Res-2016-103
BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.. &tJ/ LR -I D ~ TO AWARD THE CONTRACT FOR THE LODGE CREEK CULVERT REPLACEMENT ALONG VIA KACHESS ROAD AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO EXECUTE SAME WHEREAS: WHEREAS: WHEREAS: WHEREAS: WHEREAS: Resolution Number 2016-059 declared a Local Emergency supporting suspension of normal bidding and procurement requirements to allow expedited replacement of the culvert; and Resolution Number 2016-060 authorized engineering consultant services from Jacobs for immediate design and support ofthe replacement ofthe failed Lodge Creek culvert; and Jacobs has utilized services from Atkinson Construction for constructability reviews; and Atkinson Construction is currently working in the vicinity and has the ability to assist in the rapid procurement of materials to accommodate weather and in water work schedule restrictions; and Atkinson Construction furnished a Force Account Estimate accommodating the use of county forces to aid in cost minimization. The Director of Public Works recommends the force account estimate from Atkinson Construction, of$740,070.03 be accepted. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby award the contract for the construction of the Lodge Creek Culvert replacement in the amount of$740,070.03 to Atkinson Construction . BE IT FURTHER RESOLVED that the Director for the Department of Public Works is authorized to sign the contract documents for said project. DATED on this 2nd day of August, 2016, at Ellensburg, Washington . BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Atkinson Construction 5274 Lodge Creek Culvert Replacement *** Phil Larson ESTIMATE RECAP -BID QUANTITIES DIRECT INDIRECT TOTAL Labor 100,325 .55 39,078 .62 139,404.17 Burden 55,050.90 3,477.17 58,528 .07 Lab+Bur 155,376.45 42 ,555.79 197 ,932.24 Perm Mati 170,152.87 170,152 .87 Const Exp 42,569.01 13,068.65 55 ,637.66 Equipment 58,531.96 22,684.35 81,216.31 Subs 140,778.00 140,778 .00 Other 65,828.41 28,524.54 94,352.95 Total Costs : 633,236.70 106,833 .33 740,070.03 % of Total 85.564% 14.436% 100.000% Escalation on: Labor Burden Perm Mati Const Mati 31,339 13,157 29,531 14,607 129 .00% 129.00% 121.00% 121.00% Eq Dp Exp Sub DES FORCE ACCT 5,979 12,798 11,425 0 121.00% 110.00% 121.00% 100.00 % * Data Below here is dependent on the Summary Process. * The Summary Process was last run 07/26/2016 at 4: 17 PM Markup Addons Markup MARKUP TOTALS --> COST + MARKUP ---------> Lump Sum There * ARE NOT * closing accounts for this bid. Rounding difference : 0.00 0 .00 $740,070 .03 (On Bid Quantity) 07/2612016 16:21 %OFTOTAL 18.837% 7.908% 26 .745% 22.991% 7.518% 10 .974% 19.022% 12.749% 99.999% CoEqp Rented Eqp 2 ,294 5,823 121.00% 121.00% Misc3 Total Escalation 0 100,00% 0 .0000% 0.0000% (% of costs) -Effect on Bid- 126,952 120.71 % Unbalancing difference: -20,118 .01 Adjusted From Cut&Add Sheet-costs: From Cut&Add Sheet-markup : Pass Through Adjustments: Net Adjustments (to the balanced bid): BALANCED BID TOTAL DESIRED BID (if specified) BID TOTAL (on bid quantities) BID COSTS (on bid quantities) MARKUP (on bid quantities) (on Bid Quantity) (on Bid Quantity) None -$20,118 ,0 1 [or desired bid] $613,118 .69 $613 ,1l8 .69 $613 ,118.69 0.000% Atkinson Construction 5274 Lodge Creek Culvert Replacement *** Phil Larson EXPECTED JOB VALUE (on takeoff quantities): EXPECTED COSTS (on takeoff quantities): EXPECTED MARKUP (on takeoff quantities): Adjust to Bid Quantities = B Labor Hcs. (MHIMHS) 1,869 (inel burden) 155,376 Labor (DAY/DAYS) 0 (incl burden) 0 Labor (OtherUnits) 0 (inel burden) Labor Burden 55,050 Spread Indirects on: Spread Addons&Bond on : Key Tndi"c:ator Balanced Markup 1 0.00 1 Total Indirect Cost 1 106,833.33 1 Direct Manhours / 1,869.00 1 Balanced Markup By Bid Qty 1 0.00 ! Balanced Markup By Bid Qty 0.00 , I On Takeoff Quant ities 100 8,724 o o 33,830 3,477 Total Cost Total Cost Total Labor 197,932.24 Direct Cost 633,236.70 Job Duration 0.00 A TKN Total Cost 740,070.03 ATKN Cost Less FA 740,070.03 1,969 164,101 o o 33,830 58,528 ------ESTIMATE NOTES: ------ Bid Date: Owner: Engr Finn: $613,118 .69 $740,070.03 -$126,951.34 Spread Markup on: 07/26/2016 -17.153% Total Cost Balanced Markup/T otal Labor 0.00% TotallndirectslDirect Cost 16.87% HOURS/MO 0.00 Bal Markup/ATKN Total Cost 0.00% Bal Markup/Cost Less FA 0.00% Estimator-In-Charge: Desired Bid (ifspecifJed) = 0.00 Notes: Last Summary on 07/2612016 at 4: 17 PM. Last Spread on 07/26/2016 at 3:44 PM. 2 16:21 Atkinson Construction Page I 5274 Lodge Creek Culvert Replacement 0712612016 16:26 Phil Larson Activity Resource BID ITEM Desc 10000 Description = Materials Quantity Pcs Unit Cost Rcport Unit Cost Equip . Labor All Costs Land Item SCHEDULE: 100 Unit = LS Takeoff Quan: Expend. Matis. 