HomeMy WebLinkAboutRes-2019-105BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2019-//) E TO A WARD THE CONTRACT FOR THE TEANA WAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY CREEK CULVERT REPLACEMENT PROJECT CRP NO. 270-16 AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME WHEREAS: The Department of Public Works solicited bids for the Story Creek Culvert Replacement Project CRP No. 270-16 contract in accordance with RCW 36.77.020 Contract Procedures; and WHEREAS: Sealed bids were opened on June 06, 2019 at 10:00 a.m. in the Kittitas County Permit Center, Department of Public Works , 411 N. Ruby Street, Suite 1, Ellensburg, Washington; and WHEREAS: Three (3) bids were received for the prescribed work. The Director of Public Works recommends the lowest responsive bid be accepted; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the Story Creek Culvert Replacement Project CRP No. 270-16 in the amount of $701,231.00 to Hurst Construction. BE IT FURTHER RESOLVED that the Director for the Department of Public Works is authorized to sign the contract documents for said project. DATED on this 18 th day of June, 2019, at Ellensburg, Washington. - ABSENT D Deputy Clerk of the Board-Mandy Buchholz TEANAWAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY CREEK CULVERT REPLACEMENT BIDS OPENED PUBLICLY AT 10:00 AM ON JUNE 6, 2019 AT KITTITAS COUNTY PUBLIC WORKS RESPONSIVE BIDDER CRITERIA PROPOSAL COMPLETE NON-COUUSION OECLARATION PROPOSAL BOND LOCAL AGENCY SIGNATURE PAGE WAGE LAW CERTIFICATION SUBCONTRACTOR LIST !OPTIONAL! BASE BID EHGINEER'5 ESTIMATE Belsa;,s & Smith . . I I X UOOEA•l JTEM BID ITEM DESCRIPTION UNIT QTY UNIT COST COST UNIT COST COST I NO. ITEM PREPARATION I 0001 1 MDBlLIZATION LS 1 S n.363.00 s 77,363.00 S 88,000.00 $ 88,000.00 j $ NSI 2 CLEARING ACRE. 0,18 S 30,000.00 "S 5;400.00 s 20.000.00 $ 3,600.00 $ 0025 3 CLEARING AND GRUBBING LS 1 $ 5.000.00 S 5,000 .00 $ 16,000.00 $ 16,000.00 s 0050 4 "REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1 $ 2.500.00 s 2,500.00 s 12,000.00 $ 12,000.00 $ 0070 5 REMOVING EXISTING STRUCTURE-STORY CRK BOX CULVERT LS 1 S 5,000.00 $ 5,000.00 s 18,000.00 $ 18,000.00 $ GRADING $_ . 