HomeMy WebLinkAboutRes-2018-142 Bowers Field Master Plan UpdateBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 -J!:tl AUTHORIZING CHAIR SIGNATURE ON AN AMENDMENT TO CENTURY WEST ENGINEERING BOWERS FIELD MASTER PLAN UPDATE CONTRACT WHEREAS: Century West Engineering was selected to update the Bowers Field Master Plan by Resolution 2015-156; and WHEREAS: The original contract amount approved by the Kittitas County Board of County Commissioners was at a minimum of $312,395; and WHEREAS: The Federal Aviation Administration is now granting an additional $3,883 supporting final planning and grant closeout actions; and WHEREAS: Acceptance of the supplemental FAA funding requires a contract amendment be approved by the Kittitas County Board of County Commissioners; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on the grant amendment with Century West Engineering (Attached) increasing the Bowers Field Master Plan update contract by $3,883. DATED this 4th day of September, 2018, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KlITITA COUNTY, WASHINGTON L~haurman _d <~""1'7--r-( --'-· Obie O'Brien, Vice-Chairman C{;J;2_ Cory Wright, Commissioner AGREEMENT AND AUTHORIZATION FOR ENGINEERING CONSUL TING SERVICES ~BY CENTURY "'/HWEST ENGINEERING This Amendment, effective August 21, 2018, modifies the original contract for the Bowers Field 2015 Airport Master Plan dated November 23, 2015 as described below. Kittitas County (Client) authorizes Century West Engineering Corporation (Engineer) to carry out and complete the Scope of Services in consideration of the mutual covenants set forth in this Amendment, the ENGINEERING CONSUL TING TERMS AND COND/TJONS, and the 2015 Airport Master Plan Scope of Work. Project: Project No.: Scope of Services: Original Contract Value: Amended Contract Value: Bowers Field 2015 Airport Master Plan 12436.003.01 • Amendment I See original Scope of Work $312,395 $316,278 This amendment transfers $3,883 of Kittitas County's unused administration budget remaining in the grant ($318,908) to the Planning budget for the Engineer to utilize for project closeout. This transfer of remaining funds has been approved by FAA to account for additional effort required to close out the project. The Engineer's new contract total will be $316,278. Time & Materials, not to exceed specified amount without prior authorization by Client for work outside the scope of work. Kittitas County - By: (printed) Laura Osiadacz Title: Chair -=.:-="'------------- Date : September 4th, 2018 Century West En,lnee~orporation By: (signature) _I_~_~---------- By: (printed) Matt Rogers. PE Title: Vice President Date: __ q ..... /_1, f_,_9 _____ _ AGREEMENT AND AUTHORIZATION FOR ENGINEERING CONSUL TING SERVICES ~D7 CENTURY '40/WEST This Amendment, effective August 21, 2018, modifies the original contract for the Bowers Field 2015 Airport Master Plan dated November 23, 2015 as described below. Kittitas County (Client) authorizes Century West Engineering Corporation (Engineer) to carry out and complete the Scope of Services in consideration of the mutual covenants set forth in this Amendment, the ENGINEERING CONSUL TING TERMS AND CONDITIONS, and the 2015 Airport Master Plan Scope of Work. Project: Project No.: Bowers Field 2015 Airport Master Plan 12436.003.01 -Amendment 1 Scope of Services: See original Scope of Work Original Contract Value: Amended Contract Value: $312,395 $316,278 This amendment transfers $3,883 of Kittitas County's unused administration budget remaining in the grant ($318,908) to the Planning budget for the Engineer to utilize for project closeout. This transfer of remaining funds has been approved by FAA to account for additional effort required to close out the project. The Engineer's new contract total will be $316,278. Time & Materials, not to exceed specified amount without prior authorization by Client for work outside the scope of work. Kittitas County ~ By: (signature) _,_....,,__.__ _ __,"------- By: (printed} Laura Osiadacz Title: Chair ~=------------- Date: September 4th, 2018 Century West Engineering Corporation By: (signature) ___________ _ By: (printed} Matt Rogers , PE Title: Vice President Date : --------------- KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Tnn1m1na1 TO: Century West Engineering 1020 SW Emkay Drive #100 Bend, OR 97702 IMNIIII: Matt Rogers, PE PIIDIEIT NI: Contract for Services (Bowers Field) WE OE IE.DINI YOU: Attached: Copy of Letter REMARKS: Documents X Prints FROM: Candle Leader PHONE: (509) 962-7523 DATE: December 1, 2015 Shop Drawings Specifications Other Please find enclosed two (2) original Contracts. Please return two (2) fully executed copies to the address below: Kittitas County Public Works 411 North Ruby Street, Suite 1 Ellensburg WA 98926 Feel free to contact me with any questions at 509-962-7523. Thank you, Candie Leader 411 North Ruby St., Suite 1 Ellensburg, WA 98926 TEL (509) 962-7523 FAX (509) 962-7663 AGREEMENT AND AUTHORIZATION FOR ENGINEERING CONSUL TING SERVICES !.'loo..0/CENTURY .-uwesr I .. G I N l t • 1 N G By this Agreement, effective ilo lf . ~ d/)15 , Kittitas County (Client) authorizes Century West Engineering Corporation (Engiheer) to carry out and complete the Scope of Services In consideration of the mutual covenants set forth in this Agreement , the ENGINEERING CONSUL TING TERMSAND CONDITIONS, and the following additional attachments: SCOPE OF WORK, KIITITAS COUNTY, WASHINGTON. BOWERS FIELD (ELN), AIRPORT MASTER PLAN,· and FEE ESTIMATE, BOWERS FJELD, AIRPORT MASTER PLAN I AGIS SURVEY, July J 4, 2015. Project: Project No.: Bowers Field 2015 Airport Master Plan 12436.003.01 Scope of Services: See attached Scope of Work. Opinion of Probable Cost: Total $312,395 Kittitas C~nty By: Jf,,_,_, "j?,__ll Title: G,..._"" , C.h Q ,·,... Date: I'/),.-, /4 £ I l Time & Materials per attached fee estimate, not to exceed specified amount without prior authorization by Client. Century est Engineering Corporation By: (l..__ Title: {/( G[ f{)(E6U\J 7 Date: f Z.../ 7 /J s' ENGINEERING CONSUL TING • TERMS AND CONDITIONS 1. SERVICES : Engineer agrees to perform the Scope of Services (Services) under the following terms and conditions. Additional Services will be provided only by written amendment to this Agreement. 2. TIMES OF PAYMENTS: Engineer will submit invoices on a month ly basis for it.he unbilled porllbfl of Services -actuall y comp leted . Client will pay the Invoice with n 30 days of the invoice da te, Accou nts rernaTnlng unp aid aft er said 30 days WIil be considered delinquent and assessed a late payment charge (currently at the rate of 1 1/2% per month) calculated each month from the date of the invoice . Engineer reserves the right to suspend all Services until account delinquencies have been remedied . 3. OPINIONS OF COST: Because Engineer has no control over the cost of labor, materials, equipment or Services furnished by others, or over contractors' methods of determining prices, or other com petitive bid ding or market conditi ons, any cost estima tes provided by Eng ineer will be made on the basis of e~per!e nc e and judgment. Engineer can not-and doe~ not g uaran tee tha t proposa ls, bids or actua l Pro ject construction costs will not vary. from op inions of probable costs prepared by Engineer. 4. CLIENT-PROVIDED INFORMATION: Client will make available to Engineer, all information readily available to Client regardin g exi sting a,id proposed cond itions of the site Whi ch will ai d Engi neer in its performance of Services. Enginee r shall be en ti tled to rely, wi tho ut further Inquiry or i,westlgallon. o n all information furnished to Engineer by Client. Client agrees to advise Engineer of any hazardous substances or any condition existing in, on or near th e site presenting a po ten tial danger to hum an health, the enviro nm ent, or eq ui pment Client will immediately transmit to Engineer any new information which becomes available to Client which may have a bearing on Engi nee r's perform ance of Ser:vices or which re la tes to 11tormation Er,gln_ee r has requ ested from Client. If any haza rds, not disclosed to Eng ineer, are discovered after the Services are undertaken, Client and Engineer agree that the Scope of Services, time schedule and rate schedule shall be modified accordingly . 5. STANDARD OF PERFORMANCE: Engineer represents that Services will be performed within the limits prescribed by Client, and that its findings, recommendations, specifications and/or pro fessional advice provided hereunder will be prepared and presented In a mpm1er consistent with the level o f aare and skill ordinarily exercised by other professionals under s imilar circur:nsiances at the time the Ser:vlces ~re performed. 6. ACCESS, APPROVALS, PERMITS: Client shall arrange for access to and make all provisions for Engineer to enter onto pub llc and pri vate property as req uJred fo r Engineer to perform the Servi ce s. Un less oth erwise agreed, Client will be sole ly respo nsible for applying for and obtain ing such permi ts and approvals as may be necessary for Engineer to perfo rm the Services . Page 1 of 2 7. REUSE OF DOCUMENTS: All documents, including computer files, drawings and specifications, prepared by Engineer pursuant to this Ag reement shall remain the property of Engineer and are instruments of service with respect to the Project. They are not intended or represented to be suitable for reuse by Client or others on extensions of the Services provided for the Project under this Agreement or on any other project. Any reuse without written authorization , certification or adaptation by Engineer for the specific purpose intended will be at Client's sole risk and without liability to Engineer. 8. ASBESTOS/PCBs: All asbestos/PCB related Services are excluded from Engineer's Scope of Services. Client shall notify Engineer at the start of the Project if the presence of asbestos/PCBs on the project is suspected. If asbestos/PCBs are suspected or encountered, Engineer will stop its own work to permit proper testing and evaluation . If requested as an additional Service, Engineer will assist Client in contacting regulatory agencies and/or identifying appropriate testing laboratories. 9. SUBMITTAL REVIEW: Review by Engineer of submittals by contractor is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. The review does not affect the contractor's responsibility to perform all contract requirements with no change in contract price or time . Any action taken by the Engineer is subject to the requirements of the plans, spec ifications and other Contract Documents . Client shall indemnify Engineer against any claim by any contractor based on the review. 10 . ENGINEER AT CONSTRUCTION SITE: The presence or duties of Engineer's personnel at the construction site , whether as on-site representatives or otherwise, do not make Engineer or its personnel in any way responsible for those duties that belong to the Owner and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations , duties and responsibilities, including but not limited to, all construction methods , means, techniques, sequences and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions requ ired by such construction work. Engineer and its personnel have no authority to exercise control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting or reporting on health or safety deficiencies of the construction contractor or other entity or any other persons at the site except Engineer's own personnel. ~/HCENTURY .qg w ES T 11. INDEMNIFICATION AND INSURANCE: (a) Client agrees to indemnify, hold harmless and defend Engineer, its directors, officers, agents and employees, from and against any and all liabilities, claims, penalties, forfeitures, suits and the cost and expenses incidental thereto, including but not limited to reasonable attomey fees, which Engineer may hereafter incur, become responsible for or pay out as a result of death or bodily injuries to any person, destruction or damage to any property, contamination of or adverse effects on the environment or any violation of governmental laws, regulations or orders caused by (1) Client's breach of any term or provision of this Agreement; (2) Client's negligent or wrongful act or omission in the performance of this Agreement; or (3) Client's generation, storage or rel ease of waste products including hazardous w,as le .. (b) Eng irieer a grees to indemnify, hold harmless and defend Client, its directors, officers, agents and employees, from and against any an d a ll liabili ti es , claims, pe nalties , forfe itures, suits and the cos t an d expens es incidental there to , incici d!ng but not limited to reasonable attorney fees, which Client may hereafter incur, become responsible for or pay out as a result of death or bodily injuries to any person, destruction or damage to any property , contamination of or adverse effects on the environment or any violation of governmental laws, regulations or orders caused by Engineer's (1) breach of any term or provision of this Agreement; or (2) any negligent or wrongful act or omission in the performance of this Agreement. (c) In the e~ent any claim arises as a result of the concurrent neglige nce of Eng ineer and Client, liability will be determined on the basis of the doctrine of comparative negligence. Each party shall promptly notify the other party, in writing, of any threatened or actual claim, action, or proceeding. Engineer and Client shall jointly control the defense. (d) Notwithstanding any other provision contained in this Agreement, neither party shall be liable to the other party for any indirect, incidental, special or consequential damages of any kind, including without limitation, lost profits or loss of use, regardless of the cause, including negligence. (e) Upon request , En gi neer will p rov ide Client with Certificates of Insurance for Workers Compensation, General, Auto and Professional Liability coverage. Client agrees to maintain, during the performance of Services, general liability and automobile liability insurance in the amount of one million dollars ($1,000,000). 12. LIMITED LIABILITY: Client agrees that Engineer's llability to Client, contractors, subcontractors, and their agents, employees and consultants, and to all other third parties which may arise from or be due directly or indirectly to the negligent acts, errors and/or omissions of engineer, Its agents, employees or consultants shall be limited to a continued aggregate not to exceed the contract amount. Page 2 of 2 13. TERMINATION: Either party may terminate this Agreement upon thirty (30) days written notice to the other. Either party may terminate this Agreement immediately in the event of a material breach by the other party to perform in accordance with the terms hereof but only if said breach is through no fault of the terminating party and said breach is not corrected before the date of termination . If this Agreement terminates for Force Majeure, Client shall pay Engineer for all Services authorized and performed prior to the termination date including , if applicable, a prorated lump sum fee. 14. SUCCESSORS AND ASSIGNS: Neither Engineer nor Client may assign this Agreement without the prior written consent of the other. Engineer may, however, employ any other party or entity it deems necessary or proper for any part of the Services required to be performed by Engineer under the terms of this Agreement. The covenants, conditions and terms of this Agreement shall extend to and be binding upon and inure to the benefit of the heirs, personal representatives, successors and assigns of the parties hereto. 