HomeMy WebLinkAboutRes-2019-105BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2019-//) E
TO A WARD THE CONTRACT FOR
THE TEANA WAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY
CREEK CULVERT REPLACEMENT PROJECT CRP NO. 270-16
AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME
WHEREAS: The Department of Public Works solicited bids for the Story Creek
Culvert Replacement Project CRP No. 270-16 contract in accordance
with RCW 36.77.020 Contract Procedures; and
WHEREAS: Sealed bids were opened on June 06, 2019 at 10:00 a.m. in the Kittitas
County Permit Center, Department of Public Works , 411 N. Ruby Street,
Suite 1, Ellensburg, Washington; and
WHEREAS: Three (3) bids were received for the prescribed work. The Director of
Public Works recommends the lowest responsive bid be accepted; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby award the contract for the Story
Creek Culvert Replacement Project CRP No. 270-16 in the amount of
$701,231.00 to Hurst Construction.
BE IT FURTHER RESOLVED that the Director for the Department of Public Works is
authorized to sign the contract documents for said project.
DATED on this 18 th day of June, 2019, at Ellensburg, Washington.
-
ABSENT
D Deputy Clerk of the Board-Mandy Buchholz
TEANAWAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY CREEK CULVERT REPLACEMENT
BIDS OPENED PUBLICLY AT 10:00 AM ON JUNE 6, 2019 AT KITTITAS COUNTY PUBLIC WORKS
RESPONSIVE BIDDER CRITERIA
PROPOSAL COMPLETE
NON-COUUSION OECLARATION
PROPOSAL BOND
LOCAL AGENCY SIGNATURE PAGE
WAGE LAW CERTIFICATION
SUBCONTRACTOR LIST !OPTIONAL!
BASE BID
EHGINEER'5 ESTIMATE
Belsa;,s & Smith . .
I
I
X
UOOEA•l
JTEM BID ITEM DESCRIPTION UNIT QTY UNIT COST COST UNIT COST COST I NO. ITEM
PREPARATION I
0001 1 MDBlLIZATION LS 1 S n.363.00 s 77,363.00 S 88,000.00 $ 88,000.00 j $
NSI 2 CLEARING ACRE. 0,18 S 30,000.00 "S 5;400.00 s 20.000.00 $ 3,600.00 $
0025 3 CLEARING AND GRUBBING LS 1 $ 5.000.00 S 5,000 .00 $ 16,000.00 $ 16,000.00 s
0050 4 "REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1 $ 2.500.00 s 2,500.00 s 12,000.00 $ 12,000.00 $
0070 5 REMOVING EXISTING STRUCTURE-STORY CRK BOX CULVERT LS 1 S 5,000.00 $ 5,000.00 s 18,000.00 $ 18,000.00 $
GRADING $_ .
0300 6 ROADWAY EXCAVATION INCL HAUL CY 115 $ 70.00 ~ 8.050 00 $ 60.00 $ 6,900.00 $
