Owned— 2.95 acres (two stations) – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 2000 GMC pumper – 2006 Pierce Pumper – 2007 GMC Brush Truck – 2008 Kenworth Tender – 2002 Ford Brush Truck – 1995 Chev Rescue – 1984 International Pumper – 2018 GMC Command Vehicle – 1990 Ford Tender – 1999 Ford Support vehicle – 2000 Ford Brush Truck – 1995 Chev Aid Unit – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $940,000 CHAPTER 7. FIRE DISTRICT #1 ANNEX 2 – List of Critical Facilities Owned by the Jurisdiction: – Station 11 Thorp $350,957 – Station 12 Clark Flats, 2 Buildings $179,305 – Station 11 Storage Container $3,000 – Total Value of Critical Facilities— The total value of critical facilities owned by the jurisdiction is $533,262. Current and Anticipated Service Trends— Call volume is on the increase. 2017 saw the department hit 200 calls for the first time and 2018 is looking to surpass that number. People are building and moving into the district. Traffic volume continues to increase on Interstate 90. Wildland fires are on the increase for the county and FD1 is responding mutual aid to surrounding districts more often. 7.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 7-1 lists all past occurrences of natural hazards within the jurisdiction. 7.4. HAZARD RISK RANKING Table 7-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from wildfire and flooding, with moderate risk from severe storms, earthquakes and landslides. There is low risk from all other hazards. 7.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans that apply to Fire Di strict 1 and are also applicable to this hazard mitigation plan: – Enhanced State Hazard Mitigation Plan, final rule CFR part 201.4 – Building Code KCC 14.04 – Kittitas County Comprehensive Plan – Emergency Response Plan – Critical Areas KCC 17A.05 – Federal and state occupational safety and labor-and-industry mandates – Firewise programs within the County supported by Kittitas County Conservation District, Washington Department of Natural Resources, U.S. Forest Service, and the fire districts. 7.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 7-3. 7.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 7-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 7-5 identifies the priority for each initiative. Table 7-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. Table 7-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Wildfire 08/13/2012 N/A Winter Weather 3/25/2011 N/A CHAPTER 7. FIRE DISTRICT #1 ANNEX 3 Type of Event Date Preliminary Damage Assessment Winter Weather 3/02/2009 N/A Winter Weather 1/30/2009 N/A Flooding 1/9/2009 N/A Wildfire 8/3/2005 N/A Wildfire 7/30/2004 N/A Wildfire 7/26/2004 N/A Wildfire 7/2/2004 N/A Wildfire 7/29/2003 N/A Flooding 1/31/2003 N/A Earthquake (Nisqually) 3/1/2001 N/A Winter Weather 1/17/1997 N/A Flooding 2/9/1996 N/A Flooding/High Winds 1/3/1996 N/A Winter Weather 2/19/1993 N/A Flooding 11/26/1990 N/A Flooding 1/18/1986 N/A Volcanic Eruption 5/21/1980 N/A Flooding/Mudslide 12/10/1977 N/A Flooding 12/13/1975 N/A Flooding/Landslide 12/22/1972 N/A Landslide 6/70 N/A Flooding/Landslide 1/26/1965 N/A Heavy Rains/ Flooding 12/29/1964 N/A Table 7-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Wildfire 3x6=18 1 Flood 3x6=18 2 Severe Storms/Wind 3x5=15 3 Earthquake 2x6=12 4 Landslides 2x5=10 5 Volcano/Lahar 1x3=3 5 Dam Failure 1x3=3 6 Drought 2x1=2 7 Avalanche 0 7 Tsunami (Seiche) 0 Table 7-3. Community Classifications Participating? Classification Date Classified Public Protection Yes 6/9 — Storm Ready No — — Firewise Yes — — CHAPTER 7. FIRE DISTRICT #1 ANNEX 4 Table 7-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #KCFD1-1—Participate in the “Firewise” program by identifying project site locations and promoting Firewise techniques as a defensible space initiative. Coordinate with and donate to Kittitas Fire Adapted Communities. New and Existing Wildfire 6,7,9 KCFD-1 Low District Funds Short-term, Ongoing Initiative# KCFD1-2—Continue to provide fire safety, fire prevention and Firewise education to neighborhoods, schools and community via web pages, signage and outreach. New and Existing Wildfire 6,7,9 KCFD-1 Low Firewise Grant, District Funds Short Term Initiative KCFD1-3—Develop and maintain a coordinated approach between fire jurisdictions and water supply agencies to identify needed improvements to the water distribution system, initially focusing on areas of highest wildfire hazard. New & Existing Wildfire 1,9,10 KCFD-1 Low District Funds Short-term, Ongoing Initiative KCFD1-4—Require that development in high fire hazard areas provide adequate access roads, onsite fire protection systems, evacuation signage and fire breaks. New Wildfire 1,2,3,9,10 KCFD-1 Low County/District Funds Short-term, Ongoing Initiative # KCFD1-5—Continue to support the implementation, monitoring, maintenance and updating of this plan. New and Existing All Hazards All KCFD-1 Low HMGP, District funds Short-term, ongoing Initiative #KCFD1-6—Continue to support through active participation the countywide initiatives identified in volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 KCFD-1 Low District Funds Short-term, Ongoing Initiative #KCFD1-7— Build crew quarters, in order to improve response time, capabilities, and quality of facilities. New Wildfire 1,10 KCFD-1 High County/District Funds Long-term Initiative #KCFD1-8— Cycle out the 1990 watertender for a new, tactical watertender more suited for wildland fires New and Existing Wildfire 1,10 KCFD-1 Medium County/District Fund Short-term Initiative #KCFD1-9— Study evacuation routes (including inundation patterns and high-water evacuation routes in case of dam failure) Existing All Hazards 1,6,7,9 KCFD-1, County, USBR Medium County/District Fund Long-term CHAPTER 7. FIRE DISTRICT #1 ANNEX 5 Initiative #KCFD1-10— Site-specific location mitigation, including thinning and/or fire break development near Elk Heights New and Existing Wildfire 1,4,8,10 KCFD-1, DNR Medium County/District Fund Ongoing Table 7-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* KCFD1-1 3 High Low Yes Yes Yes High KCFD1-2 3 High Low Yes No Yes High KCFD1-3 3 High Low Yes No Yes High KCFD1-4 5 High Low Yes No Yes High KCFD1-5 10 High Low Yes Yes Yes High KCFD1-6 3 High Low Yes No Yes High KCFD1-7 1 High High Yes Yes Yes Low KCFD1-8 1 High Medium Yes Yes Yes Medium KCFD1-9 10 High Medium Yes Yes Yes Medium KCFD1-10 1 High Medium Yes Yes Yes Medium * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 7. FIRE DISTRICT #1 ANNEX 6 Table 7-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche — — 9 — 9 — Dam Failure 5 5, 6, 9 6, 9 Drought 5 5, 6, 9 6, 9 Earthquake 5 5, 6, 9 6, 9 Flood 5 5, 6, 9 6, 9 Landslide 5 5, 6, 9 6, 9 Severe Weather 5 5, 6, 9 6, 9 Seiche — — 9 — 9 — Volcano 5 5, 6, 9 6, 9 Wildfire 1, 3, 4 1, 4, 10 1,2, 6, 9 1 1, 6, 7, 8, 9, 10 3, 7, 8 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a ha zard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. CHAPTER 8. FIRE DISTRICT #7 ANNEX 1 Chapter 8. Fire District #7 Annex 8.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Roy Palmer, Fire Chief Kittitas County Fire District 7 123 East 1st Street Cle Elum, WA 98922 Telephone: 509-674-5371 Email: roypalmer@kcfd7.com Assistant Chief Kittitas County Fire District 7 123 East 1st Street Cle Elum, WA 98922 Telephone: 509-674-5371 Email: office@kcfd7.com 8.2. JURISDICTION PROFILE Kittitas County Fire District #7 (Kittitas County Fire & Rescue) is a large rural fire district on the east slope of the Cascade mountain range, 90 miles east of Seattle and 35 miles west of Ellensburg. KCFD #7 encompasses 110 square miles, with a population of 3,526 people. The district protects a 20-mile stretch of the I-90 corridor, a major transportation route from Seattle. The district borders the town of Easton to the west and surrounds the cities of Cle Elum and Roslyn, South Cle Elum and the township of Ronald (KCFD #6). The district lies in a high value forest and open range environment along the east slope of the Cascade mountain range. The district actively responds to wildfires, structure fires, light rescue and emergency medical incidents, with an average call volume of 500 incidents per year. The district has 16 paid positions and 40-plus volunteer firefighters. The district participates in the countywide mutual aid agreement. The fire district is a junior taxing district organized in 1980 under Revised Code of Washington, (RCW) Title 52. The governing body is a three-member elected board of commissioners that will assume the responsibility for adoption and implementation of this plan. The fire chief is the chief executive officer for the district and is responsible for the administration of any policies or program adopted by the board of fire commissioners. The district population is predominately located in the wildland-urban interface, along the slopes of the upper Kittitas valley. In an area known for intense wildfire behavior, the fire district actively partners with the Washington State Department of Natural Resources and U.S. Forest service to prevent and extinguish wildland fires. The following is a summary of key information about the jurisdiction: • Population Served - 4,511 as of the 2018 population estimate • Land Area Served - 126 square miles (See Figure 8-1) • Value of Area Served - The estimated value of the area served by the jurisdiction is $2,429,120,426 • Land Area Owned - 11.5 acres CHAPTER 9. FIRE DISTRICT #51 ANNEX 2 Figure 8-1. Fire District #7 Boundaries  List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 8 Type 1 Engines, Total value $775,000. – 1 Type 1 Ladder Trucks, Total Value $150,000 – 1 Mobile Air Unit, Total value $5,000 – 4 Aid Units, Total Value $60,000 – 7 Support Units, Total Value $40,000 – 9 Wild-land Units, Total Value $140,000 – 7 Water Tenders, Total Value $310,000 – Communications/Radios, Total Value $150,000 – Computer Equipment, Total Value $200,000 – Small equipment, Total Value $500,000  Total Value of Critical Infrastructure/Equipment – The total value of critical infrastructure and equipment owned by the jurisdiction is $3,829,367.  List of Critical Facilities Owned by the Jurisdiction – 8 Fire Stations CHAPTER 8. FIRE DISTRICT #7 ANNEX 3  Total Value of Critical Facilities - The total value of critical facilities owned by the jurisdiction is $8,584,851.  Current and Anticipated Service Trends - An increase in new vacation home construction, results in a minor increase in population growth but greater recreational intensity in the district. Due to the increase of tourism and recreational activity, the district may see a slight increase in overall responses. 8.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 8-1 lists all past occurrences of natural hazards within the jurisdiction. 8.4. HAZARD RISK RANKING Table 8-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from wildfire, with severe storms ranked second. The area has moderate risk from flooding, earthquakes and landslides. There is low risk from all other hazards. 8.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – Enhanced State hazard Mitigation Plan, final rule CFR part 201.4 – Building Code KCC 14.04 – Kittitas County Comprehensive Plan – Emergency Response Plan – Critical Areas KCC 17A.05 – Federal and state occupational safety and labor-and-industry mandates – Firewise programs within the County supported by Kittitas County Conservation District, Washington Department of Natural Resources, U.S. Forest Service, and the fire districts. – Kittitas County Community Wildfire Protection Plan 8.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 8-3. 8.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 8-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 8-5 identifies the priority for each initiative. Table 8-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. 8.8. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY Seismic data is needed to highlight specific hazard locations and potential vulnerabilities within the district, and to support potential remodeling or replacement. CHAPTER 8. FIRE DISTRICT #7 ANNEX 4 8.9. ADDITIONAL COMMENTS Currently, the county is under significant water availability restrictions. Federal and state agencies need to recognize and authorize allowances to support construction of emergency facilities that serve the community at large and in particular, provide for ready access to water for fire-fighting purposes. Table 8-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Severe winter storm 03/25/2011 No estimate available Severe winter storm 03/02/2009 No estimate available Severe winter storm 01/30/2009 No estimate available Earthquake/Nisqually 03/01/2001 No estimate available Severe winter storm 01/17/1997 No estimate available Severe winter storm 02/09/1996 No estimate available Severe winter storm 01/03/1996 No estimate available Severe winter storm 11/26/1990 No estimate available Volcanic eruption/ St. Helens 05/21/1980 No estimate available Severe winter storm 12/10/1977 No estimate available Severe winter storm 12/13/1975 No estimate available Severe winter storm 12/29/1964 No estimate available Table 8-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Wildland Fire 54 2 Severe winter storm 27 3 Flooding 18 4 Earthquake 12 5 Landslide 8 6 Avalanche 2 7 Dam Failure 2 8 Volcano/Lahar 1 9 Drought 1 10 Tsunami/Seiche 1 Table 8-3. Community Classifications Participating? Classification Date Classified Public Protection Yes 7/9 9/2009 Storm Ready No — — Firewise No — — CHAPTER 8. FIRE DISTRICT #7 ANNEX 5 Table 8-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative # FD7-01—Ensure a reliable source of water for fire suppression, meeting acceptable standards for minimum volume and flow requirements for existing and new development. a New & Existing Wildfire 1, 4 Community development Medium Developers, FEMA Short term/ ongoing Initiative # FD7-02—Develop and maintain a coordinated approach between fire jurisdictions and water supply agencies to identify improvements to the water distribution system, initially focusing on areas of highest wildfire hazard. New & Existing Wildfire 1, 4, 9 KCFD #7 Low District funds Short term/ ongoing Initiative # FD7-03—Enforce a minimum road width of 20 feet on all roadways greater than 50 feet in length New & Existing All Hazards 1, 4, 10 Fire marshal Low County Funds Short term/ ongoing Initiative # FD7-04—Adopt a Firewise program creating a 30-foot defensible space along all public roadways, allowing for safe evacuation routes. New & Existing All Hazards 1, 4, 10 Community development Low County Funds Short term/ ongoing Initiative # FD7-05—Replace or significantly retrofit existing fire stations to meet critical infrastructure standards. New & Existing Wildfire 4 KCFD #7 High District funds Long term Initiative #FD7-06—Ensure all dead-end public roads have adequate turn around for fire equipment. New & Existing All Hazards 1, 4 Community Development Low County Funds Short term/ ongoing Initiative #FD7-07—Continue to support the implementation, monitoring, maintenance and updating of this plan. New & Existing All Hazards 5, 9 KCFD# 7 Low District funds Short term/ ongoing Initiative #FD7-08—Support countywide initiatives related to hazard mitigation efforts. New & Existing All Hazards 9 KCFD #7 Low District funds Short term/ ongoing CHAPTER 8. FIRE DISTRICT #7 ANNEX 6 Table 8-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 01 2 High Medium Yes Yes No High 02 3 High Low Yes Yes Yes High 03 3 High Low Yes No Yes High 04 1 High Low Yes Yes Yes Medium 05 1 Medium Medium Yes Yes Yes Medium 06 2 Medium Low Yes No Yes Medium 07 2 High Low Yes Yes Yes High 08 1 High Low Yes No Yes High * See Section 1.3 for definitions of high, medium and low priorities. Table 8-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 7, 8 3,4 Dam Failure 7, 8 3,4,6 Drought 7, 8 Earthquake 7, 8 3,4,6 Flood 7, 8 3,4,6 Landslide 7, 8 3,4,6 Severe Weather 7, 8 3,4,6 Seiche 7, 8 3,4,6 Volcano 7, 8 3,4,6 Wildfire 2, 7, 8 1, 2, 4, 5, 7 1, 2, 4 1, 2, 3, 4, 5, 6 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. CHAPTER 9. FIRE DISTRICT #51 ANNEX 1 Chapter 9. Fire District #51 Annex 9.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Jay Wiseman – Fire Chief P.O. Box 99 Snoqualmie Pass, WA 98068 Telephone: 425-761-0781 Email: jwiseman@snoqualmiepassfirerescue.org Troy Donlin P.O. Box 99 Snoqualmie Pass, WA 98068 Telephone: 425-434-6333 Email: tdonlin@snoqualmiepassfirerescue.org 9.2. JURISDICTION PROFILE King and Kittitas County Fire District 51 (dba Snoqualmie Pass Fire and Rescue) is a fire protection district that provides structural fire, wildland fire, emergency medical response and rescue operations in the Snoqualmie Pass/ Lake Kachess / Stampede Pass areas of Kittitas County and along I-90 from Milepost 42 to Milepost 67. Snoqualmie Pass Fire & Rescue is a dual County Fire District in both King and Kittitas Counties. Approximately one third of the District is in King County and 2 thirds in Kittitas County The district was formed in the early 1970s and is funded through property taxes and is run by an elected Board of Fire Commissioners who appoint a Chief of the Department for day-to-day operations. Besides the property owners and residents within Snoqualmie Pass Fire & Rescue, the District also provides service to the I-90 corridor, which has up to 40,000 vehicles per day travel across it. The Districts primary industry is the Summit at Snoqualmie Ski Resort with four separate base area facilities including food and beverage services and maintenance facilities. The Summit at Snoqualmie also has approximately 40 chair lifts. The following is a summary of key information about the jurisdiction: Population Served—1000 as of 2018 – Land Area Served—Approximately 40 square miles – Value of Area Served—The estimated value of the area served by the jurisdiction is $470,507,209 – Land Area Owned—Approximately 1/3 acre – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 4 – Fire Engine: $1,400,000 – 3 – Aid Car: $300,000 – 4 – Brush Trucks: $200,000 – All portable equipment located in the emergency vehicles and station: $100,000 – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $10,000,000. – List of Critical Facilities Owned by the Jurisdiction: – Fire Station #83: $150,000 – Fire Station 291: $6,000,000 CHAPTER 9. FIRE DISTRICT #51 ANNEX 2 – Total Value of Critical Facilities—The total value of critical facilities owned by the jurisdiction is: $6,150,000 – Current and Anticipated Service Trends— As the transient population traveling over I-90 continues to increase, so do the District’s calls for service. The vast majority of responses are directly related to incidents on I-90. The Community is also growing and calls for service have increased due to this growth. Figure 9-1. Fire District 51 Boundaries 9.