15. MISCELLANEOUS: (a) This Agreement shall be governed by the laws of the State of Washington. (b) Any claim brought by Client against Engineer must be brought no later than six years after the date of substantial completion of the Services hereunder or the expiration of the appropriate statute of limitations, whichever is earlier. (c) In the event this Agreement should be referred to an attorney at law or agent for collection, Client agrees to pay such reasonable attorney's or agent's fees and costs as Engineer may incur to any attorney or agent in such collection even if no action is Instituted. In the event an action is instituted to enforce any of the terms or conditions of this Agreement, the losing party shall pay to the prevailing party, in addition to the costs and disbursements allowed by statutes, such sum as the court may adjudge reasonable as attorney's fees In such action, in both trial and appellate courts . (d) No waiver by either party of any provision of this Agreement shall be construed or deemed to be a waiver of (a) any other provision of this Agreement or (b) a subsequent breach of the same provision, unless such waiver be so expressed in writing and signed by the party to be bound. (e) The terms and conditions of this Agreement contain a series of separate agreements. If in any proceeding a court or arbitrator shall refuse to enforce any of the separate agreements, any unenforceable agreement shall be deemed reduced or eliminated from the terms and conditions for the purpose of such proceeding, but only to the extent necessary to permit the remaining agreements to be enforced in such proceeding. (f) This Agreement constitutes the entire agreement between Client and Engineer regarding the Services and supersedes all prior or contemporaneous oral or written representations or agreements . This Agreement shall not be modified except by a written document signed by both parties. ~/ff CENTURY ,YU WEST ENGINEERING PROJECT INTENT BOWERS FIELD -AIRPORT MASTER PLAN SCOPE OF WORK KITTITAS COUNTY, WASHINGTON BOWERS FIELD (ELN) AIRPORT MASTER PLAN FAA AIP Grant Number: X-XX-XXXX-XX At the advisement of the Federal Aviation Administration (FAA) Seattle Airports District Office (ADO), Kittitas County, Washington will develop a "2015-2035 Bowers Field Airport Master Plan." The project will update and replace two existing FAA-funded airport plans for Bowers Field: the Bowers Field Airfield Needs Assessment and the Bowers Field Airport Master· Plan Update. The airfield needs assessment was scoped and prepared in 2011-2012 as a focused update of the previous airport master plan update (2004 final report), but did not include several elements (environmental review, land use evaluations, noise analysis, etc.). In addition, the FAA has recently defined several areas of emphasis for airports that affect airport planning. These include land use compatibility in runway projection zones (RPZ) and "confusing" airfield geometry (collocated thresholds, intersecting runways, runway or taxiway hot spots, etc.). Although some of these elements were analyzed and reviewed by FAA in the Airfield Needs Assessment, the FAA's Increased emphasis allows the airport an opportunity to address development needs on an airport-wide scale. As a recent planning update, the 2012 Bowers Field Airfield Needs Assessment provides usable information for the master plan update. However, based on changes In FAA policies and areas of emphasis within the airport planning, environmental and development process, the FAA has indicated that the new master plan will be a major update of the 2012/2004 plans. Existing materials from the previous planning projects will be used to the maximum extent possible, but the FAA's stated intent is not to limit the project scope in its ability to thoroughly address all relevant issues. The Master Plan will allow Kittitas County to address the development needs at the airport for the current 20-year planning horizon (2015-2035) and will develop a realistic program for implementation. Century West Engineering (Consultant) has been retained by Kittitas County to accomplish the Master Plan. The Consultant will work in close liaison with county staff, a Planning Advisory Committee, airport users, local business and stakeholder groups, the Federal Aviation Administration (FAA}, and the Washington Department of Transportation -Aviation Division (WSDOT Aviation) to ensure that the plan truly reflects the airport's development needs. Page 11 BOWERS FIELD -AIRPORT MASTER PLAN The following work program describes the effort required to successfully complete the Master Plan for Bowers Field within the FAA framework. This project will provide Kittitas County with a 2015-2035 Airport Master Plan and revised Airport Layout Plan (ALP) drawings. An updated Airport Capital Improvement Program (ACIP) will provide Kittitas County with a method and proposed schedule for addressing future facility needs through use of FAA Airport Improvement Program (AIP) grants and other available funding sources. The master plan-defined ACIP will subsequently be used to Identify project priorities with the State Capital Improvement Program (SCIP), which Is administered by WSDOT Aviation in close coordination with FAA. The project wlll address and/or update the basic tasks and work elements as outlined In FAA Advisory Circulars 150/S070-68, Airport Master Plans (Change 2) and 150/5300-13A Airport Design (Change 1). The most current FAA Standard Operating Procedures (SOP) 2.00 and 3.00 will be prepared and submitted with the draft airport layout plan drawing set. FAA SOP 2.0 and 3.0 address agency review and approval requirements for Airport layout Plan and Exhibit A Property Plan drawings. The master plan update and AGIS survey include the following major work elements: • Element 1-Study Initiation and Management; • Element 2 -AGIS Survey • Element 3 -Airport Data Collection and Facilities Inventories; • Element 4 -Aeronautical Activity Forecasts and Demand Capacity Analyses; • Element 5 -Facility Requirements; • Element 6 -Summary of Environmental Status; • Element 7 -Alternatives Analysis; • Element 8 -Airport Layout and Terminal Areas Plans; • Element 9 -Compatible Land Use Planning in the Vicinity of Airports; • Element 10 -Prioritized Capital Improvement Program and Cost Estimates; • Element 11 • Airport Financial Plan; • Element 12 -Agency Coordination; • Element 13 -Public Participation and Information Process; • Element 14 -FAA Compliance Issues & Recycling and Solid Waste Management Plan; and • Element 15 -Reports and Documentation The AGIS survey identified in Element 2 will be used throughout the master plan project and will provide technical data for the Airport Layout Plan drawing set. The AGIS survey will also be used to support FAA Flight Procedures Office (FPO) changes to existing instrument procedures and development of new procedures. Page I 2 BOWERS FIELD -AIRPORT MASTER PLAN Completion of the work elements described in the project should result in: 1. A schedule of airport improvements correlated with an identified specific volume of activity or other defined measures of facility requirements, which would mandate action to accomplish the needed improvements. 2. A realistic and workable CIP that identifies items necessary to maintain/improve airport facilities. 3. Current ALP drawings that graphically depict existing conditions at the airport as well as proposed capital improvements. 4. Corresponding narrative report. s. AGIS survey documentation and graphic output (data for ALP drawing set). ELEMENT 1 -STUDY INITIATION AND MANAGEMENT Task 1.1-Refine Scope of Work, Budget and Schedule Century West will develop a detailed scope of work, budget, and schedule, including approach and level of effort, to be made a part of the project contract fee negotiations. A detailed task-by-task itemization of the project budget and schedule will be provided. Century West will also develop subconsultant teams for applicable work for the review and approval of Kittitas County. Product: The final scope of work which will also be used for an Independent fee estimate for the project for use in contract negotiations. A breakdown of project costs for each work element will be provided. Task 1.2 -Coordination and Control/Project Administration Kittitas County will manage, through its consultant, the administrative grant and fiscal aspects of the project. Additional responsibilities include consultant/airport coordination, facilitation of meetings, timely product review and supply of existing plans, report and electronic flies relating to the airport layout, land use, property ownership, approaches, pavement and faclllty conditions, and previous planning studies and current development desires. It is anticipated that the Consultant team leaders and the Kittitas County's key staff will function as a work group that will facilitate all elements of the project. The Consultant will establish a schedule of bi- weekly project meetings (teleconferences) for the work group, with an open invitation to the FAA and WSDOT Aviation to participate on an as-needed basis. The purpose of the meetings is to provide regular updates on study progress and to provide an opportunity to discuss and address issues that arise during the project. Product: A program of public participation with stakeholders that should be involved during the Airport Moster Plan study. An internal meeting schedule. Poge I 3 BOWERS FIELD -AIRPORT MASTER PLAN ELEMENT 2 • AGIS survey The Consultant will conduct an aeronautical obstruction survey at Bowers Field. The project will be done in compliance with AGIS Advisory Circulars and will i nclude an airport airspace analysis for vertically-guided operations for Runways 11/29 and 7 /25. The Advisory Circulars identified below detail the data collection requirements and accuracies for the project and the verification process by the Federal Aviation Administration (FAA) and the National Geodetic Survey (NGS). • AC 150/5300-16A "General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey." • AC 150/5300-17C "Standards for Using Remote Sensing Technologies in Airport Surveys." • AC 150/5300-188 "General Guidance and Specifications for Aeronautical Surveys: Airport Survey Data Collection and Geographic Information System Standards." Task 2.1 AGIS Survey-Elements and Process The purpose of this project is to accomplish FAA Airport Airspace Analysis Survey for all surfaces defined In FAA Advisory Circular 150/5300 -18B: Section 2.7.1.1 Runways with vertical guidance. This is inclusive of 2.7.1.1.1 through 2.7 .1.1.7. For this project, we will acquire new vertical stereo aerial photography at a nominal scale of 1"=1,905' for obstruction surface areas and 1"=508' for the airport property. The aerial photography will cover all of the VG Airspace Analysis surfaces using a Zeiss Digital Mapping Camera (DMC) during leaf-on conditions. From the 1"=1,905' aerial photography, we will produce the following: • Limited landmark feature planimetric mapping (See attached AGIS Feature Class Spreadsheet) • Color digital orthophotos with a 1.0' pixel resolution (VG) • Identification and mapping of obstruction obstacles for all of the VG surfaces From the 1"=508' aerial photography, we will produce the following: • 100 scale mapping with 2' contours of the existing airport property • Identification and mapping of obstruction obstacles for the VG RPS, VGPCS & VGPS surfaces QUALITY STANDARDS The project has been designed to conform to the National Map Accuracy Standards for 1"=100' scale planimetrlc feature collection, two foot contours and twelve Inch orthophoto production. In addition, photogrammetric mapping will meet all FAA and NGS standards. PROJECT AREA The project area encompasses all of Bowers Field inclusive of the obstruction surfaces as defined in AC 150/5300-188. Page I 4 BOWERS FIELD-AIRPORT MASTER PLAN CONTROL SURVEYING The aerial photography will be completed with ABGPS control which will be used for the base control for the geo-referencing of the aerial imagery. We will process the ABGPS data using COR stations and reference it to the project control datums: Horizontal: North American Datum of 1983/2011 (NAO 83(2011)), in the Washington State Plane Coordinate System, North Zone in US survey feet. Vertical: North American Vertical Datum of 1988 (NAVO 88) We will complete all of the remaining on-site ground control surveys, including: • Geodetic control validation of the existing airport PACS and SACS stations or establish temporary airport control according to the guidelines established in AC 150/5300-16A • Obtain all necessary ground control photo identifiable control check points required to validate the ABGPS control. • Control of all the airport runway end positions • Collection of vertical profiles for all runways • Collection of the position, elevation, and where required the appropriate navigational aid perpendicular point of all electronic and visual navigational aids (NAVAIDS) located on the airport and associated with any current instrument approach servicing the airport • Control for any obstruction obstacles or airport planimetric features that cannot be collected by photogrammetric methods • Complete map checks for feature attribute data and update the final map file attribution • Preparation and upload of a survey and quality control plan, Imagery plan, and final project report as required for submission to the FAA AGIS online database. • All other tasks, not specifically listed above, as outlined in FAA AC-18B, Table 2-1 "Survey Requirements Matrix for Airport Layout Plan." ORTHOPHOTO MAPPING We will use the control solution and scans of the aerial negatives to generate a Digital Elevation Model (DEM) for the VG surfaces. The aerial scans will be processed into color digital orthophotos using the aforementioned DEM to rectify the images. Orthophotos for the entire project area will be developed with a 1.0' pixel resolution and be delivered in a GeoTIFF file format via external hard drives VGA OBSTRUCTION SURVEYS The VGA Obstructions Surfaces will satisfy the following requirements of the AC 150/5300-188: • 2.7.1.2 Analysis of Runway 11/29 (to be renumbered 12/30 Mag. Dec) and Runway 7/25 with Vertically Guided Operations (Surfaces include the VGRPS, VG PCS, VGAS, VGPS, VGATS, VGHS and VGCS) Page I 5 BOWERS FIELD -AIRPORT MASTER PLAN The specific types and quantities of obstructions for each surface are outlined and clearly defined for the particular surface in each circular section. Any obstructions that meet the requirement of the circular, but are of a nature that elevations at the highest point of the obstruction are virtually impossible to read through photogrammetric methods (cell tower, electrical tower, etc.), will be Identified and relayed to the surveyor to initiate field surveyed elevations for the obstruction. The obstruction deliveries will include the off-airport landmark planimetric mapping and the airport planlmetric mapping and attribution data. Product: We will submit all data collected and associated required deliverable In the formats specified in the appropriate advisory circulars to the FAA Office of Airports, Airports Surveying-GIS Program. All data submissions to the FAA will be through the program's web site at http://olrports-als.fao.qov. The AC 150/5300-llC project data deliveries that will not be submitted through the web site will be delivered on external hard drives or DVDs. The 188 deliverables that wlll be uploaded to the AGIS website include: • Statement of Work, Imagery Plan and Survey and Quality Control Pion • Image Delivery • Digital limited landmark detail outside the airport • Color digital orthophotos with a 1.0' pixel resolution (Geo TIFF format) • Obstruction survey data (that covers VG surfaces) • Surveyed centerline profile on VG runways • NAVAJO data • Photogrammetrically derived and surveyed attributes in defined format • FGDC compliant metadata • Final Report All digital files will be delivered on external hard drive or CD/DVD. Task 2.2 AGIS Supplemental Information for Near In Obstruction Identification In addition to the deliverables required under 188 delivery, the Consultant will provide supplemental information to augment anticipated data collection needs for the upcoming obstruction removal project and other future work at the airport. This includes: • Part 77 obstruction data out 5,000 feet from runway endpoints (anything that penetrates or Is within 5 feet of the surface). • Planimetric data and two foot contours in Civil 30 (or other) format-see attached feature class spreadsheet Page 16 BOWERS FIELD -AIRPORT MASTER PLAN • Color digital orthophotos with a 1.0' pixel resolution in GeoTIFF (project area) • 2 color enlargements (30"x40") covering the airport and surrounding area (mounted/laminated/framed) Product: Electronic ACAD files for obstruction data and contour map. ELEMENT 3 -AIRPORT DATA COLLECTION AND FACILITIES INVENTORIES The data collection and Inventory will document existing airfield facilities and conditions that affect the operation and development of the airport. The inventory will utilize the previous Airport Master Plan and the more recent Airfield Needs Assessment, a supplemental document, to validate the data collection effort. The AGIS survey identified in Element 2 will be used as a primary data source