0405 7 COMMON B0RROWINCI...HAUL CY 1400 $ 17.00 S 23.800 00 S 30.00 $ 42,000.00 $
0470 8 EMBANKMENT COMPACTION CY 1400 S 10.00 S 14.000.00 s 11.00 $ 15,400.00 $
DRAINAGE $
0902 9 STREAMBED COBBLES 8 IN. IDN 136 S 75.00 S 10,200.00 $ 75.00 $ 10,200.00 $
0904 10 STREAMBED COBBLES 12 IN, TON 5 S 75.00 S 375 00 $ 150.00 $ 750.00 s
0906 11 STREAMBED BOULDER ONE MAN TON .29 s 1.200.00 S 34:800.00 s 110.00 $ 3,190.00 $
1093 12 STR£,i\Ml!Ell SEDIMENT TON 73 S 75.00 S 5,475 00 s 75.00 s 5 ,475.00 $
NSI 13 FORCE ACCO!JNT • STREAM9EO SAflO OOL 5000 $ 1.00 S 5.000.00 $ 1.00 $ 5.000.00 s
1180 14 SCHEDULE A CULV PIPE12 IN, DIAM L.F 110 $ 70.00 S 7,700.00 S 65.00 $ 7,150.00 $
3026 ,s PRECAST REJNF. CONC. SPLIT BOX CULVERT N0 .1 LS 1 S 200,000 .00 s 200 .00000 s 208,000.00 s 208,000.00 $
3030 16 CUL VERT BEDDING IMTERIAL C.Y 40 S 100.00 S 4,000.00 S 100.00 $ 4.000.00 $
3075 17 TEr.lPORARYSTREAI.I DIVERS10N LS 1 $ 20,000.00 $ 20.000.00 s 6],000.00 $ 63,000.00 $
NSI 18 LOG WITH ROOTWAD EACH .3 s· 500.00 s 1.500.00 s 900.00 $ 2,700.00 $
STRUCTURE $
4006 19 STRUCTURE EXCAVATION Cl.ASSA INCL H,\UL C.Y 620 $ 3000 s 180600.00 $ 42.00 $ 26,040.00 s
4013 20 SHORING OF EXTRA EXCAVATION CL. A LS 1 S 25,00000 $ 2.S.00000 s 22 ,000.00 $ 22,000.00 $
4025 21 GR,WEl. BACKfll.l. FOR WALL CY 170 S 6000 $ 10.200.00 $ 90 .00 $ 15,300.00 $
SURFAC ING $
5100 22 CRUSHED SURFACING BASE COURSE TON 250 $ 5000 s 12,500.00 $ 56.00 s 14,000.00 s
HOT MIX ASPHALT s $
5767 23 HMA CL 1/2 IN. PG 64-28 TON 110 s 150.00 S 16.500.00 $ 127.00 $ 13,970.00 $
1'2~1i,(2
Pipkin Construction Hurst Consbuction . I
I I
I 11
X X
X X
X
BIDDER #2 IITDDf!l.•3
UNIT COST COST UNIT COST COST
80.000.00 s 80,000.00 $ 50,000.00 $ 50,000.00
10,000.00 $ 7,200.00 $ 20,000.00 s 3,600,00
10,000.00 $ 10,000.00 $ 5,000.00 S 5,000.00
12,000.00 $ 12..000.00 $ 10,000.00 $ 10,000.00
25,000.00 $ 25,000.00 $ 15,000.00 $ 15,000.00
$ s
65.00 $ 7,475.00 $ 50.00 $ 5,750.00
31-00 $ 43.'100.00 S 30.00 $ 42;000.00
4 50 $ 6,300.00 $ 5.00 $ 7,000.00
$ $ .
53.00 $ 7,208.00 $ 60.00 $ 8,160,00
115.00 s 575,00 $ 60.00 $ 300,00
55.00 s 1,595.00 $ $0,00 $ 2,320.00
'10.00 $ 2.920.00 $ so .co $ 3,650.00
1.00 $ 5J)OO.OO S 1.00 $ 5,000.00
32.00 $ 3,520.00 $ 35,00. $ 3 ,850.00
250,000.00 $ 250.000.00 $ 225,000.00 $ 225,000 00
200 .. 00 $ 8,000.00 $ 150.00 s 6,00000