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 9-1 lists all past occurrences of natural hazards within the jurisdiction. 9.4. HAZARD RISK RANKING Table 9-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from earthquakes, with severe storms ranked second. The area has moderate risk from flooding, wildfire, and volcano. There is low risk from all other hazards. 9.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – Enhanced State Hazard Mitigation Plan, final rule CFR part 201.4 – Building Code KCC 14.04 – Kittitas County Comprehensive Plan – Emergency Response Plan – Critical Areas KCC 17A.05 CHAPTER 9. FIRE DISTRICT #51 ANNEX 3 – Federal and state occupational safety and labor-and-industry mandates – Firewise programs within the County supported by Kittitas County Conservation District, Washington Department of Natural Resources, U.S. Forest Service, and the fire districts. – Kittitas County Community Wildfire Protection Plan 9.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 9-3. 9.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 9-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 9-5 identifies the priority for each initiative. Table 9-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. 9.8. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY The District’s service area is extremely vulnerable to avalanche events that could isolate the area or cause a large population to become trapped in the area. The other major concern is failure of the dam on either Lake Keechelus or Lake Kachess, which would cause a major flooding event and potentially isolate portions of the district. There there is only one facilities within the District that could serve as a command post or emergency shelter if a major hazard incident were to occur. Station 291 has an emergency diesel generator and can serve as an incident command post, EOC and an emergency shelter. CHAPTER 9. FIRE DISTRICT #51 ANNEX 4 Table 9-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Severe winter storm 03/25/2011 No estimate available Severe winter storm 03/02/2009 No estimate available Severe winter storm 01/30/2009 No estimate available Earthquake/Nisqually 03/01/2001 No estimate available Severe winter storm 01/17/1997 No estimate available Severe winter storm 02/09/1996 No estimate available Severe winter storm 01/03/1996 No estimate available Severe winter storm 11/26/1990 No estimate available Volcanic eruption/ St. Helens 05/21/1980 No estimate available Severe winter storm 12/10/1977 No estimate available Severe winter storm 12/13/1975 No estimate available Severe winter storm 12/29/1964 No estimate available Table 9-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Earthquake 54 2 Severe winter storm 27 3 Flooding 18 4 Wildfire 12 5 Volcano/Lahars 8 6 Landslide 2 6 Avalanche 2 7 Dam Failure 1 7 Drought 1 7 Tsunami/Seiche 1 Table 9-3. Community Classifications Participating? Classification Date Classified Public Protection Yes 8/9 — Storm Ready No — — Firewise No — — CHAPTER 9. FIRE DISTRICT #51 ANNEX 5 Table 9-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #FD8-01—Continue to support the implementation, monitoring, maintenance and updating of this plan. New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing Initiative #FD8-02—Continue to support through active participation the countywide initiatives identified in volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing New and Existing New and Existing New and Existing New and Existing New and Existing New and Existing Initiative #FD8-03—Participate in the Firewise program by identifying project site locations and promoting Firewise techniques as a defensible space initiative. New and Existing New and Existing New and Existing New and Existing New and Existing New and Existing New and Existing Initiative #FD8-04—Comply with all applicable building and fire codes, as well as other regulations when constructing or significantly remodeling infrastructure facilities. New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing Initiative #FD8-05—Require that development in high fire hazard areas provide adequate access roads, onsite fire protection systems, evacuation signage and fire breaks. New New New New New New New Initiative #FD8-06—Enhance communication capabilities between agencies, coordination of radio types and use of existing and new systems. New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing New & Existing Table 9-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 1 3 Medium Low Yes Yes Yes High 2 3 Medium Low Yes No Yes High 3 3 High Low Yes Yes Yes High 4 4 High Low Yes No Yes High 5 4 High Low Yes No Yes High 6 4 High Medium Yes Yes No Medium * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 9. FIRE DISTRICT #51 ANNEX 6 Table 9-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 1, 2 4 1, 2 6 Dam Failure 1, 2 4 1, 2 6 Drought 1, 2 4 1, 2 6 Earthquake 1, 2 4 1, 2 6 Flood 1, 2 4 1, 2 6 Landslide 1, 2 4 1, 2 6 Severe Weather 1, 2 4 1, 2 6 Seiche 1, 2 4 1, 2 6 Volcano 1, 2 4 1, 2 6 Wildfire 1, 2 3, 4, 5 1, 2 3 6 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 4— UTILITY DISTRICT ANNEXES 1 Chapter 10. Snoqualmie Pass Utility District Annex 10.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Tom Hastings, General Manager 181 Treatment Plant Road PO Box 131 Snoqualmie Pass, WA 98068 Telephone: (425) 434-6633 Email: thastings@snopass.org Gannon Geiger 181 Treatment Plant Road PO Box 131 Snoqualmie Pass, WA 98068 Telephone: (425) 434-6633 Email: ggeiger@snopass.org 10.2. JURISDICTION PROFILE Snoqualmie Pass Utility District was formed in 1984 when the Summit Sewer District and Kittitas County Sewer District 1 were consolidated into a single district operating under RCW Chapter 57. Those original districts were located on opposite sides of the King-Kittitas county line. The joined District operates in both counties to provide water and sewer service to residential and commercial customers. The District is located near the western summit of Snoqualmie Pass along I-90 at an elevation of approximately 3,000 feet, and serves the needs of year-round residents, travelers, and recreational visitors. The area is adjacent to the popular “Summit at Snoqualmie” day-use ski area, with heavy visitation during winter weekends. A Board of Commissioners consisting of three local citizens elected on a non-partisan basis governs the District. The Commissioners establish policies, set rates, adopt system plans for water and sewer utilities and approve the revenue obligations. In addition, the Commissioners appoint the General Manager. The General Manager is directly responsible to the board of Commissioners and is the Chief Executive of the District. The following is a summary of key information about the jurisdiction: – Population Served—300 full time and 20,000 peak – Land Area Served—1,785 acres – Value of Area Served—The estimated value of the area served by the jurisdiction is $70,000,000 – Land Area Owned—7 acres – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 13.87 miles of water mains, 4 production wells, 3 reservoirs, 5 pressure-reducing-valve stations, with an estimated value of $4,535,740 – 16.56 miles of sanitary sewer mains, 2 pump stations and 1 treatment plant , with an estimated value of $6,793,258 – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $11,328,998 – List of Critical Facilities Owned by the Jurisdiction: – Wastewater Treatment Plant. Located at 370 Treatment Plant Road, Snoqualmie Pass. Onsite buildings consist of the Treatment Plant (3,942 square feet), constructed in CHAPTER 10. SNOQUALMIE PASS UTILITY DISTRICT ANNEX 2 1983, the Headworks building (600 square feet) constructed in 2009 and the Maintenance Shop (4,042 square feet) constructed in 1995 with an addition constructed in 2003. A remote building known as the Pipe Galley (286 square feet), located 1 mile southwest, was constructed in 1983. Joint Hyak maintenance facility (4,000 square feet) (shared property between SPUD and County) located at 930 Hyak Drive East, constructed in 2013. – Future Capital Projects: See Snoqualmie Pass Utility District Water Comprehensive Plan and Snoqualmie Pass Utility District Sewer Comprehensive Plan for a list of upcoming capital projects. These projects will have a combined estimated value of $10,000,000 - $13,000,000. – Total Value of Critical Facilities— The total value of critical facilities owned by the jurisdiction is $2,770,591. The value of future capital projects (water and sewer) will total $10,000,000 - $13,000,000. – Current and Anticipated Service Trends— The District estimates that 300 full-time residents currently live at Snoqualmie Pass, with an additional 500 seasonal residents on a peak winter ski weekend. In addition to residential population, the area has a large transient population, including travelers on I-90 who stop to use facilities at the pass, and day-use winter sports participants. A peak day-use population of 20,000 was estimated for a recent heavy ski year. The District’s current growth rate of single family homes is 8%. 10.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 10-1 lists all past occurrences of natural hazards within the jurisdiction. 10.4. HAZARD RISK RANKING Table 10-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from severe storm, earthquake, and wildfire, with moderate risk from avalanche, flooding, and landslides. There is low risk from all other hazards. 10.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – Snoqualmie Pass Utility District Water Comprehensive Plan – Snoqualmie Pass Utility District Sewer Comprehensive Plan – Emergency Response Plan – King County Hazard Mitigation Plan 10.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 10-3. 10.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 10-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 10-5 identifies the priority for each initiative. Table 10-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. CHAPTER 10. SNOQUALMIE PASS UTILITY DISTRICT ANNEX 3 Table 10-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Severe Winter Storm And Record And Near Record Snow (DR-1825) 3/2/2009 N/A Winter Storm (DR 1817) 1/17/2009 $50,000 Severe Winter Storms, Land & Muds Slides, & Flooding, (DR-1159) 1/17/1997 N/A Severe Storms & Flooding (DR-883) 11/26/1990 N/A Severe Storms, Mudslides, & Flooding, (DR-545) 12/10/1977 N/A Table 10-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Severe Winter Storm 24 1 Earthquake 24 1 Wildland Fire 24 2 Avalanche 6 2 Flood 6 2 Landslide 6 3 Dam Failure 0 3 Volcano 0 3 Tsunami 0 3 Drought 0 Table 10-3. Community Classifications Participating? Classification Date Classified Public Protection No — — Storm Ready No — — Firewise No — — CHAPTER 10. SNOQUALMIE PASS UTILITY DISTRICT ANNEX 4 Table 10-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #SPUD-01-Continue to support the implementation, monitoring, maintenance and updating of this plan. New and Existing All Hazards 2,8,9 SPUD Low District funds Short-term/ ongoing Initiative #SPUD-02—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards 5,6,9 SPUD Low District Funds Short-term/ Ongoing Initiative #SPUD-03—Develop a continuity of operations plan that looks at sustaining operations following disasters. New and Existing All Hazards 1, 9, 10 SPUD Low District Funds, DHS Grant funding Short-term Initiative #SPUD-04—Partner with other local governments in educating citizens on potential consequences associated with natural hazards and opportunities to mitigate their impacts. New and Existing All Hazards 2, 8, 9 SPUD Low District General Fund Short-term, ongoing Initiative #SPUD-05— Consider hazard mitigation and resiliency during the implementation of projects listed in the Snoqualmie Pass Utility District Water Comprehensive Plan and the Snoqualmie Pass Utility District Sewer Comprehensive Plan. New All Hazards 1, 2, 10 SPUD High District General Fund, USDA Funds Long-term Initiative #SPUD-06— Increase fire flow storage across the Snoqualmie Pass Utility District. Two expansions are planned in the Snoqualmie Pass Utility District Water Comprehensive Plan. New Earthquake, Flood, Wildfire 1, 8 SPUD High District General Fund, USDA Funds, grants Long-term Initiative #SPUD-07— Implement wastewater treatment facility improvements, with the goal of improving the resiliency of the wastewater treatment system to the impacts of natural hazards. New Earthquake, Flood, Wildfire 1, 8 SPUD High District General Fund, USDA Funds, grants Long-term CHAPTER 10. SNOQUALMIE PASS UTILITY DISTRICT ANNEX 5 Table 10-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 1 3 Medium Low Yes Yes Yes High 2 3 Medium Low Yes Yes Yes High 3 3 High High Yes Yes No Medium 4 3 Low Low Yes No Yes Yes 5 3 High High Yes Yes No High 6 2 High High Yes Yes No High 7 2 High High Yes Yes No High * See Section 1.3 for definitions of high, medium and low priorities. Table 10-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 1, 2 5, 7 1, 2, 4 3 Dam Failure 1, 2 5, 7 1, 2, 4 3 Drought — 5, 7 — — — — Earthquake 1, 2 5, 7 1, 2, 4 3 Flood 1, 2 5, 7 1, 2, 4 3 Landslide 1, 2 5, 7 1, 2, 4 3 Severe Weather 1, 2 5, 7 1, 2, 4 3 Seiche — 5, 7 — — — — Volcano — 5, 7 — — — — Wildfire 1, 2 5, 6, 7 1, 2, 4 6 3, 6 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to redu ce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. 1 Chapter 11. Kittitas PUD #1 Annex 11.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact General Manager 1400 Vantage Highway Ellensburg, WA 98926 Telephone: 509-933-7200 Email: kcpud@kittitaspud.com Finance Manager 1400 Vantage Highway Ellensburg, WA 98926 Telephone: 509-933-7200 Email: kcpud@kittitaspud.com 11.2. JURISDICTION PROFILE Public Utility District (PUD) #1 of Kittitas County is a special purpose district classified as a political subdivision of the state under the laws of the State of Washington. The District was established by a vote of the electorate in 1936, under Chapter 1 of the 1931 laws of the state, for the purpose of engaging in the generation, transmission, distribution and sale of electric energy. The District’s service area covers most of Kittitas County and a small portion of Yakima County. The PUD is governed by a Board of Commissioners, consisting of three local citizens elected by the people of Kittitas County. The Commissioners represent three districts. One commissioner is elected every two years in the November general election to serve a six-year term. Under the guidance of the elected commissioners, the District delivers affordable, dependable electricity to rural and urban areas. The commission establishes policy, approves plans, budgets and expenditures and reviews the District’s operations. The legal responsibilities and powers of the District, including the establishment of rates and charges for services rendered, are exercised through the commission. In addition, the Commissioners appoint a General Manager to administer District policies and conduct PUD business. The General Manager is supported by 17 full-and part-time employees. The District is a statutory preference customer of the Bonneville Power Administration and currently purchases approximately 90 percent of its power from Bonneville. The rest of the District’s power is primarily supplied by the Priest Rapids Hydroelectric Project (nearly 10 percent). The following is a summary of key information about the jurisdiction: – Population Served—10,702 people as of 2016 based upon the Census Bureau estimate of Kittitas County average household size – Land Area Served—359 square miles – Value of Area Served—The estimated value of the area served by the jurisdiction is $1,094,902,905. – Land Area Owned—15.49 acres – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 13 miles of transmission lines, 490 miles of overhead distribution lines, 190 miles of underground distribution lines, 7 electrical substations and 4 metered points of power delivery with an estimated value of $25,968,494. – FCC-licensed radio system for crew dispatching and emergency services and response valued at $65,736. CHAPTER 11. KITTITAS PUD #1 ANNEX 2 – Line Truck, Double Bucket, Service Bucket, Backhoe, Flat Bead, Foreman Truck with an estimated value of $951,966. – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $26,986,196. – List of Critical Facilities Owned by the Jurisdiction: – Main Office and Headquarters, located at 1400 Vantage Highway in Ellensburg. The on- site buildings consist of the 2-story main office building (2400 square feet including an records archive and data center in the basement), the engineering / operations building (1345 square feet-remodeled in 2009), and meter shop with attached conference room (1900 square feet-remodeled in 2009), with an estimated value of $917,998. – Warehouse and Material Yard, located behind and adjacent to the main office at 1400 Vantage Highway in Ellensburg. These facilities include the vehicle storage building (2400 square feet – constructed in 2008), the material storage yard/loading dock (0.83 acres), the material warehouse (3000 square feet – future plans include replacing, remodeling or expansion of this building). The value of these facilities is estimated to be $118,703. – Total Value of Critical Facilities—The total value of critical facilities owned by the jurisdiction is $1,036,701 – Current and Anticipated Service Trends—The Kittitas PUD 2008 Power Requirements Study projects the number of consumers, energy sales and capacity requirements through the end of 2017. This projection anticipates that the PUD will increase by 29 percent. Total energy sales are also projected to increase significantly by 2017. This projected increase is based upon the anticipated increase in consumers coupled with the changing consumption patterns by consumer class. Recent economic activity has shown that the power requirements projection may have been a bit high. The 2010 US census reported that Kittitas County has seen a population increase of 22.6 percent in the last 10 years while Washington State increased only 14.1 percent. So a 20 to 25 percent growth rate may be a safer projection. 11.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 11-1 lists all past occurrences of natural hazards within the jurisdiction. 11.4. HAZARD RISK RANKING Table 11-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from severe weather and flooding, with wildfire and drought having moderate-high risk. Avalanche, landslide, dam failure, and volcano pose a moderate risk, with seiche being a low risk hazard. 11.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – National Electrical Safety Code – National Electrical Code – National Environmental Protection Act – Federal Endangered Species Act – Public Utility Regulatory Policy Act – Washington State Building Code CHAPTER 11. KITTITAS PUD #1 ANNEX 3 – Department of Labor and Industries of the State of Washington (Washington Administrative Code 296-45) – Occupational Safety and Health Administration – Kittitas County PUD Oil Spill Containment and Countermeasure Plan – The District must adhere to all applicable codes and regulations enforced by federal, state and local authorities with a sphere of influence within the District service area. 11.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 11-3. 11.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 11-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 11-5 identifies the priority for each initiative. Table 11-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. Table 11-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Floods 2/25/1956 N/A Floods 3/6/1957 N/A Severe Storms 10/20/1962 N/A Floods 3/2/1963 N/A Heavy Rains & Flooding 12/29/1964 N/A Severe Storms, Flooding 12/13/1975 N/A Drought 3/31/1977 N/A Severe Storms, Flooding 12/10/1977 N/A Flooding 3/12/1979 N/A Volcanic Eruption 5/21/1980 N/A Severe Storms, Thunder 12/24/1980 N/A Wind 11/14/1981 N/A Severe Storms, Flooding, Thunder, Wind 1/18/1986 N/A Winter Weather 2/1/1989 N/A Severe Storms, Flooding 11/26/1990 N/A Severe Storms, Thunder 7/24/1991 N/A Eastern Washington Fires 10/18/1991 N/A Storms, High Winds, Floods 1/3/1996 N/A Severe Storms, Flooding 2/9/1996 N/A Severe Winter Storms, Flooding 1/17/1997 N/A Earthquake 3/1/2001 N/A Winter Weather 11/28/2001 N/A Elk Heights Fire 7/30/2004 N/A Flooding 5/4/2005 N/A Hurricane Katrina Evacuation 9/7/2005 N/A Winter Weather 12/14/2006 N/A Severe Winter Storm, Landslides, Mudslides and Flooding 1/30/2009 N/A CHAPTER 11. KITTITAS PUD #1 ANNEX 4 Type of Event Date Preliminary Damage Assessment Severe Winter Storm, Record Snow 3/2/2009 N/A Severe Storm, Flooding, Landslides 3/25/2011 N/A Freezing Fog and Frost Ryegrass 2013 N/A Vantage, Taylor Bridge, Table Mountain Fires 2012, 2014 N/A Table 11-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Severe Weather 54 2 Flood 51 3 Wildfire 36 3 Drought 36 4 Earthquake 24 5 Avalanche 18 5 Landslide 18 6 Dam Failure 16 6 Volcano / Lahar 16 7 Seiche 0 Table 11-3. Community Classifications Participating? Classification Date Classified Public Protection No — — Storm Ready No — — Firewise No — — CHAPTER 11. KITTITAS PUD #1 ANNEX 5 Table 11-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline KPUD-1—Acquire mobile generator to support critical infrastructure during times of disaster or service interruptions. New Severe Storm, Flood, Wildfire, Landslide, Avalanche 1,9,10 PUD Low District Funds, HMGP Immediate Short-term KPUD-2—Acquire right of way and relocate distribution structures and facilities out of areas subject to repetitive loss or damage. (All Feeders on Parke, Ellensburg, Teanaway, Smithson, and Jenkins circuits) New and Existing Severe Storm, Flood, Wildfire, Landslide, Avalanche 1,2,7,8,9,10 PUD High District Funds, HMGP Short-term KPUD-3—Implement a contingency plan to establish a more hazard-resilient electrical system by networking isolated distribution circuits (Feeder Ties S2 to T1, P3 to V1, R1 Alternate Source; Beverly Bridge) New and Existing Severe Storm, Flood, Wildfire, Landslide, Avalanche 1,2,4,7,8,9,10 PUD Medium District Funds, HMGP Short-term ongoing (S3toJ1 complete) KPUD-4—Implement a vegetation management program (manage all rights of way on a 3 year cycle) Existing Severe Storm, Wildfire 1,9,10 PUD Low District Funds, HMGP Short-term ongoing KPUD-5—Raise or mitigate substations in floodplain (Ellensburg Substation & Teanaway Substation) Existing Severe Storm, Flood, Earthquake 1,7,8,10 PUD High District Funds, HMGP Long-term, depends on funding KPUD-6—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards All PUD Low District Funds Short-term ongoing KPUD-7—Continue to support the implementation, monitoring, maintenance, and updating of this plan, as defined in Volume 1. New and Existing All Hazards All PUD Low District Funds, HMGP for 5-year update Short-term ongoing KPUD-8—Develop a curtailment and operations plan that describes maintaining operations following disasters or required service outages. New and Existing All Hazards 1, 9, 10 KPUD Low District Funds, DHS Grant funding Long-term, depends on funding CHAPTER 11. KITTITAS PUD #1 ANNEX 6 Table 11-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 1 3 High Low Yes Yes Yes High 2 6 High Medium Yes Yes Yes High 3 7 High Medium Yes Yes Yes High 4 3 High Medium Yes Yes Yes High 5 4 High High Yes Yes No Medium 6 10 Low Low Yes No Yes High 7 10 Low Low Yes Yes Yes High 8 3 Medium Low Yes Yes No Medium * See Section 1.3 for definitions of high, medium and low priorities. Table 11-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 1, 2, 5, 6, 7 1 5, 6 1 1, 2, 7 — Dam Failure 1, 2, 5, 6, 7 1 5, 6 1 2, 7 — Drought 2,5, 6, 7 — 5, 6 — 2, 7 — Earthquake 2, 5, 6, 7 4 5, 6 — 2, 7 — Flood 1, 2, 5, 6, 7 1, 4 5, 6 1 1, 2, 7 — Landslide 1, 2, 5, 6, 7 1 5, 6 1 1, 2, 7 — Severe Weather 1, 2, 5, 6, 7 1, 3, 4 5, 6 1 1, 2, 7 — Seiche — — — — — — Volcano 2, 5, 6, 7 — 5, 6 — 2, 7 — Wildfire 1, 2, 5, 6, 7 1, 3 5, 6 1 1, 2, 7 — 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 5— SCHOOL DISTRICT ANNEXES 1 Chapter 12. Kittitas School District #403 Annex 12.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Bryan Nash, Maintenance Supervisor 601 N. Pierce Street Kittitas, WA 98934 Telephone: 855.380.8844 Email: bryan_nash@ksd403.org Rich Stewart, Superintendent 601 N. Pierce Street Kittitas, WA 98934 Telephone: 855.380.8848 Email: rich_stewart@ksd403.org 12.2. JURISDICTION PROFILE The Kittitas School District was formed in 1907. The Kittitas School District has two schools on two campuses serving approximately 650 students with 85 employees. The District has a K-5 elementary school and a 6-12 secondary school. The Kittitas School District is operated with local, state, and federal funds, administered by a board of directors and superintendent. The Board will assume the responsibility for adoption and implementation of this plan. The following is a summary of key information about the jurisdiction: – Population Served—Per the 2010 Census, the Kittitas School District has a population of 3,673 with 1,530 households. – Land Area Served—603 square miles – Value of Area Served—The estimated value of the area served by the jurisdiction is $76,261,530. – Land Area Owned—68 acres. – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 10 School Buses $590,000 – 5 Pickups/Cars/Vans $66,000 – Equipment $2,327,046 – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $2,983,046. – List of Critical Facilities Owned by the Jurisdiction: – Primary Elementary $1,888,801 – Intermediate Elementary $4,300,941 – Portable Classroom $99,232 – Bus Shop $142,580 – Old High School $2,386,173 – Old High School Gym $1,155,000 – Old High School Annex $471,911 CHAPTER 12. KITTITAS SCHOOL DISTRICT #403 ANNEX 2 – Green House $45,901 – Secondary Building/Grounds $15,435,000 – Total Value of Critical Facilities—The total value of critical facilities owned by the jurisdiction is $25,923,539 – Current and Anticipated Service Trends—the Kittitas School District continues to experience an increase in enrollment. The current head count is 630 students. Ten years ago, the enrollment was 522. The District has the most affordable housing in the Kittitas Valley and has attracted people who want to relocate from major population centers to purchase land. 12.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 12-1 lists all past occurrences of natural hazards within the jurisdiction. 12.4. HAZARD RISK RANKING Table 12-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from earthquakes and severe storms. The area has moderate risk from flooding, wildfire, and dam failure. There is low risk from all other hazards. 12.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – Kittitas School District #403-Emergency Response Plan 12.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 12-3. 12.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 12-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 12-5 identifies the priority for each initiative. Table 12-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. CHAPTER 12. KITTITAS SCHOOL DISTRICT #403 ANNEX 3 Table 12-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Landslide 10/11/2009 No Estimates Available Flooding 1/9/2009 No Estimates Available Avalanche 1/7/2009 No Estimates Available Wind 1/29/2007 No Estimates Available Wind 1/7/2007 No Estimates Available Winter Weather 12/15/2006 No Estimates Available Wind 6/21/2005 No Estimates Available Flooding 5/4/2005 No Estimates Available Wind 3/29/2005 No Estimates Available Winter Weather 1/18/2005 No Estimates Available Wildfire 7/26/2004 No Estimates Available Wildfire 7/2/2004 No Estimates Available Flooding 5/20/2004 No Estimates Available Wind 4/27/2004 No Estimates Available Avalanche 12/13/2003 No Estimates Available Table 12-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Earthquake 54 2 Severe Weather 48 3 Flood 42 4 Dam Failure 18 4 Wildfire 18 5 Volcano 6 6 Drought 0 6 Landslide 0 6 Avalanche 0 6 Seiche 0 Table 12-3. Community Classifications Participating? Classification Date Classified Public Protection No — — Storm Ready No — — Firewise No — — CHAPTER 12. KITTITAS SCHOOL DISTRICT #403 ANNEX 4 Table 12-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline KSD #1—Remove football field light poles at former school. The poles have structurally weakened over time. Existing Earthquake 1,4,9 District $14,750, Medium District Funds, HMGP Short Term KSD # 2—Natural hazard event preparedness to run buildings during an outage and cut off from help. Existing All Hazards 1,9,10 District Medium Capital/grant Short term KSD #3—Develop a continuity of operations plan that looks at sustaining operations following disasters. New and Existing All Hazards 1, 9, 10 District Medium District Funds, DHS Grant funding Long-term, depends on funding KSD #4—Partner with other local governments in educating citizens and students on the potential consequences of natural hazards and how to prepare and respond to their impacts. New and Existing All Hazards 2, 8, 9 District Low District General Fund Short-term KSD #5—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards All District Low District Funds Short-term ongoing KSD #6—Continue to support the implementation, monitoring, maintenance, and updating of this plan, as defined in Volume 1. New and Existing All Hazards All District Low District Funds, HMGP for 5-year update Short-term ongoing Table 12-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 1 3 High Medium Yes No No Medium 2 3 High Medium Yes Yes Yes High 3 3 High Low Yes Yes No Medium 4 3 Low Low Yes Yes Yes High 5 10 Medium Low Yes No Yes High 6 10 Medium Low Yes Yes Yes High * See Section 1.3 for definitions of high, medium and low priorities. CHAPTER 12. KITTITAS SCHOOL DISTRICT #403 ANNEX 5 Table 12-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche — — — — — — Dam Failure 3, 5, 6 4, 5, 6 2, 3, 5 Drought — — — — — — Earthquake 3, 5, 6 1 4, 5, 6 2, 3, 5 Flood 3, 5, 6 4, 5, 6 2, 3, 5 Landslide — — — — — — Severe Weather 3, 5, 6 4, 5, 6 2, 3, 5 Seiche — — — — — — Volcano 3, 5, 6 4, 5, 6 2, 3, 5 Wildfire 3, 5, 6 4, 5, 6 2, 3, 5 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. 1 Chapter 13. Cle Elum – Roslyn School District #404 Annex 13.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Mark Soderstrom 2690 SR 903 Cle Elum, WA 98922 Telephone: 509-649-4853 Email: soderstromm@cersd.org Becky Roberts 2690 SR 903 Cle Elum, WA 98922 Telephone: 509-649-4852 Email: robertsb@cersd.org 13.2. JURISDICTION PROFILE The Cle Elum-Roslyn School District (District) has three schools and an administration building on one campus. In addition to this campus, the District has an offsite learning center that houses alternative learning and home-school connection. The District presently has 130 employees. The District operates with local, state, and federal funding, administered by a board of directors and superintendent. The board of directors will assume the responsibility for the adoption and implementation of this plan. The District’s customers are the students who attend its schools. The following is a summary of key information about the jurisdiction: – Population Served—- There are 897 students in the school district as of 2017. – Land Area Served—600 square miles – Value of Area Served—The estimated value of the area served by the jurisdiction is $2.3 billion – Land Area Owned—49 acres – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – 15 School Buses – 3 Light Trucks – 3 Vans – 2 Sport Utility Vehicles – 5 Storage trailers – Bleachers – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is $1,700,000. – List of Critical Facilities Owned by the Jurisdiction: – The High School, valued at $11,083,542 – Swiftwater Learning Center and new District office, valued at $1,200,000 – Elementary/Middle School, valued at $15,486,462 – Music building, valued at $2,600,000 CHAPTER 13. CLE ELUM – ROSLYN SCHOOL DISTRICT #404 ANNEX 2 – Tech office, valued at $271,031 – Tractor Shed, valued at $50,000 – Mechanic Shop/Storage, valued at $100,000 – Bus Garage, valued at $210,0000 – Concession Stand, valued at $100,000 – Ticket Booth, valued at $5,000 – Total Value of Critical Facilities—The total value of critical facilities owned by the jurisdiction is $31,106,035. – Current and Anticipated Service Trends— Based on a population of 1,755 in 2000 (US census) and 2,580 in 2016 (American Community Survey), the City of Cle Elum has had a growth rate of approximately 47 percent over 16 years (3 percent growth per year). The District has seen an increase in population in the last 10 years without an increase in student population due to the nature of the area being used as a second home/vacation area by a large part of the new population. This trend will probably continue for the next 10 to 15 years. The District’s boundaries are shown on Figure 16-1. Figure 13-1. Cle Elum School District boundaries. 13.3. JURISDICTION-SPECIFIC NATURAL HAZARD EVENT HISTORY Table 13-1 lists all past occurrences of natural hazards within the jurisdiction. 13.4. HAZARD RISK RANKING Table 13-2 presents the ranking of the hazards of concern. The jurisdiction is most at risk from earthquakes, with moderate risk from severe weather, flooding, wildfire. There is low risk from all other hazards. 13.5. APPLICABLE REGULATIONS AND PLANS The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: CHAPTER 13. CLE ELUM – ROSLYN SCHOOL DISTRICT #404 ANNEX 3 – Cle Elum-Roslyn School District Emergency Procedure Plan 13.6. CLASSIFICATION IN HAZARD MITIGATION PROGRAMS The jurisdiction’s classifications under various hazard mitigation programs are presented in Table 13-3. 13.7. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Table 13-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table 13-5 identifies the priority for each initiative. Table 13-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. Table 13-1. Natural Hazard Events Type of Event Date Preliminary Damage Assessment Flooding 1/9/2009 N/A Winter Weather 12/2008 $1,800 Winter Weather 12/15/2006 Operational Drought 5/2005 N/A Winter Weather 1/17/2005 N/A Drought 5/2004 N/A Drought 7/2001 N/A Earthquake 2/28/2001 N/A Winter Weather 1/14/1998 N/A Winter Weather 12/27/1996 N/A Winter Weather 1/6/1996 N/A Winter Weather 2/18/1993 N/A Winter Weather 12/8/1992 N/A Winter Weather 12/29/1990 N/A Winter Weather 2/1/1989 N/A Winter Weather 12/2/1985 N/A Winter Weather 1/2/1974 N/A Winter Weather 1/24/1972 N/A Winter Weather 12/30/1968 N/A Table 13-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Earthquake 54 2 Wildfire 45 3 Severe Weather 42 4 Flood 42 5 Volcano 6 6 Avalanche 0 7 Dam Failure 0 8 Landslide 0 9 Drought 0 10 Seiche 0 CHAPTER 13. CLE ELUM – ROSLYN SCHOOL DISTRICT #404 ANNEX 4 Table 13-3. Community Classifications Participating? Classification Date Classified Public Protection No — — Storm Ready No — — Firewise No — — Table 13-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline CESD #1—Partner with Kittitas County, City of Cle Elum and City of Roslyn on emergency drills to better prepare for the impacts of all hazards on the District. New and Existing All 1,3,9 CERSD 6000, Low CERSD, County Ongoing CESD #2—Participate in the Firewise program by deploying Firewise techniques around school properties susceptible to wildfire hazards. New Wildfire 1,8,10 CERSD 25,000, High Grant Money, CERSD Long term, depends on funding CESD #3—Seek Hazard Mitigation Assistance Grant support from competent sources such as WA Emergency Management Division, FEMA or a contractor New and Existing All 1,5,6,7,8,9,10 CERSD 5000, Medium Hazard mitigation assistance grant Long-term, depends on funding CESD #4—Continue to support through active participation the countywide initiatives identified in Volume 1 of the Kittitas County Hazard Mitigation Plan. New and Existing All Hazards All District Low District Funds Short-term ongoing CESD #5—Continue to support the implementation, monitoring, maintenance, and updating of the Kittitas County Hazard Mitigation Plan, as defined in Volume 1. New and Existing All Hazards All District Low District Funds, HMGP for 5-year update Short-term ongoing CHAPTER 13. CLE ELUM – ROSLYN SCHOOL DISTRICT #404 ANNEX 5 Table 13-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* 1 3 High Low Yes Yes Yes High 2 3 High High Yes Yes Yes High 3 8 Medium Medium Yes Yes No Medium 4 10 Medium Low Yes Yes Yes High 5 10 Medium Low Yes Yes Yes High * See Section 1.3 for definitions of high, medium and low priorities. Table 13-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 1, 4, 5 3 — — 1 3 Dam Failure 1, 4, 5 3 — — 1 3 Drought 4, 5 3 — — — 3 Earthquake 1, 4, 5 3 — — 1 3 Flood 1, 4, 5 3 — — 1 3 Landslide 1, 4, 5 3 — — 1 3 Severe Weather 1, 4, 5 3 — — 1 3 Seiche 1, 4, 5 3 — — 1 3 Volcano 1, 4, 5 3 — — 1 3 Wildfire 1, 4, 5 2, 3 — — 1 3 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. 1 Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes PART 6— CONSERVATION DISTRICT ANNEXES CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 2 Chapter 14. Kittitas County Conservation District Annex 14.1. HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact: Anna Lael, District Manager 2211 W Dolarway Rd Ste #4 Ellensburg WA 98926 Telephone: 509-925-3352 Email: a-lael@conservewa.net Alternate Point of Contact: Rose Shriner, Project Manager 2211 W Dolarway Rd Ste #4 Ellensburg WA 98926 Telephone: 509-925-3352 Email: rose-shriner@conservewa.net 14.2. JURISDICTION PROFILE The Kittitas Conservation District was created in 1942, followed by the Cle Elum Conservation District in 1948, as part of a national response to the Dust Bowl. The two districts combined in the 1960's to create the Kittitas County Conservation District (KCCD). The KCCD has worked for 75 years to assist local land managers to address the many challenges to long term sustainability. The KCCD serves the citizens of its community (county, state, country) to ensure the long term use of natural resources in an economically, socially, and environmentally sustainable manner using non-regulatory, voluntary approaches. The KCCD is primarily grant funded and averages approximately 20 open grants at any time. The grants are secured predominantly from state and federal sources such as the Washington State Conservation Commission, Department of Natural Resources, Department of Ecology, Salmon Recovery Funding Board, Bonneville Power Administration, and the USDA Natural Resources Conservation Service. Over the last seven years, the state and federal grants have accounted for 94% of the revenue received. The remaining revenue is from local and private sources, including the Special Assessment, Kittitas County Public Works and private organizations (e.g. Puget Sound Energy). The Special Assessment funding is used to secure many of the state and federal grants, so although the local funds are a small part of the overall revenue, they are critical to obtaining those grants. Kittitas County Conservation District and other conservation districts are the ONLY organizations in Washington State that routinely design and apply on-the-ground solutions to nonpoint water quality problems on privately owned resource lands. Further, the technical help provided by conservation districts to private landowners is free for the asking. Each conservation district is led by a five -member board of volunteer supervisors - three elected locally and two appointed by the state's conservation agency, the Conservation Commission. These individuals serve three-year terms, during which time they remain aware of locally important natural resource or environmental issues and decide what projects their district will undertake each year. Also, Kittitas County Conservation District has seven paid staff that work to implement the annual and long range plans of the board of supervisors each managing several natural resource concerns ranging from agriculture, water quality, soil erosion, botany, forestry and wildfire. The Kittitas County Conservation District serves unincorporated Kittitas County and the cities of Cle Elum and Roslyn (about 20,828 population). The following is a summary of key information about the jurisdiction: – Population Served - 20,828 – Land Area Served - 2,333 square miles – Value of Area Served - $5,725,414,660 – Land Area Owned - N/A CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 3 – List of Critical Infrastructure/Equipment Owned by the Jurisdiction - N/A – Total Value of Critical Infrastructure/Equipment - N/A – List of Critical Facilities Owned by the Jurisdiction - N/A – Total Value of Critical Facilities - N/A – Current and Anticipated Service Trends - Kittitas County population is expected to increase by an average annual growth rate of 1.08% annually (Kittitas County Population Projection Review and Analysis, 2016). Proposed population growth scenarios expects with current trends for the population growth from 2015-2037 to increase by 21,738. In 2037 population is expected to be at 64,408 (Kittitas County Population Projection Review and Analysis, 2016). With the increase population, natural resource issues such as flooding, wildfire and other concerns will put more residences and private properties at risk. Figure 14-1. Kittitas County Conservation District Boundaries 14.3. KITTITAS COUNTY CONSERVATION DISTRICT NATURAL HAZARD HISTORY Table 14-1 lists all past occurrences of natural hazards in the KCCD. Repetitive loss records are as follows: – Number of FEMA-Identified Repetitive Flood Loss Properties: 0 – Number of Repetitive Flood Loss Properties that have been mitigated: 0 CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 4 14.4. HAZARD RISK RANKING Table 14-2 summarizes the ranking of the hazards of concern. The jurisdiction is most at risk from wildfire, earthquake, and severe storms. Drought, flooding, avalanche, and landslide present moderate risk, and there is low risk from all other hazards. 14.5. CAPABILITY ASSESSMENT The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table 14-3. The assessment of the jurisdiction’s fiscal capabilities is presented in Table 14-4. Classifications under various community mitigation programs are presented in Table 14-5. 14.6. HAZARD MITIGATION ACTION PLAN AND EVALUATION OF RECOMMENDED INITIATIVES Kittitas County Conservation District understands the basic federal grant program criteria which will drive the identification, selection, and funding of the most competitive and worthy mitigation projects. FEMA’s grant programs (the Hazard Mitigation Grant Program, the Flood Mitigation Assistance, and Pre-Disaster Mitigation program) that offer federal mitigation funding to state and local governments all include the benefit-cost and repetitive loss selection criteria. The prioritization of new projects and deletion of completed projects will occur annually and be facilitated by the Kittitas County Emergency Manager and the joint planning committee. All mitigation activities, recommendations, and action items mentioned in this document are dependent on available funding and staffing. 14.7. FUTURE NEEDS TO BETTER UNDERSTAND RISK/VULNERABILITY No future needs identified. CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 5 Table 14-1. Natural Hazard Events Type of Event FEMA Disaster # (if applicable) Date Preliminary Damage Assessment Wildfire (Ryegrass Coulee) FM-5253 7/10/2018 $3 Million Dollars Wildfire (Jolly Mountain) FM-5200 7/2/2017- 7/22/2017 $55Million Dollars Drought N/A 2015 Wildfire (Snag Canyon) FM-5071 8/2/2014 $14 Million Dollars Wildfire (Saddle Mountain) FM-5064 7/18/2014 Wildfire (Colockum Tarps) FM-5038 7/29/2013 $7.6 Million Dollars Wildfire (Table Mountain) FM-5020 9/19/2012 $3.2 Million Dollars Wildfire (Taylor Bridge) FM-5005 8/13/2012 $59.8 Million Dollars Severe Winter Storm, Flooding, Landslides and Mudslides DR-1963 3/25/2011 Severe Winter Storm and Record Near Record Snow DR-1825 3/2/2009 Severe Winter Storm, Landslides, Mudslides and Flooding DR-1817 1/30/2009 Drought N/A 2005 Drought N/A 2001 Earthquake (Nisqually) DR-1361 3/1/2001 Severe Winter Storms/Flooding DR-1159 1/17/1997 Severe Storms/Flooding DR-1100 2/2/1996 Storms/High Winds/Floods DR-1079 1/3/1996 Flooding, Severe Storm DR-883 11/26/1990 Volcanic Eruption, Mt St. Helens DR-623 5/21/1980 Severe Storms, Mudslides, Flooding DR-545 12/10/1977 Severe Storms, Flooding DR-492 12/13/1975 Table 14-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 Wildfire 27 2 Earthquake 27 3 Severe Weather 27 4 Drought 18 5 Flood 18 6 Avalanche 9 7 Landslide 9 8 Dam Failure 3 9 Volcano 3 CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 6 Table 14-3. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Y Kittitas County Conservation District/ District Manager, Engineer, Resource Tech, Project Managers Engineers or professionals trained in building or infrastructure construction practices Y Kittitas County Conservation District/ District Engineer Planners or engineers with an understanding of natural hazards Y Kittitas County Conservation District/ District Manager, Engineer, Resource Tech, Project Managers Staff with training in benefit/cost analysis Y Kittitas County Conservation District/ Conservation Planners/ Project Managers Floodplain manager N Surveyors N Personnel skilled or trained in GIS applications Y Kittitas County Conservation District/ GIS Specialist Scientist familiar with natural hazards in local area N Emergency manager N Grant writers Y Kittitas County Conservation District / District Manager / Project Managers Table 14-4. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants N Capital Improvements Project Funding N Authority to Levy Taxes for Specific Purposes N User Fees for Water, Sewer, Gas or Electric Service N Incur Debt through General Obligation Bonds N Incur Debt through Special Tax Bonds N Incur Debt through Private Activity Bonds N Withhold Public Expenditures in Hazard-Prone Areas N State Sponsored Grant Programs Y Development Impact Fees for Homebuyers or Developers N Other Y Table 14-5. Community Classifications Participating? Classification Date Classified Community Rating System No NA N/A Building Code Effectiveness and Grading Schedule Yes 3/3 Public Protection Yes 6/9 Storm Ready No NA N/A Firewise USA Yes High 2018 Voluntary Stewardship Plan Yes High 2018 CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 7 Table 14-6. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative # KCCD- 01—Continue to develop and implement public education programs which increase public awareness of the risks associated with hazards/disasters and emergency preparedness. Existing All 6 KCCD Staff High KCCD public education programs Ongoing Initiative # KCCD-02— Pre and post disaster technical, educational and financial assistance to private landowners including conducting damage assessments, recommending practices to address erosion risk (seeding, mulching, culvert replacements, etc.), encouraging residents to participate in the National Flood Insurance Program, and seeking funding to implement actions to reduce risk and protect homes and infrastructure. Existing Flood, Dam Failure, Wildfire 1, 2, 6, 8, 10 KCCD Staff High KCCD led an interagency BAER team in 2012 fires Ongoing Initiative # KCCD-03— Track conditions of and implement projects with private landowners conducting agricultural practices in frequently flooded areas, floodplains, and geologic hazard areas that improve resource conditions and maintain the viability of agriculture. New Drought, Flood, Landslide 3, 6, 9, 10 KCCD Staff Medium Voluntary Stewardship Program Ongoing Initiative # KCCD-04— Conduct individual property and community-wide wildfire risk assessments and evaluate potential mitigation projects. Current Wildfire 1, 6, 7 KCCD Staff High KCCD experience with Firewise USA communities and individual risk assessments Ongoing Initiative # KCCD-05— Continue to work on actions items and proposed projects in the Kittitas County Community Wildfire Protection Plan including implementation of landscape scale restoration and partnering with stakeholders through the Kittitas Fire Adapted Communities Coalition (KFACC). Existing Wildfire 1, 2, 3, 6, 7, 8, 10 KCCD Staff Medium CWPP, KFACC Ongoing Initiative # KCCD-06— Implement projects and conduct outreach and education for landowners to improve water use efficiencies and resiliency in drought conditions including drought resistant landscapes, reducing water system losses, and identifying alternate water supply options. New Drought 1, 6, 10 KCCD Staff High Yakima Basin Integrated Water Resources Management Plan Ongoing CHAPTER 14. KITTITAS COUNTY CONSERVATION DISTRICT ANNEX 8 Table 14-7. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant Eligible? Can Project be Funded Under Existing Programs/Budgets? Priority* KCCD-01 1 High Medium Yes Yes No High KCCD-02 5 High High Yes Yes No High KCCD-03 4 Medium Medium Yes Yes No Medium KCCD-04 3 Medium High Yes Yes No Medium KCCD-05 7 High Medium Yes Yes No High KCCD-06 3 Medium Medium Yes Yes No High * See Section 1.3 for definitions of high, medium and low priorities. Table 14-8. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Avalanche 1 Dam Failure 2 1, 2 2 Drought 3 1, 3, 6 3 Earthquake 1 Flood 2, 3 1, 2, 3 3 2 Landslide 3 1, 3 3 Severe Weather 1 Seiche 1 Volcano 1 Wildfire 5 2, 4, 5 1, 2, 4, 5 5 2, 4 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes APPENDIX A. PLANNING PARTNER EXPECTATIONS A-1 APPENDIX A. PLANNING PARTNER EXTECTATIONS Achieving DMA Compliance for All Planning Partners One of the goals of the multi-jurisdictional approach to hazard mitigation planning is to achieve compliance with the Disaster Mitigation Act (DMA) for all participating members in the planning effort. DMA compliance must be certified for each member in order to maintain eligibility for the benefits under the DMA. Whether our planning process generates ten individual plans or one large plan that has a chapter for each partner jurisdiction, the following items must be addressed by each planning partner to achieve DMA compliance:  Participate in the process. It must be documented in the plan that each planning partner “participated” in the process that generated the plan. There is flexibility in defining “participation”. Participation can vary based on the type of planning partner (i.e.: City or County, vs. a Special Purpose District). However, the level of participation must be defined and the extent for which this level of participation has been met for each partner must be contained in the plan context.  Consistency Review. Review of existing documents pertinent to each jurisdiction to identify policies or recommendations that are not consistent with those documents reviewed in producing the “parent” plan or have policies and recommendations that complement the hazard mitigation initiatives selected (i.e.: comp plans, basin plans or hazard specific plans).  Action Review. For Plan updates, a review of the strategies from your prior action plan to determine those that have been accomplished and how they were accomplished; and why those that have not been accomplished were not completed.  Update Localized Risk Assessment. Personalize the Risk Assessment for each jurisdiction by removing hazards not associated with the defined jurisdictional area or redefining vulnerability based on a hazard’s impact to a jurisdiction. This phase will include:  A ranking of the risk  A description of the number and type of structures at risk  An estimate of the potential dollar losses to vulnerable structures  A general description of land uses and development trends within the community, so that mitigation options can be considered in future land use decisions.  Capability assessment. Each planning partner must identify and review their individual regulatory, technical and financial capabilities with regards to the implementation of hazard mitigation actions.  Personalize mitigation recommendations. Identify and prioritize mitigation recommendations specific to the each jurisdiction’s defined area.  Create an Action Plan.  Incorporate Public Participation. Each jurisdiction must present the Plan to the public for comment at least once, within two weeks prior to adoption. A-2  Plan must be adopted by each jurisdiction. One of the benefits to multi-jurisdictional planning is the ability to pool resources. This means more than monetary resources. Resources such as staff time, meeting locations, media resources, technical expertise will all need to be utilized to generate a successful plan. In addition, these resources can be pooled such that decisions can be made by a peer group applying to the whole and thus reducing the individual level of effort of each planning partner. This will be accomplished by the formation of a st eering committee made up of planning partners and other “stakeholders” within the planning area. The size and makeup of this steering committee will be determined by the planning partnership. This body will assume the decision making responsibilities on behalf of the entire partnership. This will streamline the planning process by reducing the number of meetings that will need to be attended by each planning partner. The assembled Steering Committee for this effort will meet monthly on an as needed basis as determined by the planning team, and will provide guidance and decision making during all phases of the plan’s development. With the above participation requirements in mind, each partner is expected to aid this process by being prepared to develop its section of the plan. To be an eligible planning partner in this effort, each Planning Partner shall provide the following: A. A “Letter of Intent to participate” or Resolution to participate to the Planning Team (see exhibit A). B. Designate a lead point of contact for this effort. This designee will be listed as the hazard mitigation point of contact for your jurisdiction in the plan. C. Support and participate in the selection and function of the Steering Committee selected to oversee the development of this plan. D. Provide support in the form of mailing list, possible meeting space, and public information materials, such as newsletters, newspapers or direct mailed brochures, required to implement the public involvement strategy developed by the Steering Committee. E. Participate in the process. There will be many opportunities as this plan evolves to participate. Opportunities such as: a. Steering Committee meetings b. Public meetings or open houses c. Workshops/ Planning Partner specific training sessions d. Public review and comment periods prior to adoption At each and every one of these opportunities, attendance will be recorded. Attendance records will be used to document participation for each planning partner. No thresholds will be established as minimum levels of participation. However, each planning partner should attempt to attend all possible meetings and events. F. There will be one mandatory workshop that all planning partners will be required to attend. This workshop will cover the proper completion of the jurisdictional annex template which is the basis for each partner’s jurisdictional chapter in the plan. Failure to have a representative at this workshop will disqualify the planning partner from participation in this effort. The schedule for this workshop will be such that all committed planning partners will be able to attend. A-3 G. After participation in the mandatory template workshop, each partner will be required to complete their template and provide it to the planning team in the time frame established by the Steerin g Committee. Failure to complete your template in the required time frame may lead to disqualification from the partnership. H. Each partner will be expected to perform a “consistency review” of all technical studies, plans, ordinances specific to hazards to determine the existence of any not consistent with the same such documents reviewed in the preparation of the County (parent) Plan. For example, if your community has a floodplain management plan that makes recommendations that are not consistent with any of the County’s Basin Plans, that plan will need to be reviewed for probable incorporation into the plan for your area. I. Each partner will be expected to review the Risk Assessment and identify hazards and vulnerabilities specific to its jurisdiction. Contract resources will provide the jurisdiction specific mapping and technical consultation to aid in this task, but the determination of risk and vulnerability will be up to each partner. J. Each partner will be expected to review and determine if the mitigation recommendations chosen in the parent plan will meet the needs of its jurisdiction. Projects within each jurisdiction consistent with the parent plan recommendations will need to be identified and prioritized, and reviewed to determine their benefits vs. costs. K. Each partner will be required to create its own action plan that identifies each project, who will oversee the task, how it will be financed and when it is estimated to occur. L. Each partner will be required to sponsor at least one public meeting to present the draft plan to its constituents at least 2 weeks prior to adoption. M. Each partner will be required to formally adopt the plan. Templates and instructions to aid in the compilation of this information will be provided to all committed planning partners. Each partner will be expected to complete their templates in a timely manner and according to the timeline specified by the Steering Committee. ** Note**: Once this plan is completed, and DMA compliance has been determined for each partner, maintaining that eligibility will be dependent upon each partner implementing the plan implementation-maintenance protocol identified in the plan. At a minimum, this means completing the on-going plan maintenance protocol identified in the plan. Partners that do not participate in this plan maintenance strategy may be deemed ineligible by the partnership, and thus lose their DMA eligibility. A-4 Template Letter of Intent [Date] Mr. Mark Cook Public Works Director Kittitas County Public Works 411 North Ruby Street, Suite 1 Ellensburg, WA 98926 Subject: Kittitas County Multi-Jurisdictional Natural Hazard Mitigation Plan Update Authorization and Letter of Intent to Participate – [Jurisdiction Name] Dear Mr. Cook: [Jurisdiction Name] is committed to participating in the Kittitas County (County) Hazard Mitigation Plan (Plan) Update project. By way of this letter, [Jurisdiction Name]: 1. Authorizes the County and the County Hazard Mitigation Steering Committee (Steering Committee) to guide and direct this planning process, perform certain parts of the planning process, and prepare certain parts of the plan documents on our behalf. 