1.000 Penn. Sub Matis. Contract EngrQuan: 30000105 Buy Perm Marrerillt Quan: 1.00 LS Drs/Sblt: 8.00 Cat: 508 WC: WA0201 eSBe under box = 2'x40'x40' = 120 cy eSBC on Road = 200'x24'x2' = 355 cy Total = 475 cy. Common Borrow is a guess for now. Only needed if the existing material can not be put back. Quarry Spalls = 3'x40'x40' = 177 cy -Say 250 cy to cover other potential needs . River Rock -TBO Stream Bed -40'x4'x20 ' = 120 cy in box, double quantity to include pool 240 cy. Gravel backfill for I'Ia11s = I~e assumed 5' wide around all walls. Geogrids quantities are a place holder for now. We ~ill still need to finalize pricing on all material . 2AGCSBCCY CSBe "CY"@I08% 1.00 475.00 CY 40.000 2AGGCBCY Common Borrow "CY@10 1.00 500.00 CY 30 .000 2AGGWQSCY Quarry Spalls "CY@108% 1.00 250.00 CY 40 .000 2AGGWRRCY River Rock "CY"@108% 1.00 1.00 CY 40.000 2AGGWSTMBRCStream Bed Materi@108% 1.00 240.00 CY 100 .000 2AGGWWALL Gravel Backfill f@108% 1.00 230.00 CY 40.000 2GEOGM8XT MIRAGRID 8XT@]()8% 1.00 900.00 SY 4.500 2GEOTEXSEP GEOlEX-SOIL SEPAR@l l.00 355.00 SY 0.650 2UBFF FULLFLATTOPULT@10 l.00 2.00 EA 65 .000 2UBFSB FULL SIZE ULTRABL@1 1.00 16.00 EA 70 .000 2URHB HALF ULTRABLOCK S@ l.00 4.00 EA 60.000 2UBHFT HALF FLAT TOP ULT@l l.00 4.00 EA 55 .000 $108,765.94 [ ] 24,829 19,602 13,068 52 31,363 12,023 5,293 302 170 1,464 314 288 108,766 Total 1.000 ··Unreviewl:d 24,829 19,602 lJ,068 52 31,363 12,023 5,293 302 170 1,464 314 288 108,766 108,765.94 108,765.94 > Item Totals: 10000 -Materials $108,765.94 108,765.940 1 LS BID ITEM = 10000 Description = Stockpile 30001030 Pre-Stock PlIe Material Pre-Stockpile material before closure. Assume 1 week of wo r k with a loader and LD966 LOADER 966D. OP, LAB 8LD966 WHEEL LOADER CAT 96 1.00 LCOM LABORER, COMMON G# l.00 OFELL OP ENG FE LDR <6 CY G 1.00 [ ] 108,766 108,766 108,765.94 108,765.94 Landltern SCHEDULE: 100 Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 Quan: 1.00 LS Hn/Sbft: 10.00 Cal: 510 WC: WA0201 ··Unn:vicwcd laborer on the ground for backing up t ru c ks. 50 .00 HR 50.00 MH 50.00 MH 100.00 MH 50.00 CH Prod: 5.0000 S Lab Pes: 74 .235 4,850 34.420 39 .570 [ 5249 .59] 3,654 4,572 8,226 4,850 2.00 Eqp Pes: 1. 00 4,850 3,654 4.572 $13,076.35 100.0000 MI-ULS 100.0000 MHlUnit 0.0200 UnitslHr 8,225.86 4,850.49 13,076 13,076.35 30001032 Load Out Stockpile QuaD: 1.00 LS Hrs/Sbrt: 12.00 Cal: 612 WC: WA0201 This will be done d u ring the 7 2 hr closure. As sume 2 solos the help move material between the sites . LD966 LOADER 966D, OP, LAB 5TRHRDPSOLO DUMP TRUCK SOLO@10 1.00 8LD966 WHEEL LOADER CAT 96 1.00 LCOM OFELL LABORER, COMMON G# 1.00 OP ENG FE LDR <6 CY G 1.00 72.00 144.00 HR 72 .00 HR 72.00 MH 72.00 MH CH Prod: 135 .000 74 .235 34.420 39 .570 6.0000 S Lab Pes: 2.00 Eqp Pes: 5,707 7,096 6,985 25 ,404 "'*U tlrc\liewed 1.00 25,404 6,985 5,707 7,096 Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resuurce Oesc Quantity Pcs Unit Cost Report Unit Cost Equip. Expend. Labor All Costs Matis. BID ITEM = 20000 Land Item SCHEDULE: 100 Description = Stockpile $45,192.25 144.0000 MHILS 144.0000 MHlUnit => Item Totals: 20000 -Stockpile 144.00 MH 0.0139 UnitslHr $58,268.60 244.0000 MHILS 244.00 MH 58,268 .6 00 1 LS Unit = LS Takeoff Quan: 1.000 (8399.19] 12,803 6,985 25,404 12,803.35 6,984.71 25,404.19 [ 13648.78) 21,029 11,835 25,404 21,029.21 11,835.20 25,404.19 BID ITEM = 30000 Land Item SCHEDULE: 100 Description = Diversion/EnviromcntallPumping Unit = 15 Takeoff Quan: 1.000 Page 2 07/26/2016 16:26 Penn. Sub Mads. Contract Engr Quan: EngrQuan: Total 1.000 45,192 45,192.25 58,269 58,268.60 1.000 20006005 Buy Material QuaD: 1.00 LS Hn/Sblt: 8.00 Cal; 588 WC:WA0201 Tis list is 2ECFNHIVIS 2ECFNSLTWW 2ECPOSTSTLT 2ECSB 2ECSTRAW 3AQUABAR $15,975.63 21006031 a guess for materials needed. HIGH VISmILITY .F@108 1.00 400.00 LF SILT FENCE WWIRE@10 1.00 100.00 LF STEEL "T" POST@108% 1.00 100.00 EA SANDBAGS@108% 1.00 400.00 EA BALE OF STRA W@108% 1.00 50.00 EA Aqua Barrier@108% 1.00 1.00 LS TESCLabor Assume 4 days to install all TESC Material. Assume 1 day to remove and