20,000.00 s 20,000.00 S lS",Cll(Mlll $ 25,000.00
1,200.00 $ 3,600.00 $ 1,500.00 $ 4,500.00
$ $
70.00 $ 43,400.00 $ 40.00 $ 2~,800.00
'10,000.00 $ 40,000.00 $ 20;000,00 $ 20,000.00
80.00 s 13 ,600.00 $ 100.00 $ 17,000,00
s . $
511:00 $ 15,000.00 $ 60.00 $ 15,000.00
$ $
125.00 $ 1).750.00 s 12s.oo s 13 ,750,00
TEANAWAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY CREEK CULVERT REPLACEMENT
BIDS OPENED PUBLICLY AT 10:00 AM ON JUNE 6, 2019 AT KITTITAS COUNTY PUBLIC WORKS
RESl'ONSIVE 8100ER CRITERIA
PROPOSAL COMPLETE
NON-COLLUSION DECLARATION
PROPOSAL BOND
LOCAL AGENCY SIGNATURE PAGE
WAGE LAW CERTIFICATION
SUBCONTRACTOR LIST ( OPTIONAL)
BASE BID
EHGIHEER'S ESTIMATE
Belsaa,i • Smith
X
X
•
&
X
BIDDER #1
ITEM BID ITEM DESCRIPTION UNIT QTY UNIT COST COST UNIT COST COST NO . ITEM
6403 24
6400 '25
6422 26
6408 27
6552 28
6552 29
6552 30
6552 31
6552 32
6552 &
6552 34
6552 35
6635 36
6711 37
6766 38
6719 39
6781 40
6806 41
6913 42
6971 43
7037 44
7038 45
7164 46
7480 47
7728 48
7736 49
7530 50
NSI 51
NSI 52
NSI 53
ERO~ONCONTROLANDROADSIDEPLANTING
~SC LEAD
EROSION /WATER POLLUTION CONTROL
SEEDING AND MULCHING
TOl'SOIL TYPE B
PSlPE WOODS ROSE
PS IPE SNOWBERRY
PSIPE OOUGL.\S HAW\HQRJ(
PSIPE1HINI.EAF ACDER
PSIPE OCEANSPRA Y
PSIPE BLUE Et.r:ERBERRY
PSIPE COYOI£ \'In.LOW U'll: Pl OE PLACEMENT
PSIFE COTTON'N()OD LIVE POLE PL.I.CEMENT
HIGH Vlsrallrn' Sill FENCE
lRAFAC
BEAM GUARDRAIL TYPE 31 -8 FT. LONG POST
BE/.M GUARDfWI. ANCHORiYPE 10
BEAM GUARDR,\Jl 1Yl'E 31 1''<JN-fl.AAEOiER.MiRA.i.
TEMPORARY BARRIER
PAINT LINE
PORTABLE TEMPORARY TRAFFIC CONT!sOLSIGN.O.L
F'ROJECT TEIIPORAR'\' TRAFFI C <:pllTROl
OlHERITEMS
STRUCTURE SURVEYING
P!JAOIYAY. S'JRVEY ING
GRAVITY BLOCK WALL
ROA.OSIOECLFANl,JP
MINOR CIWIGE
SPCC.PLAN
CONSTRUCTION GEO TEXT ILE FOR SEPARATION
SHORING WALL
•EMl'O RIIRY BRIDGE OEl.lVEflY MIO PL-\CEJ.lENT
!lS.lOVAl AHO_ RESTORATION Of OETOUR
TOTAL CONSTRUCTION COST
Bids have ~ Iii~ for accuracy, unbalan cing ol bid ~
Tabula!ion s have been checked and confinned
DAY 10 S
DOL 5000 S
ACRE 0.12 S
ACRE 0.1 ~ S
Ei\Cfl 11 S
EACH 11 S
EACH 50 $
EACH 80 $
EACH 80 $
EACH 80 S
EACH 115 S
EACH 55 S
LF 510 S
LF 40 0 S
EACH 2 $
EACH 1 S
LF 3611 S
Lr' 1200 S
LS 1 $
LS 1 S
LS , s
LS 1 $
SF 225 S
OOL 10000 $
CALC 1 $
LS 1 $
SY 880 $
LS 1 S
LS 1 $
l.S 1 S
s
$ .
