HomeMy WebLinkAboutResolutionAuthorizingChairSignatureProspectusRdsideHazardSafetyImprovementsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: June 19, 2018 ACTION REQUESTED: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Roadside Hazard Safety Improvements -Countywide Project BACKGROUND: The Roadside Hazard Safety Improvements -Countywide project will provide for safety improvements on several different road segments to lessen the severity of run -off -the - road accidents by installing guardrail where necessary to protect roadside hazards. Signs such as advanced warning signs and chevrons for roadway curves, upgraded stop signs at intersections, and other delineation devices will be installed as recommended per MUTCD requirements to also prevent run- off -the -road accidents. Public Works successfully received Highway Safety Improvement Program (HSIP) federal funds in the amount of $689,000 with no local match requirement if construction is authorized prior to April 30, 2019. This project was identified as the #1 priority in the Kittitas County 2017 Safety Plan, and this project addresses safety improvements to those roadway segments identified in the safety plan. This project will be tied with the 2018 Kittitas County Safety Improvements Project, and the two projects will be advertised for construction as a single contract. Public Works is preparing to advertise the project for construction in the fall of 2018 and is requesting the release of the Federal Construction Funds. This requires the Local Agency Federal Aid Project Prospectus to be signed and approved by the Chair of the BOCC. INTERACTION: Public Works RECOMMENDATION: Motion to approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Roadside Hazard Safety Improvements -Countywide HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Sara Folk, Engineering Services Manager BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE ROADSIDE HAZARD SAFETY IMPROVEMENTS -COUNTYWIDE PROJECT WHEREAS: The Roadside Hazard Safety Improvements -Countywide Project will provide for safety improvements on several different road segments to lessen the severity of run -off -the -road crashes by installing guardrail where necessary to protect roadside hazards, and installing signage and other delineation measures to prevent run -off -the -road crashes; and WHEREAS: This project will be tied with the 2018 Kittitas County Safety Improvements project, which also provides for safety improvements on several roadway segments countywide to lessen the severity of run -off - the -road accidents by installing guardrail to protect roadside hazards; and WHEREAS: Public Works received Highway Safety Improvement Program federal funds in the amount of $689,000 with no local match requirement if construction is authorized prior to April 30, 2019; and WHEREAS: In preparation to advertise the project for construction in the fall of 2018 Public Works is requesting the Washington State Department of Transportation to release the Federally Funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Roadside Hazard Safety Improvements -Countywide Project. DATED on this 19th day of June, 2018, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Obie O'Brien, Vice -Chairman Paul Jewell, Commissioner Washington State MoAll Washington of Transportation Local Agency Federal Aid Project Prospectus DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Prefix Route ( ) Date 6/13/18 Federal Aid Project Number HSIP 0005 DUNS Number O1-020-2547 Local Agency CRP 278 17 r WSDOT l Federal Employer 91-6001349 Project Number ` Use Only J Tax ID Number Agency CA Agency Federal Program Title Kittitas County Public Works ❑d Yes ❑ No 720.205 ❑ Other Project Title Start Latitude N VARIES ngitude W VARIES FEndrtLLo'nqitude Roadside Hazard Safety Improvements - Countywide End Latitude N VARIES W VARIES Project Termini From -To Nearest City Name Project Zip Code (+4) VARIES VARIES Ellensburg, 98926-7989 Begin Mile Post End Mile Post Length of Project Award Type VARIES VARIES NA Z✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 0380 19 Kittitas WSDOT Region Legislative District(s) Congressional District(s)Urban Area Number South Central Region 13 $ Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. 60,000 60,000 0 March 2018 RAN 0 0 0 Const. 689,000 0 689,000 July 2018 Total 1749,000 60,000 689,000 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes VARIES 2 Many roads have roadside hazards and non standard or non-existent delineation. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Install guardrail where necessary to protect roadside hazards. Signs such as advanced warning signs and chevrons for roadway curves, upgraded stop signs at intersections, and other delineation devices will be installed throughout the County at various locations. Local Agency Contact Person Title Phone Sara Folk Engineering Services Manager 509-962-7523 Mailing Address City State Zip Code 411 N Ruby ST, Suite 1 Ellensburg WA 98926 By Approving Authority Project Prospectus Title Public Works Director Date��3 DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Roadside Hazard Safety Improvements - Cot 6/13/18 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R NA 2 ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑✓ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑✓ Principal Arterial ❑ Principal Arterial Federal ❑ Urban ❑✓ MinorArterial ❑ Urban ❑ Minor Arterial Functional Z Rural ZCollector ❑Rural F1 Collector Classification ❑ NHS ❑✓ Major Collector ❑ NHS ❑ Major Collector ❑✓ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑ Flat ❑ Roll ❑✓ Mountain ❑ Flat [:]Roll ❑ Mountain Posted Speed VARIES Design Speed VARIES Existing ADT VARIES Design Year ADT VARIES Design Year 2018 Design Hourly Volume (DHV) NA Performance of Work Preliminary Engineering Will Be Performed By Others Agency Kittitas County Public Works / Consultant 15 % 85 % Construction Will Be Performed By Contract Agency Contractor 100 % 0 % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations Non anticipated. uui corm 14u-1 u1 Page Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Roadside Hazard Safety Improvements - Col 6/13/18 Right of Way �✓ No Right of Way Needed ❑ Right of Way Needed "AII construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required 0 No railroad work required ❑✓ All utility work will be completed prior to the start [:]All railroad work will be completed prior to the start of of the construction contract the construction contract ❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project No anticipated or known utility conflicts Involvement risFAA any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Kittitas County Public Works Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete