Loading...
HomeMy WebLinkAboutLT Agreement Cle Elum2018-2019 LODGING TAX SERVICES AGREEMENT BETWEEN KITTITAS COUNTY AND THE CITY OF CLE ELUM FOR THE LARGE-SCALE MUNICIPALITY-OWNEDCAPITAL PROJECT This Contract,dated 2nd day of January,2019 is made and entered into by and between - KITTITAS COUNTY ("County")and the Cityof Cle Elum ("Contractor"). WHEREAS,the purpose of this Agreement is to provide for Tourism-Related,Large-Scale Municipality Owned Capital Projects relating to activities and expenditures designed to increase tourism. NOW THEREFORE,in consideration of the terms and conditions contained herein,or attached and incorporated and made a part hereof,the County and the Contractor mutually agree as follows: Section 1.Scope of Work. a.Contractor shall provide the services described in the Grant Application submitted to the Lodging Tax Advisory Committee,attached hereto as Exhibit "A"incorporated herein by reference, b.Except as otherwise specifically provided in this Agreement,Contractor shall furnish the following as required to perform the services,described in Paragraph (a)above,in accordance with this Agreement:Personnel,labor and supervision;technical,professional and other services.AII such services,property and other items furnished or required to be furnished,together with all other obligations performed,or required to be performed,by Contractor under this Agreement are collectively referred to herein as "Services." c.Contractor warrants that the lodging tax funds shall be used only as allowed for in RCW 67.28.1816 as currently existing or subsequently amended. d.Contractor shall commence,perform and complete such Services in accordance with any and all attachments to this Agreement. Section 2.Payment, a.As full compensation for satisfactory performance of the Contractor's Services,the County agrees to pay Contractor the sum of One Million,Five Hundred Thousand dollars ($1,500,000.00)to be used for a capital project-Covered Arena and Associated Build-out for the Washington State Horse Park based upon the awarded project. b.Additional payment terms:The County will make payment to the Contractor only on a reimbursement basis,as detailed receipts for any items are submitted to the County,not to exceed the sum of One Million Five Hundred Thousand dollars ($1,500,000.00)to be used for capital project-covered arena and associated build-out for the Washington State Horse Park. LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Page 1 c.Requests for reimbursements must be submitted to: Kittitas County Auditor Attn:Judy Pless 205 West 5th Ave.,Suite 105 Ellensburg,WA 98926 auditoraccounting@co.kittitas.wa.us Reporting requirements will be required on prescribed forms from the County Auditor. Section 3.Perforrnance by contractor. a.Contractor shall at all times be an independent contractor and not an agent or representa- tive of the County with regard to performing the Services.Contractor shall not represent that it is,or hold itself out as,an agent or representativeof the County.In no event shall Contractor be authorized to enter into any Agreement or undertaking for or on behalf of the County.It is understood that the Contractor and the Contractor's staff and employees are not employees of the County and are not,therefore,entitled to any benefits provided employees of the County. b.Contractor shall comply with all applicable laws,ordinances,rules,regulations,orders, licenses,permits,and other requirements,now or hereafter in effect,of any governmental authority (including,but not limited to,such requirements as may be imposed upon the County and applicable to Services).Contractor shall furnish such documents as may be required to effect or evidence such compliance.AII laws,ordinances,rules,and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference.Contractor agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the term of this Agreement. c.The County and the Contractor agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race,creed,color,national origin,age, sex,marital status,or the presence of a physical,sensory,or mental handicap. d.The Services shall at all times be subject to inspection by and approval of the County,but the County's making (or failure or delay in making)such inspection or approval shall not relieve Contractor of its responsibility to perform the Services in accord with this Agreement,notwithstanding the County's knowledge of defective or non-complying performance,or the substantiality or ease of discovering the same.Contractor shall provide the County with sufficient,safe,and proper facilities and equipment for such inspection and free access to such facilities. e.This contract is subject to review by any Federal or State auditor.Contractor shall promptly furnish the County or its designee,or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. Contractor shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6)years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Contractor shall provide the County access to (and the County shall have the right to LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Þage 2 examine,audit and copy,with or without notice)all of Contractor's books,documents, papers and records related to the Services or this Agreement. f.Contractor understands and acknowledges that Contractor is solely responsible for its own reporting and accounting of all state,federal,social security,and local taxes,of every nature, arising from Contractor's performance of this Agreement.All compensation received by the Contractor will be reported to the Internal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. Section 4.Release,indemnity,and Hold Harmless. The County assumes no liability for the Contractor's actions under this Agreement.Contractor releases and shall defend,indemnify,and hold harmless the County,its officers and employees, agents,representatives,attorneys and/or volunteers,from and against all claims,costs,liabilities, damages,and expenses,(including,but not limited to,reasonable attorney fees)which arise or may arise or be alleged to arise out of or by reason of this Agreement including: •Any fault,negligence,strict liability or product liability of Contractor in connection with the Services for this Agreement; •Any lien asserted upon any property of the County in connection with the Services for this Agreement; •Any failure of Contractor,or of the Services,to comply with any applicable law,ordinance, rule,regulation,order,license,permit and other requirement,now or hereafter in effect,of any governmentalauthority;or •Any breach of or default under this Agreement by Contractor. Section 5.Compliance with Public Records Law. a.In compliance with Washington's public records law,the County will retain copies of any documents associated with this Agreement,which may be required by law unless legally exempt from such retention,for any applicable legally required retention period. b.In the event a public records request is made to the County for documents created in relation to this Agreement,should legal uncertainty arise regarding the disclosability of any documents under federal or state public records laws,the County shall provide notice to Contractor pursuant to Washington's public records act,chapter 42.56 RCW,to allow Contractor to seek a court injunction. c.The County specifically shall not be liable to Contractor for the County's release under public records laws of any documents not protected by trademark,copyright or other law. Section 6.Industrial Insurance Waiver. With respect to performance of this Agreement and as to any claims against the County,its Additional Insureds,officers,agents and employees,the Contractor expressly waives its immunity under Title 51 LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Page 3 of the Revised Code of Washington,the Industrial Insurance Act,for injuries to Contractor's employees and agrees that the obligations to indemnify,defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Contractor.This waiver is mutually negotiated by the parties to this Agreement. Section 7.Insurance and Endorsements. a.The County may require through a request in writing that the contractor provide the County with a certificate,binder,or policy of liability insurance,acceptable to the County in an amount specified by the County. b.Such liability insurance shall be such as will protect Contractor,its employees,agents and representatives,from all claims,losses,harm,costs,liabilities,damages and expenses arising out of personal injury (including death)or property damage that may result from performance of the Services or this Agreement,whether such performance is by Contractor or any of its employees,agents or representatives. c.Should the County require such liability insurance,the Contractor agrees to provide proof of insurance prior to commencing performance of this Agreement. d.Copies of the County's written request and the insurance documents provided by Contractor shall be attached to this Agreement and by this reference will be made part hereof. e.Where insurance is requested by the county,all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance,and that any insurance,self-insured retention,deductibles,or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Contractor shall furnish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Section 8.Termination. The County may,by written notice thereof to Contractor,terminate this Agreement as to all or any portion of the Services not yet performed,whether or not Contractor is in breach or default.Upon receiving such notice of termination,Contractor shall,except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice.In the event the County terminates the Contractor's Services,the Contractor is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Contractor,if any,as of the date of the notice of termination. Section 9.Miscellaneous. a.Contractor shall not (by contract,operation of law or otherwise)assign this Agreement or any right or interest in this Agreement without the County's prior written consent. b.This Agreement embodies the entire Agreement between the County and Contractor,and LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Page 4 supersedes any and all prior oral or written communications,proposals,conditions,promises, representations,or understandings regarding the Services.No change,amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties. c.Notice for any purpose under this Agreement,except service of process,shall be given by the Contractor to the Kittitas County Commissioners and the Kittitas County Auditor,Attn: Judy Pless,205 W.5'"Ave.,suite 105,WA 98926.For all purposes under this Agreement,any notice by the County to the Contractor shall be given to the Contractor's address provided on the signature page.Notice may be given by delivery or by depositing in the U.S.Mail,first class, postage prepaid,certified mail,return receipt requested. d.The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict,affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs. e.This Agreement may be executed in one or more counterparts and by facsimile,each of which will be deemed an original,but all of which together will constitute one and the same instrument. f.Contractor warrants to the County that the individual signing on contractor's behalf has the requisite power and authority to enter into and to perform Contractor's obligations under this Agreement.Contractor further warrants to the County that Contractor has made no misrepresentation or misleading statement in connection with this Agreement,and is not in violation of any applicable law,ordinance,or regulation the consequence of which will or may materially affect Contractor's ability to perform its obligations under this Agreement. g.If any term or condition of this Agreement or the application thereof to any person(s)or circumstances is held invalid,such invalidity shall not affect the other terms,conditions or applications which can be given effect without the invalid term,condition or application.To this end,the terms and conditions of this Agreement are declared severable. KITTITAS COUNTY BOARD OF CO NYY COMMISSIONERS CITY OF CLE ELUM [Telephone] LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Page 5 TTEST .'/7 '(l 7 | .Ce of the Board APP Q T(ÚO Deputy Prosecuting Attorney LT-LS-CP 2019-001 County Lodging Tax Funding Agreement Page 6 Exhibit A APPUCATION FOR TOURISM-RELATED,LARGE-SCALE, MUNICIPALITY-OWNED CIP LISTING Applicant information: Name of Municipality:City of Cle Elum,WA Mailing Address:119 West First Street,Cle Elum,WA 98922 Contact Person and Title:Rob Omans,City Administrator Phone:(509)674-2262 Email:robert@cityofcleelum.com Project Title:Washington State Horse Park Covered Arena and Associated Build-Out Project Location:1202 Douglas Munro Blvd.,Cle Elum,WA 98922 Application Requirements: X 1.The project qualifies for lodging tax funds as a capital expenditure of a tourism- related facility owned or operated by a municipality. X 2.If this application is not from Kittitas County,the municipality's lodging tax advisory committee (or equivalent)has been informed of the project and endorsed it.A letter from the municipality is included. N/A 3.Lodging tax capital project funds are not being substituted for other funds that are already secured or applied for (if applicable). X 4.A completed project budget is included in the application. X 5.A detailed 8 1/2 X 11vicinity map that clearly shows the location of the project is included. Tourism-Related,Large-Scale Municipality-OwnedCapital Project Narrative 1 1.Project Description:Please describe the project in detail.Indicate the major work to be completed,any milestones that need to be overcome in order for the project to move forward,and include a comparison of existing and proposed conditions. The Washington State Horse Park Authority ("the Authority")is a 501(c)3 nonprofit corporation whose mission is to develop,promote,operate,manage and maintain a first-class horse park facility in accordance with RCW 79A.30 passed 1995 (recodified 67.18 ).The Authority obtained land and funding to develop the initial revenue-generating facilities for the Washington State Horse Park in Cle Elum,Kittitas County,Washington.The Park held its first event in 2010 and has been self-sustaining since that time.However,its ability to satisfy current customer needs and host larger and more diverse horse groups is limited because all of its existing riding facilities are outdoors while many event organizers require protection from the weather.This project seeks $1.5 million from the Kittitas County Lodging Tax to construct a $4.6 million Coveret:I Arena and Associated Build-Out (covered arena,not an enclosed arena)at the Washington State Horse Park for the