HomeMy WebLinkAboutRes-2018-132 Plat ApprovalBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON PRELIMINARY PLAT APPROVAL SUNCADIA PHASE 3 DIVISION 14 PRELIMINARY PLAT (LP-18-00002) RESOLUTION NO. 2018 -l ?J 2- WHEREAS, according to the seventh version of the development agreement entered into by Kittitas County and Suncadia LLC, Kittitas County Code Title 16 relating to the Subdivision of Land, and RCW 58.17, an open record hearing was held by the Kittitas County Board of County Commissioners on August 7, 2018 for the purpose of considering a preliminary plat known as the Suncadia Phase 3 Division 14 Preliminary Plat and described as follows: The division of 6.97 acres into 10 single-family residential lots with an access tract and a community open space tract. The proposed lots range in size from 0.31 acres to 0. 79 acres. All lots are proposed to be served by community water and sewer systems. The project is proposed on a site zoned Master Planned Resort (Suncadia). WHEREAS, due notice of the hearing had been given as required by law, and the necessary inquiry has been made into the public interest to be served by such platting; and, WHEREAS, an open record public hearing was held by the Board of County Commissioners on August 7, 2018 at 2pm in the Commissioners Auditorium; and WHEREAS, eight members of the public were in attendance at the public hearing and six of whom provided public comment; and WHEREAS, a motion was made and seconded to approve the proposal as presented by staff and for staff to prepare the enabling documents; and WHEREAS, the motion was approved by a vote of 3-0; and, WHEREAS, the Kittitas County Board of Commissioners make the following FINDINGS OF FACT and CONCLUSIONS OF LA w concerning said proposed preliminary plat: Findings of Fact I. Steven Lathrop, authorized agent for New Suncadia, LLC, landowner, submitted an application for a IO detached residential lot plat with an access tract and a community open space tract on approximately 6.97 acres ofland that is zoned Master Planned Resort. The proposed lots range in size from 0.31 acres to 0. 79 acres . In conjunction with this preliminary plat application, a site development plan was submitted for Suncadia Phase 3 Division 14 and a boundary line adjustment with the adjacent parcel 950044 which would add 0.62 acres to parcel 950057 creating the total plat area of approximately 6 .97 acres. The project is Phase 3 Division 14 of the Suncadia Master Planned Resort. 2. Site Information: The subject property is located off of Tired Creek Lane, Cle Elum, WA 98922. Section 14, T20N, R14E , WM, in Kittitas County. Assessor's Map Numbers 20-14-14050-0021, parcel number 950057. Total Project Size: Number of Lots: Domestic Water: Sewage Disposal: Fire Protection: Irrigation District: Site Characteristics: 6.97 10; ranging in size from 0.31 acres to 0.79 acres Community Water System Community Septic System Fire District 7 None North: A few single family residences, wooded undeveloped land, golf course, and Cle Elum River (all within Suncadia Master Plan Resort) South: Single family residences, wooded undeveloped land, and golf course (all within Suncadia Master Plan Resort) East: Golf course and single family residences and wooded land (all within Suncadia Master Plan Resort) West: A few single family residences, wooded undeveloped land, golf course, and Cle Elum River (all within Suncadia Master Plan Resort) Access: Primary access to the site will be provided via Tired Creek Lane. 3. The Comprehensive Plan designation is Rural Recreation. 4. The subject property is zoned Master Planned Resort, which allows for a variety ofresidential densities. 5. A complete long plat application, site development plan and boundary line adjustment application was submitted to Community Development Services on May 4, 2018. Pursuant to section 5.1 of the development agreement, the application submittal packet was sent to department heads "de em ed appropriat e ". A notice of application was sent to all prop erty owners within 500 feet of the proje'C t si t a nd noticed in the local county paper of record on Juu e 1411', 2018. 