clean up. ~4 4 MAN LABOR CREW 8TRPU450 FLATRACK, BAREBED 1.00 40.00 HR LCOM LABORER, COMMON G# 3.00 120.00 MH LFM LABORER FOREMAN 1.00 40.00 MH 160.00 MH 40.00 $11,811.62 160.0000 MHILS 160.0000 MHlUnit 0.0250 UnitslHr 0.200 0.950 2.000 4.000 5.000 10,000.000 [ ] QuaD: 1.00 LS Hn/Sbft: CH Prod: 5.0000 S 16.167 782 34.420 8,161 36.920 2,868 [ 7233.28) 11,029 782 11,029.15 782.47 ·*Unrcvicwcd 105 105 124 124 261 261 2,091 2,091 327 327 13,068 13,068 13,068 2,908 15,976 13,068.00 2,907.63 15,975.63 8.00 Cal: 588 WC: WA0201 ··Unrevicwcd Lab Pes: 4.00 Eqp Pes: 1.00 782 8,161 2,868 11,812 11,811.62 20006SO<i ReDtPumps QuaD: 1.00 LS Drs/Sbft: 8.00 Cal: 588 WC: WA0201 $20,000 is I labor to LAB I 4PUMP8 LCOM $29,200.99 a plug for the pumping system. man pumps while crews are not around only. 1 MAN LABOR CREW 80 .00 CII 8" Pump@108% 1.00 LABORER, COMMON G# 1.00 80.0000 MHILS 80.0000 MHlUnit 20.00 DAY 80.00 MH 80.00 MH 0.0125 UnitsIHr Prod: 1,000.000 34.420 [ 3552.15) 10.0000 S 5,441 5,441 5,440.99 Lab Pcs: 1.00 Eqp Pes: 23,760 "Unreviewed 0.00 23,760 5,441 23,760 29,201 23,760.00 29,200.99 20006631 Flln Trees QuaD: 1.00 LS Hrs/Sbft: 12 .00 Cal: 611 WC: WA0201 Use 330 EX33 00 8006 8EX330 OBHH OOL OGRADE $5,854.64 to fall trees after pumps are EX 330, 06, OP, GC 75CYIHR D6D DOZER ( 140 lIP ) 1.00 EXCAV CAT 330 (71K LB 1.00 or ENG BACKHOE 3-5C 1.00 OP ENG DOZER 09 & < 1.00 or ENG GRADECHECKE 1.00 36.0000 MHILS 36.0000 MHIUnit running. 12 .00 CH 12.00 HR 12.00 HR 12 .00 MH 12.00 MH 12.00 MH 36.00 MH 0.0833 UnitslHr =---> Item Totals: 30000 -Dlversion/Enviromental/Pumping Prod: 1.0000 S 67.848 1,064 83.223 1,305 40.090 1,194 39.120 1,173 36 .6 10 1,119 [ 2191.29) 3,486 2,369 3,485.65 2,368.99 Lab Pes: 3.00 Eqp Pes: 2.00 1,064 1,305 1,194 ],173 1,119 5,855 5,854.64 Atkinson Construction 5274 Lodge Creek Culvert Replacement 07/2612016 Page 3 16:26 Phil Larson Activity Resource Desc BID ITEM ,., 30000 Pes Description = DiversioniEnviromental/Pumping QUlUltity Unit Cost Report Unit Cost Equip. Labor All Costs Land Item SCHEDULE: 100 Unit = LS TakeoffQuan: Expend. Matis. 1.000 Perm. Sub Matis. Contract Engr Quan: Total 1.000 $62,842.88 62,842.880 276.0000 MH/18 l1S 276.00 MH [ 12976.72] 19,956 3,151 13,068 2,908 23,760 62,843 19,955.79 3,151.46 13,068.00 2,907.63 23,760.00 62,842.88 BID ITEM '" 40000 Description = Shoring 40001005 Buy Pea Gravel 16 each x 3' holes x 40' = 167 cy @ 30% waste Using CFD for plug pricing. 2CONCCDF CONTROLLED DENSIT@ 1.00 40001009 Trucking for Soldier PIle Piles and sheets = 4 loads in and out. 4 hour rounds from yard = 16 hrs x 2 5TRHRFLTBD TRUCK SEMI FLATBE@ 1.00 220.00 CY 32 hrs. 32.00 HR LiU1d Item Unit = Quan: 220 cy QuaD: SCHEDULE: 100 18 TakeoffQuan: 1.000 EngrQuan: 220.00 CY "nISbn: 8.00 Cal: 508 WC: W A0201 200.000 57,499 32.00 HR Hrs/Sbrt: 8.00 Cal: 508 WC: W A020} 150.000 6,273 40001013 BuynReDtS~ISbeeu QuaD: 56,160.00 LB UrslSbft: 8.00 Cal: 508 WC: WA0201 16 beams and 16 sheets 16 x 40 x 117 = 28080 Ibs Sheets weigh about the same so call it 56,160 ~ 3SHPLGFA SHORING PLATES GF@1 1.00 56,160.00 LB 0.175 12,843 40001028 Drill Soldier PIle QuaD: 5.00 DAY HnlSbrt: 8.00 Cal: 508 WC: WA0201 Need plug from driller. Go with Mobilization + day rate + Pea Gravel cost. Assume 4 to 5 days 4DRSHAFTDAY DayRate@108% 1.00 5.00 DAY 8,000.000 47,520 40001029 Load Drill Spoils Quan: 220.00 CY HnlSbet: 8.00 Cal: 508 WC:WA0201 LD966 LOADER 966D, OP, LAB 32.00 CH Prod: 4.0000 S Lab Pes: 3.00 Eqp Pes: 8LD966 WHEEL LOADER CAT 96 1.00 32.00 HR 74.235 3,104 STROU5 JOB HAUL DUMP TRUC 1.00 32.00 HR 33.723 1,410 LCOM LABORER, COMMON G# 1.00 32.00 MH 34.420 2,176 OBHL OP ENG BACKHOEIL<75 1.00 32.00 MH 39.120 2,718 OFELL OP ENG FE LDR <6 CY G 1.00 32.00 MH 39.570 2,740 $12,149.09 0.4363 MH/CY 96.00 MH [ 21.224] 7,635 4,515 0.4364 MHlUnit 6.8750 UnitslHr 34.70 20.52 40001041 Rem POe & Sbeets QuaD: 32.00 EA HrslSbft: 8.00 Cal: 508 WC: WA0201 Includes install of sheets and removal of sheets and pile. Ones shift to install and 2 to remove. EX330 8EX330 OBHH OGRADE EX 330, OP, GRDCHK 75CYIHR EXCAV CAT 330 (71K LB 1.00 OP ENG BACKHOE 3-5C 1.00 OP ENG GRADECHECKE 1.00 24.00 HR 24.00 MH 24.00 MH 24.00 CH Prod: 83.223 40.090 36.610 3.0000 S Lab Pes: 2,073 1,950 2,610 2.00 Eqp Pes: 1.000 ..... Uruevjewed 57,499 **Unrcvicwcd 6,273 :to"U.nreviewed 12,843 ....... Unrcvjcwed 47,520 ··Unreviewcd 2.00 3,104 1,410 2,176 2,718 2,740 12,149 55.22 :t·Unreviewed 1.00 2,610 2,073 1,950 Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Desc Quantity Pes Unit Cost Report Unit Cosl Equip. Expend. Labor All Costs Matis. Page 4 07/26/2016 16:26 Penn. Sub Matis. Contract Total BID ITEM = 40000 Description = Shoring Land Item SCHEDULE: 100 $6,633.46 40001086 1.5000 MHIEA 1.5000 MH/Unit Driller Mobilization 4DRSHAFTMOB MoblDemob Driller@108% 1.00 40001089 Flagging 3 man crew [or 5 days during drilling. TCFLAG TC -FLAGGING 8 GENU ENG DRIVEN LITE TOW 1.00 8TRPU450 FLATRACK, BAREBED 1.00 LFLAGGER LABORER, FLAGGER Gil 2.00 LFM LABORER FOREMAN 0.50 $9,807.53 125.0000 MHfLS 125.0000 MH/Unit ~-> Item Totals: 40000 -Sboring 48.00 MH 1.3333 Unil.5/Hr 1.00 LS 50.00 50.00 HR 50.00 HR 100.00 MH 25.00 MH 125.00 MH 0.0200 UnitslHr $176,485.15 269.0000 MHILS 269.00 MH 176,485.150 1 LS Unit = LS Takeoff Quan: 1.000 [ 74.207] 4,023 125.73 2,610 81.57 Engr Quan: Quan: 1.00 EA IIn/Sbft: 8.00 ClIl: 508 WC: WA0201 1.000 6,633 207.30 ··Unreviewed 20,000.000 23,760 23,760 Quan: 1.00 LS Urs/Sblt: 10.00 Cal: 510 WC:WA0201 ++Unreviewed CH Prod: 5.0000 S Lab Pes: 2.50 Eqp Pes: 2.00 11.718 709 709 16.167 978 978 27.530 6,192 6,192 36.920 1,928 1,928 [ 5216.24] 8,121 1,687 9,808 8,120.52 1,687.01 9,807.53 [ 12260.05] 19,778 8,812 19,116 57,499 71,280 176,485 19,778.44 8,811.64 19,1l5.87 57,499.20 71,280.00 176,485.15 BID ITEM = 50000 Land Item SCHEDULE: 100 Description = 72 HR Closure Unit = LS Takeoff Quan: 1.000 EngrQuan: 1.000 There will be two crews working double shifts. 300012031 Crew A QuaD: 48.00 HR HrsfSbrt: 12.00 Cal: 611 WC: WA0201 ··Unrcvicwcll Only 4 shifts. Box culvert set has its own crew. Final shift will be for subs to complete work. Assume 5 12hr shifts. millQ EX 330, OP, GRDCI-lK 75CYIHR 48.00 CH Prod: 4.0000 S Lab Pes: 7.50 Eqp Pes: 5.00 8C0563 COMPACT CAT CP563 1.00 48.00 HR 43.020 2,698 2,698 8D05 D5 DOZER (25k) 1.00 48.00 HR 40.682 2,552 2,552 8EX330 EXCAVCAT330 (71KLB 1.00 48.00 HR 83.223 5,220 5,220 8EXMINI EXC MINI (14K LB) 1.00 48.00 HR 32.064 2,011 2,01l 8LD966 WHEEL LOADER CAT 96 1.00 48.00 HR 74.235 4,656 4,656 LCOM LABORER, COMMON G# 1.50 72.00 MH 34.420 5,707 5,707 OBHH OP ENG BACKHOE 3-5C 1.00 48.00 MH 40.090 4,776 4,776 OBHL OP ENG BACKHOEfL<75 1.00 48.00 MH 39.120 4,692 4,692 ODL OP ENG DOZER D9 & < 1.00 48.00 MH 39.120 4,692 4,692 OFELL OP ENG FE LDR <6 CY G 1.00 48.00 MH 39.570 4,731 4,731 OGRADE OP ENG GRADECHECKE 1.00 48.00 MH 36.610 4,475 4,475 OPAKH OP ENG COMPACTOR H 1.00 48.00 MH 39.120 4,692 4,692 $50,902.34 7.5000 MHfHR 360.00 MH [ 449.752] 33,764 17,138 50,902 7.5000 MHIUnit 1.0000 UnitsfHr 703.42 357.05 1,060.47 30001232 CrewB Quan: 48.00 IIR Ur,/Shft: 12.00 Cal: 612 WC: WA0201 ··Unrc:viewed Assume 4 shifts. EX320 EX 320, OP, GRDCHK. 50CYfHR 48.00 CH Prod: 4.0000 S Lab Pes: 7.50 Eqp Pes: 7.00 8CODIESELCOMDIESEL PLATE COMPAC 1.00 48.00 HR 17.522 1,099 1,099 8COHP COMPACT HOE PACK 1.00 48.00 HR 20.100 1,261 1,261 8D04H D4H DOZER LGP ( 90 HP 1.00 48.00 HR 38.450 2,412 2,412 8EX320 EXCAV CAT 320 (50K LB 1.00 48.00 HR 56.245 3,528 3,528 8FK9K FORKLIFT VR 9K# 1.00 48.00 HR 31.516 1,977 1,977 8LD950 WHL LOADER CAT 950 1.00 48.00 HR 53.296 3,343 3,343 Atkinson Construction Page 5 5274 Lodge Creek Culvert Replacement 07/26/2016 16:26 Phil Larson Activity Resource Dese BID ITEM '" 50000 Description = 72 HR Closure SLOSKID SKIDSTEER LCOM LABORER, COMMON G# OBH OP ENG BACKHOE <3CY OBHL OP ENG BACKHOEIL<75 ODL OP ENG DOZER D9 & < OFELL OP ENG FE LOR <6 CY G OGRADE OPENGGRADECHECKE Quantity P e s Unit 1.00 411 .00 HR 1.50 72.00 MH 1.00 48.00 MH 2.00 96.00 MH 1.00 48.00 MH 1.00 4S .00 MH 1.00 48.00 MH $48,685.72 7.5000 MHlHR 360.00 MH Cost Report Unit C ost Equip. Expend. Labor All Costs Matis. Land Item SCHEDULE: 100 Unit = LS TakeoffQuan: 1.000 21.473 1,347 34.420 5,707 39.570 4,731 39.120 9,384 39.120 4,692 39.570 4,731 36 .610 4,475 [ 448.932] 33,719 14,967 7.5000 MHlUnit 1.0000 UnitslHr 702.48 311.80 > Item Totals: 50000 -72 HR Closure Penn. Sub MatIs. Contract Engr Quan : Total 1.000 1,347 5,707 4,731 9,384 4,692 4,731 4,475 48,686 1,014.29 $99,588.06 720.0000 MHILS 720.00 MH [ 43136.81] 99,588.060 I LS 67,483 67,483 .31 32,105 32,104.75 99,588 99 ,588.06 BID ITEM "" 60000 Description = Box Culvert 35009610 Buy Grout Use 5 cy fo r a short load . 2CONCIO CONCRETE-10 SACK@I 5CONPCY3942 CYRATE 39-42 MET@IO 5CONPHR42M 42 METER PUMP@108% $1 ,756.01 35009c.31 Set Box 1.00 1.00 1.00 Assume 4 hour to set bottom of box. LAB6 6 MAN LABOR CREW LCOM LABORER, COMMON G# 5 .00 LFM LABORER FOREMAN 1.00 $1,920.42 24 .0000 MHILS 24.0000 MHlUnit 35009635 Grout Box As s ume 4 hours to grout and c leanup . LAB6 6 MAN LABOR CREW 8AC375 COMPRESSOR PORT 375 LOO 8WELD400D LCOM LFM $2,119.53 35009640 WELDER 400 AMP LOO LABORER, COMMON G# 5.00 LABORER FOREMAN LOO Set Top 24 .0000 MHILS 24 .0000 MHlUnit Assume 4 hours to set top. Land Item Unit = QuiD: 5.00 CY 5.00 CY 4.00 HR QuiD: 4 .00 CH SCHEDULE: LS Takeoff Quan: 5.00 CY 150.000 2.750 145.000 [ ] 1.00 LS Prod: 34.420 36.920 Hrs/Shlt: Hrs/ShR: 0.3333 S 1,585 335 100 1.000 EngrQuan: 8.80 Cal: 508 WC: WA0201 980 18 758 776 980 155.18 196.02 12.00 Cal: 612 WC: WA0201 Lab Pes: 6 .00 Eqp Pes: 20.00 MH 4.00 MH 24.00 MH 0.2500 UnitslHr [ 1318.18) 1,920 1,920.42 QuaD: 1.00 LS HralShrt: 12.00 Cal: 611 WC: WAOlO! 4.00 Cll PrDd: 0.3333 S Lab Pes: 6.00 EqpPcs: 4.00 HR 25.575 134 4.00 HR 12.520 65 20.00 MH 34.420 1,585 4.00 MH 36.920 335 24.00 MH [ 13l8.18 J 1,920 199 0 .2500 UnitslHr 1,920.42 199.11 QuaD: 1.80 LS Hrs/Shft: 12.00 Cal: 612 WC: WA010I 6 man cre w f o r 1 1 2 hr shift to s e t bo t tome, top and gro ut. ~ 6 MAN LABOR CREW 4 .00 ClI LCOM LFM $1 ,920.42 LABORER., COMMON G# 5 .00 LABORER FOREMAN 1.00 24 .0000 MH/LS 24 .0000 MHlUnit 20.00 MH 4.00 MH 24.00 MH 0 .2500 UnitstHr Prod: 34.420 36.920 [ 1318.18] 0.3333 S 1,585 335 1,920 1,920.42 Lab Pes: 6.00 Eqp Pes: 1.000 "Unreviewed 980 18 758 1,756 35 1,20 ··Unreviewed 0.00 1,585 335 1,920 1,92D.42 2.00 134 65 1,585 335 2,120 2,119 .53 ··Unrcviewed 0.00 1,585 335 1,920 1,920.42 Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Desc BID ITEM = 60000 Description = Box Culvert :JSOO9696 EqulpmeDt Support Pes 5CR300 300 TON CRANE REN@1 LOO 5CR300MOB 300 TON CRANE MOB@ LOO 5CR3000SMOB 300 TON CRANE ONS@! 1.00 $33,375 .67 Quantity Unit 12 .00 HR 1.00 EA 1.00 EA -> Item Totals: 60000 -Box Culvert $41,092.05 72.0000 WIlLS 72.00 MIl 41,092.050 I LS BID ITEM = 70000 Description = BarricrlMBGR 60010115 F&I MBGR Still need final quantities Assume 4 flared end sections 4FLARET Flared End@108% 1.00 4.00 EA 60010117 F&IBarrier Still need final quantities Assume 60' of type 2. 4BARTY2 F&I Type 2 Barric@108% 1.00 60 .00 LF => Item Totals: $20 ,196.00 70000 -BarrlerfMBGR 20,196.000 I LS BID lTEM = 75000 Description = HMA 18000011 HMA Gues s on the tonage for now. 4HMAM Mob HMA@108% 4HMAT HMA@108% $25,542 .0 0 1.00 1.00 ~-=> Item Totals: $25,542 .00 75000 -HMA 25,542.000 I LS BID ITEM = 80000 Description = Traffic Control 1.00 LS 150.00 TON Cost Report Unit Cost Equip. Labor All Costs Land !L~m SCHEDULE: 100 Unit= LS Takeoff Quan: Expend . Matis. 1.000 07/26/2016 Perm. Sub Matis. Contract EngrQuan: Total 1.000 Page 6 16:26 QuaD: 1.00 LS IIn/SbIt: S.OO Cal: 50S WC; WA0201 Land Item 545.000 15,000.000 4,000.000 [ 1 [ 3954.54 1 5,761 5,761.26 SCHEDULE: 8,546 19,602 5,227 33,376 33,375.67 199 34,152 199.11 34,151.58 100 Unit = LS TakcoffQuan: 1.000 980 980.10 EngrQuan: ··Unreviewed 8,546 19,602 5,227 33,376 33,375.67 41,092 41,092.05 1.000 QuaD: 1.00 LS HnlShrt: 8.00 Cal: 50S WC:WA0201 ··Unrevicwed 3,500.000 16,632 16,632 Quan: 1.00 LS HrslSbft: 8.08 Cal: 508 WC:WA0201 "·Unrcvicwed 50.000 3,564 3,564 [ 1 20,196 20,196 20,196.00 20,196.00 Land Item SCHEDULE: 100 Unit = LS TakeoffQuan: 1.000 EngrQuan: 1.000 Quan: 150.00 TON HnlSbft: 8.00 Cal: 508 we: WA0201 5,000.000 110.000 [ 1 [ 1 Land Item SCHEDULE: 100 Unit = LS Takeoff Quan: 1.000 5,940 19,602 25,542 170.28 ... ·Unrcviewcd 5,940 19,602 25,542 170.28 25,542 25,542 25,542.00 25,542.00 EngrQuan: 1.000 Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Desc Quantity Pes Unit Cost Report Unit Cost Equip . Expend. Labor All Costs MatIs. Page 7 07126/2016 16:26 Penn. Sub Matis. Contract Total BID ITEM = 80000 Land Item SCHEDULE: 100 Description = Traffic Control 15001005 Buy Traffic CODtrol Mati At lhis point we don't know what we need. Below are plug pricing for different material. For now we will plug 3 PCMS 100 Drums 10 Type 3 3TCBRL TC BARRELS@108% 1.00 3TCBRLLGT TC BARREL LIGHTS@1O 1.00 100.00 EA 1.00 EA 3TCBRLLGTBATTC BARREL UGHT B@l 1.00 1.00 EAMO 3TCCLBSIGN TC CLASS B SIGNS@108 1.00 3TCFLGSTA TC FLAGGINGSTATI@l 1.00 3TCPCMS TC PCMS@I 08% 1.00 3TCSIGNSTND TC SIGN STANDS@108% 1.00 3TCSPECSIGN TC SPECIAL SIGNS@108 1.00 3TCTY2BAR TC TYPE 2 BARRICA@lO 1.00 3TCTY3BAR TC TYPE 3 BARRICA@IO 1.00 3TCWHITES WHITE SUITS FOR T@lO 1.00 $16,657 .78 15001045 FlaggiDg/Spotting Assume a 4 