DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: November 20, 2018
ACTION REQUESTED: Request to Approve a Resolution to Authorize the Chair's
Signature on KPFF Supplement No. 2 on Task Order No. 8
— No. 6 Bridge Replacement
BACKGROUND: The Board of County Commissioners approved KPFF Task
Order No. 8 (No. 6 Bridge Replacement Design) with
Resolution 2017-115 ($87,354). During design, staff
identified a conflict with Ellensburg Water Company
access to its ditch rider road. This conflict was managed in
design with KPFF by issuing Supplement No. 1 to Task
Order No. 8 with Resolution 2018-034 ($7,850). Recently,
during pile driving operations, several pile did not reach
design pile depth and additional geotechnical and structural
evaluation were required resolving the issue. Staff is now
seeking cost recovery for KPFF for additional services with
Supplement No. 2 to Task Order No. 8 in the amount of
$3,000.
INTERACTION: Public Works
RECOMMENDATION: Authorize the Chair's signature on Supplement No. 2 on
KPFF Task Order No. 8 — No. 6 Bridge Replacement
Design.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution with Task Order Supplement attached.
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
AUTHORIZING THE CHAIR'S SIGNATURE ON KPFF TASK ORDER NO.8
SUPPLEMENT NO.2 — NO. 6 ROAD BRIDGE REPLACEMENT DESIGN
WHEREAS: The Kittitas County Board of County Commissioners authorized KPFF Task
Order No. 8 with Resolution 2017-115 No. 6 Road Bridge Replacement Design;
($87,354.00); and
WHEREAS: The Kittitas County Board of County Commissioners authorized KPFF Task
Order No. 8 Supplement No. 1 with Resolution 2018-034 allowing additional
design accommodating the Ellensburg Water Company ditch rider road access at
the bridge ($7,850.00); and
WHEREAS: Recent pile driving operations have required additional geotechnical and design
support addressing two pile driven to less than original design depth; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on KPFF Task Order No.
8 Supplement No. 2 in the amount of $3,000.00 bringing the total task order value to $98,317.00.
DATED this 20th day of November, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Cory Wright, Commissioner
1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 kpff.com
November 14, 2018
Mark Cook, PE
Kittitas County Public Works
411 North Ruby, Suite 1
Ellensburg, WA 98926
Subject: Kittitas County On -Call Agreement KCPW 2017-19ENG2
Supplement #2 for Task Order 8
Dear Mark:
This letter addresses the scope and fee for out of scope work discussed between the County and
KPFF conforming to the project goals and final development of the PS&E contract documents and
construction support.
The new scope items are described as follows:
1. Geotechnical construction support for pile installation provided by PanGeo Engineers.
2. Additional structural construction support for shop drawing reviews, contractor RFI's and
field change conditions beyond original scope.
Pursuant to accomplishing this additional work, we request an additional budget of $3,000.00,
bringing our total not -to -exceed amount for this Task Order to $98,350.00. Detailed breakdowns of
our original fee and our supplemental fee are shown on the following pages.
If you have any questions, please feel free to call me at (206) 926-0442.
Sincerely,
Aaron Olson
Kittitas County — Task Order Supplement — TO #8
November 14, 2018
ORIGINAL BUDGET:
KINNax Cayary CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET
Onwll - 2017
Tail Doak, I
CONSULTANT FEE DETERMINATION BY KPFF FOR KRTRAS COUNTY ON CALL
ROAD 6 BRIDGE PSAt
ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS
COST
TASK ORDER 6
PnI=lDi+a
IhfAlNnn1
Prolan
Ma.G.
Iimr
V11Nkninl
}e0nka
spet'iNSI
RIXn
Wriryay.bu
5e1am
EiDilna
150wN:a�d
G.vli
DnNyl
Er
ISIr CUrMb
CM!
c T o
(SIIJcuuWb
CINI
Prolk01
'VmiMA3bM
Fpniaegcl
REN SCOPE OF WORK
UZ50
.y"!i]3
36423
N2<0
JM16
Sfd OC
26.k0
265'.2^
1 OEKFF 11 MANAGEMENT MIO COORDINATION
Cmkmt Camylmrme d o g mmar
t 5
2
$137
GllFnt CommrlrrtNwnx
6
5t /TI
Staff. Flesd GnerM Prgesl Lawdnabn
19
<
Sld:,o.a Ml G oa"OSS.