6. Based upon review of the submitted application materials including an environmental checklist, the application was found to be consistent with Development Agreement, Environmental Impact Statement, General Site Plans and Site Development Plan and as such no additional review is required. 7. The proposal is consistent with the goals and policies of the Kittitas County Comprehensive Plan. The proposed subdivision will be adequately served by rural levels of service. The lots will be served by a community water and sewage systems. Staff has conducted an administrative critical area review in accordance with KCC 17 A and found no hazardous slopes , as illustrated on the mapping provided by staff as Index #13. Campas mapping indicates there is a type 4 stream located on the property; based on aerial photography dating back to 1998 it does not appear that a stream exists in this location. Further critical areas were assessed during the MountainStar EIS process, MPR approval process, and Development Agreement process. The applicant will adhere to all applicable regulations as outlined in the Development Agreement The area is designated a winter elk concentration area; with the abundant open spaces in the area, no additional mitigation is necessary. 8. This proposal is consistent with the Kittitas County Zoning Code 17.37. The MPR zone allows for a mixture of densities. 9. This proposal is consistent with the Kittitas County Critical Areas Code 17 A. 10. This proposal is consistent with the Kittitas County Subdivision Code for Preliminary Plats. 11. All roads are required to meet all Kittitas County Road Standards as outlined in the Development Agreement. 12. Comments were received from various agencies and members of the public. These comments are included in the index file for review. 13. The Phase 3 Division 14 project is served by the Suncadia Water Company, a Group A water system regulated by the Washington State Department of Health (DOH). 14. Site Development Plan Approval was granted via letter from the Planning Official on August 1, 2018 in accordance with Section 5 .1 ( d) of the Development Agreement approved through Ordinance 2000-16. 15. The Boundary Line Adjustment request was granted preliminary approval via a letter from the Planning Official on August 1, 2018 in accordance with Section 5.1 (d) Of the Development Agreement approved through Ordinance 2000-16. Conclusions of Law: 1. As conditioned, the development meets the goals, policies and implementation recommendations as set forth in the Kittitas County Comprehensive Plan. 2. As conditioned, this proposal is consistent with applicable federal and state laws and regulations. 3. Public use and interest will be served by approval of this proposal. 4. As conditioned, the proposal is consistent with Kittitas County Code Title 16 Subdivision, Title 17 Zoning, Title 17 A Critical Areas, Title 15 Environmental, and Title 12 Roads and Bridges. Conditions of Approval The Board of County Commissioners finds that the following conditions are necessary to protect the public's interest. 1. The project shall proceed in substantial conformance with the plans and application materials on file dated May 4th, 2018 and revised information submitted on July 17 th and 18 th , 2018 except as amended by the conditions herein. 2. The applicant is responsible for compliance with all applicable local, state and federal rules and regulations, and must obtain all appropriate permits and approvals. 3. This application is subject to the latest revision of the MountainStar Development Agreement. The MountainStar Conceptual Master Plan, Environmental Impact Statement, General Site Plans and Site Development Plans which govern development within the Master Planned Resort. 4. It is the responsibility of the applicant to contact the Kittitas County Assessor's and Treasurer's offices to confirm all taxes are current prior to final plat approval. 