person crew during c10suer 1 TCS and 3 Labs TCFLAQ TC -FLAGGING 8GENU ENG DRIVEN LITE TOW 1.00 8TRPU450 FLATRACK., BAREBED 1.00 LeOM LABORER, COMMON G# 1.00 LFLAGGER LABORER, PLAGGER G# 2.00 LFM LABORER FOREMAN 1.00 $23,797.75 4 .0000 MHIMH 4.0000 MlIlUnit 1.00 SF 1.00 EA 3.00 EAMO 1.00 EA 1.00 SF 1.00 EA 10.00 EA 1.00 EA 72.00 72.00 HR 72.00 HR 72.00 MH 144.00 MH 72.00 MH 288.00 MH 1.0000 UnitslHr > Item Totals: 80000 -Traffie Control $40,455.53 288 .0000 MHILS 288.00 MH 40,455.530 1 LS PARENT ITEM = 999000 Description = Project Indirects Listing of Sub-Blditems of Parent Item 999000: Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 Quam 1.00 LS HrslSbft: H.OO Cal: 508 WC: WA0201 ··Unrcviewed 60.000 7,841 7,841 20.000 26 26 2.000 3 3 10.000 13 13 2,000.000 2,614 2,614 \,000.000 3,920 3,920 100.000 131 131 15.000 20 20 50.000 65 65 150.000 1,960 1,960 50.000 65 65 [ 1 16,658 16,658 16,657.78 16,657.78 QuaD: 72.00 MH Hrs/Sbft: 12.0Q Cal: 612 WC: WA0201 "·Unrevjewed CH Prod: 6.0000 S Lab Pes: 4 .0 0 Eqp Pes: 2.00 11. 718 1,021 16.167 1,408 34.420 5,707 27.530 9,630 36.920 6,031 [ 199 .287 J 21,368 2,429 296.78 33 .74 [ 14348 .65] 21,368 2,429 16,658 21,368.44 2,429.31 16,657.78 Unit = LS Takeoff Quan: 1.000 EngrQuan: 1,021 1,408 5,707 9,630 6,031 23,798 330.52 40,456 40,455.53 1.000 BID ITEM == 999100 Land Item SCHEDULE: 100 Description = 010005 SACONMGR SASU SASUGEN $19,533.83 SUPERVISION/PROJECT MGMT SupervbloD ==> ==> ==> 1.00 1.00 1.00 0.50 MO 0.00 MO 0.50 MO Unit = LS Takeoff Quan: 1.000 EngrQuan: 0.0 00 QuaD: 1.00 MO Un/Sbft: 8.00 Cal: 508 WC; WA4900 17,137.000 11,259.000 13,148.000 [ J 11,053 8,480 19,534 19,533.83 "Unreviewcd "8unun Code: TRO 11,053 8,480 19,534 19,533.83 Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource BID ITEM Description = 010007 SAADMIN SABUSMGR SAFOM SAPURCH $5,816.61 '" Desc Quantity Pes Unit 999100 SUPERVTSJONIPROJECT MGMT Field omce Manager ==> 1.00 1.00 MO ==> 1.00 0.00 MO => 1.00 0.00 MO ==> 1.00 0.00 MO Cost Report Unit Cost Equip. Labor All Costs Land Item SCHEDULE: 100 Expend. Matis. Unit = LS Takeofl' Quan: 1.000 Page g 07/26/2016 16:26 Perm. Sub Matis . Contract Engr Quan: Total 0.000 Quan: 1.00 MO HrslShft: 8.06 Cal: 508 WC: WA4900 4,509.000 11,259.000 6,095.000 11,259.000 [ ) 5,817 5,817 5,816.61 ··Unreviewed "Summ Code: TRO 5,817 5,817 5,816.61 > Item Totals: $25,350.44 999100 -SUPERVISIONIPROJECT MGMT 25,350.440 1 LS BID ITEM '" 999150 Description = ENGINEERING 010101 Genera' Sitework Engineering SAEN SAENF SAENST $8,480.46 --> => => 1.00 1.00 1.00 0.00 MO 0.00 MO 0.50 MO -> Item Totals: $8,480.46 999150 -ENGINEERING 8,480.460 1 LS BID ITEM ~ 999200 Description = ADMIN FACILITIES & SUPPLIES 010204 Communication (TRO) lITCLMO Cellular Phone Monthly 1.00 6.00 MMO IITDPMO Desk Phone Monthly 1.00 0.00 MO IITHlMB HeavyJob Mobile Subseripti 1.00 4.00 MMO lITINDS DSUCable Internet 1.00 0.00 MO lITlNTI T-J Connection 1.00 0.00 MO $774.40 010205 JOb8ite Sheds I Storage One shed for each crew. IYDSH y ard/J ob Shacks and Sheds 1.00 2.00 EA 010207 Motor Veblcle Eq!enses 3 CPOs for .5 months = 1.5 months 4 crew trucks for .5 months = 2 months 8TRPUl50M CP.O. VEHICLES -MO R 1.00 1.50 MO 8TRPU450M FIELD TRUCKS -MO RE 1.00 2.00 MO $5 ,989.50 [ 1 25,350 25,350.44 Land Item SCHEDULE: 100 Unit = LS Takeoff Quan: 1.000 EngrQuan: 25,350 25,350 .44 0.000 Quan: 1.06 MO HrslSbft: 8.00 Cal: 508 WC: WA4900 "Unreviewed ··Summ Code: TRO 11,259.000 9,909.000 13,148.000 8,480 8,480 [ 1 8,480 8,480 8,480.46 8,480.46 [ 1 8,480 8,480 8,480.46 8,480.46 Land Item SCHEDULE: 100 Unit = LS TakeoffQuan: 1.000 EngrQuan: 0.000 Quan: 1.00 MO HnlShft: 8.00 Cal: 508 WC:WAOZOI "Unreviewcd ··Sunun Code: TRO 100.000 726 726 800.000 10.000 48 48 250.000 1,500.000 [ ) 774 774 774.40 774.40 Quan: 5.00 EA Hn/Sbft: 8.06 Cal: 508 WC:WA0201 "Unrevicwed "Summ Code: FOH 2,000.000 4,840 4,840 Quan: 1.00 MO HnlSbfl: 8.00 Cal: 508 WC:WA0201 "Unreviewed ··Summ Code: TRO 1,300.000 2,360 2,360 1,500.000 3,630 3,630 [ 1 5,990 5,990 Atki oson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Dese BID ITEM = 999200 Pes Description = ADMIN FACILITIES & SUPPLIES Quantity Unil Cost Report Unit Cost Equip. Labor All Costs Land Item SCHEDULE: 100 Expend. Matis. Unit= LS Takeoff Quan: 1.000 5 ,989.50 Page 9 0712 6/201 6 16 :26 Perm. Sub Matis. Contract EngrQuan : Tol al 0 .000 5,989.50 ===> Item Totals: $J 1,603.90 999200 -~DMIN FACILITIES & SUPPLIES 11,603.900 1 LS BID ITEM = 999300 Description = SAFETY 010301 3 SAFEFALL 3SAFESUPP $13,068.65 010305 IMD Job Safei)' ExpensCs SAFETY FALL PROT.