0
S.kM1 &!Vine[( Swrmvin
I5
e
N
S1 Y1<
wOw suMMN is
>
Y
o
o
a
0 H
{7,144
!o
2 SIZE OR CLIENT VMIT IM Rrapksnowa7Na:a,
1mre11RTl
<
<
SIG"Prey.
dket rv:fnly.
2
<
2
f19W
wbJr SJOIeW 211
e 1
B 1
0 1d
0 1 0
{].5M
310J
S DEVE3O1MENT OF ME- CONTRACT BID DOCUMENTS
Snnelr-Cmw
;.f
SOlmo
ICO
E1.W
Snae12-Om NVIef.WtirYlle). Syacs. Grum Sev lnJ
49
240o
lli,w1f,
Save S.Gmnal R.J. 3 atov. 0 Elawbn
do
22080
fA2e'fi
SSISK4 FWW.I, AbN, S`l.%V WW61
20
k0
00
61
S.e S- Fauld., Abi@emI W WLIx 2
<0
30
""76
SaSSO.- Fremaq Rnn inn Ortdan l
40
0.0
3<.56]
Smkri.UYders2. Btarrys.JJar
I•I
a0
noISO
34.1111
Sraat S-NPraam Gfn61N
10
20
ISO
$3 on
Shag 0-fhlFs Rar dC .IdaMl
10
200oa
5520
3 ek10-Craard Rat 2 d Ma,,;
10
120190
IJ 112
P. R,d Lduk.n Wale, Ccokd Ch.aJM Re.ren-.
60
90
24020
Y.7M
Ran Co QO 'MM C.MIS " CTA Gadla:.mr;.ail
d0
1004.0
32.830
EwdRWg
20
20OS2.s0J
Grvl NgnaOra9 O.S I,., OkG&. grades xu0 StU. d..rr
N9J. do".. %,",.I riNea SbNPn9.!ESC dra wravr+w.
SSIaq
d0
60.0
AO
0311A
1a0w3SMaS`3
0
d
41
aaaaaaaaaa
In
!42 0
AO 759
SC
4 COSTRUCTICN 3UPPONT-9ramd7
Col.h.S. RFI BW5nJ90.Ynw, O.NSLwrS
Sln n. rµM<rvlal
i
J
t2
12
E 1
40Ga
w6w suetaal<:
1
4
12
12
e 1
3<Of<
TOTµ LMIDR
10
4S
45
212
t50
1p IS f
E1.1M
TOM MEMBURSABIE
f
IDIOM
MANAGEMENT RESERVE IOMIONM)
3
2.OD0
BRAND !OTµ. NOT TO EXCEED
5025
3).223
lal"s
NA"
96.007
$9.612 017 3
97.331
Page 2
Kittitas County— Task Order Supplement — TO #8
November 14, 2018
SUPPLEMENT NO. 1 BUDGET:
ENLrcas uunly CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET
OnKall-3017
Tadb ONar 6
Page 3
CONSULTANT FEE DETERMINATION BY KPFF FOR KITTRAS COUNTY ON CALL
ROAD BRIDGE PS6E
LSTIMAr10N OF MANAGEMENT AND ENGINEERING HOURS
COST
TASK ORDER6
PmuPw
lor.;e
Prolar M.na9w
r(T—.nsp«Ixl$r'.
s«m: Ery�
omen eymw
LAor«n
Rerec+eoucmaw
MtlSAlml
'on wm:aman>.
il
Rtm wrwn+nl
0.l
�IEwaWmldd.+l
a r
I l6rrmmalLve11161ooImN 6Crvul
IAiaman4u)
EG2.60
$6033 r
(6933
fd2 d0
$35.16
$3500
II36.dB
MULTPLIER:
26552
REM ELOPE OF VpRN
1 COWFACTM EWNT MO COORORATION
Conuad Complbnce a Organ,,.
