Loading...
HomeMy WebLinkAboutRes-2019-029 Award BidBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS ST A TE OF WASHINGTON RESOLU TIO N TO A WARD THE BID TO FURNISH MAINTENANCE ROCK MATERIALS FOR ONE (1) CALENDAR YEAR FOLLOWING CONTRACT EXECUTION AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO SIGN CONTRACT DOCUMENTS WHEREAS: A N otice of Call for Bids was approved and signed on January 15 , 2019, to furnish Maintenance Rock Materials for 2019; and WHEREAS: Sealed bids were opened on January 29 , 2019 at 2:00 pm in the Kittitas County Public Works Office and one (1) bid was received ; and WHEREAS: The Public Works Department recommends that the responsible bid of Ellensburg Cement Products , Inc. be accepted for Schedules "A ", "B " and "C " for Maintenance Rock Materials for one (1) calendar year following contract execution; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public , does hereby award the bid for 2019 Maintenance Rock Materials to Ellensburg Cement Products , Inc . for Schedules "A ", "B ", and "C ", upon such terms and conditions as specified in the Proposal submitted by said bidder(s); and BE IT FURTHER RESOLVED that the Director of Public Works is authorized to sign the contract documents upon such terms and conditions specified in the Proposal submitted by said bidder(s). DATED this 5th day of February, 2019, at Ellensburg , Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHING TON ABSENT D Deputy Clerk of the Board-Mandy Buchholz ' ' 2019 Maintenance Rock Materials Bid Opening January 29, 2019 at 2:00 p.m. SCHEDULE 'A' County to Provide Labor and Equipment to Load Materials ESTIMATED ITEM QUANTITY NO. (In TONS) Location ITEM DESCRIPTION Ellensburg Cement Products BIDDER PRICE PER PRICE PER TON TOTAL PRICE TON TOTAL PRICE 1 6 ,400 Ellensburg BST Crushed Surfacing 1/2 to No . 4 $10.25 $65 ,600 .00 $0 .00 2 4 ,700 East Kitt itas BST Crushed Surfacing 1/2 to No. 4 $10 .25 $48 ,175 .00 $0.00 - 3 3 ,400 Cle Elum BST Crushed Surfac\ng 1/2 to No . 4 $10 .25 $34 ,850.00 $0 .00 -·---!-----·---·- 4 1 ,700 Easton BST Crushed Surfacing 1/2 to No . 4 $16 .25 $27 ,625.00 -·- 5 2 ,400 Ellensburg BST Crushed Surfacing 3/8 to No . 10 $13.40 $32 ,160 .00 $0 .00 -·------·--·--.. 6 1,600 Cle Elum BST Crushed Surfacing 3/8 to No . 10 $13.40 $21,440 .00 $0 .00 ---· 7 4 ,000 Ellensburg Maintenance Sand $8 .35 $33 ,400 .00 $0 .00 8 4 ,000 Cle Elum Maintenance Sand $8.35 _ $33,400 .00 $0 .00 ··----•-•·• 1 1 /4" Crushed Surfacing Base 9 1 ,000 Ell ensburg Course $7 .75 $7,750 .00 $0 .00 10 1 ,000 Cle Elum n 1 /4" Crushed Surfacing Base CoursE $7 .75 $7 ,750 .00 $0 .00 11 2 ,000 Ellensburg 5/8" Crushed Surfacing Top Course $7 .85 $15 ,700 .00 $0 .00 12 2 ,000 C le Elum 5/8" Crushed Surfacing Top Course $7.85 $15 ,700 .00 $0 .00 13 1 ,000 Ellensburg 2 1 /2" Ballast $7.65 $7 ,650 .00 $0.00 14 1,000 Cle Elum 2 1 /2 " Ballast $7.65 $7 ,650.00 $0 .00 Sub-total before Tax -$358 ,850.00 $0.00 SALES TAX-8 .00% $28 ,708 .00 8 .00% $0 .00 Total Schedule "A" -$387,558.00 $0.00 SCHEDULE "A" 2019 Maintenance Rock Materials Bid Opening January 29, 2019, at 2 :00 p.m . SCHEDULE 'B' Vendor to Provide Labor and Equipment to Load Materials ESTIMATED ITEM QUANTITY NO. (In TONS) Location ITEM DESCRIPTION Ellensburg Cement Products BIDDER PRI CE PER PRICE PER TON TOTAL PRICE TON TOTAL PRICE 1 6 ,400 Ellensburg BST Crushed Surfacing 1/2 to No. 4 $10 .50 $67 ,200 .00 $0.00 2 4 ,700 East Kittitas BST Crushed Surfacing 1/2 to No . 4 $10 .50 $49 ,350 .00 $0 .00 - 3 3 ,400 Cle Elum BST Crushed Surfacing 1/2 to No . 4 $10.50 $35 ,700 .00 $0.00 ---· 4 1 ,700 Easton BST Crushed Surfacing 1/2 to No . 4 $16 .50 $28 ,050 .00 $0 .00 ------1--·- 5 2,400 Ellensburg BST Crushed Surfacing 3/8 to No . 10 $13 .65 $32 ,760.00 6 1,600 Cle Elum BST Crushed Surfacing 3/8 to No . 10 $13 .65 $21 ,840 .00 $0 .00 7 4 ,000 Ellensbu rg Maintenance Sand $8.60 $34 ,400 .00 $0.00 ---· 8 4 ,000 Cle Elum Maintenance Sand $8 .60 $34 ,400 .00 $0 .00 1 1/4 " Crushed Surfacing Base 9 1,000 Ellensburg Course $8 .00 $8 ,000 .00 $0.00 1 1/4" Crushed Surfacing Base 10 1,000 Cle Elum Course $8 .00 $8,000 .00 $0 .00 11 2 ,000 Ellensburg 5/8 " Crushed Surfacing Top Course $8.10 $16 ,200 .00 $0 .00 12 2 ,000 Cle Elum 5/8 " Crushed Surfacing Top Course $8 .10 $16 ,200 .00 $0 .00 13 1,000 Ellensburg 2 1/2" Ballast $7 .90 $7 ,900 .00 $0 .00 14 1 ,000 Cle Elum 2 1 /2 " Ballast $7.90 $7 ,900 .00 $0 .00 Sub-total before Tax -$367 ,900 .00 $0 .00 SALES TAX-8.00% $29,432 .00 8.00% $0.00 Total Schedule "B" -$397,332.00 $0.00 SCHEDULE "B" 2019 Maintenance Rock Materials Bid Opening January 29, 2019, at 2:00 p.m . SCHEDULE 'C' Vendor to Provide Labor and Equipment to Load Materials ESTIMATED ELLENSBURG CEMENT BIDDER IH:M QUA:NTITY PRICE PER NQ. (In TONS) ITEM DESCRIPTI ON PRICE PER TON TOTAL PRICE TON TOTAL PRICE ! Pe rTon I 15 (Elle nsbu rg) Select Borrow $4 .00 $4 .00 $0.00 Pe r To n 16 (Cle El um ) Select Borrow $6 .00 $6 .00 $0 .00 Pe r Ton 17 (Ellensburg ) Light Loose Riprap $24 .00 $24 .00 $0 .00 Per Ton 18 (Cle Elum ) Light Loose Riprap $24 .00 $24 .00 $0 .00 Pe r Ton 19 (Ellensburg ) Quarry Spalls $8 .25 $8 .25 $0 .00 - Per Ton 20 (C le Elum ) Quarry Spalls $8 .25 $8 .25 $0 .00 SALES TAX -8.00% 8.00% $0 .00