for the facility inventory and throughout the master plan project. Recent state, federal and local documents will be reviewed. The Consultant will conduct interviews with airport tenants and users to help document recent trends. An assessment of existing County-owned structures on the airfield will be performed to estimate remaining useful life. Data from the recent airfield construction projects, the most recent airfield pavement maintenance plan, and other Kittitas County documents will also be reflected in the facility inventory. The primary objective In the inventory is to provide a current "snap shot" of existing conditions to support subsequent analyses In the master plan update. In addition to documenting current conditions, the updated inventory will provide a benchmark of change that has oc,curred since the last master plan was completed. Examples of key indicators of change include: A. Based Aircraft (changes in fleet mix and size) B. Annual Operations C. Hangar Inventory (square footage or number of spaces) D. Annual Fuel Sales Volume (2012-current) E. Airport Tenants (number of active leases) F. Significant Facility Improvements G. Roadway and utility improvements H. Changes in Land Use and Land Use Planning (annexation, zoning, etc.) Task 3.1 -Evaluate Existing Documents The Consultant will evaluate all existing documents from previous planning studies and airport records, as provided by airport management, including data pertaining to based aircraft, historic aviation activity, construction programs, and FAA or WSDOT Aviation grants. A summary of current hangar occupancy Page I 7 BOWERS FIELD-AIRPORT MASTER PLAN will be prepared based on data provided by airport management and a survey of private hangar owners (contact information to be provided by Kittitas County from lease/rental agreements). The Consultant will collect, analyze and incorporate information from local, regional and state (WSDOT Aviation) aeronautical or surface transportation studies, comprehensive planning documents, as related to the development of Bowers Field. Historic and forecast socioeconomic data will be collected from secondary sources. The Consultant will review existing and future land use within the airport environs and existing zoning patterns, including overlay zoning designations. In addition, noise sensitive uses/areas will be identified and any natural characteristics, which could impact development and planning on and off airport property, will be documented. Existing airport traffic patterns and noise abatement procedures will be summarized. Existing data and information, such as, but not necessarily limited to, documents, maps, studies and projects currently underway or in the planning stages (on and off airport property and in the vicinity) which may directly or indirectly influence this study effort will be identified, reviewed, and documented. Such information would, for example, include a review of any existing regional and state system plans, airport layout plans, pavement maintenance plans, environs plans, surface transportation plans, utility plans, and engineering reports, among others. The updated all weather wind rose developed for the 2012 Airport Layout Plan (ALP) Is adequate for use In the master plan and ALP update. The wind rose reflects 79,236 observations collected by the Automated Surface Observation System (ASOS) between 2000 and 2009. The Consultant will acquire one year of instrument flight activity data from a third party vendor (FllghtAware) to verify current instrument activity levels. This analysis is also an important element in the evaluation of critical aircraft (business class turboprop and business jets) and the evaluation of activity trending since the most recent aviation activity forecasts were approved by FAA in 2011. Product: A summary of existing documents and previous planning efforts for Input to future work elements of this study. Summaries of based aircraft by type, Airport Reference Code (ARC} and weight and of historical aviation activity since the previous master plan/needs assessment. Task 3.2 -Aerial Photography Aerial photography flown as an element of the AGIS survey (see Task 2.2) will be used to support master plan elements. Product: Aerial photo for the airport. ~/dc7r'11f Rtl{msl ~,:41"\o ,Ul~lil · " Page I 8 BOWERS FIELD -AIRPORT MASTER PLAN Task 3.3 -Airport Facilities Inventory The Consultant will utilize inventory data contained In the previous Airport Master Plan and the Airfield Needs Assessment In addition to other airport specific, regional, or state aviation system planning studies. Other data sources including the FAA Airport Record Form 5010, pavement management plan, construction drawings and other relevant documents, as provided by airport management. An on-site inspection of major components of the airport will also be performed. The examination will include a determination of the facility's use, type, size, condition, and adequacy, and extent it meets or exceeds FAA standards. The findings documented in the Inventory Chapter will be used to support analyses throughout the master plan. The facilities that will be inventoried and the data that will be provided include but are not limited to the following: Airfield/ Airspace A. Airfield Pavements -pavement thickness, pavement markings and signage, strength and construction history of runway, taxiway and apron pavements. The most recent WSDOT Aviation Pavement Management Plan for the airport will be utilized in addition to review of existing design drawings. Collocated thresholds, confusing geometry, non- standard conditions, MODs, RON B. Airspace -NAVAIDs, procedures, air traffic, obstructions, weather (is this Task 2.6?) C. On-airport Airfield Lighting and Navigational Aids. Facilities (GA and/or terminal) D. On-airport buildings by type, use and condition (ownership and use data to be provided by Kittitas County). Hangars, aprons, flight schools, based aircraft E. Fixed Base Operator (FBO) facilities and services, including aircraft maintenance and any assigned management responsibilities for County-owned rental hangars, local or transient aircraft parking positions, aircraft fueling facilities, etc. Support Facilities F. Fuel Facilities -storage and issue locations, capacities and condition of existing and proposed facilities. Records of existing underground storage tanks (UST) and the historic removal of any USTs located on the airport will be provided by Kittitas County. G. FAA-owned facilities, local emergency response facilities and capabilities. H. Airport Maintenance Equipment -airport maintenance and snow removal equipment will be documented (data to be provided by Kittitas County). Page I 9 BOWERS FIELD-AIRPORT MASTER PLAN Access, circulation, parking I. Airport Access Roads and Auto Parking -the location and configuration of existing auto parking, internal airport access roads, and access easements will be examined. The location and configuration of controlled/uncontrolled vehicle access points (gates, etc.) to the airport will be documented. Common vehicular access routes within the airport's landside areas (hangars, aprons, etc.) will be noted. J. Perimeter Fencing and Gates -the adequacy of airport perimeter fencing and access to the airport operations area will be examined. The location and configuration of controlled/uncontrolled vehicle and pedestrian access gates will be documented. K. Documents related to airport property ownership and airport access will be assembled and summarized in the inventory to provide a clear understanding of issues that may affect current planning or ongoing airport development and operations. Kittitas County will provide the consultant copies of documents for review and incorporation into the master plan report and specific drawings in the Airport Layout Plan (ALP) set, based on historic property acquisition, access agreements, and other related items. L. Airport Leases -Kittitas County wlll provide copies of all current leases, including lease diagrams, binding site plan, or other drawings that depict the physical locations and configurations of all leased areas on the airport. M. Current Kittitas County zoning and land use designations for areas within airport property will be summarized and compared to updated designations developed in the previous plan update. Product: Tabulated airport facilities inventory for Input to later work elements. Task 3.4 -Inventory Existing Utilities and Site Conditions The Consultant will conduct an Inventory and prepare base mapping of existing utilities, to include water, gas, sanitary sewer, storm water, electric, telephone, communications, and any other utilities within the airport boundaries. Existing utility easements and any specified development setbacks located within airport property will be depicted and/or noted. Existing City of Ellensburg and other local utility provider drawings (electronic files when available) will be used to provide data for this task. Existing mapping of natural site conditions will be consolidated into a common base map for use in the project. AGIS survey data will be used to define surveyed terrain, physical features, and built Items when available. Additional site conditions definition may include topography, wetlands, water bodies, and natural drainage features identified through existing mapping, aerial photography, etc. Product: A written inventory, summarization, and mapping of all utilities within airport property; a consolidated airport site conditions map. Page I 10 BOWERS FIELD-AIRPORT MASTER PLAN Task 3.5 -Airports Inventory/Define Airport SeNlce Area The Consultant will conduct an airport service area analysis for Bowers Field by identifying competing public use airports within typical 30-and 60-minute surface travel times. The analysis will evaluate the roles, facilities and services for competing airports. Specific factors including proximity to Bowers Field, regional surface transportation constraints/opportunities, and population centers will be addressed. This Information will be utilized to assess the influence that surrounding airports have with respect to competing services, facilities and equipment, navigational aids, and accessibility. Product: A detailed facilities inventory recording of the airports located within an approximate 30-mile radius of Bowers Field. An updated airport service area map wl/l be prepared. Task 3.6 -Airspace and NAVAIDS Inventory The Consultant will identify and describe existing airspace utilization factors for the area surrounding Bowers Field. This assessment will also provide an Inventory of local instrument approach and departure procedures, as well as a verbal and graphic depiction of regional airspace considerations. Product: A complete inventory and assessment (both narrative and graphics) of all procedures and airspace utilization for Bowers Field and the surrounding area. Task 3. 7 -Airport Activity Summary The Consultant will summarize existing airport activity for the purposes of providing base year data for subsequent forecasts. The summary will include a current based aircraft count (by type -to be provided by airport management) and an estimate of current operations (takeoff and landings) based on available activity Indicators. Product: Activity data for subsequent analysis and work elements. Task 3.8 • Flnanclal Inventory Kittitas County will provide airport operating revenue and maintenance and operation expense information from the past three (3) years and aviation fuel sale/delivery records maintained by Kittitas County. A current airport rates and fees schedule, airport minimum standards document and standard airport lease terms will also be provided, if available. Interviews with Kittitas County staff will be conducted as part of the data collection. The objective of this task is to gather documents ~hich affect the financial management of airport maintenance, operations and capital development and to develop an understanding of the structure, constraints, requirements and opportunities for financing airport activities as related to the Page I II BOWERS FIELD-AIRPORT MASTER PLAN development of a Capital Improvement Program (Element 9) and the Airport Financial Plan (Element 10). Product: Compilation and summarization of financial information to be used in subsequent tasks relating to alternative evaluations as well as final plan recommendations. Task 3.9 -Socioeconomic Data Consultant will utilize available data (secondary sources) related to local and regional population, employment, and other relevant socioeconomic conditions (historic data/trends and future projections). This data may Include state and regional economic data, tourism activity and trends, and area military or other state or federal government activity, as appropriate. U.S. Census data and population projections contained in currently adopted County comprehensive plans will be used to support aviation forecasting activities (see Element 3), unless determined to be outdated. Historical data and long term forecasts maintained by the FAA (active pilots, general aviation fleet, fuel consumption, hours flown, etc.) will provide broad industry indicators to be used in preparing the master plan forecasts. Product: Socioeconomic information for subsequent analysis and work elements. Task 3.10 -Land Use Controls The Consultant will obtain land use documents, maps and regulations from Kittitas County and the City of Ellensburg to include existing comprehensive planning, zoning ordinances, subdivision regulations, easements, rights-of-way and other documents pertaining to land use management in the vicinity of the airport and on airport property. The Consultant will evaluate and summarize the existing protections provided to Bowers Field through existing Comprehensive Planning and zoning ordinances. The Consultant will review, where applicable, the consistency between current zoning and comprehensive plan land use designations to identify any areas in the vicinity of the airport that could experience future changes in zoning, consistent with comprehensive planning. The Airport Land Use Plan drawing (see Element 8) will be updated and prepared to illustrate revisions to the existing and ultimate airport features, airfield configuration, existing avigation easements, airport influence area delineated by the airport traffic pattern including all RPZs noting potential impacts to land uses in the airport environs. Following the summary of the existing planning standards, the Consultant will summarize and review supporting comprehensive plan policies and land use regulations (Kittitas County, City of Ellensburg). The narrative will include explicit descriptions of airport zoning, appropriate uses not currently defined Page I 12 BOWERS FIELD -AIRPORT MASTER PLAN in the existing code, or for zones that require modification or clarlficatlon of allowed uses. The Consultant will coordinate with local planning staff to identify needs and confirm the adequacy of the ultimate recommendations and zoning language. A review of current Kittitas County and City of Ellensburg airport safety zone ordinances and mapping will be performed In conjunction with WSDOT Aviation Division coordination. Product: File of land use Information will be obtained from the County and City and maintained for use in later work elements. Assessment of existing land use protections for consistency with applicable zoning ordinances, with recommendations for any additional measures. Task 3.11-Prepare Inventory Working Paper The Consultant will develop a detailed working paper summarizing the tasks outlined above. The draft working paper will provide information for subsequent decisions. This working paper will be submitted to Kittitas County and Federal Aviation Administration for review and comment approximately one week prior to scheduled meetings (see Element 11 for document distribution details). The draft Inventory working paper will be presented to the planning advisory committee at the first PAC meeting, as part of the project notebook if possible based on meeting and on site inventory schedules. Note: subsequent draft working papers will normally be distributed to advisory committee members at least one week prior to scheduled PAC meetings, except in cases where major presentations are anticipated (preliminary development alternatives, etc.) in conjunction with delivery of working papers. In these cases, delivery of the draft materials will occur at the PAC