Loading...
HomeMy WebLinkAboutRes-2019-089 CRSBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESoLUTToN No. 2ors - of q RATIFY THE CHAIR'S SIGNATURE ON COMMUNITY RATING SYSTEM CC.23O VERIFICATION FEMA FORM 086-0-354 WHEREAS: Public'Works is required to verify Community Rating System (CRS) compliance on a five year cycle; and WHEREAS: Public'Works was required to submit compliance documentation on }if.ay 29,2019 and said submittal required the Chair's signature; and WHEREAS: The submittal deadline with CRS did not afford full Board of County Commission action; and WHEREAS: The Chair of the Board was able to sign submittal documents meeting the CRS deadline supporting Public Works required submittal; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby ratify the Chair's signature on Community Rating System CC-230 Verification FEMA FORM 086-0-354. DATED this 4th day of June,2019, at Ellensburg, 'Washinglon. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, V/ASHINGTON Cory of the Board- Julie Kjorsvik Brett th, Vice-Chairman I Depuiy Clerk of the Board- Mandy Buchholz ABSENT Laura Osiadacz, Commissioner OMB Control Number: 1660-0022 3t3112020 CC-230 Verification State WACommunitY KittitasCounty (6-digit NFIP Community ldentification Number) ctD 530095 lnitial FIRM Date 5/5/1981May 30,20'19Date of Visit Current FIRM Date 5/5/'198'147,364Population ISO/CRS Specialist Marlene JacobsCountyKittitas County Coordinator'sManualYear FIA-1512017 CRS CoordinatorChief Executive Offìcer Karen HodgesCory WrightName Floodplain ManagerChairman, Board of CommissionersTitle 411 N Ruby Street, Suite 1 Ellensburg, WA 98926 205 West 5th Avenue, Suite 108 Ellensburg, WA 98926 Address (50e) e62 7523(509) 962-7508Phone number karen. hodges@co. kittitas.wa. uscory.wrig ht@co. kittitas.wa. usE-mail address I hereby certify that Kittitas County [community name] is implementing the following activities [check the ones that applyl. We will continue to implement these activities and will advise FEMA if any of them are not being conducted in accordance with this certifìcation. We will cooperate with the ISO/CRS Specialist's verifìcation visit and will submit the documentation and annual recertification needed to validate our Program. 31 0 (Elevation Certificates) 320 (Map lnformation Service) 330 (Outreach Projects) 340 (Hazard Disclosure) 350 (Flood Proteclion lnformation) 360 (Flood Protection Assistance) 370 (Flood lnsurance Promotion) 410 (Floodplain Mapping) 420 (Open Space Preservation) 430 (Higher Regulatory Standards) 440 (Flood Data Maintenance) 450 (Stormwater Management) (Repetitive Loss Requirements) 51 0 (Floodplain Management Planning) 520 (Acquisition and Relocation) 530 (Flood Protection) 540 (Drainage System Maintenance) 610 (Flood Warning and Response) 620 (Levees) 630 (Dams) X tr ! E T xI tr T X X X X I hereby ceftify that, to the best of my knowledge and belief, we are in full compliance with the minimum requirements of the NFIP and we understand that we must remain in full compliance with the minimum requirements of the NFIP. We understand that at any time we are not to be in full compliance, we will retrograde to a CRS Class ''t0. ': ':' . :" ir- cc-230-1 X FEMA FORM 086-0-354 (04t17)Page 5 of 13 OMB Control Number: 1660-0022 3t31t2020 CommunitY Kittitas CountY State WA ctD 530095 (6-digit NFIP Community ldentification Number) I hereby certify that we will maintain FEMA Elevation Certificates on all new buildings and substantial improvements constructed in the Special Flood Hazard Area following the date at which we joined the CRS. I hereby certify that if there are one or more repetitive loss properties in our community that we must take certain actions that include reviewing and updating the list of repetitive loss properties, mapping repetitive loss areas, describing the cause of the losses, and sending an outreach project to those areas each year, and if we have fifty (50) or more repetitive loss properties must also prepare a plan of how it will address its repetitive flood problem. I hereby certify that, to the best of my knowledge and belief, we are maintaining in force all flood insurance policies that have been required of us as a condition of Federal financial assistance for insurable buildings owned by us and located in the Special Flood Hazard Area shown on our Flood lnsurance Rate Map. I further understand that disaster assistance for any community-owned building located in the Special Flood Hazard Area is reduced by the amount of National Flood lnsurance Program flood insurance coverage (structural and contents) that a community should be carrying on the building, regardless of whether the community is carrying a policy. .,'4 Signature (Chief Executive Officer) cc-230-2 FEMA FORM 086-0-354 (04117)Page 6 of 13 OMB Control Number: 1660-0022 3t31t2020 Community Kittitas County State WA ctD 530095 (6{ig¡t NFIP Community ldentification Number) Comments: note the number of the line to which the comment CRS Program Data Table A. ln the SFHA B. ln a regulated floodplain outside the SFHA C. ln the rest of the community '1. Last report's number of buildings in the SFHA (bSF) (line ô, last report)1505 2. Number of new buildings constructed since last report +4 3. Number of buildings removed/demolished since last report NA 4. Number of buildings affected by map revisions since last report (+ or -)revision 5. Number of buildings affected by corporate limits changes (+ or I revtston 6. Gurrent total number of buildings in the SFHA (bSF) (total lines 1 -5)revision 7. Number of substantial improvemenVdamage projects since last report 0 8. Number of repetitive loss properties mitigated since last report 0 9. Number of LOMRs and map revisions (not LOMAs) since last report I 10. Acreage of the SFHA (aSFHA) as of the last report (line 13, last report)20939 11. Acreage of area(s) affected by map revisions since last report (+ or -)revtston 12. Acreage of area(s) affected by corporate limits changes (+ or ,NA 13. Cunent