@l 1.00 SAFETY SUPP.IES@108 1.00 Medical Ellam I Drug Teit Medical Exams/Drug Testin 1.00 -> Item Totals: 999300 -SAFETY $14 ,278 .65 14,278 .650 ILS BID ITEM = 999400 Description = CLEAN-UP 010402 DumpSler Service ICUMO Debris BoxlMonthly Trash 1.00 ICUSKIP Skip Box Purchase LOO $6,050.00 010464 Final Clran.Up 1.00 EA 1.00 MH 10 .00 EA 3 .00 MO 1.00 EA ICUFN Final Clean-Up 1.00 1,000.00 LS ==> Item Totals: 999400 " CLEAN-UP $7,260 .00 7,260.000 I LS BID ITEM ., 999500 Description = JOBSITE WORK REQUIREMENTS 010514 Small Toob & Suppll~ [ J 5,990 5,614 5,989.50 5,6 14 .40 Land Item S CHEDULE: 100 Unit = LS Takeoff Quan: 1.000 Quan: 1.00 LS lInfShR: 8.00 Cal: 508 10,000.000 13,068 0 .500 I [ I 13,069 13,068.65 QIIOD: 10.00 KA nrslShft: 8.00 Cal: 508 100 .000 1,210 [ ] 14,279 14,278 .65 Land Item SCHEDULE: 100 Unit = LS Takeoff Quan: 1.000 QuaD: 1.00 MO Hn/SUIt: 8.00 Cal: S08 1,000.000 3,630 2 ,000.000 2,420 [ I 6,050 6,050.00 Quan: 10.00 tJR UnlShn: 8.00 Cal: 508 LOOO 1,210 [ 1 7,260 7,260.00 Land Item SCHEDULE: 100 Unit = LS Takeoff Quan : 1.000 Quan: 1.00 LS Hr5/shfi: 8.00 CIII: 508 Th ere are no cost resources jor this activity. 010531 OnnWn!: Water QUlin.: 1.00 MO t/nlSbrt: 8.00 Cal: 508 Engr Quan: WC:WA01OI 11,604 11,603 .90 0.000 "Unreviewed "Summ Code: FOH 13 ,068 I 13,069 13,068.65 WC: WA0201 "Umeviewed "Summ Code: FOH 1,210 14,279 14.27&.65 Engr Quan: 0.000 WC:WAD1OJ "Unreviewed "Summ Code: TRO 3 ,630 2,420 6,0511 6,050 .00 WC:WA020J "Unreviewed "Summ Code : FOH 1,210 7,260 7,260.00 EngrQuan: 0.000 WC:W,<\020J "Unreviewed "Summ Cooe: FOH WC:WA0201 "IJnreviewed "Sun101 Codo: TR O Alkinson Canstl1lction Page 10 5274 Lodge Creek Culvert Replacemenl 07/26/20]6 16:26 Phil Larson Cost Report Activity Resource Desc Pes BID ITEM = 999500 [Jcscriptioll = .I0BSITE WORK REQUIREMENTS ISPH2 Drinking Water 1.00 Quantily Unit 1,00 MO Land [tern Unit= ====> Item Totals: $363.00 999500 -JOBSITE WORK REQUIREMENTS 363.000 1 LS RIO ITEM = 999600 Land Item Description = TEMP. UTlLITIES Unil = 010607 Temp Toilets Quan: IUTPT Portable Toilets 1.00 5.00 EAMO =====> Item Totals: $453.75 999600 -TEMP. UTILITIES 453.750 I LS BID ITEM = 999700 Land Ilem Description = BONDS, INSURANCE, PER.,V1lTS, FEES Unit = 010101 Bonds -General Contractor Quan: lBIPP P&P Bond LOO 1.00 LS 010702 Bonds -Subcontractors Quan: There are no cost resources jor Ihis activity. 010703 BuDder's Risk Insurance Quan: IBIBR Builder's Risk Insurance 1.00 LOO LS 010704 Llcenses/Permits/Fees QuaD: IPE Permitting Expenses 1.00 1.00 LS 010705 Taxes Quan: IBIBOLO Local B&O Tax 1.00 LOO LS IBIBOST State B&O Tax 1.00 1.00 LS $2.42 010706 Insurance gain/Loss Quan: There are 110 cosl resources jor this aclivity. 010707 Legal Fees Quan: lLGCO Legal Counsel LaO 1.00 HR 010708 RR Protective Insurance Quan: IBIRR RR Insurance 1.00 LOO LS Unit Cost Equip. Expend. Perm. Sub MatIs. Contract Labor All Costs MatIs. SCHEDULE: LS Takeoff QUfln: 300.000 [ J SCHEDULE: LS Takeoff Quan: 1.00 EAM Hrs/Sbft: 75.000 [ 1 SCHEDULE: LS Takeoff Quan: 1.00 LS Un/Sbft: 1.000 1.00 LS DrslShft: t.OO LS Un/Sbft: 1.000 1.00 LS UnlSbft: 1.000 1.00 LS HrslShft: 1.000 1.000 [ ] 1.00 LS Un/Sbft: 1.00 LS Drs/SMt: 250.000 1.00 LS Un/Shft: 1.000 100 1.000 363 363 363 .00 100 1.000 8.00 Cal: 508 454 454 453.75 100 1.000 8.00 Cal: 508 8.00 Cal: 508 8.00 Cal: 508 8.00 Cal: 588 8.00 Cal: 508 2 2.42 8.00 Cal: 5011 8.00 Cal: 508 303 8.00 Cal: 508 Engr Quan: Engr Quan: WC:WA0201 Total 0.000 363 363 363.00 0.000 "Unreviowcd "Summ Code: TRO Engr Quan: WC:WA0201 454 454 453.75 0.000 "Unrcviewed "Summ Coue: FOH WC:WA0201 "Unreviewed "Sunun Code: FOH WC:WA:0101 "Unreviewcd "Sunun Code: I'OH WC:WA0101 "Unreviewed "Sunlffi Code: FOH WC:WA0201 "'*Unreviewcd >I<"'Summ Code: FOR 2 2.42 WC:WA0201 ++Umcviewcd *"'Summ Code: FOH WC:WA0201 ·"'Urucviewed **Surnm Code: FOH 303 WC:WA0201 "Unreviewed "Summ Code: FOH Atkinson Construction Page II 5274 Lodge Creek Culvert Replacement 07/26/2016 16:26 Phil Larson Cost Report Activity Resource Desc Pcs Quantity Unit BID ITEM = 999700 Land Item Unit= Description = BONDS, INSURANCE, PERMITS, FEES 010709 Tort Claims Quaa: ILGTO Tort Claims l.00 1.00 LS 010710 Owner's Contract Protect Ins Quan: IBIOC ocrl 1.00 1.00 LS 010713 Liability Insurance QuaD: IBICG Contractor's General Liabili 1.00 1.00 LS 010714 Project Financing Cost QuaD: There are no cost resources for this activity. 