Loading...
HomeMy WebLinkAboutRes-2018-053 ManastashBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 -053 AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE MANAST ASH ROAD BRIDGE REPLACEMENT PROJECT WHEREAS: The Manastash Road Bridge project will replace the deteriorated bridge over Manastash Creek at MP 10.60. This bridge is currently load restricted and is the only access in and out for many residents and commercial operations; and WHEREAS: Public Works received a grant from Federal Highways BRAC program for the bridge replacement in the amount of $2 ,746,970 with a 13.5% local match requirement; and WHEREAS: Public Works was notified by the County Road Administration Board on August 17 , 2017 that the design funding necessary for the project had been awarded in the amount of $315,480; and WHEREAS: In preparation to advertise the project for construction in April of2018 Public Works is requesting the Washington State Department of Transportation to release the Federally Funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Bridge Replacement Project. DATED on this 20th day of March, 2018, at Ellensburg, Washington . ~lIty Clerk of the Board-Mandy Buchholz '±fM!v, ecAMb(7;r BOARD OF COUNTY COMMISSIONERS ~~oJp-~':vUNTY, WASHINGTON I,; j lil nez, Chairman ~~ Obie O'Brien, Vice-Chairman ABSENT Paul Jewell , Commissioner Washington State Department of Transportation Local Agency Federal Aid Project Prospectus Federal Aid Pro'ect Number Local Agency Project Numbe r Agency I Prefix CRP 276-17 Kittitas County Public Works Project Title Route 19DE ( WSDOT ) Use Only CA Agency - T Federal Program Title Vi Yes D No [l] 20.205 D Other Start Latitude N 46.959997 M a nastash Rd -Manastash Creek Bridge Replacement End Latitude N 46.959313 Date 3114/2018 -- DUNS Number 01-020-2547 Federal Employer 91-6001349 Tax 10 Number Start Longitude W -120.785222 End Lon itude W -120.686851 Project Termini From-To MP 10.56 MP 10.64 Nearest City Name Ellensburg Project Zip Code (+4) 98926-7989 Begin Mile Post End Mile Post 10.56 10 .64 Length of Project .08 ~~~ l [l] Local D Local Forces D State D Railroad Route 10 Begin Mile Point End Mile Point WSDOT Region Legislative District(s) City Number 0380 19 Kittitas County Number County Name l --.-----~----~-- Congressional District(s) Urban Area Number So uth Central Region 13 8 r phase -Total Local Agency Phase Start Federal Funds Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. 350,480 350,480 0 September 2017 RIW 38,500 38,500 0 December 2017 Canst. 3 ,122,653 375 ,683 2 ,746 ,970 May 2018 Total 13,511,633 764,663 2,746,970 I Description of Existing Facility (Existing Design and .,esent Condition) Roadway Width 1 Number of Lanes 26 ~ I ------------------------ I Existing bridge is damaged and significantly load restricted, additionally significant scour is occurring from I Manastash creek threatening the integrety of the bridge and put it at risk for closure during high flows. r. Description of Proposed Work Descript ion of Proposed Work (Attach additional sheet(s) if necessary) Replace existing 1975 distressed concrete bridge with a longer, single-span prestressed concrete girder structure. Local Agency Contact Person Lucas Huck Mailing Address 41 1 N Ruby ST, Suite 1 BY ~~ Title I County Engineer City Ellens burg ~-Approving Authority Phone 509-962-7523 State Zip Code WA 98926 Project Prospectus Title Public Works Director IDate 3~JiI-JiJ DOT Form 140-101 Revised 04/2015 Previous Editions Obsolete Page 1 I Agency Kittitas County Public Works , ProjectTitle IDate Manastash Rd -Manastash Creek Bridge Rei 3114/2018 !ype of Proposed Work -Project Type (Check all that Apply) I Roadway Width I Number of Lanes [l] New Construction o Path / Trail D3-R 30 2 [lJ Reconstruction o Pedestrian / Facilities D2-R D Railroad D Parking D Other I [l] Bridge Geometric Design Data Description Through Route Crossroad I D Principal Arterial D Principal Arterial Federal DUrban o Minor Arterial D Urban D Minor Arterial o Collector D Collector Functional [l] Rural D Rural D Major Collector D Major Collector Classification DNHs DNHS [l] Minor Collector o Minor Collector D Local Access D Local Access Terrain o Flat 0 Roll [l] Mountain o Flat D Roll 0 Mountain Posted Speed 35 "- Design Speed 35 Existing ADT ADT<400 ----Design Year ADT 400 Design Year 2018 Design Hourly Volume (DHV) NA - Performance of Work Preliminary Engineering Will Be Performed By Kittitas County Public Works / Consultant 85 % 15 % Construction Will Be Performed By Con tract Agency Contractor others 1 Agency 100 % 0 ~ Environmental Classification D Class I -Environmental Impact Statement (EIS) o Project Involves NEPAISEPA Section 404 Interagency Agreement D Class III -Environmental Assessment (EA) D Project Invo lves NEPAISEPA Section 404 [l] Class II -Categorically Excluded (CE) [l] Projects Requiring Documentation (Documented CE) I Interagency A£l reements ~========================================~ I Environmental Considerations The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to the U.S. Army Corps of Eng ineers (USACE), Washington Department ofFish and Wildlife (WDFW), and Washington Department of Ecology (Ecology). After submittal ofthe JARPA Package coordination will be provided with federal andlor state agencies to obtain a Corps 404 permit from the USACE, a Hydrau lic Permit Approval (HPA) from WDFW, and an Ecology 401 permit fi'om Ecology. Because of the federal nexus, Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA) Section 106 consultations must be completed. A biological assessment and formal consultation will be completed for ESA. and a cultural assessment and report will be completed for NHPA requirements. DOT F('lrIT11 ~0-1.0 1 Revised 04/2015 Previous Editions Obsolete Page 2 Agency Project Title I Date Kittitas County Public Works Manastash Rd -Manastash Creek Bridge Rel [ 3114/2018 =-~~~-======================--- I Right of Way D No Right of Way Needed * All construction required by the contract can be accomplished within the exiting right of way. Utilities D No utility work required [l] Right of Way Needed [l] No Relocation I D Relocation Required I Railroad [l] No railroad work required [l] All utility work will be completed prior to the start D All railroad work will be completed prior to the start of I the construction contract of the construction contract D All utility work will be completed in coordination D All the railroad work will be completed in coordination with the construction contract with the construction contract ========~================================~ Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project existing utilities will be temporarily relocated out ofthe way for construction once project is complete utility companies will install permanent utilities on the hangers across the new bridge. FAA Involvement l iS any airport located within 3.2 kilometers (2 miles) of the proposed p roject? DYes [l] No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Date 'F iltita· County Public Works , /J "',. .f) CJltCU,\t.~, _'\--=: ~·1~....:::..-0L __ I Mayor/Cha irperson DOT Form 140-101 Revised 04/2015 Previous Editions Obsolete Page 3