15
2
2
$]Si
Cxe Ito munuWa
� B
s1A71
i$ul(flbaBGemral Rofetl Coatlnetlm
16
I a
s3590
Isuxmrpwmnl cao-am.uon
D
'
_ 'llnwc.+9a Rg«rwrerearwa
15
6
e
5+914
un
1
fibers teal t:
3
35
0
0
0
0
+E
$6,120
3 SREORCLIENTVSR!ux[a Tnowuaaoaol
Trere11RT1
d
2
4
d
4
2
$1559
IReO. a%n wl Cnry
91.005
boor SublWal 3:
6
0
6
6
0
0
E3,564
$200
$ 109 1-OPRENT OF PS6E- CONTRACT EO DOCORENTS
]$neml
10
30
10D
Sl 157
nnat I -Gen NOIM. Q.., Specn, hOae S«bn
�
4.0
6.0
.0
220
so
I BO
2n li
26D
Si]55
SI2]G
SneB+3-General Plan, LepulBEbzaWn
�SnN14-FouMalkn MNmenrwwalla+]0
._
_
40
1 200
200
S, 11
1slal FounaaMn aC uncal. WiNalis 2
20 rtt
80
I 160
160
Sd l]fi
SSM l6 Framng Pl na GuEam1
30
d0
160
200
_.
Sd.SGI
$n ] G _ rl
20
0
Sd.Vo
16.0
16D
Sna B App oaz 51 I
tD
20
HO
IBO
1 40
300
5 19 B geR, r
aG �
30 20 0
YSMe110 Gmm Ra tBMzc
10
120
53]]3
40 16.0
PH nO Lalullalun Ou aAy Lpn Wl LIlll,a,ll Rem rB
BOf
60
z40
1 40
11.0
r
SE ]89
_
Pa. Gowan wln Courh!SurveYC GaorecOnkeO
60
100 .I
00 ?
- <0 •
_
52.8M
ltan RalulS
20
zoo
40
$2.993
Lwp Fr.Gxaennl 1—d —, prell¢ grace .a..meds. dal—
al- 0uaearall revew. sbgping, TESL, arainae
60
400
+Go
360
$13436
:raUew.ONicl
i
Aadman of lemppary,a«way w—P xwm. cw.en. amww.v am
+D
240
'.
so
r D
1 D
M70
snly r wa•B.ev re.wwn.
__ •..
�
Fersa eAanaw aM apecal p.o-.:sine 1u z wawncam
20
e0
010
Labor SaMaan:j
6
e
n
331
IN
us
1
VC152
so
4 COSTRUUgN SOPPMT-aPl.
Cmw1U4x. RFI and SMP Reww. 0unticn5
1
4
12
11 �
6
r
S"O
spec LauMy Vep
Iii
Ubw suMMN 4:
1_
0
4
12_ 1
+3 J
6
1
S4..
-
TOTAL LABOR
10
50
51
241
176
372
9
3 03.150
TOTAL RENSURSAILE
E 20000
MAai,mwMNT RESERVE IOPTVKaU
S 2000
CRO TOTAL - NOT TO E%GEED
$635
$3M2
$3,531
M.218
$6,1$6
$10,609
N30
E 94350
Page 3
Kittitas County — Task Order Supplement— TO #8
November 14, 2018
SUPPLEMENT NO. 2 BUDGET:
Nitktai C..4 CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET
On -c40 - 7017
Task Ober B
CONSULTANT FEE DETERMINATION BY KPFr FOR KITTITA5 COUNTY ON CALL
ROAD 6 BRIDGE PSBE
EaTc N OF MANAGEMENT AND ENWN'
. NODE.
COST
TASK ORDER !I
-WORK
RMCrg
{190,.1
SYLblen;
F^yC
t4aunn117w,
Nrolnean
Tnrf'ci:-91
saxcWtu
ITnm
Il:�:lc.-,unl
$^r,KI
ErNmO[r
;A+rrnemA
Lrs�a
LrntlT'
E,. ecer
IBYldnalA
[tA,l
f,AL1 JNft
ISy JURIA
f.'rn'I
4r¢I'±,
[6mm,al¢:
IA f.mwnn:
MULTIPLIER
IiMA I SCOFF qP
592.6E
369.22
364.71
Se2./C'
336.16
52k W
52040
2lf 52
1 CONT T IIG ENT AND ....'NATION
Caffiael Conn,%unu 4[IgamapM:
1A,
2
2
$157
clxtt C¢mrtxnca6a'n
tl
31.d]1
Ss . Fe¢s a G¢n¢z ProaYL I4ssrd men
10
a
5'5592
E:q'Yl•MlAnllli-03rS nJ6¢n
9
Frrmcrp6T1'¢1¢m 94mm¢ncs
1.5
A
5
51914
SN,tn i A]Eta IEz )p.TtlM
9
1
$/39
SrT.+. MNmmnl MnneOr:�.M'BPr,^,ac94a1mSoncen
Labor SWtatl t.