meeting to facilitate discussion at, and subsequent to the meeting. Product: A narrative and graphical summary of the Inventory; the working paper will be revised as necessary based on review comments and will subsequently become a chapter of the Airport Moster Plan report. ELEMENT 4 · AERONAUTICAL ACTIVITY FORECASTS AND DEMAND CAPACllY ANALYSES Per FAA guidelines, the airport master plan will include updated activity forecasts Including based aircraft, annual aircraft operations, activity peaking, fleet mix, instrument approaches and operations, and distribution between local and itinerant operations. The current and future design aircraft wlll be identified through the forecast update. Bowers Field is a general aviation airport with no recent history of scheduled commercial air service. Page I 13 BOWERS FIELD -AIRPORT MASTER PlAN Task 4.1-Collect and Evaluate Existing Operational Data and Identify Critical Aircraft The Consultant will compile a summary of aviation activity and operational data for Bowers Field to Indicate historical growth and present a basis for statistical analysis of based aircraft, annual aircraft operations, and related factors. A review of the airport's current based aircraft fleet will be performed in addition to identifying regular transient operators served by the local fixed base operator (FBO). The evaluation of airport service area (Task 3.5) will be incorporated into the forecast update to reflect the potential for increased market share. The previous Airport Master plan/needs assessment forecasts will be compared to actual data in order to gauge the accuracy of individual projections and identify specific trends. The FAA Aerospace Forecasts (FY 2014-2034), the FAA Terminal Area Forecasts (TAF), and the current WSDOT Long Term Air Transportation Study (LATS) forecasts will be reviewed for comparison with current and recent historic data and summarized in the forecast narrative. As noted earlier, the impacts of the recent economic recession will be addressed to ensure that any defined trends are considered in the proper context relative to recent events. Airport management will provide a current list of locally-based aircraft by number and type. Specific manufacturer and model data will be gathered for the largest type of based and/or itinerant aircraft that regularly use the Airport. The Consultant will utilize other data sources including FlightAware ... , review of airport records, fuel delivery data, on-site inventories, and an airport user survey to supplement airport management data, as appropriate. Bowers Field does not have landing fees or actual air traffic counts (non-towered airport) to aid in the activity analysis. The Consultant will · determine the existing critical aircraft based on review of available data and previous airport planning documents. The e><isting critical aircraft (or family of aircraft) will be identified, If necessary by approach category, by wingspan, and/or by weight, for different airport components. By FAA standard, the critical aircraft/family of aircraft, must conduct at least 500 annual itinerant operations. In the event that more than one aircraft meets the FAA criteria for defining critical aircraft for runway length or pavement strength evaluation purposes, those aircraft will be identified. The existing critical aircraft will serve as the basis for developing updated forecasts and obtaining FAA approvals. Product: Summary of current/historical based aircraft data and operations far input to later tasks. Task 4.2 -Prepare Aviation Activity Forecasts Forecasts of future aviation demand levels will be developed by the Consultant, using trend analysis, market share analysis or similar methodologies. Socioeconomic and airport activity data collected during Page I 14 BOWERS FIELD -AIRPORT MASTER PLAN the inventory will be analyzed for input Into the forecasting analyses. Proposed development/activity that may affect the number of airport operations and the type of aircraft will be evaluated. The forecasts will reflect conditions that are deemed feasible. The evaluation of airport service area (Task 3.5) will be used as a specific input into the updated forecasts to ensure that regional market factors are considered. The analysis of air traffic will determine any potential changes in Airport Reference Code (ARC) for the critical aircraft. If the forecasts indicate a change in ARC, the facility requirements analysis would evaluate conformance to both current and future ARC-defined design standards. Based on a review of the updated master plan forecasts and TAF projections, the Consultant will recommend a "preferred forecast" for the master plan update. Forecasts will be submitted to Kittitas County and FAA for approval prior to proceeding with subsequent forecast-dependent work elements. The FAA spreadsheets, "Comparison to TAF" and "Forecast Summary" will be included in the forecast chapter appendix. The forecast spreadsheets may be found at the FAA web site: http://apo.faa.gov/Contracts/AF1.D0C, then click on "excel format.'' Forecasts of aviation activity projected for the airport will be prepared in 5-year intervals for a 20-year planning period and categorized into short-term (0-5 years), intermediate-term (6-10 years), and long- term (11-20 years) time periods: A. Number of based aircraft (single engine, multi-engine piston, single/multi-engine turboprop, business jets, helicopters and other aircraft (light sport aircraft, gliders, ultralights). Forecast based aircraft fleet will be further organized by aircraft reference code (ARC} and operating weight. B. Number of annual aircraft operations including mix of general aviation itinerant and local operations; commercial operations; and military operations. The distribution of fixed wing and helicopter operations will be included for each forecast year. c. Activity Peaking (peak month, design hour, peak hour operations). D. Identification of the fleet mix for preferred aircraft operations forecast by ARC and weight. E. Identification of critical aircraft for each forecast year. Product: Preparation of general aviation fleet mix and operations forecasts in 5-year Intervals for the 20 year planning period. The critical aircraft will be submitted for FAA approval prior to proceeding with subsequent related work elements. The FAA TAF spreadsheet will be included as an appendix to the master plan report. Page I 15 BOWERS FIELD -AIRPORT MASTER PLAN Task 4.3 -Prepare SO-Vear Aviation Activity Forecast The Consultant will develop a SO-year forecast of based aircraft and annual aircraft operations to supplement the 20-year master plan forecasts. The SO-year forecast will extrapolate the preferred 20- year forecasts, adjusted as needed to reflect long-term population forecasts and FAA long-term aerospace forecasts . The SO-year forecast will be used to approximate long-term aviation use land requirements for the airport. Task 4.4 -Develop Forecast Working Paper The Consultant will develop a detailed working paper describing the tasks outlined above . The draft working paper will provide information for subsequent decisions. This working paper will be submitted to Kittitas County and FAA for review and comment approximately two weeks prior to scheduled meetings (See Element 15 for document distribution details). The draft working paper will be distributed to the planning advisory committee at least one week prior to a scheduled meeting. Approval of the forecast by the FAA, (or agreement to proceed without approval) will be required prior to commencement of Element Four. Product: A narrative and graphical summary of the forecasting analysis; the working paper will be revised as necessary based on review comments and will become a chapter of the 2015-2035 Airport Master Plan report. A PAC meeting will be conducted to present the findings of the forecast analysis to the PAC. Task 4.5 -Forecast Approval The Federal Aviation Administration (FAA) Seattle Airports District Office (ADO) will review forecasts of aviation demand. Based on its review, the ADO will approve the forecasts as submitted, or provide comments and request revisions to be made by the Consultant (for subsequent review by the FAA Seattle ADO and FAA Headquarters). Product: FAA comment/approval of forecasts. ELEMENT S · FACILITY REQUIREMENTS The facility requirements analysis will address the airport's ability to accommodate airside and landside facility needs based on the updated aviation activity forecasts and the selection of the current and future design aircraft (Element 3). The updated facility requirements analysis will quantify demand and provide a comparison with the previous master plan/needs assessment projections. ~/D'ceNTURY Wl!ST ~, 1.M.1.\IU(,\;i .~(t,V6liit1i),-Page I 16 BOWERS FIELD -AIRPORT MASTER PLAN Existing and future airside and landside facilities will be analyzed to determine the type and magnitude of aviation Improvements ultimately planned and programmed for the airport. The facilities requirements analysis focuses on the physical facilities and associated improvements needed to safely and efficiently accommodate projected aviation demand on those aviation facilities for the twenty year planning period (2015-2035). Task 5.1 -Determine Aircraft Operational Requirements Based on updated aviation activity forecasts, the Consultant will assess the facility needs for types of aircraft expected to operate at Bowers Fleld, with particular attention being given to the critical aircraft (or family of aircraft) as prescribed by Advisory Circular 150/5300-13A. The Consultant will analyze the operational requirements of these aircraft to assist in the determination of facility standards, including the airport design category. In the event that the existing and future ARC are different, the facility requirements analysis will address the needs of both design categories. Product : Evaluate/verify requirements of critical aircraft and ARC for Input to later tasks. Task 5.2 -Airport Service Area Facility Analysis Existing airport master plan/needs assessment, state and regional aviation planning documents will be reviewed to identify any existing or anticipated facility constraints and planned facility expansion for the public use airports located within the airport service area defined in Task 3.5. The purpose of this task is to identify conditions within the airport service area that have the potential of impacting activity at Bowers Field . Task 5.3 -Design Standards & FAR Part 77 Airspace Standards Review/Evaluation An evaluation of FAA airport design standards and FAR Part 77 airspace standards will be accomplished based on the criteria established by the current/future ARC and the approach type/category for each runway end. Any non-conforming existing Items will be documented, with potential dispositions noted. Items requiring further analysis will be addressed in other facility requirements tasks and Incorporated into the airport development alternatives evaluation. Any deviations from FAA design standards that cannot be mitigated will be noted in the master plan as well as on the Airport Layout Plan. Two areas of emphasis have been identified during the early stages of scoping the master plan update based on current FAA policy focus. These include land uses within Runway Protection Zones (RPZ) and the existing (intersecting runway) geometry. Based on the Interim Guidance on Land Uses Within o Runway Protection Zone memorandum issued September 27, 2012, the FAA now requires a documented evaluation of all proposals Involving changes to existing conditions (e.g., roads, etc.) within RPZs, or changes to the RPZs themselves (e.g., increase in dimension or RPZ configuration/location which Page 117 BOWERS FIELD -AIRPORT MASTER PLAN introduces new items within the RPZ, etc.). The policy requires that airports evaluate all available options when RPZ impacts are anticipated through proposed development, with the overall goal to protect people and property on the ground within an RPZ whenever feasible. The evaluation of runway geometry is intended to be consistent with FAA Engineering Brief No. 75 (lncorporotion of Runway Incursion Prevention Into Taxiway and Apron Design). The technical evaluation of RPZ issues and airfield geometry will be integrated into both the facility requirements and development alternatives analyses (Element 6). Product: Identification of any non-conforming facility configurations. Task 5.4 • Define Alrslde Facllitles Requirements Based on updated forecasts of demand and established facility planning and capacity standards, the Consultant will convert the aeronautical demand forecast into gross airside facility needs including runway, taxiways, NAVAIDS and approaches, lighting and approximate land area requirements. As noted, the facility requirements associated with the existing and future ARC will be documented. Specific evaluations of runway length requirements will be conducted based on the appropriate critical aircraft or family of aircraft. In the event that there ls a change in the future ARC for the airport, the conformance of existing airside facilities with future standards will be evaluated. A table listing all deviations from current FAA design standards pertaining to the recommended ARC will be provided in the report as well as on the ALP drawing, including proposed disposition of the deviations. Disposition would entail recommended development and/or recommended FAA approval of modifications to standards. The Consultant will work with the FAA and Kittitas County to determine the most appropriate facilities and the location of the facilities. Projected facility requirements will be prioritized based on the updated master plan forecasts. Improvements will be correlated with a specific volume of activity or change in the level of service that will require the recommended improvement. Airside facility evaluations will Include the following: A. Runway length, width, orientation, threshold configurations, confusing geometry, grade, safety areas, runway protection zones, and other setbacks consistent with current/future Runway Design Code (RDC); B. Property Acquisition -any property acquisition anticipated (based on preliminary assessment of facility needs, such as an increase in runway length) will be identified for subsequent alternatives evaluations, if required; Page I 18 BOWERS FIELD -AIRPORT MASTER PlAN C. Parallel Taxiway and other major taxiways -dimensions, runway separation, airfield access requirements, runway exit taxiways (number, locations, and configuration), confusing geometry, protected areas, and aircraft holding areas, compass rose, consistent with the appropriate Taxiway Design Group (TOG); D. Airfield Pavement -pavement condition as documented in current airport pavement management plan and through on-site observation, evaluate published pavement strength in relation to current and future critical aircraft; E. Evaluation of FAR Part 77 imaginary surface clearance/penetrations (primary, transitional, approach, horizontal, conical); F. Approach area requirements; TERPS 40:1 departure surface for designated Instrument runways, as appropriate; G. Helicopter landing area requirements; H. Airfield Lighting (runway, taxiway, approach lighting systems; visual guidance indicators; REILS; rotating beacon); and I. Instrument Approach and Weather Observation requirements. The methodology contained in FAA Advisory Circular 150/5325-4B, Runway Length Requirements for Airport Design and FAA Airport Design Program Version 4.2d, or latest version, will be used to determine runway length and dimensional criteria, with the results being Incorporated into the master plan. Print- outs from the FAA Airport Design computer program will be submitted to the FAA and included as an appendix to the draft and final reports as appropriate. The Declared Distances module from the Airport Design program will be provided at the time of the ALP preparation (Element 7). The FAA Seattle ADO will review the airside facility requirements with the appropriate FAA divisions (Airway Facilities, Air Traffic, Flight Procedures, etc.) and provide the Consultant with comments prior to the PAC meeting for the facility requirements presentation. Product: Documentation and evaluation of airs/de facility requirements for Input to later tasks. Task 5.5 -Define General Aviation (GA) Landside Facilitles Requirements Based on updated forecasts of demand and established facility planning standards, the