HomeMy WebLinkAboutRes-2018-126 Culvert ReplacementBOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -I 2 ltJ
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS FOR THE KACHESS LAKE ROAD
CULVERT REPLACEMENT PROJECT
WHEREAS: The Kachess Lake Road Culvert Replacement project will replace an
undersized culvert on Kachess Lake Road with a larger structure designed
to meet current hydraulic demand as well as fish passage requirements;
and
WHEREAS: Public Works received Surface Transportation Block Grant (STBG)
federal funds in the amount of $69,200 for the Preliminary Engineering
phase of this project; and
WHEREAS: In preparation to commence design work, Public Works is requesting the
Washington State Department of Transportation to release the federal
funds for Preliminary Engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the Kachess Lake
Road Culvert Replacement Project
DATED on this 7th day of August, 2018, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
flTA ' UN .I . , WASHINGTON
Cory Wright, Commissioner
Washington State
Department of Transportation
--
Prefix
---Federal Aid STPR Project Number
--
Route ( )
Local Agency Federal Aid
Project Prospectus
I Date 8/7/18 ----·-
DUNS Number 0 I -020-254 7
--Local Agency CRP 284-18 ( WSDOT ) Federal Employer 91-6001349 Project Number Use Only Tax ID Number
Agency ~Agency Federal Program Title
Kittitas County Public Works [Z]Yes ONo IZ] 20.205 D Other ----
Project Title Start Latitude N 47-19-32. 76 I Start Longitude W 121-16-10.64
K ac hcss Lake Road Culvert Replacement End Latitude N47-19-48.06 End Lonoitude W 121-15-50.11 ·-
Project Termini From-To Nearest City Name Project Zip Code (+4)
MP 2.30 MP 2.70 Cle Elum 98926
Begin Mile Post End Mile Post Length of Project Award Type
2.30 2.70 0.40 Ii] Local O Local Forces D State D Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
19 Kittitas ·--
WSDOT Region Legislative District( s) Congressional District(s) Urban Area Number
South Central Region 13 8 --
Phase I Total Local Agency Phase Start Federal Funds Estimated Cost Funding Date
----_{Nearest Hundred Dollar) (Nearest Hundred Dollar) /Nearest Hundred Dollar) Month Year
P.E . 80,000 10,800 69,200 Sept 2018 --
R/W 0 0 0
I--Const. 600,000 600,000 0 Mar 2020
Total 680,000 610,800 69,200 --
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width J Number of Lanes
26 2
[Existing culvert under the road is undersized and sediment continually plugs aod damages the culvert, forcing
water onto the road. Damaged ends have been removed annually, and now culvert end is at edge of pavement.
~scription of Proposed Work
scription of Proposed Work (Attach additional sheet(s) if necessary)
This project provides for the replacement of an undersized culvert on Kachess Lake Road. The culve1t will be l replaced with a larger structure that meets current design standards and will reduce annual maintenance, better
accommodate high flows, and improve fish habitat.
Local Agency Contact Person Title
Sara Folk __________ Engineering Services Manager
Mailing Address City
411 N Ruby ST, Suite I Ellens bu rg
Phone
509-962-7523
State
WA
Zip Code
98926
By _~2._~
Project Prospectus e--------Approving A_u_th _or_ity ________ ~------
Title Public Works Director Date <:c-.b-Jct°
DOT F-O rm 140-101
Revised 04/2015 Previous Editions Obsolete Page 1
---~
I Agency Project Title Date
Kittitas County Public Works Kachess Lake Road Culvert Replacement 8/7/18
~ -·
Type of Proposed Work --
Project Type (Check all that Apply) Roadway Width Number of Lanes
D New Construction 0 Path / Trail 03-R 26 2
[l] Reconstruction D Pedestrian/ Facilities 02-R
D Railroad D Parking liJ Other
D Bridge
Geometric Design Data
Description Through Route Crossroad
D Principal Arterial 0 Principal Arterial
Federal D Urban
D Minor Arterial D Urban
D Minor Arterial
D Collector D Collector Functional [l] Rural 0Rural D Major Collector D Major Collector Classification •NHS •NHS IZJ Minor Collector D Minor Collector
D Local Access D Local Access
Terrain -D Flat D Roll IZJ Mountain D Flat D Roll D Mountain
Posted Speed 35 -
Design Speed 35 ·-
Existing ADT <400 -
Design Year ADT 400 -Design Year 2019
Design Hourly Volume (DHV) NA
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Kittitas County Public Works I Consultant 10 % 90 %
Construction Will Be Performed By Contract Agency
Contractor 100 % 0 %
Environmental Classification -D Class I -Environmental Impact Statement (EIS) l.iJ Class II -Categorically Excluded (CE)
D Project Involves NEPA/SEPA Section 404 [{] Projects Requiring Documentation
lnteragency Agreement (Documented CE)
D Class Ill -Environmental Assessment (EA)
D Project Involves NEPA/SE PA Section 404
l nterag ency Agreements -
Environmental Considerations
Environmental permitting needs will be identified and permits will be acquired during the PE phase. It is anticipated that the
project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) to the U.S. Army Corps of Engineers
(USACE), Washington Department of Fish and Wildlife (WDFW), and Washington Depat1ment of Ecology (Ecology.).
Consultations may be required for Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA)
Section 106.
. --~ ---.-DO r Form 140-10 1
Revised 04/2015 Previous Editions Obsolete
Page 2
Agency Project Title
Kittitas County Public Works Kachess Lake Road Culvert Replacement ;::::::===========-=====-_.___
Right of Way
[,r] No Right of Way Needed IO Right of Way Needed
* All construction required by the D No Relocation
contract can be accomplished
within the exiting right of way. I
\ D Relocation Required
Utilities Railroad
D No utility work required [l] No railroad work required
Date
8/7/18
[l] All utility work will be completed prior to the start
of the construction contract
D All railroad work will be completed prior to the start of
the construction contract
D All utility work will be completed in coordination
with the construction contract
D All the railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utility conflicts will be identified during the PE phase of the project, and utility relocation will be coordinated
before construction begins.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? D Yes [l] No -------=====::::
Remarks
This project has been reviewed by the leg1slat1ve body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140-101
Revised 04/2015
Public Works
Mayor/Chairperson
Previous Editions Obsolete Page 3