HomeMy WebLinkAboutCC23_20190312 ( 2019 Q2)
Contract Change
Bainbridge Island Office: 350 Madison Avenue North, Bainbridge Island, WA 98110 (206) 780-9370
Bellingham Office: 907 Harris Avenue, Suite 301, Bellingham, WA 98225 (360) 746-8964
Bend Office: 532 SW 13th St., Ste. 103, Bend, OR 97702 (971) 865-5896
Seattle Office: 710 2nd Ave, Suite 550, Seattle, WA 98104 (206) 328-7443
Portland Office: 522 SW Fifth Avenue, Suite 301, Portland, OR 97204 (971) 865-5890
Wenatchee Office: 23 South Mission Street, Suite C, Wenatchee, WA 98801 (509) 888-5766
Yakima Office: 123 East Yakima Avenue, Suite 200, Yakima, WA 98901 (509) 895-5957
www.aspectconsulting.com
Contract No.: 23 Project No. : 150338 Date: March 12, 2019
Client: Kittitas County
Project Name: 2019 Water Right Technical Assistance
Description of Work Cost
Aspect Consulting (Aspect) is assisting Kittitas County with expanding its
water bank to cover all developable parcels in the County. Significant
over-the-county (OTC) and permit coverage exists in the Upper and
Lower County through past acquisitions and permitting related efforts.
Targeted expansions are planned for 2019 in harder to mitigate areas.
These include the following:
• Expansion of mitigation above KRD in the Lower County. A pilot
in the Wilson-Caribou subbasin is being coordinated by Ecology
currently that looks like it will be approved by April 2019. The
next step will be to seek further expansion into other subbasins.
• Expansion of green zone coverage through use of County in-lieu
fee or other mitigation projects in other key basins (e.g.
Teanaway).
• Completion of permitting for remaining back-mitigation
obligations.
• Expansion of the County’s portfolio to ensure adequate mitigation
for future growth.
Aspect will provide on-call permitting, hydrogeologic support, technical
support, Ecology coordination and facilitation, Water Transfer Working
Group attendance (as requested), or other services as directed by Kittitas
County. We understand that Kittitas County continues to add internal staff
capabilities to handle a greater percentage of water banking
responsibilities. In addition, the expectations of Ecology for complete
water bank coverage in the County cannot be readily predicted. In
addition, the expectations of Ecology for complete water bank coverage in
the County cannot be readily predicted. Based on the information
available, Aspect forecasts providing technical assistance not-to-exceed
$17,500 in the second quarter of 2019. Aspect will keep Kittitas County
updated monthly on progress towards meeting these goals.
Aspect proposes to complete
this work on a time-and-
materials basis, not-to-
exceed:
$17,500
Change Order No. 23
Project No. 150338
Page 2
This change amends contract between Aspect Consulting, LLC and Client dated November 6, 2013.
Except as amended above, all terms and conditions of contract apply to this contract change.
ASPECT CONSULTING, LLC
a limited liability company
By:
Printed Name: Daniel R. Haller, PE
Principal Water Resources Engineer
Office: Yakima
CLIENT
By:
Printed Name/Date:
V:\150338 Kittitas County General Permit Technical Assistance\Contracts\Proposal Material\CC23_20190312.docx