purpose of equine competitions and training events, recreational riding and other uses. Background:In 1995,the State legislature passed RCW 79A.30 (recodified 67.18 )to create the Washington State Horse Park Authority.The legislation directed the Authority to establish "3)a first-class horse park facility in Washington to meet the important needs of the state's horse industry,attract investment,enhance recreational opportunities,and bring new exhibitors and tourists to the state from throughout the region and beyond;and 4)A unique opportunity exists to form a partnership between state,county and private interest to create a major horse park facility that will provide public recreational opportunities and statewide economic and employment benefits."Upper Kittitas County was selected as the location for the Horse Park when suitable wooded acreage was donated by Suncadia LLC for the purpose of developing a horse park.The 112-acre site is conveniently located off I-90 at 1202 Douglas Munro Blvd in the city of Cle Elum.This location met requirements determined by earlier studies for a horse park facility,including good highway access and a dry climate.The City took ownership of the donated property and entered into a 99-year lease with the Authority. Legislative support continued with appropriation of $3.5 million in the 2007-2009 capital budget for Phase I construction of the Horse Park.That work included design,development, permitting and engineering components,as well as site clearing,road grading,utility improvements and initial arenas and stabling to begin hosting activities and generating revenues.Ground was broken in March 2010 and the first event took place in August of that year.In an Oct 12,2009 posting on houserepublicans.wa.gov,then Rep.Judy Warnick (now Sen.Judy Warnick,13'"Legislative District)included in the list of reasons for her support:"Most of all,these facilities will help the local economy and provide much-needed jobs."This view by the legislators was reinforced by Senator Holmquist Newbry on April 22,2013 on the same website.Speaking to the importance of Senate Bill #5212,which increased the number of members on the Horse Park Authority from 7 to 11,she said,"This bill is about bringing in more tourism dollars to benefit the greater community that will lead to further private sector job creation."The bill passed both the House and Senate unanimously. Construction of the Horse Park has been divided into three phases.Phase I was completed when the Park opened for business.Its cost of $3.5 million to develop the initial infrastructure 2 and competition facilities was funded by the state legislature in the 2007-2009 capital budget. Phase II,which expands upon those basic amenities,has been ongoing since that time and includes acquisition of equipment,horse stalls,bleacher seating,electricity extensions,cattle pens,jumps and fencing,etc.as well as development of a fourth arena,cross country courses, competitive trail obstacle course,etc.The Park is now ready to initiate Phase III which includes this project (a covered arena)plus eventual expansion of stabling,parking and a final (sixth, uncovered)arena to attract and host major regional,national and international competitions. A Covered Arena was identified as a key facility as early as 1991 in the first Washington State Horse Park feasibility study,which was funded by the Washington State Department of Community Development.Recreation and Showing/Competition comprise 71%of US horse usage (source:AHCF 2005).This segment is different from the SCORP segment of equine activity,which is limited to trail riding. The Covered Arena itself will comprise the following features: 1.The competition arena is 150 feet x 300 feet. 2.A 25-foot wide "porch"wraps around the arena,resulting in a building that is 200 feet in width and 350 feet in length. 3.Features of the porch: •Floor level of the porch is the same as the competition arena,so gates can be placed to enter the arena at any location. •Portable seating can be placed at any location in the porch,depending on the needs of the event. •Judges stands can be placed at any location in the porch,depending on the needs of the event. •The porch can be used for competition warm up and to protect the horse and rider from adverse weather while waiting to compete. •The porch protects the competition space from direct sunlight and from rain. •Roll-down mesh screens can be installed at select locations at the outer wall of the porch (portions at north and west)to protect from wind.These can be motorized and controlled from a single location. •Eave height of the porch is 16 feet,so horses can enter at any location. •The porch can be used for storage of event equipment. •Vendors,concessionaries and hospitality areas can be conveniently staged within the porch area. 4.Lighting the Arena •The eave height around the entire structure is 16 feet so light arrives evenly from all sides. •A translucent panel skylight at the ridge balances the lighting for the arena. •Lighting would be provided for night events. 5.Gable Ends •The gable ends above the wraparound porch are solid,providing space on the outside for the arena logo and name and on the inside for scoreboards and advertising. •Air vents and/or mechanical circulation may be placed in the end gables if needed. 6.Structure and Materials 3 •The entire structure is prefabricated steel,including the porch. •Bullding footings are concrete with ties under the arena floor. •Roofing and siding materials are metal. Providing shade and weather protectlon for both participants and spectators will not only enhance the user experience,it will also expand the Horse Park's calendar by affording more months of operation and attracting more diversified equine activities,especially "A"rated equestrian competitions,thereby Increasing revenues and visltor volumes.Currently these activities are hosted at fairgrounds and private venues across the State with covered or indoor arenas.Many equestrian event organizers have expressed their strong Interest in holding large shows at more modern and conducive facilities as the Park represents. Below Is an artist's rendering of the planned covered arena without the screens down.The arena is intended to be a bright and airy structure that will be inviting for horses and riders,and preserve the sense of place of the Park's woodland setting. The land where the covered arena will be built is currently lightly wooded,surrounded by graveled parking and roadways,and has utilities (water,electric and sewer)adjacent to it. There are no impediments to moving forward with the project once funding is secured. 2.Kittitas County Tourism Infrastructure Plan:Please explain how the project meets the Goals and Actions In the Kittitas County Tourism Infrastructure Plan as adopted.Also, describe the specific county tourism Infrastructure needs the project addresses and how the project directly increases tourism.Explain how the Improvements will promote tourism In Kittitas County and Indicate specifically how the Improvements will directly increase economic activity resulting from tourlsts, 4 Based on input from show organizers,the Authority estimates that approximately 40 new and expanded medium-to-large size competitions could be hosted at the Horse Park once the covered arena is available.The chart on page 8 of this application demonstrates how those events will translate into additional tourism impacts and economic benefits. The covered arena has always been part of the Horse Park's development master plan,and the City of Cle Elum Master Plan.The project is cited as a high priority strategic objective of the Kittitas County Tourism Plan (Action 5:Recreational Tourism)and the Kittitas County Parks and Recreation Capital Improvement Plan (CIP)2016. The Washington State Horse Park covered Arena promotes the following goals and priorities of the Kittitas County Tourism Plan: •Goal 1:Develop integrity of place--This project will enhance Kittitas County's character by developing and improving the venue in distinctive ways to differentiate Kittitas County from other areas and to engender local community pride.In addition to bringing international caliber competitions to the area,many equestrian event organizers have expressed their strong interest in moving some of their large shows to a different,more modern and conducive venue.This market opportunity represents approximately 40 new and expanded medium-to-large size competitions that potentially could be hosted at the Horse Park.Local economic impact is estimated at $4.5 to $5.5 million. •Goal 11:Interpret interactively-The WA State Horse Park Covered Arena and Associated Build-out will attract and engage a unique segment of visitors,representing some 25-30,000 overnight stays.These visitors will learn about other recreational assets of Kittitas County, thereby gaining a richer experience and helping residents develop pride in their locale.The Park's beautiful woodland setting,system of trails,competition facilities and horse-specific operations make it a unique facility in the county and the state. 3.Real Property:If real property acquisition is a component of the project,please explain. Include any information of property already secured or evidence of the ability to secure the real property. The covered arena will be developed on land currently occupied by the Park's maintenance facilities,thus forcing them to be related.The covered arena also will attract more spectators and the need for expanded parking.The Authority has included in its plan the acquisition of up to 8 additional acres in the northeast corner of the site where it,ideally,can relocate the maintenance area and provide additional parking.However,if this acreage cannot be obtained, the project will move forward and alternative provisions for these needs will be made within the existing footprint. 4.Coordination:Please explain how this project has been coordinated with other jurisdictions as well as affected stakeholders.Please include letters of support from stakeholders. 5 The development of a covered arena was included in the Park's original master plan prepared with input from potential users groups and made publicly available to stakeholders.It was included in the Environmental Impact Study and Development Agreement approved by the City. As the Park's landlord,we partner closely with the Authority and have had several recent discussions about the covered arena project. Over the past 18 months,the Authority has solicited input from current and prospective user groups and coordinated with them on project design details.The covered arena project described in this application has generated much support and enthusiasm from throughout the horse community thanks to its scope and attent¡on to details that make it highly functional and attractive.Letters of support from current and prospective user groups,the City,County,and other stakeholders are attached. 5.Studies.Please attach any feasibility or other studies that demonstrate linkages between the proposed project and the anticipated tourism impacts.Also please include your operations/maintenancestrategy and other plans for long-term project sustainability (how the facility or facilities will be operated and maintained over at least five years following completion). Attached is the Financial Feasibility and Economic Impact study conducted by professors at Central Washington University in 2006.The study is based on other major equine facilities the vast majority of which have covered and/or indoor competition space.Page 6 of the Addendum describes The Facility and states "the key_facility on the site will be a 200 x 300 foot covered arena with a 175 x 300 foot open arena".Our current thinking on the dimensions has changed slightly,but the need remains central to the Park's operations and strategy. The Horse Park completed its sixth full season of operations in 2016,and has grown to host 40 events annually in a wide range of activities with up to 300 horses participating in shows running from one to seven days for English and western disciplines.People are drawn to the Park's first class facilities,convenient location and beautiful setting.Since its inception,the Park has sustained itself through operating revenue and an array of private and public support as summarized in the following chart: Hisiurkal Novenues Sourco E009 2010 2011 2012 IDIT :OH Nils 0,6 10TM The following chart summarizes the user metrics and economic impact of the Horse Park to date.The measurement process includes gathering zip codes from all Park users,on-site surveys,the Dean Runyan Report provided by Washington Tourism Alliance,and discussion 6 with event organizers.For Recreational Riders the visitor clays and %non-local data is collected from day-user registration forms and seasonal passes;number of visitor overnights from stall rentals;reasonable estimate of number of people camping versus staying in a hotel (these numbers are conservative).For Events,the number and zip codes for all participants are supplied by each event organizer;this base data is then multiplied by 1.5 to 3 depending on the type of group to project total attendees (Central Washington University conducted an economic study in 2006 of over 40 horse parks across the country.The CWU findings estimate 3 people (including trainers,grooms,family,spectators,staff,volunteers,vendors,etc.)attend an event for each horse/participant,and that assumption seems reasonable for many groups based on our experience managing the Park to-date.] 2014 2015 2016 Recreational Riders Total #visitor days 733 1,470 1,140 Non-local%70%i 67%66% Non-local #513 985 753 Overnight #150 300 170 -expenditures @ $115/day avg,$17,250 $34,500 $19,550 Other non-local (day use)#363 685 583 -expenditures @ $86/day $31,218 $58,910 $50,138 Estimated economic impact:$48,468 $93,410 $69,688 Events 1-2-day Events:total #visitor days 2,903 1,830 1,695 3-6 day Events:total #visitor days 14,343 22,997 26,668 Total #visitor days 17,246 24,827 28,363 Non-local %93%88%95% Non-local #16,039 21,848 26,945 Overnight #11,469 13,351 16,193 -expenditures @ $120/day avg.$1,376,280 $1,602,120 $1,943,160 | Other non-local (day use)#4,570 8,497 10,752 -expenditures @$86/day $393,001 $730,721 $924,659 Estimated economic impact:$1,769,281 $2,332,841 $2,867,819 Total Estimated Economic Impact $1,817,749 $2,426,251 $2,937,507 %Annual growth 33%21% This chart reflects strong but slowing growth without the Covered Arena,because the Park's largest shows have reached its capacity until more arena space is added,and inability to attract more large events without a covered competition arena. 7 The chart below projects the measurable objectives and economic impact of the Park,with significant increases expected to occur in 2020 and beyond due to completion of the Covered Arena and Associated Build-Out and the related growth in the number and size of competitions. 