5 . Computer sheets shall be submitted with the final plat showing the closure of plat boundaries, blocks, lots or any tract. It is the responsibility of the Professional Licensed Surveyor (PLS) to ensure the lot closures are correct and accurate. 6. The Final Plat shall meet all requirements of applicable law as defined in the Development Agreement. 7. The Final Plat shall contain the name of the Engineer/Surveyor responsible for preparing the documents on all sheets. 8. The Final Plat shall contain the page number and total number of pages on all sheets. 9. The intended ownership limits of Lot 10/AC-1 is unclear. This shall be clarified prior to final plat approval. 10 . Tired Creek Lane shall include width, ownership, and surfacing on the Final Plat. (EX: Tired Creek Lane -30' wide private R/W-Paved) 11. The lot area tables on the Final Plat shall include S-1, AG-1, and OC-1. 12. All development, design and construction shall comply with all applicable laws as defined in the Development Agreement. 13. Lot and road dimensions are to be shown on the face of the plat. 14. The applicant shall contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to obtain addresses prior to obtaining a building permit. A parcel cannot receive a building permit or utilities until such parcel is identified with a 911 address. 15. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with the Development Agreement. 16. Required Infrastructure and Utilities, as defined in the Development Agreement, shall be installed and completed or bonded or other financial guaranties or accommodations made for their completion prior to final plat approval of each subphase. 17. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5 .3 Infrastructure, Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site Development Plan must be provided and available for use before the issuance of the first certificate of occupancy for Master Planned Resort Accommodation Units included with such plan. For purposes of final plat approval or issuance of building permits, infrastructure may be guaranteed through surety bonding or other financial assurance device acceptable to the County. The estimated costs of providing all such guaranteed Infrastructure shall be reviewed and approved by the County Public Works Director or designee. Surety bonding or other financial device provided to the County shall be in an amount equal to at least 110% of such estimated costs as determined by Trend west's architects and engineers. 18. Water availability certificates shall be provided by Suncadia Water System LLC for each of the 10 lots created by this subdivision. 19. The Suncadia Phase 3 Division 14 Boundary Line Adjustment (BL-18-00007) shall receive final approval prior to submittal for final plat approval. NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners hereby grants preliminary plat approval to the Suncadia Phase 3 Division 14 Preliminary Plat (LP-18-00002) and adopts the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby is, approved with the proposed development configuration (See Exhibit A). DATED this 2 1 8t day of {. ,.l.l l-frA ff ATTEST: _, 2018 at Ellensburg, Washington. COMMISSIONERS , WASHINGTON Obie O'Brien, Vice-Chairman Cory Wright, Commissioner APPROVED AS TO FORM: Neil Caulkins, Deputy Prosecuting Attorney < ..... -~ .,,t::J -~ ~ E I ' } ~ ~ ~ t I -c" ! I :: ~ :i- 1 A PORTION OF SECTIONS 14AND 23, TWP. 20 N., RGE., 14 E., W.M., KITTITAS COUNTY, WASHINGTON 2 r'i~ERITT SEATTLE VICINITY MAP NOT TO SCALE BASIS OF HORIZONTAL & VERTICAL_DATUMS BASIS Of HORIZONTAL DATUM: r T ,w~o• SIAT!! J)IJJ~ CC0ll!Jt>u,1t $\"$1t:W. S,O!m,.?ONt, ti>,lle(l t. P~ !Sc ~C'!) i/\1\ ~ TO /lC'S 0Cf<l1'11(. l'<l!Mi!.' "!.