HomeMy WebLinkAboutResolutionAuthorizingChairSignatureProspectusKachessLakeRoadCulvertKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: August 7, 2018
ACTION REQUESTED: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Kachess Lake Road Culvert Replacement Project
BACKGROUND: Public Works is planning to rehabilitate Kachess Lake
Road at approximate milepost 2.5 by replacing an
undersized culvert. Upstream fire damage has caused
sediment to travel downstream annually, continually
clogging and damaging the culvert and forcing water onto
the road. Damaged culvert ends must be removed
annually; currently the culvert ends are at the edge of
pavement.
Project work includes replacing the undersized corrugated
metal pipe with a larger structure meeting the hydraulic
demand and fish passage requirements.
Construction is planned for summer/fall of 2020. Public
Works is preparing to commence with design work on the
project and is requesting the release of the federal funds for
the Preliminary Engineering phase. This requires the Local
Agency Federal Aid Project Prospectus to be signed and
approved by the Chair of the BOCC.
INTERACTION: Public Works
RECOMMENDATION: Motion to approve the Resolution Authorizing the Chair's
signature on the Local Agency Federal Aid Project
Prospectus for the Kachess Lake Road Culvert
Replacement Project
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Sara Folk, Engineering Services Manager
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS FOR THE KACHESS LAKE ROAD
CULVERT REPLACEMENT PROJECT
WHEREAS: The Kachess Lake Road Culvert Replacement project will replace an
undersized culvert on Kachess Lake Road with a larger structure designed
to meet current hydraulic demand as well as fish passage requirements;
and
WHEREAS: Public Works received Surface Transportation Block Grant (STBG)
federal funds in the amount of $69,200 for the Preliminary Engineering
phase of this project; and
WHEREAS: In preparation to commence design work, Public Works is requesting the
Washington State Department of Transportation to release the federal
funds for Preliminary Engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the Kachess Lake
Road Culvert Replacement Project
DATED on this 7th day of August, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Cory Wright, Commissioner
AM
� Washington State
A Department of Transportation
Local Agency Federal Aid
Project Prospectus
Prefix
Route ( )
Date8/7/18
Federal Aid
Funding
Pro ect Number STPR
— (Nearest Hundred Dollar) _ _
DUNS Number 01-020-2547
Federal Employer 91-6001349
Local AgencyCRP 284-18
r WSDOT
10,800
Project Number
` Use Only
0
Tax ID Number
Agency CAAgency
Federal Program Title
Kittitas County Public Worksn Yes ❑ No
[j 20.205 ❑ Other
Project Title
Start Latitude N 47-19-32.76 Start Longitude W 121-16-10.64
Kachess Lake Road Culvert Replacement
End Latitude N47-19-48.06 Ind Longitude W 121-15-50.11
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
MP 2.30 MP 2.70
Cle Elum
98926
Begin Mile Post . End Mile Post Length of Project Award Type
2.30 2.70 0.40 U Local ❑ Local Forces ❑ State ❑ Railroad
Route ID Begin Mile Point End Mile Paint
City Number County Number County Name
--- By
0220 19 Kittitas
WSDOT Region Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region 13
8 1-
- -
Total
Local Agency
Federal Funds Phase Start
Phase Estimated Cost
Funding
Date
— (Nearest Hundred Dollar) _ _
- . jNearest-Hundred Dollar) _
INearest Hundred Dollaj Month Year
— — -
P.E. 80,000
10,800
69,200 Sept 2018
R/W 0
0
0
Const.600,000
600,000
0 Mar 2020
-.._-
Total 1680,000
Total
..-- _
----------
610,800
69,200
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
26 2
Existing culvert under the road is undersized and sediment continually plugs and damages the culvert, forcing
water onto the road. Damaged ends have been removed annually, and now culvert end is at edge of pavement.
Description of Proposed Work
- - ---- __._ -- ..- .................... ._
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replace culvert with larger structure that meets current hydraulic demands and fish passage standards.
Local Agency Contact Person Title Phone
Sara Folk Engineering Services Manager 509 962-7523
J
1r g - — -- - -- - - ..- -... o —
Mailing Address T City State Zip Code
411 N Ruby ST, Suite I Ellensburg WA 98926
--- By
Project Prospectus i_— Approving Authority
Title Public Works Director
pa6��L0
DOT Form 140-101 Page i
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Kachess Lake Road Culvert Replacement
8/7/18
Type of Proposed Work
Project Type (Check all that Apply)
Roadway
Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R 26
2
7 Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
Other
❑ Bridge
Geometric Design Data
j Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal❑Urban
Minor Arterial
E]❑Urban
ElMinor Arterial
Functional
Z Rural
❑ Collector
❑ Rural
❑ Collector
Classification
❑ NHS
E:1❑NHS Major Collector
El Major Collector
[✓ Minor Collector
El minor Collector
❑ Local Access
❑ Local Access
Terrain
❑ Flat [:]Roll Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
35
Design Speed
35
Existing ADT
<400
-----
Design Year ADT
- - ----- -- -- - ------ - ---
400
-
—----------.
- ---- - - --
-.._-..-------
--- -
---..._..------...-----
--- -
Design Year
2019
Design Hourly Volume (DHV)
NA
Performance of Work
Preliminary Engineering Will Be Performed By
Kittitas Countv Public Works / Consultant
Construction Will Be Performed By
Contractor
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Environmental Considerations
Others Agency
10 % 90 %i
- - --
Contract Agency
100 %'_ 0 —%
✓� Class II - Categorically Excluded (CE)
Z Projects Requiring Documentation
(Documented CE)
Environmental permitting needs will be identified and permits will be acquired during the PE phase. It is anticipated that the
project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) to the U.S. Army Corps of Engineers
(USACE), Washington Department of Fish and Wildlife (WDFW), and Washington Department of Ecology (Ecology.).
Consultations may be required for Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA)
Section 106.
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
Kittitas County Public Works Kachess Lake Road Culvert Replacement 8/7/18
Right of Way
❑✓ No Right of Way Needed '; ❑ Right of Way Needed
All construction required by the ! ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities
Railroad
❑ No utility work required
_
V1 No railroad work required
[✓� All utility work will be completed prior to the start
❑ All railroad work will be completed prior to the start of
of the construction contract
the construction contract
❑ All utility work will be completed in coordination
❑ All the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utility conflicts will be identified during the PE phase of the project, and utility relocation will be coordinated
before construction begins.
L
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes U No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
Agency Kittitas County Public Works
By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 0412015 Previous Editions Obsolete