Consultant will convert forecast demand into specific landside facility requirements. Both existing and future landside facilities will be analyzed to determine the type and gross quantities of aviation improvements to be Page I 19 BOWERS FIELD -AIRPORT MASTER PlAN planned and programmed for the Airport. This analysis will provide the basis for the evaluation of airport development alternatives in Element 6. The facilities requirements analysis focuses on the actual physical facilities and associated improvements needed to safely and efficiently accommodate the projected aviation demand on these aviation facilities for twenty years . Projected facility requirements will be prioritized based on the updated master plan forecasts. Gross facility needs will be correlated with a specific volume of activity or change in the level of service that will require the recommended improvement. In the event that there is a change In the future ARC for the airport, the conformance of existing landside facilities with future standards will be evaluated . Landslde facility evaluations will include existing Items documented in the inventory chapter and any additional items that are identified through the master planning evaluation : A. Aircraft parking needs -light aircraft tiedowns, business class aircraft parking, helicopter parking areas for Itinerant and locally based aircraft; B. Aircraft hangar needs -T-hangars, conventional hangars, executive hangars; C. Corporate and aviation-related industrial hangars; D. FBO facilities (hangar, terminal, corporate aviation services, fuel storage, fuel truck parking, etc.); E. Storm drainage requirements; F. Bulk fuel storage facilities (location, capacity, security); G. Aircraft wash facilities; H. Automobile parking for tenants and visitors; I. Local/regional roadway network connection points and identify potential upgrades (signals, turn lanes, etc.); J. Internal airport access roads and emergency access routes; K. Perimeter fencing and access controls (fencing type and configuration; location of access points, emergency access, etc.); L. Airport security overview (facilities and procedures); M. Airport maintenance equipment and materials storage; N. Utility needs to service existing/new landside facilities, fire protection; O. Non-Aeronautical and Non-Aviation land Inventory and demand assessment; and P. Aeronautical land use requirements . Page 120 BOWERS FIELD -AIRPORT MASTER PLAN Product: Documentation and evaluation of landside facility requirements for Input to later tasks. Task 5.6 • Develop Facility Requirements Working Paper The Consultant will develop a detailed working paper describing the tasks outlined above. The draft working paper will provide Information for subsequent decisions. This working paper will be submitted to Kittitas County and the Federal Aviation Administration for review and comment approximately two weeks prior to scheduled meetings (See Element 15 for document distribution details). The draft working paper will be distributed to the planning advisory committee at least one week prior to a scheduled meeting. Product: A narrative and graphical summary of the facility requirements analysis; the working paper will be revised as necessary based on review comments and will become a chapter of the Airport Master Pion report. ELEMENT 6 · SUMMARY OF ENVIRONMENTAL STATUS The Consultant will evaluate the status of known environmental Issues during the initial stages of data collection (Element 3). This information will be incorporated into subsequent facility requirements, alternatives, and land use analyses. The impacts of storm drainage, water quality and potential wetland impacts will be addressed as part of the evaluation of existing conditions and any future expansion options. Task 6.1 • Environmental Conditions Inventory 6 .1.1 -Part 1-Existing Conditions Utilizing existing maps of the airport environs and existing environmental documents, the Consultant will prepare an environmental inventory/overview of the Airport's environmental setting and operating environment. No formal coordination with federal and state agencies will be conducted as part of this work element. Informal coordination may occur during the process of obtaining existing documents, etc. from various agencies. This task does not include analysis or other scientific evaluation of resources. This summary is intended to reference any known or potential environmental conditions or issues that could be affected by proposed airport development that have been identified in recent environmental efforts conducted on the airfield. Gather and review studies and secondary source data concerning area environmental factors related to airport development. Information gathered will include information on: Page I 21 BOWERS FIELD -AIRPORT MASTER PLAN A. Known threatened and endangered species; B. Incompatible land uses; C. Air and water quality; D. Waste water and solid waste treatment and/or disposal; E. Drainage patterns (Storm water issues, storm water detention ponds); F. Wetlands; and G. Parks and recreational areas. The Consultant will gather this information and provide summary and applicable excerpts to be included in the Master Plan Report. Product: Compilation of existing environmental data or issues to be used in subsequent tasks relating to alternative evaluations os well as final pion recommendations. 6.1.2 -Part 2 -Evaluation of Proposed Development (see Element 7, Task 7.3 for details on this Item} By using data collected in Part 1 of this task, the preliminary development alternatives will be evaluated to identify potential environmental issues. Task 6.2 -Prepare Environmental Working Paper The Consultant will develop a detailed working paper summarizing the tasks outlined above. The draft working paper will provide information for subsequent decisions. This working paper will be submitted to Kittitas County and the Federal Aviation Administration for review and comment approxlmately two weeks prior to scheduled meetings. The draft working paper will be distributed to the planning advisory committee at least one week prior to a scheduled meeting. Product: A narrative and graphical summary of the preceding tasks; the working paper will be revised as necessary based on review comments and will subsequently become a chapter of the Airport Master Plan report. ELEMENT 7 -ALTERNATIVES ANALYSIS This element of the study will consist of four components: A. Goals Definition; B. Identification of Alternatives; C. Evaluation of Alternatives; and D. Recommendations. Based on established goals and desires of the appropriate entities and an evaluation of potential alternatives for airport development, a specific plan and program for airport development will be Page 122 BOWERS FIELD -AIRPORT MASTER PLAN prepared representing recommendations 1. Fiscally and operationally efficient, 2. Environmentally and socially sustainable, implementable and defensible. The purpose of this element is to evaluate the effects of the alternatives and, thus provide the technical basis necessary for selecting a "preferred" development plan for the airport. The alternatives will be subjected to a detailed evaluation that will permit a comparison of the merits and deficiencies of all options under consideration. An evaluation matrix will be prepared to compare the composite rankings of each alternative. Factors to be considered in the evaluation include: Ability to Serve Forecast Demand: Each alternative will be evaluated to determine Its ability to meet forecast demand levels within accepted performance standards such as aircraft delay and airport user convenience. These evaluations will be performed for each type of facility and will be aggregated to permit comparison. The results of this evaluation process will be quantified to the extent possible for use in the evaluation matrix. Airport Design Standards: Each alternative will be evaluated toward FAA airport design standards. Potential approach obstructions and required mitigation, if any, will be Identified. Potential impacts on existing airport or tenant facilities will be addressed. Airspace Compatibility: Using the airspace requirements developed earlier and the forecasts of aviation activity, a determination will be made of the future airspace use pattern for the airport. The results of this evaluation will be quantified and arranged In the matrix format by alternative as they relate to state requirements for the provision of general aviation airport protection. Land Use and Environmental Compatiblllty: The proposed development will be evaluated to determine its impact area on land use and on the environment. The analysis will be conducted in accordance with Impact categories outlined in FAA Order 1050.lE, including Change 1, Po lici es and Procedures for Considering Env i ronmental Impacts, and FAA Order 5050.48, FAA Env iron mental Handbook and pertinent State of Washington guidance. Development Costs: Preliminary (planning level) estimates of the development and operational costs required to expand the airport under each alternative will be prepared. These capital and operational cost estimates will provide an indication of the cost of developing the airport and also will provide a basis for comparing cost-effectiveness among the various airport alternatives. The cost of maintaining the airport and developing or relocating any required off-site roadways under various alternative scenarios will also be estimated. Page I 23 BOWERS FIELD -AIRPORT MASTER PLAN Task 7.1 • Goals Development Based on inventory findings, demand considerations, forecasts of aviation activity and input from the Kittitas County and stakeholder groups, the Consultant will assemble a series of goals that describe the intent, direction and functional role of the airport. These goals will, after thorough review and approval by Kittitas County, serve as the basis for the preparation of the development plan for the Airport and will help to ensure a commonalty in terms of communication, direction and cohesiveness of future airport Improvements. Product: Formulation of goals to serve as a guide for the preparation of the development plan and program. Task 7.2 -Prepare Preliminary Development Alternatives The Consultant will be responsible for identifying and evaluating feasible alternatives for the development of airport facllitles, utilizing the findings and determinations from previous tasks. Anticipated areas of emphasis Include: A. Airfield geometry, RPZ configurations, collocated thresholds, non-standard conditions, runway designation (primary, secondary); B. Runway length(s) required to accommodate current/future design aircraft C. Evaluation to include both Runway 11/29 and Runway 7 /25, based on direction provided by FAA Seattle ADO (2015); D. Taxiway access; E. Landside development areas; and F. Lighting, visual guidance Indicators, signage, markings. A maximum of three (3) airside development options and three (3) landside development options, in addition to a no-action option will be evaluated. The airport development alternatives will be prepared using an aerial photo base combined with the electronic file for the Airport Layout Plan that depicts existing conditions. With exception of the no-action option, each of the preliminary alternatives will be capable of accommodating the gross facility requirements quantified in the Element 5. Options for acquiring property may be integrated into the alternatives, if required. The no action option (no-development alternative) offers a baseline to which other alternatives may be compared. The no-action option typically maintains existing capabilities but does not involve new development required to respond to demand. The limitations of a no-development alternative will be described A modified no-action Page I 24 BOWERS FIELD -AIRPORT MASTER PLAN alternative would be to maintain current design capabilities and forego upgrading the airfield to another design category. The preliminary alternatives will be presented graphically and in narrative (working paper) form, including large-scale drawings (and online) for presentation to the Kittitas County, the Planning Advisory Committee (PAC), FAA, WSDOT Aviation, and the general public for review and consideration. The development alternatives phase of the master plan will involve a multi-step public review process that will begin with preliminary alternative concepts capable of accommodating the facility requirements identified in Element 5. The preliminary alternatives concepts will be presented for public review and comment as noted above. The public input provided will be used to refine the concepts that will be presented during a second round of public review and comment. Based on technical evaluations, public input and coordination with local officials, the process will lead to the selection of a preferred alternative by Kittitas County that will be presented for additional public review and comment. All alternatives considered in this process must be consistent with all applicable FAA technical standards and regulations. Product: Preliminary oirside and lands/de development alternatives for the future development of the airport. Task 7.3 -Environmental Review of Alternatives The Consultant will review and identify potential key environmental Impacts of the various airport development alternatives based upon information and mapping generated in Element 3, with the goal of avoiding or minimizing Impacts on sensitive resources, This screening mechanism can be used by Kittitas County in selecting a preferred alternative that can be supported by the FAA during the subsequent NEPA study process. Product : Documentation of the environmentol lmpo cts for the various pre/Im/nary airport development alternatives to assist Kittitas County with the selection of a preferred development alternative and provide sufficient background doto to be used in the scoping/preparation of a post-planning environmental assessment documents. Task 7 .4 -Prepare Development Alternatives Working Paper The Consultant will develop a detailed working paper describing the tasks outlined above. This working paper will be submitted to Kittitas County, FAA, and PAC members for review and comment approximately two weeks prior to scheduled meet1ngs. The draft working paper Will be distributed to the planning advisory committee at least one week prior to a scheduled meeting. Page I 25 BOWERS FIELD-AIRPORT MASTER PLAN Product: A narrative and graphical summary of the alternatives analysis; the working paper will be revised/amended as necessary based on review comments and will become a chapter of the Airport Moster Plan report. Task 7 .5 -Select Preferred Development Alternative Based on review and comment of the preliminary development alternatives, Kittitas County will select a preferred development alternative for the Consultant to proceed with preparation of an airport capital improvement program and airport layout plan drawing set. The preferred alternative may Include elements from one or more of the preliminary development alternatives, or may include refinements that were created during the evaluation of the preliminary alternatives. Comments provided by the master plan PAC, FM, Kittitas County, airport users and tenants, and the general public will be documented and summarized in memo form. A preferred alternative will be recommended with a description of the basis for the preference of the alternative over the others. The recommendations will be presented to Kittitas County for final review and approval of the preferred alternative. As noted earlier, the preferred alternative must be consistent with all applicable FAA technical standards and regulations . Product: Kittitas County selected preferred development alternative to be reflected in graphic depiction and narrative description. A preferred alternative figure and an addendum to the alternatives working paper. ELEMENT 8 • AIRPORT LAYOUT AND TERMINAL AREAS PLANS The previous Airport Layout Plan drawing set will be updated, using AGIS data, to reflect current conditions, updated master plan development recommendations, and all applicable FAA airport design standards. All of the major development proposed In the Capital Improvement Program (CIP) will be shown on the ALP in schematic form. All drawings will be exported from AGIS Into AutoCAD and formatted with color imaging and use of color aerial photography. It will be developed according to FAA SOP 2.00 and 3.00. ALP Drawing set Submittals 1. Preliminary Draft ALP Drawing Set and .pdf files (1 copy each to Kittitas County, FAA Seattle ADO, and WSDOT Aviation for informal coordination); 2. Draft ALP Drawing Set (3 copies to Kittitas County; 6 copies to FAA Seattle ADO; 1 copy to WSDOT Aviation for formal coordination, with FAA SOP 2.00 ALP Checklist and FM SOP 3.00), and .pdf files to each recipient. Page I 26 BOWERS FIELD -AIRPORT MASTER PLAN 3. Final ALP Drawing Set (3 copies to Kittitas County for signature; to be forwarded to FAA Seattle ADO for approval and signature; 1 signed set returned to Kittitas County); 1 additional unsigned "final" drawing set provided to WSDOT Aviation. 4. Final ALP Drawing Set Electronic Flies. PDF files of the final ALP drawing set will be provided to FAA, WSDOT, and Kittitas County. AutoCAD(.dwg) files will be provided to Kittitas County. See Element 15 for document distribution summary. The Consultant will be responsible for submitting a signed copy of the FAA ALP checklist with six (6) copies of the draft ALP submittal to the FAA. Following completion of FAA and local review, the Consultant will make all necessary revisions; comments provided by Kittitas County staff, the master plan PAC and others will be addressed during the same revision period. Following revision, the Consultant will submit three (3) final drawing sets for Kittitas County signature and final submittal to FAA for signature . The FAA typically returns one signed ALP set to the Sponsor and keeps two sets on file at the ADO. Task 8.1 -Airport Layout Plan An Airport Layout Plan (ALP) drawing shall be prepared in accordance with the findings, recommendations and approvals resulting from the study. The ALP shall be developed utilizing the data collected from AGIS and exported into AutoCAD, Version 2012. Additionally, the ALP will be compatible with the file format currently used by Kittitas County. The Airport Layout Plan will contain the information as required in FAA Advisory Circular 150/5300-13, and the most current FAA SOP 2.00 and SOP 3.00. The Airport Layout Plan will contain sufficient data to obtain approvals from the FAA. The Airport Layout Plan will be depicted as a black and white line drawing with color, as needed, to help differentiate the line work and hatching. Product: Preparation of an Airport Layout Plan In AutoCAD format, compatible with the file format currently used by Kittitas County. Task 8.2 -On-Airport Individual Area Plans Individual Area Plans will be prepared to depict the existing and proposed facilities for various areas within airport property. The plans will generally be comprised of, but not limited to existing general aviation facilities located on the south side of Runway 7 /25 and any new general aviation areas (locations to be determined through master plan evaluation). Facilities that will be shown on the drawings include: A. Apron Configuration and Aircraft Parking Positions (based and itinerant aircraft, Including helicopter parking positions); B. Aircraft Taxiways and Taxilanes; Pege 127 BOWERS FIELD -AIRPORT MASTER PLAN C. FBO/Corporate Aviation Facilities; D. Access Roadways and public vehlcle parking; E. Security Fencing and Gates; F. Fueling Facilities; and G. DNR and CWU lease areas. The information on this drawing shall be depicted at a scale consistent with FAA SOP 2.0. Product: Individual Area Plans projecting development consistent with the ALP drawing, but in greater detail. Task 8.3 -Airport Airspace Drawing (FAR Part 77) The FAR Part 77 drawing depicts the plan view of the ultimate FAR Part 77 Imaginary surfaces for the airport. The existing and future full-length approach plan and profile views to each runway end. Any obstructions will be listed, the amount of penetration determined using AGIS data and their proposed disposition will be identified. Fifty-foot contour intervals will be shown for all FAR Part 77 imaginary surfaces for full length of all approach surfaces. The 2012 Airspace Plan drawing reflected all available obstruction data at the time of drawing preparation; however, this data will be updated with AGIS data collected. The Incorporation of survey data collected through the Airport GIS (AGIS) survey project (Element 14) will be the source data for the drawing. AGIS-generated data is summarized in the attached AGIS Feature Class spreadsheet. An aerial photo will be used In the development of these drawings. USGS quadrangle maps will be utilized for the base layer on the Part 77 plan view. Product: A FAR Port 77 airspace plan drawing for the airport. Task 8.4 -Runway Protection Zone (RPZ)/lnner Approach Plan and Profile Drawings Drawings will be prepared that show the plan view of the Runway Protection Zones (RPZ) and plan and profile views of the inner portion of the runway approach surface for each runway end. In addition, obstacle clearance surfaces (OCS) or TERPS instrument runway departure surfaces will be depicted, as applicable. Any obstructions within the RPZ or the other noted surfaces will be identified and a recommended disposition will be provided. Aerial photography may be used to develop these drawings. This drawing may be combined with other drawings. Product: A Runway Protection Zone/Approach Plan and Profile drawing that shows the RPZs for each runway end at the airport. Page I 28 BOWERS FIELD -AIRPORT MASTER PLAN Task 8.5 -Approach Plan and Profile for Each Runway End Drawings will be prepared that show the existing and future full approach plan and profile for the approaches to each runway. In addition, obstacle clearance surfaces (OCS) or TERPS instrument runway departure surfaces will be depicted, as applicable. Any obstructions within the approaches will be identified and a recommended disposition will be provided. This drawing may be combined with other drawings. USGS maps will be utilized. Product: An Approach Pion and Profile drawing that shows the Part 77 approaches for each runway end. The ultimate Part 77 approach pion and profile will be prepared for the most critical airfield configuration (existing or ultimate). TERPS instrument runway departure surfaces w/11 also be depicted If applicable. Task 8.6 -Threshold Siting Surface Drawings for Runways 7, 25, 12, 30 A Threshold Siting Surface Drawing will be prepared based on the findings and recommendations reflected in the preferred alternative. A plan showing the existing and ultimate threshold siting surface will be developed for each runway end. Plan and profile views of each area will be developed Identifying all physical obstructions. The obstruction's height and location will be noted based on available survey data. Any obstruction requiring removal or relocation to meet FAA standards will be noted and an action plan identified. This drawing may be combined with other drawings, if appropriate. Product: A Threshold Siting Surface drawing depicting the surfaces for each runway end. Task 8.7 -On-Airport Land Use Plan The Land Use Plan drawing will depict existing and recommended uses of all land within the ultimate airport property. Current zoning designations for the Airport will also be depicted. The Land Use Plan will be illustrated on a drawing (same sheet size and scale as the ALP) and described within the body of the Master Plan document. Findings resulting from this study effort will be incorporated into environs land use recommendations that will be provided to affected governmental jurisdictions In the vicinity of the Airport. The Consultant will work with Kittitas County during the development of the On-Airport Land Use Plan to ensure accurate depiction of local land use. The airport layout plan and on-airport land use plan drawings are Intended to provide a clear path for effective and efficient facility development based on anticipated demand, while providing airport management adequate flexibility to refine facility configurations as needed to respond to changing market conditions. ""-m'Ce NTURY W .1!.ST ~ ..:,,,...,,'li ,,~r.<i i'i.WvXitlV...-Page I 29 BOWERS FIELD -AIRPORT MASTER PLAN Product: An On-Airport Land Use Plan for all land within the ultimate airport property. Task 8.8 -Off-Airport Land Use Plan The Off-Airport Land Use Plan drawing will depict existing and recommended uses of all land in the vicinity of the airport, generally identified as that area surrounding the airport, generally within ½-mile of the facility. Land uses will be depicted by existing and future comprehensive plan land use categories, including such as agriculture, residential, Industrial, commercial, open space, aviation-related, public, etc. Current zoning designations will also be depicted. Off-airport land use will be Illustrated on a drawing (same sheet size as the ALP) and described within the body of the Master Plan document. Findings resulting from this study effort will be incorporated into environs land use recommendations that will be provided to affected governmental jurisdictions in the vicinity of the Airport. The Consultant wlll work with the Kittitas County and City of Ellensburg planning departments during the development of the Off-Airport Land Use Plan drawing to ensure that recommendations needed to implement any changes in land use designations or zoning have been thoroughly reviewed. It is noted that master plan addresses a 20 -year planning horizon that does not typically require immediate implementation for all action items. Product: An Off-Airport Land Use Pion for lands in the vicinity of the airport. Task 8.9 -Exhibit "A" Airport Property Map An Exhibit "A" drawing wlll be prepared depicting property ownership, avfgation and surface easements. The current airport boundary along with detailed parcel information (granter, grantee, type of interest, acreage, book & page, date of recording, and appropriate FAA project application numbers if applicable is to be provided to the Consultant by Kittitas County or secondary sources. The Exhibit "A" will be prepared in accordance with FAA SOP 3.0. Product: Exhibit "'A" Property Mop ELEMENT 9 -COMPATIBLE LAND USE PLANNING IN THE VICINITY OF AIRPORTS The Consultant will evaluate both airport and off-airport land uses In the vicinity of the airport to address the potential development of a broad range of land uses that are compatible with airport operations and support the region's economic development strategy. The goal of this effort ls to identify what types, acreages, and locations of economic development land are appropriate and legally allowed to be identified for future development compatible with the aeronautical operations at the airport. Pagej30 BOWERS FIELD -AIRPORT MASTER PLAN The Consultant will review zoning of developable land in the vicinity of the airport to assess the potential for zoning modifications to protect the future aeronautical uses at the airport, encourage land uses compatible with airport operations, and encourage future economic development near the airport. The updated airport land use plan drawing will reflect e><isting land use and zoning on, and In the vicinity of the airport, per the requirements of FAA. The land use plan drawing will also depict the physical boundaries of any locally-adopted airport overlay zones. The Consultant will obtain all e,cisting zoning and land use mapping from Kittitas County for use in updating the drawing(s). Product: The outcomes of the Airport Vicinity Land Use evaluation will be compiled Into a draft chapter that includes an executive summary with recommendations for potential land use and zoning changes. It will also include a summary of items to be included in the Airport Moster Pion report, as necessary. ELEMENT 10 -PRIORITIZED CAPITAL IMPROVEMENT PROGRAM. COST ESTIMATES. AND IMPLEMENTATION PLAN The master plan's 20-year CIP will summarize all development and major maintenance projects anticipated during the current planning period. The Consultant will work closely with Airport Management to identify key development priorities to be reflected in the updated CIP. The cost of each project will be listed with the amount of FAA and local Kittitas County participation defined based on current funding eligibility. The CIP will provide an .annual breakdown of projects for the short-tenn period (years 1-5); then overall groupings of projects provided for the intermediate (years 6-10) and long-term (years 11-20) periods. Task 10.1-Capital Improvement Program The Consultant will prepare a 20-year airport Capital Improvement Program (CIP), which will Include recommended phases of development, estimates of cost for each improvement, possible funding sources, including an evaluation of the airport's predicted available FAA grant funding based on current funding legislation. The CIP will also estimate local expenses associated with project implementation that are not typically eligible for FAA funding. The short-term period of the CIP (years 1-6) will be organized with prioritized annual project listings; projects included in the Intermediate and long term periods will be prioritized within the overall tlmeframe. A phasing diagram will iden tify each development and major pavement maintenance project programmed in the 20-year planning period. Product: A 20-year CIP (in spreadsheet form and project phasing diagram, with associated text.) Page I 31 BOWERS FIELD -AIRPORT MASTER PLAN Task 10.2 -Capital Improvement Program Working Paper The Consultant will develop a detailed working paper describing the tasks outlined above. This working paper will be submitted to the FAA and PAC members for review and comment approximately two weeks prior to scheduled meetings (See Element 15 for' docume-nt distribution deta ils). The draft working paper wlll be distributed to the planning advisory committee at least one week prior to a scheduled meeting. Product: A narrative and tabular summary of the financial analysis. The working paper will be revised/amended as necessary based on review comments and wf/1 became a chapter of the 2015-2035 Airport Master Plan report. ELEMENT 11 -AIRPORT FINANCIAL PLAN In concert with the 20-year CIP, an airport financial plan will be prepared that analyzes airport revenues and maintenance & operation expenditures for use in updating short-and long-term operating strategies. The Consultant will also review the current airport rates and fees schedule for comparison with other similar airports located in the defined airport service area. Evaluating the market potential for airport land and the remaining useful life for county-owned structures and any other structures of interest, pavement and other facilities are generally key elements in defining strategies. The financial impact of deferred maintenance will be examined in detail with the goal of creating a realistic schedule for addressing these needs in terms of financial feasibility. Task 11.1-Flnanclal/lmplementation Plan Projections of the airport operating revenue and expenses will be prepared to coincide with the 20-year CIP. The financial plan will be developed from data acquired during the inventory (Task 3.8) and through interviews with Kittitas County staff. Specific assumptions regarding potential changes in expenses or revenues will be coordinated between Kittitas County and Consultant and will reflect the general timeframe for major revenue-generating projects or increased maintenance or operational costs. The projection is to Identify the levels of airport-generated funding that may be available to support the capital improvement program during the current planning period. The financial planning will support the implementation planning for the master plan CIP, developed in Task 10. The implementation plan will identify key steps moving forward, agency coordination, etc. Product: A 20-year airport revenue and expense projection. Page 132 BOWERS FIELD-AIRPORT MASTER PLAN Task 11.2 -Financial Plan Working Paper The Consultant will develop a detailed working paper describing the tasks outlined above. This working paper will be submitted to Kittitas County and FAA for review and comment approximately two weeks prior to scheduled meetings (See Element 15 for document distribution details). Product: A narrative and tabular summary of the financial analysis. The working paper will be revised/amended as necessary based on review comments and will become a chapter of the Airport Master Plan report. ELEMENT 12 -AGENCY COORDINATION Effective coordination with local and regional jurisdictions and state and federal agencies Is a critical element in the success of any long-term planning process. Agency coordination will be Initiated at the earliest stages of the project and maintained throughout to provide effective lines of communication. Task 12.1-Prepare List of Agency Stakeholders The Consultant will work closely with Kittitas County staff at the outset of the project to create a comprehensive list of agency stakeholders with their respective areas of interest/responsibility Identified. A list of non-agency stakeholders will also be created (see Task 12.1). Product: Agency stakeholder list to be utilized for project coordination and document distribution. ELEMENT 13 • PUBLIC PARTICIPATION AND INFORMATION PROCESS Task 13.1-Identify Project Stakeholders Century West will assist Kittitas County in Identifying project stakeholders for the purpose of creating a project contact list. The contact list will be used to provide periodic updates on the study process, provide Information about the availability of draft work products, and to announce upcoming project meetings or other related events. Project stakeholders may include individuals, businesses, organizations, or government entities (See Task 11.1) that have an interest in the planning, development or operation of Bowers Field. ~3.1.1-Defi ne Roles and Resp o nsib ilities As the first step of the public Involvement process, the Consultant will work with Kittitas Countv to develop a framework for the process that defines the roles and responsibilities for all participants. It is critical to manage expectations from the beginning by defining the level of input of all participants and identifying the key decision points and decision makers. The roles and responsibilities will be clearly ~m-c et'j7 uRv WEST VI :,Jl~lll' U.