acreage of the SFHA (aSFHA) (total lines 10-12)Revision 14. Primary source for building data:GIS Mapping 15. Primary source for area data:GIS Mapping 16. Period covered October 2018 - May 201 9 Current FIRM date 05/05/2019 lf available, the following data would be useful: 17. Number of new manufactured homes installed since last report 2 18. Number of other new 1 4 family buildings constructed since last report 1 19. Number of all other buildings constructed/installed since last report NA Lines 4-6, 11, and 13 are all under revision at this date (May 29, 2019). Locations within the LOMR for Currier Creek and parts of Reecer Creek have not been counted thoroughly because of remapping. Kittitas County has recently received and begun using data from the 2O19 Draft Hazard Mitigation Plan Update. We now have access to building footprints in most areas of Kittitas County. This information will be updated after LOMR Analysis is complete. Please be aware that Preliminary FEMA Map Updates are still moving forward. Kittitas County expects to receive the Letter of Final Determination from FEMA soon. After that point the County will have the opportunity to re-analyze the acreage in the SFHA and accept the maps within 6 months of LFD. Notes by Karen Hodges, Floodplain Manager for Kittitas County. We will provide notice to all the agencieswhen the information is received. KH - 2019 cc-230-3 FEMA FORM 086-0-354 (04t17)Page 7 of 13 OMB Control Number: 1660-0022 3t31t2020 Community Kittitas County State WA ctD 530095 (6-digit NFIP Community ldentification Number) lnstructions At the first verifìcation visit after the 2013 CRS Coordinatof s Manuallakes effect, ONLY LINES 6 AND 13 NEED TO BE COMPLETED' These lines form the baseline data about the number of buildings and area of the SFHA for when the table is completed as part of the next annual recertification. The "period covered" entered in line 16 is the date that lines 6 and 13 are first completed. At all subsequent annual recertifications and cycle verification visits, the entire table is completed. The information in lines 6 and 13 from the last report is transferred to lines 1 and 10 in the next report. lnstructions for the Columns Column A numbers are for the SFHA (the A and V Zones shown on the Flood lnsurance Rate Map) (FIRM)). Use the FIRM currently in effect, not a draft or pending revision. Column B is completed only if the community receives CRS credit for regulating floodplain development outside the SFHA underActivity 410 (Floodplain Mapplng) or Aclivity 430 (Higher Regulatory Standards). Golumn C numbers help relate what happens in the floodplain to what is happening in the rest of the community. Enter "0" if there are no numbers to report for this period. Do not leave a cell blank. Do not fill in the shaded boxes. lnstructions for the Lines Lines 1-7 deal with buildings. o Section 301.a of the CRS Coordinatols Manual defines what constitutes a "building" and lists examples of structures that are not counted as "buildings" bY the CRS. o Section 302.a of the CRS Coordinatols Manual describes how the CRS counts buildings. For example, accessory structures are not counted.o As noted in Section 302.a, to determine building counts, communities may use any method that yields reasonably good estimates of the number of buildings. Examples of acceptable methods are listed in Section 302.a. Precision is less important for large numbers. For example, the impact of the numbers will not change much if there are 1 0,000 buildings or 1 0, 100 buildings. o lf a building is out of the SFHA, but in a parcel that is partly in the SFHA, it is not counted in column A -ln the SFHA. o ln line '14, note how the building counts were obtained or estimated. Use the comments area, if needed. Line 4 refers to map revisions. These include physical map revisions, Letters of Map Revision (LOMR), and Letters of Map Amendment (LOMA). lf a building is removed from the SFHA by FEMA through a LOMA, but the community still administers its floodplain management iegulations on the property, the building should not be included in the line 4 count in column A -ln the SFHA. However, communities that still regulate areas removed by LOMAs can receive credit under Activities 410 or 430. lf the community is receiving such credit, the building should be counted under column B -ln a regulated floodplain outside the sFHA. Line 7 is for the total number of buildings that were substantially improved plus the number of buildings that were substantially damaged during the period covered. Lines 10 -13 deal with areas. o These areas are based on the areas shown on the community's FIRM including LOMRs or LOMAs. Section 403.b discusses those portions of the SFHA that are subtracted from the area of the SFHA to calculate the community's aSFHA used in credit calculations. o Section 403.e of the CRS Coordinatot's Manual discusses calculating areas for GRS purposes. o Section 403.e notes that communities "should not spend an inordinate amount of time measuring areas." As with buildings, communities may use any method that yields reasonably good estimates. Examples of acceptable approaches are listed in Section 403.e. o Line 13 asks for the current acreage of the SFHA. The best source for this number is a GIS layer that shows the SFHA. lf the community does not have GlS, the county, regional agency, or state NFIP mapping office may have SFHA layers and may be able to provide the data. lf the community has a relatively recent FIRM, the study contractor or consulting engineer may have the data. o ln line 15, note how the area calculations were obtained or estimated. Use the comments area, if needed. Lines 17 -19 are voluntary, if the nùmbers are readily available. o Line 17 includes replacing an existing manufactured home with a new one. The newly placed manufactured home is counted as a new, poslFlRM, building. o The total of lines 't7 -19 should equal the value entered in line 2. cc-230-4 FEMA FORM 086-0-35A (04t17\Page I of 13