]
96
0
9
0
s
i!
Nr0
98.311
53
2 SITE OR CIIENT MIT Iss 4r611rtRnRRzsPrsnr
i"rc;RTI
4
4
a
31 i50
P.fP TAro1 III; c-"'
2
/
2
S1005
Ln6nr S..", 2:1
fl 1
9
0
6
0
0
62-W6
baja
VELDPMENi of PSA-CDNTRACi BID DOCUMENTS
5,,m i. ers.0
'.D
to
:00
F16 -w
SUM 2-& N¢Ws, O®nlbc. Epccs, C.. S<c0¢II
e6
N
09
200
54255
Sn¢M 3 9s[m¢RI PL¢'I, U,,. A Lk'0.M
¢.f
'L".t;w
0
57 221,
Sm_s14-;Mr AbJ:mnm. Pl WMs1
20
4�-
2DA
20[1
542%
SMnl5•€a.n6¢Ien Ak &nl, u'1'nafe2
2.0
4D
VSD
16L
5e./74
S¢9n1I-f..M54en s,3 faux rs,
34
n0
•.E0
2D0
L4b57
S0¢nl7-GMnn 2, BeerD2>lrrlt
2fi
4('
rCIO
lFD
54176
91en18-Papr,>ah 91e6(nl
IO
20
60
-AD
19022
Slreel9-&idu. RNAG,Orersl'
SC
290
4D
:cc
S'.]49
B".r-.P-D.bB R932 A FAB,
t0
170
40
160
91M
RAIF., Calnra,rc Onbty C'm cp.""pl3 R..'.
li.6
6.0
24.0
en
Y.0
W78,
P;u:C:nn�].',xcnwlP CAnm90¢nW Cryi. Li¢M4cMIiYI
E.0
100
2.0
40
$2.830
l„BR RPtIn
]D
760
40
9;493
LW.I l,gm.R!rg tra6¢ x•ser, pIC4¢, 5ra0ps, apiszs Wass.
pPlmrYpNd6e4¢nni, 91-M ) raelan. Slfipp1R) TFBC
r 'Ir 1
0A
40.0
40.0
leo
F,i4H
A"JERGI G fEmPtlrarY IG,'lnly paY111 iMC. SLi Wln
StT.q r
2p.D
e5
240
,i,
$5745
Revy;. eyyrex, an9 zp¢w4 wP.:8vnfrf 2snen¢r•¢ 1..
20
40
5915
"be, 5AMW13:
6
6
47
991
158
966
1
678,352
so
/ C21`2 CTION uPPOgT-ro,imni
C¢n¢Fa1m,RF P•d Ebpp Rrnew, (Acs6Ms
S,4Aa J ,kI4M,ral W. nl�kg ReYl9wvCAnbsurty,SxoPd1
4
`2
,A,
iFL
sj6
$2036
Leblr 5siKobl/r
7-77--
4
99
12
f
1
Not
5!. , 2 P3¢ 5,4.IPgrgnql
S$]2
TOTAL LABOR
10 I
50 1
51 1
259 I
176 1
972
IS S
95,317
TOTAL REMBURSARLE
N 000
MANAGEMENT RESERVE IDPTIONAL)
$
9500
BRAND TOTAL• NOT TO IDIG Eb
$425
53,462
33,55,
310,962
$6,158
310006
$503 5
eB,3i7
Page 4
Kittites County — Task Order Supplement — TO #8
/November 94, 2098
SIGNATURES
Indicate agreement to the revised Task Order 8 scope and fee as described above, by signing
below.
Initials: AWO
Page 5