<Slp!l" {1'10 SX0662) ANO "U358" (PO S);O<S) 'll'l: 0<5'~ 51j()"•H ~ AA£ Cij()I.W DIST"-"°'$, TO CONVERT TO GRID DISTANCES. MULTIPLY SY A COMBINED .AVERAGE SCALE -FACTOR OF 0999870387 BASIS OF VERTICAL DATUM: NGVD '29 BENCH MARK DISK L 525 1982, LOGO MARK -NGS NGVD 29 ELEVATION = 2026.05 LOCATION: SET IN TOP NORTH ENO OF WEST CURB OF THE INTERSTATE 90 HIGHWAY OVERPASS ALONG STATE HIGHWAY 90.3. OWNER NEW SUNCAOIA LLC, A DELAWARE LIMITED LIABILITY COMPANY 770 SUNCADIA TRAIL CL£ ELUM, WASHINGTON 98922 TELEPHONE (509) 649-3000 FACSIMILE (509) 649-6251 GENERAL NOTES VACATION HOMESITES RANGING IN SIZE FROM 0.31 ACRES TO 0179 ACRES TOTAL ACREAGE PHASE 3, DIVISION 14 = 6 97 ACRES TOTAL LOT ACREAGE = 5_57 ACRES TOTAL NUf.ABER OF LOTS = 10 TOTAL NUMBER OF TRACTS = 3 WATER & S.E.W.EB NOTES. SEE PRELIMINARY SITE AND UTILITY ENGINEERING SUMMARYi -..... ____ :---.,,,_ -~ .. -~ ..... ~""'8,E s·:.::. -l &a..,. ' ~ I. ~I -· ~ . _ .. '> ~-~ " >. • : .... , ...... ,,.. f v~~ C • "\'-. .,._ ___ •~ • ~i;. /", -~-...--=-' ...,._. • '<:;--~-0-9,,¾c--• LOCATION MAP NOT TO SCALE LEGAL DESCRIPTION TRACT A OF THAT CERTAIN SURVEY RECORDED ___ , 2018, UNDER AUDITOR'S FILE NO , ___ AND FILED IN BOOK _ OF SURVEYS, PAGES __ AND _, RECORDS OF KITTITAS COUNTY, STATE OF WASHINGTON; BEING TRACT Z-1 AND A PORTION OF TRACT G-1, PLAT OF ~SUNCAOIA -PHASE J DIVISIONS 6 TO 9 (TUMBLE CREEK)", AUDITOR'S FILE NO 200506220001, BEING A PORTION OF SECTIONS 14 AND 23, TOWNSHIP 20 NORTH, RANGE 14 EAST, W,M,, KITTITAS COUNTY, STATE OF WASHINGTON TAX PARCEL NO. 20-14-14050-0021 ----- CENTER t .._ ____________________________________________________________ __. 9tll'1~:111,<oU""' ,:._ - ~i Il 1! I-:.... :• ~ ~-i1 .. . B ~~ - 5 80 J, ~ ~! . ~ ; 1 E P : il ~~1 "i - m : I : H ~· "• ~~ z ~ z :c ~ i ... z 0 (.) U) ...J > ...J i5 5 <l: i5 C') c.. <{ UJ ilc (.) (/) < z <( ~ ::J I.! (J) 0.. ;;j ~ 0:: <( c.. w i5 z <( (.) z :::> ~ (/) z :, 8 ~ "' --_,....., --. •..ICI ---... ,_ .. ..... O-C-<>• """ --tO,.N,a __, PP-01 f t i 3- i! ~ ~ LOT 8-12 LOT 8-11 "~ '~. ' ·~~ ~ ,,.. L;3S,66". R=55 oo· ~ A PORTION OF SECTIONS 14 AND 23, TWP. 20 N ., RGE., 14 E., W .M ., KITTITAS COUNTY, WASHINGTON LOT 8-9 PLAT OF "SUNCAOIA-PHASE 3 DIVISIONS 6 TO 9 (TUMB:.£ CREEK)" -~ro;•oo·s ~ . <N 44'53'0 " <N 07"44"08" W{IQ \ ,,., 29 03" 3 } W(R)> s 29"03":!Y t \ 109 08 -w LOT 8-10 n SCALE: 1" = 50' 67 81 \ '\: iS-17'46" ~ ~ . . ...... ? /__,--•"'. .. --/"'n~• ------- \' s 26'43"58" C 411 64° \ ' 3 (0 79 ACRES) 2 (O 7J ACRES) o . -\ .. \, L=31 .27", R=160 62'_ 6 :11 09'1-I"' TRACT G-1 L;5 1 76", R=l 19 .00" 0"24~•~· PLAT OF "SUNCADIA-PHAS£ J DIVISIONS 6 TO 9 (TUMBLE CREEK)" a\ --__ ~s---, . --- 1 1~· - : : 4 ~ "'I I (0 51 ACRES) v/ • ' ir. \ • I ' :~ I \ l 'l \ ' \ \ \ \ ' ' ' 5 (O 72 A.CRES) 6 (0 62 ACRES) ' ,~. ,,, --.: .. , _,ft___ ~---....... ~/~ (0,71 ACRES) ,-!: 7 ·~ 78-29'14" W 207 32" ' (O J6 ACRES ) 50 25 TRACT G-7 PLAT OF "SUNCAOIA-PHASE 3 DIVISIONS 6 TO 9 (TUMBLE CREEK)" -..-1s1 ,so·. R-200 oo· ·6=52"04"59" 9 (0,.36 ACRES) ll 70"34'13" w ·•ol 43" so 100 TRACT LEGEND S SERVICE AC ACCESS TRACT OS OPEN SPACE TR.ACT ~ .. 76 16'43• w ---. • ,.. I --._, I '\ 10 ;· ~--/' '"'' '""' ' ---. 1 _,,, 17"5254 OS-1 ------------... --- .... ' ~ooo· A~~ENT I AND I .. J UTI~ ---.......J S 72'30'20 ~ JOSS< 216.53' -...... --- I ·i ~ ! !\ ! .• ~ ;i ~ -i !j ; • I' ' -! H ' -:I!: iJI ! .. 1-~ ~ fl , il '-? 11 iii 3 j,t ] - n ~ L ~ H ~· "" iJ z a I; ;:; :c '<I" i T"" z 0 (.) (/) ..J > ..J 0 5 <t 0 C') a.. <t w ~ (.) (/) < z <t: ~ :::, I~ en a.. i.l 3: a:: c:i: a.. UJ 0 z <{ () z ::J ~ (/) ::, a u I ""'~ ___ , ------o. .... ~ "" ...,_,. ... .., tU111!1!~ ~~L - PP-02 A PORTION OF SECTIONS 14 AND 23, TWP. 20 N., RGE., 14 E., W.M., fi KITTITAS COUNTY, WASHINGTON \ ' \ .,, .,.. -....__ "? '-.._, ', ,, ~-~ '\ WT 8-11 ' 0 \ \ -.,.· \ I -~ < I \-"?,z, I ~-\ ~ 0 \ LOT 8-9 LOT B-ro PLAT OF ''SUNCAOIA-PHASE 3 OIVISIONS 6 TO 9 (TUMBLE CREEK) • ~ : I 'l : : ' I 4 3 2 \ ' \ Y" \, I .I ,- ' I I \ ' I ' ' \ ' ., \ ., ' I I i I I I I I ' ' \ \ \ ' ~ \, 5 6 ', '< -~~ \, ·•-.::.._~ ✓--'"-· . ~ ---.. ..... ~ . ,,\ l •\_ , \ ), \ ' 7 \ -, -·r-_,., os-, -------=---------~ . --------~ ------ TRACT G-1 --PLAT OF ''SUNCAOIA-PHASE 3 DIVISIONS 6 TO 9 (TUMBLE CRffK)" 9 10 --... SCALE: 1" = 50' pill~' 5~5 ~ 50 TRACT G-1 PLAT OF ''SUNCAO!A-PHASE 3 DIVISIONS 6 TO 9 (TUMBLE CREEK)" -... TRACT LEGEND S SERVICE AC ACCESS TRACT OS OPEN SPACE TRACT --_; -, 10 I -1 ------20.00' ACC~;~ "lll ~ / ~TILllY EASEMENT ------ --.J ----.J: