Loading...
HomeMy WebLinkAboutRes-2019-113BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019-I I 3 TO AW ARD THE CONTRACT FOR THE BIG BOULDER CREEK BRIDGE REPLACEMENT PROJECT (PROJECT NO. RC1595/CRP NO. 296-18) AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME WHEREAS: The Department of Public Works solicited bids for the Big Boulder Creek Bridge Replacement Project (Project No. RC1595/CRP No. 296-18) contract in accordance with RCW 36.77.020 Contract Procedures; and WHEREAS: Sealed bids were opened on June 27, 2019 at 10:00 a.m. in the Kittitas County Permit Center, Department of Public Works, 411 N. Ruby Street, Suite 1, Ellensburg, Washington; and WHEREAS: Three (3) bids were received for the prescribed work. The Director of Public Works recommends the lowest responsive bid be accepted; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the Big Boulder Creek Bridge Replacement Project (Project No. RC1595/CRP No. 296-18) in the amount of $92,106 to Thayer Excavating. BE IT FURTHER RESOLVED that the Director for the Department of Public Works is authorized to sign the contract documents for said project. DATED on this 2nd day of July, 2019, at Ellensburg, Washington. D Deputy Clerk of the Board-Mandy Buchholz BIG BOULDER CREEK BRIDGE REPLACEMENT BIDS OPENED PUBLICLY AT 10:00 AM ON JUNE 27, 2019 AT KITTITAS COUNTY PUBLIC WORKS RESPONSIVE BIDDER CRITERIA Morgan &Sons Weber Construction Thayer Excavating PROPOSA L CO MPLETI: X X X NON-COLLU SION DECLARATION X X X PROPOSAL BOND I • 1 LOCAL AGENCY SIGNATURE PAGE X l X ~ENCY PROPOSAL SK;NATURE PAGE • . •- WAGE LAW CERTIFICATION ' l l PRE BID SITE VIS rT X l ., BASE BID ENGINEER'S ESTIIIA.TE llll)C)at •1 BIDOER•l -61DDEIU3 BIDDER#4 ITEM BIO ITEM DESCRIPTION UNIT QTY UNIT COST COST UNIT COST COST UNIT COST COST UNIT COST COST UNIT COST COST NO. ITEM ·~llOll ~ -- ~ 0001 I MOB[LlZAT ION LS I s ll.E77 $ 11..moo $ !t9>6.00 s 9,936.00 $ LO,lS0 .00 s 10,1511.l'O $, i,37J,IXI $ s,.m;oo • - 00!0 ' ~.,..,...,..,~'() LS I $ ~-~ s 4.00!).QO s 5',W..00 s 5.5-1~.oo $ 3..000.00 s J'ooo.ai i 2.000.00 $ 2.000.00 $ - GlWIIIIG :S _G .. 6 d $ 00)8 ' ~ IIQ4(,KQ'Vl,'!NCL HAUL TON 50 s 40 s 1 000.90 t 38.00 ~ 1.!IDD.00 $ 'IS.00 s J.)'50.0Q $ J;.111) s 1,650.00 $ . om1 .. l',Ml11';~COMPACTK>N CY JO ~ 80 s 2,-IOO.QO ' '32.110 $ 900,00 $ J0.00 $, 900.00 L 8LI» ! 2.'430.()0 J . 0300 ' ' 'IJM'frNA.Y ~CAVATIO N INCL HAUL CY "" s ill s l ~ ' 19.al $ '2.<170.00 $ 81!.00 $ 1M tull!l $ 53.00 • 7$lll.OO J '~ $ a .• -] ~ 0 " NSI • n:MPOIC/.tn' BRIDGE DELIVERY AN D PLACEMENT LS I $ l>.OQIJ $ ~.000.00 $ ll.192ll0 ·s 32.192 .00 s lS,500.00 $ ~ $ l).)9.7.«, s 3'.U17J)() .$ . T ~ --» -·11 0 s ~ 6100 1 c:w,)!Il)...,....__ 11.>S....,....._ 1011 llO $ 5() $ 6,000 00 $ ~5 ,00 $ 5,400.00 $ 75.00 $ 9,000.00 ' 33.00 $ 3,960.00 $ EROSION CONTROL AND ROADSllE PlAlll1NG S', 8 ti Q l $ NSI B TEMPORARY EROSION AND SEDIMENT CONTROL u-I '5 ~000 $ 8,000 00 -' 3,6-li.OO $ 3,645 .00 s l.450.~ $ 2,450.00 $ 2,956.00 $ 2,956.00 $ TRAFFIC '$ UL 0 0 $ 6971 ' ~--~--u I s 8,QOQ $ 8,000.00 s 6,000.00 $ 6,000.00 s 7,000.~ $ 7,000.00 $ 8,900.00 $ 8,900.00 $ 6776 10 TEMPORARY CONCRETE BARRJER CY , .. s 50 $ 5,200.00 I 162.00 $ 16,848.00 s IW:00 $ 17,576.00 $ 100.00 $ 10,400.00' $ OTHERITEIIS -_$ -~ 0 0 1 0 $ -~ ,- 7037 II STRUCTI.IRE SURVEYlNG ... I s UIOO $ 2,000 00 I ~7.\2.00 $ 3,742.00 $ .)l!Mc00 $ 3,000.00 $ 1,000.00 $ 1,000.00 $ 7038 12 RO/\OWAYSURVEYINC .. I ; 2.000 $ 2,000 00 I 3.7~ $ 3,742.00 $ -3.001.00 $ 3,000.00 $ 1,000.00 $ 1,000.00 $ NSI ll S\VPPP PREPARATION ... I s 1.000 $ 1,000 00 s l,&:71l .m $ 1,870.00 s '-5/lO.OO $ 2,500.00 $ 2,500.0CJ $ 2,500 .00 $ 7480 14 ROADSIDE CLEANUP i,sr I s 5,000 $ 5,000.00 s S,000.00 $ 5,000.00 s S,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 7736 ,, SPCCPLAN LS I $ 1,500 $ 1.500.00 $ 500.00 $ 500.00 $ 2.500-00 $ 2.500.00 $ 1,000.00 $ 1,000.00 $ TOTAL CONSTRUCTION COST $ 101,19700 $ 99.750 00 $ 105,826 00 $ 92 ,106.00 $ Bids have been reviewed for accuracy, unbalancing of bid items ·~~~ Page l•n