HomeMy WebLinkAboutChange Order 2Kittitas County Solid Waste Programs 925 Industrial Way, Ellensburg, WA 98926 Telephone: (509) 962-7542 Fax: (509) 962-7087 CHANGE ORDER PROJEIT Ryegrass West Septage Pond Reconstruction TO CONTRACTOR Belsaas & Smith Construction, Inc. P.O. Box 926 Ellensburg, WA 98926 THE CONTACT IS CHANGED AS FOllOWS: CHANGE ORDER NO: 002 Date: 9-11-2017 Notice to Proceed Date 10-03-2016 The original Contact Sum was $ 243,540.00 Net change by previous authorized Change Orders $ 7,613.00 The Contract Sum prior to this Change Order was $ 251,153.00 The Contract will be increased/decreased by this Change Order in the amount of $ (14,942.96) The New Contract Sum including this Change Order will be $ 236,210.04 The Contract Time will be extended by . The date of Substantial Completion with this Change Order is DESCRIPTION OF CHANGE COP 06 Delete Item 6 "Site Restoration" with tax Tax not include In CHANGE ORDER NO: 001 dated 01-03-2017 for $7,613.00 change In contract amount Belsaas & Smith Construction By (Signa turf!) Days o o Days 12-28-2016 Cost $ (15552.00) $ 609.04 ~~ Letu.-YkL 091 CU'L/{(!, z Pr/ntNamf! Pr/ntNamf! 10 eiV J:xy :3 l W l r Datf! ~("'\10<] Dote DESCRIPTION MobiJimtlon Ex. Pond Demolition LS LS P.O. BOX 926 /103 E 4TH AVE SUITE 209 ELLENSBURG, WA 98926 509·925·9747 I FAX 509·962-3031 RYE GRASS SEPTAGE POND RECONSTRUCTION Pay Request No.2 (FINAL) • Quantities Through Completion UNIT PRICE CONTRACT TOTAL PAY REQUEST #1 (12/31/16) 1 $ 21,700.00 $ 21,700.00 1 $ 21,700.00 19,890.00 1 $ 22,100.00 $ 22,100.00 0.9 $ PAY REQUEST #2 Final TOTAL TO DATE $ 0 1$ $ 2,210.00 0 1 $ 3 UnerFoundation LS 1 $ 30,100.00 $ 30,100.00 1 $ 30,100.00 79,400.00 57,800.00 o o o o $ 0 1$ 21,700.00 22,100.00 30,100.00 79,400.00 57,800.00 4 GeosyntheticUnv 5yste.m LS 1 $ 79,.400.00 $ 79,400.00 1 $ $ 0 1 S S Operating Layer LS 1 $ 57,sao.00 $ 57,800.00 1 $ $ 0 1 $ 6 Site Restoration LS 1 $ 14,400.00 S 14.400.00 0 ....;:$~ ___ _ $ 0 0 ..:$~ ___ _ 1 Replace Lyslmeter LS 2 Sand Bedding LS 3 Replace Con crete Ramp LS 4 Added Contract TIme LS 5 Operating layer LS 6 Delete Item 6 'Site Restoration' LS SubtotaiBase B!~._. t . _.~~!.~~~ L .. _~08~~.~ __ .. 1 $ $ 1 $ 2,423.00 $ 1 $ 6,554.00 $ 1 S S 2,423.00 6,554.00 1 S (1,364.00) S (1,364 .00) 1 $ (14,400.00) S (14,400.00) _$.'__ 7,fi13.00 SUB-TOTAL: $ 233,113.00 8 .0% WSST: S 18,649.04 TOTAL: $ 251,762.04 o o o o o o $ $ $ $ $ $ $ $ 208,890.00 $ 16,711.20 $ 225,601.20 5% RETAINAGE: $ 11,280.06 TOTAL LESS RETAINAGE: $ 214,321.14 1 1 1 1 1 o .j_. __ ~_~~~~_. _______ ... __ ... t __ $ 01$ $ 2,423 .00 0 1 $ $ 6,554.00 0 1 $ $ 01$ $ (1,364.00) 0 1 $ _~!~!1~~~. 2,423.00 6,554.00 (1,364.00) $ 0 0 ..:$~ ___ _ $~ 7;613:00 _ _ ~$. 7,6~.00 $ 9,823.00 $ 785.84 $ 10,608.84 $ 530.44 $ 10,078.40 $ 218,713.00 $ 17,497.04 ToDIDuoto $ 236210.04 Dote , ~ ~ ?1tr/17 Authorized Signature: ~ BeI~ ~nstruction,lnc. Authorized Signature: _______________________ _ Kittitas County Solid Waste (or Representative)