0300 6 ROADWAY EXCAVATION INCL HAUL CY 115 $ 70.00 ~ 8.050 00 $ 60.00 $ 6,900.00 $ 0405 7 COMMON B0RROWINCI...HAUL CY 1400 $ 17.00 S 23.800 00 S 30.00 $ 42,000.00 $ 0470 8 EMBANKMENT COMPACTION CY 1400 S 10.00 S 14.000.00 s 11.00 $ 15,400.00 $ DRAINAGE $ 0902 9 STREAMBED COBBLES 8 IN. IDN 136 S 75.00 S 10,200.00 $ 75.00 $ 10,200.00 $ 0904 10 STREAMBED COBBLES 12 IN, TON 5 S 75.00 S 375 00 $ 150.00 $ 750.00 s 0906 11 STREAMBED BOULDER ONE MAN TON .29 s 1.200.00 S 34:800.00 s 110.00 $ 3,190.00 $ 1093 12 STR£,i\Ml!Ell SEDIMENT TON 73 S 75.00 S 5,475 00 s 75.00 s 5 ,475.00 $ NSI 13 FORCE ACCO!JNT • STREAM9EO SAflO OOL 5000 $ 1.00 S 5.000.00 $ 1.00 $ 5.000.00 s 1180 14 SCHEDULE A CULV PIPE12 IN, DIAM L.F 110 $ 70.00 S 7,700.00 S 65.00 $ 7,150.00 $ 3026 ,s PRECAST REJNF. CONC. SPLIT BOX CULVERT N0 .1 LS 1 S 200,000 .00 s 200 .00000 s 208,000.00 s 208,000.00 $ 3030 16 CUL VERT BEDDING IMTERIAL C.Y 40 S 100.00 S 4,000.00 S 100.00 $ 4.000.00 $ 3075 17 TEr.lPORARYSTREAI.I DIVERS10N LS 1 $ 20,000.00 $ 20.000.00 s 6],000.00 $ 63,000.00 $ NSI 18 LOG WITH ROOTWAD EACH .3 s· 500.00 s 1.500.00 s 900.00 $ 2,700.00 $ STRUCTURE $ 4006 19 STRUCTURE EXCAVATION Cl.ASSA INCL H,\UL C.Y 620 $ 3000 s 180600.00 $ 42.00 $ 26,040.00 s 4013 20 SHORING OF EXTRA EXCAVATION CL. A LS 1 S 25,00000 $ 2.S.00000 s 22 ,000.00 $ 22,000.00 $ 4025 21 GR,WEl. BACKfll.l. FOR WALL CY 170 S 6000 $ 10.200.00 $ 90 .00 $ 15,300.00 $ SURFAC ING $ 5100 22 CRUSHED SURFACING BASE COURSE TON 250 $ 5000 s 12,500.00 $ 56.00 s 14,000.00 s HOT MIX ASPHALT s $ 5767 23 HMA CL 1/2 IN. PG 64-28 TON 110 s 150.00 S 16.500.00 $ 127.00 $ 13,970.00 $ 1'2~1i,(2 Pipkin Construction Hurst Consbuction . I I I I 11 X X X X X BIDDER #2 IITDDf!l.•3 UNIT COST COST UNIT COST COST 80.000.00 s 80,000.00 $ 50,000.00 $ 50,000.00 10,000.00 $ 7,200.00 $ 20,000.00 s 3,600,00 10,000.00 $ 10,000.00 $ 5,000.00 S 5,000.00 12,000.00 $ 12..000.00 $ 10,000.00 $ 10,000.00 25,000.00 $ 25,000.00 $ 15,000.00 $ 15,000.00 $ s 65.00 $ 7,475.00 $ 50.00 $ 5,750.00 31-00 $ 43.'100.00 S 30.00 $ 42;000.00 4 50 $ 6,300.00 $ 5.00 $ 7,000.00 $ $ . 53.00 $ 7,208.00 $ 60.00 $ 8,160,00 115.00 s 575,00 $ 60.00 $ 300,00 55.00 s 1,595.00 $ $0,00 $ 2,320.00 '10.00 $ 2.920.00 $ so .co $ 3,650.00 1.00 $ 5J)OO.OO S 1.00 $ 5,000.00 32.00 $ 3,520.00 $ 35,00. $ 3 ,850.00 250,000.00 $ 250.000.00 $ 225,000.00 $ 225,000 00 200 .. 