HomeMy WebLinkAboutRes-2018-053 ManastashBOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -053
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS FOR THE MANAST ASH ROAD BRIDGE
REPLACEMENT PROJECT
WHEREAS: The Manastash Road Bridge project will replace the deteriorated bridge over
Manastash Creek at MP 10.60. This bridge is currently load restricted and is the
only access in and out for many residents and commercial operations; and
WHEREAS: Public Works received a grant from Federal Highways BRAC program for the
bridge replacement in the amount of $2 ,746,970 with a 13.5% local match
requirement; and
WHEREAS: Public Works was notified by the County Road Administration Board on August
17 , 2017 that the design funding necessary for the project had been awarded in
the amount of $315,480; and
WHEREAS: In preparation to advertise the project for construction in April of2018 Public
Works is requesting the Washington State Department of Transportation to
release the Federally Funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the agency's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Bridge
Replacement Project.
DATED on this 20th day of March, 2018, at Ellensburg, Washington .
~lIty Clerk of the Board-Mandy Buchholz '±fM!v, ecAMb(7;r
BOARD OF COUNTY
COMMISSIONERS
~~oJp-~':vUNTY, WASHINGTON
I,; j lil nez, Chairman
~~
Obie O'Brien, Vice-Chairman
ABSENT
Paul Jewell , Commissioner
Washington State
Department of Transportation Local Agency Federal Aid
Project Prospectus
Federal Aid
Pro'ect Number
Local Agency
Project Numbe r
Agency
I Prefix
CRP 276-17
Kittitas County Public Works
Project Title
Route
19DE
(
WSDOT )
Use Only
CA Agency - T Federal Program Title
Vi Yes D No [l] 20.205 D Other
Start Latitude N 46.959997
M a nastash Rd -Manastash Creek Bridge Replacement End Latitude N 46.959313
Date 3114/2018 --
DUNS Number 01-020-2547
Federal Employer 91-6001349 Tax 10 Number
Start Longitude W -120.785222
End Lon itude W -120.686851
Project Termini From-To
MP 10.56 MP 10.64
Nearest City Name
Ellensburg
Project Zip Code (+4)
98926-7989
Begin Mile Post End Mile Post
10.56 10 .64
Length of Project
.08
~~~ l [l] Local D Local Forces D State D Railroad
Route 10 Begin Mile Point End Mile Point
WSDOT Region Legislative District(s)
City Number
0380 19 Kittitas
County Number County Name l
--.-----~----~--
Congressional District(s) Urban Area Number
So uth Central Region 13 8
r phase
-Total Local Agency Phase Start Federal Funds Estimated Cost Funding Date
Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P.E. 350,480 350,480 0 September 2017
RIW 38,500 38,500 0 December 2017
Canst. 3 ,122,653 375 ,683 2 ,746 ,970 May 2018
Total 13,511,633 764,663 2,746,970 I Description of Existing Facility (Existing Design and .,esent Condition)
Roadway Width 1 Number of Lanes
26 ~ I ------------------------
I Existing bridge is damaged and significantly load restricted, additionally significant scour is occurring from
I Manastash creek threatening the integrety of the bridge and put it at risk for closure during high flows.
r. Description of Proposed Work
Descript ion of Proposed Work (Attach additional sheet(s) if necessary)
Replace existing 1975 distressed concrete bridge with a longer, single-span prestressed concrete girder
structure.
Local Agency Contact Person
Lucas Huck
Mailing Address
41 1 N Ruby ST, Suite 1 BY ~~
Title
I County Engineer
City
Ellens burg
~-Approving Authority
Phone
509-962-7523
State Zip Code
WA 98926
Project Prospectus
Title Public Works Director IDate 3~JiI-JiJ
DOT Form 140-101
Revised 04/2015 Previous Editions Obsolete Page 1
I Agency
Kittitas County Public Works
, ProjectTitle IDate
Manastash Rd -Manastash Creek Bridge Rei 3114/2018
!ype of Proposed Work -Project Type (Check all that Apply) I Roadway Width I Number of Lanes
[l] New Construction o Path / Trail D3-R 30 2
[lJ Reconstruction o Pedestrian / Facilities D2-R
D Railroad D Parking D Other
I [l] Bridge
Geometric Design Data
Description Through Route Crossroad I
D Principal Arterial D Principal Arterial
Federal DUrban
o Minor Arterial
D Urban
D Minor Arterial o Collector D Collector Functional [l] Rural D Rural
D Major Collector D Major Collector Classification DNHs DNHS [l] Minor Collector o Minor Collector
D Local Access D Local Access
Terrain o Flat 0 Roll [l] Mountain o Flat D Roll 0 Mountain
Posted Speed 35
"-
Design Speed 35
Existing ADT ADT<400 ----Design Year ADT 400
Design Year 2018
Design Hourly Volume (DHV) NA -
Performance of Work
Preliminary Engineering Will Be Performed By
Kittitas County Public Works / Consultant 85 % 15 %
Construction Will Be Performed By Con tract Agency
Contractor
others 1 Agency
100 % 0 ~
Environmental Classification
D Class I -Environmental Impact Statement (EIS) o Project Involves NEPAISEPA Section 404
Interagency Agreement
D Class III -Environmental Assessment (EA)
D Project Invo lves NEPAISEPA Section 404
[l] Class II -Categorically Excluded (CE)
[l] Projects Requiring Documentation
(Documented CE)
I
Interagency A£l reements
~========================================~ I Environmental Considerations
The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to the U.S. Army Corps of
Eng ineers (USACE), Washington Department ofFish and Wildlife (WDFW), and Washington Department of Ecology (Ecology).
After submittal ofthe JARPA Package coordination will be provided with federal andlor state agencies to obtain a Corps 404
permit from the USACE, a Hydrau lic Permit Approval (HPA) from WDFW, and an Ecology 401 permit fi'om Ecology. Because of
the federal nexus, Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA) Section 106
consultations must be completed. A biological assessment and formal consultation will be completed for ESA. and a cultural
assessment and report will be completed for NHPA requirements.
DOT F('lrIT11 ~0-1.0 1
Revised 04/2015 Previous Editions Obsolete Page 2
Agency Project Title I Date
Kittitas County Public Works Manastash Rd -Manastash Creek Bridge Rel [ 3114/2018
=-~~~-======================---
I
Right of Way
D No Right of Way Needed
* All construction required by the
contract can be accomplished
within the exiting right of way.
Utilities
D No utility work required
[l] Right of Way Needed
[l] No Relocation I D Relocation Required
I
Railroad
[l] No railroad work required
[l] All utility work will be completed prior to the start D All railroad work will be completed prior to the start of I
the construction contract of the construction contract
D All utility work will be completed in coordination D All the railroad work will be completed in coordination
with the construction contract with the construction contract
========~================================~ Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
existing utilities will be temporarily relocated out ofthe way for construction once project is complete utility
companies will install permanent utilities on the hangers across the new bridge.
FAA Involvement
l iS any airport located within 3.2 kilometers (2 miles) of the proposed p roject? DYes [l] No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
'F iltita· County Public Works , /J "',. .f)
CJltCU,\t.~, _'\--=: ~·1~....:::..-0L __ I Mayor/Cha irperson
DOT Form 140-101
Revised 04/2015 Previous Editions Obsolete Page 3