150.00 $ 1,500.00 $ 100.00 $ 1,000.00 $
1-CXI $' S:000 .00 s 1.00 $ 5,000.00 $
6J JOO.OO S· 720.00 $ 12,500.00 $ 1,500.00 $
15.000 00 S 1,800.00 $ 20,000 .00 $ 2,400.00 $
1500 $ 165.00 $ 32 .00 $ 352 .00 $
1500 $ 165.00 S 32 .00 S 352,00 $
10.00 $ 500.00 S 28.00 s 1.400.00 $
16.00 $ 1,280.00 $ 2'1.00 $ 1,920.00 s
1500 $ 1,200.00 S 24.00 $ 1,920.00 $
1500 s 1,200.00 S 24.00 $ 1,920.00 $
16Jl0 s 1.840.00 $ 2'1.00 S 2,760.00 $
7.00 s 385.00 $ 24.00 $ 1,320.00 $
8.00 $ 4,080.00 s 5.00 s 2.550 .00 $
$
35 .00 $ 14,000.00 $ 32 .00 $ 12,800.00 $
1.000.00 s 3,600 .00 $ 1,300.00 s 2,600 .00 $
3,000.00 $ 3,000.00 $ 3,300 .00 S 3,300.00 $
2000 $ 7.200 .00 $ 25 .00 $ 9.000.00 $
4 00 $ 4,800 00 s 2.00 $ 2,400 .00 s
20.00000 S 20 ,000 .00 s 36,000 .00 $ 36,000,00 s
20,00000 i. 20.000.00 $ 24,000 .00 $ 2'1 ,000.00 $
s
10,000.00 S 10,000.00 s '1 ,000 .00 $ 4,000.00 $
7,500.00 s 7,500.00 $ 7,000 .00 $ 7,000.00 $
3500 s 7,875.00 $ 26.00 S 5,850.00 $
1 00 :r 10.000.00 $ LOO $ 10,000.00 $
1.000.00 s 1,000.00 s 1.00 $ 1.00 $
2.000 .00 S 2,000 .00 $ 500 .00 S 500.00 $
600 S 5,280.00 $ 2.00 s 1,760.00 $
10,000.00 s· 10,000.00 $ 9,000.00 $ 9,000.00 $
50.00000 $ 50.000 .00 s 7'1,000.00 $ 7~.000 .00 $
15,000 .00 s 15,000 .00 $ 68,000.00 $ 68,000 .0D $
724,053 00 S 897 ,280.00 $
PiJ*i n Con5tnlctioa Hurst COftllnlcbon
' I
• .
X '
• •
• •
•
BIOOER #2 llDOER .ri:3
UNIT COST COST UNIT COST COST
$ . s
150.00 $ 1,500.00 $ 100.00 $ 1,000.00
1.00 $ 5,000.00 $ 1.00 $ 5,000 .00
20,000 .00 $ 2.400.00 $ 25,000.00 $ 3,000.00
20,000.00 $ 2,400.00 $ 30,000.00 $ 3,600.00
22.00 $ 242 .00 $ 40.00 $ 440.00
22.00 $ 242 .00 $ 40.00 $ 440.00
22.00 $ 1,100.00 $ 40.00 s l))Q).00
22.00 S 1.1~.oo s 40 00 $ 3,200.00
22.00 I 1,760.00 $ 40.00 $ 3;200:00
2200 S 1.760 .00 $ 40.00 $ 3.200.00
11 .00 S 1,265.00 $ 25.00 $ 2.ll75 .00
11 .00 $ 605 .00 $ 25.00 $ 1,375 .00
7.00 $ 3,570.00 $ 10.00 ' 5,1 00 ,00
$ . s .
30,00 s 12,000.00 $ 35.00 s 14.000,00
1,300.00 $ 2.600 .00 $ 1,250.00 $ 2,500 .00
3,200 00 $ 3.200 .00 s 3,500 .00 $ 3,500.00
21.00 I s 7,560.00 s. 40 .00 $ 14,400.00
1.60 $ 1,920.00 $ 0.80 $ 960.00
30,000.00 s 30,000.00 $ 15 ,000 .00 $ 15.000.00
12,000.00 $ 12,000.00 s 10,000 .00 $ 10,000.00
$ s .
5.000.00 $ 5,000.00 $ 2,500.00 S· 2.500.00
8,000 .00 s 8,000.00 $ 5,000 .00 $ 5,000.00
Iii.OD $ 13,950.00 $ 40.00 $ 9,000.00
1.00 $ 10,000.00 $ ..ioo $ 10,000.00
1.00 S 1.00 s 100 $ LOO
1,500 .00 $ 1.500.00 $ 500.00 $ 500.00
3.00 $ 1,6-lO .OO $ 2.00 $ 1,760:00
5,000.00 $ 5,000 .00 $ 25,000.00 $ 25 ,000.00
51 ,000 .00 $ si.000.00 $ 20.000.00 s 21),000.00
50,000 .00 $ 50,000 .00 $ 20 ,000.00 s 20,000.00
859,518 .00 $ 701 ,231 00