00 $ 8,000.00 $ 150.00 s 6,00000 20,000.00 s 20,000.00 S lS",Cll(Mlll $ 25,000.00 1,200.00 $ 3,600.00 $ 1,500.00 $ 4,500.00 $ $ 70.00 $ 43,400.00 $ 40.00 $ 2~,800.00 '10,000.00 $ 40,000.00 $ 20;000,00 $ 20,000.00 80.00 s 13 ,600.00 $ 100.00 $ 17,000,00 s . $ 511:00 $ 15,000.00 $ 60.00 $ 15,000.00 $ $ 125.00 $ 1).750.00 s 12s.oo s 13 ,750,00 TEANAWAY ROAD HYDRAULIC IMPROVEMENTS PHASE 1: STORY CREEK CULVERT REPLACEMENT BIDS OPENED PUBLICLY AT 10:00 AM ON JUNE 6, 2019 AT KITTITAS COUNTY PUBLIC WORKS RESl'ONSIVE 8100ER CRITERIA PROPOSAL COMPLETE NON-COLLUSION DECLARATION PROPOSAL BOND LOCAL AGENCY SIGNATURE PAGE WAGE LAW CERTIFICATION SUBCONTRACTOR LIST ( OPTIONAL) BASE BID EHGIHEER'S ESTIMATE Belsaa,i • Smith X X • & X BIDDER #1 ITEM BID ITEM DESCRIPTION UNIT QTY UNIT COST COST UNIT COST COST NO . ITEM 6403 24 6400 '25 6422 26 6408 27 6552 28 6552 29 6552 30 6552 31 6552 32 6552 & 6552 34 6552 35 6635 36 6711 37 6766 38 6719 39 6781 40 6806 41 6913 42 6971 43 7037 44 7038 45 7164 46 7480 47 7728 48 7736 49 7530 50 NSI 51 NSI 52 NSI 53 ERO~ONCONTROLANDROADSIDEPLANTING ~SC LEAD EROSION /WATER POLLUTION CONTROL SEEDING AND MULCHING TOl'SOIL TYPE B PSlPE WOODS ROSE PS IPE SNOWBERRY PSIPE OOUGL.\S HAW\HQRJ( PSIPE1HINI.EAF ACDER PSIPE OCEANSPRA Y PSIPE BLUE Et.r:ERBERRY PSIPE COYOI£ \'In.LOW U'll: Pl OE PLACEMENT PSIFE COTTON'N()OD LIVE POLE PL.I.CEMENT HIGH Vlsrallrn' Sill FENCE lRAFAC BEAM GUARDRAIL TYPE 31 -8 FT. LONG POST BE/.M GUARDfWI. ANCHORiYPE 10 BEAM GUARDR,\Jl 1Yl'E 31 1''<JN-fl.AAEOiER.MiRA.i. TEMPORARY BARRIER PAINT LINE PORTABLE TEMPORARY TRAFFIC CONT!sOLSIGN.O.L F'ROJECT TEIIPORAR'\' TRAFFI C <:pllTROl OlHERITEMS STRUCTURE SURVEYING P!JAOIYAY. S'JRVEY ING GRAVITY BLOCK WALL ROA.OSIOECLFANl,JP MINOR CIWIGE SPCC.PLAN CONSTRUCTION GEO TEXT ILE FOR SEPARATION SHORING WALL •EMl'O RIIRY BRIDGE OEl.lVEflY MIO PL-\CEJ.lENT !lS.lOVAl AHO_ RESTORATION Of OETOUR TOTAL CONSTRUCTION COST Bids have ~ Iii~ for accuracy, unbalan cing ol bid ~ Tabula!ion s have been checked and confinned DAY 10 S DOL 5000 S ACRE 0.12 S ACRE 0.1 ~ S Ei\Cfl 11 S EACH 11 S EACH 50 $ EACH 80 $ EACH 80 $ EACH 80 S EACH 115 S EACH 55 S LF 510 S LF 40 0 S EACH 2 $ EACH 1 S LF 3611 S Lr' 1200 S LS 1 $ LS 1 S LS , s LS 1 $ SF 225 S OOL 10000 $ CALC 1 $ LS 1 $ SY 880 $ LS 1 S LS 1 $ l.S 1 S s $ . 