2. Agrees to meet the minimum requirements of jurisdictional participation (a.k.a., the Planning Partner Expectations), specifically:  Execute and return this “Authorization and Acknowledgement” letter to the Kittitas County Department of Public Works, attention: Mark Cook.  Identify jurisdictional representatives to serve as the planning points of contact (POCs), below. These people will be responsible for representing our community and assuring that these participation expectations are met.  Support the Steering Committee selected to oversee the development of this plan.  Provide representation at Steering Committee meetings.  Provide information about the assets (structures and facilities, new development, etc.) within our jurisdiction as requested by the County, Steering Committee, or the contract consultant.  Assist with the identification of stakeholders within our community that should be informed and potentially involved with the planning process.  Review draft Plan sections when requested and provide comment and input as appropriate.  Prepare (or update) and submit a Jurisdictional Annex to the County Steering Committee and/or the contract consultant. Templates and instructions to aid in the compilation of this information will be provided to all participating partners. Each partner will be expected to complete their templates in a timely manner and according to the timeline specified by the Steering Committee.  The Steering Committee and/or the contract consultant will assure that technical and administrative resources are available to assist with the preparation and completion of the Jurisdictional Annexes.  Identify at least one mitigation initiative (action, project, or program) that our community will implement in order to reduce their risk from each high-ranked natural hazard. These initiatives will be presented in our Jurisdictional Annex.  Involve our local National Flood Insurance Program Floodplain Administrator in the planning process. A-5  Adopt the Plan by resolution of their governing body after Federal Emergency Management Agency conditional approval.  Annually, provide information on progress on identified initiatives as requested by the County Hazard Mitigation Coordinator. 3. Has assigned the following person(s) to be the POCs for our jurisdiction. We understand that these POCs are responsible for assuring municipal representation at Steering Committee meetings, and assuring that the other minimum requirements of jurisdictional participation, as detailed in the Planning Partner Expectations above, are met. (Other jurisdictional representatives that should be actively involved in the development of this Plan include persons from DPW, planning and zoning, construction and engineering, and emergency management.)  [Jurisdiction Name] Primary Hazard Mitigation Planning (HMP) Point of Contact is: Name of HMP POC: Position/Department: Phone Number: Email Address:  [Jurisdiction Name] Secondary Hazard Mitigation Planning Point of Contact is: Name of HMP POC: Position/Department: Phone Number: Email Address:  [Jurisdiction Name] designated local Floodplain Administrator (FPA) under the NFIP (if applicable) is: Name of NFIP FPA: Position/Department: Phone Number: Email Address: Thank You. Sincerely, [POC] [Title, Jurisdiction Name] c: Karen Hodges, Kittitas County Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes APPENDIX B. PROCEDURES FOR LINKING TO THE HAZARD MITIGATION PLAN B-1 APPENDIX B. PROCEDURES FOR LINKING TO THE HAZARD MITIGATION PLAN Not all eligible local governments within Kittitas County are included in the Kittitas County Hazard Mitigation Plan. It is assumed that some or all of these non-participating local governments may choose to “link” to the Plan at some point to gain eligibility for programs under the federal Disaster Mitigation Act. In addition, some of the current partnership may not continue to meet eligibility requirements due to a lack of participation as prescribed by the plan. The following “linkage” procedures define the requirements established by the Plan’s Steering Committee and all planning partners for dealing with an increase or decrease in the number of planning partners linked to this plan. It should be note d that a currently non- participating jurisdiction within the defined planning area is not obligated to link to this plan. These jurisdictions can chose to do their own “complete” plan that addresses all required elements of section 201.6 of 44 CFR. Increasing the Partnership through Linkage The annual time period for the linkage process will be from ______ to ______ during any year. Eligible linking jurisdictions are instructed to complete all of the following procedures during this time frame: – The eligible jurisdiction requests a “Linkage Package” by contacting the Point of Contact (POC) for the plan: Karen Hodges Department of Public Works 411 N Ruby Street, Suite 1 Ellensburg, WA 98926 Telephone: 509-962-7523 Email: karen.hodges@co.kittitas.wa.us The POC will provide a linkage package that includes: – Copy of Volume 1 and 2 of the plan – Planning partner’s expectations package. – A sample “letter of intent” to link to the hazard mitigation plan. – A Special Purpose District or City template and instructions. – Catalog of Hazard Mitigation Alternatives – A “request for technical assistance” form. – A copy of Section 201.6 of Chapter 44, the Code of Federal Regulations (44 CFR), which defines the federal requirements for a local hazard mitigation plan. – The new jurisdiction will be required to review both volumes of the hazard mitigation plan, which includes the following key components for the planning area: – The planning area risk assessment – Goals and objectives B-2 – Plan implementation and maintenance procedures – Comprehensive review of alternatives – County-wide initiatives. Once this review is complete, the jurisdiction will complete its specific annex using the template and instructions provided by the POC. Technical assistance can be provided upon request by completing the request for technical assistance form provided in the linkage package. Technical assistance may be provided by the POC or any other resource within the Planning Partnership such as a member of the Steering Committee or a currently participating City or Special Purposes District partner. The POC will determine who will provide the technical assistance and the possible level of assistance, based on resources available at the time of the request. – The new jurisdiction will be required to develop a public involvement strategy that ensures the public’s ability to participate in the plan development process. At a minimum, the new jurisdiction must make an attempt to solicit public opinion on hazard mitigation at the onset of this linkage process and a minimum of one public meeting to present their draft jurisdiction specific annex for comment, prior to adoption by the governing body. The Planning Partnership will have resources available to aid in the public involvement strategy such as the Plan website. However, it will be the new jurisdiction’s responsibility to implement and document this strategy for incorporation into its annex. It should be noted that the jurisdictional annex templates do not include a section for the description of the public process. This is because the original partnership was covered under a uniform public involvement strategy that covered the planning area described in Volume 1 of the plan. Since new partners were not addressed by that strategy, they will have to initiate a new strategy, and add a description of that strategy to their annex. For consistency, new partners are encouraged to follow the public involvement format utilized by the initial planning effort as described in Volume 1 of the plan. – Once their public involvement strategy is completed and they have completed their template, the new jurisdiction will submit the completed package to the POC for a pre-adoption review to ensure conformance with the Regional plan format. – The POC will review for the following: – Documentation of public involvement strategy – Conformance of template entries with guidelines outlined in instructions – Chosen initiatives are consistent with goals, objectives and mitigation catalog of the hazard mitigation plan – A designated point of contact – A ranking of risk specific to the jurisdiction. The POC may utilize members of the Steering Committee or other resources to complete this review. All proposed linked annexes will be submitted to the Steering Committee for review and comment prior to submittal to WA Emergency Management Division. – Plans approved and accepted by the Steering Committee will be forwarded to WA Emergency Management Division for review with a cover letter stating the forwarded plan meets local approved plan standards and whether the plan is submitted with local adoption or for criteria met/plan not adopted review. B-3 – WA Emergency Management Division will review plans for federal compliance. Non- Compliant plans are returned to the Lead agency for correction. Compliant plans are forwarded to FEMA for review with annotation as to the adoption status. – FEMA reviews the new jurisdiction’s plan in association with the approved plan to ensure DMA compliance. FEMA notifies new jurisdiction of results of review with copies to WA Emergency Management Division and approved planning authority. – New jurisdiction corrects plan shortfalls (if necessary) and resubmits to WA Emergency Management Division through the approved plan lead agency. – For plans with no shortfalls from the FEMA review that have not been adopted, the new jurisdiction governing authority adopts the plan (if not already accomplished) and forwards adoption resolution to FEMA with copies to lead agency and WA Emergency Management Division. – FEMA regional director notifies new jurisdiction governing authority of plan approval. The new jurisdiction plan is then included with the regional plan with the commitment from the new jurisdiction to participate in the ongoing plan implementation and maintenance. Decreasing the Partnership The eligibility afforded under this process to the planning partnership can be rescinded in two ways. First, a participating planning partner can ask to be removed from the partnership. This may be done because the partner has decided to develop its own plan or has identified a different planning process for which it can gain eligibility. A partner that wishes to voluntarily leave the partnership shall inform the POC of this desire in writing. This notification can occur any time during the calendar year. A jurisdiction wi shing to pursue this avenue is advised to make sure that it is eligible under the new planning effort, to avoid any period of being out of compliance with the Disaster Mitigation Act. After receiving this notification, the POC shall immediately notify both WA Emergency Management Division and FEMA in writing that the partner in question is no longer covered by the hazard mitigation plan, and that the eligibility afforded that partner under this plan should be rescinded based on this notification. The second way a partner can be removed from the partnership is by failure to meet the participation requirements specified in the “Planning Partner Expectations” package provided to each partner at the beginning of the process, or the plan maintenance and implementation procedures specified in Volume 1 of the plan. Each partner agreed to these terms by adopting the plan. Eligibility status of the planning partnership will be monitored by the POC. The determination of whether a partner is meeting its participation requirements will be based on the following parameters: – Are progress reports being submitted annually by the specified time frames? – Are partners notifying the POC of changes in designated points of contact? – Are the partners supporting the Steering Committee by attending designated meetings or responding to needs identified by the body? – Are the partners continuing to be supportive as specified in the Planning Partners expectations package provided to them at the beginning of the process? Participation in the plan does not end with plan approval. This partnership was formed on the premise that a group of planning partners would pool resources and work together to strive to reduce risk within the planning area. Failure to support this premise lessens the effectiveness of this effort. The following procedures will be followed to remove a partner due to the lack of participation: B-4 – The POC will advise the Steering Committee of this pending action and provide evidence or justification for the action. Justification may include: multiple failures to submit annual progress reports, failure to attend meetings determined to be mandatory by the Steering Committee, failure to act on the partner’s action plan, or inability to reach designated point of contact after a minimum of five attempts. – The Steering Committee will review information provided by POC, and determine action by a vote. The Steering Committee will invoke the voting process established in the ground rules established during the formation of this body. – Once the Steering Committee has approved an action, the POC will notify the planning partner of the pending action in writing via certified mail. This notification will outline the grounds for the action, and ask the partner if it is their desire to remain as a partner. This notification shall also clearly identify the ramifications of removal from the partnership. The partner will be given 30 days to respond to the notification. – Confirmation by the partner that they no longer wish to participate or failure to respond to the notification shall trigger the procedures for voluntary removal discussed above. – Should the partner respond that they would like to continue participation in the partnership, they must clearly articulate an action plan to address the deficiencies i dentified by the POC. This action plan shall be reviewed by the Steering Committee to determine whether the actions are appropriate to rescind the action. Those partners that satisfy the Steering Committee ’s review will remain in the partnership, and no further action is required. – Automatic removal from the partnership will be implemented for partners where these actions have to be initiated more than once in a 5 year planning cycle. Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes APPENDIX C. JURISDICTIONAL ANNEX INSTRUCTIONS AND TEMPLATE FOR MUNICIPALITIES C-1 APPENDIX C. JURISDICTION ANNEX INSTRUCTIONS AND TEMPLATE FOR MUNICIPALITIES C-2 Instructions for Completing Municipality Annex Template This document provides instructions for completing the annex template for city and county governments participating in multi-partner hazard mitigation planning. Assistance in completing the template will be available in the form of a workshop for all planning partners or one -on-one visits with each partner, depending on funding availability. Any questions on completing the template should be directed to: Jessica Fleck Dewberry 8401 Arlington Blvd. Fairfax, VA 22031 (703)849-0166 Email: jfleck@dewberry.com Please provide a digital copy of the completed template to Dewberry upon completion. Chapter Number and Title In the chapter title at the top of Page 1, type in the complete official name of your jurisdiction (The City of Metropolis, Jefferson County, etc.). At this time, also change the name in the “header” box on Page 3, using the same wording. Note that the template is set up as Chapter “X.” Please leave all references to “X” in the template as they are. Once all templates are received, chapter numbering will be assigned for incorporation into the final plan. Hazard Mitigation Plan Point of Contact Please provide the name, title, mailing address, telephone number, and e-mail address for the primary point of contact for your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the annex for your jurisdiction. This person should also be the principle liaison between your jurisdiction and the Steering Committee overseeing development of this plan. In addition, designate an alternate point of contact. This would be a person to contact sh ould the primary point of contact be unavailable or no longer employed by the jurisdiction. C-3 Jurisdiction Profile Provide information specific to your jurisdiction as indicated, in a style similar to the example provided in the box at right. This should be information that was not provided in the overall mitigation plan document. For population data, use the most current population figure for your jurisdiction based on an official means of tracking (e.g., the U.S. Census or state office of financial management). Jurisdiction-Specific Natural Hazard Event History Chronological List of Hazard Events In Table X-1, list in chronological order (most recent first) any natural hazard event that has caused damage to your jurisdiction since 1975. Include the date of the event and the estimated dollar amount of damage it caused. Please refer to the summary of natural hazard events within risk assessment of the overall hazard mitigation plan. Potential sources of damage information include: – Preliminary damage estimates your jurisdiction filed with the county or state – Insurance claims data – Newspaper archives – Other plans/documents that deal with emergency management (safety element of a comprehensive plan, emergency response plan, etc.) – Citizen input. Repetitive Loss Properties A repetitive loss property is any property for which FEMA has paid two or more flood insurance claims in excess of $1,000 in any rolling 10-year period since 1978. In the space provided in the text for Section X.3, indicate the number of any FEMA-identified Repetitive Flood Loss properties in your jurisdiction (your technical assistance provider will be able to help you confirm this information). If you have none, indicate “none” in the space provided. Example Jurisdiction Profile: – Date of Incorporation—1858 – Current Population—17,289 as of July 2006 – Population Growth—Based on the data tracked by the California Department of Finance, Arcata has experienced a relatively flat rate of growth. The overall population has increased only 3.4% since 2000 and has averaged 0.74% per year from 1990 to 2007 – Location and Description—The City of Arcata is located on California’s redwood coast, approximately 760 miles north of Los Angeles and 275 miles north of San Francisco. The nearest seaport is Eureka, five miles south on Humboldt Bay. Arcata is the home of Humboldt State University and is situated between the communities of McKinleyville to the north and Blue Lake to the east. It sits at the intersection of US Highway 101 and State Route 299. – Brief History—The Arcata area was settled during the California gold rush in the 1850s as a supply center for miners. As the gold rush died down, timber and fishing became the area’s major economic resource. Arcata was incorporated in 1858 and by 1913 the Humboldt Teachers College, a predecessor to today’s Humboldt State University was founded in Arcata. Recently, the presence of the college has come to shape Arcata’s population into a young, liberal, and educated crowd. In 1981 Arcata developed the Arcata Marsh and Wildlife sanctuary, an innovative environmentally friendly, sewage treatment enhancement system. – Climate—Arcata’s weather is typical of the Northern California coast, with mild summers and cool, wet winters. It rarely freezes in the winter and it is rarely hot in the summer. Annual average rainfall is over 40 inches, with 80% of that falling in the six- month period of November through April. The average year- round temperature is 59ºF. Humidity averages between 72 and 87 percent. Prevailing winds are from the north, and average 5 mph. – Governing Body Format—The City of Arcata is governed by a five-member City Council. The City consists of six departments: Finance, Environmental Services, Community Development, Public Works, Police and the City Manager’s Office. The City has 13 Committees, Commissions and Task Forces, which report to the City Council. – Development Trends—Anticipated development levels for Arcata are low to moderate, consisting primarily of residential development. The majority of recent development has been infill. Residentially, there has been a focus on affordable housing and a push for more secondary mother-in-law units on properties. – The City of Arcata adopted its general plan in July 2000. The plan focuses on issues of the greatest concern to the community. City actions, such as those relating to land use allocations, annexations, zoning, subdivision and design review, redevelopment, and capital improvements, must be consistent with such a plan. Future growth and development in the City will be managed as identified in the general plan. C-4 Next, indicate the number (if any) of repetitive loss structures in your jurisdiction that have been mitigated. Mitigated for this exercise means that flood protection has been provided to the structure. If you do not know the answer to this question, the planning team will provide it for you. Hazard Risk Ranking The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and therefore needs to rank risk for its own area, using the same methodology as used for the overall planning area. The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential impact on people, property and the economy. A detailed discussion of the concepts associated with risk ranking is provided in the overall hazard mitigation plan. The instructions below outline steps for assessing risk in your jurisdiction to develop results that are to be included in the template. Determine Probability of Occurrence for Each Hazard A probability factor is assigned based on how often a hazard is likely to occur. In Table 1, list the probability of occurrence for each hazard as it pertains to your jurisdiction, along with its probability factor, as follows: – High—Hazard event is likely to occur within 25 years (Probability Factor = 3) – Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2) – Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1) – None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0) Table 1. Hazard Probability of Occurrence Hazard Type Probability Probability Factor The probability of occurrence of a hazard event is generally based on past hazard events in an area. For example, if your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Determine Potential Impacts of Each Hazard The impact of each hazard was divided into three categories: impacts on people, impacts on property, and impacts on the economy. These categories were also assigned weighted values. Impact on people was assigned a weighting factor of 3, impact on property was assigned a weighting factor o f 2 and impact on the economy was assigned a weighting factor of 1. Steps to assess each type of impact are described below. C-5 Impacts on People To assess impacts on people, values are assigned based on the percentage of the total population exposed to the hazard event. The degree of impact on individuals will vary and is not measurable, so the calculation assumes for simplicity and consistency that all people exposed to a hazard because they live in a hazard zone will be equally impacted when a hazard event occurs. In Table 2, list the potential impact of each hazard on people in your jurisdiction, along with its impact factor, as follows: – High Impact—50% or more of the population is exposed to a hazard (Impact Factor = 3) – Medium Impact—25% to 49% of the population is exposed to a hazard (Impact Factor = 2) – Low Impact—25% or less of the population is exposed to the hazard (Impact Factor = 1) – No impact—None of the population is exposed to a hazard (Impact Factor = 0) Table 2. Hazard Impact on People Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 3) Impacts on Property To assess impacts on property, values are assigned based on the percentage of the total property value exposed to the hazard event. In Table 3, enter the cost estimates for potential damage to exposed structures, taken from the “Summary of Loss” matrix provided with these instructions. Table 3. Cost Estimates for Potential Damage to Structures Hazard type Estimate of Potential Dollar Losses to Jurisdiction- Owned Facilities Exposed to the Hazard C-6 In Table 4, list the potential impact of each hazard on property in your jurisdiction, along with its impact factor. Determine impact based on damage estimates from Table 3, as follows: – High Impact—30% or more of the total assessed property value is exposed to a hazard (Impact Factor = 3) – Medium Impact—15% to 29% of the total assessed property value is exposed to a hazard (Impact Factor = 2) – Low Impact—14% or less of the total assessed property value is exposed to the hazard (Impact Factor = 1) – No impact—None of the total assessed property value is exposed to a hazard (Impact Factor = 0) Table 4. Hazard Impact on Property Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 2) Impacts on the Economy To assess impacts on the economy, values are assigned based on the percentage of the total property value vulnerable to the hazard event. Values represent estimates of the loss from a major event of each hazard in comparison to the total assessed value of property in the county. For some hazards, such as wildland fire, landslide and severe weather, vulnerability is the same as exposure due to the lack of loss estimation tools specific to those hazards. In Table 5, list the potential impact of each hazard on the economy in your jurisdiction, along with its impact factor, as follows: – High Impact—Estimated loss from the hazard is 20% or more of the total assessed property value (Impact Factor = 3) – Medium Impact—Estimated loss from the hazard is 10% to 19% of the total assessed property value (Impact Factor = 2) – Low Impact—Estimated loss from the hazard is 8% or less of the total assessed property value (Impact Factor = 1) – No impact—No loss is estimated from the hazard (Impact Factor = 0) C-7 Table 5. Hazard Impact on Operations Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 1) Determine Risk Rating for Each Hazard A risk rating for each hazard is determined by multiplying the assigned probability factor by the sum of the weighted impact factors for people, property and the economy: – Risk Rating = Probability Factor x Weighted Impact Factor {people + property + economy} Using the results developed in Tables 1, 2, 4 and 5, complete Table 6 to calculate a risk rating for each hazard of concern. Table 6. Hazard Risk Rating Hazard Type Probability Factor (P) Sum of Weighted Impact Factors on People, Property & Operations (I) Risk Rating (P x I) Complete Risk Ranking in Template Once Table 6 has been completed above, complete Table X-2 in your template. The hazard with the highest risk rating in Table 6 should be listed at the top of Table X -2 and given a rank of 1; the hazard with the second highest rating should be listed second with a rank of 2; and so on. Two hazards with equal risk ratings should be given the same rank. It is important to note that this exercise should not override your subjective assessment of relative risk based on your knowledge of the history of natural hazard events in your jurisdiction. If this risk ranking exercise generates results other that what you know based on substantiated data and documentation, you may alter the ranking based on this knowledge. If this is the case, please note this fact in the comments at the end of the template. Remember, one of the purposes of this exercise is to support the selection and prioritization of initiatives in your plan. If you identify an initiative with a high priority that mitigates the risk of a hazard you have ranked low, that project will not be competitive in the grant arena. C-8 Capability Assessment Legal and Regulatory Capability Describe the legal authorities available to your jurisdiction and/or enabling legislation at the state level affecting planning and land management tools that can support hazard mitigation initiatives. In Table X -3, indicate “Yes” or “No” for each listed code, ordinance, requirement or planning document in each of the following columns: – Local Authority—Enter “Yes” if your jurisdiction has prepared or adopted the identified item; otherwise, enter “No.” If yes, then enter the code or ordinance number and its date of adoption in the comments column. – State or Federal Prohibitions—Enter “Yes” if there are any state or federal regulations or laws that would prohibit local implementation of the identified item; otherwise, enter “No.” – Other Regulatory Authority—Enter “Yes” if there are any regulations that may impact your initiative that are enforced or administered by another agency (e.g., a state agency or special purpose district); otherwise, enter “No.” – State Mandated—Enter “Yes” if state laws or other requirements enable or require the listed item to be implemented at the local level; otherwise, enter “No.” Administrative and Technical Capability This section requires you to take inventory of the staff/personnel resources available to your jurisdiction to help with hazard mitigation planning and implementation of specific mitigation actions. Complete Table X-4 by indicating whether your jurisdiction has access to each of the listed personnel resources. Enter “Yes” or “No” in the column labeled “Available?”. If yes, then enter the department and position title in the right-hand column. Financial Resources Identify what financial resources (other than the Hazard Mitigation Grant Program and the Pre-Disaster Mitigation Grant Program) are available to your jurisdiction for implementing mitigation initiatives. Complete Table X-5 by indicating whether each of the listed financial resources is accessible to your jurisdiction. Enter “Yes” if the resource is fully accessible to your jurisdiction. Enter “No” if there are limitations or prerequisites that may hinder your eligibility for this resource. Community Mitigation Related Classifications Complete Table X-6 to indicate your jurisdiction’s participation in various national programs related to natural hazard mitigation. For each program enter “Yes” or “No” in the second column to indicate whether your jurisdiction participates. If yes, then enter the classification that your jurisdiction has earned under the program in the third column and the date on which that classification was issued in the fourth column; enter “N/A” in these columns if your jurisdiction is not participating. Hazard Mitigation Action Plan Action Plan Matrix Identify the initiatives your jurisdiction would like to pursue with this plan. Refer to the mitigation catalog for mitigation options you might want to consider. Be sure to consider the following factors in your selection of initiatives: C-9 – Select initiatives that are consistent with the overall goals, objectives and guiding principles of the hazard mitigation plan. – Identify projects where benefits exceed costs. – Include any project that your jurisdiction has committed to pursuing regardless of grant eligibility. – Know what is and is not grant-eligible under the HMGP and PDM (see fact sheet provided). Listing HMGP or PDM as a potential funding source for an ineligible project will be a red flag when this plan goes through review. If you have projects that are not HMGP or PDM grant eligible, but do mitigate part or all of the hazard and may be eligible for other grant programs sponsored by other agencies, include them in this section. – Although you should identify at least one initiative for your highest ranked risk, a hazard - specific project is not required for every hazard. If you have not identified an earthquake related project, and an earthquake occurs that causes damage in your jurisdiction, you are not discounted from HMGP project grant eligibility. Complete Table X-7 for all the initiatives you have identified: – Enter the initiative number and description. – Indicate whether the initiative mitigates hazards for new or existing assets. – Identify the specific hazards the initiative will mitigate. – Identify by number the mitigation plan objectives that the initiative addresses. These have been provided in the Steering Committee meeting minutes that were forwarded to you in the past. – Indicate who will be the lead in administering the project. This will most likely be your governing body. – Identify funding sources for the project. If it is a grant, include the funding sources for the cost share. Refer to your fiscal capability assessment (Table X-5) to identify possible sources of funding. – Indicate the time line as “short term” (1 to 5 years) or “long term” (5 years or greater). Technical assistance will be available to your jurisdiction in completing this section during the technical assistance visit. Prioritization of Mitigation Initiatives Complete the information in Table X-8 as follows: – Initiative #—Indicate the initiative number from Table X-7. – # of Objectives Met—Enter the number of objectives the initiative will meet. – Benefits—Enter “High,” “Medium” or “Low” as follows: – High: Project will have an immediate impact on the reduction of risk exposure to life and property. Wording Your Initiative Descriptions: Descriptions of your initiatives need not provide great detail. That will come when you apply for a project grant. Provide enough information to identify the project’s scope and impact. The following are typical descriptions for an action plan initiative:  Initiative 1—Address Repetitive Loss properties. Through targeted mitigation, acquire, relocate or retrofit the five repetitive loss structures in the County as funding opportunities become available.  Initiative 2—Perform a non- structural, seismic retrofit of City Hall.  Initiative 3—Acquire floodplain property in the Smith subdivision.  