\I riiWilJh,, Page ( 33 BOWERS FIELD -AIRPORT MASTER PLAN defined on a one page handout that can be used at all meetings to establish the framework and control the process throughout the project. 13.1.2 -Planning Advisory Committee (PAC} A Planning Advisory Committee (PAC) with approximately 12 members will be assembled to provide Input and allow for public dissemination of data . The PAC will include members of the Bowers Field Airport Advisory Committee (up to 8 positions), which Includes representation from several organized stakeholder groups. Additional "at large" members may be appointed to e,cpand the master plan PAC beyond the established airport advisory committee, and may include airport tenants, pilots, local & regi onal economic development interests, neighbors of the airport, and staff/repre_sentatlves of Kittitas County. In addition to the membership composition and number noted above, representatives from the FAA Seattle Airports District Office (ADO) and WSDOT Aviation Division will serve as ex officio members of the PAC. Up to four (4) PAC meetings will be held during the co urse of the study and will be held on the same day or in conjunction with the public Information meeting described below during plan and program development. The Consultant will be responsible for conducting the meetings, reviewing the scope of the project, presenting the findings and recomrnen·dations of the plan and program, preparing written meeting summaries, and responding to any technical and professional questions and concerns. The Consultant will prepare any supplemental handouts or presentation graphics needed for the meetings. PAC meetings will be held corresponding to the following project milestones; (1) kick off & inventory (combined with data collection to confirm draft inventory chapter contents); (2) aviation activity forecasts & facility requirements; (3) Preliminary development alternatives; and a final meeting to present the (4) preferred alternative, draft CIP, and draft ALP prior to formal submittal for approval and adoption. 13.1.3 -Public Informational Meetihgs Up to two (2) public informational meetings will be scheduled during the project in conjunction with PAC meetings. The process of evaluating airport development alternatives will involve meetings to initially present preliminary concepts, followed by presentation of refined concepts, eventually leading to the Kittitas County's selection of a preliminary preferred alternative. Input provided from all sources, including neighbors, the general public, PAC members, Kittitas County officials and staff, FAA, and WSDOT Aviation will be considered in the formulation of the preliminary preferred alternative. Coordination with Kittitas County will occur simultaneously during the alternatives evaluation stage of the project to ensure that all issues are fully considered. Additional refinement and public comment will also be encouraged after the preliminary preferred alternative is selected. This Input Is designed to refine the proposed development that will be reflected in the preferred alternative. Page I 34 BOWERS FIELD-AIRPORT MASTER PLAN The public informational meetings will be organized as public workshops to inform the public in general and to provide a forum for neighbors and stakeholder groups to discuss the project and provide input. The meetings will be scheduled to coincide with PAC meetings (same day or consecutive day). Participants would be invited to complete a survey early in the project to provide feedback on the effectiveness of the initial public participation program and to provide suggestions for future public participation events . The survey will be developed jointly by Kittitas County staff and the Consultant and may be either web-based (i.e., SurveyMonkey, etc.) or distributed through direct mailing . The survey is not intended to provide a scientifically based analysis tool, but will provide a general indication of key areas of interest within the community and at the airport. Public notification of upcoming meetings will be provided through the project malling list and website. Public notice of upcoming meetings shall be made at least one week prior to the meeting date (or as prescribed by Kittitas County public meeting notice requirements), and are subject to newspaper printing deadlines. Newspaper advertisements are the responsibility of Kittitas County. 13.1.4 -pro ject Kicko ff Work shop The first meeting will serve as the project kickoff meeting designed to provide information about the project and planning process and to obtain public Input to Identify key issues or concerns. The specific format and organizational elements for the meeting will be determined by Kittitas County staff and the Consultant. However, for the first public meeting, we propose to hold a workshop that provides an informal setting to provide information to the public, collect input and answer questions. The meeting would be staffed by several members of the Consulting team and Kittitas County staff, with other stakeholders Invited to attend/participate. Several information areas would be used to address likely key issues related to the project (examples include airport noise, current activity highlights, land use, community growth, etc.). Each informational station would be organized to encourage questions and to provide an opportunity for the public to provide written comments. A project mailing list will be created and maintained throughout the project for use in actively encouraging public participation. Invitations to public meetings, project newsletters and PAC meeting summaries will be mailed or sent via email from the mailing list, in addition to public advertisement . Project newsletters will be prepared and distributed periodically during the project to summarize meeting highlights, including a summary of key issues identified by the public. The project newsletters and draft project deliverables will also be available online. Issues requiring additional or periodic follow- up or public briefing will be tracked throughout the project. See summary below for more information about the public participation plan. Page I 35 BOWERS FIELD -AIRPORT MASTER PlAN Public Participation Meeti ngs Summary: A. Establish Planning Committee Advisory (PAC) B. Four (4) PAC meetings to be held during the course of the project. The PAC meetings will coincide with presentations at key project milestones (1) inventory; (2) aviation activity forecasts; (3) facility requirements & preliminary development alternatives; (4) preferred alternative, draft CIP and ALP. c. Two (2) Public Information Meetings to be held during the course of the project, to be scheduled coinciding with PAC meetings. Assumptions: Kittitas County will be responsible for coordinating scheduling of Planning Advisory Committee (PAC) and other public meetings, providing facilities for such meetings, and providing all required notification to PAC members and/or the general public. The Consultant will provide the content for the announcements and notifications. Kittitas County will advertise the date and time of the meeting to allow public attendance as desired. Meetings will follow Kittitas County policy for public meeting announcements. It is anticipated that meetings will be advertised locally and notice will be provided via the project mailing list and on the project website. 13 ,2 -Public Information Program In addition to the opportunities for public participation available through public meetings and committees, the Consultant will prepare and implement a public information program to disseminate project information and collect Input from the public that may not be able to participate in established meetings. 1~.2.1-Project Stakeholder List The Consultant will prepare and update regularly a project stakeholders list that Includes all participants in the project including Kittitas County staff, Consultant, FAA, WSDOT Aviation, and other agency staff, PAC members, airport users, neighbors and neighborhood association representatives, and members of the general public that choose to participate in the process. A mailing list will be developed so that surveys, project updates, newsletters, meeting summaries and meeting invitations can be mailed or emailed to stakeholders during the project. The Consultant will prepare content for any mailings and Kittitas County will be responsible for making copies and mailing out materials including postage costs . 13.2.2 -Public Meeting Notices/Press Releases The Consultant will prepare content for up to four (4) public meeting notices and press releases of scheduled meetings to assist in the advertisement of meeting purpose and other pertinent details by the Kittitas County staff. The Consultant will coordinate with Kittitas County staff to develop a schedule for advertisements once the overall project schedule is developed to ensure that adequate advance notice Page 136 BOWERS FIELD -AIRPORT MASTER PLAN is provided to the public for project meetings , Kittitas County will assume all costs of advertising and press release announcements in the local media and will coordinate with Kittitas County IT staff to post notices and press releases to the county website. 13.2.3 -Website Content for Kittitas County or Century West Hosted Project Website The Consultant will provide project deliverables including draft chapters, meeting agendas, meeting notices, press releases, surveys, and meeting notes to Kittitas County in PDF format to be uploaded on the Kittitas County web page or a project-specific website hosted by Century West if desired. Kittitas County will determine what content is suitable for public consumption. The project web page will provide an opportunity for the public to review project deliverables and progress throughout the project. It can also be used to solicit public comment through posted surveys for those unable to attend the public meetings. 13.2.4 -Public Meeting and Online Questionnaires The Consultant and Kittitas County staff will jointly develop up to two (2) questionnaires to solicit input from the public at key points during the project. Typically public Input at the Facility Requirements stage prior to the development of alternatives and at the Alternatives stage is Important to define needs and also get input towards the selection of the preferred alternative. Questionnaires will be distributed and collected at public meetings and can also be made available on the project website. 13.2.5 -Public Meeting Notes and Comment list The Consultant will prepare notes for all meetings for Kittitas County to review. Once the meeting notes have been reviewed, edited, and approved, the Consultant will provide a PDF copy to post to the project web page. The consultant will also prepare a summary of comments received and Kittitas County responses that can be posted on the website. ELEMENT 14 -PLANNING FOR COMPLIANCE & RECYCLING ANO SOLID WASTE MANAGEMENT PLAN The Consultant will evaluate airport compliance issues as they are defined by the FAA's Seattle ADO. The tasks included in this element are to be completed during the last one-third of the project In order to fully benefit from information and data collected and evaluated during the earlier master plan elements. Data collected initially during the data collection and inventory (Element 3) will be updated as needed to ensure currency when the work is completed. Needs identified through this review will be incorporated into the Airport Layout Plan and CIP. Page 137 BOWERS FIELD -AIRPORT MASTER PLAN Task 14.1-FAA Compliance Summary Ob !ective Applying for and receiving Airport Improvement Program (AIP) grant funding contractually obligates an airport sponsor to comply with the Assurances contained in the application package. FAA makes continual efforts to educate sponsors in general about their grant obligations, but much of FAA's compliance efforts with Individual sponsors Is reactive, in that violations come to FM's attention and require correction. The objective of this task is to take a proactive-even preemptive-approach to achieving compliance and avoiding noncompliance at a specific airport with its unique circumstances by examining existing and potential compliance issues as part of an airport planning project. Approach The airport sponsor through their Consultant will conduct a thorough review of the approved airport layout plan (ALP), Exhibit 'A' Property Map, Airport Ordinance (if any), Zoning Ordinance, Rules and Regulations, Minimum Standards, airport enterprise fund/budget, leases, easements, permits and any other pertinent governing documents to ascertain consistency with the Assurances. A common-sense "look-around" will also take place to identify potential problems, such as: A. incompatible land uses in the airport environs and/or an absence of appropriate airport- compatibility zoning B. existing "through-the-fence" access for aircraft based off airport property and/or possible future requests for same (especially residential airparks) C. revenue diversion (Including improper use of airport property) o. on-airport residential use (sometimes called "crew quarters") E. non-aeronautical local events closing the airport or a runway (such as drag racing on runways) F. unabated wildlife attractants G. trees or structures (possibly unstudied/uncharted) obstructing the airport's airspace H. anything else in conflict with the Assurances or sound operation of the airport Product A. Summarize current compliance with FM Grant Assurances. B. List and describe any existing and potential compliance issues, referenced to the specific Assurance or other obligation involved. C. For existing violations, recommend remedies and time frame for achieving compliance. o. For potential violations, recommend strategies to avoid noncompliance (i .e., new ordinance) E. Develop and implement a strategy/program to educate the airport sponsor's decision-makers and the general public on the components and importance of compliance . Include educational -Mc ~NTUf!Y W l!:aT ~ .::,.\1i,,i ,~'"u..,,11o u,~fvllihtP Page I 38 BOWERS FIELD -AIRPORT MASTER PLAN materials for officials and citizenry on Federal and State requirements, and develop tools for understanding grant Assurances. Product: "Draft" Airport Compliance Summary working paper will be provided to the KITTITAS COUNTY and FAA. FAA deliverables defined in Work Element 15.4; Kittitas County deliverables defined in Work Element 15.5. Task 14.2 -Recycling and Solid Waste Management Plan # The FAA Modernization and Reform Act of 2012 (FMRA) extended the FAA Airport Improvement Program through 2015. Along with the reauthorization of the program, FMRA included a number of changes to the AIP program. One such change is the requirement of airport sponsors to develop a recycling and solid waste management plan. The specific guidance is included in Program Guidance Letter 12-08 (PGL 12-08) and is as follows: dd. Develop o pion for recycling and minimizing the generation of airport solid waste. The scope must be consistent with applicable State and local recycling laws and must include the following: 1 A waste audit; 2 The feasibility of solid waste recycling at the airport,· 3 Minimizing the generation of solid waste at the airport; 4 Operation and maintenance requirements; 5 The review of waste management contracts; and 6 The potential for cost savings or the generation of revenue. 