2017 2018 2019 2020 2021 Recreational Riders Total #visitor days 1,300 1,400 1,500 1.800 2,200 Non-local %70%70%70%67%65% Non-local #9 980 1,050 1,206 1,430 |Overnight #310 330 345L 400 572 -expenditures @ $115/day avg.$35,650 $37,950 $39,675 $46,000 $65,780 Other non-local (day use)#600 650 705 806 858 -expenditures @ $86/day $51,600 $55,900 $60,630 $69,316 $73,780 Estimated economic impact:$87.250 $93,850 $100.305 $115.316 $139,560 Events 1-2-day Events:total #visitor days 1,800 1,900 2,200 2,300 2,600 3-6 day Events:total #visitor days 30,000 32,000 33,500 <0,000 52,000 Total #visitor days ¯11,800 33.900 35.700 42.300 54.600 Non-local%95%95%95%92%90% Non-local #30,214 32,205 33,915 38,916 49,140 Overnight #_21,147 22,544 23,741 26,852 32,924 -expendllures @ $120/day avg.$2,537,640 $2,705.220 $2,848,860 $3,222,245 $3,950,856 Other non-local (day use)#9,063 9.662 10,175 12,064 16.216 -expenditures @$86/day__$779.418 $830,889 $875,007 $1.037,501 $1.394,593 Estimated economic impact._$3,317,058 53,536,109 $3,723,867 $4,259,745 $5,345.449 Total Estimated Economic impact $3,404,308 $3,629,959 $3,824,172 $4,375,051 $5,485,009 %Annual growth ¯1E 7%5%14%25% The chart below reflects projected funding sources for ongoing rnaintenance and operations: Souttes of Ileventies for Orig0htg Maintenance a;1tl Opt•rmloris Projected Income 2016 2017 2018 2019 2020 I 2021 2022 2023 Ifrevenues from evenr.s and shows ?.315.000 $330.000 i 945.00U $300,000 5400,000 3480,000 90.00g 5400,(mi.! Prkatetuniltaisttigjt.friperrittons $1/IA,fMM1$1ah,000 50.00 SlV·,tlOli $17.,000 $3115,fliid $1%.000 $705.000 Busmess sponsorships $35.000 $25,000 $35,000 $50.000 $65,01B 590.000 $100,000 5110.000 lin-elnd supporr $25,000 32%000 $30,000 Sis.ûnn 540,000 545.000 _$45.000 .$50.000 Total $495,000 $525,000 $560,000 $600.0006 $(iBO,000 $800.000 $$90.000 $965,000, 6.Project Readiness:Please provide a detailed project schedule,including milestones necessary for completion as mentioned in question 1 above.On the schedule,indicate items completed and exactly where in the schedule the project is at this time.Be sure to include expected completion date. 8 Est. Milestone Status Completion Obtain land,develop access for vehicles and Completed 2009-10 utilities Listed among 2018 Local and Community Projects,ProposedSecure$2.0MM State capital Budget Grant Jul-17Senate2017-19 Capital Budget, Senate Ways &Means Comm. "Unbridled Evening"capital Fundraising Campaign Initiated Nov 2016,raised $60k Jul-18 Secure $1.6MM County Lodge Tax Capital Grant Application submitted Jul-17 Grant awarded for $60k;applySecure$310k County Distressed Sales &Use Tax Jan-18forremaining$250k Apply for $10k/year set-aside for iSecure$30k City of Cle Elum Lodging Tax Grant Jun-17threeyears Secure remaining private funding On-going Dec-19 Design and Engineering Preliminary 2016 Construction details Dec-17 .Coordinate with e×istingOwnershipArrangementandIndemnification Dec-17documents Permitting Feb-18 Secure State Recreation and Conservation Office Application 2018 Jan-19(RCO)Grant Groundbreaking Mar-18 Comple on Dec-19 Note:construction will need to take place around the Park's activities during its busy April to October operating season. 7.Applicant Certification:Please sign below in agreement with the statement of certification. Certification is hereby given that the information provided is accurate and the applicable attachments are complete and included as part of the application package. I further certify that the application thresholds are met at the time of application. City Administrator,city of Cle Elum Signature of Official Representative Title Date 9 Tourism-Related,Large-Scale Municipality-Owned Capital Project Budget All applicants must supply a detailed and complete project budget utilizing the following basic format: Funding Sources Coulity Lollgang Tax 1Ltild5 R€QMPil $1,SÏ)O,ÜOU J *Other Grant Funds (Listed by Source) Disgessed Salg,and Use Tax (09)Funding ant (seaged)60,000 Disuessed Sales and Use Tax 09)Fynding Grant (proposed 2017)'250,000 WA State 2017-19 Capital Budget (applied,included in Proposed Senate 2017-19 agitgBudggt 12420,17 5 31.lu.Il00 State Recreation and Conservation Office (RCO)Giant,application 2018 $IIII 000 *Other Local Government Funds City of Cg Elv I udging Tax I unding (prol used)10.000 inrKind (design,engineering,construction semices and materials)S 160,000 *Private Funds "Unbridled Ejening"/Other Private Donor Designated Capital Funding $315,000 Cornorate sponsorship campaiGn (launchedt _$125,000 Total Available fundinU $4,640,000 Project enses Real opettyar "ftight 01 Wpy'Acqujsition Cast Capital Asset Cost Acquisillon of 8-acre parcel from New Suncadia LLC lor parIgny $150,000 Capital_Asset Cost ConstrLrttlan Cost or "Hard"Costs Site Preparation and drajage 5 65,000 Metal building (J_hi.hn/si x nu,_000_si)_$!,730,000 Porch at4gabte ends ($24/sf x 9,600 s()$230A00 Foundations $185,000 Mechanical $35,000 Electrical and angmeerk)g i 250,000 Fendna 6 50,000 Arena footing $200,000 Translucent panels jakyli hti S 450,000 Landscaping $40,000 Portable bleBCIIerb $60,000 Weather screens 6 55,000 Restroorns $200,000 Additional palking landminanniand consinschon §75,000 Relocation of maintenance area gitilities,landclearing,site development)i 156,000 Subtotal 5 3,761A00 ContingencyJS%)$188.070 WSST [8%)$_11(,958 Totai _$4,265.428 Soft Cost %Admlrtistrative Cast un S2.0MM state funding __$60.tK)0 Project Management .200.ubo Permit Fees 15 000 Architectural and structural Design Fees :I 50,000 Total i 225,000 Total Pro[ect costs S 4,640A28 10 This proJect budget,being submitted as part of this application,will be considered an estimate As the project progresses through the four-step process,applicants will be required to update the project budget as more information becomes available and at the time of funding award.*At the time funding awards are being considered (Steps 3 and 4),verifying documentation shall be required and attaciled to the final project budget.Verifying documentation may include award letters,letters of commitment,or loan approval documentation,If the funding source includes applicant funds,proof of available funding in the form of a letter of commitment from an authorized body or representative of the applicant is adequate. 11 DetailedVicinityMapIFUTUREEXiiTINGt.WASHINGTONSTATEHORSEPARKIuRev.U20!!7CROSSCOUNTRYCOUR5FSTRAlt5/OBSTACLEsLMONUMENTSIGNTOSLATTLE.NTRSTATE9010SPOKAN1LEGENDARENASimsaA.ParkEntrance#lFutureCoveredArena(150ftx300ft)ToaccesstheWestXCCourseexitB.SpectatorParking#2OutdoorArena(150ftx250ft)1-90atBullfrogRoadandturnC.TemporaryShowerBuilding#3OutdoorArena(150ftx250ft)ontoWoodDuckRoadD.MaintenanceandStorageArea#4OntdoorArena(150ftx310ft)E.RV,TrailerParkingwithHook-ups#5OutdoorArena(250ftx250ft)F,Stalls#6OutdoorArena(130ftx250ft)G.WashRacksH.LungingAreasPortableSpectatorSearingLShowOfficeiManureBunkersoste0100500FTK,Loading/ParkingLTentCampitgAreaM.RVSanitationStationN.LivestockHoldingPensO.Restrooms/StiewerBuildingDAWSONASSOCIATESARCHITECTS/PLANNERS Washington State Horse Park Covered Arena and Associated Buildout Project Statement of Work 7-20-18 This proposal is for constructinga covered riding arena on the city-owned property of theWashingtonStateHorsePark,Cle Elum,WA.The structure size is 200 by 350 feet overall with afreespanridingsurfaceof150by300feet. The Project consist of: Site and Structure Design -completed by Dawson Associates in May 2016 (submittal copies included,Exhibits l-lll) Engineering -this entirely steel structure was been engineered by Faber Construction in June 2016 (submittal documents of engineered structure included,Exhibit IV and V.) Permit Reviews -the overall project scope of the Washington State Horse Park (which includes the proposed covered arena)has been completed and permitted,and is subject tothe"Agreement Relating to the Development of the WA State Horse Park within The CityofCleElum"August,2013.All master development permits relating to the complete buildoutoftheentireMasterPlanforthehorseparkwerecompletedandapprovedpriortothisbindingagreementforfutureconstructionphases.The agreement is a 20 year term. Remaining permits are limited in scope to include the submittal for the covered building design to the City of Cle Elum for applicable building code review and construction permitting.All records are on file with the city of Cle Elum or the Washington State Horse Park and are available for review on request if needed. Scope of Work to include: •Clearing,grading and excavation for the structure; •Foundation construction; •Steel building erection; •Equestrian footing drainage and placement; •Arena fencing installation; •Final grading and site restoration; •Completion and Final approval by the City of Cle Elum Building Department. Total Project Funding Request:$1,500,000 This funding request will be applied to Phase 1 of this project,which is the arena construction itself as defined on the attached Exhibit VI.Applicant shall submit monthly progress reports with related costs,and request disbursement of funds accordingly in increments as we fulfill the contract scope. l WASHING TON S I A I E HORSE PARK ARENA DA3fsoN Assoc1ATES1202DouglasMunraBoulevardARCHITECTS/PLANNER3CleElum,Washington 98922 =.--=--.--=.e-s- ----luinunaRuinalunumninuununRumHuuluuD.uuluu.uluulEBukJ.MW&-NORTHBUILDINGELEVATION3/3‡•=T-0"iII,««filliiiilRimmHilliHINMMiiHHimIii..RETRACYABLEWSCREENSASN£EDEDWESTBUILDINGELEVATIONSOUTHBUILDINGELEVATION3/32"=T-0"METALROOFNGMMiiMMlillfilimiIlulldiragElevallonsEASTBUILDINGELEVATION3/32.=7-0"A2.1 • L t. • yrff _ _ _ r+� L t it k " 0 �5 � �c• •• . t. nom" ��. S. '�; �� *'}..�� s }}�{,y;?;;}4afs;�. -tr i ;'-_ -; y •:'�:: .. - - - .. - . -- fir:: ;ti.. ..1. 047 IR rte ##'=-EIEf-.' _ .y' '- ''�•:. ,S. .,:ii , , t�[ �� rL�Y "rJ�i�L7,C��'�S�!'t�F •wF•� S t _ '�r'`Y. li � _ ,� ti��,;�::�` !�� ff G .fly-• _ :-r ;'� • :' ; � :` _ _ � 1�.` Y�'i] - �ii. •'ice ir'r_eAR:ir hs"'y: F �; v''r' i 4��:. _....e" ir',—'' FF•' d. ."�'��e � .• i:'S_ �f. f.�" .. ••,�,d � r` _ 11 � ::: 1`}]s�;ti��.'-:.:74�� t }a. MR. IN 34 ir i=-'� � �' � .-fir. •y •:. ' � .t } ; L '=3-.t•' ._. _.L.-� -mow ..'�� "�""``^• . _ 'fir- �. `• - _ � �� _r _ -, -¾TAR gogosalReport BUlLDING SYSTEMS.Lynden,WA98264 AN NCl COMPANY Jobs ite Oi Project ID WA State Horse Park Arena Name WashilStarBizInquiryN/A Contact N/A Project Status Approval Business NIAEstimatorDavidVerretEndUseofBuilding4A COMMUNITY -RECREATIONALEstimateDate6/14/2016 Address 1202 Douglas Munro BlvdCityLimitsOutsideCleElum,WA,98922CommitmentNumberCountyKittitasQuoteNumberQ-2260-16,A LB Secondary to Primary Conn.Welded Clips ShippingMin.EW Anc.Rod Dia.5/8 SBS Complexity N/A Shipping Point Spokane,WA Estimated Complexity 8 Shippmg Terms Truck MBMA Complexity 8 Freight Terms Pre-Paid Multiplier Authorization N/A Carrier Best Address 1202 Douglas Munro Blvd Contact David Verret Cle Elum,WA,98922 Phone 3604106935 County Kittitas Night Phone 3604106935 Truck Tarps No Using Builder System generated Anchor Rod Plan No Address 1202 Douglas Munro Blvd (Order must contain Anchor Rod Plan and Design Repoit)Cle Elum,WA,98922 County KittitasPayment DrawingsContactDavidVerret Phone 360.354.3500 Licensed Engineering Seal WA,United States P.O.Number N/A Method Mailed Rolled Credit Terms Star Established Terms Corp ofEngs,DOD,DOE Fed No TaxExemptStatus Exempt UFC 4-01-01 Anti-Terrorism No Tax Exempt Number N/A requirements Overnight NoSustainabilityandEnergyEfficiencycarrierN/A Account Number N/ASustainabilityGoalNoneJobsiteSignQuantity1ClimateControlledBuildingNoE-Drawing Size Size D (22"x 34")Energy Efficiency Code N/A E-Drawing Erection Type StandardHasPanelAirInfiltrationRequirementsNo Qtv g Purpose _S__eg M2AnchorRodPlanFinalSealedSize D (22"x 34")wl Reactions 1 Enhanced Erection Approval ID Note Size D (22"x 34")2 Hard Copy of Final Sealed Calculations 1 Standard Product Final None Size D (22"x 34") 1 Letter of Cert.Final Sealed'Note -$tar Building Systems wiß automatically provide one (1)set ofFinal EreetionDrawingsandane(1)set of $tandard Product Drawings in the crating accompanying flie shipment in addition to the quantities speelheil Hbove. *Note -Approval Drawings will be invoiced at the time of mailing. Printed.ói2"li2016 2:40:56 PM Q-2260-16.sus Page 2 of26 Project Notes 1.Bldg B:EWB Lean-to Due to SBS limitations,the overall dimensions of this building need to be adjusted by Estimating;the E.H.=16',3:12 pitch,Height of high side EWD =21'-9"approx. 2.Bldg C:EWD Lean-to Due to SBS limitations,the overall dimensions of this building need to be adjusted by Estimating;the E.H.=16',3:12 pitch Height of high side EWB =21'-9"approx. 3.Roof Opening:Large Skylight provided by others,please refer to attached mfgr details.The overall opening dimensions =316'x32'symmetric at ridge.Estimating, please provide opening and deduct panels. Modify Ridge Pan Cover equal to 16'-0"on both ends of opening. 4.EW Column Layout Our Client would prefer to reduce the column count at both endwalls.Estimating please modify endwall column layout.The ideal layout typical at endwalls is: 25',3T,38',38',3T,25' IF the desired endwall column layout is feasible,please proceed with SBS modifications. 5.Roof Bracing The Client has proposed to use retractable canvas screens between main frames and EW columns. The open area is designated as open to wind wl future covering. Estimating:does this allow for a reduction in continuous rod bracing at the roof(s)? 6.Skylight (by others) Estimating:please deduct roof panels for a 260'x38'pre-engineered symmetrical ridge skylight,by others. Estimating Notes 06/27/16 1)Lean-to's have been adjusted to the correct dimensions.high side column and high sidewall bracing will be removed and frames will attach as typical lean-tos to main building endwall columns. ----->adjusted lean-to frame spacing to 25ft bays and removed 2 bays,but was unable remove enough to match column spacing requested in notes above due to purlin limitations with high snow. 2)Material added for hip frames and roof structure at each of the 4 corners 3)260'X38'area of panel and purlins deducÏed for skylight at ridge(aprox 19ft at either side of ridge),note there will still be a strut purlin at ridge that will be visible in skylight area.Beams have been priced to support skylight on either side located aprox 19ft from ridge. 4)See model for bracing locations(can be adjusted to different bays if needed) 5)Per conversation minimum roof snow load was changed to 110psf 6)Material included for suppon of scoreboard at each endwall,weight was assumed at approx 1200lbs or less,actual weight to be confirmed by builder. 7)Support beams on all walls priced to support canvas screens.Note attachment of screens at support beam and floor are not by Star. 8)Due to special hipped configuration of roof design,all roof panels &flashing provided by Star must be field cut,beveled,and fit to be water tight by the erector at the job site as required by Star Drawings. 9)The builder is responsible to review the accuracy of this quote confirmation as to what materials are being provided and what is or is not included in the pricing.Star is not responsible for the quote complying with or exceeding any architectural plans and specifications.Compliance is the sole responsibility of the builder. Codes And Loads Project Use Category Agricultural Jobsite Address 1202 Douglas IViunro Bivd Building Code 2015 IBC Cle Elum,WA,98922 County Kittitas Live/Wind Live Load 20.000 psf Wind Category NIA Trib.Area Reduction Allowed Yes Miles From Coastline NIA Wind Exposure Exposure C Rain Intensity 4.0000 in/hr Hurricane Coastline No Ground Snow Load 115.000 psf Snow Exposure Partially Exposed Min Roof Snow Load 110.000 psf Rain Load NIA Elevation Above Sea Level N/A Seismic Spectral Response(Ss)67.00 %%of Snow Load for Seismic Normal Spectral Response(Sh)N/A Seismic Zone N/A Spectral Response(S1)27.00 %Near Source Factor NiA Spectral Response($2)NIA Design Seismic for Schools N/A Accelerated Coefficient(Aa)NIA Soil Type (D)Stiff Soil Velocity Coefficient(Av)NIA *Note -Snow Exposure could be updated by the application to a per building value based on input entered into this project. Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 3 of2( New Building A -350'x200'x16' Label A Type Stand Alone Structure New Frame Type Symmetrical Attachment No Elevation A Sidewall Geometry Width 200'-0"Length 300'-0" Eave Height 16'-0"Eave Height 16'-0" Roof Slope 3.000000 I 12 Roof Slope 3.000000 /12 Distance To Ridge 100'-0"Distance To Ridge 100'-0" Girts 8.0"-Exterior Gitts 8.0"-Exterior EWB EWD Type Half-Load Frame Type Half-Load Frame Girts 10.0"-Flush Girts 10.0"-Flush User Specified Setback System Standard 1'-2"User Specified Setback System Standard 1'-2" Designed Setback O'-0"Designed Setback O'-0" Gable Flash Yes Gable Flash Yes Insulation Trim No Insulation Trim No Purlins 12.0"Z Pregalvanized Secondary No LBP Min Depth NIA Hot-Dipped Primary No LBP Max Depth NIA Seal Welds NIA Steel Shop Coat Gray Frame Bolt Washers No Bolt Finish Plated Spacing SWA Bay Spacing (EWB-EWD)20'-0",20'-0",20'-0",20'-0",20'-0",20'.0",20'-0",20'-0 20'-0",20'-0",20'4)",20'-0",20'-0",20'-0",20'-0" Roof Bay Spacing (EWB-EWD)20'-0",20'-0",20'-0",20'-0",20'-0",20'-0",20'-0",20'-0" 20'-0",20'-0",20'-0",20'-0",20'-0",20'-0",20'-0" SWC Bay Spacing (EWD-EWB)20'-0",20'-0",20'-0",20'-0",20'-0",20'-0",20'-0",20'-0" 20'-0",20'-O",20'-0",20'-0",20'-0",20'-0",20'-0" SWA Soldier Column Recesses (EWB-EWD)N/A SWC Soldier Column Recesses (EWD-EWB)N/A EWB Column Spacing (SWC49WA)25'-0",25'-0",25'-0",25'-0",25'-0",25'-0",25'-0",25'-0"EWD Column Spacing (SWA-sWC)25'-0",25'-0",25'-0",25'-0",25'-0",25'-0",25'-0",25'-0"EWB Column Recesses (SWC-SWA)0.0",0.0",0.0",0.0",0.0",0.0",0.0",0.0",0.0" EWD Column Recesses (SWA-SWC)0.0",0.0",0.0",0.0",0.0",0.0",0.0",0.0",0.0" *Note -Negative column recess raises the base of the column above the finished floor. SWA Girt Spacings (Base to Eave)System Standard SWC Girt Spacings (Base to Eave)System Standard EWB Girt Spacings (Base to Peak)System Standard EWD Girt Spacings (Base to Peak)System Standard Purlin Spacing (Nominal Horizontal Distance)System Standard NIA Frame Groups ¾pm 1 (Clearspan) Frame Lines 1,2,3,4,5,6,7,8,9,10,11,12,13, 14,15,16 SWA SWC Column Tapered Allowed Column Tapered Allowed Unbraced To Elevation 16'-0"Unbraced To Elevation 16'-0" Max Column Web Depth 60.0"Max Column Web Depth 60.0" Max Rafter Web Depth 60.0"Max Rafter Web Depth 60.0" Exterior Column Elevation At Finished Floor Exterior Column Elevation At Finished Floor Loads,Wind Enclosure,Deflections &Sidesway Building Leads Importance Factors Roof Snow Load By Design 110.000 psf Snow Is 1.00 Risk Factor II -Normal Wind Iw N/A Thermal Condition Unheated Seismic Ie 1.00 Seismic Design Category D Designed Snow Exposure Partially ExposedWindSpeed110.00 mph Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 4 of26 New Building A -350'x200'x16'Continued... Loads,Wind Enclosure,Deflections &Sidesway Continued.. Wind Enclosure Enclosure Partially EnclosedAreFramedOpeningsenclosedwithmaterialsthataredesignedtowithstandthewindloadandwindbornedebris(if applicable)?N/A Are all Open Areas for Other enclosed with materials that are designed to withstand the wind load and wind borne debris (if NIA applicable)? Open Building Condition Clear (unobstructed)flow Uniform Collateral Loads Ceiling Load 0.000 psf Ceiling Type N/A Brittle Wall/Dryvit No Other 5.000 psf Deflections Purlins Roof Panel Rafters Live L/150 Code Limit Live Ll60 Code Limit Live L/180 Code LimitSnowL/180 Code Limit Snow Ll60 Code Limit Snow L/180 Code LimitWindL/180 Code Limit Wind L/60 Code Limit Wind L/180 Code LimitTotalGravityLli20CodeLimitTotalGravityLi60CodeLimitTotalGravityL/120 Code LimitTotalUpliftNIATotalUpliftLl60CodeLimitTotalUpliftN/A Girts Ll90 Code Limit Wall Panel L/60 Code Limit Endwall Columns L/120 Code Limit Sidesway Portal Frame Frame Serviceability Wind HI60 Code Limit Live HI60 Code LimitSeismicHI40CodeLimitSnowHI60CodeLimit Serviceability Wind HI60 Code LimitCraneH!100 Code Limit Total Gravity HI60 Code Limit Total Seismic H/40 Code Limit *Note -Code deflection limits are based on the applicable building code,user defined loading and the manufacturer's interpretation of what the minimum value should be. *Note -It is the responsibility of the Builder to interpret all aspects of the End Customer's specifications and incorporate the appropriate speciñcations,design criteria,and design loads into the Order Documents submitted to Star Building Systems. *Note -The material supplied by building manufacturer has been designed with the following minimum deflection criteria.The actua!dellection may be less depending upon actual load and member length.The frame sidesway for wind load is based upon a represenistion of the 10-year Mean Recurrence Interval wind load. Topography -Escarpments Does the building lie on the upper half of a hill,ridge,or escarpment?No Is this hill,ridge or escarpment unobstructed in any direction by another similar topographic feature within a distance of 100 times its height or 2 miles No (3.21 km),whichever is less? Is the hill or escarpment at least twice as tall as any other topographic features within 2 miles (3.21km)?No Does the average slope on the top half of the hill,ridge,or escarpment equal or exceed 20%(11.3")?No Is the height of the hill,ridge or escarpment equal to or greater than 15 feet (49.21 m)for Exposure C or D,or 60ft (196.8 m)for Exposure B?No TOPueraphic Effects Hill Shape N/A Lh,Horizontal distance of crest to half height of hill or escarpment N/A H,Height of Hill or Escarpment N!A X,Distance From the Crest to the Building Site N/A Bracing SWA Full Height Portal Frame (EWB to EWD)@ Bays 3,6,10,13 Roof Rod (EWB to EWD)@ Bays 3,6,10,13 LBP Bracing Location N/A SWC Full Height Portai Frame (EWD to EWB)@ Bays 13,10,6,3EWBNone(SWC to SWA)@ Bays No Bays EWD None (SWA to SWC)@ Bays No Bays Purlins Angles SWA Girts Sag Angles SWC Girts Sag Angles EWB Girts Sag Angles EWD Girts Sag Angles Rafter Flange Braces Standard Column Flange Braces Standard Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 5 of 24 New Building A -350'x200'x16'Continued... Bracing Continued... Portal Frames SWA SWC Rod Tiers Above N/A Rod Tiers Above NIA Max Column Web Depth 60.0000"Max Column Web Depth 60.0000" Max Rafter Web Depth 60.0000"Max Rafter Web Depth 60.0000" EWB EWD Rod Tiers Above N/A Rod Tiers Above NIA Max Column Web Depth N/A Max Column Web Depth N/A Max Rafter Web Depth N/A Max Rafter Web Depth N/A Roof Panel (61,953 sqft) Type SuperLok Options Gauge 24 SS Clip Type Utility ClipThicknessNIA(No Insulation)Color SIG -200 TBD Thermal Blocks NoneFinishWarrantyYesNon-Handed Erection N/APerforationGuaranteeNIADirectionNIAInteriorPanelN/A FM-4471 Roof Panel Anchorage No R Value N/A UL90 NoExteriorSkinN/A UL Letter No Ridge Pan NoFastenerInformationAlignmentStripNIATypeSelf-Drilling Eave Panel Extension NoHeadFinishLong-Life Purchase Hand Crimper to ship with PanelsNoLengthStandard Vendor Atlas Weathertightness Warranty Type None Term N/A Wall Panel (0 sqft) Type Not by Star Options Gauge 0 Reverse Rolled N/AThicknessN/A Washers N/AColorN/A Concrete Notch NIAFinishWarrantyN/A Sealed Wall NoInteriorPanelN/A Eave Closure No R Value N/A Rake Closure No Fastener Information Foam Tape (If applicable)No Type NIA Head Finish N/A Length N/A Vendor N/A Base Condition Framing None Closure None Trim None Trim SWA Options SWC Options Trim Type Gutters and Downspouts Trim Type Gutters and Downspouts Gutter Type Northern Large Gutter Type Northern LargeGutterTypebyDesignNorthernLargeGutterTypebyDesignNorthernLargeAdditionalGutterSupportsByDesignAdditionalGutterSupportsByDesign Downspout Drops 5 Downspout Drops 5 Downspout Height 16'-0"Downspout Height 16'-0"Include Elbow Yes Include Elbow Yes EwB Options EWD Options Trim Type Gable Trim Trim Type Gable Trim Gutter Type N/A Gutter Type N/A Gutter Type by Design N/A Gutter Type by Design NIA Additional Gutter Supports N/A Additional Gutter Supports NIA Downspout Drops NIA Downs pout Drops NIA Downspout Height N/A Downspout Height N/A Include Elbow N/A Include Elbow N/A Printed:6/27í2016 2:4û:56 PM Q-2260-16.sbs Page 6 of 26 New Building A -350'x200'x16'Coñtinued... Trim Continued... Color Selections Eave SIG -200 TBD Trim Profile Cascading Gable SIG -200 TBD Trim is 26 gauge unless noted otherwise. Corner SIG -200 TBD (*)Denotes Signature 300 color.Base SIG -200 TBD All Other SIG -200 TBD Trim for roof system with Sig 300 color is 24 gauge. Gutters SIG -200 TBD *Note -Gutters selected may differ from the Gutters designed. Downspouts SIG -200 TBD Roof to Roof NIA Roof to Wall N/A Walk Doors SIG -200 TBD Insulation Building Has Insulation No Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 7 of21 New Building A -350'x200'x16'Continued.. Add Lines List Description Support beams in all walls for retractable canvas screens Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Description Add for all frames in main building Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Description add support at each endwall for scoreboard Quantity 1.00 By Star Yes Quote #Q-2260-16,A LB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Description add support beams for skylight at ridge Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Description Deduct framing for Skylight at ridge Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Printed:Gi27/2ûló 2:4û:56 Pivi Q-2260-16.sbs Page 8 of26 New Building A -350'x200'x16'Continued. Accessories on Roof/Wall Open Areas Type Fuli Height Left Jamb Yes Support Beam Open For Wind Left Jamb Flash Yes Not by Manufacturer %Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type N/A Masonry Type NIA Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 300'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation A Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Full Height Left Jamb No Support Beam Open For Wind Left Jamb Flash No Not by Manufacturer %Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N/A Masonry Type N/A Flash Color NIA Masonrÿ Reinforcement N!A Height î 6'-0" Shear Wall No Width 23'-10" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation B Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Attachment Height Left Jamb No Sunnort Beam Open For Wind Left Jamb Flash No Not by Manufacturer %Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psi Header Flash Type NíA Masonry Type N/A Flash Color N/A Masonry Reinforcement N/A Height 22'-3" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation B Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column 23'-10" Distance From Left Steelline 23'-10" Type Full Height Left Jamb No Support Beam Open For Wind Left Jamb Flash No Not by Manufacturer %Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N/A Masonry Type N/A Flash Color N/A Masonry Reinforcement N!A Height 16'-0" Shear Wall No Width 23'-10" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation B Will Area be Sheeted in Future Yes Bay 8 Distance From Left Column 1'-2" Distance From Leñ Steelline 176'-2" Type Full Ñeight Left Jarnb Yes Open For Wind Left Jamb Flash Yes %Open For Wind 100.00 %Right Jamb Yes Material Thickness NIA Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type N/A Masonry Type N/A Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 300'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Till-up No Elevation C Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-O" Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 9 of 2 New Building A -350'x200'x16'Continued.. Accessories on Roof/Wall Continued... Distance From Left Steelline O'-0" Support Beam Not by Manufacturer Type Full Height Left Jamb No Support BeamOpenForWindLeftJambFlashNoNotbyManufacturer %Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type NIA Masonry Type N/A Flash Color N/A Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 23'-10" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation D Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Attachment Height Left Jamb No Support BeamOpenForWindLeftJambFlashNoNotbyManufacturer%Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N/A Masonry Type N/A Flash Color NIA Masom y Reinforcement N/A Height 22'-3" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation D Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column 23'-10" Distance From Left Steelline 23'-10" Type Full Height Left Jamb No Support BeamOpenForWindLeftJambFlashNoNotbyManufacturer%Open For Wind 100.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N/A Masonry Type N/A Flash Color N/A Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 23'-10" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation D Will Area be Sheeted in Future Yes Bay 8 Distance From Left Column 1'-2" Distance From Left Steelline 176'-2" *Note -DedLict Panel Only Open Area constitutes panels provided by others and shall be structurally equal to Manufacturer's PBR panel Panel attachment is NOT byManufacturer. Gutters Type Northern Large Elevation A Quantity 1 Bay 1 Length 300'-0"Distance from Left Column O'-0" Distance from Left Steelline O'-0" Type Northern Large Elevation C Quantity 1 Bay 1 Length 300'-0"Distance from Left Column O'-0" Distance from Left Steenine O'-0" Gutters (List)Total Downspouts Quantity 5 Elevation A Length 16'-0" Elbow Yes Trim SIG -200 TBD Quantity 5 Elevation C Length 16'-0" Elbow Yes Trim SIG -200 TBD Downspouts (List)Total Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 10 of 26 New Building A -350'x200'x16'Continued.. Accessories on Roof/Wall Continued... Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 11 of 2 New Building B -EWB Lean-to Label B Type Attachment Stmeture New Frame Type Single SlopeAttachmentYesElevationAEndwall Geometry Width 25'-0"Length 152'-4" SWD SWB Eave Height 22'-3"Eave Height 16'-0"Roof Slope 0.000000 I 12 Roof Slope 3.000000 I 12 Distance To Ridge O'-0"Distance To Ridge 25'-0" Girts 10.0"-Flush Girts 10.0"-Exterior EWA EWC Type Expandable Frame Type Expandable Frame Girts 10.0"-Flush Girts 10.0"-Flush User Specified Setback System Standard 1'-2"User Specified Setback System Standard 1'-2"Designed Setback 1'-2"Designed Setback 1'-2" Gable Flash Yes Gable Flash YesInsulationTrimNoInsulationTrimNo Purlins 12.0"Z Pregalvanized Secondary NoLBPMinDepthN/A Hot-Dipped Primary NoLBPMaxDepthN/A Seal Welds N/A Steel Shop Coat Gray Frame Bolt Washers NoBoltFinishPlated Attachment Attached To Location Building A -350'x200'x16'Attachment Wall SidewallWallBStartColumnNIA Offset 176'-2"Stop Column NIA *Note -The sheeting and secondary is removed on this building (child building)at the attachment area.The sheeting and secondary remain on the building it attaches to (parentbuilding)unless an Open Area is shown in accessories ofthe parent building. Spacing SWD Bay Spacing (EWA-EWC)26'2",25'-0",25'-0",25'-0",25'-0",26'-2"Roof Bay Spacing (EWA-EWC)26'-2",25'-D",25'-0",25'-0",25'-0",26'-2"SWB Bay Spacing (EWC-EWA)26'-2",25'-0",25'-0",25'-0",25'-0",26'-2"SWD Soldier Column Recesses (EWA-EWC)N/A SWB Soldier Column Recesses (EWC-EWA)N/A EWA Column Spacing (SWB-SWD)25'-0"EWC Column Spacing (SWD-SWB)25'-0" EWA Column Recesses (SWB-SWD)0.0",0.0"EWC Column Recesses (SWD-SWB)0.0",0.0" *Note -Negative column recess raises the base ofthe column above the finished floor. SWD Girt Spacings (Base to Eave)System Standard SWB Girt Spacings (Base to Eave)System Standard EWA Gitt Spacings (Base to Peak)System Standard EWC Girt Spacings (Base to Peak)System Standard Purlin Spacing (Nominal Horizontal Distance)System Standard N/A Frame Groups GmupNumb 1 (Clearspan) Frame Lines 1,2,3,4,5,6,7 Column Tapered Allowed Column Tapered AllowedUnbracedToElevationN/A Unbraced To Elevation N/AMaxColumnWebDepth60.0"Max Column Web Depth 60.0"Max Rafter Web Depth 60.0"Max Rafter Web Depth 60.0"Exterior Column Elevation At Finished Floor Exterior Column Elevation At Finished Floor Printed:6/27/2016 2:40:56 PM Q-2260-16.sos Page 12 of26 Loads,Wind Enclosure,Deflections &Sidesway Ruilding Lands importance Factors Roof Snow Load By Design 110.000 psf Snow Is 1.00 Risk Factor li -Normal Wind Tw N/A Thermal Condition Unheated Seismic Ie 1.00 Seismic Design Category D Designed Snow Exposure Partially Exposed Wind Speed 110.00 mph Wind Enclosure Enclosure Partially Enclosed Are Framed Openings enclosed with materials that are designed to withstand the wind load and wind borne debris (if applicable)?N/A Are all Open Areas for Other enclosed with materials that are designed to withstand the wind load and wind borne debris (if N/A applicable)? Open Building Condition Clear (unobstructed)flow Uniform Collateral Loads Ceiling Load 0.000 psf Ceiling Type N/A Brittle Wall/Dryvit No Other 0.500 psf Deflections Purlins Roof Panel Rafters Live L/150 Code Limit Live Ll60 Code Limit Live L/180 Code LimitSnowL/180 Code Limit Snow Ll60 Code Limit Snow L/180 Code LimitWindLI180CodeLimitWindLl60CodeLimitWindL/180 Code LimitTotalGravityL/120 Code Limit Total Gravity LI60 Code Limit Total Gravity L/120 Code LimitTotalUpliftN/A Total Uplift Ll60 Code Limit Total Uplift N/A Girts Ll90 Code Limit Wall Panel L/60 Code Limit Endwall Columns L/120 Code Limit Sidesway Portal Frame Frame Serviceability Wind HI60 Code Limit Live HI60 Code LimitSeismicHI40CodeLimitSnowHI60CodeLimit ..Serviceability Wind HI60 Code LimitCraneHI100CodeLimitTotalGravityHI60CodeLimit Total Seismic HI40 Code Limit *Note -Code deflection limits are based on the applicable building code,user defined loading and the manufacturer's interpretation of what the minimum value should be. *Note -It is the responsibility of the Builder to interpret all aspects of the End Customer's specifications and incorporate the appropriate specifications,design criteria,and design loads into the Order Documents submitted to Star Building Systems. *Note -The material supplied by building manufacturer has been designed with the following minimum deflection criteria.The actual deflection may be less depending upon actual load and member length.The frame sidesway for wind load is based upon a representation of the 10-year Mean Recurrence Interval wind load. Topography -Escarpments Does the building lie on the upper halfof a hill,ridge,or escarpment?No Is this hill,ridge or escarpment unobstructed in any direction by another similar topographic feature within a distance of 100 times its height or 2 miles No (3.21 km),whichever is less? Is the hill or escarpment at least twice as tall as any other topographic features within 2 miles (3.21 km)?No Does the average slope on the top half of the hill,ridge,or escarpment equal or exceed 20%(11.3")?No Is the height ofthe hill,ridge or escarpment equal to or greater than 15 feet (49.21 m)for Exposure C or D,or 60ñ (196.8 m)for Exposure B?No Topourapliic Effects Hill Shape N/A Lh,Horizontal distance of crest to half height of hill or escarpment N/A H,Height of Hill or Escarpment N/A X,Distance From the Crest to the Building Site N/A Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 13 of 2 Bracing SWD 1 Tier Rod (EWA to EWC)@ Bays 5 Roof Rod (EWA to EWC)@ Bays 5 LBP Bracing Location N/A SWB Full Height Portal Frame (EWC to EWA)@ Bays 2 EWA None (SWB to SWD)@ Bays No BaysEWCNone(SWD to SWB)@ Bays No Bays Purlins Angles SWD Girts Sag Angles SWB Girts Sag Angles EWA Girts Sag Angles EWC Girts Sag Angles Rafter Flange Braces Standard Column Flange Braces Standard Portal Frames SWD SWB Rod Tiers Above N/A Rod Tiers Above N/A Max Column Web Depth 60.0000"Max Column Web Depth 60.0000" Max Rafter Web Depth 60.0000"Max Rafter Web Depth 60.0000"EWA EWC Rod Tiers Above N/A Rod Tiers Above NIA Max Column Web Depth NIA Max Column Web Depth N/A Max Rafter Web Depth N/A Max Rafter Web Depth N/A Roof Panel (3,953 sqft) Type SuperLok Options Gauge 24 SS Clip Type Utility ClipThicknessN/A (No Insulation)Color SIG -200 TBD Thermal Blocks None Finish Warranty Yes Non-Handed Erection NIAPerforationGuaranteeN/A Direction N/AInteriorPanelN/A FM-4471 Roof Panel Anchorage No R Value N/A UL90 NoExteriorSkinN/A UL Letter No Ridge Pan NoFastenerInformationAlignmentStripN/ATypeSelf-Drilling Eave Panel Extension NoHeadFinishLong-Life Purchase Hand Crimper to ship with PanelsNoLengthStandard Vendor Atlas Wenthertightness Warranty Type None Tern N!A Wall Panel (0 sqft) Type Not by Star Options Gauge 0 Reverse Rolled N/AThicknessN/A Washers N/AColorNIAConcreteNotchN/AFinishWarrantyN/A Sealed Wall NoInteriorPanelN/A Eave Closure No R Value N/A Rake Closure No Fastener Information Foam Tape (If applicable)No Type N/A Head Finish N/A Length N/A Vendor N/A Base Condition Framing None Closure None Trim None Trim SWD Options SWB Options Trim Type No Trim Trim Type Gutters and DownspoutsGutterTypeNIAGutterTypeNorthernLarge Gutter Type by Design N/A Gutter Type by Design Northern Large Additional Gutter Supports N/A Additional Gutter Supports By Design Downspout Drops N/A Downspout Drops 3 Downspout Height NIA Downspout Height 10'-0" Include Elbow NIA Include Elbow Yes Printed:6/27/2ûló 2:40:56 PM Q-2260-16.sbs Page 14 of26 New Building B -EWB Lean-to Continued... Trim Continued... EWA Options EWC Ootions Trim Type Gable Trim Trim Type Gable Trim Gutter Type N/A Gutter Type NIA Gutter Type by Design NIA Gutter Type by Design NIA Additional Gutter Supports NIA Additional Gutter Supports NIA Downspout Drops NIA Downspout Drops N/A Downspout Height NIA Downspout Height N/A Include Elbow N/A Include Elbow NIA Color Selections Eave SIG -200 TBD Trim Profile Cascading Cable SIG -200 TBD Trim is 26 gauge unless noted otherwise. Corner SIG -200 TBD (*)Denotes Signature 300 color.Base SIG -200 TBD Trim for roof system with Sig 300 color is 24 gauge.All Other SIG -200 TBD Gutters SIG -200 TBD *Note -Gutters selected may differ from the Gutters designed. Downspouts SIG -200 TBD Roof to Roof N/A Roof to Wall NIA Walk Doors SIG -200 TBD insulation Building Has Insulation No Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 15 of 24 New Building B -EWB Lean-to Continued. Add Lines List Description Add for hip conditions Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estirnator's Initials ALB Expires On 7/7/2016 Printed:6/27/2ûlé 2:4û:56 PM Q-2260-16.sbs Page 16 of 26 New Building B -EWB Lean-to Continued... Accessories on Roof/Wall Open Areas Type Fuli Height Left Jamb Yes Supcort Beam Open For Wind Left Jamb Flash Yes Not by Manufacturer %Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type N/A Masonry Type NIA Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 25'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation AWillAreabeSheetedinFutureYesBay1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Full Height Left Jamb Yes Support Beam Open For Wind Left Jamb Flash Yes Not bv Manufacturer %Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type NIA Masonry Type N/A Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Material O'-O" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation B Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Full Height Left Jamb Yes Suwpori:Beam Open For Wind Left Jamb Flash Yes Not by Manufacturer %Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0,000 psf Header Flash Type N!A Masonry Type N/A Flash Color SIG -200 TBD Masonry Reinforcernent N/A Height 16'-0" Shear Wall No Width 25'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation C Will Area be Sheeted in Future Yes Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Child Bldg Attachment Left Jamb No Suunort Beam Open For Other Left Jamb Flash No Not by Manufacturer %Open For Wind 0.00 %Right Jamb No Material Thickness NIA Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N!A Masonry Type N/A Flash Color N/A Masonry Reinforcement N!A Height 22'-3" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Materia!C'-O" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation D Will Area be Sheeted in Future N/A Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" *Nole -Deduct Panel Only Open Area constitutes panels provided by others and shall be structurally equal to Manufacturer's PBR panel.Panel attachment is NOT byManufacturer. *Note -Girts and panels for child building(s)have been removed at common area(s) Gutters Type Noithern Large Elevation B Quantity 1 .Bay 1 Length 152'-4"Distance from Left Column O'-0" Distance from Left Steelline O'-0" Gutters (List)Total Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 17 of2 New Building B -EWB Lean-to Continued... Accessories on Roof/Wall Continued... Downspouts Quantity 1 Elevation B Length 10'-0" Elbow Yes Trim SIG -200 TBD Quantity 1 Elevation B Length 10'-0" Elbow Yes Trim SIG -200 TBD Quantity 1 Elevation B Length 10'-0" Elbow Yes Trim SIG -200 TBD Downspouts (List)Total Printed:6/27/2ûló 2:40:56 PM Q-2260-16.sbs Page 18 of26 New Building C -EWD Lean-to Label C Type Attachment Structure New Frame Type Single Slope Attachment Yes Elevation A Endwali Geometry Width 25'-0"Length 152'-4" SWD SWB Eave Height 16'-0"Eave Height 22'-3" Roof Slope 3.000000 /12 Roof Slope 0.000000 I 12 Distance To Ridge 25'-0"Distance To Ridge O'-0" Girts 10.0"-Exterior Girts 10.0"-Flush EWA EWC Type Expandable Frame Type Expandable Frame Girts 10.0"-Flush Girts 10.0"-Flush User Specified Setback System Standard 1'-2"User Specified Setback System Standard 1'-2"Designed Setback 1'-2"Designed Setback 1'-2" Gable Flash Yes Gable Flash Yes Insulation Trim No Insulation Trim No Purlins 12.0"Z Pregalvanized Secondary No LBP Min Depth N!A Hot-Dipped Primary No LBP Max Depth NIA Seal Welds N/A Steel Shop Coat Gray Frame Bolt Washers No Bolt Finish Plated Attachment Attached To Location Building A -350'x200'x16'Attachment Wall Sidewall Wall D Start Column N/A Offset 176'-2"Stop Column N/A *Note -The sheeting and secondary is removed on this building (child building)at the attachment area.The sheeting and secondary remain on the building it attaches to (parent building)unless an Open Area is shown in accessories ofthe parent building. Spacing SWD Bay Spacing (EWA-EWC)26'-2",25'-0",25'-0",25'-0",25'-0",26'-2" Roof Bay Spacing (EWA-EWC)26'-2",25'-0",25'-0",25'-0",25'-0",26'-2" SWB Bay Spacing (EWC-EWA)26'-2",25'-0",25'-0",25'-0",25'-0",26'-2" SWD Soldier Column Recesses (EWA-EWC)N/A SWB Soldier Column Recesses (EWC-EWA)N/A EWA Column Spacing (SWB-SWD)25'-0" EWC Column Spacing (SWD-SWB)25'-0" EWA Column Recesses (SWB-SWD)0.0",0.0" EWC Column Recesses (SWD-SWB)0.0",0.0" *Note -Negative column recess raises the base of the column above the finished floor. SWD Girt Spacings (Base to Eave)System Standard SWB Girt Spacings (Base to Eave)System Standard EWA Girt Spacings (Base to Peak)System Standard EWC Girt Spacings (Base to Peak)System Standard Purlin Spacing (Nominal Horizontal Distance)System Standard ly/A Frame Groups GoupNambm 1 (Clearspan) Frame Lines 1,2,3,4,5,6,7 SWD SWB Column Tapered A!!owed Column Tapered Allowed Unbraced To Elevation N/A Unbraced To Elevation NIA Max Colunm Web Deplh 60.0"Max Column Web Depth 60.0" Max Rafter Web Depth 60.0"Max Rañer Web Depth 60.0" Exterior Column Elevation At Finished Floor Exterior Column Elevation At Finished Floor Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 19 of 2 Loads,Wind Enclosure,Deflections &Sidesway Building Loads importance Factors Roof Snow Load By Design 110.000 psf Snow Is 1.00 Risk Factor II -Normal Wind Iw N/AThermalConditionUnheatedSeismicle1.00 Seismic Design Category D Designed Snow Exposure Partially ExposedWindSpeed110.00 mph Wind Enclosure Enclosure Partially EnclosedAreFramedOpeningsenclosedwithmaterialsthataredesignedtowithstandthewindloadandwindbornedebris(if applicable)?N/AAreallOpenAreasforOikerenclosedwithmaterialsthataredesignedtowithstandthewindloadandwindbomedebris(if NIAapplicable)? Open Building Condition Clear (unobstructed)flow Uniform Collateral Loads Ceiling Load 0.000 psf Ceiling Type N/A Brittle Wall/Dryvit No Other 0.500 psf Deflections Purlins Roof Panel Rafters Live L/150 Code Limit Live LI60 Code Limit Live L/180 Code LimitSnowL/180 Code Limit Snow Ll60 Code Limit Snow L/180 Code LimitWindLI180CodeLimitWindLI60CodeLimitWindL/180 Code LimitTotalGravityL/120 Code Limit Total Gravity LI60 Code Limit Total Gravity L/120 Code LimitTotalUpliftN/A Total Uplift Ll60 Code Limit Total Uplift N/A Girts Ll90 Code Limit Wall Panel L/60 Code Limit