010715 JV Expenses QuaD: There are no cost res()urces for this activity. Unit Cost Equip. Labor All Costs Expend. Malls. Penn. Sub Matis. Contract Total SCHEDULE: 100 LS Takeorf Quan: 1.000 Engr Quan: 0.000 1.00 LS Hrs/Sblt: 8.00 Cal: 508 WC:WA0201 "Unrevicwed "Swnm Code: FOH 1.000 1.00 LS HnlSbft: 8.00 Cal: 50S WC:WA0201 ""'Unrcvicwcd ·"Summ Code: FOH 1.000 1.00 LS Hn/Sbft: 8.00 Cal: 50S WC:WA0201 ··Unreviewed ·*Summ Code : FOH 1.000 1.00 LS HrslShft: 8.00 Cal: 508 WC:WA0201 "Unrevlewed "Summ Code: FOH 1.00 LS Hn/Shft: 8.00 Cal: 50S WC:WA0201 ··Unrcvicwcd ... ·Summ Code : FOH ==> Item Totals: 999700 -RONDS, INSURANCE, PERMlTS, FEES $313.39 313.390 I LS BID ITEM :0 999800 Description = EQUIPMENT 010810 Equipment In & Out IEQMB SmaU Equipment Mobes 010S11 Mechanic EJ]len5eS MECHANIC TRUCK - M ~=> EQ MECHANIC G#1 LaO 10.00 EA 1.00 0,50 MO 1.00 100.00 MH Land Item Unit = Quan: QuaD: [ J 313 313 313.39 313.39 SCHEDULE: 100 LS Takeoff Quan: 10.00 EA Hn/shft: 1,100.000 1.00 MO HrslSbft: 1,800.000 1,089 40.680 8,725 LOOO Engr Quan: 0.000 8.00 Cal: 508 WC: WAOZ01 "Unreviewed "Sunun Code: FOH ]3,310 13,310 8.00 Cal: SOS WC: WA020J "U,treviewed "Summ Code: TRO 1,089 8,725 8TRMEM OEMECH $9,813 .89 100.0000 MHIMO 100.00 MH [ 5247.72] 8,725 1,089 9,814 010812 8ACI85 8COVIB 8FK91GvI 8GENLI 8MIWAG RTRWA4 $15,605.81 010813 010814 100.0000 MH/Unit Overhead Equipment Quan: ==> COMPRESSOR POR 1.00 80.00 HR ==> COMPACT HAND VI 1.00 80.00 HR FORKLIFT 9K -MO REN 1.00 0 ,50 MO ==> ENG DRlVEN LITE T l.00 160.00 FIR WATER BUFfALO 1.00 80.00 HR ==> WATER TRUCK 400 1.00 80.00 Hi{ Equipment Adjustment Quan: There (lre 110 cost resources jor this activity. Damaged Equipment Quan: There (Ire 110 cost res()urces jor this actiVity, 8,724.89 1,089.00 1.00 MO IIrs/Shft: 15.886 1,538 12.513 1,211 2,550,000 1,543 11.718 2,269 25.000 2,420 63.375 6,625 [ J [5,606 15,605.81 9,813.89 8.00 Cal: 50S WC: WA0201 "*Unrcvicwcd • ... Summ Code: TRO 1,538 1,211 1,543 2,269 2,420 6.615 15,606 15,605.81 1.00 LS HnlShrt: 8.00 Cal: 50S WC: WA0201 "Unreviewcd "Sunun Code: FOH 1.00 LS Hn/Sbft: S.OO Cal: 508 WC: WAOZOJ "Unreviewed "Sworn Cade: FOH 1\ tkin~on Constmction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Desc BID ITEM = 999800 Description = EQUIPMENT ===> Item Totals: 999800 $38,729.70 100.0000 MlIILS 38,729.700 I L.<; BID ITEM '" 999900 Description = MISCELLANEOUS ==> Item Totals: $0.00 0.000 999900 lLS --> Item Totals: 999000 $106,833.29 100.0000 MHILS t 06,833.290 1 LS $740,069.50 ** * Report Totals »> indicates Non Additive Activity ----·Report Notcs:----- Quantity Pes Unit -EQUIPMENT 100.00 MH -MISCELLANEOUS -Proj eet Indireets 100.00 MH *** 1,969.00 MH The estimate was prepared with BID Quantities. This report shows TAKEOFF Quantities with the resources. "Unreviewed" Activities are marked. Bid Date: Owner: Engineering Finn: Estimator-In-Charge: JOB DOES NOT HAVE NOTES Cost Report Unit Cost Equip. Labor All Costs Land Item SCHEDULE: 100 Unit = LS TakeoffQuan: Expend. Matis. 1.000 (5247.72] 8,725 16,695 13,310 8,724.89 16,69481 13,310_00 Land Item SCHEDULE: 100 Unit = LS Takeoff Quan: 1.000 [ ] Total of Above Sub-Bidltcms [ 5247.72 I 42,556 22,684 41,593 42,555.79 22,684.31 41,593.19 197,932 81,216 149,991 .. on units of MH indicate average labor unit cost was used rather than base rate. [ ] in tbe Unit Cost Column = Labor Unit Cost Without Labor Burdens Page 12 07126/2016 16 :26 Perm. Sub Matis. Contract Engr Quan: EngrQuan: Total 0.000 38,730 38,729.70 0.000 106,833 106,833.29 170,153 140,778 740,070 In equipment resources, rent % and EOE % not = 100% are represented as XXX%YYY where XXX=Rent% and YYY~EOE% ------Calcodar Codes----- 410 4-10HRDAYS 508 5 - 8 HR DAYS STD WORK WEEK (Default Calendar) 509 5 -9 HR DAYS 510 5-IOHRDAYS 610 6-JOHRDAYS 612 SID S12 S8 SX8 WJS W2S XIO X12 6-12 HRDAY SATURDAY -10 HR DAY SATURDAY -12 HRDAY SATUIUJAY -8 HRDAY SA T & SUN -8 HR DAY WEEKEND SINGLE SHIFT NIGHTS WEEKEND WORK ROUND CLOCK SUNDAY -10 HR DAY SUNDAY -12 HR DAY Atkinson Construction 5274 Lodge Creek Culvert Replacement Phil Larson Activity Resource Desc BID ITEM .. 999900 Description = MISCELLANEOUS X8 SUNDAY -8 HR DAY Quantity Pes Unit Co.tReport Unit Cost Equip. Labor All Costs Land Item SCHEDULE: 100 Expend. Matis. Unit= 1.8 Takeoff Quan: 1.000 Page 13 07/26/2016 16 :26 Perm. Sub Matls. Coolract EngrQuan: Total 0.000