14.2.1 Waste Audit The Consultant will perform a waste audit of all current sources of waste material currently generated on the airport. The audit will summarize material source, amount, current disposal protocol, and applicable State and Federal requirements for disposal, if any. This will include waste material generated from standard annual operations at the airfield and a basic summary of construction waste material generated through airfield Improvement projects. The waste audit will catalog waste sources including hangar tenants, FBO and maintenance hangar wastes, annual event wastes, deplaned waste, routine airport infield maintenance waste (yard debris), and construction waste generated through projects identified on the 5 year CIP. The waste audit will summarize waste over the busiest summer month and also include estimates for any annual events . Page 139 BOWERS FIELD -AIRPORT MASTER PLAN The "ownership" and responsibility for recycling or disposal of each waste source will be identified in the audit. 14.2.2 Recycling Feasibility The Consultant will review the waste material identified in the waste audit and evaluate recycling feasibility for each constituent. The consultant will provide a table with a list of waste materials with recommendations for recycling options for each, if applicable. This task will include contacting local waste management and recycling vendors to understand the availability of recycling for each waste stream and a review of logistical requirements, local ordinances, state requirements, hauler and landfill requirements, and associated costs. The findings of this review will be summarized to identify current practices, opportunities, and barriers to recycling at the airport. 14.2.3 Plan to Minimize Solid Waste Generation The Consultant will work with the Airport Sponsor to develop a plan to minimize solid waste generation on the airport. The consultant will utilize the list of solid waste constituents generated in the waste audit and provide recommendations for waste reduction opportunities for each, as applicable. The plan will Include the following elements: A. Waste reduction policy and goals statement; B. Waste tracking protocols, recycling effectiveness, and reporting; C. Summary of lease requirements, local ordinances, development specifications related to waste reductions, and purchasing policies; o. Summary of physical constraints and requirements for recycling best practices; 14.2.4 Operational and Maintenance Requirements The Consultant will review operational and maintenance activities that produce waste materials and evaluate opportunities to reduce, reuse, or recycle materials generated from these activities. A summary will be provided that includes each category of waste and who is responsible for the costs, maintenance of equipment, and overall Implementation of the plan for each type of waste. 14.2.5 Review Waste Management Contracts The Consultant will review existing waste management contracts for the airport and airport users and tenants to identify cost saving and recycling opportunities for waste materials generated at the airport. This will include a review of current contracts including janitorial contracts, tenant leases, and standard contract specifications for all maintenance and development projects. It will also include a review of Page J 40 BOWERS FIELD -AIRPORT MASTER PLAN current contracts for waste management including the hauling contract, and landfilling contract to will identify opportunities for recycling through existing and other locally available providers. 14.2.6 Potential for Cost Savings or Revenue Generation The Consultant will review all elements related to the generation, reuse, recycling, and disposal of all waste materials generated on the airport and evaluate and provide recommendations for costs savings or revenue generation. This section will include the following tasks: A. Plan for future development projects including hangar construction, tenant improvements, landside and airside facility development and rehabilitation projects. B. Opportunities for periodic review to identify if market dynamics have changed (i.e., glass recycling pick up becomes available for the airport area.); C. Recommendations for Implementation including immediate actions, short term implementation, and ongoing actions triggered by events or projects. This will also include recommendations for modifications to project specifications and airport contracting procedures to require recycling, as appropriate, for future projects and agreements. D. Summary of cost savings or revenue generation at the airport through the implementation of the plan. Product: "Draft" Airport Recycling and Solid Waste Management Plan working paper will be provided to Kittitas County and FAA. FAA deliverables defined In Work Element 15.4; Kittitas County deliverables defined In Work Element 15.5. ELEMENT 15 -REPORTS AND DOCUMENTATION Task 15.1-"Preliminary'' Draft ALP Set In order to address any concerns from Kittitas County or the FAA prior to the public meeting for the ALP presentation, a draft ALP set will be prepared for Kittitas County and FAA preliminary review and comment. Formal reviews will be conducted following the preliminary coordination. Product: "Preliminary Draft" Airport Layout Plan Set will be provided to Kittitas County. FAA deliverables defined in Work Element 15.4; Kittitas County deliverables defined in Work Element 15.5. Task 15.2 -Draft Airport Master Plan Report and Draft ALP Drawing Set To insure proper coordination of the planning effort and assure agreement between the Consultant, Kittitas County and FAA, a Draft Airport Master Plan Report and Draft ALP drawing set will be submitted Page I 41 BOWERS FIELD -AIRPORT MASTER PLAN for formal review. The draft report will contain all preliminary working papers (revised based on comments provided on original drafts), ALP drawings and the financial evaluation. Comments provided in the previous task will be reflected In the updated ALP drawing set submitted for formal review. The draft documents and plans will submittal to the FAA for review and coordination with the appropriate FAA divisions (Air Traffic, etc.). Product: "Draft" Airport Layout Plan Set and "Dra/t11 Airport Master Plan Report will be provided to Kittitas County. FAA deliverables defined In Work Element 15.4; Kittitas County deliverables defined in Work Element 15.5. Task 15,3 • Final Report and ALP Drawing Set The Final Airport Master Plan Report and ALP drawings set will be prepared and distributed based on comments received from the FAA final coordination/review process and any subsequent comments received from Kittitas County, WSDOT Aviation PAC, or general public. This will be the final publication of the report and plans set. Product: "Final" Airport Layout Plan Set and "Final" Airport Master Plan Report will be provided to Kittitas County. FAA deflverables defined in Work Element 15.4; Kittitas County deliverables defined in Work Element 15.5. Task 15.4 -Summary of Products to FAA Product: Draft Working Papers (Chapters) with Track Changes Draft Working Paper (Chapters) Draft Final Report (Revised Chapters) with Track Changes Preliminary Draft ALP Print Sets Draft Final Master Plan Report Final Draft ALP Prints (bond) & FAA Checklist Final ALP Prints (bond) Final ALP Drawing Set Final Master Plan Report Quantity 1-Hard Copy 1-Electronic Copy (Word) 1-Hard Copy 1-HardCopy 1-Electronic Copy (Word) 1-Hard Copy 1 Electronic Copy (PDF) 6 -(FAA internal airspace & other coordination) and .pdf of sheets 3 -(Kittitas County/FAA approval set) 1-CADD Files and PDF 1-Hard Copy; 1 Electronic Copy (PDF) Page j 42 I BOWERS FIELD -AIRPORT MASTER PLAN Task 15.5 -Summary of Products to Kittitas County The items listed below include distribution to Kittitas County. Product: Draft Working Papers (Chapters) with Track Changes Draft Final Report (Revised Chapters) with Track Changes Preliminary Draft ALP Print Sets Draft Final Master Plan Report Draft Final Master Plan Report Final Draft ALP Prints (bond) & FM Checklist Final ALP Prints (bond) Final ALP Drawing Set Final Master Plan Report Task 15.6 -Surveying, Elevations, and Profiles Quantity 15 (each) -Hard Copy; Project Notebook (includes PAC) 1-Electronic Copy (Word) 15 (each) -Hard Copy; Project Notebook (includes PAC) 1-Electronic Copy {Word) 1-Hard Copy 5 -Hard Copy for Sponsor Review 15 -Electronic Copies (PDF on CD) 1-(FAA Internal airspace & other coordination) 3 -(Kittitas County/FM approval set) 1 -CADD Files and PDF 5-Hard Copy; 15 Electronic Copies (PDF on CD} Topographic and obstruction data from AGIS (see Element 2) will be used for development of all plans. Task 15. 7 -Scope Assumptions/Clarifications 1. The Consultant will coordinate and schedule all meetings between Kittitas County, FM, and the Planning Advisory Committee (PAC) established for this planning effort. 2. Kittitas County staff, the FAA, WSDOT Aviation and the PAC will provide the Consultant with a maximum of two rounds of comments for each project item. The Consultant shall receive review comments from all groups within three (3) weeks of the submittal or presentation. The consultant shall then address and resolve their comments prior to proceeding with the next scope of work element. Page ( 43 I ,1iau,.,_. ~FELD 0 AIAPOR1MM1EJllftLAN ~, ....... .... •···-··-·- -r,• .. •••-•u•••""'W,Jll -• ~, .. .... u-._aa.. . _ _._...._.,..c....u.i,. .... \... ,~ .. ... ~-~l -~, ·-··--• ,ur<1: MAU ,_. 1 a..u-.0tw1~ ..... ,...._._. •'---• ·-_a •t IJ.&'ta itM•l-G&Jrilft'._,. .• ,. ..... ---·• , .. .... •-· ...... -... __, .. -~ ...... -..., .. -•!U lh "..___H " .. -~ :Qp".-•-11 ....... .1.n.-, ,.. '~•·ft .. _ ..... __ Lt ,~. -" • lthl.-.i.l\.at - . n ~ .... ~ ........ L il ·--ITutill ~ • ~. ~nCAL&-O'TM'TYf---n AMOV .. _ 1,,. ... •.&0tYAJl•tvan H ....... ..,....,0.,-..-... -· ·, ~--,...__....-, .. --.. ,~ ...... ., ... t ......... ~&tD.i ... , ......... ,.. ,._ .. ..1 v~,,- u ~ ..... ..._.. :....__., .. t .. --Ht-··------~· .... ......._,.,_~-~·---···--~ ·~ -.-.. ,.,__...,~ ... ~~llardanl1&,AIIP1rt1f~Scandtrdl, . ~-... ~- •• 0.1'1,tN,.W.(ac,9: ... ln.........1 .. -.~ r.cH11•illl,,., . .- IA......i.....:r .... , ..... _,,.__.._~-·-· 1•-·ll ludaf '·-~· iu ................. -.. .. ~••t•tu,1 Lt ,_ '"'--"'-"'---•-·11·-,. ,..,.,.(,-" ... ~. -· ~" ··•--t,1.....-i.rtfl .. ---~i... ''""~~----.. ., . ...._, t~r:J, u nnll.&.YNUAAt.&i'ftO •.. '"'-•"'Dt""'__. p i.... ........ .,~o._.w~,.,~..,. •• ·-• r-._......_.fl.-t••11f~I/IHH , .. -.~1•-H .. ~ ... --, 1, .. .u'l:a. .,_t jllll M Ct,_. ............. ANl!i..ti.l •••• .,.._.t -· .1>111o....,•11a<otJI , ... -........ AAl'Al II UN"l " ·'--"'U.TM ~ u °" ,ll......-.-••----1an.1 lu "" •~-... ----... , ........ .. n.,... ,. ,llba a.-.....J.L. l)i ---• u .a -~,:Mll ~A µrl_.._1.., _...__ , .... u 11o ...-~i-~-~a.l1011IIWila11tl-,._1J1..-.i',,1:1 . , o-,o.--.. .-,u..a.....,., IU M .ll>'Mri U l-•11 ~1'Wn LI 1t,t1w.•11,•u ..... ··•---at.lit lul .. aa.,-,11 '·-~• ~ .... Kft8 -......,.,., UIC:~IH ~~o, ··-·· ,~ r..,1.1.u ,1u.1 -1in1•1l... .... u-... ~--•·-· 1 .:1 • .. -· FEE ESTIMATE BOWERS FIELD AIRPORT MASTER PLAN / AGIS SURVEY July 1.C, 2015 c,murvWulf11•1-• .... ,::..,JL -_...,. ..... ..... ......... C.000 1Nl'it11,-. .. . -~ ·-· ··~ I .... .... -...... ~ ,,05m ....... 11!,2.tJO tnuo IHISGO 1&51D I • . • • • . • • .. • • • .. • . • . . •• . • • • I • I I • • • I t . . I . I . • . ' I • O' I 2 • I . . .. 12 • I • . • . • . . I • • • .. . • • . I ' . I • ., ., I • ' . ,· • • . • • 2 ' . II I . • . • • ' .. • .. .. D I . ' • . D ' .. • "" . • • • . . . 1 1 10 . I . ' • 2 • • . 1 • .. . H I • I . •· • . .. . I I . ~ .. • , . .. ' I "' ' . .. • " . . .. J 1 .., D • . • ' ... • .. "' -0 I . . • • • . • ' • . > . ' I c-. . ' ' " I • u • I • D . . , C • ,, n • I • • • . 1 I " .. • I . . l • • 10 . • ~ . " M I • " • I .. • • • 0 ' .. D I .. . . .., D I I . . ,, • • . . ,. ' 1 ' . , D 1 ' . . • • I • • . , . ,. I ' 0 . I II " . .. "' D . . . • I . • . I ' • I • I lubcttruiuNMt ---.. u .... ....... _lo.._ . • ,,,.,,eri " .. ··--.. , . u--· ,. ,., ~ l11111!1N • " ..... ,"' ,. __ • . .. ··--••1 n_.,. . 17 12cau11 • ' •-,a •· 17 11.anoo . . WtU,l.MI . . ·-oo . 1 ->11•m .. • s1m.oo • I 111800 • ' Ut•DO ' ' ~ ' ,. 1.1.A,,UM I .. , •1Ut1h • u 11.u,m • ,, •·•aot.,m • • _,._ • "' ..... - • • .,..m • 114 . ........ ,, • ,..:n.m • I ... u,-wm ' ... •t4..151.IIO • " ~"'"" • .. ~ ...... • " 11.,n1111 I .., IJll,t"--, • .. 1,,,..,.1111 .. ,...., 0 • II t..,.Ni • tl . .... ,,., . ., .. -.. ·--, .. • -·-. , .. u,-- • .. ·--. ,. ••--m D " t.t.Mll~ ' m --···~ • " .,u,_ • " ..... - • .. ••-•oo D .. .,, .. ,. • I ,.,...,,_ .. D • .,_.,, D 17 .,_.., • .. ••b•- • " •"l-]1'111 . IU ,--, .. 0 ,, .... M T 11 11-0I • u II.Alt.» I 1c,wrill f'WU).AIIU'Ol'IT MAITIR PLA.N di.J n,.tlit.,1 •~-u 1;AH1•t.!!;!l!!}!.Um(f"'~..,.I.J.llft-.. 1 n,1 .. •-• ..... ,. ..... J~•~flilO....- ,u 1.i;: __ 1"'11,.. ...... t•-,--. .., ..... ~·----- 1 ••• 1..D ....__.1 ''---.1ttt ••• U il ,_ ..... _ ltJ ~, ... , ..... ~ .. ~,.u , ... ,J-c·-....J·•-• ... , . 1---~ u.,._IA .... ,,~-··-..... -- .,. 1 • .,.,, "": l'Ji••-·4 1fflW .L!.lbu.f.AIJLh:t~l~lll .. --,ttnt.act,..,._.,..._._.,,- , .... ,.1 n.,.,_ ... 1..__.._v,t ·-dlitou IU.'I ,_ .. ·d•-• ··~· .... 1U,e_11T-.at,,._,1.,._.,,1 u.u -..,.__~ ..... -•-n -• .... ~' ' "' , ........ ,1. ........ r-.----,.-"-~ '. , ___ ...,.m.1•----·IJII • jlnJ.11 t:1ia.\4IL.:"-L .. 1.ui 1 ....... Qia.lN.~ ... ,n,..1,1t .... u, 11 ~ ........ • .J • ..,..,itlna.1111__._.._.. ............ ,,_tl'lftll..,.. 11 'i_1 ·-~. c,r.;,~u ni.& !_.,.._ ....... ,._ .... ,..,..,,t,-..,.•.J•W f1di;•uol-• r .. ..,,.,, ·-•""--,u,,fOJlc;OlPl!-•'--•a.-~111r1,l£11 ... , .. ft~•!!!l!!!W'I Jl•~Ji'-tlhM ...... ¥111.w.;,,- .. .l.l l'---""-rp•'l&lt • I.!.,!.!__. l\lhlt~J:t,k\\'1:.it.-i..o...:!llaa. ... 1.....__..h,Nl 11'11t.l.ai.J..u..at1na:A11at ... .... -..~~l&IIWM .... ··• .. C ... ""'" .. • • Q ..... ,~, .... ,1C!L&Cuftl,fl '- 11 .. 1o1t.1.i.t-t1 ·--11 •••--•.,•wl'lftlV'11lur11111.llOH u,.t ~~Uu.Ulflt .. :~1•'--•'•lll•ru.A"•~•o..c.1J1,~J.11 .. "~ ..... ---... u ' .. , .. ,u ~ -,11 ........... <ll"lft.l. ... I~,......-llltntl.._u. ..... ... l•---A,a,,tu-•--t...~ --•-~- 1,- C..ll.ll....,W1• ,Ad4111Df\111E11pt.nMt (lravwt,c......_lllllen, ,..._.,_, .... , ~fi.uJ• rt.t, & RI,_. p,tnllnt -o..n a. nn11run1•• I~ ~Y~•.~J .1 Trlfatlltl Jlf ....... 1un) C'WfiC ltJft1:. I Trlp1 ~ Car, ta•, tit) .....,.~fJ,,.ftM1 ~,1',1,,mlacttlanlevtl "'JDll1n•11P'•n«1Dly•el1H,-rO., ~,.......•~Mrllt_,....,Mtfllftgt,•lc.J ftflwtUpal'IM&~utlw,.po.a.11,el&.I r.u1-c~ ....... ._,.,#i 1t, r.-1..,.-. FEE ESTIMATE BOWERSAELD AIRPORT MASTER PLAN/ AGIS SURVEY July 14, 2015 -klMtrl'Rrftcl --........ IIICNillN vu, ... , ,,~.-... ,_, --· .,luo a:,uo,. ,,.,u:. UM.CO 111 111.ft'J- . • . .. • I 1 • • ' J ,, II ' • I .. • • , I • • • • I .. I • • • • • • • • . • • . . • • I . • • . .. ~ . . . • . • • ' ' • • • J . • ,. ,-L...._ 2 • • . • . . . . • I 0 • D • , . • • I • • • . " D " . • , .. . I • • • • D __J__ . D . D . . . . '" • > • • . • • . . D • • ' • • ·• ' • . " • ' • • ' • . .. I • • • I I . • • I ' . 0 • . • . • . • . l . 0 • ' " I .. " U ·I ... ... "' ' "···· I 1,4".11 I Hf.II I ..... I 1,HDM I ...... I l,IH.H I -·-·· _ _..r,~., ~,ttH CAOO -1----L-..... ...... k,.., , ....... • • .. ._.a,.mi. • . II 11..»CIID • • u Uh•d . I " ,, __ • • ,. .. ... _ ' • " •·-··· . • I -.. I ' . , .... • • I l.1'irAl'l'I . • I 1tMIO .. •• .., 11:um.oo . I ., .,, .. _ • , 10 11.1111.IDO ' • •• ··--. • .. ___JJ.!ll.l!I. . . """" . • ,. 11.nsoo • . . ·-·-• • . ,_M '" I ~ --·--.. ... -··- • • .. .... ,.., . n ·····-. I I ,,..., • ' • ITNM . ' I ,,.,., • I l --• I ' ., lc:o a ' . •111.DD n. • ... t1·--- . • .. It.'"•- • .. .. ··-·-. , . .. ..... - • . ,., ··- 0 . 0.. ma, 0.. ...... D -- " .. .. _J!.!!fM u , .. , ... .. ,,n • MaH I