Endwall Columns L/120 Code Limit Sideswav Portal Frame Frame Serviceability Wind H/60 Code Limit Live HI60 Code LimitSeismicHI40CodeLimitSnowHI60CodeLimit Serviceability Wind HI60 Code LimitCraneHI100CodeLimitTotalGravityHI60CodeLimit Total Seismic HI40 Code Limit *Note -Code deflection limits are based on the applicable building code,user defined loading and the manufacturer's interpretation ofwhat the minimum value should be. *Note -It is the responsibility of the Builder to interpret all aspects of the End Customer's specifications and incorporate the appropriate specifications,design criteria,and designloadsintotheOrderDocumentssubmittedtoStarBuildingSystems. *Note -The material supplied by building manufacturer has been designed with tlic following minimum deflection criteria The actual deflection may be less depending uponactualloadandmemberIcitgth.The frame sidesway for wind load is based upon a representation ofthe [0-year Meam Recurrenceinterval wind load. Topography-Escarpments Does the building lie on the upper half of a hill,ridge,or escarpment?No Is this hill,ridge or escarpment unobstructed in any direction by another similar topographic feature within a distance of 100 times its height or 2 miles No(3.21 km),whichever is less? Is the bill or escarpment at least twice as tall as any other topographic features within 2 miles (3.21 km)?NoDoestheaverageslopeonthetophalfofthehill,ridge,or escarpment equal or exceed 20%(11.3")?No Is the height ofthe hill,ridge or escarpment equal to or greater than 15 feet (49.21 m)for Exposure C or D,or 60ft (196.8 m)for Exposure B?No Topographie EtTects Hill Shape N/A Lh,Horizontal distance of crest to half height of hill or escarpment NIA H,Height of Hill or Escarpment NIA X,Distance From the Crestto the Building Site N/A Printed:6/27/2016 2:40:56 PM Q-2260-16.sos Page 20 of 26 Bracing SWD Full Height Portal Frame (EWA to EWC)@ Bays 5 Roof Rod (EWA to EWC)@ Bays 5 LBP Bracing Location NIA SWB 1 Tier Rod (EWC to EWA)@ Bays 2 EWA None (SWB to SWD)@ Bays No Bays EWC None (SWD to SWB)@ Bays No Bays Purlins Angles SWD Girts Sag Angles SWB Girts Sag Angles EWA Girts Sag Angles EWC Giits Sag Angles Rafter Flange Braces Standard Column Flange Braces Standard Portal Frames SWD SWB Rod Tiers Above NIA Rod Tiers Above N/A Max Column Web Depth 60.0000"Max Column Web Depth 60.0000" Max Rafter Web Depth 60.0000"Max Rafter Web Depth 60.0000" EWA EWC Rod Tiers Above N/A Rod Tiers Above NIA Max Column Web Depth N!A Max Column Web Depth N/A Max Rafter Web Depth N/A Max Rañer Web Depth NiA Roof Panel (3,953 sqft) Type SuperLok _Qat_foni Gauge 24 SS Clip Type Utility ClipThicknessN/A (No Insulation)Color SIG -200 TBD Thermal Blocks NoneFinishWarrantyYesNon-Handed Erection N/APerforationGuaranteeN/A Direction N/AInteriorPanelNIAFM-4471 Roof Panel Anchorage No R Value N/A UL90 NoExteriorSkinN/A UL Letter No Fastener Information Ridge Pan No Type Self-Drilling Alignment Strip NIA eenadthFinish n I ceh e aEnd Cnri per to ship with Panels Vendor Atlas Weathertightness Warranty Type None Term NIA Wall Panel (0 sqft) Type Not by Star Options Gauge O Reverse Rolled N/AThicknessN/A Washers N/AColorNIAConcreteNotchN/AFinishWarrantyNíASealedWallNoInteriorPanelN/A Eave Closure No R Value N/A Rake Closure No Fastener Information Foam Tape (If applicable)No Type NIA Head Finish NiA Length NíA Vendor N/A Base Condition Framing None Closure None Trim None Trim SWD Options SWB Options Trim Type Gutters and Downspouts Trim Type No Trim Gutter Type Northern Large Gutter Type N/A Gutter Type by Design Northern Large Gutter Type by Design N/A Additional Gutter Supports By Design Additional Gutter Supports N/A Downspout Drops 3 Downspout Drops NIA Downspout Height 16'-0"Downspout Height N!A Include Elbow Yes Include Elbow N/A Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 21 of 21 New Building C -EWD Lean-to Continued... Trim Continued... EWA Options EWC Options Trim Type Gable Trim Trim Type Gable Trim Gutter Type N/A Gutter Type N/A Gutter Type by Design NIA Gutter Type by Design N/AAdditionalGutterSupportsN/A Additional Gutter Supports NIA Downspout Drops N/A Downspout Drops NIA Downspout Height NIA Downspout Height NIAIncludeElbowN/A Include Elbow NIA Color Selections Eave SIG -200 TBD Trim Profile Cascading Gable SIG -200 TBD Trim is 26 gauge unless noted otherwise. Corner SIG -200 TBD (*)Denotes Signature 300 color,Base SIG -200 TBD Trim for roof system with Sig 300 color is 24 gauge.All Other SIG -200 TBD Gutters SIG -200 TBD *Note -Gutters selected may differ from the Gutters designed. Downspouts SIG -200 TBD Roof to Roof N/A Roofto Wall NIA Walk Doors SIG -200 TBD Insulation Building Has Insulation No Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 22 of26 New Building C -EWD Lean-to Continued... Add Lines List Description Add for hip conditions Quantity 1.00 By Star Yes Quote #Q-2260-16,ALB Add to Freight Yes Estimator's Initials ALB Expires On 7/7/2016 Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 23 of 2 New Building C -EWD Lean-to Continued... Accessories on Roof/Wall Open Areas Type Full Height Left Jamb Yes Support BeamOpenForWindLeftJambFlashYesNotbyManufacturer%Open For Wind 100.00 %Right Jamb Yes Material Thickness NIA Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type NIA Masonry Type N/A Flash Color SIG -200 TBDMasonyReinforcementN/A Height 16'-0" Shear Wall No Width 25'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt..up No Elevation AWillAreabeSheetedinFutureYesBay1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Child Bldg Attachment Left Jamb No Support BeamOpenForOtherLeftJambFlashNoNotbyManufacturer%Open For Wind 0.00 %Right Jamb No Material Thickness N/A Right Jamb Flash No Material Weight 0.000 psf Header Flash Type N/A Masonny Type N/A Flash Color N/A Masonry Reinforcement N/A Height 22'-3" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation BWillAreabeSheetedinFutureN/A Bay 1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Full Height Left Jamb Yes Support BemuOpenForWindLeftJambFlashYesNotbyManufacturer%Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type N/A Masonry Type NIA Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 25'-0" Deduct Liner Panel Yes Distance Steelline to Material O'-0" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation CWillAreabeSheetedinFutureYesBay1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" Type Full Height Left Jamb Yes Support BeamOpenForWindLeftJambFlashYesNotbyManufacturer%Open For Wind 100.00 %Right Jamb Yes Material Thickness N/A Right Jamb Flash Yes Material Weight 0.000 psf Header Flash Type N/A Masorry Type N/A Flash Color SIG -200 TBD Masonry Reinforcement N/A Height 16'-0" Shear Wall No Width 152'-4" Deduct Liner Panel Yes Distance Steelline to Material O'-O" Deduct Insulation Yes Distance Steelline to Beam O'-0" Cols.Braced by Mas'y/Tilt-up No Elevation DWillAreabeSheetedinFutureYesBay1 Distance From Left Column O'-0" Distance From Left Steelline O'-0" *Note -Deduct Panel Only Open Area constitutes panels provided by others and shall be structurally equal to Manufacturer's PBR panel.Panel attachment is NOT byManufacturer. *Note -Girts and panels for child building(s)have been removed at common area(s) Gutters Type Northern Large Elevation D Quantity 1 Bay 1 Length 152'-4"Distance from Left Column O'-0" Distance from Left Steelline O'-0" Gutters (List)Total Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 24 of 26 New Building C -EWD Lean-to Continued... Accessories on Roof/Wall Continued... Downspouts Quantity 3 Elevation D Length 16'-0" Elbow Yes Trim SIG -200 TBD Downspouts (List)Total Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 25 of 2 Notes Note:Star Building Systems carries Conunercial General Liability insurance which faciudes Products Liability and Completed Opemtions coverage.Star BuildingSystemsisamamifacturerofmetalbuildingsandcomponents.We rnanufacture a inngible product for sale in the market.As such,we do not peribrm or tender professional services to outside parties as that term is used and is understood to mean in Professional Liability insurance policies.Professional Liability Insurance.if retiuited,will be an add to the contmet amourtt. Note:Excluding Applicable tax and freight. Note:Pricing does not include any export overages or containerization,unless otherwise noted. Note:Unless prior agreement is reached with Star Building Systems,any in-plant inspections required by the Building Owner will be at the Building Owner's expense. Note:Commtinication to Star Building Systems with the need to hold to any preliminary design information provided by SBS is the responsibility of the buyer.StarBuildingSystemswißnotbeliableforanychangesinfinaldesignifthebuyerdoesnotcommunicatetoStarBuildingSystems. Note:Standard Star Building Systems'Specifications,including welding standards nud specifications,are applicable tittless specifically describrd otherwise on thisdocument.If plans and/or specifications and/or Ownefs Purchase Order accompanies 1his document,and there is a deviation from Star Building Systems standardspecifications,that deviation is not applicable unless referenced on this document.The words "See Attached"do not fulfill this reference requirement.AnydeviationfromstandardmustbelistedonthisdoeurnentorinProjectNotes. Note:All materials not supplied by Star Building Systems and the tie-in of Star Building Systems materials to materials Not By Star (NBS)i.e.masomy wall otherexistingstructures,is the responsibility of the purchaser as relates the aesthetics,weatherlighiness and perlbrmance of same. Note:The buyer is solely responsible for review and accuracy of all information contained within this order,and it's compliance with any plans,specifications,andbuildingcodes.Materîais and engineering shall be supplied in strict accordance with this order,and not necessarity in accordance.with plans,specifientions,building codes,or other contracts.Plans and/or specifications shall be considered ns reference materiat only.Star will not participale in any penshies,liquidated damages,or retainage for any tenson. Note:The complexity rating is derived from the geometry and accessories input into SBS.The use of Addlines or any other modifications can influence this rating.StarBuildingSystemsreservestherighttochangethisratingatanytimewithoutnotincation. Note:Anchor Rods,leveling plates,shim plates,sill plates,embedded items and other miscellaneous metals are not supplied by Star. Note:If project contains screw-down roof or wall panels,they may be up to 45'-0"in length (at Star's discretion)unless otherwise noted.If project contains standingseampanels,they may be up to 53'-0"in length (at Star's discretion)unless otherwise noted. Note:NOTICE:Uniform visual appearance of Galvatume®Plus coaled panels cannot be guaranteed.The Galvaleme®Plus conting is subject to variances in spanglefromcoiltocoilwllichmayresultinanoticeableshadevariationininstalledpanels,The Galvalume®Plus conting is uiso subject to difTerernial weathering afterpanelinstallation.Panels may appear to be different shades due to this weathering characteristic.lf unifomt visual appearance is required,Star recommends diatourprepaintedSignature®200 or Signature®300 panels be used in lica of Galvahimc®Plus.Shade variations in panels manufactured from Galva1ume®Plus coated malerial do not diminish tiie structural finegrity of the product.Tliese shade variations should be anticipated and are not a cause for rejection. Note:If soil profile other than (D),(4),(SD),(S4)is to be used,Star requires a sealed letter or copy of a soils report from a registered design professional stating the soiltypetobeusedinthedesignofthemetalbuilding. Note:Buÿer acknowledges Ilial.allhough mirtimum loads may be supplied automntically,it is Buyer's responsibility lo determine the intended use of the Metal BiúldingSystemordered,its appropriateness for u1l loads to be encountered,including but not limited to,live load,Wind lead,snow/ice load,wat¢r load,collateral andauxiliaryloads,as well as ils appropriaten¢ss for drainage systems and compliance with Ihe reqtticements of all goveming code bodies,statutory and regulatoryugencies. Note:All design information provided is preliminary,including but not [imited to "Designed","System Standard"and "IMault"design criteria.Star will not beresponsibleforconditionsresultingfromchangesinthefinaldesignulilussthatspecificrequirementisnotedonthePurchaseOrder. Note:Anchor Rods are not supplied by Star unless noted specifically on this document.Embedment length is not designed by Star. Note:All SBS Support Beams are designed and priced with the assumption that the beam is located at or within 2'-0"of the top of the open area material and that the openareadoesnotextendabovetheeavelineand/or roofline. Note:Structural paint is intended as a primer.The primers supplied by Star are not irttended to provide the uniformity of appearance of a finish coat nor lo provideextendedprotectionifsubjectedtoprolongedexposure.If immediate erection of steel is not possible,it mesi be protected from exposure lo atmospheric and/orenvironmentalconditionsthatmaybedetrimentaltoprimerperformance.These conditions would include,bin not be limited to..prolonged exposure to ultra-violetlightresultinginpossiblefadingandorspottingorstandingwaterresultinginsperfing,peeling,or localized surfac¢Oxidation.Gray Primer in parlicular will showrustspots/streaks due to imperfections in the application process and the properties associated wit|1 Gray Primers.Primer touch-up due to transit abrasions and/orscratchingduringloadingandunloadinganderectionistobeexpected.Rusting or abnisions on structural members is not subject to customer rejection or claim (brtouchup.Additional guidelines can be found in the MBMA Commentary,the AISC Code of Standard Praclice and Star's Standard Specifications. Note:Standard Minimum shop cut panel lengths are 4'-0.