150.00 $ 1,500.00 $ 100.00 $ 1,000.00 $ 1-CXI $' S:000 .00 s 1.00 $ 5,000.00 $ 6J JOO.OO S· 720.00 $ 12,500.00 $ 1,500.00 $ 15.000 00 S 1,800.00 $ 20,000 .00 $ 2,400.00 $ 1500 $ 165.00 $ 32 .00 $ 352 .00 $ 1500 $ 165.00 S 32 .00 S 352,00 $ 10.00 $ 500.00 S 28.00 s 1.400.00 $ 16.00 $ 1,280.00 $ 2'1.00 $ 1,920.00 s 1500 $ 1,200.00 S 24.00 $ 1,920.00 $ 1500 s 1,200.00 S 24.00 $ 1,920.00 $ 16Jl0 s 1.840.00 $ 2'1.00 S 2,760.00 $ 7.00 s 385.00 $ 24.00 $ 1,320.00 $ 8.00 $ 4,080.00 s 5.00 s 2.550 .00 $ $ 35 .00 $ 14,000.00 $ 32 .00 $ 12,800.00 $ 1.000.00 s 3,600 .00 $ 1,300.00 s 2,600 .00 $ 3,000.00 $ 3,000.00 $ 3,300 .00 S 3,300.00 $ 2000 $ 7.200 .00 $ 25 .00 $ 9.000.00 $ 4 00 $ 4,800 00 s 2.00 $ 2,400 .00 s 20.00000 S 20 ,000 .00 s 36,000 .00 $ 36,000,00 s 20,00000 i. 20.000.00 $ 24,000 .00 $ 2'1 ,000.00 $ s 10,000.00 S 10,000.00 s '1 ,000 .00 $ 4,000.00 $ 7,500.00 s 7,500.00 $ 7,000 .00 $ 7,000.00 $ 3500 s 7,875.00 $ 26.00 S 5,850.00 $ 1 00 :r 10.000.00 $ LOO $ 10,000.00 $ 1.000.00 s 1,000.00 s 1.00 $ 1.00 $ 2.000 .00 S 2,000 .00 $ 500 .00 S 500.00 $ 600 S 5,280.00 $ 2.00 s 1,760.00 $ 10,000.00 s· 10,000.00 $ 9,000.00 $ 9,000.00 $ 50.00000 $ 50.000 .00 s 7'1,000.00 $ 7~.000 .00 $ 15,000 .00 s 15,000 .00 $ 68,000.00 $ 68,000 .0D $ 724,053 00 S 897 ,280.00 $ PiJ*i n Con5tnlctioa Hurst COftllnlcbon ' I • . X ' • • • • • BIOOER #2 llDOER .ri:3 UNIT COST COST UNIT COST COST $ . s 150.00 $ 1,500.00 $ 100.00 $ 1,000.00 1.00 $ 5,000.00 $ 1.00 $ 5,000 .00 20,000 .00 $ 2.400.00 $ 25,000.00 $ 3,000.00 20,000.00 $ 2,400.00 $ 30,000.00 $ 3,600.00 22.00 $ 242 .00 $ 40.00 $ 440.00 22.00 $ 242 .00 $ 40.00 $ 440.00 22.00 $ 1,100.00 $ 40.00 s l))Q).00 22.00 S 1.1~.oo s 40 00 $ 3,200.00 22.00 I 1,760.00 $ 40.00 $ 3;200:00 2200 S 1.760 .00 $ 40.00 $ 3.200.00 11 .00 S 1,265.00 $ 25.00 $ 2.ll75 .00 11 .00 $ 605 .00 $ 25.00 $ 1,375 .00 7.00 $ 3,570.00 $ 10.00 ' 5,1 00 ,00 $ . s . 30,00 s 12,000.00 $ 35.00 s 14.000,00 1,300.00 $ 2.600 .00 $ 1,250.00 $ 2,500 .00 3,200 00 $ 3.200 .00 s 3,500 .00 $ 3,500.00 21.00 I s 7,560.00 s. 40 .00 $ 14,400.00 1.60 $ 1,920.00 $ 0.80 $ 960.00 30,000.00 s 30,000.00 $ 15 ,000 .00 $ 15.000.00 12,000.00 $ 12,000.00 s 10,000 .00 $ 10,000.00 $ s . 5.000.00 $ 5,000.00 $ 2,500.00 S· 2.500.00 8,000 .00 s 8,000.00 $ 5,000 .00 $ 5,000.00 Iii.OD $ 13,950.00 $ 40.00 $ 9,000.00 1.00 $ 10,000.00 $ ..ioo $ 10,000.00 1.00 S 1.00 s 100 $ LOO 1,500 .00 $ 1.500.00 $ 500.00 $ 500.00 3.00 $ 1,6-lO .OO $ 2.00 $ 1,760:00 5,000.00 $ 5,000 .00 $ 25,000.00 $ 25 ,000.00 51 ,000 .00 $ si.000.00 $ 20.000.00 s 21),000.00 50,000 .00 $ 50,000 .00 $ 20 ,000.00 s 20,000.00 859,518 .00 $ 701 ,231 00