Initiative 4—Enhance the County flood warning capability by joining the NOAA “Storm Ready” program. C-10 – Medium: Project will have a long-term impact on the reduction of risk exposure to life and property, or project will provide an immediate reduction in the risk exposure to property. – Low: Long-term benefits of the project are difficult to quantify in the short term. – Costs—Enter “High,” “Medium” or “Low” as follows: – High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed project. – Medium: Could budget for under existing work-plan, but would require a reapportionment of the budget or a budget amendment, or the cost of the project would have to be spread over multiple years. – Low: Possible to fund under existing budget. Project is part of, or can be part of an existing ongoing program. If you know the estimated cost of a project because it is part of an existing, ongoing program, indicate the amount. – Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the benefit rating (high, medium or low) is the same as or higher than the cost rating (high benefit/high cost; high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than the cost rating (medium benefit/high cost, low benefit/medium cost; etc.) – Is the Project Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP and PDM. – Can Project Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is this initiative currently budgeted for, or would it require a new budget authorization or funding from another source such as grants? – Priority—Enter “High,” “Medium” or “Low” as follows: – High: Project meets multiple plan objectives, benefits exceed cost, funding is secured under existing programs, or is grant eligible, and project can be completed in 1 to 5 years (i.e., short term project) once funded. – Medium: Project meets at least 1 plan objective, benefits exceed costs, requires special funding authorization under existing programs, grant eligibility is questionable, and project can be completed in 1 to 5 years once funded. – Low: Project will mitigate the risk of a hazard, benefits exceed costs, funding has not been secured, project is not grant eligible, and time line for completion is long term (5 to 10 years). This prioritization is a simple review to determine that the initiatives you have identified meet one of the primary objectives of the Disaster Mitigation Act. It is not the det ailed benefit/cost analysis required for HMGP/PDM project grants. The prioritization will identify any projects whose probable benefits will not exceed the probable costs. Analysis of Mitigation Actions Complete Table X-9 summarizing the mitigation actions by hazard of concern and the following six mitigation types: C-11 – Prevention—Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. – Property Protection—Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. – Public Education and Awareness—Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. – Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. – Emergency Services—Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. – Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Future Needs to Better Understand Risk/Vulnerability In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or state agency mandates such as EPA’s Bio-terrorism assessment requirement for water districts. Additional Comments Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered in this template. C-12 Municipality Annex Template Chapter X. [Insert Jurisdiction Name] Annex X.1 Hazard Mitigation Plan Point of Contact Primary Point of Contact Alternate Point of Contact [Name, Title] [Street Address] [City, State ZIP] Telephone: [Phone #] e-mail Address: [email address] [Name, Title] [Street Address] [City, State ZIP] Telephone: [Phone #] e-mail Address: [email address] X.2 Jurisdiction Profile The following is a summary of key information about the jurisdiction and its history: – Date of Incorporation—[Insert Date of Incorporation] – Current Population—[Insert Population] as of [Insert Date of Population Count] – Population Growth—[Insert Discussion of Population Growth] – Location and Description—[Insert Description of Location, Surroundings, Key Geographic Features] – Brief History—[Insert Summary Discussion of Jurisdiction’s History] – Climate—[Insert Summary Discussion of Climate] – Governing Body Format—[Insert Summary Description of Governing Body] – Development Trends—[Insert Summary Description of Development] X.3 Jurisdiction-Specific Natural Hazard Event History Table X-1 lists all past occurrences of natural hazards within the jurisdiction. Repetitive loss records are as follows: – Number of FEMA Identified Repetitive Flood Loss Properties: [Insert #] – Number of Repetitive Flood Loss Properties that have been mitigated: [Insert #] X.4 Hazard Risk Ranking Table X-2 presents the ranking of the hazards of concern. X.5 Capability Assessment The assessment of the jurisdiction’s legal and regulatory capabilities is presented in Table X-3. The assessment of the jurisdiction’s administrative and technical capabilities is presented in Table X-4. The assessment of the jurisdiction’s fiscal capabilities is presented in Table X-5. Classifications under various community mitigation programs are presented in Table X-6. C-13 X.6 Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives Table X-7 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table X-8 identifies the priority for each initiative. Table X-9 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. X.7 Future Needs to Better Understand Risk/Vulnerability [Insert text, if any] X.8 Additional Comments [Insert text, if any] C-14 Table X-1. Natural Hazard Events Type of Event FEMA Disaster # (if applicable) Date Preliminary Damage Assessment Table X-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 2 3 4 5 6 7 8 9 C-15 Table X-3. Legal and Regulatory Capability Local Authority State or Federal Prohibitions Other Jurisdictional Authority State Mandated Comments Codes, Ordinances & Requirements Building Code Zonings Subdivisions Stormwater Management Post Disaster Recovery Real Estate Disclosure Growth Management Site Plan Review Special Purpose (flood management, critical areas) Planning Documents General or Comprehensive Plan Floodplain or Basin Plan Stormwater Plan Capital Improvement Plan Habitat Conservation Plan Economic Development Plan Emergency Response Plan Shoreline Management Plan Post Disaster Recovery Plan Other Other C-16 Table X-4. Administrative and Technical Capability Staff/Personnel Resources Available? Department/Agency/Position Planners or engineers with knowledge of land development and land management practices Engineers or professionals trained in building or infrastructure construction practices Planners or engineers with an understanding of natural hazards Staff with training in benefit/cost analysis Floodplain manager Surveyors Personnel skilled or trained in GIS applications Scientist familiar with natural hazards in local area Emergency manager Grant writers Table X-5. Fiscal Capability Financial Resources Accessible or Eligible to Use? Community Development Block Grants Capital Improvements Project Funding Authority to Levy Taxes for Specific Purposes User Fees for Water, Sewer, Gas or Electric Service Incur Debt through General Obligation Bonds Incur Debt through Special Tax Bonds Incur Debt through Private Activity Bonds Withhold Public Expenditures in Hazard-Prone Areas State Sponsored Grant Programs Development Impact Fees for Homebuyers or Developers Other Table X-6. Community Classifications Participating? Classification Date Classified Community Rating System Building Code Effectiveness Grading Schedule Public Protection Storm Ready Firewise C-17 Table X-7. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description C-18 Table X-8. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* * See Section 1.3 for definitions of high, medium and low priorities. C-19 Table X-9. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Notes: 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduc e hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and sha tter-resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, set back levees, floodwalls, retaining walls, and safe rooms. D-1 Kittitas County Hazard Mitigation Plan Volume 2: Planning Partner Annexes APPENDIX D. JURISDICTIONAL ANNEX INSTRUCTIONS AND TEMPLATE FOR SPECIAL-PURPOSE DISTRICTS D-2 APPENDIX D. JURISDICTION ANNEX INSTRUCTIONS AND TEMPLATE FOR SPECIAL-PURPOSE DISTRICTS D-3 Instructions for Completing Special-Purpose District Annex Template This document provides instructions for completing the annex template for special- purpose districts participating in multi- partner hazard mitigation planning. Assistance in completing the template will be available in the form of a workshop for all planning partners or one-on-one visits with each partner, depending on funding availability. Any questions on completing the template should be directed to: Jessica Fleck Dewberry 8401 Arlington Blvd. Fairfax, VA 22031 (703)849-0166 Email: jfleck@dewberry.com Please provide a digital copy of the completed template to Dwberry upon completion. Chapter Number and Title In the chapter title at the top of Page 1, type in the complete official name of your jurisdiction (West County Fire Protection District #1, Burgville Flood Protection District, etc.). At this time, also change the name in the “header” box on Page 3, using the same wording. Note that the template is set up as Chapter “X.” Please leave all references to “X” in the template as they are. Once all templates are received, chapter numbering will be assigned for incorporation into the final plan. Hazard Mitigation Plan Point of Contact Please provide the name, title, mailing address, telephone number, and e-mail address for the primary point of contact for your jurisdiction. This should be the person responsible for monitoring, evaluating and updating the annex for your jurisdiction. This person should also be the principle liaison between your jurisdiction and the Steering Committee overseeing development of this plan. In addition, designate an alternate point of contact. This would be a person to contact should the primary point of contact be unavailable or no longer employed by the jurisdiction. Associated Materials: Along with the annex template and these instructions, you have been provided with other materials with information that is needed for completing the template. Be sure to review these materials before you begin the process of filling in the template:  Summary-of-loss matrix for the hazard mitigation plan  Results from the hazard mitigation plan questionnaire  Catalog of mitigation alternatives  Fact sheet on Hazard Mitigation Grant Program (HMGP) and Pre-Disaster Mitigation Grant Program (PDM) D-4 Jurisdiction Profile Narrative Profile Please provide a brief summary to profile your jurisdiction. Include the purpose of the jurisdiction, the date of inception, the type of organization, the number of employees, the mode of operation (i.e., how operations are funded), the type of governing body, and who has adoptive authority. Describe who the jurisdiction’s customers are (if applicable, include number of users or subscribers). Include a geographical description of the service area. Provide information in a style similar to the example provided in the box at right. This should be information that was not provided in the overall mitigation plan document. Summary Information Complete the bulleted list of summary information as follows: – Population Served—List the estimated population that your jurisdiction provides services to. If you do not know this number directly, create an estimate (e.g., the number of service connections times the average household size for the service area based on Census data). – Land Area Served—Enter the service area of your jurisdiction in acres or square miles. – Value of Area Served—Enter the approximate assessed value of your service area. If you do not have this information, the County should be able to provide a number using the County Assessor’s database. – Land Area Owned—Enter the area of property owned by the jurisdiction in acres or square miles. – List of Critical Infrastructure/Equipment Owned by the Jurisdiction—List all infrastructure and equipment that is critical to your jurisdiction’s operations and is located in a natural hazard risk zone. Briefly describe the item and give its estimated replacement -cost value. Examples are as follows: – Fire Districts—Apparatus and equipment housed in a facility that is located in a natural hazard risk zone. This is the equipment that is essential for you to deliver services to this area should a natural hazard occur. It is not necessary to provide a detailed inventory of each engine and truck and its contents. A summary will suffice, such as “5 Engines, 2 ladders, and their contents”. Do not list reserve equipment. – Dike/Flood Control Districts—Miles of levees, pump stations, retention/detention ponds, tide gates, miles of ditches, etc., within natural hazard risk zones. – Water Districts—Total length of pipe (it is not necessary to specify size and type), pump stations, treatment facilities, dams and reservoirs, within natural hazard risk zones. – Public Utility Districts—Miles of power line (above ground and underground), generators, power generating sub-stations, miles of pipeline, etc., within natural hazard risk zones. Example Jurisdiction Narrative Profile: – Humboldt Community Services District is a special-purpose district created in 1952 to provide water, sewer, and street lighting to the unincorporated area surrounding the City of Eureka known as Pine Hill & Cutten. The District’s designated service areas expanded throughout the years to include other unincorporated areas of Humboldt County known as Myrtletown, Humboldt Hill, Fields Landing, King Salmon, and Freshwater. A five- member elected Board of Directors governs the District. The Board assumes responsibility for the adoption of this plan; the General Manager will oversee its implementation. As of April 30, 2007, the District serves 7,305 water connections and 6,108 sewer connections, with a current staff of 21. Funding comes primarily through rates and revenue bonds.. D-5 – School Districts—Anything within natural hazard risk zones, besides school buildings, that is critical for you to operate (e.g., school buses if you own a fleet of school buses). – Total Value of Critical Infrastructure/Equipment—Enter total replacement-cost value of the critical infrastructure and equipment listed above. – List of Critical Facilities Owned by the Jurisdiction—List all buildings and other facilities that are critical to your jurisdiction’s operations and are located in a natural hazard risk zone. Briefly describe the facility and give its estimated replacement-cost value. – Total Value of Critical Facilities—Enter total replacement-cost value of the critical facilities listed above. – Current and Anticipated Service Trends—Enter a brief description on how your jurisdiction’s services are projected to expand in the foreseeable future and why. Note any identified capital improvements needed to meet the projected expansion. Examples are as follows: – For a Fire District: Portions of the jurisdiction have experienced a 13 percent growth over the last five years. Land use designations allow for an increase in light commercial and residential land uses within the service area. This increase in density of land uses will represent an increase in population and thus a projected increase in call volume. Our District is experiencing an average annual increase in call volume of 13 percent. – For Dike/Drainage/Flood Control District: Portions of the jurisdiction have experienced a 13 percent growth over the last five years. Land use designations allow for an increase in light commercial and residential land uses within the service area. This increase in density of land use will result in an increase in impermeable surface within our service area and thus increase the demand on control facilities. – For a Water District: Portions of the jurisdiction have experienced a 13 percent growth over the last five years. Land use designations allow for an increase in light commercial and residential land uses within the service area. This increase in density of land use will represent an increase in the number of housing units within the service area and thus represent an expansion of the district’s delivery network. Boundary Map Maps that illustrate the service area boundary for all special-purpose district partners will be provided at the workshop. Please confirm that the boundaries reflected on the maps are current and accurate for your jurisdiction. In the box for this section, include a reference to the map that includes your jurisdiction ’s boundaries. Jurisdiction-Specific Natural Hazard Event History In Table X-1, list in chronological order (most recent first) any natural hazard event that has caused damage to your jurisdiction since 1975. Include the date of the event and the estimated dollar amount of damage it caused. Please refer to the summary of natural hazard events within risk assessment of the overall hazard mitigation plan. Potential sources of damage information include: – Preliminary damage estimates your jurisdiction filed with the county or state – Insurance claims data – Newspaper archives – Other plans/documents that deal with emergency management (safety element of a comprehensive plan, emergency response plan, etc.) D-6 – Citizen input. Hazard Risk Ranking The risk ranking performed for the overall planning area is presented in the risk assessment section of the overall hazard mitigation plan. However, each jurisdiction has differing degrees of risk exposure and vulnerability and therefore needs to rank risk for its own area, using the same methodology as used for the overall planning area. The risk-ranking exercise assesses two variables for each hazard: its probability of occurrence; and its potential impact on people, property and operations. A detailed discussion of the concepts associated with risk ranking is provided in the overall hazard mitigation plan. The instructions below outline steps for assessing risk in your jurisdiction to develop results that are to be included in the template. Determine Probability of Occurrence for Each Hazard A probability factor is assigned based on how often a hazard is likely to occur. In Table 1, list the probability of occurrence for each hazard as it pertains to your jurisdiction, along with its probability factor, as follows: – High—Hazard event is likely to occur within 25 years (Probability Factor = 3) – Medium—Hazard event is likely to occur within 100 years (Probability Factor = 2) – Low—Hazard event is not likely to occur within 100 years (Probability Factor = 1) – None—If there is no exposure to a hazard, there is no probability of occurrence (Probability Factor = 0) Table 1. Hazard Probability of Occurrence Hazard Type Probability Probability Factor The probability of occurrence of a hazard event is generally based on past hazard events in an area. For example, if your jurisdiction has experienced two damaging floods in the last 25 years, the probability of occurrence is high for flooding and scores a 3 under this category. If your jurisdiction has experienced no damage from landslides in the last 100 years, your probability of occurrence for landslide is low, and scores a 1 under this category. Determine Potential Impacts of Each Hazard The impact of each hazard was divided into three categories: impacts on people, impacts on property, and impacts on your jurisdiction’s operations. These categories were also assigned weighted values. Impact on people was assigned a weighting factor of 3, impact on property was assigned a weighting factor of 2 and impact on operations was assigned a weighting factor of 1. Steps to assess each type of impact are described below. D-7 Impacts on People To assess impacts on people, values are assigned based on the percentage of the total population exposed to the hazard event. The degree of impact on individuals will vary and is not measurable, so the calculation assumes for simplicity and consistency that all people exposed to a hazard because they live in a