(8'-0 for IMP's)Panels shorter than this will require field cutting.If field cutting is unacceptable,send toEstimatingforspecialshortpanelcutchargesasrequired. Note:Tarping is recommended for all loads that travel through or to areas that make use of road salt during winter or wintry weather conditions. Note:Eave Struts,Endrafters and Header members are not designed to sustain transverse wind or seismic loading from masonry/other construction. Note:Seamer rentals and freight are included in pricing for one month (4 weeks).After one month.Electronic seamer rcRtal fees are as foffows:$40 Daily,$180 Weeklyand$700 Monthly per seamer.After one month,Hand crimper rental fees are as follows:$30 Weekly and $95 Monthly per crimper.Lead time;typically two (2)weeks on a first come first serve basis.The rental clock begins on the day of shipment and does not stop until the seamer equipment is back in the possession ofMBCI.Push Tool seamer rental (for seaming panel sidelaps in vertical applications)and freiglu is NOT included and you rmist calt and inquire with StatsEstimatingDept.regarding pricing.Star/MBCI paint,Galvalume Plus and optional weathertightness warranties will not cover damage caused by scamingequipmentnotsuppliedbyStar/MBCI and the use of such unauthorized seaming equiprnent may result in the warranties being void. Printed:6/27/2016 2:40:56 PM Q-2260-16.sbs Page 26 of 26 Note:Star Building Systems provides a one-year material and workmanship guarantee on all components. Note:The manufacturer will not guarantee any level of performance for air infiltration or air barrier performance.Furthermore,the manufacturer will not be responsible for any Innierial or labor costs toquired to adliiëve atiÿ perforñiatice level of aff infibration foi any wall or roof assembly or whole-Iniílding testing. Resolution: Yes.to amend,all the signatories must sign.So if there is a holdout (or two),either the existing agreement remains in force,or those that wish to do something different can get out of the old agreement and enter into a new one more to their liking.That new agreement would not include the entity that disagreed with the change. TAR golficationReport c BUlLD\NG5YSTEMS.Lynden,WA98264 AN NCJ COMPANY Section 1 -General 1.01 Work Included Melal building systems,complete with structural Traming (Columns,rafters,struts,purlins,girts,bracing),and optional prefinished roofing,siding,roof and wallinsulation,building canopies,metal flashings,trim,gutters,dowitspouts,fasteners,mof and wall accessories and other components and material required for a completeilistallation, 1.02 Descriptions Bulldinq A -350'x200'x16',Symmetrical Clear Span gabled rigid frame with uniform or variable depth columns and rafters. Building Label:A Roof Slope:3.0000/12-Sidewall A,3.0000/12-Sidewall C Column Spacing at Exterior Walls:As shown on drawings and compatible with placement of openings and other requirements. Eave Height:16'-0"lows ide Measured vertically from top of eave strut at sidewall steelline to base of sidewall frame column. Interior columns with Multi-Span structures will be recessed 5"below finished floor as standard,tempor above or below finished floor as specified. Buildinq B -EWB Lean-to.Single Slope Clear Span single slope rigid frame with uniform depth columns and uniform or variable depth rafters. Building Label:B Roof Slope:0.0000/12-Sidewall B,3.0000/12-Sidewall D Column Spacing at Exterior Walls:As shown on drawings and compatible with placement of openings and other requirements. Eave Height:16'-0"lowside Measured vertically from top of eave strut at sidewall steelline to base of sidewall frame column. Interior columns with Multi-Span structures will be recessed 5"below finished floor as standard,tempor above or below finished floor as specified. Building C -EWD Lean-to,Single Slope Clear Span single slope rigid frame with uniform depth columns and uniform or variable depth rafters. Building Label:C Roof Slope:3.0000/12-Sidewall B,0.0000/12-Sidewall D Column Spacing at Exterior Walls:As shown on drawings and compatible with placement of openings and other requirements. Eave Height:16'-0"lowside Measured vertically from top of eave strut at sidewall steelline to base of sidewall frame column. Interior columns with Multi-Span structures will be recessed 5"below finished floor as standard,tempor above or below finished floor as specified. Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 2 of9 Section 1 -General Continued... 1.03 Quality Assurance Codes and Standards Use the following where applicable in building design: AWS D1.1 "Structural Welding Code-Steel." MBMA "Metal Building Systems Manual,"Current Edition.AISI "North American Specification for itte Design of Cold-Formed Steel Stmetural Mernbers."Current Edition.AISC "Sleel Construction Manual"and "Specification for Structural Stee1Buíldings Current Edition."SJI "Standard Specifications and Load Tables and Weight Tables forSicel loiBLE BIKÏ JOißt Girdet3."SDI "Diapragm Design Manual"and "Design Manual for Composite Decks,Form Decks and Roof Decks -No.31." Use the following where applicable in other phases of design: -Building Code and regulations of other governing authorities having jurisdiction at project site. -Federal (Fed.Spec.),Military (MIL)and Commercial (CS)Standards and Specifications,as referenced herein. -American Society for Testing and Materials (ASTM),Standards as referenced herein. Ratings By Underwriters'Laboratories,Inc.UL 580 Factory Mutual Research.Class 1 Roof FMRC Standard #4471 Design Criteria Project Use Category Agricultural Jobsite Address 1202 Douglas Munro BlvdBuildingCode2015IBCCteElum,WA,98922 County Kittitas Live/Wind Live Load 20.000 psf Wind Category N/ATrib.Area Reduction Allowed Yes Miles From Coastline NIAWindExposureExposureCRainIntensity4.0000 in/hrHurricaneCoastlineNo Snow und Snow Load 115.000 psf Snow Exposure Partially ExposedMinRoofSnowLoad110.000 psf Rain Load N/AThermalConditionsN/A Elevation Above Sea Level N/A Seismic Spectral Response(Ss)67.00 %%of Snow Load for Seismic NormalSpectralResponse(Sh)N/A Seismic Zone NIASpectralResponse(S1)27.00 %Near Source Factor N!ASpectralResponse(S2)NIA Design Seismic for Schools NIAAcceleratedCoefficient(Aa)NIA Soil Type (D)Stiff SoilVelocityCoefficient(Av)NIA Site Class/Soil Type (D)Stiff Soil Collaterals Building UL Classification Celling Load Other lond Ceiline TvveA-350'x200'x16'None 0.000 psf 5.000 psf Acoustical/Other B -EWB Lean-to None 0.000 psf 0.500 psf Acoustical/Other C -EWD Lean-to None 0.000 psf 0.500 psf Acoustical/Other Cranes Deflection Criteria Building A -350'x200'x16' Roof Purlins Roof Rafters Live Lí150 Code Limit Live L/180 Code LimitSnowL/180 Code Limit Snow L/180 Code LimitWindL/180 Code Limit Wind L/180 Code LimitTotalGravityL/120 Code Limit Total Gravity L/120 Code LimitTotalUpliftNIATotalUpliftN/A Frame Sidesway Girts LI90 Code Limit Total Gravity HI60 Code LimitEndwallColumnsL/120 Code Limit Total Lateral HI60 Code Limit Crane Load HI100 Code Limit Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 3 of Section 1 -General Continued... LO3 Oualitv Assurance Counduued., Deflection Criteria Continued.. Building B -EWB Lenn-to Roof Purlins Roof Rafters Live L/150 Code Limit Live LI180 Code LimitSnowL/180 Code Limit Snow L/180 Code LimitWindL/180 Code Limit Wind LI180 Code LimitTotalGravityL/120 Code Limit Total Gravity L/120 Code LimitTotalUpliftN/A Total Uplift N/A Frame Sideswav Girts L/90 Code Limit Total Gravity HI60 Code LimitEndwallColumnsL/120 Code Limit Total Lateral HI60 Code Limit Crane Load H/100 Code Limit Building C-EWD Lean-to Roof Purlins Roof Rafters Live L/150 Code Limit Live L/180 Code LimitSnowL/180 Code Limit Snow L/180 Code LimitWindL/180 Code Limit Wind L/180 Code LimitTotalGravityL/120 Code Limit Total Gravity L/120 Code LimitTotalUpliftN/A Total Uplift N/A Frame Sidesway Girts Ll90 Code Limit Total Gravity HI60 Code LimitEndwallColumnsL/120 Code Limit Total Lateral HI60 Code LimitCraneLoadHI100CodeLimit Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 4 of9 Section 1 -General Continued... 1.03 Quality Assurance Countinued... Load Combinations As required per the Building Code specified.Minimum Load Combinations Considered: a.DL +LL b.DL +SNOW c.DL +A d.DL +WL e.DL +EQ f.DL ÷ SNOW +A g.DL +SNOW +EQ h.DL +1/2 WL +A i.DL+1/2EQ+A j.DL +SNOW +1/2 WL k.DL +1/2 SNOW +WL DD Roof Dead Load LL Roof Live Load SNOW Roof Snow Load WL Lateral primary wind load EQ Lateral seismic load A Auxilianj load Exceptions: 1)Crane hook loads need not be combined with roof live loads or with more than three-fourths of the snow load or one-half of the wind load. 2)Flat roof snow loads of 30 PSF or less need not be combined with seismic loads.Where flat roof snow loads exceed 30 PSF,20 percent shall be combined withseismicloads. 1.04 Submittals General To comply with general conditions. Shop Drawings and Calculations Design Calculations and Ereclion Drawings,Prepared by,or under direct supervision of,a Registered Professional Engineer,licensed to practice in the State ofWAnittialldrawingsandcatenlationsbearingengineer's seal. Each type of s1tueturtil building finme regilited and Iheir locations withili SImetiire shall be shown;detai‡s of ancher rod settings;sidewall,endwell and roof framing;diagonal bracittg und location williin stnicture;inetal floor deck alid joist types;wall and roof insulation and types;longiltldinal and Irailsverse cross sections;details ofcurbs,roof jacks,and items penetrating roof;canopy framing alid dertills;trim,guiters,downspou18,litter panels,wall and roof coverings,and all accessory ilems;materials;fmishes;construction and installation details;and other pertinent information required for proper and complete fabrication,assembly siid erection ofwatertightmetalbuildingsystem. 1 05 Product HandHn Oc)ivery,and Storage Deliver and store prefabricated components,sheets,panels,and other manufactured items so they will not be damaged or deformed. Stack materials on platforms or pallets above grade or on concrete slab,covered with opaque tarpaulins or other approved weather-resistant ventilated covering. Store metal sheets and panels if subjected to water accumulation in such a manner so they will drain freely.Do not store sheets and panels in contact with othermaterialswhichmightcausestaining. Inspect panels for quality.Damaged material must be reported to determine if replacement is required. Prevent moisture between panels,and secure as required. 1.06 Warranties Ali Components: Manufacturer's standard one (1)year material and workmanship warranty. Roof Panels: Manufacturer's Standard:Finish warranty. Wall Panels: Manufacturer's Standard:Finish warranty. Roof and wall panels with siliconized polyester finish:StarGuard warranty. Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 5 of Section 2 -Products and Fabrication 2.01 Stmetiiral Steel Materials: Structural Plate or Bar Stock:Minimum yield strength (Fy)of 50,000 psi.Cold Formed Structural Steel:Minimum yield strength (Fy)of 50.000 psi. Primary Structural Bolts:ASTM A325 and A490;Size and quantity required by metal building system Manufacturer.All uncoated structural steel shall be cleaned of all foreign matter and loose scale in accordance with SSPC-SP2 and given a one mil coat of Star Building Systems'standard dark gray primer.Primer shall meet the perforniance cliaracteristics of Federal Specification SSPC Paint 15.This conting is intended to provide temporaryprotectionforeliveryanderectionandisnotintendedort¢posented as a finish coat. All secondary structural nframing coil stock shall be prepainted with 0.5 mil minimum dry film thickness of Star Building Systems'standard dark gray primer.ThiscoatingprocessmeetsorexceedstheperformancecharacteristicsoffederalSpecificationSSPCPaint15.This conting is iñtended to provide temporary protectionofordeliveryanderectionandisnotintendedorrepresentedasafinishcoat. Fabrication: Primary Framing:Rigid frames of shop-welded steel plate columns and rafters,both tapered and uniform depth sections as required by drawing,complete with allnecessarystiffeners,connection plates and holes for field-bolted assembly. Columns and Rafters:Fabricated with holes in web and/or flanges for attachment of secondary members. Splice Plates:Factory fabricated for precision for all rafter-to-rafter and/or column-to-rafter connections,complete with connection bolt holes.Base Plates,Cap Plates,Splice Plates and Stiffeners:Fabricate to sizes required,complete with all holes for connection of primary and secondary structural members.Factory weld into place. Join flanges and webs of structural members fabricated of plate or bar stock together by continuous automatic submerged are welding process with all weldingperformedbycertifiedweldersinaccordancewithstandardpracticesofAWSDl.I. Make all primary rigid frame field-bolted connections with A325 high-strength bolts of size required by building system Manufacturer.Clean all components of oil,dirt,loose scale,and foreign matters.Factory paint with one (1)coat of Manufacturer's standard shop coat. Endwall Framing: Precision hot rolled,and/or shop-welded steel plate members consisting ofraffers and columns fabricated for field-bolted assembly. Columns,Rafters,Splice Plates,Clips,Angles and Channels:Factory fabricate to size required. Plate Stock Endwall Framing Members:Join flanges and webs by continuous automatic submerged arc welding process,by welders certified in accordance withstandardpracticesofAWSD1.1 Clean Components of oil,dirt,loose scale and foreign matter,per SSPC-SP2,and apply one (I)coat of Manufacturer's standard shop coat.Secondary Framing,(Purlins,Girts,Struts,Flange Braces,Base Angles,as required):Purlins Manufacturer's standard 12'-0"Z -Exterior secilons,roll formed from minimum (Fy)55,000 p.ä steel,puneliedManufacturer's standard 12'-0"Z -Flush sections,roll formed from minimum (Fy)55,000 psi steel,punched Girts 8'-0"Z -Exterior or channel sections of roll formed Fy 55,000 psi sleel,punched for attacliment with 0.50"diameler bolts.10'-0"Z -Flush or channel sections of roll formed Fy 55,000 psi steel,punched for aitachment with 0.50"diameter bolts.10'-0"Z -Exterior or channel sections of roll formed Fy 55,000 psi steel,punched for attachment with 0.50"diameter bolts. Eave Struts 12.00"C -Exterior or channel sections of roll formed Fy 55000.000 psf steel,punched for attachment with 0.50"diameter bolts.12.00"C -Flush or channel sections of roll formed Fy 55000.000 psf steel,punched for attachment with 0.50"diameter bolts. Roof Struts 12.00"x 3.25"sections of cold formed minimum Fy 55000.000 psf steel,with vertical web to receive sidewall panels and four (4)0.50"diameter bolt attachments torigidframeinfactory-punched holes in column or bracket L2.0û"X 3.25"sections of cold formed tilinimum Fy 55000.000 psf steel,with vertical web to receive sidewall panels and four (4)0.50"diameter bolt attachments torigidframeinfactory-punched holes in colurun or bracket. Flange Bracing Provide as required,detailed and shown on final sliop drawings,as required by design analysis,with attachment to top flange or rigid frame rafters by two (2)0.50"minirnum size diameter bohs at each end of strut.Fisuge Braces:Steel angles attached to purlin or girt,to stiffen rigid frame flanges as dictated by design and notedonfinalshopdrawings. Printed:6/27|2016 2:53:39 PM Q-2260-16.sbs Page 6 of 9 Section 2 -Products and Fabrication Continued.,. 2.02 Rooling and Siding Roof Panels: SuperLok SuperLok shall be roll-formed 16.0"wide with a 2.0"deep straight rib at each edge.One edge rib shall have a "male"flange at its top and the other edge rib shallhavea"female"flange.This design allows a friction interlock of "male/female"ribs on adjacent panels.At end laps the end of the overlapping panel shall be factoryswagedtoallownestingwiththebottompanel. Interlocking straight ribs at side laps shall be field criniped togetlier by the use of an elec1rie seaming tool ob1ained from Star Building Systems.Factory applied scalant shall be provided in the overlapping "female"Bunge to assure weathertightness of the continuously crimped joint.Concealed clips,which are crimped into thepanelsidelaps,shall be famished by Ceco to fasten pancis to structural members. Each panel shall provide 16.0"coverage.Panel gauge is 24 standard with 26 and 22 gauge as an option.Surface texture of panel may be specified as smooth or embossed.Finish may be specified as either Galvalume Plus or painted.Refer to color charts for Standard and Premium paint colors available. *Note -Underwriters Laboratories Approval:SuperLok panels carry a Class 4 UL-2218 rating under impact resistance,Class A UL-263 fire rating,and Class 90 UL-580 uplift resistance rating. *Note -Factory Mutual Approval:SuperLok panels carry a Class 1-SH ilail damage rating,Class A ASTM E108 fire rating,and Class 1-90 FM windstormrating. Wall Panels; Roof Panel Finishes: Manufacturer's standard 0.5 oz.per sq.ft Galvalume Plus alloy-coating with manufacturer's standard polyester finish. Wall Panel Finishes: Manufacturer's standard 0.5 oz.per sq.It galvalume plus alloy-coating (0.55 oz.per sq.ft.unpainted)with manufacturer's standard color siliconized polyester finish. Fasteners Wall Panels: Manufacturer's standard long-life coated #12-x 14 x 0.875"self-drilling carbon steel screws for liner panels and/or exterior single skin wall panels and #12-14 x 1.25"self-drilling carbon steel screws for exterior single skin wall panels utilizing blanket insulation up to 4.0"thick.Manufacturer's standard #14 x 1.75"stainless steelself-tapping screws for factory insulated panels.All exposed fastener heads will be factory colored to match color of panels. Exposed Fasteners for Eave,End Splice,Ridge Cover and Flashings:Manufacture/s standard #12-14 x 1.25"self-drilling screw with sealing washer.Cap head and washer with 0.008"thick type 302 stainless steel caps or zinc/aluminum alloy head.Painted or unpainted. Trim Fasteners: Manufacturer's standard plated and finish painted #8 x 0.625"self-drilling screws with 0.25"hex washer head. Sealant: N/A 2.03 Wind Bracing Commercial Grade steel rod bracing,zine coated steel wire strand or portal frames located as determined by Manufacturer on the finalshop drawings. Steel Rod Bracing:Provide complete with necessary slope washers,flat washers and adjusting nuts at each end.Wire Strand Bracing:Provide complete with necessary hardware. All bracing components except wire strand to receive one shop coat of paint. 2.04 Wall and Roof Insuladen Wall and Roof Fiberglass insulation Manufacturer's standard noncombustible fiberglass blanket insulation with vapor retarder.Unless shown otherwise on drawings the following Thickness and R Factorswillbeused. En11ding Elevadon Facine Thickneas R ValueN/A Provide insulation and facing (as a composite material )carrying UL fire hazard (UL 723)rating indicating a flame spread rating of 25 or less;or FM classification as Class 1 material when rating is applied to each individual component if field assembled,or to composite unit if supplied factory assembled. 2.05 Accessories Gutters N/A Dmynspouts Downspouts shall be located according to design requirements as specified. Downspouts siml]be field attacited to the gutter.Downspouts shall be attaclied to die wall panel using 26-gauge pre-galvartized factory-colored steel straps on 10.0" centers.A 75-degree elbow sha11 f>e provided al the base of all downspoltts to direct the water flow away from the budding wllere required. Finish:Manufacturer's standard siliconized polyester system finish or ful170 percent polyvinylidene fluoride (Kynar)finish in color. Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 7 of Section 2 -Products and Fabrication Continued. 2.05 Accessories Countinued.. Slide Doors Sliding doors (for single-skin ribbed wali panels only)shall be single and/or double sliding doors constructed of cold-formed structural steel sheeted panel with amaximumopeningof24.00"wide x 20.0û"height. Door systems shall be provided with all tracks,trolleys,covering,trim,flashing,closures,locks,astragal plates and base guides necessary for field assembly of thedoorsystem. Sliding door sections shall be suspended by four-wheeled trolleys at each end sliding inside a track mounted on the exterior wall.Any structural exposed when door is closed shall be pre-galvanized steel fastened with plated fasteners.The jambs and header of the door opening shall be painted onecoatofredoxideshopcoat. Section 3 -Execution 3.01 Erection General: Erection shall be accomplished by a trained,competent erector having experience in erecting metal buildings. Install all metal building system components in strict compliance with Manufacturer's instructions shown on final shop drawings.Handle and store all materials to avoid damage and replace any damaged materials. Erector shall observe aiid follow recominendations of the Metal Building Manufacturers Association (MBMA),the American Institute of Steel Construction (AISC),and the Occupational Safety and Health Administration (OSHA)practices,procedures and safety standards where.applicable. Do not field cut or alter structural members without approval from Manufacturer. Structural Frames: Erect true to line,level and plumb,brace and secure with temporary bracing in all directions as required. Level base plates and secure to anchor rods to level plane with full bearing to foundation suppolting structures. Bracing: Install all permanent diagonal rod or angle bracing in roof and sidewalls as approved by Manufacturer. Properly tighten rods to avoid excessive sag. Roofing and Siding Panels: Install roof and canopy panels in such a manner to permit drainage to eaves of building,with panel ends square to eave.Install wall panels with vertical edges plumb. Arrange and nest sidelap joints away from prevailing winds when possible. Apply panels and associated items for neat and weathertight enclosure. Avoid "panel creep"or application not true to grid lines. Protect factory finishes from mechanical damage or abrasions. Install approved type closures to exclude weather. Install weather seal under ridge cap.Flash and seal roof panels at eave,gable and perimeter of all openings through roof and elsewhere as required or shown ondrawings. Flash and/or seul wall and liner panels at perimeter of all openings,under eaves and gable trims,along lower panel edges,and elsewhere as required or shown ondrawings,as applicable. Remove all fastener or cut shavings from roof and wall as erection is completed. Standing Seam Roof Panels: Install pancis with positive interlock between installation clips and standing seams in such a manner that will allow panels to support erection loads prior to closing ofseamswiuiseamer. Install concealed pariel clips (of sliding design to allow lbr expansion and contraclion inovement of partels)over top of roofing insulation along each standing seam atlocationandspacingdeierminedbymetalbuildingManufacturerandshownornhoManufa¢ttirefs drawings. Whore panel end splices occur,nest panels with end laps according to Manutocturer's instructions and install interlocking clamping plates and sealant.Make spliceindependentefstruciutetoallowforfreeexpansionandcon1ractionmovemeniofpunclswillioutsilessonsplice. Crimp standing seams with approved type motorized seamer tool to assure complete sealant engagement and to assure structural integrity of panel-to-panel andpanel-to-clip connections. Use fasteners penetrating mof panel olily at caves and end spiices (when required).At these conditions,use fasteners in conjunction with clamping plates (withfactory-punched holes to assure correct fastener placement)and approved type butyl scalant to assure positive watertight seals. Install ridge cover units of approved expansion joint design to accommodate expansion and contraction movement of roof panels without ponding at end splices.Coordinate installation of accessories and items to be mounted on metal roofing. Maintain proper panel coverage according to Manufacturer's instructions and drawings. Wall Panels: Install wall panels on exterior side of metal framing with liner panels installed on building interior in locations shown on drawings.Align bottoms of panels to proper coverage and fasten with Manufacturer's recommended and supplied fasteners. Cut and fasten flashing and trims with approved type fasteners. Install all fasteners with power tool having adequate torque and proper r.p.m.adjusted to seat fastener without damage to heads,washers or panels.Install panel sidelap away from prevailing wind or view direction when possible,maintaining proper lap without fastener dimpling or excessive overlap. Printed:6/27/2016 2:53.39 PM O-2260-16.sbs Page 8 of 9 Section 3 -Execution Continued... 3.01 Erection Countinued... Accessories: Install gutters,downspouts,flashings,trim,ridge covers,roof curbs,pipe flashings,closure strips,roof jacks,and other accessories and sheet metal items in accordancewithManufacturer's recommendations for positive attachment to building and provide a weathertight mounting. 3.02 Paintine Touch-up all abrasions,scratches,field welds or other damages in shop-coat or factory-finished painted surfaces consistent with shop coat,or factory-finished painting. Provide finish coats which are compatible with metal building Manufacturer's shop coat paints if required. If finish coat is not compatible with shop coat provide approved barrier coats over incompatible shop coats.All finish coats by others should be solvent base orapprovedbyStarBuildingSystems'. 3.03 Tolerances All framing members shall be erected plumb,level or aligned not to exceed a deviation 1:500 (1:1000 for Canadian Projects). Printed:6/27/2016 2:53:39 PM Q-2260-16.sbs Page 9 of Section 4 -Credentials 4.0 Star Building Systeltu Credeniials <View Credentials Here> Association Memberships: Metal Building Manufacturers Association-Member American Institute of Steel Construction-Associate Member Registered Professical Engineers: Registered in all 50 states Professional Associatiori Memberships by Manufacturer's Engineers:National Society of Professional EtigineersOklallomaSocietyofProfessionalEngineera Anierican Society of Civil Engineers Anletican Welding Socicly Oklahoma Structural Engineers Association Internacionul Code Council (ICC) American Society for Testing and Materials (ASTM)American Society of Heating,Refrigeration,and Air-conditioning Engineers (ASHRAE)National Roofing Contractors Association Metal Roofing Systems Association Accreditation: ICC,International Accreditation Service,Inc. Approved for Steel Fabricatiott under Section 1704.2.2 of2003 and 2006 IBC and Section 1701.7 of 1997 UBCIASFabricatorInspectionProgram,FA-175,Monticello,IA Plant IAS Fabricator Inspection Program,FA-277,Atwater,CA Plant IAS Fabricator Inspection Prograrn,FA407,Elliabethton,TN Plant Canadian Welding Bureau W47.I.Division 1 Certification of Monticello,IA <View Certificate>,Atwater,CA,and Elizabethton,TN Plants:Monticeno,IA Plant,CSA A660 Certificate Atwater,CA Plant,CSA A660 CertificateELIcertification Underwriters Laboratories,Inc.Uplift Classified Roof Panels Construction No.59,59A,&144 -PBR Roof Panels Construction No.165 -StarShield Standing Seam Roof Panels U.S.Army Corps of Engineers StarShield Roof Panel approved per CEGS 074160 test specification State Approvals: State of Indiana Master Plan approval -Star building types:STR,STB,SRLO,SRHI,SMS,SMT,SSB,and SWE approved Local Approvals: Los Angeles,CA Atwater,CA Plant,approved fabricator of High Strength Steel Riverside,CA Atwater,CA Plant,approved type 1 fabricator Dade County,Florida StarShield Roof Approval,Acceptance No.01.0711.01 Las Vegas,NV Atwater,CA Plant,approved fabricator of Metal Buildings Clark County,NV Atwater,CA Plant,approved fabricator of Metal Buildings Elizabethton,TN Plant,approved fabricator of Metal Buildings Houston,TX Monticello.IA Plant,approved as Metal Building Fabricator -Registration No.3768EUzubethian,TN Plant,nppioved as Metal thiffding Fabricalor -Registration No.376C Seattle,WA Atwater,CA Plant,approved fabricator of Metal Buildings Factory Mutual Approvals: StarShield Standing Seam Roof System approved per FM Standard 4471 Product Credentials: PBR Wall Panel Air infi[tration:Tested per ASTM E283 with no leakage. Water Pene1ration:Tested per ASTM E331 with no water penetration. Double-Lok Roof Panel Air Infiltration:Tested per ASTM E1680 with no leakage.Water Penetration:Tested per ASTM E1646 with no water penetration. Washington State Horse Park Exhibit VIBudgetforcoveredArenaandAssociatedBuildoutProjectPhases5-5-18 Phase 1 Phase 2 Project Covered Arena Assoc.Buildout TotalFundingSources County Lodging Tax Funds Request (pending)$1,500,000 WA State 2017-19 Capital Budget (awarded January 2018)$2,000,000DistressedSalesandUseTax(.09)Funding Grant (secured)$60,000"Unbridled Evening"/Other Private Donor Designated Capital Funding $200,000CorporateSponsorshipcampaign$100,000In-Kind (design,engineering,construction services and materials)$140,000 Phase 1 Funding -In Hand $4,000,000DistressedSalesandUseTax(.09)Funding Grant (proposed 2019)$250,000StateRecreationandConservationOffice(RCO)Grant (application 2020)$500,000CityofCleElumLodgingTaxFunding(proposed) $30,000In-Kind (design,engineering,construction services and materials)$20,000"Unbridled Evening"/Other Private Donor Designated Capital Funding $115,000CorporateSponsorshipCampaign $25,000Phase2Funding $940,000 Total Project Funding $4,000,000 $940,000 $4,940,000 Project Expenses Site Preparation and drainage $65,000Metalbuilding($32.78/sf x 60,000 sf)$1,966,500Porchatgableends($27.56/sf x 9,600 sf)$264,500 Foundations $197,500Mechanical $37,450 Electrical and engineering $267,500 Fencing $53,500 Translucent panels (skylight)$250,000 Arena footing $200,000 Relocation of maintenance area (utilities,site development)$70,000 Phase 1 Arena Contruction $3,371,950 Real Property -Acquisition of 8-acre parcel from Suncadia for parking $150,000Landscaping $40,000Portablebleachers $60,000Weatherscreens $55,000RestroomS $200,000Additionalparkingland-clearing and construction $75,000Relocationofmaintenancearea(fencing,shed))$86,000 Phase 2 Associated Buildout $666,000Contingency(5%)$168,598 $33,300 WSST (8%)$283,244 $55,944 3%Administrative Cost on $2.0MM state funding $60,000 $- Project Management $60,000 $40,000PermitFees$15,000 $-Architectural and Structural Design Fees $30,000 $20,000 Total Soft Costs $616,841 $60,000TotalCosts$3,988,791 $726,000 $4,714,791ProjectedFundingAdequacy$11,209 $214,000 $225,209