hazard zone will be equally impacted when a hazard event occurs. In Table 2, list the potential impact of each hazard on people in your jurisdiction, along with its impact factor, as follows: – High Impact—50% or more of the population is exposed to a hazard (Impact Factor = 3) – Medium Impact—25% to 49% of the population is exposed to a hazard (Impact Factor = 2) – Low Impact—25% or less of the population is exposed to the hazard (Impact Factor = 1) – No impact—None of the population is exposed to a hazard (Impact Factor = 0) Table 2. Hazard Impact on People Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 3) Impacts on Property To assess impacts on property, values are assigned based on the percentage of the total value of buildings, equipment and infrastructure that is exposed to the hazard event. In Table 3, enter the cost estimates for potential damage to the jurisdiction’s exposed buildings, equipment and infrastructure, taken from the “Summary of Loss” matrix provided with these instructions. Table 3. Cost Estimates for Potential Damage to Structures Hazard type Estimate of Potential Dollar Losses to Jurisdiction- Owned Facilities Exposed to the Hazard D-8 In Table 4, list the potential impact of each hazard on property in your jurisdiction, along with its impact factor. Determine impact based on damage estimates from Table 3, as follows: – High Impact—50% or more of the total assessed property value of facilities, equipment and infrastructure is exposed to a hazard (Impact Factor = 3) – Medium Impact—25% to 49% of the total assessed property value of facilities, equipment and infrastructure is exposed to a hazard (Impact Factor = 2) – Low Impact—24% or less of the total assessed property value of facilities, equipment and infrastructure is exposed to the hazard (Impact Factor = 1) – No impact—None of the total assessed property value of facilities, equipment and infrastructure is exposed to a hazard (Impact Factor = 0) Table 4. Hazard Impact on Property Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 2) Impacts on the Jurisdiction’s Operations Impact on operations is assessed based on estimates of how long it will take your jurisdiction to become 100-percent operable after a hazard event. The estimated functional downtime for critical facilities has been estimated for most hazards within the planning area. In Table 5, list the potential impact of each hazard on the operations of your jurisdiction, along with its impact factor, as follows: – High = functional downtime of 365 days or more (Impact Factor = 3) – Medium = Functional downtime of 180 to 364 days (Impact Factor = 2) – Low = Functional downtime of 180 days or less (Impact Factor = 1) – No Impact = No functional downtime is estimated from the hazard (Impact Factor = 0) D-9 Table 5. Hazard Impact on Operations Hazard Type Impact Impact Factor Weighted Impact Factor (Unweighted Factor x 1) You will need to consult the risk assessment for this task. The critical facilities exposed to each hazard have been identified, and the impacts on operability have been estimated for most of the hazards within the planning area. If the functional downtime component has not been provided for a hazard in the risk assessment, consider the impact on operability of that hazard to be low. Determine Risk Rating for Each Hazard A risk rating for each hazard is determined by multiplying the assigned probability factor by the sum of the weighted impact factors for people, property and operations: – Risk Rating = Probability Factor x Weighted Impact Factor {people + property + operations} Using the results developed in Tables 1, 2, 4 and 5, complete Table 6 to calculate a risk rating fo r each hazard of concern. Table 6. Hazard Risk Rating Hazard Type Probability Factor (P) Sum of Weighted Impact Factors on People, Property & Operations (I) Risk Rating (P x I) Complete Risk Ranking in Template Once Table 6 has been completed above, complete Table X-2 in your template. The hazard with the highest risk rating in Table 6 should be listed at the top of Table X -2 and given a rank of 1; the hazard with the second highest rating should be listed second with a rank of 2; and so on. Two hazards with equal risk ratings should be given the same rank. It is important to note that this exercise should not override your subjective assessment of relative risk based on your knowledge of the history of natural hazard events in your jurisdiction. If this risk ranking exercise generates results other that what you know based on substantiated data and documentation, you may alter the ranking based on this knowledge. If this is the case, please note this fact in the comments at the end of the template. Remember, one of the purposes of this exercise is to support the selection and prioritization D-10 of initiatives in your plan. If you identify an initiative with a high priority that mitigates the risk of a hazard you have ranked low, that project will not be competitive in the grant arena. Applicable Regulations and Plan List any federal, state, local or district laws, ordinances, codes and policies that govern your jurisdiction that include elements addressing hazard mitigation. Describe how these laws may support or conflict with the mitigation strategies of this plan. List any other plans, studies or other documents that address hazard mitigation issues for your jurisdiction. Note whether the documents could have a positive or a negative impact on the mitigation strategies of this plan. “None applicable” is a possible answer for this section. Classification in Hazard Mitigation Programs Complete Table X-3 to indicate your jurisdiction’s participation in various national programs related to natural hazard mitigation. For each program enter “Yes” or “No” in the second column to indicate whether your jurisdiction participates. If yes, then enter the classification that your jurisdiction has earned under the program in the third column and the date on which that classification was issued in the fourth column; enter “N/A” in these columns if your jurisdiction is not participating. Hazard Mitigation Action Plan Action Plan Matrix Identify the initiatives your jurisdiction would like to pursue with this plan. Refer to the mitigation catalog for mitigation options you might want to consider. Be sure to consider the following factors in your selection of initiatives: – Select initiatives that are consistent with the overall goals, objectives and guiding principles of the hazard mitigation plan. – Identify projects where benefits exceed costs. – Include any project that your jurisdiction has committed to pursuing regardless of grant eligibility. – Know what is and is not grant-eligible under the HMGP and PDM (see fact sheet provided). Listing HMGP or PDM as a potential funding source for an ineligible project will be a red flag when this plan goes through review. If you have projects that are not HMGP or PDM grant eligible, but do mitigate part or all of the hazard and may be eligible for other grant programs sponsored by other agencies, include them in this section. – Although you should identify at least one initiative for your highest ranked risk, a hazard - specific project is not required for every hazard. If you have not identified an earthquake related project, and an earthquake occurs that causes damage in your jurisdiction, you are not discounted from HMGP project grant eligibility. D-11 Complete Table X-4 for all the initiatives you have identified: – Enter the initiative number and description. – Indicate whether the initiative mitigates hazards for new or existing assets. – Identify the specific hazards the initiative will mitigate. – Identify by number the mitigation plan objectives that the initiative addresses. These have been provided in the Steering Committee meeting minutes that were forwarded to you in the past. – Indicate who will be the lead in administering the project. This will most likely be your governing body. – Identify funding sources for the project. If it is a grant, include the funding sources for the cost share. – Indicate the time line as “short term” (1 to 5 years) or “long term” (5 years or greater). Technical assistance will be available to your jurisdiction in completing this section during the technical assistance visit. Prioritization of Mitigation Initiatives Complete the information in Table X-5 as follows: – Initiative #—Indicate the initiative number from Table X-4. – # of Objectives Met—Enter the number of objectives the initiative will meet. – Benefits—Enter “High,” “Medium” or “Low” as follows: – High: Project will have an immediate impact on the reduction of risk exposure to life and property. – Medium: Project will have a long-term impact on the reduction of risk exposure to life and property, or project will provide an immediate reduction in the risk exposure to property. – Low: Long-term benefits of the project are difficult to quantify in the short term. – Costs—Enter “High,” “Medium” or “Low” as follows: – High: Would require an increase in revenue via an alternative source (i.e., bonds, grants, fee increases) to implement. Existing funding levels are not adequate to cover the costs of the proposed project. – Medium: Could budget for under existing work-plan, but would require a reapportionment of the budget or a budget amendment, or the cost of the project would have to be spread over multiple years. – Low: Possible to fund under existing budget. Project is part of, or can be part of an existing ongoing program. If you know the estimated cost of a project because it is part of an existing, ongoing program, indicate the amount. – Do Benefits Exceed the Cost?—Enter “Yes” or “No.” This is a qualitative assessment. Enter “Yes” if the benefit rating (high, medium or low) is the same as or higher than the cost rating Wording Your Initiative Descriptions: Descriptions of your initiatives need not provide great detail. That will come when you apply for a project grant. Provide enough information to identify the project’s scope and impact. The following are typical descriptions for an action plan initiative:  Initiative 1—Address Repetitive Loss properties. Through targeted mitigation, acquire, relocate or retrofit the five repetitive loss structures in the County as funding opportunities become available.  Initiative 2—Perform a non- structural, seismic retrofit of City Hall.  Initiative 3—Acquire floodplain property in the Smith subdivision.  Initiative 4—Enhance the County flood warning capability by joining the NOAA “Storm Ready” program. D-12 (high benefit/high cost; high benefit/medium cost; medium benefit/low cost; etc.). Enter “No” if the benefit rating is lower than the cost rating (medium benefit/high cost, low benefit/medium cost; etc.) – Is the Project Grant-Eligible?—Enter “Yes” or “No.” Refer to the fact sheet on HMGP and PDM. – Can Project Be Funded Under Existing Program Budgets?—Enter “Yes” or “No.” In other words, is this initiative currently budgeted for, or would it require a new budget authorization or funding from another source such as grants? – Priority—Enter “High,” “Medium” or “Low” as follows: – High: Project meets multiple plan objectives, benefits exceed cost, funding is secured under existing programs, or is grant eligible, and project can be completed in 1 to 5 years (i.e., short term project) once funded. – Medium: Project meets at least 1 plan objective, benefits exceed costs, requires special funding authorization under existing programs, grant eligibility is questionable, and project can be completed in 1 to 5 years once funded. – Low: Project will mitigate the risk of a hazard, benefits exceed costs, funding has not been secured, project is not grant eligible, and time line for completion is long term (5 to 10 years). This prioritization is a simple review to determine that the initiatives you have identified meet one of the primary objectives of the Disaster Mitigation Act. It is not the detailed benefit/cost analysis required for HMGP/PDM project grants. The prioritization will identify any projects whose probable benefits will not exceed the probable costs. Analysis of Mitigation Actions Complete Table X-6 summarizing the mitigation actions by hazard of concern and the following six mitigation types: – Prevention—Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. – Property Protection—Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter-resistant glass. – Public Education and Awareness—Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school-age and adult education. – Natural Resource Protection—Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. – Emergency Services—Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. D-13 – Structural Projects—Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms. This exercise demonstrates that the jurisdiction has selected a comprehensive range of actions. Future Needs to Better Understand Risk/Vulnerability In this section, identify any future studies, analyses, reports, or surveys your jurisdiction needs to better understand its vulnerability to identified or currently unidentified risks. These could be needs based on federal or state agency mandates such as EPA’s Bio-terrorism assessment requirement for water districts. Additional Comments Use this section to add any additional information pertinent to hazard mitigation and your jurisdiction not covered in this template. D-14 Special-Purpose District Annex Template Chapter X. [Insert Jurisdiction Name] Annex X.1 Hazard Mitigation Plan Point of Contact Primary Point of Contact Alternate Point of Contact [Name, Title] [Street Address] [City, State ZIP] Telephone: [Phone #] e-mail Address: [email address] [Name, Title] [Street Address] [City, State ZIP] Telephone: [Phone #] e-mail Address: [email address] X.2 Jurisdiction Profile [Insert Narrative Profile Information, per Instructions] The following is a summary of key information about the jurisdiction: – Population Served—[Insert Population] as of [Insert Date of Population Count] – Land Area Served—[Insert Area] – Value of Area Served—The estimated value of the area served by the jurisdiction is [Insert Total Value] – Land Area Owned—[Insert Area] – List of Critical Infrastructure/Equipment Owned by the Jurisdiction: – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – Total Value of Critical Infrastructure/Equipment—The total value of critical infrastructure and equipment owned by the jurisdiction is [Insert Total Value] – List of Critical Facilities Owned by the Jurisdiction: – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – [Insert Description of Item] [Insert Value of Item] – Total Value of Critical Facilities—The total value of critical facilities owned by the jurisdiction is [Insert Total Value] – Current and Anticipated Service Trends—[Insert Summary Description of Service Trends] D-15 The jurisdiction’s boundaries are shown on Figure [Insert # of Figure Showing Jurisdiction Boundaries] X.3 Jurisdiction-Specific Natural Hazard Event History Table X-1 lists all past occurrences of natural hazards within the jurisdiction. X.4 Hazard Risk Ranking Table X-2 presents the ranking of the hazards of concern. X.5 Applicable Regulations and Plans The following existing codes, ordinances, policies or plans are applicable to this hazard mitigation plan: – [Insert Name of Code, Ordinance, Policy or Plan] – [Insert Name of Code, Ordinance, Policy or Plan] – [Insert Name of Code, Ordinance, Policy or Plan] – [Insert Name of Code, Ordinance, Policy or Plan] – [Insert Name of Code, Ordinance, Policy or Plan] – [Insert Name of Code, Ordinance, Policy or Plan] X.6 Classification in Hazard Mitigation Programs The jurisdiction’s classifications under various hazard mitigation programs are presented in Table X-3. X.7 Hazard Mitigation Action Plan and Evaluation of Recommended Initiatives Table X-4 lists the initiatives that make up the jurisdiction’s hazard mitigation plan. Table X-5 identifies the priority for each initiative. Table X-6 summarizes the mitigation initiatives by hazard of concern and the six mitigation types. X.8 Future Needs to Better Understand Risk/Vulnerability [Insert text, if any] X.9 Additional Comments [Insert text, if any] D-16 Table X-1. Natural Hazard Events Type of Event FEMA Disaster # (if applicable) Date Preliminary Damage Assessment Table X-2. Hazard Risk Ranking Rank Hazard Type Risk Rating Score (Probability x Impact) 1 2 3 4 5 6 7 8 9 D-17 Table X-3. Community Classifications Participating? Classification Date Classified Public Protection Storm Ready Firewise Table X-4. Hazard Mitigation Action Plan Matrix Applies to new or existing assets Hazards Mitigated Objectives Met Lead Agency Estimated Cost Sources of Funding Timeline Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description Initiative #—Description D-18 Table X-5. Mitigation Strategy Priority Schedule Initiative # # of Objectives Met Benefits Costs Do Benefits Equal or Exceed Costs? Is Project Grant- Eligible? Can Project Be Funded Under Existing Programs/Budgets? Priority* * See Section 1.3 for definitions of high, medium and low priorities. D-19 Table X-6. Analysis of Mitigation Initiatives: Initiative Addressing Hazard, by Mitigation Type Hazard Type 1. Prevention 2. Property Protection 3. Public Education and Awareness 4. Natural Resource Protection 5. Emergency Services 6. Structural Projects Notes: 1. Prevention: Government, administrative or regulatory actions that influence the way land and buildings are developed to reduce hazard losses. Includes planning and zoning, floodplain laws, capital improvement programs, open space preservation, and stormwater management regulations. 2. Property Protection: Modification of buildings or structures to protect them from a hazard or removal of structures from a hazard area. Includes acquisition, elevation, relocation, structural retrofit, storm shutters, and shatter -resistant glass. 3. Public Education and Awareness: Actions to inform citizens and elected officials about hazards and ways to mitigate them. Includes outreach projects, real estate disclosure, hazard information centers, and school -age and adult education. 4. Natural Resource Protection: Actions that minimize hazard loss and preserve or restore the functions of natural systems. Includes sediment and erosion control, stream corridor restoration, watershed management, forest and vegetation management, and wetland restoration and preservation. 5. Emergency Services: Actions that protect people and property during and immediately after a hazard event. Includes warning systems, emergency response services, and the protection of essential facilities. 6. Structural Projects: Actions that involve the construction of structures to reduce the impact of a hazard. Includes dams, setback levees, floodwalls, retaining walls, and safe rooms.